JPH0988307A JP24487095A JP24487095A JPH0988307A JP H0988307 A JPH0988307 A JP H0988307A JP 24487095 A JP24487095 A JP 24487095A JP 24487095 A JP24487095 A JP 24487095A JP H0988307 A JPH0988307 A JP H0988307A
Authority
JP
Japan
Prior art keywords
floor
existing floor
drainage channel
base material
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24487095A
Other languages
Japanese (ja)
Inventor
Kamihide Matsubayashi
神秀 松林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Goto Concrete Co Ltd
Original Assignee
Goto Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Goto Concrete Co Ltd filed Critical Goto Concrete Co Ltd
Priority to JP24487095A priority Critical patent/JPH0988307A/en
Publication of JPH0988307A publication Critical patent/JPH0988307A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To perform the new construction of the floor face of a building and repair work at low cost and in a short time by aligning protrusions of approximately truncated cone shape at specified spaces on one face of foundation material, and laying the foundation material on an existing floor in the state of the protrusions pointing to the existing floor so as to form utility space between the foundation material and the existing floor. SOLUTION: Foundation material with protrusions 10 of approximately truncated cone shape aligned with specified spaces on one face is laid on an existing floor 12, in the state of the protrusions 10 pointing to the existing floor 12 so as to form utility space for a drain passage or the like between the foundation material and the existing floor 12. Manual work such as tiling is therefore dispensed with, and the most part of the lower side of the foundation material is made the space for the drain passage or the like excluding the protrusions 10. The new construction of the floor face of a building and repair work can thereby be performed at low cost and in a short time, and convenience of drainage and the like is improved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、例えば既存の床等
に重ねられる基礎材にかかり、特に、地下道の路面、屋
外の床面あるいはOAフロアー等建造物の床面の新設や
手直しをより安価にかつ短時間で行え、しかも、地下道
等路面、床面等の排水性等利便性を内部に形成される利
用空間によりさらに高めることが可能となる基礎材に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation material to be overlaid on, for example, an existing floor, and in particular, it is cheaper to newly install or repair a floor surface of an underpass, an outdoor floor surface, or a floor surface of a building such as an OA floor. The present invention relates to a basic material which can be performed in a short time, and can further enhance the convenience such as drainage of a road surface such as an underground passage, a floor surface, etc. by a use space formed inside.

【0002】例えば、都市の駅前には地下空間がさらに
拡大しており、その地下道等の路面を多数の人が通行し
ている。
For example, an underground space is further expanded in front of a station in a city, and a large number of people pass along the road surface such as the underpass.

【0003】[0003]

【従来の技術】ここで、例えば地下道を新たに設ける場
合、まず基礎面を形成し、次にその上面をコンクリート
で平坦化し、最後に、このコンクリート面をタイルなど
で覆う作業が必要とされる。
2. Description of the Related Art Here, for example, when a subway is newly provided, it is necessary to first form a foundation surface, then flatten the upper surface with concrete, and finally cover the concrete surface with tiles. .

【0004】さらに、排水溝が地下道に沿って設けら
れ、地下道上に流れ出た水は排水溝へ流される様構成さ
れる。
Further, a drainage channel is provided along the underpass so that the water flowing out on the underpass is flowed to the drainage channel.

【0005】[0005]

【発明が解決しようとする課題】しかして、例えば、地
下道などを新設する場合、その地下道をタイルなどで覆
う作業が行われることから、これに多額の費用が必要と
なり、長時間が費やされる。
However, for example, when a subway or the like is newly constructed, since the work of covering the subway with tiles or the like is performed, a large amount of cost is required for this and a long time is spent.

【0006】さらに、タイルなどの貼り直し作業を行う
場合も、費用,時間が同様に必要とされる。
[0006] Further, when the work of reattaching tiles and the like is performed, the cost and time are similarly required.

【0007】そして、多雨時には地下空間へ降雨水が集
中し易く、場合によっては、排水溝が機能不能となって
地下道が浸水する。漏水時においても、この事態をしば
しば招く。
When the rainfall is heavy, the rainwater is likely to concentrate in the underground space, and in some cases, the drainage channel becomes inoperable and the underground passage is flooded. This often happens even when water leaks.

【0008】本発明は上記従来の事情に鑑みて為された
ものであり、その目的は、地下道の路面,屋外の床面あ
るいはOAフロアー等建造物の床面などの新設や手直し
の工事をより安価にかつ短時間で行え、しかも、排水性
等の利便性に極めて優れた基礎材を提供することにあ
る。
The present invention has been made in view of the above-mentioned conventional circumstances, and an object thereof is to perform new construction or repair work on a road surface of an underpass, an outdoor floor surface or a floor surface of a building such as an OA floor. An object of the present invention is to provide a base material that is inexpensive and can be performed in a short time, and that is extremely convenient in terms of drainage and the like.

【0009】[0009]

【課題を解決するための手段】図1において、基礎材
は、略円錐台の突起10が一方の面に所定の間隔で整列
配置され、突起10を既存床12へ指向させた姿勢で既
存床12上に敷設されて既存床12との間に利用空間
(排水路)が形成される。
In FIG. 1, the foundation material is such that projections 10 having a substantially truncated cone shape are aligned on one surface at a predetermined interval, and the projections 10 are directed to the existing floor 12 in the existing floor. A space for use (drainage channel) is formed between the existing floor 12 and the existing floor 12.

【0010】図1において、基礎材は、略円錐台の突起
10が一方の面に所定の間隔で整列配置され、突起10
を既存床12へ指向させた姿勢で既存床12上に敷設さ
れて既存床12との間に利用空間(排水路)が形成さ
れ、他方の面から前記の排水路へ至る水抜き穴14が突
起10を避けた位置に設けられる。
In FIG. 1, the base material is such that projections 10 having a substantially truncated cone shape are arranged on one surface at predetermined intervals, and the projections 10
Is laid on the existing floor 12 in a posture in which the water is directed to the existing floor 12, and a utilization space (drainage channel) is formed between the existing floor 12 and the drainage hole 14 from the other surface to the drainage channel. It is provided at a position avoiding the protrusion 10.

【0011】図1において、基礎材は、略円錐台の突起
10が一方の面に所定の間隔で整列配置され、突起10
を既存床12へ指向させた姿勢で既存床12上に敷設さ
れて既存床12との間に利用空間(排水路)が形成さ
れ、他方の面から前記排水路へ至る水抜き用の長穴14
が前記突起10を避けた位置に設けられる。
In FIG. 1, the base material is such that projections 10 each having a substantially truncated cone shape are arranged on one surface at predetermined intervals, and the projections 10 are formed.
Is laid on the existing floor 12 in a posture of directing to the existing floor 12 to form a use space (drainage channel) between the existing floor 12 and the drainage channel from the other surface to the drainage channel. 14
Are provided at positions avoiding the protrusions 10.

【0012】(作用)地下道の路面、屋外の床面あるい
はOAフロアーの床面などを新設する場合、まず基礎面
を形成し、次にその上面をコンクリート等で平坦化し、
この既存の床12(コンクリート床)上へ基礎材を単に
重ね置く。
(Operation) When a road surface of an underpass, an outdoor floor surface, or a floor surface of an OA floor is newly constructed, first a foundation surface is formed, and then the upper surface is flattened with concrete or the like,
The foundation material is simply laid on this existing floor 12 (concrete floor).

【0013】そして地下道等の面の長手方向へ密に並
べ、地下道等の幅が広い場合には、その地下道を横切る
方向へも基礎材を密に並べる。
Then, the base materials are densely arranged in the longitudinal direction of the surface of the underpass or the like, and when the width of the underpass or the like is wide, the base materials are densely arranged in the direction crossing the underpass.

【0014】したがって、タイル貼りなどの手作業が不
要となり、このため、地下道などをより安価にかつ短時
間に効率良く新設できる。
Therefore, it is not necessary to perform manual work such as attaching tiles, so that an underpass or the like can be newly constructed more efficiently at low cost in a short time.

【0015】基礎材を既存床12上へ重ね置くのみで、
この既存床12との間に排水路等利用空間が形成され、
基礎材下側の大部分が突起10を除いて排水路等の空間
となるので、排水性その他の利便性が著しく良好なもの
となる。
By simply laying the foundation material on the existing floor 12,
A space such as a drainage channel is formed between the existing floor 12 and
Since most of the lower side of the base material is a space such as a drainage channel except for the protrusions 10, the drainage performance and other convenience are significantly improved.

【0016】したがって、排水路とした場合には多雨時
や漏水時に地下へ降雨水が集中しても、地下道が浸水し
て使用不能となることが有効に防止される。
Therefore, when the drainage channel is used, even if rainwater concentrates underground when it is raining or leaking water, it is effectively prevented that the underpass is flooded and unusable.

【0017】また、突起10が略円錐台とされているこ
とから、その太さ,間隔を適切なものに設定したり地下
道用基礎材の全体をコンクリート製とすることで、強固
で耐久性に優れた地下道床などを形成することが可能と
なる。
Further, since the projection 10 is formed into a substantially truncated cone, the thickness and interval of the projection 10 can be set appropriately, or the entire foundation material for the underpass can be made of concrete, so that it is strong and durable. It becomes possible to form an excellent underpass.

【0018】さらに、既存地下道,屋外の床面,OAフ
ロアー等建造物の手直しを行う場合で、これにタイル貼
りが既に施されていたときには、そのタイル貼りの作業
をやり直すことなく、既存のタイル面上へ基礎材を単に
重ね置くのみで良い。
Furthermore, when reconstructing a structure such as an existing underpass, an outdoor floor surface, an OA floor, etc., when tiles have already been applied to the structures, the existing tiles need to be re-executed without redoing the operation. It is sufficient to simply lay the foundation material on the surface.

【0019】水抜き穴14が前記突起10を避けた位置
に設けられることから、基礎材の下側へ効率良く排水さ
れ、地下道等の路面上に水溜りが生ずることはない。
Since the drain hole 14 is provided at a position avoiding the protrusions 10, the drainage holes 14 are efficiently drained to the lower side of the foundation material, and no water pool is formed on the road surface such as an underground passage.

【0020】水抜き用(排水用)の穴14が長穴とされ
ることから、排水性がより高められる。
Since the hole 14 for draining water (for drainage) is a long hole, drainage is further enhanced.

【0021】しかも、この長穴を地下道の路面、屋外の
床面あるいはOAフロアーの床面等の新設時や手直し時
に吊上げ用のフック穴として使用すれば、その作業をよ
り容易に能率良く行うことが可能となる。
Moreover, if this long hole is used as a hook hole for lifting at the time of new construction or repair of the road surface of an underpass, the outdoor floor surface or the floor surface of the OA floor, the work can be performed more easily and efficiently. Is possible.

【0022】[0022]

【実施例】図1は本発明の一実施例を示す斜視図であ
り、本実施例の基礎材はガラス繊維を含有したコンクリ
ート製とされ、強度の向上が図られていると共に、その
軽量化が企図されている。
EXAMPLE FIG. 1 is a perspective view showing an example of the present invention, in which the base material of this example is made of concrete containing glass fibers to improve its strength and reduce its weight. Is intended.

【0023】図2は本実施例の縦断面を説明するもの
で、その下面には突起10が所定の間隔で整列配置され
ている。
FIG. 2 illustrates a vertical cross section of this embodiment, and projections 10 are arranged on the lower surface of the projection 10 at predetermined intervals.

【0024】図3は本実施例を裏返して示すもので、同
図及び図2から理解されるように、各突起10は円錐台
状とされており、周側面が裾方向にRして断面積が次第
に増大している。
FIG. 3 shows this embodiment turned upside down. As can be understood from this drawing and FIG. 2, each projection 10 is in the shape of a truncated cone, and the peripheral side surface is rounded in the hem direction and cut off. The area is gradually increasing.

【0025】したがって、それら突起10の太さ,間隔
を適切なものに設定することで、圧縮に強く耐久性に優
れた地下道の路面、屋外の床面あるいはOAーフロアー
等の床面が形成される。
Therefore, by setting the thicknesses and intervals of the projections 10 to appropriate values, a road surface of an underpass, an outdoor floor surface or an OA-floor surface which is resistant to compression and has excellent durability is formed. .

【0026】また、図2及び図3から理解されるよう
に、多数の水抜き穴14が突起10を避けた位置に設け
られている。
Further, as understood from FIGS. 2 and 3, a large number of drain holes 14 are provided at positions avoiding the protrusions 10.

【0027】これら水抜き穴14は図4のように長穴と
されており、かつ、本実施例の基礎材を上下に貫通して
いる。
These drain holes 14 are elongated holes as shown in FIG. 4, and penetrate the base material of this embodiment vertically.

【0028】その基礎材は図1のように突起10を既存
床12へ指向させた姿勢で既存床12上に敷設される。
The base material is laid on the existing floor 12 in a posture in which the projections 10 are directed to the existing floor 12 as shown in FIG.

【0029】敷設作業は長穴の水抜き穴14を金具でフ
ックして吊上げることにより行われる。
The laying work is carried out by hooking the water draining hole 14 which is a long hole with a metal fitting and lifting it.

【0030】図5から理解されるように、本実施例の基
礎材は地下道等床面の長手方向及びこれを横切る方向へ
密に並べられ、既存床12の上面を覆う。
As can be seen from FIG. 5, the foundation material of this embodiment is densely arranged in the longitudinal direction of the floor surface of the underground passage and in the direction crossing the floor surface and covers the upper surface of the existing floor 12.

【0031】基礎材の吊上げには重機を使用することが
好ましく、重機を使用すれば、敷設作業を省力化して効
率良く行える。本実施例の板材は重機の重さ及び走行に
も十分に耐えられる。
It is preferable to use a heavy machine for hoisting the foundation material. If a heavy machine is used, the laying work can be saved and can be performed efficiently. The plate material of this embodiment can sufficiently withstand the weight of heavy machinery and running.

【0032】基礎材の敷設が完了すると、既存床12と
の間に排水路トンネル(利用空間)が図6のように形成
され、基礎材の下側を縦横に走る。
When the laying of the base material is completed, a drainage tunnel (utilization space) is formed between the existing floor 12 and the existing floor 12 and runs vertically and horizontally under the base material.

【0033】既存床12は、地下道等床面を新設する際
に基礎面を平坦化したコンクリート床とされている。
The existing floor 12 is a concrete floor whose base surface is flattened when a floor surface such as an underpass is newly constructed.

【0034】また既存地下道等の手直し時においては、
コンクリート床上に貼られたタイル面とされている。
When repairing an existing underpass, etc.,
It is said to be a tile surface attached on a concrete floor.

【0035】本実施例の基礎材は以上のように構成され
ており、以下、その作用を詳細に説明する。
The base material of this embodiment is configured as described above, and its operation will be described in detail below.

【0036】地下道等床面を新設する場合、まず基礎面
を形成し、次に基礎上面をコンクリートで平坦化し、こ
のコンクリート床12上へ本実施例の基礎材を単に重ね
置く。
In the case of newly constructing a floor surface such as an underpass, a foundation surface is first formed, then the foundation upper surface is flattened with concrete, and the foundation material of this embodiment is simply placed on the concrete floor 12.

【0037】その基礎材の敷設作業は、長穴14を金具
でフックして重機で吊上げ、地下道等の長手方向と地下
道等を横切る方向へ基礎材を図5のように密に並べるこ
とにより、行われる。
The laying work of the base material is carried out by hooking the elongated holes 14 with metal fittings and hoisting them with a heavy machine, and arranging the base materials densely in the longitudinal direction of the underpass or the direction crossing the underpass as shown in FIG. Done.

【0038】すなわち、タイル貼りの手作業が省略さ
れ、このため、地下道の床面等の工費が著しく削減さ
れ、その工期も大幅に短縮される。
That is, the manual work of tile application is omitted, so that the construction cost of the floor surface of the underpass is remarkably reduced, and the construction period is also remarkably shortened.

【0039】また、既存地下道等既存床面の手直しを行
う場合は、タイルの路面上に本実施例の基礎材が新設時
と同様にして敷設される。
When the existing floor surface such as an existing underpass is to be repaired, the base material of this embodiment is laid on the tile road surface in the same manner as when the new building is installed.

【0040】したがって既存地下道等における既存床面
の手直しを行う場合にも、地下道等床面の工費が著しく
削減され、その工期も大幅に短縮される。
Therefore, even when the existing floor surface of the existing underground passage is reworked, the construction cost of the floor surface of the underground passage is remarkably reduced and the construction period is also remarkably shortened.

【0041】なお、本実施例の基礎材がコンクリート製
とされ、各突起10が円錐台状とされ、その周側面が裾
方向にRして断面積が次第に増大していることから、本
実施例の基礎材は重機の重さ及び走行にも十分に耐えら
れる。
The base material of the present embodiment is made of concrete, each protrusion 10 has a truncated cone shape, and the peripheral side surface thereof is rounded toward the hem direction, and the cross-sectional area gradually increases. The example base material can withstand the weight and running of heavy equipment.

【0042】また、本実施例の基礎材がガラス繊維を含
有したコンクリート製とされて軽量化されていることか
ら、重機を用いることなく人手のみでも敷設作業を行え
る。
Further, since the base material of this embodiment is made of concrete containing glass fibers and is lightweight, it is possible to perform the laying work by hand without using a heavy machine.

【0043】ここで、基礎材が既存床12上へ重ね置か
れると、この既存床12との間に排水路等の利用空間が
形成され(図6参照)、基礎材下側が突起10部分を除
いて全て排水路等の利用空間となるので、地下道の排水
性等の利便性が著しく良好なものとなる。
Here, when the foundation material is laid on the existing floor 12, a utilization space such as a drainage channel is formed between the foundation material and the existing floor 12 (see FIG. 6), and the lower portion of the foundation material forms the projection 10 portion. Except for the drainage channel, all of the space will be used space, so the convenience of drainage of the underpass will be extremely good.

【0044】したがって、多雨時や漏水時に地下等へ降
雨水が集中して従来は地下道が浸水するときにおいて
も、地下道面が水没することはなく、このため、通常の
ときと同様に通行できる。
Therefore, even when rainwater is concentrated under the ground and is flooded by an underground passage at the time of heavy rain or water leakage, the surface of the underground passage is not submerged, and therefore, the passage can be carried out in the same manner as usual.

【0045】また、突起10が略円錐台とされて板材が
コンクリート製とされるので、地下道等床面は耐久性に
優れ、長期間に亘りそのまま使用できる。
Further, since the projection 10 is formed into a substantially truncated cone and the plate material is made of concrete, the floor surface such as an underpass has excellent durability and can be used as it is for a long period of time.

【0046】さらに、水抜き穴14が前記突起10を避
けた位置に設けられることから、地下道等の路面上に水
が溜ることなくそのまま基礎材の下側へ排出され、この
ため、地下道等の通行中に水跳ねが生ずることはない。
Further, since the drain hole 14 is provided at a position avoiding the projections 10, the water is drained as it is to the lower side of the foundation material without accumulating on the road surface such as an underground passage. No water splashes will occur during passage.

【0047】しかも、水抜き(排水用)の穴14が長穴
とされることから、地下道の排水性等の利便性が極めて
高い。
Moreover, since the drainage (drainage) hole 14 is a long hole, the drainage performance of the underpass is extremely convenient.

【0048】そして、既存床12との間に形成された利
用空間(排水路トンネル)内にガス,上下水の配管や電
気,電話の配線も行える。尚、本実施例において前記既
存床の代わりに本発明の基礎材を仰向けにして設置し、
すなわち、突起10を上側にして設置し、その上に基礎
材を重ねるようにして設置することもできる。
In the use space (drainage tunnel) formed with the existing floor 12, gas, water and sewer pipes, electricity, and telephone wiring can be installed. In this example, the foundation material of the present invention is placed on the back instead of the existing floor,
That is, the protrusion 10 may be placed on the upper side, and the base material may be placed on the protrusion 10 so as to be placed thereon.

【0049】この場合は利用空間が更に広くなる。In this case, the use space becomes wider.

【0050】以上説明したように本実施例によれば、略
円錐台の突起10が一方の面に所定の間隔で整列配置さ
れ、突起10を既存床12へ指向させた姿勢で既存床1
2上に敷設されて既存床12との間に利用空間(排水
路)が形成され、他方の面から排水路へ至る水抜き用の
長穴14が突起10を避けた位置に設けられるので、地
下道の路面,屋外の床面あるいはOAフロアー等の建造
物の床面の新設や手直しの工事に要する費用を削減し、
またその工期を短縮し、さらに地下道の排水性の利便性
を向上させることが可能となる。
As described above, according to the present embodiment, the substantially circular truncated cone projections 10 are arranged on one surface at a predetermined interval, and the projections 10 are oriented toward the existing floor 12 so that the existing floor 1 can be positioned.
Since the utilization space (drainage channel) is formed between the existing floor 12 and the second floor, and the long hole 14 for draining water from the other surface to the drainage channel is provided at a position avoiding the protrusion 10. Reduce the cost required for new construction and repair work on the floor surface of structures such as underpasses, outdoor floors or OA floors,
Also, the construction period can be shortened and the drainage convenience of the underpass can be improved.

【0051】そして、基礎材がコンクリート製とされる
ので、地下道等の耐久性が高められ、重機を使用するこ
とで工期を大幅に短縮できる。
Since the base material is made of concrete, the durability of the underpass and the like is enhanced, and the construction period can be greatly shortened by using a heavy machine.

【0052】[0052]

【発明の効果】以上説明したように本発明によれば、略
円錐台の突起が一方の面に所定の間隔で整列配置され、
突起を既存床へ指向させた姿勢で既存床上に敷設されて
既存床との間に利用空間(排水路)が形成されるので、
タイル貼りなどの手作業を不要して地下道工事等に要す
る費用を削減し、その工期を短縮し、かつ、地下道等の
排水性等の利便性を高めることが可能となる。
As described above, according to the present invention, the projections of the substantially truncated cone are arranged on one surface at a predetermined interval,
Since the projection is directed to the existing floor, it is laid on the existing floor and the space used (drainage channel) is formed between it and the existing floor.
By eliminating the need for manual work such as tiling, it is possible to reduce the cost required for underpass construction, shorten the construction period, and improve the convenience of drainage of underpasses.

【0053】また、基礎材を貫通して前記の排水路へ至
る水抜き穴14が突起10を避けた位置に設けられるの
で、地下道の路面上に水が溜ることなくそのまま基礎の
下側へ排出され、このため、地下道の通行中に水跳ねが
生ずることはない。
Further, since the drain hole 14 which penetrates the foundation material and reaches the drainage channel is provided at a position avoiding the projection 10, the water is not drained on the road surface of the underpass and is drained to the lower side of the foundation as it is. Therefore, water splashes do not occur during passage of the underpass.

【0054】そして、水抜き用として長穴14が設けら
れるので、基礎の排水性がより高められ、さらに、これ
をフック穴として利用することにより板材敷設の作業を
効率良く行うことが可能となる。
Since the long hole 14 is provided for draining water, the drainage of the foundation is further improved, and by using this as a hook hole, the work of laying the plate material can be efficiently performed. .

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例の全体構成を示す斜視図である。FIG. 1 is a perspective view showing the overall configuration of an embodiment.

【図2】実施例の縦断面説明図である。FIG. 2 is a vertical cross-sectional explanatory view of an example.

【図3】実施例の裏返し斜視図である。FIG. 3 is a perspective view showing an inside out of the embodiment.

【図4】水抜き穴の説明図である。FIG. 4 is an explanatory diagram of a drain hole.

【図5】基礎材敷設作業の説明図である。FIG. 5 is an explanatory diagram of a foundation material laying operation.

【図6】排水路形成作用の説明図である。FIG. 6 is an explanatory diagram of a drainage channel forming action.

【符号の説明】[Explanation of symbols]

10 突起 12 既存床 14 水抜き用の長穴 10 Protrusion 12 Existing floor 14 Long hole for draining water

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04G 23/02 E04G 23/02 E ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI Technical display location E04G 23/02 E04G 23/02 E

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 略円錐台の突起(10)が一方の面に所
定の間隔で整列配置され、 前記突起(10)を既存床(12)へ指向させた姿勢で
該既存床(12)上に敷設されて該既存床(12)との
間に利用空間が形成される、 ことを特徴とした基礎材。
1. Protrusions (10) of substantially frusto-conical shape are aligned on one surface at a predetermined interval, and the protrusions (10) are oriented on the existing floor (12) on the existing floor (12). A base material, which is laid on a floor to form a space for use with the existing floor (12).
【請求項2】 略円錐台の突起(10)が一方の面に所
定の間隔で整列配置され、 前記突起(10)を既存床(12)へ指向させた姿勢で
該既存床(12)上に敷設されて該既存床(12)との
間に排水路が形成される、 ことを特徴とした基礎材。
2. The substantially circular truncated cone projections (10) are arranged on one surface at predetermined intervals, and the projections (10) are oriented on the existing floor (12) on the existing floor (12). A base material, which is laid on a floor to form a drainage channel between the floor and the existing floor (12).
【請求項3】 略円錐台の突起(10)が一方の面に所
定の間隔で整列配置され、 前記突起(10)を既存床(12)へ指向させた姿勢で
該既存床(12)上に敷設されて前記既存床(12)と
の間に排水路が形成され、 他方の面から前記排水路へ至る水抜き穴(14)が前記
突起(10)を避けた位置に設けられる、 ことを特徴とした基礎材。
3. The substantially frustoconical projections (10) are arranged on one surface at predetermined intervals, and the projections (10) are oriented on the existing floor (12) on the existing floor (12). A drainage channel is formed between the drainage channel and the existing floor (12), and a drainage hole (14) from the other surface to the drainage channel is provided at a position avoiding the protrusion (10). Basic material characterized by.
【請求項4】 略円錐台の突起(10)が一方の面に所
定の間隔で整列配置され、 前記突起(10)を既存床(12)へ指向させた姿勢で
該既存床(12)上に敷設されて前記既存床(12)と
の間に排水路が形成され、 他方の面から前記排水路へ至る水抜き用の長穴(14)
が前記突起(10)を避けた位置に設けられる、 ことを特徴とした基礎材。
4. The substantially frustoconical projections (10) are arranged on one surface at predetermined intervals, and the projections (10) are oriented on the existing floor (12) on the existing floor (12). And a drainage channel is formed between the drainage channel and the existing floor (12), and the drainage channel extends from the other surface to the drainage channel (14).
Is provided at a position avoiding the protrusions (10).
【請求項5】 前記既存床(12)の代わりに請求項1
乃至4記載の基礎材を前記略円錐台の突起(10)を上
方にして設置し、 突起(10)を前記基礎材へ指向させた姿勢で前記基礎
材上に敷設され、該基礎材との間に利用空間が形成され
る、 ことを特徴とした請求項1、請求項2、請求項3及び請
求項4記載の基礎材。
5. The method of claim 1 in place of the existing floor (12).
The base material according to any one of claims 1 to 4 is installed with the projection (10) of the substantially truncated cone facing upward, and the base material is laid on the base material in a posture in which the projection (10) is directed toward the base material. A base material according to claim 1, claim 2, claim 3 or claim 4, wherein a utilization space is formed therebetween.
JP24487095A 1995-09-22 1995-09-22 Foundation material Pending JPH0988307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24487095A JPH0988307A (en) 1995-09-22 1995-09-22 Foundation material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24487095A JPH0988307A (en) 1995-09-22 1995-09-22 Foundation material

Publications (1)

Publication Number Publication Date
JPH0988307A true JPH0988307A (en) 1997-03-31

Family

ID=17125230

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24487095A Pending JPH0988307A (en) 1995-09-22 1995-09-22 Foundation material

Country Status (1)

Country Link
JP (1) JPH0988307A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002174024A (en) * 2000-09-26 2002-06-21 Tajima Inc Surface-finished floor tile for air-conditioning double floor
JP2013014900A (en) * 2011-07-01 2013-01-24 Sekisui House Ltd Floor structure
JP3197423U (en) * 2015-02-25 2015-05-14 三山工業株式会社 Septic tank foundation plate and septic tank
JP2016124764A (en) * 2015-01-06 2016-07-11 日本電気硝子株式会社 Micro hole array and method of manufacturing the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002174024A (en) * 2000-09-26 2002-06-21 Tajima Inc Surface-finished floor tile for air-conditioning double floor
JP2013014900A (en) * 2011-07-01 2013-01-24 Sekisui House Ltd Floor structure
JP2016124764A (en) * 2015-01-06 2016-07-11 日本電気硝子株式会社 Micro hole array and method of manufacturing the same
JP3197423U (en) * 2015-02-25 2015-05-14 三山工業株式会社 Septic tank foundation plate and septic tank

Similar Documents

Publication Publication Date Title
JP6022512B2 (en) Draining material using a waterproof sheet
CN113175163B (en) Construction method of integrated roof node structure
KR100629782B1 (en) Double floor type inducing waterproof structure having level-down of slab edge and green roof structure using the same
CN111851877A (en) Flat roof drainage method
JPH0988307A (en) Foundation material
CN110552450A (en) Construction method of large-span short-vertical-edge vertical double-lock-edge titanium-zinc alloy metal roof
JP6027389B2 (en) Foundation structure built using the frame of an existing structure
CN106939671A (en) Metal sandwich roof plate construction method
CN1059726C (en) Construction method and apparatus against gap leakage between panel and pipe
KR100661018B1 (en) Double floor type inducing waterproof system and green roof structure using the same
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN111058467B (en) Basement backwater surface waterproof drainage structure and construction method
CN211691115U (en) Pre-buried device of roofing downspout
KR200420547Y1 (en) Double floor type inducing waterproof system and green roof structure using the same
CN113684957A (en) Combined floor slab and construction method thereof
JP2010209627A (en) Drainage structure of roof
JP2006161453A (en) Construction method for repairing batten seam roof
CN112900653A (en) Construction method of waterproof structure of expansion joint of toilet
CN220058582U (en) Roof skylight drainage node structure
CN217782616U (en) Roof drainage structure
CN212026892U (en) Waterproof node of roof fan base
CN216516213U (en) Waterproof device for reserved circular horizontal opening of prefabricated laminated slab
CN213926967U (en) Precast concrete U type groove is with layer drainage structures
CN220267041U (en) Drainage cornice structure in aluminum alloy
CN218438229U (en) Cast-in-place anti-bank structure of aluminium mould

Legal Events

Date Code Title Description
A02 Decision of refusal

Effective date: 20040316

Free format text: JAPANESE INTERMEDIATE CODE: A02