JPH0978525A - Suspending method and suspending device for diagonal member cable - Google Patents

Suspending method and suspending device for diagonal member cable

Info

Publication number
JPH0978525A
JPH0978525A JP23826395A JP23826395A JPH0978525A JP H0978525 A JPH0978525 A JP H0978525A JP 23826395 A JP23826395 A JP 23826395A JP 23826395 A JP23826395 A JP 23826395A JP H0978525 A JPH0978525 A JP H0978525A
Authority
JP
Japan
Prior art keywords
strand
chute
erection
guide means
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23826395A
Other languages
Japanese (ja)
Other versions
JP2680290B2 (en
Inventor
Akiyoshi Suzuki
昭好 鈴木
Taku Minagawa
卓 皆川
Wataru Ohashi
渡 大橋
Masamitsu Takei
雅光 武井
Shigeo Shoji
茂雄 庄司
Kimio Mine
公雄 峰
Shigeki Nakamura
茂樹 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
S II KK
JFE Steel Corp
JFE Techno Wire Corp
Original Assignee
S II KK
Kawatetsu Wire Products Co Ltd
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by S II KK, Kawatetsu Wire Products Co Ltd, Kawasaki Steel Corp filed Critical S II KK
Priority to JP23826395A priority Critical patent/JP2680290B2/en
Publication of JPH0978525A publication Critical patent/JPH0978525A/en
Application granted granted Critical
Publication of JP2680290B2 publication Critical patent/JP2680290B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To facilitate suspending work by suspending and supporting the suspension chute of an upper opening on a guide rope suspended between a main tower side and a bridge girder side, feeding a strand in sequence from one end side of the chute, and guiding it to the other end side. SOLUTION: Each strand is suspended into the through hole of a fixing section 2a via a suspension chute 4 suspended between the fixing sections 2a so that the strand can be stretched and extracted from an opening section. When a lead body is fitted at the tip section of the strand, the release of the strand from the chute 4 is prevented by the lead body even when the strand is warped and bent when it passes through the chute 4. The whole suspension chute 4 is flexibly warped between the fixing section 2a on the main tower 2 side of a diagonal suspension bridge 1 and the fixed section 2a of a bridge girder 3 side. An unreasonable load by the weight of the strand at the head/tail connection portion of the single chute is excluded, and the work efficiency can be improved.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、例えば、斜張橋の
斜材ケーブルを、主塔と橋桁との間の定着部に架設する
場合におけるケーブル架設方法とその方法に使用される
架設装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cable laying method and a erection device used in the method for laying, for example, a diagonal cable of a cable-stayed bridge in a fixing portion between a main tower and a bridge girder. .

【0002】[0002]

【従来の技術】従来、斜張橋や吊り橋における斜材ケー
ブルを架設する方法は、従来例として、斜張橋の主塔
側と橋桁側の定着部の間に予めガイドワイヤーを架設
し、このガイドワイヤーに巻上げワイヤを移動自在に懸
吊させ、該巻き上げワイヤで合成樹脂製の円筒管である
防錆用の架設シースを主塔側と橋桁側の定着部間に架設
し、その架設シース内に例えば主塔側からPC鋼線若し
くはPC鋼より線のストランドを複数本挿通させ、前記
両定着部のアンカーヘッドで緊張・定着させ、前記架設
シース内に防錆材をグラウトする方法が知られている。
2. Description of the Related Art Conventionally, as a conventional method for constructing a cable cable in a cable-stayed bridge or suspension bridge, a guide wire is installed in advance between the main tower side of the cable-stayed bridge and the anchor portion on the bridge girder side. The hoisting wire is movably suspended on the guide wire, and a rustproof erection sheath, which is a cylindrical tube made of synthetic resin, is erected between the main tower side and the fixing part on the bridge girder side with the hoisting wire. For example, there is known a method in which a plurality of strands of PC steel wire or PC steel stranded wire is inserted from the main tower side, tensioned and fixed by the anchor heads of the both fixing portions, and a rust preventive material is grouted in the erection sheath. ing.

【0003】また、従来例として、最初に、主塔側と
橋桁側の定着部間に、ポリエチレン等の保護材で各々の
ストランドが被覆されたマルチストランドの斜材ケーブ
ルにおける、最初のストランドを架設して緊張しこれを
ガイドケーブルの代わりとし、その後、複数本の小ケー
ブルとUボルト及び台車等で形成される誘導ケージでも
って前記最初のストランドに懸吊させて、引張ケーブル
と特殊な台車などで後続のストランドの頭部を引っか
け、前記引張ケーブルをウインチで巻き上げることによ
って橋桁側から主塔側へと当該後続のストランドを引っ
張り上げ、ストランドの頭部を前記台車から外して定着
部のアンカーヘッドに挿通させ、楔等の定着部材で定着
させて架設しジャッキなどで緊張させ、その後、前記誘
導ケージを撤去する架設方法が知られている(特開平6
−299517号)。
Further, as a conventional example, first, the first strand in a multi-strand diagonal cable in which each strand is covered with a protective material such as polyethylene is erected between the fixing portions on the main tower side and the bridge girder side. Then, it is tensioned and used as a substitute for the guide cable, and then it is suspended on the first strand by a guide cage formed by a plurality of small cables, U bolts, and a dolly, and a pulling cable and a special dolly, etc. The head of the subsequent strand is hooked with, and the tensile cable is wound up with a winch to pull the subsequent strand from the bridge girder side to the main tower side, the strand head is removed from the carriage, and the anchor head of the fixing unit The guide cage, and then fix it with a fixing member such as a wedge and erect it with a jack or the like, and then remove the guide cage. The method is known (JP-A-6
-299517).

【0004】[0004]

【発明が解決しようとする課題】しかしながら、従来例
では、防錆用の架設シースに各ストランドを複数本挿
通させるので、挿通させた本数が増えるに従って架設シ
ース内が輻輳して挿通させ難くなり、架設シース内で捩
れてしまって定着部のアンカーヘッドの貫通孔に通す際
に対応箇所を取り違えてしまう等の不都合があり、架設
シースにグラウトするのも手間の掛かるものであった。
However, in the conventional example, since a plurality of strands are inserted into the rust-proof erection sheath, the inside of the erection sheath becomes more congested and difficult to be inserted as the number of inserted strands increases. There is an inconvenience such as twisting in the erection sheath and mistakenly corresponding portions when passing through the through hole of the anchor head of the fixing portion, and it is troublesome to grout the erection sheath.

【0005】また、前記従来例では、誘導ケージの形
成が容易ではなく、各ストランドが橋桁側から主塔側へ
と引張ケーブルで引き上げられるので、Uボルト間にお
いて重いストランドが弛むことになり、引き上げ負荷が
増大して長大な斜材ケーブルの架設に適しているとは言
えず、更に、引き上げたストランドの頭部を台車から外
して定着部のアンカーヘッドに挿通させるのは主塔側に
おける高所作業で手間が掛かると言う問題点がある。
Further, in the above-mentioned conventional example, the formation of the induction cage is not easy, and each strand is pulled up from the bridge girder side to the main tower side by the pulling cable, so that the heavy strand is loosened between the U bolts, and the pulling up is performed. It cannot be said that it is suitable for erection of a long diagonal cable due to increased load.In addition, it is a high place on the main tower side that the head of the pulled-up strand is removed from the carriage and inserted into the anchor head of the fixing part. There is a problem that it takes time to work.

【0006】このように、従来の斜材ケーブルの架設方
法は、架設作業の容易性において解決すべき課題を有し
ていた。
As described above, the conventional method for laying a diagonal cable has a problem to be solved in terms of easiness of erection work.

【0007】[0007]

【課題を解決するための手段】本発明に係る斜材ケーブ
ルの架設方法の上記課題を解決するための要旨は、主塔
側の定着部と橋桁側の定着部との間に複数のストランド
からなる斜材ケーブルを緊張して架設する方法であっ
て、前記主塔側と橋桁側との定着部間にガイドロープを
架設し、該ガイドロープに上部が開口するガイド手段を
吊垂支持させ、該ガイド手段の一端側からストランドを
順次供給して他端側へガイドさせるようにしたことであ
る。
The gist of the method for constructing a diagonal cable according to the present invention for solving the above-mentioned problems is to provide a plurality of strands between a fixing portion on the main tower side and a fixing portion on the bridge girder side. In the method of tensioning the diagonal cable, the guide rope is erected between the fixing portions of the main tower side and the bridge girder side, and the guide rope is hung and supported by the guide means having an upper opening. That is, the strands are sequentially supplied from one end side of the guide means and guided to the other end side.

【0008】そして、前記両定着部間でストランドを緊
張させることにより、ガイド手段の上部開口から当該ス
トランドを抜け出させて架設すること、;前記ストラン
ドの先端部に、ガイド手段の開口部からのストランドの
抜け出しを防止する先導体を装着すること、;更に、前
記先導体に、ガイド手段の開口部から突出しストランド
先端部の移動位置を示す指標部が設けられているこ
と、;前記ストランドを、主塔側の定着部から橋桁側の
定着部へとガイド手段に挿通させること、;前記ガイド
手段は、筒状体であってその縦断面形状が、上部の開口
部を形成するテーパ部と、下部の矩形部で形成され、ス
トランドの挿通時に当該ストランドの波打ちがあっても
前記矩形部で上方に移動しないように規制したこと、;
そして、前記ガイド手段の開口部の幅を、先導体の外径
よりも小さく、かつ、ストランドの直径よりも大きく形
成し、ストランドをガイド手段に挿通させている時に前
記開口部から前記先導体が抜け出さないようにし、か
つ、ストランドをガイド手段に挿通させた後に前記開口
部からストランドの抜け出しを可能にしたこと、;前記
ガイド手段は、所要長さの単体シュートを首尾連接して
なる架設シュートであり、各単体シュートが吊垂支持手
段の下端部に回動自在に取り付けられ、ガイドロープの
撓みに追従できるようにしたことである。
Then, by tensioning the strand between the both fixing portions, the strand is pulled out from the upper opening of the guide means and installed, and the strand from the opening portion of the guide means is attached to the tip of the strand. Mounting a leading conductor for preventing the strand from coming off; further, the leading conductor is provided with an indicator portion projecting from the opening of the guide means and indicating the movement position of the strand tip portion; Inserting the guide means from the fixing portion on the tower side to the fixing portion on the bridge girder; the guide means is a tubular body, and the longitudinal cross-sectional shape thereof is a tapered portion forming an upper opening, and a lower portion. Of the rectangular portion, and is regulated so as not to move upward in the rectangular portion even when the strand is wavy when the strand is inserted.
Then, the width of the opening of the guide means is formed smaller than the outer diameter of the leading conductor and larger than the diameter of the strand, and when the strand is inserted into the guiding means, the leading conductor is cut from the opening. To prevent the strand from slipping out, and to allow the strand to slip out from the opening after inserting the strand into the guide means; the guide means is an erection chute in which unit chutes of a required length are continuously connected. That is, each single chute is rotatably attached to the lower end portion of the suspension supporting means so that it can follow the bending of the guide rope.

【0009】本発明に係る斜材ケーブルの架設装置の要
旨は、主塔と橋桁との両定着部間にケーブルを架設する
ための架設装置であって、前記両定着部間に架設される
ガイドロープと、該ガイドロープに吊垂支持手段で支持
させた架設シュートと、からなり、前記架設シュートの
上部にストランドの抜け出し用の開口部が設けられてい
ることである。
The gist of the diagonal cable erection device according to the present invention is a erection device for laying a cable between both fixing parts of a main tower and a bridge girder, and a guide installed between the both fixing parts. It is composed of a rope and an erection chute supported on the guide rope by suspending and supporting means, and an opening for pulling out a strand is provided on an upper part of the erection chute.

【0010】前記架設シュートは、筒状体であってその
縦断面形状が、上部の開口部を形成するテーパ部と、下
部の矩形部で形成されていること、;そして、前記架設
シュートの開口部の幅が、ストランドの端部に取り付け
られる先導体の外径よりも小さく、かつ、ストランドの
直径よりも大きく形成されていること、;更に、前記架
設シュートは、所要長さの単体シュートを首尾連接して
なり、各単体シュートの長手方向の端部の下側に、吊垂
支持手段の下端部に回動自在に取り付けるための取付手
段が設けられていることである。
The erection chute is a tubular body, and its longitudinal cross-sectional shape is formed by a tapered portion forming an upper opening and a lower rectangular portion; and the opening of the erection chute. The width of the portion is formed to be smaller than the outer diameter of the leading conductor attached to the end of the strand and larger than the diameter of the strand; and the erection chute is a single chute having a required length. That is, the attachment means is provided so as to be rotatably attached to the lower end portion of the suspension supporting means, and the attachment means is provided below the end portion in the longitudinal direction of each unit chute.

【0011】本発明に係る斜材ケーブルの架設方法によ
れば、斜材ケーブルを構成する各ストランドを、両定着
部間に架設せしめたガイド手段により、確実に定着部の
貫通孔に各々対応させて架設でき、また、該ストランド
を引張・緊張させることでガイド手段の上部に設けられ
た開口部から容易に抜け出させることができる。よっ
て、一本の架設シース内に多数のストランドを挿通させ
る架設方法ではないので、シース内でのストランドの錯
綜もなく、作業能率が向上する。
According to the method for constructing the diagonal cable according to the present invention, each of the strands constituting the diagonal cable is surely made to correspond to the through hole of the fixing portion by the guide means which is provided between both fixing portions. It can be erected and can be easily pulled out from the opening provided in the upper part of the guide means by pulling and tensioning the strand. Therefore, since it is not a erection method in which a large number of strands are inserted into one erection sheath, there is no stranding of the strands in the sheath, and the work efficiency is improved.

【0012】更に、ガイド手段に挿通させるストランド
の先端部に先導体を装着することで、当該ガイド手段内
をストランドが通過している最中に撓んで緩やかに屈曲
することがあっても、前記先導体によってガイド手段内
から抜け出したりすることがない。
Further, by attaching a front conductor to the tip of the strand to be inserted into the guide means, even if the strand is bent and gently bent while the strand is passing through the guide means, The tip conductor does not come out of the guide means.

【0013】また、ガイド手段の縦断面形状もその下部
を矩形状にしたので、ストランドが架設シュート内の挿
通時に波打つことがあっても上方に移動規制され、スト
ランド自体が架設シュートの開口部から抜け出すことが
ない。
Further, since the lower portion of the longitudinal section of the guide means is also rectangular, the movement of the strand is restricted upward even if the strands are wavy during insertion into the erection chute, and the strand itself is removed from the opening of the erection chute. I can't get out.

【0014】そして、ガイド手段たる架設シュートを構
成する単体シュートが、吊垂支持手段の下端部に回動自
在に取り付けられているので、前記架設シュート全体と
して両定着部間において柔軟に撓むこととなり、単体シ
ュートの首尾連接部分においてストランドの重さによる
無理な負荷が掛からないようになる。
Since the single chute constituting the erection chute as the guide means is rotatably attached to the lower end portion of the hanging support means, the erection chute as a whole can be flexed flexibly between both fixing portions. Therefore, it is possible to prevent an unreasonable load from being applied by the weight of the strand at the connecting portion of the single chute.

【0015】[0015]

【発明の実施の形態】次に、本発明に係る斜材ケーブル
の架設方法の実施形態について図面を参照して詳細に説
明する。本発明の第1実施例は、図1乃至図3にその概
略構成を示すように、例えば、斜張橋1の主塔2側の定
着部2aと橋桁3側の定着部3aとの間に、ストランド
のガイド手段たる筒状の架設シュート4を架設する。
BEST MODE FOR CARRYING OUT THE INVENTION Next, an embodiment of a method for constructing a diagonal cable according to the present invention will be described in detail with reference to the drawings. In the first embodiment of the present invention, as shown in the schematic configuration in FIGS. 1 to 3, for example, between the fixing section 2a on the main tower 2 side of the cable-stayed bridge 1 and the fixing section 3a on the bridge girder 3 side. A cylindrical erection chute 4 as a guide means for the strand is installed.

【0016】前記架設シュート4は、前記両定着部2
a,3a間に、予めアンカー体a等に繋着して架設され
たガイドロープ5と、このガイドロープ5にU字状のシ
ャックル6を介して移動自在に所要複数個を懸吊した吊
垂支持手段の吊り金具7と、該吊り金具7の各々の上部
において連架された引上げワイヤー8と、により、前記
吊り金具7の下端部と当該架設シュートの取付手段で回
動自在に連結されて、前記引上げワイヤー8で橋桁3側
から主塔2側に引き上げられて架設されるものである。
The erection chute 4 is provided with the both fixing portions 2
Between the a and 3a, a guide rope 5 which is erected in advance by being connected to the anchor body a and the like, and a suspension in which a required plurality of pieces are suspended movably via the U-shaped shackle 6 on the guide rope 5. By the hanging metal fitting 7 of the supporting means and the pulling wire 8 which is bridged at the upper part of each of the hanging metal fitting 7, the lower end portion of the hanging metal fitting 7 is rotatably connected by the mounting means of the erection chute. The pulling wire 8 is pulled up from the bridge girder 3 side to the main tower 2 side and installed.

【0017】この架設シュート4は、軽量な単体シュー
ト9を首尾連接して構成されるものであり、当該単体シ
ュート9の構造を説明する。
The erection chute 4 is constructed by connecting light weight single unit chutes 9 successfully. The structure of the single unit chute 9 will be described.

【0018】単体シュート9は、図4乃至図6に示すよ
うに、その本体9aが金属製(例えば、ステンレス製)
の全体細長い筒状(例えば、2m程度)で、その上部に
開口部9bが長手方向に沿って設けられているものであ
る。
As shown in FIGS. 4 to 6, the unit chute 9 has a main body 9a made of metal (for example, stainless steel).
The whole is a long and slender tubular shape (for example, about 2 m), and the opening 9b is provided in the upper part thereof along the longitudinal direction.

【0019】前記本体9aの下部は、図5に示すよう
に、断面矩形状に形成され、前記開口部9bを形成すべ
く前記矩形状の上端部からテーパ部9cが設けられてい
る。
As shown in FIG. 5, the lower portion of the main body 9a is formed in a rectangular cross section, and a taper portion 9c is provided from the rectangular upper end to form the opening 9b.

【0020】そして、本体9aの一端側には、図4及び
図5に示すように、端面から突出して設けられ、隣接す
る単体シュート9の端部をガイドしつつ受入れる上コ字
型で厚肉の金属製ガイド受板10が溶接等の手段で固着
され、更に、前記ガイド受板10の突出側の端面に揃え
てL字型の金属製連結板11が該ガイド受板10の下面
に溶接等の手段で固着され、前記ガイド受板10の本体
9a側の端面に当接させて筒状の本体9aの形状を維持
する金属製補強板12が溶接等の手段で固着されてい
る。
As shown in FIGS. 4 and 5, one end of the main body 9a is provided so as to project from the end face, and the upper end of the adjacent single chute 9 is guided and received in a thick U-shape. The metal guide receiving plate 10 is fixed by welding or the like, and further, an L-shaped metal connecting plate 11 is welded to the lower surface of the guide receiving plate 10 in alignment with the end surface of the guide receiving plate 10 on the protruding side. A metal reinforcing plate 12 that is fixed by means such as the above, and is brought into contact with the end surface of the guide receiving plate 10 on the side of the main body 9a to maintain the shape of the cylindrical main body 9a is fixed by means such as welding.

【0021】前記連結板11は、その垂下部にボルト挿
通用の貫通した取付孔11a,11bが設けられてい
る。
The connecting plate 11 is provided with penetrating mounting holes 11a and 11b for inserting bolts in its hanging portion.

【0022】また、本体9aの他端側には、図4及び図
6に示すように、筒状の本体9aの形状を維持する補強
部材と前記連結板11との連結部材を兼用するようにし
た補強連結板13が、本体9aに溶接等の手段で固着さ
れている。
As shown in FIGS. 4 and 6, the other end of the main body 9a serves as a connecting member for connecting the connecting plate 11 and a reinforcing member for maintaining the shape of the cylindrical main body 9a. The reinforced connecting plate 13 is fixed to the main body 9a by means such as welding.

【0023】更に、前記補強連結板13の下部に、前記
連結板11の取付孔11a,11bに対応した位置に取
付用のスリット13a,13bが設けられている。
Further, under the reinforcing connecting plate 13, mounting slits 13a and 13b are provided at positions corresponding to the mounting holes 11a and 11b of the connecting plate 11.

【0024】この単体シュート9における上部の開口部
9bは、本体9aの長手方向に沿ってその全長に亘って
形成され、該開口部9bの幅が両定着部間に架設しよう
とするストランド15の直径よりも大きい寸法で、か
つ、後述の球形状の先導体14の外径寸法よりも小さい
寸法に設定されている。
The upper opening 9b of the unitary chute 9 is formed along the longitudinal direction of the main body 9a over the entire length thereof, and the width of the opening 9b corresponds to the strand 15 to be installed between both fixing portions. The size is set to be larger than the diameter and smaller than the outer diameter of the spherical leading conductor 14 described later.

【0025】このようにして形成された単体シュート9
を首尾連接するには、図7乃至図10に示すように、斜
めに架設した状態で上位置側を天側とし、下位置側を地
側とすると、一方の単体シュート9の地側(例えば、図
7(イ)に示す側)と他方の単体シュート9の天側(例
えば、図7(ロ)に示す側)を、ガイド受板10に単体
シュート9の地側を載せるようにして、嵌合させる。
The unitary chute 9 thus formed
7 to 10, the upper position side and the lower position side are set to the top side and the ground side, respectively, as shown in FIG. 7 to FIG. , (The side shown in FIG. 7A) and the top side of the other single chute 9 (for example, the side shown in FIG. 7B) so that the ground side of the single chute 9 is placed on the guide receiving plate 10. Mating.

【0026】そして、ボルト16及び蝶ナット17によ
り、これらを互いに当接した連結板11と補強連結板1
3の各々の取付孔11a,11bとスリット13a,1
3bに通して仮止めする。
Then, the connecting plate 11 and the reinforcing connecting plate 1 which are in contact with each other by the bolt 16 and the wing nut 17 are attached.
3 mounting holes 11a, 11b and slits 13a, 1
Pass through 3b to temporarily fix.

【0027】前記単体シュート9の天側には、吊垂支持
手段たる金属製の吊り金具7の下端部18a(吊垂した
場合の水平棒状部分)を連結板11の屈曲部分に係止
し、金属製止め板19を、図9乃至図10に示すよう
に、ボルト16の頭部の大きさよりも大きな孔径で下部
側に設けられた貫通孔19a,19aを該ボルト16の
頭部に通過させ、更に、ボルト部の直径に合わせた孔径
の取付孔19b,19b側へとスライドさせて、前記蝶
ナット17を締め込んで、前記連結板11と補強連結板
13と止め板19とを締結する。
On the ceiling side of the single chute 9, the lower end portion 18a (horizontal bar portion in the case of suspension) of the metal suspending metal 7 which is suspension supporting means is locked to the bent portion of the connecting plate 11, As shown in FIGS. 9 to 10, the metal stopper plate 19 is made to pass through the head portion of the bolt 16 through the through holes 19a, 19a provided on the lower side with a hole diameter larger than the head portion of the bolt 16. Further, the wing nut 17 is tightened by sliding it toward the mounting holes 19b, 19b having a hole diameter corresponding to the diameter of the bolt portion, and the connecting plate 11, the reinforcing connecting plate 13, and the stop plate 19 are fastened. .

【0028】こうして、吊垂支持手段の吊り金具7の下
端部に回動自在に取り付けるための取付手段が、前記止
め板19の上部と連結板11とによって構成され、矩形
状の空間である挿通孔に吊り金具7の下端部18aが遊
嵌され、当該吊り金具7の下端部18aに対して単体シ
ュート9が回動自在にセットされるものである。
In this way, the attachment means for rotatably attaching to the lower end portion of the suspension metal fitting 7 of the suspension support means is constituted by the upper part of the stop plate 19 and the connecting plate 11, and is a rectangular space. The lower end portion 18a of the hanging metal fitting 7 is loosely fitted in the hole, and the unit chute 9 is rotatably set to the lower end portion 18a of the hanging metal fitting 7.

【0029】尚、他方の単体シュート9の天側に吊り金
具7の下端部18aを、前記止め板19及びボルト16
・蝶ナット17で仮係止させ、その後に、一方の単体シ
ュート9の地側を嵌合させるのであるが、その場合、地
側の補強連結板13のスリット13aにより、地側を上
方から蝶ナット17と補強連結板13の間に差し込んで
ボルト16のボルト部に嵌合させることができることに
留意し、前記蝶ナット17を締め込んで締結するように
するのが、連接作業上好ましいものである。
In addition, the lower end portion 18a of the hanging metal fitting 7 is attached to the ceiling side of the other single chute 9 and the stopper plate 19 and the bolt 16 are provided.
-The wing nut 17 is temporarily locked, and then the ground side of one of the single chutes 9 is fitted. In that case, the slit 13a of the reinforcing connecting plate 13 on the ground side causes the ground side to swing from above. It is preferable in connection work to tighten the wing nut 17 by tightening the wing nut 17 while keeping in mind that the wing nut 17 can be fitted into the bolt portion of the bolt 16 by inserting it between the nut 17 and the reinforcing connecting plate 13. is there.

【0030】そして、吊垂支持手段たる前記吊り金具7
について説明すると、図11乃至図12に示すように、
吊垂状態で水平な棒状の下端部18aの一端側から上部
に延設された本体部と、更に、本体部の上部が水平に屈
曲され、その先端部に垂直に立設し溶接等の手段で固着
された平板体18bと、から当該吊り金具7が形成され
ている。
Then, the hanging metal fitting 7 as a hanging support means.
As shown in FIGS. 11 to 12,
A main body portion extending from one end side of a horizontal rod-shaped lower end portion 18a in a suspended state to an upper portion, and further, an upper portion of the main body portion is bent horizontally, and is vertically erected at a tip end portion thereof for welding or the like. The hanging metal fitting 7 is formed from the flat plate member 18b fixed by.

【0031】前記下端部18aには、所要の間隔をおい
て単体シュート9の水平方向の抜け出しを防止するワリ
ピンなどを差し込むための貫通孔18c,18cが穿設
され、前記平板体18bには、上側にシャックル6のボ
ルトを挿通させるための貫通孔20と、下側に掛止め部
材22をボルト23・ナット24で固定する際の該ボル
ト23を挿通させるための貫通孔21とが設けられてい
る。
The lower end portion 18a is provided with through holes 18c, 18c for inserting a warp pin or the like for preventing the single chute 9 from coming off in the horizontal direction at a required interval, and the flat plate member 18b is provided with A through hole 20 for inserting the bolt of the shackle 6 is provided on the upper side, and a through hole 21 for inserting the bolt 23 when fixing the locking member 22 with the bolt 23 and the nut 24 is provided on the lower side. There is.

【0032】そして、前記貫通孔21の下側で平板体1
8bの片面に、突起部25が設けられ、前記掛止め部材
22の、ボルト締め時における、軸芯回りの回転防止手
段となっている。
Then, below the through hole 21, the flat plate body 1 is formed.
A protrusion 25 is provided on one surface of 8b, which serves as a rotation preventing means for the latch member 22 around the axis when the bolt is tightened.

【0033】前記掛止め部材22は、図12に示すよう
に、中央部にボルト挿通用の貫通孔22aが設けられ、
片面側に引上げワイヤー8を挟持するための半円形状の
凹部22bと、これと同じ側で下部に突部22cとが設
けられている。
As shown in FIG. 12, the latch member 22 has a through hole 22a for inserting a bolt in the central portion thereof.
A semicircular recess 22b for holding the pulling wire 8 is provided on one side, and a protrusion 22c is provided on the lower side on the same side as the recess 22b.

【0034】よって、図12(イ)に示すように、平板
体18bの貫通孔21にボルト23を通して前記止め部
材22の貫通孔22aに貫通させ、前記凹部22bと平
板体18bとで引上げワイヤー8を挟装し、座金を付け
てナット24で締結することにより、引上げワイヤー8
に吊り金具7が固定されるものである。また、突起部2
5によって、前記止め部材22がナット締め付け時に締
め付け方向に回転しようとしても、該止め部材22の下
端部が当接して回転阻止されるものである。
Therefore, as shown in FIG. 12A, the bolt 23 is passed through the through hole 21 of the flat plate 18b to penetrate the through hole 22a of the stopper member 22, and the pulling wire 8 is formed between the recess 22b and the flat plate 18b. The pull-up wire 8
The hanging metal fitting 7 is fixed to the. Also, the protrusion 2
Even if the stopper member 22 tries to rotate in the tightening direction when the nut is tightened, the lower end portion of the stopper member 22 comes into contact with the stopper member 22 to prevent rotation.

【0035】そして、図13に示すように、前記平板体
18bの貫通孔20には、ガイドロープ5に掛けたシャ
ックル6用のボルトが挿通され、当該吊り金具7がガイ
ドロープ5に対して移動自在に懸吊されるものである。
Then, as shown in FIG. 13, a bolt for the shackle 6 hung on the guide rope 5 is inserted into the through hole 20 of the flat plate member 18b, and the hanging metal fitting 7 moves relative to the guide rope 5. It can be suspended freely.

【0036】次に、ストランド15の先端部に、取り付
けられる先導体14について説明する。該先導体14
は、図14に示すように、金属製の球体であって、その
一部にネジ孔が穿孔され、そこに係止用の頭部26aを
有したボルト26がボルト部を外部に突出させて遊装さ
れ、前記ボルト26の頭部26aに係合するネジ27を
前記先導体14のネジ孔に螺着することで、ボルト26
の抜け止めとなる。
Next, the leading conductor 14 attached to the tip of the strand 15 will be described. The lead conductor 14
As shown in FIG. 14, is a metal sphere, and a screw hole is formed in a part of the sphere, and a bolt 26 having a locking head portion 26a protrudes the bolt portion to the outside. A screw 27 that is loosely mounted and that engages with the head portion 26 a of the bolt 26 is screwed into the screw hole of the lead conductor 14 so that the bolt 26
It will keep you from falling out.

【0037】そして、ストランド15の先端部には、金
属製キャップ28が、被せられて六角ネジ29で止着さ
れている。前記先導体14のボルト26のネジ部を前記
キャップ28の先端中央部に穿設されたネジ孔28aに
螺着することで、当該先導体14がストランド15の先
端部に取り付けられるものである。
A metal cap 28 is covered on the tip of the strand 15 and fixed by a hexagonal screw 29. The front conductor 14 is attached to the front end of the strand 15 by screwing the threaded portion of the bolt 26 of the front conductor 14 into the screw hole 28a formed in the center of the front end of the cap 28.

【0038】以上のように構成される、ガイド手段たる
単体シュート9を連接した架設シュート4、吊垂支持手
段の吊り金具7、ストランドの先端部に取り付けられる
先導体14、によって、例えば斜張橋1の斜材ケーブル
を架設する方法を説明する。
By means of the construction chute 4 connecting the unitary chute 9 as the guide means, the hanging metal fitting 7 of the hanging support means, and the front conductor 14 attached to the end of the strand, which is constructed as described above, for example, a cable-stayed bridge. A method of constructing the diagonal cable of No. 1 will be described.

【0039】まず、図1乃至図3に示すように、斜張橋
1の主塔2側の定着部2aと橋桁3側の定着部3aとの
間にガイドロープ5と引上げワイヤー8を架設する。
First, as shown in FIGS. 1 to 3, a guide rope 5 and a pulling wire 8 are installed between a fixing portion 2a on the main tower 2 side of the cable-stayed bridge 1 and a fixing portion 3a on the bridge girder 3 side. .

【0040】前記引上げワイヤー8の一端側をウインチ
に繋着しておき、その他端側において、即ち橋桁3側に
おいてシャックル6と吊り金具7及び止め部材22によ
り、それぞれ必要なボルト・蝶ナット・ナット等を用意
して、前記吊り金具7を引上げワイヤー8に掛止させる
とともにガイドロープ5に吊垂させる。
One end side of the pulling wire 8 is attached to the winch, and the other end side, that is, the bridge girder 3 side is provided with the shackle 6, the hanging metal fitting 7, and the stop member 22, which are necessary bolts, wing nuts, and nuts, respectively. Etc. are prepared, and the hanging metal fitting 7 is hooked on the pulling wire 8 and hung on the guide rope 5.

【0041】次に、単体シュート9の天側に、吊り金具
7の下端部18aを係合させて、止め板19を連結板1
1にボルト16・蝶ナット17で仮締めし、更に、前記
下端部18aの貫通孔18c,18cにワリピンを差し
込んで掛止する。これによって、吊り金具7に単体シュ
ート9が回動自在に取り付けられる。
Next, the lower end portion 18a of the hanging metal fitting 7 is engaged with the ceiling side of the single chute 9 to attach the stopper plate 19 to the connecting plate 1.
1 is temporarily tightened with a bolt 16 and a wing nut 17, and further, a warp pin is inserted into the through holes 18c, 18c of the lower end portion 18a and hooked. As a result, the single chute 9 is rotatably attached to the hanging metal fitting 7.

【0042】そして、次段の(架設方向において下側)
単体シュート9を取り付けるためにウインチで引上げワ
イヤー8を、単体シュート9の長さ分(約2m程度)だ
け主塔側に引き上げる。
The next stage (lower side in the erection direction)
To attach the single chute 9, the pulling wire 8 is pulled up to the main tower side by the length of the single chute 9 (about 2 m) with a winch.

【0043】次に、吊り金具7を前述のようにガイドロ
ープ5に吊垂させ、次段の単体シュート9の天側を前記
吊り金具7の下端部18aに回動自在に取り付ける。
Next, the hanging metal fitting 7 is hung on the guide rope 5 as described above, and the ceiling side of the next single chute 9 is rotatably attached to the lower end portion 18a of the hanging metal fitting 7.

【0044】そして、次段の単体シュート9の天側に、
先ほどの先行した単体シュート9の地側を嵌合させる。
該単体シュート9の地側の補強連結板13を前記次段の
単体シュート9の天側の蝶ナット17と連結板11との
間に上方から差し込んで、前記蝶ナット17を本締めし
て、図8に示すように隣接する単体シュート9,9を連
結するものである。
Then, on the top side of the next single shot 9,
The ground side of the preceding single chute 9 is fitted.
The ground-side reinforcing connecting plate 13 of the single chute 9 is inserted from above between the wing nut 17 on the top side and the connecting plate 11 of the next-stage single chute 9 to fully tighten the wing nut 17. As shown in FIG. 8, adjacent single chutes 9 and 9 are connected.

【0045】このように、吊り金具7に単体シュート9
を取り付けてガイドロープ5に沿って引上げワイヤー8
で主塔側に引き上げながら、当該単体シュート9の首尾
連接を繰り返して、図1乃至図3に示すように、両定着
部2a,3a間にガイド手段たる架設シュート4を架設
する。尚、後述のように、架設シュート4の開口部9b
からストランド15を抜き出すので、当該架設シュート
4は、両定着部2a,3a間で、斜め下側に位置するよ
うに架設するのが好ましいものである。
In this way, the hanging metal fitting 7 is attached to the hanging metal fitting 7 by a single chute 9.
Attach the wire 8 along the guide rope 5
While pulling up to the main tower side, the continuous connection of the single unit chute 9 is repeated, and as shown in FIG. 1 to FIG. 3, the erection chute 4 as the guide means is installed between both fixing portions 2a and 3a. As will be described later, the opening 9b of the erection chute 4
Since the strands 15 are pulled out of the fixing chute 4, it is preferable that the erection chute 4 is erected so as to be positioned obliquely below between the fixing portions 2a and 3a.

【0046】次に、橋桁3上の巻取りドラム30から架
設しようとするストランド15を繰り出し、プッシング
マシン31で該ストランド15を押し出して、ガイドパ
イプ32に沿って主塔2側の定着部2aにストランド1
5を供給する。
Next, the strand 15 to be erected from the take-up drum 30 on the bridge girder 3 is fed out, and the strand 15 is extruded by the pushing machine 31, and is guided along the guide pipe 32 to the fixing portion 2a on the main tower 2 side. Strand 1
Supply 5.

【0047】そして、主塔側の定着部2aの貫通孔2b
にストランド15を挿通させた後に、ストランド15の
先端部に先導体14を、キャップ28及びボルト26を
介して取り付ける(図14参照)。
Then, the through hole 2b of the fixing portion 2a on the main tower side
After inserting the strand 15 into the strand 15, the front conductor 14 is attached to the tip of the strand 15 via the cap 28 and the bolt 26 (see FIG. 14).

【0048】次に、前記先導体14を先頭にしてストラ
ンドを、図2に示すように、定着部2a,3a間に架設
された架設シュート4の天側の端面開口部から挿通させ
る。
Next, as shown in FIG. 2, the strand with the leading conductor 14 at the top is inserted through the end face opening on the ceiling side of the erection chute 4 erected between the fixing portions 2a and 3a.

【0049】そして、図15(イ)に示すように、架設
シュート4の最下段の端面開口部から先導体14及びス
トランド15の先端部が出てきたら、前記先導体14を
ストランド15から撤去し、橋桁側の定着部3aの貫通
孔に挿通して、二つ割りの楔等の公知手段で掛止する。
Then, as shown in FIG. 15A, when the front conductor 14 and the tip of the strand 15 come out from the end face opening of the lowermost stage of the erection chute 4, the front conductor 14 is removed from the strand 15. , Is inserted through the through hole of the fixing portion 3a on the bridge girder side, and hooked by a known means such as a half wedge.

【0050】また、主塔側の定着部2aにおいても、ス
トランド15を前記楔等の公知手段で掛止して、供給側
のストランドから切り放すべく当該ストランド15を切
断する。
Also in the fixing section 2a on the main tower side, the strand 15 is hooked by the known means such as the wedge, and the strand 15 is cut so as to be separated from the strand on the supply side.

【0051】その後、前記ストランド15をジャッキ等
の緊張手段で、主塔側又は橋桁側のいづれかで緊張させ
るかを任意にして、緊張させる。すると、図15(ロ)
に示すように、ストランド15が、架設シュート4の長
手方向に沿って連続して形成された上部の開口部9bか
ら順次抜け出してくる。
After that, the strand 15 is tensioned by a tensioning means such as a jack, whichever is closer to the main tower side or the bridge girder side. Then, Figure 15 (b)
As shown in, the strands 15 sequentially come out from the upper opening 9b formed continuously along the longitudinal direction of the erection chute 4.

【0052】その後、架設シュート4から全部抜け出し
たストランド15を緊張・定着させる。そして、再び、
主塔側の定着部の貫通孔2bに、切断後の供給側のスト
ランド15を巻取りドラム30から供給しながら定着部
の貫通孔に挿通させて、その先端部に先導体14を取り
付けて前述と同様な架設作業を繰り返して、両定着部2
a,3a間にストランド15を所要数架設するものであ
る。
After that, the strands 15 that have all come out of the erection chute 4 are tensioned and fixed. And again,
While supplying the cut supply-side strand 15 from the winding drum 30 to the through-hole 2b of the fixing unit on the main tower side, the strand 15 is inserted into the through-hole of the fixing unit, and the tip conductor 14 is attached to the leading end of the through-hole 2b. Repeat the same erection work as above to fix both fixing units 2
A required number of strands 15 are installed between a and 3a.

【0053】架設シュート4にストランド15を挿通さ
せると、図16(イ),(ロ)に示すように、先導体1
4は、その外径が開口部9bの幅よりも大きいので、架
設シュート4内を移動中は該開口部9bから抜け出すお
それが無く、また、ストランド15は、挿通後に緊張さ
せて上方に持ち上げるようにすれば、前記開口部9bか
ら抜け出すことができるのである。
When the strands 15 are inserted through the erection chute 4, as shown in FIGS.
Since the outer diameter of 4 is larger than the width of the opening 9b, there is no risk of slipping out of the opening 9b during movement in the erection chute 4, and the strand 15 can be tensioned and lifted upward after insertion. By doing so, it is possible to escape from the opening 9b.

【0054】また、ストランド15を架設シュート4内
に挿通させている間に、該ストランド15が不意に波打
つようなことがあっても、単体シュート9の本体9aの
下部は、矩形状に形成されているので、鉛直な側壁に衝
突するのみで、曲面に沿って上方向に移動する作用が生
じないので、ストランド15の上方向への跳ね上がりが
防止され、前記開口部9bからストランド15が架設シ
ュート内通過中に抜け出すようなおそれもない。
Further, even if the strand 15 is unexpectedly undulated while the strand 15 is being inserted into the erection chute 4, the lower portion of the main body 9a of the single chute 9 is formed in a rectangular shape. Therefore, since only the collision with the vertical side wall does not cause the action of moving upward along the curved surface, the upward jump of the strand 15 is prevented, and the strand 15 is erected from the opening 9b. There is no danger of getting out while passing through.

【0055】また、架設シュート4は、ガイドロープ5
に吊垂された複数の吊り金具7に回動自在に取り付けら
れた単体シュート9を首尾連接してなるので、主塔2側
と橋桁3側に架設されたガイドロープ5が、図1に示す
ように、下方向に撓んだ状態になるのが避けられないも
のであるが、これに追従して架設シュート4も全体とし
て撓むことができ、架設も容易となるものである。更
に、ストランド15を架設シュート4内に挿通させてい
る間にも、単体シュートの首尾連接部分においてストラ
ンドの重さによる無理な負荷が掛からないものである。
The erection chute 4 is provided with a guide rope 5
Since a single chute 9 rotatably attached to a plurality of hanging metal fittings 7 hung on the bridge is successfully connected, the guide rope 5 laid on the main tower 2 side and the bridge girder 3 side is shown in FIG. As described above, it is inevitable that the erection chute 4 is bent downward, but the erection chute 4 can also be flexed as a whole by following this, and erection is facilitated. Further, even while the strand 15 is being inserted into the erection chute 4, an unreasonable load due to the weight of the strand is not applied to the connecting portion of the single chute at the succession.

【0056】次に、本発明の第2実施例は、図17に示
すように、上記第1実施例に対して、先導体14に指標
部33を設けたことにおいて相違するものである。
Next, the second embodiment of the present invention is different from the first embodiment in that an index portion 33 is provided on the leading conductor 14, as shown in FIG.

【0057】前記指標部33は、先導体14の頂部に立
設部材34を植設し、該立設部材34の先端部を架設シ
ュート4の開口部9bから突出させ、そして、例えば、
球状の指標部33を設けたものである。なお、この指標
部33は、先導体14の位置の確認のためであるので、
作業者が肉眼で視認できるものであれば良く、例えば、
旗等でもよく、特に形状を限定するものではない。
In the indicator portion 33, a standing member 34 is planted on the top of the leading conductor 14, the tip of the standing member 34 is projected from the opening 9b of the erection chute 4, and, for example,
A spherical indicator portion 33 is provided. Since the indicator portion 33 is for confirming the position of the leading conductor 14,
Anything that can be visually recognized by the operator, for example,
It may be a flag or the like, and the shape is not particularly limited.

【0058】このようにした第2実施例によれば、スト
ランド15を架設シュート4内に挿通させて橋桁側に移
動させる際に、架設作業中の作業者がストランド15の
先端位置を確認することができ、ストランド15の供給
の加減が判断でき、更に、作業の安全性が確保されるも
のである。
According to the second embodiment as described above, when the strand 15 is inserted into the erection chute 4 and moved to the bridge girder side, the operator during the erection work can confirm the tip position of the strand 15. Therefore, it is possible to judge whether the supply of the strand 15 is adjusted or not, and further the work safety is ensured.

【0059】本発明の第3実施例は、図をもって図示し
ていないが、最も短い斜材ケーブルの位置から最も長い
斜材ケーブルの位置までの架設作業の手順において、例
えば、最も短い斜材ケーブルの位置の複数のストランド
を架設した後に、次の上側の斜材ケーブルの架設のため
に、既に主塔側と橋桁側の間に架設されているガイドロ
ープ5と引上げワイヤー8及び架設シュート4をそのま
ま上に持ち上げて転用し、長さの不足分の架設シュート
を橋桁側で単体シュート9を吊り金具7で継ぎ足して架
設することとし、その後、ストランド15を前記長さを
足した架設シュート4に挿通させて行うようにした斜材
ケーブルの架設方法である。
Although the third embodiment of the present invention is not shown in the drawings, in the procedure of the erection work from the position of the shortest diagonal cable to the position of the longest diagonal cable, for example, the shortest diagonal cable is used. After laying a plurality of strands at the position of, the guide rope 5, the pulling wire 8 and the laying chute 4 already laid between the main tower side and the bridge girder side are laid for the next upper diagonal cable laying. As it is, it is lifted up and diverted, and the erection chute for which the length is insufficient is to be erected on the bridge girder side by adding the single chute 9 with the hanging metal fitting 7, and then the strand 15 is added to the erection chute 4 having the above length. It is a method of erection of a diagonal cable that is inserted and carried out.

【0060】また、逆に、最も長い斜材ケーブルの位置
から架設作業を始めて、順次下側の斜材ケーブルを架設
するようにし、転用させた架設シュート4の余分な長さ
分を単体シュート9に解体撤去しながら、最も短い長さ
の斜材ケーブルの位置へと架設作業をする斜材ケーブル
の架設方法とすることもできる。このようにして、架設
シュート4の架設作業を短縮して効率化を図ることがで
きるものである。
On the contrary, the erection work is started from the position of the longest diagonal cable, and the lower diagonal cables are sequentially erected, and the extra length of the erected chute 4 is diverted. It is also possible to adopt a method of erection of a diagonal cable in which the erection work is carried out to the position of the diagonal cable having the shortest length while dismantled and removed. In this way, the work of constructing the construction chute 4 can be shortened and efficiency can be improved.

【0061】[0061]

【発明の効果】以上説明したように、本発明に係る斜材
ケーブルの架設方法は、主塔側の定着部と橋桁側の定着
部との間に複数のストランドからなる斜材ケーブルを緊
張して架設する方法であって、前記主塔側と橋桁側との
定着部間にガイドロープを架設し、該ガイドロープに上
部が開口するガイド手段を吊垂支持させ、該ガイド手段
の一端側からストランドを順次供給して他端側へガイド
させるようにしたことなので、ストランドがガイド手段
によってストランド同士の錯綜もなくガイドされ、能率
的に架設作業ができると言う優れた効果を奏する。ま
た、両定着部間に架設されたガイド手段にストランドが
挿通されて架設されるので、当該ストランドが架設途中
においてその重さによって弛むことが無く、スムーズな
架設作業となると言う優れた効果を奏する。
As described above, in the method for constructing the diagonal cable according to the present invention, the diagonal cable composed of a plurality of strands is tensioned between the fixing portion on the main tower side and the fixing portion on the bridge girder side. A guide rope is erected between the main tower side and the bridge girder side fixing portion, and a guide means having an upper opening is suspended from the guide rope and supported from one end side of the guide means. Since the strands are sequentially supplied so as to be guided to the other end side, there is an excellent effect that the strands are guided by the guide means without any complication between the strands and the erection work can be performed efficiently. Further, since the strand is inserted through the guide means that is installed between both fixing portions and is installed, the strand does not loosen due to its weight during the installation, and there is an excellent effect that the installation work is smooth. .

【0062】また、両定着部間でストランドを緊張させ
ることにより、ガイド手段の上部開口から当該ストラン
ドを抜け出させて架設するようにしたので、従来の架設
作業に於ける架設シースのように閉鎖された筒体に複数
のストランドを挿通させることで生じるストランド相互
の錯綜が、本発明のガイド手段によって解消され架設作
業能率が向上すると言う優れた効果を奏する。
Further, since the strand is pulled out from the upper opening of the guide means by tensioning the strand between the both fixing portions, the strand is erected and thus closed like the erection sheath in the conventional erection work. It is possible to eliminate the intricacy between the strands caused by inserting the plurality of strands into the tubular body, and to improve the erection work efficiency by eliminating the guide means of the present invention.

【0063】更に、ストランドの先端部に、ガイド手段
の開口部からのストランドの抜け出しを防止する先導体
を装着することにより、架設作業中にストランドがガイ
ド手段から立つ策するおそれもなく、また、前記先導体
に、ガイド手段の開口部から突出しストランド先端部の
移動位置を示す指標部が設けられていることで、作業者
にとってストランドの挿通状態を確認することができ、
ストランドの供給加減の判断が容易となり、かつ、作業
の安全性も確保されると言う優れた効果を奏する。
Further, by attaching a leading conductor to the tip of the strand to prevent the strand from slipping out of the opening of the guide means, there is no risk of the strand standing up from the guide means during the erection work, and Since the leading conductor is provided with an index portion that projects from the opening of the guide means and indicates the moving position of the strand tip, the operator can confirm the insertion state of the strand,
This has an excellent effect that it becomes easy to judge whether the supply of the strand is adjusted and the work safety is secured.

【0064】前記ガイド手段は、筒状体であってその縦
断面形状が、上部の開口部を形成するテーパ部と、下部
の矩形部で形成され、ストランドの挿通時に当該ストラ
ンドの波打ちがあっても前記矩形部で上方に移動しない
ように規制したので、ストランドの架設作業中ではスト
ランドのガイド手段からの脱落が防止され、ストランド
の挿通後は、ガイド手段からストランドを抜け出させて
架設することが可能となると言う優れた効果を奏する。
The guide means is a cylindrical body having a vertical cross-sectional shape formed by a tapered portion forming an upper opening and a lower rectangular portion, and when the strand is inserted, the strand is wavy. Since the rectangular portion is also regulated so as not to move upward, the strand is prevented from falling off from the guide means during the erection work, and after the insertion of the strand, the strand can be pulled out from the guide means and erected. It has an excellent effect that it becomes possible.

【0065】本発明に係る斜材ケーブルの架設装置は、
主塔と橋桁との両定着部間にケーブルを架設するための
架設装置であって、前記両定着部間に架設されるガイド
ロープと、該ガイドロープに吊垂支持手段で支持させた
架設シュートと、からなり、前記架設シュートの上部に
ストランドの抜け出し用の開口部が設けられているの
で、ストランドを架設シュートで両定着部間に架け渡し
た後、当該架設シュートからストランドを抜け出させる
ことができるので、複数のストランドが錯綜することが
ないと言う優れた効果を奏する。
The diagonal cable erection device according to the present invention is
A erection device for laying a cable between both fixing portions of a main tower and a bridge girder, the guide rope being erected between the both fixing portions, and an erection chute supported on the guide rope by suspension supporting means. Since an opening for pulling out the strand is provided in the upper portion of the erection chute, it is possible to dismount the strand from the erection chute after the strand is bridged between both fixing parts by the erection chute. As a result, it has an excellent effect that multiple strands do not get complicated.

【0066】前記架設シュートは、筒状体であってその
縦断面形状が、上部の開口部を形成するテーパ部と、下
部の矩形部で形成されているので、ストランドの波打ち
が架設作業中に発生しても、前記矩形部によりストラン
ドの上方向への移動が阻止されて、架設シュートからス
トランドが脱落することがなく架設作業の信頼性が向上
する。
Since the erection chute is a tubular body and its longitudinal cross-sectional shape is formed by the taper portion forming the upper opening and the lower rectangular portion, the corrugation of the strands is generated during the erection work. Even if it occurs, the upward movement of the strand is prevented by the rectangular portion, and the strand does not fall off from the erection chute, and the reliability of the erection work is improved.

【0067】前記架設シュートの開口部の幅が、ストラ
ンドの端部に取り付けられる先導体の外径よりも小さ
く、かつ、ストランドの直径よりも大きく形成するの
で、架設作業中のストランドの架設シュートからの脱落
が防止されると共に、挿通後は該ストランドを架設シュ
ートから抜け出させて架設することができると言う優れ
た効果を奏する。
Since the width of the opening of the erection chute is smaller than the outer diameter of the leading conductor attached to the end of the strand and larger than the diameter of the strand, the erection chute of the strand being erected is It has an excellent effect that it can be prevented from falling off and that the strand can be pulled out from the erection chute and erected after the insertion.

【0068】前記架設シュートは、所要長さの単体シュ
ートを首尾連接してなり、各単体シュートの長手方向の
端部の下側に、吊垂支持手段の下端部に回動自在に取り
付けるための取付手段が設けられているので、両定着部
間に亘って架設シュートを容易に架設できると共に、架
設されたガイドロープの撓みに応じて前記架設シュート
も適宜に撓み、単体シュートの首尾連接部に無理な負荷
が掛からないと言う優れた効果を奏する。
The erection chute is constructed by connecting unit chutes of a required length to each other, and is rotatably attached to the lower end of the suspension supporting means below the end of each unit chute in the longitudinal direction. Since the mounting means is provided, the erection chute can be easily erected between both fixing portions, and the erection chute is also appropriately deflected according to the bending of the erected guide rope, so that the single chute is connected to the tail connecting portion. It has an excellent effect that no unreasonable load is applied.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例に係るかケーブル架設状態
の概略を示す説明図である。
FIG. 1 is an explanatory view showing an outline of a cable erection state according to a first embodiment of the present invention.

【図2】同本発明の第1実施例に係るケーブル架設状態
の概略を示す説明図である。
FIG. 2 is an explanatory diagram showing an outline of a cable installation state according to the first embodiment of the present invention.

【図3】同本発明の第1実施例に係るケーブル架設状態
における、主塔側と橋桁側の両定着部(途中を省略)に
おける概略構成図である。
FIG. 3 is a schematic configuration diagram of both fixing units (the middle is omitted) on the main tower side and the bridge girder side in the cable erection state according to the first embodiment of the present invention.

【図4】単体シュートの正面図である。FIG. 4 is a front view of a single chute.

【図5】同単体シュートの左側面図である。FIG. 5 is a left side view of the single chute.

【図6】同単体シュートの右側面図である。FIG. 6 is a right side view of the single chute.

【図7】同単体シュートの地側の斜視図(イ)、天側の
斜視図(ロ)である。
FIG. 7 is a ground side perspective view (a) and a top side perspective view (b) of the single chute.

【図8】同単体シュートを首尾連接した状態の一部の正
面図である。
FIG. 8 is a partial front view showing a state in which the single chutes are successfully connected.

【図9】同単体シュートの首尾連接部分の止め板の正面
図である。
FIG. 9 is a front view of a stop plate at a portion where the single shoots are connected to each other successfully.

【図10】同単体シュートの首尾連接部分の止め板の背
面側の一部と蝶ナットを締結させた状態の説明図であ
る。
FIG. 10 is an explanatory view showing a state in which a wing nut is fastened to a part of the back side of the stop plate of the neck connecting portion of the single chute.

【図11】吊り金具の正面図(イ)と側面図(ロ)であ
る。
FIG. 11 is a front view (a) and a side view (b) of the hanging metal fitting.

【図12】同吊り金具の上部に係り、引上げワイヤーに
固定した様子を示す説明図(イ)、止め部材の縦断面図
(ロ)、止め部材の正面図(ハ)である。
FIG. 12 is an explanatory view (A) showing a state of being fixed to a pulling wire with respect to an upper part of the hanging fitting, a vertical cross-sectional view (B) of the stopping member, and a front view (C) of the stopping member.

【図13】本発明の第1実施例に係る架設方法の実施状
態の一部を拡大して示す説明図である。
FIG. 13 is an explanatory view showing an enlarged part of an implementation state of the erection method according to the first embodiment of the present invention.

【図14】同本発明の第1実施例に係る架設方法におけ
る、ストランドの先端に取り付けた先導体の構成を示す
縦断面図である。
FIG. 14 is a vertical cross-sectional view showing a structure of a leading conductor attached to a tip of a strand in the erection method according to the first embodiment of the present invention.

【図15】同本発明の第1実施例に係る架設方法の架設
状態を示す説明図(イ)、(ロ)である。
FIG. 15 is an explanatory view (a) and (b) showing a erected state of the erection method according to the first embodiment of the present invention.

【図16】同本発明の第1実施例に係る架設方法におけ
る、架設シュートと先導体及びストランドとの抜け出し
を説明する説明図(イ)、(ロ)である。
16 (a) and 16 (b) are explanatory diagrams (a) and (b) for explaining the escape of the erection chute, the lead conductor and the strand in the erection method according to the first embodiment of the present invention.

【図17】本発明の第2実施例に係る架設方法を示す説
明図である。
FIG. 17 is an explanatory view showing the erection method according to the second embodiment of the present invention.

【図18】斜張橋に斜材ケーブルを架設する場合の説明
図である。
FIG. 18 is an explanatory diagram of a case where a diagonal cable is installed on a cable-stayed bridge.

【符号の説明】[Explanation of symbols]

1 斜張橋、 2 主塔、 2a,3a 定着部、 3 橋桁、 4 架設シュート、 5 ガイドロープ、 6 シャックル、 7 吊り金具、 8 引上げワイヤー、 9 単体シュート、 9b 開口部、 9c テーパ部、 10 ガイド受板、 11 連結板、 12 補強板、 13 補強連結板、 14 先導体、 15 ストランド、 19 止め板、 22 掛止め部材、 33 指標部、 34 立設部材。 1 cable-stayed bridge, 2 main tower, 2a, 3a anchorage part, 3 bridge girder, 4 erection chute, 5 guide rope, 6 shackle, 7 hanging metal fittings, 8 pulling wire, 9 single chute, 9b opening part, 9c taper part, 10 Guide receiving plate, 11 connecting plate, 12 reinforcing plate, 13 reinforcing connecting plate, 14 leading conductor, 15 strands, 19 stopper plate, 22 hooking member, 33 indicator portion, 34 standing member.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 鈴木 昭好 東京都新宿区西新宿6丁目3番1号 株式 会社エスイー内 (72)発明者 皆川 卓 東京都新宿区西新宿6丁目3番1号 株式 会社エスイー内 (72)発明者 大橋 渡 東京都新宿区西新宿6丁目3番1号 株式 会社エスイー内 (72)発明者 武井 雅光 千葉県千葉市中央区新浜町1番地 川鉄テ クノワイヤ株式会社内 (72)発明者 庄司 茂雄 千葉県千葉市中央区新浜町1番地 川鉄テ クノワイヤ株式会社内 (72)発明者 峰 公雄 東京都千代田区内幸町2丁目2番3号 川 崎製鉄株式会社東京本社内 (72)発明者 中村 茂樹 東京都千代田区内幸町2丁目2番3号 川 崎製鉄株式会社東京本社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Akiyoshi Suzuki, 3-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo Within ESE Co., Ltd. (72) Inventor Taku Minagawa 6-3-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo In stock company S 72 (72) Inventor Watashi Ohashi 6-3 Nishi-Shinjuku, Shinjuku-ku, Tokyo Within S E stock company (72) Inventor Masamitsu Takei 1 Shinhamacho, Chuo-ku, Chiba-shi, Chiba Inside Kawatetsu Techno Wire Co., Ltd. (72) Inventor Shigeo Shoji 1 Shinhamacho, Chuo-ku, Chiba, Chiba Prefecture, Kawakawa Techno Wire Co., Ltd. (72) Inventor Kimio Mine 2-3-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Co., Ltd. 72) Inventor Shigeki Nakamura 2-3 2-3 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Co., Ltd. Tokyo head office

Claims (12)

【特許請求の範囲】[Claims] 【請求項1】 主塔側の定着部と橋桁側の定着部との間
に複数のストランドからなる斜材ケーブルを緊張して架
設する方法であって、前記主塔側と橋桁側との定着部間
にガイドロープを架設し、該ガイドロープに上部が開口
するガイド手段を吊垂支持させ、該ガイド手段の一端側
からストランドを順次供給して他端側へガイドさせるよ
うにしたことを特徴とする斜材ケーブルの架設方法。
1. A method of tensioning and installing a diagonal cable consisting of a plurality of strands between an anchoring portion on the main tower side and an anchoring portion on the bridge girder side, the anchoring on the main tower side and the bridge girder side A guide rope is installed between the parts, a guide means having an upper opening is suspended and supported on the guide rope, and strands are sequentially supplied from one end side of the guide means and guided to the other end side. The method of erection of diagonal cable.
【請求項2】 両定着部間でストランドを緊張させるこ
とにより、ガイド手段の上部開口から当該ストランドを
抜け出させて架設することを特徴とする請求項1に記載
の斜材ケーブルの架設方法。
2. The method for laying a diagonal cable according to claim 1, wherein the strand is pulled out from the upper opening of the guide means by tensioning the strand between the both fixing portions to lay the strand.
【請求項3】 ストランドの先端部に、ガイド手段の開
口部からのストランドの抜け出しを防止する先導体を装
着することを特徴とする請求項1に記載の斜材ケーブル
の架設方法。
3. The method for constructing a diagonal cable according to claim 1, wherein a tip conductor for preventing the strand from coming out of the opening of the guide means is attached to the tip of the strand.
【請求項4】 先導体に、ガイド手段の開口部から突出
しストランド先端部の移動位置を示す指標部が設けられ
ていることを特徴とする請求項3に記載の斜材ケーブル
の架設方法。
4. The method for constructing a diagonal cable according to claim 3, wherein the leading conductor is provided with an index portion that projects from the opening of the guide means and indicates a movement position of the strand tip.
【請求項5】 ストランドを、主塔側の定着部から橋桁
側の定着部へとガイド手段に挿通させることを特徴とす
る請求項1に記載の斜材ケーブルの架設方法。
5. The method for constructing a diagonal cable according to claim 1, wherein the strand is inserted through the guide means from the fixing portion on the main tower side to the fixing portion on the bridge girder side.
【請求項6】 ガイド手段は、筒状体であってその縦断
面形状が、上部の開口部を形成するテーパ部と、下部の
矩形部で形成され、ストランドの挿通時に当該ストラン
ドの波打ちがあっても前記矩形部で上方に移動しないよ
うに規制したことを特徴とする請求項1に記載の斜材ケ
ーブルの架設方法。
6. The guide means is a tubular body having a vertical cross-sectional shape formed by a taper portion forming an upper opening and a lower rectangular portion, and there is a waviness of the strand when the strand is inserted. The method for constructing a diagonal cable according to claim 1, wherein the rectangular portion is regulated so as not to move upward.
【請求項7】 ガイド手段の開口部の幅を、先導体の外
径よりも小さく、かつ、ストランドの直径よりも大きく
形成し、ストランドをガイド手段に挿通させている時に
前記開口部から前記先導体が抜け出ないようにし、か
つ、ストランドをガイド手段に挿通させた後に前記開口
部から当該ストランドの抜け出しを可能にしたことを特
徴とする請求項3に記載の斜材ケーブルの架設方法。
7. The width of the opening of the guide means is formed to be smaller than the outer diameter of the lead conductor and larger than the diameter of the strand, and the lead is passed through the opening when the strand is inserted into the guide means. The method for constructing a diagonal cable according to claim 3, wherein the body is prevented from falling out, and the strand can be pulled out from the opening after the strand is inserted into the guide means.
【請求項8】 ガイド手段は、所要長さの単体シュート
を首尾連接してなる架設シュートであり、各単体シュー
トが吊垂支持手段の下端部に回動自在に取り付けられ、
ガイドロープの撓みに追従できるようにしたことを特徴
とする請求項1に記載の斜材ケーブルの架設方法。
8. The guide means is an erection chute in which unit chutes of a required length are continuously connected, and each unit chute is rotatably attached to a lower end portion of the hanging support unit,
The method for constructing a diagonal cable according to claim 1, wherein the bending of the guide rope can be followed.
【請求項9】 主塔と橋桁との両定着部間にケーブルを
架設するための架設装置であって、前記両定着部間に架
設されるガイドロープと、該ガイドロープに吊垂支持手
段で支持させた架設シュートと、からなり、前記架設シ
ュートの上部にストランドの抜け出し用の開口部が設け
られていることを特徴とする斜材ケーブルの架設装置。
9. A erection device for laying a cable between both fixing portions of a main tower and a bridge girder, wherein the guide rope is erected between the both fixing portions, and a suspension supporting means is provided on the guide rope. An apparatus for constructing a diagonal cable, comprising: a supported chute, and an opening for pulling out a strand is provided on an upper part of the chute.
【請求項10】 架設シュートは、筒状体であってその
縦断面形状が、上部の開口部を形成するテーパ部と、下
部の矩形部で形成されていることを特徴とする請求項9
に記載の斜材ケーブルの架設装置。
10. The erection chute is a tubular body, and its longitudinal cross-sectional shape is formed by a tapered portion forming an upper opening and a lower rectangular portion.
The diagonal cable erection device described in.
【請求項11】 架設シュートの開口部の幅が、ストラ
ンドの端部に取り付けられる先導体の外径よりも小さ
く、かつ、ストランドの直径よりも大きく形成されてい
ることを特徴とする請求項9に記載の斜材ケーブルの架
設装置。
11. The width of the opening of the erection chute is formed to be smaller than the outer diameter of the leading conductor attached to the end of the strand and larger than the diameter of the strand. The diagonal cable erection device described in.
【請求項12】 架設シュートは、所要長さの単体シュ
ートを首尾連接してなり、各単体シュートの長手方向の
端部の下側に、吊垂支持手段の下端部に回動自在に取り
付けるための取付手段が設けられていることを特徴とす
る請求項9に記載の斜材ケーブルの架設装置。
12. The erection chute comprises unitary chutes of a required length which are continuously connected, and is rotatably attached to the lower end of the suspension supporting means below the longitudinal end of each unitary chute. The diagonal cable erection device according to claim 9, wherein the attachment means is provided.
JP23826395A 1995-09-18 1995-09-18 Installation method and installation equipment for diagonal cable Expired - Fee Related JP2680290B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23826395A JP2680290B2 (en) 1995-09-18 1995-09-18 Installation method and installation equipment for diagonal cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23826395A JP2680290B2 (en) 1995-09-18 1995-09-18 Installation method and installation equipment for diagonal cable

Publications (2)

Publication Number Publication Date
JPH0978525A true JPH0978525A (en) 1997-03-25
JP2680290B2 JP2680290B2 (en) 1997-11-19

Family

ID=17027588

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23826395A Expired - Fee Related JP2680290B2 (en) 1995-09-18 1995-09-18 Installation method and installation equipment for diagonal cable

Country Status (1)

Country Link
JP (1) JP2680290B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003530524A (en) * 1999-10-05 2003-10-14 ファウ・エス・エル・インターナツイオナール・アクチエンゲゼルシヤフト Connection device
WO2013179549A1 (en) * 2012-06-01 2013-12-05 株式会社Ihiインフラシステム Method for swapping stay cable, and temporary hanger for replacing stay cable

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003530524A (en) * 1999-10-05 2003-10-14 ファウ・エス・エル・インターナツイオナール・アクチエンゲゼルシヤフト Connection device
WO2013179549A1 (en) * 2012-06-01 2013-12-05 株式会社Ihiインフラシステム Method for swapping stay cable, and temporary hanger for replacing stay cable
JP2013249678A (en) * 2012-06-01 2013-12-12 Ihi Infrastructure Systems Co Ltd Replacement method of oblique cable and temporary hanger for replacing oblique cable
US9021644B2 (en) 2012-06-01 2015-05-05 Ihi Infrastructure Systems Co., Ltd. Method for replacing sloped cables, and temporary hanger for replacing sloped cables

Also Published As

Publication number Publication date
JP2680290B2 (en) 1997-11-19

Similar Documents

Publication Publication Date Title
CA2253077C (en) Tensionable cable truss support system
CN206768626U (en) A kind of steel hinge line lashing accessory system
US4700434A (en) Line tightening mechanism
JP2680290B2 (en) Installation method and installation equipment for diagonal cable
JP2004197556A (en) Assembling method for obliquely stretched cable
CN212670303U (en) Stay cable beam end mounting structure
US20120049140A1 (en) APPARATUS (Sheave) FOR GUIDING CABLE IN AND OUT OF MANHOLES AND CONDUITS
CN109230279B (en) Building construction hoisting device
CN114645619B (en) Construction method for integrally pulling Gamma steel strand of containment vessel of nuclear power station
JP3044343B2 (en) Cable catch with shooter
GB2155428A (en) Cable handling system
JP2005068989A (en) Assembling method of brace
JPS63144707A (en) Method and apparatus for paying off messemger rope for laying cable in cable rack
CN112290457A (en) Construction method of carbon fiber composite core wire
CN213417592U (en) Cable traction system
US7726634B2 (en) System and method for tensioning and locking a safety strand
CN108130859B (en) Beam end installation method of stay cable
JP6710382B2 (en) Cable installation method
JP3581854B2 (en) Corner guide for cable overhead line
JP2001327016A (en) Stringing construction method for cable and corner guide for cable stringing
CN219341563U (en) Winch for cable laying
GB2430016A (en) Four-to-three connector for replacing overhead cables
JP2004107951A (en) Diagonal cable suspending method and its device
CN215329004U (en) Novel rope separating device for coal mine
CN211622698U (en) Portable safety device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20080801

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080801

Year of fee payment: 11

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080801

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090801

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees