JPH0960300A - Jig for bar arrangement - Google Patents

Jig for bar arrangement

Info

Publication number
JPH0960300A
JPH0960300A JP20866095A JP20866095A JPH0960300A JP H0960300 A JPH0960300 A JP H0960300A JP 20866095 A JP20866095 A JP 20866095A JP 20866095 A JP20866095 A JP 20866095A JP H0960300 A JPH0960300 A JP H0960300A
Authority
JP
Japan
Prior art keywords
stanchion
bar
jig
holding
bar arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20866095A
Other languages
Japanese (ja)
Inventor
Nobuhiro Sakaguchi
伸宏 坂口
Mitsuo Yamamoto
光雄 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyoto Spacer Co Ltd
Original Assignee
Kyoto Spacer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyoto Spacer Co Ltd filed Critical Kyoto Spacer Co Ltd
Priority to JP20866095A priority Critical patent/JPH0960300A/en
Publication of JPH0960300A publication Critical patent/JPH0960300A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To simplify the bar arrangement work by providing multiple arms vertically displaceable against a stanchion on the stanchion erected on a support base, and temporarily holding reinforcing bars. SOLUTION: A nearly T-shaped holding piece 12 holding and erecting a stanchion 2 is provided on one side of a square support base 1 made of a metal material, and a hook section 13 and a pair of horizontal grooves 14 are formed on the holding piece 12. A pair of coupling knobs 22 screwed to the coupling section 21 of the stanchion 2 made of a long angular steel are inserted into the horizontal grooves 14 provided at the hook section 13 of the support base 1. Multiple arms 3 each provided with a slender hold section 31 temporarily holding reinforcing bars on the upper side face and a drop preventing projection 32 preventing the reinforcing bars from being slipped off the tip of the hold section 31 are fitted to the stanchion 2, and a jig for bar arrangement constituted of the stanchion 2 and the arms 3 is molded. The bar arrangement work is efficiently conducted, and the work time can be shortened.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、主として鉄筋コン
クリート造建築物の施工に関し、詳しくは、鉄筋を配筋
する際に用いる治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates mainly to the construction of reinforced concrete buildings, and more particularly to a jig used for arranging reinforcing bars.

【0002】[0002]

【従来の技術】従来、鉄筋コンクリート造建築物の施工
における配筋は、作業者の手作業により行なわれてい
た。すなわち、壁などの配筋を例にとると、所定間隔で
立設させた縦筋に横筋を架設する場合、まず、横筋を架
設するための位置決めを、作業者がその都度チョークな
どで所定ピッチ毎に縦筋に印つけて行い、その後、少な
くとも二人の作業者が印をつけた位置で横筋を仮保持
し、結束線を用いて横筋を縦筋に結束する作業を行って
いた。
2. Description of the Related Art Conventionally, the bar arrangement in the construction of a reinforced concrete building has been performed manually by an operator. In other words, taking a wall arrangement as an example, when a horizontal bar is erected on a vertical bar that has been erected at a predetermined interval, first, the operator must position the horizontal bar at a predetermined pitch each time with a choke or the like. The vertical streaks were marked on each occasion, and then at least two workers temporarily held the horizontal streaks at the marked positions and used the binding line to bind the horizontal streaks to the vertical streaks.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記のよう
に、作業者の手作業で配筋を行うと、配筋作業に時間が
かかり生産性が向上せず、また、多数の作業人数を要し
コスト高であるという問題がある。さらに、横筋を架設
する場合などには、架設のための位置決めは、作業者が
その都度縦筋に印をつけて行うため、印をつけたピッチ
間に狂いを生じる場合も多く、作業者の熟練度如何によ
っては、配筋において寸法的なばらつきを生じ易いとい
う問題がある。
However, as described above, when the rebar is manually arranged by the worker, the rebar work takes time, the productivity is not improved, and a large number of workers are required. However, there is a problem that the cost is high. Furthermore, when a horizontal bar is erected, the operator marks the vertical bar each time when positioning for erection, so there is often a case where the marked pitch is misaligned, and There is a problem that dimensional variations are likely to occur in the bar arrangement depending on the skill level.

【0004】本発明の目的は、少ない作業人員でも効率
的に配筋でき、しかも、作業者の熟練を要せずとも、寸
法的にばらつきのない安定した配筋を実現できる配筋用
治具を提供することにある。
An object of the present invention is to efficiently arrange the bar even with a small number of workers, and to realize a bar arrangement jig which does not have a dimensional variation and is stable without requiring the skill of the operator. To provide.

【0005】[0005]

【課題を解決するための手段】そこで、上記目的を達成
するため、請求項1記載の発明は、支持台1に立設した
支柱2に鉄筋を仮保持する複数のアーム3を設けて配筋
用治具となしたのである。
In order to achieve the above-mentioned object, the invention according to claim 1 arranges a plurality of arms 3 for temporarily holding reinforcing bars on a supporting column 2 erected on a supporting base 1 to arrange a bar. It was used as a jig.

【0006】また、請求項2記載の発明は、アーム3を
支柱2に対して上下方向に位置変更可能としたのであ
る。
Further, according to the second aspect of the invention, the position of the arm 3 can be vertically changed with respect to the support column 2.

【0007】さらに、請求項3記載の発明は、アーム3
が、鉄筋を仮保持する位置と鉄筋の保持を解除する位置
とに位置変更可能となるように、支柱2を支持台1に対
して移動可能としたのである。
Further, the invention according to claim 3 is the arm 3
However, the column 2 is movable with respect to the support base 1 so that the position can be changed between the position for temporarily holding the reinforcing bar and the position for releasing the holding of the reinforcing bar.

【0008】[0008]

【発明の作用効果】請求項1記載の発明では、配筋にお
いて、鉄筋の仮保持は治具を用いて行えるので、少数の
作業人員、例えば一人でも配筋作業を簡単に行うことが
でき、また、治具の使用により効率的に配筋作業が行え
るため作業時間も短縮でき、生産性を向上させることが
できる。
According to the invention of claim 1, since the reinforcing bar can be temporarily held by using a jig in the bar arrangement, a small number of workers, for example, one person can easily perform the bar arrangement work. Further, since the work of the bar arrangement can be efficiently performed by using the jig, the work time can be shortened and the productivity can be improved.

【0009】しかも、仮保持の際に鉄筋を架設するため
の位置決めは、あらかじめアーム3により決められるの
で、作業者の熟練度に関係なく、寸法的に安定したばら
つきのない配筋を実現できる。
Moreover, since the positioning for erection of the reinforcing bar during the temporary holding is determined in advance by the arm 3, it is possible to realize a dimensionally stable bar arrangement without variation, regardless of the skill of the operator.

【0010】請求項2記載の発明では、アーム3を支柱
2に対して上下方向に位置変更可能としたので、現場に
応じた所望のピッチ間隔で配筋することができる。
According to the second aspect of the present invention, since the arm 3 can be vertically moved with respect to the column 2, the bar can be arranged at a desired pitch interval according to the site.

【0011】請求項3記載の発明では、複数のアーム3
をもつ支柱2ごと支持台1に対して移動可能としたの
で、結束後に仮保持の解除を一度に行うことができ、配
筋作業を簡潔に完了することができる。
According to the third aspect of the invention, the plurality of arms 3 are provided.
Since it is possible to move the support column 2 with the support 2 with respect to the support base 1, the temporary holding can be released at once after binding, and the reinforcing work can be completed simply.

【0012】[0012]

【発明の実施の形態】図1は、本発明の配筋用治具の一
部省略斜視図を示し、1は支持台であって、該支持台1
の一側方から上方に向かって支柱2を立設させ、該支柱
2には鉄筋を仮保持するアーム3を所定間隔毎に水平方
向に多数設けている。
1 is a perspective view of a jig for bar arrangement according to the present invention, in which a part thereof is omitted, and 1 is a support base.
The column 2 is erected from one side to the upper side, and the column 2 is provided with a large number of arms 3 for temporarily holding reinforcing bars in the horizontal direction at predetermined intervals.

【0013】前記支持台1は、金属材料からなる平面視
四角形状の厚板であって、四角形状の各角部にはそれぞ
れ螺着孔を設けてねじ11体を螺着し、この4つのねじ
11体を支持台1下方への突出させて夫々位置調整可能
とすることにより、例えば、設置地面にベース筋が配筋
してある場合にも、がたつきのない設置を可能としてい
る。
The support base 1 is a thick plate made of a metal material and having a quadrangular shape in plan view. Each quadrangular corner portion is provided with a screwing hole to which a screw 11 is screwed. By allowing the screws 11 to project downward of the support base 1 and adjusting their positions, for example, even when the base muscle is laid on the installation ground, the installation can be performed without rattling.

【0014】前記支持台1の一側方には、支柱2を保持
し立設させるための断面略T字状の保持片12を形成
し、該保持片12における上方側に延び、且つ支柱2と
対向する片を係止部13とし、該係止部13に一対の横
溝14を設けて、後述する前記支柱2に設けられた係合
用摘み22の軸22aを挿嵌できるようにする一方、前
記係止部13の下端は接地するようにして、前記4つの
ねじ11と相俟って、がたつきのない設置を可能として
いる。
A holding piece 12 having a substantially T-shaped cross-section is formed on one side of the support base 1 to hold and stand the supporting pillar 2, and the holding piece 12 extends upward from the holding piece 12 and the supporting pillar 2 is formed. A piece opposite to is used as a locking portion 13, and a pair of lateral grooves 14 are provided in the locking portion 13 so that a shaft 22a of an engaging knob 22 provided on the support 2 described later can be inserted and fitted. The lower end of the locking portion 13 is grounded so that it can be installed without rattling in cooperation with the four screws 11.

【0015】前記支柱2は、長尺な角形鋼からなり、図
2に示すように、その全長にわたって所定のピッチ間隔
で後述するアーム3の位置決めを行う位置調整用孔20
を設けると共に、その下端部には、前記係止部13と対
向する略長方形状の薄板からなる係合部21を設け、該
係合部21には、前記横溝14に対応した位置に一対の
螺着孔を設けて、前記横溝14に挿嵌して係合させる係
合用摘み22を螺着させるのである。すなわち、支柱2
の支持台1への保持は、図3に示すように、前記係止部
13に設けられた一対の横溝14に前記係合部21に螺
着させた一対の係合用摘み22の軸22aを挿嵌した
後、前記係合用摘み22を螺締することにより行うので
ある。また、図4に示すように、前記係止部13におけ
る前記横溝14の反対側一側縁に前記係合部21の当接
片15を設けて、前記係合用摘み22の軸22aを前記
横溝14に挿嵌した際に、前記係合部21の側縁が前記
当接片15に当接するようにして、前記支柱2の立設位
置を固定するようにしてもよい。この場合には、前記横
溝14及び前記係合用摘み22は1つ設ければよく作業
を簡易化できる。また、前記係止部13の裏面13aと
前記係合部21の裏面21bのそれぞれいずれか一方
に、係合突起と係合段部とを設けて、前記支柱2の立設
位置をさらに確実に固定するようにしてもよい。
The pillar 2 is made of a long rectangular steel, and as shown in FIG. 2, a position adjusting hole 20 for positioning the arm 3 described later at a predetermined pitch interval over the entire length thereof.
And an engaging portion 21 made of a substantially rectangular thin plate facing the engaging portion 13 is provided at the lower end thereof, and the engaging portion 21 is provided with a pair of positions at positions corresponding to the lateral grooves 14. The screwing holes are provided, and the engaging knobs 22 that are inserted into the lateral grooves 14 and engage with each other are screwed. That is, the pillar 2
3, the shaft 22a of the pair of engaging knobs 22 screwed to the engaging portion 21 is screwed into the pair of lateral grooves 14 formed in the engaging portion 13, as shown in FIG. After the insertion, the engaging knob 22 is screwed. Further, as shown in FIG. 4, an abutment piece 15 of the engaging portion 21 is provided at one side edge of the engaging portion 13 on the opposite side of the lateral groove 14 so that the shaft 22a of the engaging knob 22 is attached to the lateral groove. The vertical position of the column 2 may be fixed such that the side edge of the engaging portion 21 abuts on the abutting piece 15 when the post 2 is inserted and fitted. In this case, only one lateral groove 14 and one engaging knob 22 may be provided to simplify the work. Further, an engaging projection and an engaging step portion are provided on either one of the back surface 13a of the locking portion 13 and the back surface 21b of the engaging portion 21, so that the upright position of the support column 2 can be further ensured. It may be fixed.

【0016】このような構成により、支柱2を支持台1
に対して移動可能として、後述するアーム3が、鉄筋を
仮保持する位置と鉄筋の保持を解除する位置とに位置変
更可能としているのである。
With this structure, the support 2 is attached to the support 1
The arm 3, which will be described later, is movable so that the arm 3 can be moved between a position for temporarily holding the reinforcing bar and a position for releasing the holding of the reinforcing bar.

【0017】尚、本実施例では、前記係止部13の裏面
13aに前記係合部21の表面21aが当接するように
前記支柱2を立脚させたが、これとは逆に、前記係止部
13の表面13bに前記係合部21aを当接するように
して、アーム3が支持台1に対して外側に向くように前
記支柱2を立脚させてもよい。
In this embodiment, the pillar 2 is erected so that the front surface 21a of the engaging portion 21 abuts on the back surface 13a of the engaging portion 13, but, conversely, the supporting pillar 2 is engaged. The strut 2 may be erected so that the arm 3 faces outward with respect to the support 1 by contacting the engaging portion 21a with the surface 13b of the portion 13.

【0018】前記アーム3は、金属材料から形成され、
鉄筋を上側面で仮保持する長細状の保持部31と、その
先端部に、鉄筋を仮保持したときに該鉄筋が保持部31
の先端部からすべり落ちないようにするための落下防止
用突起32を設ける一方、該保持部31の後端部には、
前記支柱2にアーム3を挿通する挿通部33を形成す
る。前記挿通部33は前記支柱2の外周面に対向する内
面をもつ角筒形状で、図2に示すように、前記挿通部3
3における前記保持部31の反対側側面には、蝶ねじを
螺着する螺着部34を設けて、該螺着部34に蝶ねじ3
5を螺着すると共に、該蝶ねじ35の螺進により、その
先端部を位置調整用孔20の1つに係合させることで、
前記アーム3を前記支柱2に固定するのである。従っ
て、作業者は前記蝶ねじ33の螺着弛緩のみにより、前
記アーム3を支柱2に対して上下方向に位置変更するこ
とができ、しかも、前記支柱2には前記位置調整用孔2
0が所定のピッチ間隔で設けられているので、現場に応
じた所望のピッチ間隔で前記アーム3の位置変更を可能
としている。
The arm 3 is made of a metal material,
A long and thin holding part 31 for temporarily holding the reinforcing bar on the upper side surface, and a holding part 31 for holding the reinforcing bar at the tip of the holding part 31.
While a drop prevention protrusion 32 is provided to prevent slipping from the tip end of the
An insertion portion 33 through which the arm 3 is inserted is formed on the pillar 2. The insertion portion 33 has a rectangular tube shape having an inner surface facing the outer peripheral surface of the support column 2, and as shown in FIG.
3 is provided with a screwing portion 34 for screwing a thumbscrew on the side surface on the opposite side of the holding portion 31.
5 is screwed on and the tip end thereof is engaged with one of the position adjusting holes 20 by screwing of the thumbscrew 35,
The arm 3 is fixed to the column 2. Therefore, the operator can change the position of the arm 3 in the vertical direction with respect to the support column 2 only by screwing and loosening the thumbscrew 33, and the support column 2 has the position adjusting hole 2
Since 0 is provided at a predetermined pitch interval, the position of the arm 3 can be changed at a desired pitch interval according to the site.

【0019】次に、本発明の配筋用治具の使用方法を説
明する。
Next, a method of using the reinforcing bar jig of the present invention will be described.

【0020】図5は、壁の配筋などにおいて、所定間隔
で立設させた縦筋Yに、横筋Xを架設する際に、本発明
の配筋用治具を使用した例であり、立設された縦筋Yの
両端に、あらかじめ所定ピッチの間隔としたアーム3を
もつ一対の配筋用治具を設置し、両側の各治具のアーム
3の保持部31の上側面に横筋Xを2本ずつ配設するこ
とにより、各縦筋Y間で横筋Xを仮保持するのである。
このように仮保持した横筋Xを、横筋Xと縦筋Yとの交
叉部位を結束線Cにより結束することにより、縦筋Yに
固定し、斯る後に、前記係合用摘み22を緩めて前記横
溝14から前記係合用摘み22の軸を抜いて、支柱2を
支持台1に対して移動させることにより、鉄筋の仮保持
を一度に解除して配筋作業を簡潔に完了するのである。
FIG. 5 shows an example in which the reinforcing bar jig of the present invention is used when the horizontal bar X is erected on the vertical bar Y which is erected at a predetermined interval in the bar bar. A pair of jigs for bar arrangement having arms 3 having a predetermined pitch interval are installed at both ends of the provided vertical bar Y, and a horizontal bar X is provided on the upper surface of the holding portion 31 of the arm 3 of each jig. By arranging two of them, the horizontal stripes X are temporarily held between the vertical stripes Y.
The horizontal muscle X temporarily held in this manner is fixed to the vertical muscle Y by binding the intersection of the horizontal muscle X and the vertical muscle Y with the binding line C, and then the engaging knob 22 is loosened. By pulling out the shaft of the engaging knob 22 from the lateral groove 14 and moving the support column 2 with respect to the support base 1, the temporary holding of the reinforcing bar is released at a time, and the reinforcing bar work is simply completed.

【0021】このように本発明の配筋用治具を用いて配
筋作業を行った場合、少数の作業人員、例えば一人でも
配筋作業を簡単に行うことができ、また、効率的に配筋
できるため作業時間も短縮でき、生産性を向上させるこ
とができる。
As described above, when the bar arrangement jig of the present invention is used for the bar arrangement work, even a small number of workers, for example, one person can easily perform the bar arrangement work, and the work can be efficiently arranged. Since it can be streaked, work time can be shortened and productivity can be improved.

【0022】しかも、仮保持の際の鉄筋の位置決めは、
あらかじめアーム3により決めることができるので、作
業者の熟練度に関係なく、寸法的に安定したばらつきの
ない配筋を実現できる。
Moreover, the positioning of the reinforcing bar during temporary holding is
Since it can be determined in advance by the arm 3, dimensionally stable bar arrangement without variation can be realized regardless of the skill level of the operator.

【0023】尚、本実施例では、横筋を縦筋に配筋する
場合について説明したが、本発明の配筋用治具横筋は、
横筋の配筋に限らず、帯筋など水平方向に架設する鉄筋
に好適に用いられる。
In this embodiment, the case where the horizontal bar is arranged in the vertical bar has been described, but the horizontal bar of the bar arrangement jig of the present invention is
It is preferably used not only for horizontal reinforcing bars but also for horizontal reinforcing bars such as stirrups.

【0024】[0024]

【図面の簡単な説明】[Brief description of drawings]

【図1】配筋用治具の一部省略斜視図である。FIG. 1 is a partially omitted perspective view of a reinforcing bar jig.

【図2】図1のAーA線拡大断面図である。FIG. 2 is an enlarged sectional view taken along line AA of FIG.

【図3】配筋用治具の一部拡大斜視図である。FIG. 3 is a partially enlarged perspective view of a reinforcing bar jig.

【図4】他の実施の形態を示した一部拡大斜視図ある。FIG. 4 is a partially enlarged perspective view showing another embodiment.

【図5】配筋用治具の使用例を示した図である。FIG. 5 is a view showing a usage example of a reinforcing bar jig.

【符号の説明】[Explanation of symbols]

1 支持台 2 支柱 3 アーム 1 Support 2 Support 3 Arm

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 支持台(1)に立設した支柱(2)に鉄
筋を仮保持する複数のアーム(3)を設けていることを
特徴とする配筋用治具。
1. A reinforcing bar jig comprising a plurality of arms (3) for temporarily holding reinforcing bars provided on columns (2) standing on a support base (1).
【請求項2】 アーム(3)を支柱(2)に対して上下
方向に位置変更可能としている請求項1記載の配筋用治
具。
2. The jig for rebar arrangement according to claim 1, wherein the arm (3) can be vertically moved relative to the support column (2).
【請求項3】 アーム(3)が、鉄筋を仮保持する位置
と鉄筋の保持を解除する位置とに位置変更可能となるよ
うに、支柱(2)を支持台(1)に対して移動可能とし
ている請求項1又は2記載の配筋用治具。
3. The column (2) is movable with respect to the support base (1) so that the arm (3) can be moved between a position for temporarily holding the reinforcing bar and a position for releasing the holding of the reinforcing bar. The bar arrangement jig according to claim 1 or 2.
JP20866095A 1995-08-16 1995-08-16 Jig for bar arrangement Pending JPH0960300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20866095A JPH0960300A (en) 1995-08-16 1995-08-16 Jig for bar arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20866095A JPH0960300A (en) 1995-08-16 1995-08-16 Jig for bar arrangement

Publications (1)

Publication Number Publication Date
JPH0960300A true JPH0960300A (en) 1997-03-04

Family

ID=16559944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20866095A Pending JPH0960300A (en) 1995-08-16 1995-08-16 Jig for bar arrangement

Country Status (1)

Country Link
JP (1) JPH0960300A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005336944A (en) * 2004-05-31 2005-12-08 Marubi:Kk Spacer for reinforced concrete
JP2006328744A (en) * 2005-05-25 2006-12-07 Keiryu Tachibami Reinforcement assembling jig and reinforcement assembling method
GB2550316A (en) * 2015-12-22 2017-11-22 British Telecomm Mechanical support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005336944A (en) * 2004-05-31 2005-12-08 Marubi:Kk Spacer for reinforced concrete
JP4520220B2 (en) * 2004-05-31 2010-08-04 株式会社丸備 Reinforced concrete spacer
JP2006328744A (en) * 2005-05-25 2006-12-07 Keiryu Tachibami Reinforcement assembling jig and reinforcement assembling method
GB2550316A (en) * 2015-12-22 2017-11-22 British Telecomm Mechanical support
GB2550316B (en) * 2015-12-22 2020-01-15 British Telecomm Mechanical support

Similar Documents

Publication Publication Date Title
US3096588A (en) Masonry guide apparatus
JPH05239902A (en) Construction of wall surface of building
JP4108092B2 (en) Work scaffold support device and work scaffold installation method
JPH0960300A (en) Jig for bar arrangement
JP2000345708A (en) Hanging jig for reinforcement for wall
EP0107460A2 (en) Method of constructing concrete structure
JP2634571B2 (en) Concrete formwork equipment
JPH1061181A (en) Panel support tool
JPH0913399A (en) Reinforcement holding device
US6415578B1 (en) Method and apparatus for bricklaying
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
EP0416690B1 (en) Mason's adjusting profile
JPH11182040A (en) Concrete form for floor and ceiling
JPH074260Y2 (en) Wall construction structure
JP2003082852A (en) Form holding fixture
JPS6235803Y2 (en)
JP2528349Y2 (en) Concrete frame fixture
KR200203624Y1 (en) Steel reinforcing for spacer
JP3640455B2 (en) Anchor bolt temporary holder
JPH04124375A (en) Sleeper holder
JP2592746Y2 (en) Mobile opening curing frame
JPS62225638A (en) Truss member
JPH08109745A (en) Construction of reinforced concrete pole and reinforcement positioning jig used for its execution
JPH09302846A (en) Lath frame positioning metal fitting and positioning work method
JPH09324529A (en) L-shaped workbench