JP3640455B2 - Anchor bolt temporary holder - Google Patents

Anchor bolt temporary holder Download PDF

Info

Publication number
JP3640455B2
JP3640455B2 JP02487996A JP2487996A JP3640455B2 JP 3640455 B2 JP3640455 B2 JP 3640455B2 JP 02487996 A JP02487996 A JP 02487996A JP 2487996 A JP2487996 A JP 2487996A JP 3640455 B2 JP3640455 B2 JP 3640455B2
Authority
JP
Japan
Prior art keywords
temporary
anchor bolt
frame
horizontal
holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP02487996A
Other languages
Japanese (ja)
Other versions
JPH09195283A (en
Inventor
健司 苅谷
英一 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Forestry Co Ltd
Original Assignee
Sumitomo Forestry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Forestry Co Ltd filed Critical Sumitomo Forestry Co Ltd
Priority to JP02487996A priority Critical patent/JP3640455B2/en
Publication of JPH09195283A publication Critical patent/JPH09195283A/en
Application granted granted Critical
Publication of JP3640455B2 publication Critical patent/JP3640455B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
この発明は、コンクリ−ト基礎などに対して、アンカ−ボルトを所定位置に、正確に位置づけて設け得るようにしたアンカ−ボルトの仮保持具の提供に関する。
【0002】
【従来の技術】
布基礎などのコンクリ−ト基礎の構成にあっては、通例、土台などの取付けに用いられるアンカ−ボルトを、この構成されるコンクリ−ト基礎に対して一体に止着されるように設けている。
【0003】
かかるアンカ−ボルトは、通例、コンクリ−ト基礎の打込み用の仮枠あるいはコンクリ−ト基礎を構成するフープ筋などの鉄筋に対して、前もって取付け用意し、この取付けアンカ−ボルトの上部が、打設コンクリ−トの天端面から上方に突き出すように、打設仮枠に対して基礎コンクリ−トの打ち込みをなすことで、コンクリ−ト基礎に対して止着設けるようにしていた。
【0004】
また、かかるアンカ−ボルトは、仮枠に対して、打ち込まれた基礎コンクリ−トが硬化する前に、この打設コンクリ−ト面から、下部側を、この打設コンクリ−トに挿し入れることによって、コンクリ−ト基礎の天端面から上部側を所定寸法分上方に突き出した状態にしてセットすることで、このコンクリ−ト基礎に対して止着設けるようにしていた。
【0005】
【発明が解決しようとする課題】
しかしながら、アンカ−ボルトを、所定位置に、しかも、構成されるコンクリ−ト基礎の天端面から、所定の突き出し寸法となるように、正確に位置づけて、これを仮枠材あるいは配筋中の鉄筋などに対して、確実に組付けるには、仮枠施工に際して、熟練者により、しかも多くの作業手間を要した仮枠施工を必要とする不都合があった。
【0006】
また、かかる手法にあっては、仮枠施工後におけるコンクリ−トの打ち込みに際して、正しい位置に、しかも鉛直に組付け位置づけられているアンカ−ボルトに位置づれ、あるいは傾きを生じたり、突き出し寸法に不揃いを生ずるなどの難があった。
【0007】
また、前記の打設コンクリ−トに対して、この打設コンクリ−トが充分に硬化する前に、アンカーボルトの下部側を、この打設コンクリ−ト内に挿し込むようにした前記のアンカ−ボルトの埋設手法にあっては、打設コンクリ−トに対して、アンカ−ボルトの挿し込み時期が早すぎた場合、アンカ−ボルトが打設コンクリ−トに対して沈み込むことがあり、これによって所定の突き出し寸法を構成コンクリ−ト基礎のアンカ−ボルトにもたらすことができない難があった。また、かかる際に、打設コンクリ−トに挿し入れたアンカ−ボルトが、経時的に傾いたり、倒れ込んだりすることがあり、その、いずれにあっても挿し込み設置されたアンカ−ボルトを、打設コンクリ−トが硬化するまでの間、充分に監視し、随時挿し込み設置されたアンカ−ボルトの差し込み姿勢の手直しをなす必要があった。
【0008】
また、かかる打設コンクリ−トに対するアンカ−ボルトの挿し込み設置の手法にあっては、アンカ−ボルトの挿し込み設置されるコンクリ−トが既に硬化状態にある場合、アンカ−ボルトを、この打設コンクリ−トに対して容易、確実に、充分な深さに到るように挿し込み設置することができない難があり、しかも、打設コンクリ−トの天端面にクラックなどを生ずる難があった。
【0009】
かかる点から、打設コンクリ−トに対して、アンカ−ボルトを挿し込み設置する手法にあっては、常に打設コンクリ−トの硬化状況を確認しながら、適時に、しかも、一気に、アンカ−ボルトを打設コンクリ−トに対して挿し込み設置をする必要があり、このため、熟練者による長年の勘に頼り、かつ、多くの人手をもって一気に処理をなす必要があった。
【0010】
特に、かかる打設コンクリ−トに対するアンカ−ボルトの挿し込み設置にあっては、仮枠に対するコンクリ−トの打設が、各現場にあって、通例数回に亘ってなされることが多く、かかるコンクリ−トの打設の合間を縫って、打設コンクリ−トに対するアンカ−ボルトの挿し込み設置をなす必要があることとなり、このため、作業スケジュールの管理上、多くの不都合があった。
【0011】
本発明は、かかる従来におけるアンカ−ボルトの組付け手法における不都合を解消し、コンクリ−ト基礎に設けられるアンカ−ボルトを、容易に、しかも正確に位置づけ得ると共に、この正確に位置づけられたアンカ−ボルトに位置づれなどを生ずることなく、アンカ−ボルトを、確実に、打設コンクリ−トに設け得るようにしたアンカ−ボルトの仮保持具の提供を目的としている。
【0012】
【課題を解決するための手段】
本発明に係るアンカ−ボルトの仮保持具Hは、請求項1の発明に係るアンカ−ボルトの仮保持具Hを、コンクリートの打ち込み仮枠Kを構成する構成仮枠材Ka間に亘って備えつけられる横架具10と、この横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20とを備え、
前記横架具10が、構成仮枠材Kaの上端面に支承される横架部11と、この横架部11の両側端部又はいずれか一方の側端部にあって、前記構成仮枠材Kaの外側面に当接される係当部12とを備えていると共に、前記保持具20が、アンカーボルト30の上部側の挿通される筒部21と、この挿通アンカーボルト30を該筒部21に固定する固定具22とを備えている構成としてある。
【0013】
また、請求項2の発明に係るアンカ−ボルトの仮保持具Hを、前記請求項1の発明に係るアンカ−ボルトの仮保持具Hにあって、コンクリートの打ち込み仮枠Kを構成する構成仮枠材Ka間に亘って備えつけられる横架具10が、2以上の、相互に組付け位置調節の可能な横架部11を有する横架体10Y、10Yの組み付けによって構成してある。
【0014】
更に、請求項3の発明に係るアンカ−ボルトの仮保持具Hを、前記請求項1の発明に係るアンカ−ボルトの仮保持具Hにあって、横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20が、前記横架具10における横架方向に向けて移動自在に備えられている構成としてある。
【0015】
【発明の実施の形態】
以下、本発明に係るアンカ−ボルトの仮保持具Hの各実施の形態について詳細に説明する。
図1〜図6は、第1の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものであって、図1では、当該アンカ−ボルトの仮保持具仮保持具Hを、仮枠Kに用いる状態を斜視で、図2では、これを仮枠Kに装着した状態を断面で、更に、図3では、その断面の向きを変えて示している。
また、図4では、かかるアンカ−ボルトの仮保持具Hを用いてアンカ−ボルトを仮枠Kに装着して、これにコンクリ−トを打設した状態を、更に、図5では、構成されたコンクリ−ト基礎に土台42を取付けた状態を、更に、図6では、構成されるコンクリ−ト基礎40’に対して、土台42、柱43などを備えつけた状態を、要部破断の斜視として示している。
【0016】
図7及び図8は、第2の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものであって、図7では、当該アンカ−ボルトの仮保持具Hを、コンクリ−トの打設されている仮枠Kに用いる状態を斜視で、また、図8では、この仮枠Kに打設されたコンクリ−ト40に対してアンカ−ボルトを差し込んだ状態を断面として示している。
【0017】
図9及び図10は、第3の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものであって、図9では、当該アンカ−ボルトの仮保持具Hを、仮枠Kに装着用いる状態を斜視で、図10では、アンカ−ボルトの仮保持具Hをアンカ−ボルトと共に仮枠Kに装着した状態を断面で示している。
【0018】
図11及び図12は、第4の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものであって、図11では、当該アンカ−ボルトの仮保持具Hを、仮枠Kに装着用いる状態を斜視で、図12では、アンカ−ボルトの仮保持具Hをアンカ−ボルトと共に仮枠Kに装着した状態を断面で示している。
【0019】
図13及び図14は、第5の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものであって、図13では、当該アンカ−ボルトの仮保持具Hを、仮枠Kに装着用いる状態を斜視で、図14では、アンカ−ボルトの仮保持具Hをアンカ−ボルトと共に仮枠Kに装着した状態を断面で示している。
【0020】
ここで、本発明の実施の形態に係るアンカ−ボルトの仮保持具Hは、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10と、この横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20とを備えた構成としてある。
【0021】
このように構成されるアンカ−ボルトの仮保持具Hは、仮枠Kに対して、コンクリ−トの打設前に、アンカ−ボルト30を、当該仮枠Kに対して、容易に、所期の位置に、しかも、所期の高さを備えたものとしてセッティングすることができる。
【0022】
また、かかるアンカ−ボルトの仮保持具Hにセッティングされたアンカ−ボルト30は、仮枠Kに対するコンクリ−トの打設に際しても、当初のセッティング位置からのずれ出し、傾倒、浮き上がり、あるいは沈み込みなどを生ずることがなく、当初のセッティングの状態を効果的に維持することができる。
【0023】
更に、かかる構成よりなるアンカ−ボルトの仮保持具Hを用いて、打設コンクリ−トに対してアンカ−ボルトの挿し込み保持をなすようにした場合にあっては、コンクリ−トの打設後、直ちにアンカ−ボルトを、この打設コンクリ−トに対して挿し込みセットできると共に、この打設コンクリ−トに挿し込みセットされたアンカ−ボルトを、鉛直の状態に正確に保持し、且つ、この挿し込みセットされたアンカ−ボルトを、打設コンクリ−トに対して沈降させることなく確実に所期の突き出し寸法を備えたものとして設けることができる。
【0024】
次いで、前記のアンカ−ボルトの仮保持具Hにあって、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10が、型枠パネル50などの構成仮枠材Kaの上端面に支承される横架部11と、この横架部11の両側端部又はいずれか一方の側端部にあって、前記型枠パネル50などの構成仮枠材Kaの外側面に当接される係当部12とを備えている構成としたことを、他の典型的な実施の形態の一つとしている。
【0025】
このように構成されるアンカ−ボルトの仮保持具Hにあっては、これを容易に仮枠Kに対して装着、用いることができると共に、このアンカ−ボルトの保持に用いられる仮保持具Hを、仮枠Kにおける型枠パネル50などの構仮枠材Kaを連設するつなぎ板として機能させることができる。
【0026】
更に、前記のアンカ−ボルトの仮保持具Hにあって、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10が、2以上の、相互に組付け位置調節の可能な横架部11を有する横架体10Y、10Yの組み付けによって構成したことを更に典型的な他の実施の形態の一つとしている。
【0027】
このように構成されるアンカ−ボルトの仮保持具Hにあっては、仮枠Kにおけるコンクリ−トの打設間隙に変化がある場合にあっても、構成される各仮枠Kに対して、容易に、しかも確実に、仮保持具Hの取付けが可能とされ、この仮保持具Hを用いて、確実にアンカ−ボルト30の仮枠Kに対する組付け、保持が可能とされる。
【0028】
次いで又、前記のアンカ−ボルトの仮保持具Hにあって、横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20が、前記横架具10における横架方向に向けて移動自在に備えられている構成としたことを、更に他の典型的な実施の形態の一つとしている。
【0029】
このように構成されるアンカ−ボルトの仮保持具Hにあっては、この仮保持具Hを仮枠Kに装着した後、この仮保持具Hに備えつけられている保持具20を、仮保持具Hの横架方向に移動することによって、仮枠Kに対してアンカ−ボルト30のセッティングの位置決めをなすことができる。
【0030】
更に又、前記のアンカ−ボルトの仮保持具Hにあって、横架具10に対してアンカーボルト30を垂直状態に保持する保持具20が、アンカーボルト30の上部側の挿通される筒部21と、この挿通アンカーボルト30を該筒部21に固定する固定具22とを備えている構成としたことを、更に他の典型的な実施の形態の一つとしている。
【0031】
このように構成されるアンカ−ボルトの仮保持具Hにあっては、アンカ−ボルト30を仮保持具Hに対して、容易に鉛直状態のままで、上下方向に移動することができ、しかも所定の高さ位置において、これを位置決めセットすることができる。
【0032】
(1) 第1の実施の形態に係るアンカ−ボルトの仮保持具
先ず、図1〜図6に示される第1の実施の形態に係るアンカ−ボルトの仮保持具Hについて説明する。
この典型的な第1の実施の形態に係るアンカ−ボルトの仮保持具Hは、仮枠Kに対してコンクリ−トを打設する前に、当該仮枠Kに対して、アンカ−ボルトの仮保持具Hを取付け用意し、この仮保持具Hを用いて、アンカ−ボルト30を、構成される仮枠Kに対して、所定位置に位置づけ保持し、かかるアンカ−ボルト30を仮枠Kに組付け用意した後に、この仮枠Kに対して、コンクリ−ト40を打ち込む構成としている。
【0033】
ここで用いられる仮保持具Hは、構成される仮枠Kにおける天端上に載置支承される横架具10と、この横架具10上にあって、横架具10の横架方向に対して移動可能に備えつけられる保持具20とを備えた構成としてある。
【0034】
この第1の実施の形態に係る仮保持具Hは、仮枠K、この図示例にあっては、仮枠材Kaとしての型枠パネル50を用いた仮枠Kに対して、アンカ−ボルトの仮保持具Hを組み付け用いたものであり、例えば、型枠板を用いた仮枠K、フーチング打設用の型枠板などに対して、当該アンカ−ボルトの仮保持具Hを組み付け用いるようにしてあっても良い。
【0035】
ここで示される仮枠Kは、根切り部分に、割りぐり石44を配し、これに、捨コンクリート45を打設すると共に、この捨コンクリート45の天端に対して布基礎を構成する一対の型枠パネル50、50を仮枠材Kaとしての所定の間隔を設けて立設すると共に、この各型枠パネル50、50を控51、根止め杭52などで保持すると同時に、各型枠パネル50、50相互間につなぎ板53を打ちつけることによって、この各型枠パネル50、50間に所定のコンクリ−ト40の打ち込み隙間を構成するように連結している。
【0036】
かかる仮枠Kの構成に用いられる型枠パネル50は、その下端と、上端とに、外向きに張り出す、略水平な縁鍔50aを備えた構成としてあり、下端に備えられた縁鍔50aを、前記捨コンクリート44の面に密着した状態で載置することによって、この型枠パネル50を、当該捨コンクリート44の面上に起立状態に備えつけると共に、上端に備えられた縁鍔50a、50a間に、つなぎ板53を添装し、このつなぎ板53の夫々の側端部分を、当該縁鍔50a、50aに釘打ちすることによって、相互の型枠パネル50、50が連結される構成としてある。
【0037】
従って、ここで構成される仮枠Kは、これを構成する各仮枠Ka、Kaの各型枠パネル50が、その上端に、水平な、しかも、相互に同一平面を構成する縁鍔50a、50aを備えた構成としてあり、この各型枠パネル50を構成している各縁鍔50a、50aに横架具10が都合良く載置、取付けられる構成としてある。
【0038】
ここで、仮保持具Hを構成する横架具10は、前記型枠パネル50における各縁鍔50a、50aの面に密着して載置される細長い板状の横架部11と、この板状をなす横架部11の両側端にあって、下方に略垂下状態に屈曲して構成されている板状をなす係当部12とを備えた構成としてあり、仮枠Kを構成する各仮枠材Ka、Ka間に、この横架具10を添装した際に、この横架具10における係当部12が、この仮枠Kを構成している型枠パネル50における各縁鍔50aの外側の面に引っ掛かる構成としてある。
【0039】
このように構成される仮保持具Hは、アンカ−ボルト30の仮保持具Hとして用いられると同時に、仮枠Kにおける各仮枠材Ka、特に、型枠パネル50、50相互の天端側の連結具として、前記つなぎ板53と同様に用いることができる。
【0040】
かかる点から、ここで用いられる仮保持具Hにおける横架具10を、特に、鉄板、鋼板などの折り曲げ金物として用意し、この横架具10を構成する係当部12が、建て込まれる仮枠Kの各型枠パネル50における夫々の縁鍔50aの側面に対して都合良く引っ掛かり、且つ、この横架具10における各係当部12、係当部12間に、仮枠Kにおける各型枠パネル50、50、特に、その各縁鍔50a、50aの側縁が、密に収まり入る構成と
することで、当該横架具10を、各型枠パネル50、50相互の連設手段として用いることができる。
【0041】
かかる横架具10を構成する横架部11は、この横架具10の横架方向、即ち、各型枠パネル50、50間に亘る方向、更に具体的には、各係当部12、係当部12の備えられる側間に亘る方向に、ガイドスリット13が、上下の面間を連通するように設けてあり、このガイドスリット13を介して、アンカ−ボルト30の上端側を、下方から上方に向けて挿通できる構成としてある。
【0042】
かかる横架具10と共に仮保持具Hを構成する保持具20は、この横架具10における板状をなす横架部11、特に、この板状をなす横架部11の幅方向に亘って備えられると共に、その両側端を、この横架部11の幅方向の側面に係当するように垂下状態に屈曲した一対の係合片23a、23aとして備えている摺動枠片23と、この摺動枠片23上に一体に設けられた筒部21と、この筒部21の周側面からネジ込まれる固定具22とを備えた構成としてある。
【0043】
即ち、この保持具20を構成する摺動枠片23は、横架具10における板状をなす横架部11に跨設される態様で、摺動枠片23を、この横架部11の板状面に摺接し、且つ、夫々の係合片23a、23aを、この板状をなす横架部11の側縁に係当するように組み付けられている。即ち、型枠パネル50、50間に備えつけられている横架具10にあって、この各型枠パネル50、50間を、自在に移動できる構成としてあり、且つ、各係合片23a、23aを、板状をなす横架部11の側縁に対して、摺接係当することで、保持具20を、横架具10に対して安全に、移動可能な跨設状態としてある。
【0044】
かかる構成よりなる摺動枠片23の上面に対して、筒部21を溶接などの手法で一体に設けると共に、この摺動枠片23に、筒部21に連通する孔を設け、この摺動枠片23と筒部21に連通して設けられている孔24に対してアンカ−ボルト30の上端側を挿通可能に構成してある。
【0045】
また、この保持具20を構成する筒部21には、その外側部分に蝶ボルトなどの固定具22を備えつけ、保持具20における筒部21に挿通されるアンカ−ボルト30の保持をなす構成としている。
即ち、この図示例にあっては、保持具20を構成する横架具10の外周側に、固定具22を構成する蝶ボルトの螺挿孔25を設け、この螺挿孔25から、前記孔24内に向けて螺進退される蝶ボルトによって、この孔24に挿通されているアンカ−ボルト30の留めつけをなす固定具22を構成するようにしてある。
【0046】
かくして用意された仮保持具Hは、建て込まれている仮枠K、特に、型枠パネル50、50における上端の縁鍔50aに対して、この各型枠パネル50、50を連設しているつなぎ板53と同様の手法で、載置し、これを仮枠Kに組付け用いる。
即ち、この仮保持具Hにおける横架部11の板面を、前記縁鍔50aの面に載置すると共に、各係当部12を、この縁鍔50aの各側縁に係当することで、仮枠Kに対して、この仮保持具Hの取付けをなす。
【0047】
この仮枠Kに取付けられる仮保持具Hは、構成されるコンクリ−ト基礎40’の所定の位置に、アンカ−ボルト30が立設状態に備えられるように、仮枠Kに対して、前もって位置決めをして組付けられ、又は、仮枠Kにおける縁鍔50a上を摺動させながら、アンカ−ボルト30の設定位置を割り出し、これを位置決めセットするようにしてあり、通例は、建て込まれる各型枠パネル50に設けられた墨線を目印として横架具10の位置決め、あるいは移動位置決めをなす。
【0048】
かくして仮枠Kの所定位置にセットされた仮保持具Hに備えつけられている保持具20に対して、前もって、アンカ−ボルト30を備えつけ、又は、この備えつけられた仮保持具Hの保持具20に対して、アンカ−ボルト30を挿通し、これを固定具22を用いて締め付け固定すると共に、この保持具20を、仮保持具Hを構成している横架具10に対して移動させて、この保持具20に備えつけられているアンカ−ボルト30を、仮枠材Kaの構成するコンクリ−ト40の打設空間の適所に移動セットする。
かかるアンカ−ボルト30の、仮枠Kの幅方向に向けた位置決めは、仮枠施工に際して張り込まれる水糸に添うように、前記の保持具20を、横架具10に対して移動することでなす。
【0049】
尚、かかる仮枠Kに対する仮保持具Hの組付けにあっては、仮保持具Hを構成する横架具10に対して、前もって、アンカ−ボルト30の挿通セットされた保持具20を組付け用意し、このアンカ−ボルト30のセットされた保持具20を備えた横架具10を、仮枠Kに対して直接組付けるようにしてあっても良い。
【0050】
かくして仮枠Kにセットされた仮保持具Hにあっては、保持具20における筒部21に備えられている固定具22を用いて、この固定具22に挿通用意されているアンカ−ボルト30を上下方向に移動調整して、このアンカ−ボルト30の上端を、構成される基礎40’の天端面から、所定寸法突き出すようにセットすると共に、このアンカ−ボルト30の屈曲の向きを調整するようにしてセットする。
【0051】
このようにして、仮保持具Hの組付け建て込まれている仮枠Kに対して、図4に示すようにコンクリ−ト40を打設する。
このコンクリ−ト40の打設は、建て込まれている型枠パネル50における墨線54を目やすとしてなされると共に、更に、この墨線54上に設けられた墨線55を利用してモルタル41を塗り込んで、コンクリ−ト基礎40’を構成する。
【0052】
かくして構成された布基礎などのコンクリ−ト基礎40’に対して、土台42を、前記アンカ−ボルト30を用いて組付けると共に、柱43などの建て込みをなす。
【0053】
(2) 第2の実施の形態に係るアンカ−ボルトの仮保持具
図7及び図8は第2の実施の形態に係るアンカ−ボルトの仮保持具Hを示している。
この第2の実施の形態に係るアンカ−ボルトの仮保持具Hは、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hと同一の構成の仮保持具Hを用いてアンカ−ボルトを仮枠K、特に、仮枠Kに打設したコンクリ−ト40に対して挿し込み保持する手段として用いたものであって、かかる仮枠Kに、既に打設準備されているコンクリ−ト40に対して、アンカ−ボルトの挿し込みセットをなす以外の構成を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hの構成と同一、又は実質的に同一としてある。
また、仮枠Kに対する仮保持具Hのセッティング手法を、この前もって打設されているコンクリ−ト40に対して、アンカ−ボルト30の挿し込みセットをなすようにした以外の手法を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおけると同一、又は実質的に同一としてある。
【0054】
かかる点から、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hの構成と同一、又は実施的に同一の構成部分については、同一の番号を付して、その説明を省略する。
【0055】
この第2の実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、前記の第1の実施の形態に係るアンカ−ボルトの仮保持具Hの組付け仮枠Kと同様に、各仮枠材Ka、例えば、各型枠パネル50、50などによって、仮枠Kの建て込みをなすと共に、この建て込まれた仮枠Kにおける型枠パネル50の墨線54を目やすとして、コンクリ−ト40を打ち込み、この打ち込みコンクリ−ト40が硬化する前に、この建て込まれた仮枠Kに対して仮保持具Hを装着し、この仮保持具Hを用いてアンカ−ボルト30を、この打ち込み、コンクリ−ト40に対して挿し込み保持するようにしてある。
【0056】
即ち、建て込まれている仮枠Kに対して、前もってアンカ−ボルト30をセットすることなく、一旦、コンクリ−ト40の打ち込みをなした後、この打ち込みコンクリ−ト40が硬化する前に、この打ち込みコンクリ−ト40の天端面からアンカ−ボルト30の下部側を挿し入れ、これを起立状態に保持することで、構成されるコンクリ−ト基礎40’に、アンカ−ボルト30を立設状態に備えつけるものであって、この打ち込みコンクリ−ト40に対するアンカ−ボルト30のセッティング手段として、仮保持具Hを用いるものである。
【0057】
ここで用いられるアンカ−ボルトの仮保持具Hにあっては、この仮保持具Hにアンカ−ボルト30を組付け用意すると共に、この仮保持具Hに組付け用意されたアンカ−ボルト30の先端を、仮枠Kに前もって打ってある墨線と、この仮枠Kにおけるの打設空間に張り込まれている水糸などを目印として、打設されているコンクリ−ト40の天端面から挿し入れ、この状態で、仮保持具Hを型枠K、特に、型枠パネル50の縁鍔50a面に取付けると共に、アンカ−ボルト30を、コンクリ−ト40に対して、所要深さとなるまで押し入れ、この押し入れ位置で、筒部21の固定具22を締め込むことによって、仮保持具Hに対して、アンカ−ボルト30を、その垂設状態、即ち、鉛直の状態で、しかも沈み込まないように、当該コンクリ−ト40が充分に硬化するまで保持するようになす。
【0058】
(3) 第3の実施の形態に係るアンカ−ボルトの仮保持具
図9及び図10は、第3の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものである。
この第3の実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、横架具10を、一対の、相互に組付け位置を調節可能とした横架体10Y、横架体10Yを用いて構成した以外の構成を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおける構成と同一、又は実質的に同一の構成としてある。
また、構成されるアンカ−ボルトの仮保持具Hの取扱いにあっても、この仮保持具Hを構成する横架具10を、長さ調節可能とした点以外において前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおける取扱手法と同一、又は実質的に同一としてある。
【0059】
かかる点から、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおける構成と同一、又は実施的に同一の構成部分については同一の番号を付してその説明を省略する。
【0060】
ここで仮保持具Hを構成する横架具10は、細長板状をなす横架部11の一方の側を、略垂下状態に屈曲することで、板状の係当部12を一連に備えた一対の横架体10Y、横架体10Yを用意し、この一対の各横架体10Y、横架体10Yにおける夫々の係当部12、係当部12が向き合うように、夫々の横架部11、横架部11を重ね合せ状になし、この重ね合せ横架部11、横架部11部における各重ね合せ幅を変更することによって、横架体10Y、横架体10Yの構成する各係当部12、係当部12間の間隔を調整できるように構成してある。
【0061】
即ち、上方に組付け用いられる横架体10Yにおける横架部11には、下方に組付け用いられる横架体10Yの横架部11の各側縁に係当する縁鍔14、14を、垂設状に設け、この各縁鍔14、14内に、下方に組付け用いられる横架体10Yの横架部11が収まり入る構成とすると共に、この各横架体10Y、横架体10Yにおける横架部11部分に開設されているガイドスリット13、ガイドスリット13を、互に連通する態様に設け、このガイドスリット13、ガイドスリット13に組み付け手段、この図示例にあっては、ガイドスリット13の下方側から挿通されたボルト15の突き出し端に蝶ナット16を締めつけることで、この一対の横架体10Y、横架体10Yを、長さ調節可能に組付けた構成としてある。
【0062】
このように構成されたアンカ−ボルトの仮保持具Hにあっては、建て込まれる仮枠K、特に、型枠パネル50、50における各縁鍔50a、50aの外側縁相互の間隔が均一でない場合にあっても、この各縁鍔50aの外側縁に対して、前記各横架体10Y、横架体10Yの縁鍔14を係当し、この各縁鍔50aの外側縁に対する縁鍔14の係当状態において、前記蝶ナット16をボルト15に対して締めつけることで、仮保持具Hを、仮枠Kの上部に対して、緩みなく組付けることができる。
【0063】
かくして用意された仮保持具Hを用いることによって、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hと同様の手法で、アンカ−ボルト30を保持させ、建て込まれる仮枠Kに対してコンクリ−ト40の打設をなし、又は、前記第2の実施の形態に係るアンカ−ボルトの仮保持具Hと同様の手法で、打設されたコンクリ−ト40に対して、アンカ−ボルト30を挿し入れ保持するようにして用いる。
【0064】
(4) 第4の実施の形態に係るアンカ−ボルトの仮保持具
図11及び図12は第4の実施の形態に係るアンカ−ボルトの仮保持具Hを示すものである。
この第4の実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおける横架具10、特に、この横架具10を構成する横架部11に係当部12を設けず、この横架部11を仮枠Kに対して、直接、ビス、釘などを用いて、その位置調整をしながら止着、用い得るように構成した以外の構成を、前記の第1の実施の形態に係るアンカ−ボルトの仮保持具Hの構成と同一、又は実質的に同一の構成としている。
また、かかる横架部11を、建て込まれる仮枠K、特に型枠パネル50における縁鍔50aに対して、直接ビス、釘18を用いて留めつけ用い得るようにした以外の取扱い手法を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hの取扱い手法と同一、又は実質的に同一としてある。
【0065】
かかる点から、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおけると同一、又は実質的に同一の構成部分については、同一の番号を付して、その説明を省略する。
【0066】
この実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、建て込まれる仮枠Kに対して組付けられる仮保持具Hにおける横架具10、特に、この横架具10を構成する横架部11を、係当部12を備えていない平たい板状のものとして用意すると共に、その両端部分に、夫々ビス、釘などの挿通孔17を開設用意し、建て込まれる仮枠Kの建て込みに際して、又は、建て込み後に、この仮保持具Hを、仮枠Kに対して、ビス、釘18を用いて止着用いる構成としてある。
【0067】
従って、こゝで構成、用意される仮保持具Hは、これを、仮枠Kを構成する他のつなぎ板と同様に、各仮枠材Ka、Kaの連設手段として用いることができる。
また、既に構成されている仮枠Kに対して、この仮枠Kを構成する各仮枠材Ka、Ka、特に、設置間隔の一致していない各型枠パネル50、50に対して、確実に対応し、且つ、これに止着して用いることができる。
【0068】
かくして構成されるアンカ−ボルトの仮保持具Hにあっては、建て込まれた仮枠Kに対して、アンカ−ボルト30を装着しない態様、又は、前もってアンカ−ボルト30を装着した態様で、この建て込まれている仮枠Kにおける各型枠パネル50、50間に亘って、架設状態にセットし、次いで、これを、型枠パネル50に設けた墨線、仮枠Kに張設された水糸などを利用してアンカ−ボルト30の装着される筒部21、又は、筒部21に装着されているアンカ−ボルト30が所定の位置に位置づけられる状態になすと共に、前記挿通孔17を用いて、ビス、釘18などで型枠パネル50の縁鍔50aに止着するようにして、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hと同様に用いる。
【0069】
また、ここで構成されるアンカ−ボルトの仮保持具Hを、建て込まれた仮枠Kに対して、前もってコンクリ−ト40を打設し、この打設コンクリ−ト40が硬化する前に、この打設コンクリ−ト40に対するアンカ−ボルト30の挿し込み保持手段として、前記第2の実施の形態に係るアンカ−ボルトの仮保持具Hと同様に用いる。
【0070】
尚、図中19は、アンカ−ボルト30の上端部分に被嵌状態に装着用いる塩ビチューブなどのプラスチックチューブを示したものであって、前記で、仮保持具Hに挿し込み保持されているアンカ−ボルト30の上端部分、特に土台42などに対する取付けに際して用いられる雄ネジ部分に対して装着し、この雄ネジ部分に対するセメントなどの付着の防止をなす。
また、このチューブ19を用いて、筒部21に挿通されたアンカ−ボルト30を、固定具22の締め込みに先立って、仮に保持し、アンカ−ボルト30を、所要の高さ位置にセットした後に、固定具22を用いて、アンカ−ボルト30を筒部21に対して本留めをなすようにして用いても良い。
【0071】
かかる点から、このチューブ19は、例えば、軟質、あるいは半硬質のプラスチック製の筒体として構成し、このチューブ19に対して、圧挿入されるアンカ−ボルト30の上部、特に、雄ネジ部が、都合良く、仮留め状態に保持される構成、材質のものとして用意するのが好ましい。
【0072】
(5) 第5の実施の形態に係るアンカ−ボルトの仮保持具
図13及び図14は第5の実施の形態に係るアンカ−ボルトの仮保持具Hを示している。
この第5の実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、仮保持具Hを構成する横架具10、特に、横架部11を、一枚の細長い平板状の構成とし、第1の実施の形態に係るアンカ−ボルトの仮保持具Hにおけるような係当部12を設けず、この横架部11に、ビス、釘18などの挿通孔17を設けると共に、保持具20を構成する筒部21を、この横架部11に対して直接溶接、一体とした以外の構成を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hの構成と同一、又は実質的に同一としてある。
また、かかる筒部21を横架部11に対して一体に設けた点、及び、係当部12に代えてビス、釘18などの挿通孔17を設けたことに伴う取扱い操作での異なり以外の取扱い操作を、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hと同一としてある。
【0073】
かかる点から、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hの構成と同一、又は実質的に同一の構成部分については、同一の番号を付して、その説明を省略する。
【0074】
この実施の形態に係るアンカ−ボルトの仮保持具Hにあっては、アンカ−ボルト30の挿通保持される保持具20を、横架具10と一体に設け、横架具10に対する保持具20の移動組付けをなすことなく、この横架具10自体を、仮枠Kに対して、当該仮枠Kの幅方向に移動調整しながらビス、釘18などによって止着できる構成としてある。
【0075】
即ち、仮保持具Hを構成する横架具10を、係当部12を備えていない平たい一枚の細長い板体としての横架部11部分のみで構成すると共に、この横架部11部分にガイドスリット13を開設せず、この横架部11部分に、直接保持具20を構成する筒部21を溶接し、この筒部21と、横架部11とにアンカ−ボルト30の挿通孔24を設け、この挿通孔24に挿通されるアンカ−ボルト30の締めつけ手段としての固定具22を、該筒部21に備えつけるようにしたものである。
【0076】
かくして構成されるアンカ−ボルトの仮保持具Hにあっては、建て込まれた仮枠Kに対して、アンカ−ボルト30を装着しない態様、又は、前もってアンカ−ボルト30を装着した態様で、この建て込まれている仮枠Kにおける各型枠パネル50、50間に亘って、架設状態にセットし、次いで、これを、型枠パネル50に設けた墨線、仮枠Kに張設された水糸などを利用してアンカ−ボルト30の装着される筒部21、又は、筒部21に装着されているアンカ−ボルト30が所定の位置に位置づけられる状態になすと共に、前記挿通孔17を用いて、ビス、釘18などで型枠パネル50の縁鍔50aに止着するようにして、前記第1の実施の形態に係るアンカ−ボルトの仮保持具Hと同様に用いる。
【0077】
また、ここで構成されるアンカ−ボルトの仮保持具Hを、建て込まれた仮枠Kに対して、前もってコンクリ−ト40を打設し、この打設コンクリ−ト40が硬化する前に、この打設コンクリ−ト40に対するアンカ−ボルト30の挿し込み保持手段として、前記第2の実施の形態に係るアンカ−ボルトの仮保持具Hと同様に用いる。
【0078】
【発明の効果】
本発明に係るアンカ−ボルトの仮保持具Hは、前記の特長ある構成、特に、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10と、この横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20とを備えた構成としたことによって、
仮枠Kに対して、コンクリ−トの打設前に、アンカ−ボルト30を、当該仮枠Kに対して、容易に、所期の位置に、しかも、所期の高さを備えたものとしてセッティングすることができる特長を有している。
【0079】
また、かかるアンカ−ボルトの仮保持具Hにセッティングされたアンカ−ボルト30は、仮枠Kに対するコンクリ−トの打設に際しても、当初のセッティング位置からのずれ出し、傾倒、浮き上がり、あるいは沈み込みなどを生ずることがなく、当初のセッティングの状態を効果的に維持することができる特長を有している。
【0080】
更に、かかる構成よりなるアンカ−ボルトの仮保持具Hを用いて、打設コンクリ−トに対してアンカ−ボルトの挿し込み保持をなすようにした場合にあっては、コンクリ−トの打設後、直ちにアンカ−ボルトを、この打設コンクリ−トに対して挿し込みセットできると共に、この打設コンクリ−トに挿し込みセットされたアンカ−ボルトを、鉛直の状態に正確に保持し、且つ、この挿し込みセットされたアンカ−ボルトを、打設コンクリ−トに対して沈降させることなく確実に所期の突き出し寸法を備えたものとして設けることができる特長を有している。
【0081】
次いで、前記のアンカ−ボルトの仮保持具Hにあって、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10が、型枠パネル50などの構成仮枠材Kaの上端面に支承される横架部11と、この横架部11の両側端部又はいずれか一方の側端部にあって、前記型枠パネル50などの構成仮枠材Kaの外側面に当接される係当部12とを備えている構成としたことによって、
これを容易に仮枠Kに対して装着、用いることができると共に、このアンカ−ボルト30の保持に用いられる仮保持具Hを、仮枠Kにおける型枠パネル50などの構仮枠材Kaを連設するつなぎ板として用い得る特長を有している。
【0082】
更に、前記のアンカ−ボルトの仮保持具Hにあって、コンクリートの打ち込み仮枠Kを構成する型枠パネル50などの構成仮枠材Ka間に亘って備えつけられる横架具10が、2以上の、相互に組付け位置調節の可能な横架部11を有する横架体10Y、10Yの組み付けによって構成したことによって、
仮枠Kにおけるコンクリ−トの打設間隙に変化がある場合にあっても、構成される各仮枠Kに対して、容易に、しかも確実に、仮保持具Hの取付けが可能とされ、この仮保持具Hを用いて、確実にアンカ−ボルト30の仮枠Kに対する組付け、保持が可能とされる特長を有している。
【0083】
次いで又、前記のアンカ−ボルトの仮保持具Hにあって、横架具10に対して、アンカーボルト30を垂直状態に保持する保持具20が、前記横架具10における横架方向に向けて移動自在に備えられている構成としたことによって、
この仮保持具Hを仮枠Kに装着した後、この仮保持具Hに備えつけられている保持具20を、仮保持具Hの横架方向に移動することによって、仮枠Kに対してアンカ−ボルト30のセッティングの位置決めをなすことができる特長を有している。
【0084】
更に又、前記のアンカ−ボルトの仮保持具Hにあって、横架具10に対してアンカーボルト30を垂直状態に保持する保持具20が、アンカーボルト30の上部側の挿通される筒部21と、この挿通アンカーボルト30を該筒部21に固定する固定具22とを備えている構成としたことによって、
アンカ−ボルト30を仮保持具Hに対して、容易に鉛直状態のままで、上下方向に移動することができ、しかも所定の高さ位置において、これを位置決めセットすることができる特長を有している。
【図面の簡単な説明】
【図1】 第1の実施の形態に係るアンカ−ボルトの仮保持具Hの仮枠Kに対する組付け前の状態を示す斜視図
【図2】 同仮枠Kに仮保持具Hとアンカ−ボルト30を備えつけた状態の断面図
【図3】 同切断面を異にして示す拡大断面図
【図4】 同コンクリ−ト40の打設した状態の拡大断面図
【図5】 同構成されたコンクリ−ト基礎40’に対して土台42を取付けた状態を示す拡大断面図
【図6】 同構成されたコンクリ−ト基礎40’に土台、柱などの組付け状態を示す要部斜視図
【図7】 第2の実施の形態に係るアンカ−ボルトの仮保持具Hを、仮枠Kに組付ける前の状態を示す斜視図
【図8】 同仮枠Kに仮保持具Hとアンカ−ボルト30とを備えつけた状態の断面図
【図9】 第3の実施の形態に係るアンカ−ボルトの仮保持具Hを、仮枠Kに組付ける前の状態を示す斜視図
【図10】 同仮枠Kに仮保持具Hとアンカ−ボルト30とを備えつけた状態の断面図
【図11】 第4の実施の形態に係るアンカ−ボルトの仮保持具Hを、仮枠Kに組付ける前の状態を示す斜視図
【図12】 同仮枠Kに仮保持具Hとアンカ−ボルト30とを備えつけた状態の断面図
【図13】 第5の実施の形態に係るアンカ−ボルトの仮保持具Hを、仮枠Kに組付ける前の状態を示す斜視図
【図14】 同仮枠Kに仮保持具Hとアンカ−ボルト30とを備えつけた状態の断面図
【符号の説明】
10 横架具
10Y 横架体
11 横架部
12 係当部
20 保持具
21 筒部
22 固定具
30 アンカーボルト
40 打込みコンクリート
40’ コンクリート基礎
K 仮枠
Ka 仮枠材
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to provision of an anchor bolt temporary holding tool which can be provided with an anchor bolt accurately positioned at a predetermined position with respect to a concrete foundation or the like.
[0002]
[Prior art]
In the case of a concrete foundation such as a fabric foundation, an anchor bolt used for mounting a foundation or the like is usually provided so as to be integrally fixed to the constructed concrete foundation. Yes.
[0003]
Such anchor bolts are usually prepared in advance for mounting to a reinforcing frame such as a temporary frame for driving a concrete foundation or a hoop that constitutes the concrete foundation. The foundation concrete is driven into the placement temporary frame so as to protrude upward from the top end surface of the construction concrete, so that the foundation is fixedly provided on the concrete foundation.
[0004]
In addition, such anchor bolts are inserted into the placement concrete from the surface of the placement concrete before the foundation concrete that has been driven into the temporary frame is hardened. Thus, the upper part of the concrete base is set so as to protrude upward by a predetermined dimension from the top end surface, so that the concrete base is fixedly provided.
[0005]
[Problems to be solved by the invention]
However, the anchor bolt is accurately positioned at a predetermined position and from the top end surface of the constructed concrete base so as to have a predetermined protruding dimension, and this is positioned as a temporary frame member or a reinforcing bar in the bar arrangement. In order to securely assemble the temporary frame, there is an inconvenience of requiring temporary frame construction that requires a lot of work by an expert when constructing the temporary frame.
[0006]
In addition, in this method, when the concrete is driven after the temporary frame construction, the anchor bolt is positioned at the correct position and positioned vertically, or tilted, or the protruding dimension is set. There were difficulties such as inconsistencies.
[0007]
Further, the anchor in which the lower side of the anchor bolt is inserted into the placing concrete before the placing concrete is sufficiently cured with respect to the placing concrete. -In the bolt embedding method, if the anchor bolt is inserted too early with respect to the placing concrete, the anchor bolt may sink into the placing concrete. As a result, there is a difficulty that a predetermined protruding dimension cannot be provided to the anchor bolt of the constituent concrete foundation. In such a case, the anchor bolt inserted into the placing concrete may tilt or fall over time, and the anchor bolt inserted and installed in any case Until the casting concrete is cured, it is necessary to carefully monitor and correct the insertion posture of the anchor bolt inserted and installed as needed.
[0008]
Further, in the method of inserting the anchor bolt into the placing concrete, when the concrete into which the anchor bolt is inserted is already in a hardened state, the anchor bolt is inserted into the anchor bolt. There is a difficulty that it cannot be inserted into the installation concrete so as to reach a sufficient depth easily, surely, and there is a difficulty in generating cracks on the top end surface of the installation concrete. It was.
[0009]
From this point, in the method of inserting the anchor bolt into the placing concrete and always installing the anchor bolt, while confirming the hardening condition of the casting concrete, the anchor is fixed at once and at a stretch. It is necessary to install the bolt by inserting it into the driving concrete. For this reason, it is necessary to rely on a long-time intuition by a skilled worker and to perform processing at once with a lot of human hands.
[0010]
In particular, in the installation of anchor bolts inserted into the placing concrete, the concrete is often placed several times at each site, It is necessary to sew the interval between the placement of the concrete and to insert the anchor bolt into the placement concrete. Therefore, there are many inconveniences in managing the work schedule.
[0011]
The present invention eliminates the disadvantages of the conventional anchor bolt assembly method, and enables the anchor bolts provided on the concrete foundation to be easily and accurately positioned. It is an object of the present invention to provide a temporary holder for an anchor bolt in which the anchor bolt can be surely provided on the placing concrete without causing the bolt to be positioned.
[0012]
[Means for Solving the Problems]
The anchor bolt temporary holder H according to the present invention is provided with the anchor bolt temporary holder H according to the first aspect of the present invention between the constituent temporary frame members Ka constituting the concrete driving temporary frame K. A horizontal fixture 10 and a holder 20 for holding the anchor bolt 30 in a vertical state with respect to the horizontal fixture 10,
The horizontal frame 10 is provided on a horizontal frame 11 supported on the upper end surface of the constituent temporary frame member Ka, and both side end portions or any one side end portion of the horizontal frame portion 11, and the constituent temporary frame The retainer 20 includes an engaging portion 12 that is in contact with the outer surface of the material Ka, and the holder 20 is inserted into an upper portion of the anchor bolt 30 and a tubular portion 21 is inserted into the tubular anchor bolt 30. And a fixture 22 for fixing to the portion 21. As a configuration.
[0013]
The invention of claim 2 The anchor bolt temporary holder H according to the above Invention of Claim 1 In the anchor bolt temporary holding tool H according to the present invention, two or more horizontal frames 10 provided between the constituent temporary frame materials Ka constituting the concrete driving temporary frame K are adjusted to each other. It is comprised by the assembly | attachment of the horizontal bodies 10Y and 10Y which have the horizontal part 11 which can be.
[0014]
Furthermore, the invention of claim 3 The anchor bolt temporary holder H according to the present invention is the anchor bolt temporary holder H according to the first aspect of the invention, and holds the anchor bolt 30 in a vertical state with respect to the horizontal frame 10. The tool 20 is configured to be movable in the horizontal direction in the horizontal tool 10.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, each embodiment of the anchor bolt temporary holder H according to the present invention will be described in detail.
1 to 6 show an anchor bolt temporary holder H according to the first embodiment. In FIG. 1, the anchor bolt temporary holder temporary holder H is temporarily attached to a temporary frame. The state used for K is a perspective view, FIG. 2 shows a state in which this is mounted on the temporary frame K in a cross section, and FIG. 3 shows the cross section in a different orientation.
Further, in FIG. 4, the anchor bolt is mounted on the temporary frame K using the anchor bolt temporary holder H, and the concrete is placed on the anchor frame K, and FIG. FIG. 6 shows a state in which the foundation 42 is attached to the concrete foundation, and FIG. 6 shows a state in which the foundation 42, the pillar 43 and the like are provided to the constructed concrete foundation 40 ′. As shown.
[0016]
7 and 8 show an anchor bolt temporary holder H according to the second embodiment. In FIG. 7, the anchor bolt temporary holder H is shown in FIG. The state used for the temporary frame K provided is a perspective view, and in FIG. 8, the state where the anchor bolt is inserted into the concrete 40 placed on the temporary frame K is shown as a cross section.
[0017]
9 and 10 show an anchor bolt temporary holder H according to the third embodiment. In FIG. 9, the anchor bolt temporary holder H is mounted on a temporary frame K. FIG. 10 is a sectional view showing a state where the anchor bolt temporary holder H is mounted on the temporary frame K together with the anchor bolt.
[0018]
11 and 12 show an anchor bolt temporary holder H according to the fourth embodiment. In FIG. 11, the anchor bolt temporary holder H is mounted on a temporary frame K. FIG. 12 is a sectional view showing a state where the anchor bolt temporary holder H is mounted on the temporary frame K together with the anchor bolt.
[0019]
13 and 14 show an anchor bolt temporary holder H according to the fifth embodiment. In FIG. 13, the anchor bolt temporary holder H is mounted on a temporary frame K. FIG. 14 is a sectional view showing a state where the anchor bolt temporary holding tool H is mounted on the temporary frame K together with the anchor bolt.
[0020]
Here, the anchor bolt temporary holder H according to the embodiment of the present invention is a horizontal frame provided between constituent temporary frame members Ka such as the formwork panel 50 constituting the concrete placement temporary frame K. 10 and a holding tool 20 that holds the anchor bolt 30 in a vertical state with respect to the horizontal frame 10.
[0021]
The anchor bolt temporary holder H configured as described above can be easily attached to the temporary frame K with the anchor bolt 30 before the concrete is placed. It can be set at the position of the period and with the expected height.
[0022]
Further, the anchor bolt 30 set in the temporary holding tool H of the anchor bolt is shifted from the original setting position, tilted, lifted, or sinked when the concrete is placed on the temporary frame K. Thus, the initial setting state can be effectively maintained.
[0023]
Further, when the anchor bolt temporary holder H having such a structure is used to insert and hold the anchor bolt to the placing concrete, the concrete is placed. Immediately afterwards, the anchor bolt can be inserted into and set in the driving concrete, and the anchor bolt inserted and set in the driving concrete is accurately held in a vertical state, and The anchor bolt that has been inserted and set can be reliably provided with an expected protruding dimension without being settled against the driving concrete.
[0024]
Next, in the temporary holding tool H of the anchor bolt, the horizontal frame 10 provided between the constituent temporary frame members Ka such as the mold panel 50 that constitutes the concrete driving temporary frame K is formed into the mold frame. The horizontal frame part 11 supported on the upper end surface of the constituent temporary frame material Ka such as the panel 50, and both the side edge part or any one side edge part of the horizontal frame part 11, such as the mold panel 50 One of the other typical embodiments is a configuration including the engagement portion 12 that is in contact with the outer surface of the configuration temporary frame material Ka.
[0025]
The anchor bolt temporary holder H configured as described above can be easily mounted on and used with the temporary frame K, and the temporary holder H used for holding the anchor bolt. Can be made to function as a connecting plate for continuously providing a temporary frame material Ka such as the formwork panel 50 in the temporary frame K.
[0026]
Further, in the temporary holding tool H of the anchor bolt, two or more horizontal supports 10 provided between the constituent temporary frame members Ka such as the formwork panel 50 constituting the concrete placing temporary frame K are provided. One of the other typical embodiments is constituted by assembling the horizontal bodies 10Y and 10Y each having the horizontal part 11 capable of adjusting the assembly position.
[0027]
In the anchor bolt temporary holder H configured as described above, even if there is a change in the concrete placing gap in the temporary frame K, the temporary bolt K is configured to each temporary frame K configured. The temporary holder H can be easily and securely attached, and the temporary holder H can be used to securely assemble and hold the anchor bolt 30 with respect to the temporary frame K.
[0028]
Next, in the temporary holding tool H for the anchor bolt, the holding tool 20 that holds the anchor bolt 30 in a vertical state with respect to the horizontal tool 10 is directed in the horizontal direction in the horizontal tool 10. In addition, the configuration of being movably provided is one of other typical embodiments.
[0029]
In the anchor bolt temporary holder H configured as described above, after the temporary holder H is mounted on the temporary frame K, the holder 20 provided in the temporary holder H is temporarily held. By moving the tool H in the horizontal direction, the setting of the anchor bolt 30 relative to the temporary frame K can be performed.
[0030]
Furthermore, in the temporary holding tool H for the anchor bolt, the holding part 20 for holding the anchor bolt 30 in a vertical state with respect to the horizontal member 10 is inserted into the cylindrical part on the upper side of the anchor bolt 30. 21 and a fixing tool 22 for fixing the insertion anchor bolt 30 to the cylindrical portion 21 are one of other typical embodiments.
[0031]
In the anchor bolt temporary holder H configured as described above, the anchor bolt 30 can be easily moved vertically with respect to the temporary holder H while being in a vertical state. This can be positioned and set at a predetermined height position.
[0032]
(1) Anchor bolt temporary holder according to the first embodiment
First, the anchor bolt temporary holder H according to the first embodiment shown in FIGS. 1 to 6 will be described.
The anchor bolt temporary holder H according to the typical first embodiment is arranged such that the anchor bolt is fixed to the temporary frame K before placing the concrete on the temporary frame K. A temporary holder H is prepared for mounting, and the anchor bolt 30 is positioned and held at a predetermined position with respect to the temporary frame K constituted by using the temporary holder H, and the anchor bolt 30 is fixed to the temporary frame K. After the assembly is prepared, the concrete 40 is driven into the temporary frame K.
[0033]
The temporary holding tool H used here is a horizontal frame 10 placed and supported on the top end of the constructed temporary frame K, and the horizontal direction of the horizontal frame 10 on the horizontal frame 10. The holder 20 is provided so as to be movable with respect to the holder.
[0034]
The temporary holding tool H according to the first embodiment is an anchor bolt for the temporary frame K, and in the illustrated example, the temporary frame K using the formwork panel 50 as the temporary frame material Ka. For example, the anchor holder temporary holder H is assembled to a temporary frame K using a mold plate, a mold plate for footing placement, or the like. It may be like that.
[0035]
The temporary frame K shown here has a pair of granite stones 44 disposed at the root cutting portion, and a discarded concrete 45 is placed thereon, and a pair of cloth foundations are formed on the top edge of the discarded concrete 45. The formwork panels 50 and 50 are erected with a predetermined interval as the temporary formwork material Ka, and the formwork panels 50 and 50 are held by the lock 51 and the rooting pile 52, and at the same time, A connecting plate 53 is struck between the panels 50 and 50 so that a predetermined concreting gap for the concrete 40 is formed between the mold panels 50 and 50.
[0036]
The formwork panel 50 used in the configuration of the temporary frame K is configured to include a substantially horizontal edge rim 50a that protrudes outward at the lower end and the upper end thereof, and the edge rim 50a provided at the lower end. Is placed in close contact with the surface of the discarded concrete 44, so that the formwork panel 50 is provided in a standing state on the surface of the discarded concrete 44, and the edge rod 50a provided at the upper end. A connecting plate 53 is attached between 50a, and the respective side end portions of the connecting plate 53 are nailed to the edge ribs 50a, 50a so that the mutual formwork panels 50, 50 are connected. It is as.
[0037]
Therefore, the temporary frame K configured here has the frame 50 which constitutes the temporary frame Ka and Ka which form the temporary frame K at the upper end, and which is horizontal and has the same plane as each other. 50a, and the horizontal fixture 10 is conveniently mounted on and attached to the edge rods 50a, 50a constituting each formwork panel 50.
[0038]
Here, the horizontal frame 10 constituting the temporary holder H includes an elongated plate-shaped horizontal frame 11 placed in close contact with the surfaces of the edge ribs 50a and 50a of the mold panel 50, and the plate. Each of which constitutes a temporary frame K, and is provided with a plate-like engaging portion 12 which is formed on both side ends of the horizontally extending portion 11 and bent downward in a substantially hanging state. When the horizontal frame 10 is attached between the temporary frame members Ka, Ka, the engaging portion 12 of the horizontal frame 10 is connected to each edge of the form panel 50 constituting the temporary frame K. It is configured to be caught on the outer surface of 50a.
[0039]
The temporary holder H configured as described above is used as the temporary holder H of the anchor bolt 30 and at the same time, the temporary frame members Ka in the temporary frame K, in particular, the top end sides of the formwork panels 50 and 50. As the connecting tool, the same as the connecting plate 53 can be used.
[0040]
From this point, the horizontal fixture 10 in the temporary holding tool H used here is prepared as a bent metal such as an iron plate or a steel plate, and the engaging portion 12 constituting the horizontal fixture 10 is temporarily installed. Each type in the temporary frame K is conveniently hooked to the side surface of each edge frame 50a in each form panel 50 of the frame K, and between the engaging portions 12 and the engaging portions 12 in the horizontal frame 10. The frame panels 50 and 50, in particular, the side edges of the edge flanges 50a and 50a,
By doing so, the said horizontal fixture 10 can be used as a connection means of each formwork panel 50 and 50 mutually.
[0041]
The horizontal part 11 that constitutes the horizontal tool 10 includes a horizontal direction of the horizontal tool 10, that is, a direction between the respective formwork panels 50, 50, more specifically, each engaging part 12, A guide slit 13 is provided so as to communicate between the upper and lower surfaces in a direction across the side where the engaging portion 12 is provided, and the upper end side of the anchor bolt 30 is moved downward through the guide slit 13. It is set as the structure which can be penetrated upwards.
[0042]
The holder 20 that constitutes the temporary holder H together with the horizontal bracket 10 extends across the width of the horizontal portion 11 that forms a plate in the horizontal bracket 10, particularly the horizontal portion 11 that forms the plate. A sliding frame piece 23 provided as a pair of engaging pieces 23a, 23a that are bent in a hanging state so that both side ends thereof are engaged with side surfaces in the width direction of the horizontal portion 11; A cylindrical portion 21 provided integrally on the sliding frame piece 23 and a fixture 22 screwed from the peripheral side surface of the cylindrical portion 21 are provided.
[0043]
That is, the sliding frame piece 23 that constitutes the holder 20 is in a state of being laid across the plate-like horizontal portion 11 of the horizontal member 10, and the sliding frame piece 23 is connected to the horizontal portion 11. It is slidably contacted with the plate-like surface, and the respective engagement pieces 23a, 23a are assembled so as to engage with the side edges of the horizontal portion 11 forming the plate shape. That is, in the horizontal mount 10 provided between the formwork panels 50 and 50, the structure can be freely moved between the formwork panels 50 and 50, and the engagement pieces 23a and 23a are provided. Are held in sliding contact with the side edges of the plate-like horizontal portion 11 so that the holder 20 is in a straddling state that can be safely moved with respect to the horizontal member 10.
[0044]
The cylindrical portion 21 is integrally provided on the upper surface of the sliding frame piece 23 having such a structure by a technique such as welding, and a hole communicating with the cylindrical portion 21 is provided in the sliding frame piece 23. The upper end side of the anchor bolt 30 can be inserted into the hole 24 provided in communication with the frame piece 23 and the cylindrical portion 21.
[0045]
Further, the cylindrical portion 21 constituting the holder 20 is provided with a fixing tool 22 such as a butterfly bolt on the outer portion thereof, and the anchor bolt 30 inserted through the cylindrical portion 21 in the holder 20 is held. Yes.
That is, in this illustrated example, a screw insertion hole 25 of a butterfly bolt constituting the fixing tool 22 is provided on the outer peripheral side of the horizontal frame 10 constituting the holder 20, and the hole is inserted from the screw insertion hole 25. A fixing tool 22 for fastening the anchor bolt 30 inserted in the hole 24 is constituted by a butterfly bolt that is screwed back and forth into the hole 24.
[0046]
The temporary holding tool H thus prepared is formed by connecting the formwork panels 50, 50 to the built-in temporary form K, in particular, the upper edge flange 50a of the formwork panels 50, 50. It is mounted in the same manner as the connecting plate 53, and this is assembled to the temporary frame K and used.
That is, the plate surface of the horizontal portion 11 in the temporary holder H is placed on the surface of the edge rod 50a, and each engagement portion 12 is engaged with each side edge of the edge flange 50a. The temporary holder H is attached to the temporary frame K.
[0047]
The temporary holding tool H attached to the temporary frame K is in advance with respect to the temporary frame K so that the anchor bolt 30 is provided in a standing state at a predetermined position of the configured concrete base 40 '. The set position of the anchor bolt 30 is determined while sliding on the edge rod 50a in the temporary frame K, and the set position of the anchor bolt 30 is set. The horizontal frame 10 is positioned or moved and positioned using the black line provided on each formwork panel 50 as a mark.
[0048]
Thus, with respect to the holder 20 provided to the temporary holder H set at a predetermined position of the temporary frame K, the anchor bolt 30 is provided in advance, or the holder 20 of the temporary holder H provided. On the other hand, the anchor bolt 30 is inserted and fastened and fixed using the fixing tool 22, and the holding tool 20 is moved relative to the horizontal frame 10 constituting the temporary holding tool H. Then, the anchor bolt 30 provided in the holder 20 is moved and set to an appropriate position in the placement space of the concrete 40 constituting the temporary frame material Ka.
For positioning the anchor bolt 30 in the width direction of the temporary frame K, the holding tool 20 is moved with respect to the horizontal frame 10 so as to follow the water string to be stretched during the temporary frame construction. Make it.
[0049]
In addition, in assembling the temporary holder H to the temporary frame K, the holder 20 having the anchor bolts 30 inserted in advance is assembled to the horizontal frame 10 constituting the temporary holder H. The horizontal frame 10 provided with the holding tool 20 on which the anchor bolt 30 is set may be directly assembled to the temporary frame K.
[0050]
Thus, in the temporary holding tool H set in the temporary frame K, the anchor bolt 30 provided to be inserted into the fixing tool 22 by using the fixing tool 22 provided in the cylindrical portion 21 of the holding tool 20. Is adjusted so that the upper end of the anchor bolt 30 protrudes from the top end surface of the foundation 40 'to be constructed with a predetermined dimension, and the bending direction of the anchor bolt 30 is adjusted. Set it like this.
[0051]
In this manner, the concrete 40 is placed on the temporary frame K in which the temporary holding tool H is assembled and built, as shown in FIG.
The concrete 40 is placed so as to make the black line 54 in the built-in formwork panel 50 visible. Further, the mortar 41 is applied using the black line 55 provided on the black line 54. The concrete foundation 40 '.
[0052]
The foundation 42 is assembled to the concrete foundation 40 ′ such as the fabric foundation using the anchor bolts 30 and the pillars 43 and the like are built.
[0053]
(2) Anchor bolt temporary holder according to the second embodiment
7 and 8 show an anchor bolt temporary holder H according to the second embodiment.
The anchor bolt temporary holder H according to the second embodiment is an anchor using the temporary holder H having the same configuration as the anchor bolt temporary holder H according to the first embodiment. The bolt is used as means for inserting and holding the bolt into the temporary frame K, in particular, the concrete 40 placed in the temporary frame K, and the concrete which has already been prepared for placement in the temporary frame K. The structure of the anchor 40 other than the anchor bolt insertion set is the same as or substantially the same as the structure of the anchor bolt temporary holder H according to the first embodiment.
Further, as a method for setting the temporary holding tool H with respect to the temporary frame K, a method other than that in which the anchor bolt 30 is inserted into the previously placed concrete 40 is used. It is the same as or substantially the same as that of the temporary holding tool H of the anchor bolt according to the first embodiment.
[0054]
From this point, the same or practically the same components as those of the anchor bolt temporary holder H according to the first embodiment are designated by the same reference numerals and the description thereof is omitted. .
[0055]
In the anchor bolt temporary holder H according to the second embodiment, similarly to the assembly temporary frame K of the anchor bolt temporary holder H according to the first embodiment, Each temporary frame material Ka, for example, each mold panel 50, 50, etc. is used to build the temporary frame K, and to make the ink line 54 of the mold panel 50 in the built temporary frame K easy to see. -The toe 40 is driven, and before the driving concrete 40 is hardened, the temporary holding tool H is attached to the built temporary frame K, and the anchor bolt 30 is attached using the temporary holding tool H. The driving and inserting are performed with respect to the concrete 40.
[0056]
That is, without setting the anchor bolt 30 in advance to the temporary frame K that has been built, after the concrete 40 has been driven once, before the driven concrete 40 is cured, By inserting the lower side of the anchor bolt 30 from the top end surface of the driving concrete 40 and holding it in an upright state, the anchor bolt 30 is erected on the constructed concrete base 40 '. The temporary holding tool H is used as a setting means for the anchor bolt 30 with respect to the driving concrete 40.
[0057]
The anchor bolt temporary holder H used here is prepared by assembling the anchor bolt 30 to the temporary holder H, and the anchor bolt 30 prepared and assembled to the temporary holder H. Insert the tip from the top end surface of the concrete 40 that has been placed, using the black line that has been struck in advance to the temporary frame K and the water thread that has been placed in the placement space in the temporary frame K as a mark. In this state, the temporary holder H is attached to the mold K, particularly the edge 50a surface of the mold panel 50, and the anchor bolt 30 is pushed into the concrete 40 until the required depth is reached. In this push-in position, the fixing bolt 22 of the cylindrical portion 21 is tightened, so that the anchor bolt 30 is not vertically depressed with respect to the temporary holding tool H, that is, in a vertical state. The concrete 40 forms to hold until cured sufficiently.
[0058]
(3) Anchor bolt temporary holder according to the third embodiment
9 and 10 show an anchor bolt temporary holder H according to a third embodiment.
In the anchor bolt temporary holder H according to the third embodiment, the horizontal body 10Y and the horizontal body 10Y can be adjusted with respect to each other. The configuration other than that configured by using the anchor bolt is the same as or substantially the same as the configuration of the anchor bolt temporary holder H according to the first embodiment.
In addition, even when handling the temporary holding tool H of the anchor bolt that is configured, the first embodiment described above except that the length of the horizontal frame 10 constituting the temporary holding tool H can be adjusted. It is the same as the handling method in the temporary holder H of the anchor bolt which concerns on, or is substantially the same.
[0059]
In view of this, the same or practically the same components as those in the anchor bolt temporary holder H according to the first embodiment will be given the same reference numerals and explanation thereof will be omitted.
[0060]
Here, the horizontal frame 10 constituting the temporary holder H is provided with a series of plate-like engaging portions 12 by bending one side of the horizontal plate portion 11 having an elongated plate shape into a substantially hanging state. A pair of horizontal bodies 10Y and 10Y are prepared, and each of the horizontal bodies 10Y and each of the horizontal portions 10Y, the respective engaging portions 12 and the engaging portions 12 of the horizontal body 10Y face each other. The horizontal body 10Y and the horizontal body 10Y are configured by forming the part 11 and the horizontal part 11 in a superposed manner and changing the overlapping widths of the superposed horizontal part 11 and the horizontal part 11 part. Each engaging portion 12 and the interval between the engaging portions 12 can be adjusted.
[0061]
That is, on the horizontal part 11 in the horizontal body 10Y used for upper assembly, the edge rods 14 and 14 engaged with the respective side edges of the horizontal part 11 of the horizontal body 10Y used for lower installation, Each of the horizontal bodies 10Y and 10Y is provided in a vertically-arranged manner so that the horizontal frame 11 of the horizontal body 10Y used for assembly is accommodated in each of the edge rods 14 and 14. The guide slit 13 and the guide slit 13 which are established in the horizontal portion 11 in the above are provided in such a manner that they communicate with each other. The guide slit 13 and the means for assembling to the guide slit 13, and in the illustrated example, the guide slit The pair of horizontal bodies 10Y and 10Y are assembled so as to be adjustable in length by tightening the wing nut 16 to the protruding end of the bolt 15 inserted from below 13.
[0062]
In the anchor bolt temporary holder H configured as described above, the interval between the outer edges of the temporary frames K to be built, particularly the edge frames 50a and 50a in the formwork panels 50 and 50, is not uniform. Even in this case, the lateral body 10Y and the lateral edge 14 of the lateral body 10Y are engaged with the outer edge of each of the edge edges 50a, and the edge edge 14 with respect to the outer edge of the edge edge 50a. When the wing nut 16 is fastened to the bolt 15, the temporary holder H can be assembled to the upper portion of the temporary frame K without loosening.
[0063]
By using the temporary holding tool H thus prepared, the temporary frame K to be built by holding the anchor bolt 30 in the same manner as the temporary holding tool H of the anchor bolt according to the first embodiment. For example, the concrete 40 is driven by the same method as the anchor bolt temporary holder H according to the second embodiment. The anchor bolt 30 is inserted and used.
[0064]
(4) Anchor bolt temporary holder according to the fourth embodiment
11 and 12 show an anchor bolt temporary holder H according to a fourth embodiment.
In the anchor bolt temporary holder H according to the fourth embodiment, the horizontal bracket 10 in the anchor bolt temporary holder H according to the first embodiment, particularly the horizontal bracket. The horizontal portion 11 constituting the tool 10 is not provided with the engaging portion 12, and the horizontal portion 11 is fixed to the temporary frame K directly using screws, nails or the like while adjusting its position. The configuration other than that which can be used is the same as or substantially the same as the configuration of the anchor bolt temporary holder H according to the first embodiment.
In addition, a handling method other than that in which the horizontal portion 11 can be used directly by using screws and nails 18 to the temporary frame K to be built, in particular, the edge rod 50a in the formwork panel 50, The handling method of the anchor bolt temporary holder H according to the first embodiment is the same as or substantially the same.
[0065]
From this point, the same or substantially the same components as those of the anchor bolt temporary holder H according to the first embodiment are given the same reference numerals, and the description thereof is omitted.
[0066]
In the anchor bolt temporary holder H according to this embodiment, the horizontal bracket 10 in the temporary holder H assembled to the temporary frame K to be built, in particular, this horizontal rack 10 is configured. The horizontal part 11 to be prepared is prepared as a flat plate without the engaging part 12, and through holes 17 such as screws and nails are provided at both end parts, and the temporary frame K to be built is built. This temporary holding tool H is fixed to the temporary frame K using screws and nails 18 at the time of or after installation.
[0067]
Accordingly, the temporary holding tool H constructed and prepared with the punch can be used as a means for connecting the temporary frame members Ka and Ka in the same manner as other connecting plates constituting the temporary frame K.
Further, with respect to the temporary frame K that has already been configured, each temporary frame material Ka, Ka that constitutes the temporary frame K, in particular, each mold panel 50, 50 that does not coincide with the installation interval is surely secured. It can be used by being fixed to this.
[0068]
In the anchor bolt temporary holder H configured as described above, the anchor bolt 30 is not attached to the built-in temporary frame K, or the anchor bolt 30 is attached in advance. The built-in temporary frame K is set in an erected state across the respective formwork panels 50, 50, and then this is stretched over the black line provided on the formwork panel 50 and the temporary frame K. The tubular portion 21 to which the anchor bolt 30 is attached using water thread or the like, or the anchor bolt 30 attached to the tubular portion 21 is positioned at a predetermined position, and the insertion hole 17 is formed. It is used in the same manner as the anchor bolt temporary holder H according to the first embodiment so that it is fixed to the edge flange 50a of the formwork panel 50 with screws, nails 18 or the like.
[0069]
In addition, the anchor 40 temporary holding tool H constructed here is placed in advance on the built-in temporary frame K with the concrete 40 before the setting concrete 40 is cured. As the means for inserting and holding the anchor bolt 30 into the placing concrete 40, the anchor bolt temporary holder H according to the second embodiment is used.
[0070]
In the figure, reference numeral 19 denotes a plastic tube such as a vinyl chloride tube used to be fitted to the upper end portion of the anchor bolt 30, and the anchor is inserted and held in the temporary holder H. -It attaches to the upper end portion of the bolt 30, in particular, a male screw portion used for attachment to the base 42 and the like, and prevents adhesion of cement or the like to the male screw portion.
Further, using this tube 19, the anchor bolt 30 inserted through the cylindrical portion 21 is temporarily held prior to fastening of the fixture 22, and the anchor bolt 30 is set at a required height position. Later, the anchor bolt 30 may be used so as to be fastened to the cylindrical portion 21 by using the fixture 22.
[0071]
In view of this, the tube 19 is configured as, for example, a soft or semi-rigid plastic cylinder, and an upper portion of the anchor bolt 30 to be press-fitted into the tube 19, in particular, a male screw portion. For convenience, it is preferable to prepare as a configuration and material that are held in a temporarily fixed state.
[0072]
(5) Anchor bolt temporary holder according to the fifth embodiment
13 and 14 show an anchor bolt temporary holder H according to a fifth embodiment.
In the anchor bolt temporary holder H according to the fifth embodiment, the horizontal frame 10 that constitutes the temporary holder H, in particular, the horizontal frame 11 is formed as a single long and thin flat plate. The anchoring portion 12 as in the anchor bolt temporary holder H according to the first embodiment is not provided, and the horizontal portion 11 is provided with an insertion hole 17 such as a screw or a nail 18 and is held. The structure except that the cylindrical portion 21 constituting the tool 20 is directly welded and integrated with the horizontal portion 11 is the same as the structure of the anchor bolt temporary holder H according to the first embodiment. Or substantially the same.
Other than the difference in the handling operation associated with the provision of the insertion hole 17 such as a screw or a nail 18 in place of the engaging portion 12 instead of providing the cylindrical portion 21 integrally with the horizontal portion 11. This handling operation is the same as the anchor bolt temporary holder H according to the first embodiment.
[0073]
From this point, the same or substantially the same components as those of the anchor bolt temporary holder H according to the first embodiment will be denoted by the same reference numerals and description thereof will be omitted. .
[0074]
In the anchor bolt temporary holder H according to this embodiment, the holder 20 into which the anchor bolt 30 is inserted and held is provided integrally with the horizontal bracket 10, and the holder 20 for the horizontal bracket 10 is provided. The horizontal frame 10 itself can be fixed to the temporary frame K with screws, nails 18 and the like while moving and adjusting in the width direction of the temporary frame K without performing the moving assembly.
[0075]
That is, the horizontal frame 10 constituting the temporary holding tool H is configured only by the horizontal frame 11 portion as a flat and long thin plate body that does not include the engaging portion 12, and the horizontal frame 11 portion includes Without opening the guide slit 13, the cylindrical portion 21 constituting the holder 20 is directly welded to the horizontal portion 11, and the insertion hole 24 of the anchor bolt 30 is connected to the cylindrical portion 21 and the horizontal portion 11. , And a fixing tool 22 as a fastening means for the anchor bolt 30 inserted through the insertion hole 24 is provided on the cylindrical portion 21.
[0076]
In the anchor bolt temporary holder H configured as described above, the anchor bolt 30 is not attached to the built-in temporary frame K, or the anchor bolt 30 is attached in advance. The built-in temporary frame K is set in an erected state across the respective formwork panels 50, 50, and then this is stretched over the black line provided on the formwork panel 50 and the temporary frame K. The tubular portion 21 to which the anchor bolt 30 is attached using water thread or the like, or the anchor bolt 30 attached to the tubular portion 21 is positioned at a predetermined position, and the insertion hole 17 is formed. It is used in the same manner as the anchor bolt temporary holder H according to the first embodiment so that it is fixed to the edge flange 50a of the formwork panel 50 with screws, nails 18 or the like.
[0077]
In addition, the anchor 40 temporary holding tool H constructed here is placed in advance on the built-in temporary frame K with the concrete 40 before the setting concrete 40 is cured. As the means for inserting and holding the anchor bolt 30 into the placing concrete 40, the anchor bolt temporary holder H according to the second embodiment is used.
[0078]
【The invention's effect】
The anchor bolt temporary holding tool H according to the present invention has the above-described characteristic configuration, in particular, a horizontal frame provided between constituent temporary frame members Ka such as a formwork panel 50 constituting a concrete placement temporary frame K. By adopting a configuration including the tool 10 and the holding tool 20 that holds the anchor bolt 30 in a vertical state with respect to the horizontal frame 10,
With respect to the temporary frame K, the anchor bolt 30 is easily placed at an intended position and has an intended height with respect to the temporary frame K before placing concrete. It has the feature that can be set as.
[0079]
Further, the anchor bolt 30 set on the anchor bolt temporary holder H is shifted from the initial setting position, tilted, lifted, or sinked when the concrete is placed on the temporary frame K. The initial setting state can be effectively maintained without causing any problems.
[0080]
Further, when the anchor bolt temporary holder H having such a structure is used to insert and hold the anchor bolt to the placing concrete, the concrete is placed. Immediately after that, the anchor bolt can be inserted and set in the driving concrete, and the anchor bolt inserted and set in the driving concrete is accurately held in a vertical state, and The anchor bolt that has been inserted and set can be reliably provided with an expected protruding dimension without being settled against the driving concrete.
[0081]
Next, in the temporary holding tool H of the anchor bolt, the horizontal frame 10 provided between the constituent temporary frame members Ka such as the mold panel 50 that constitutes the concrete driving temporary frame K is formed into the mold frame. The horizontal frame part 11 supported on the upper end surface of the constituent temporary frame material Ka such as the panel 50, and both the side edge part or any one side edge part of the horizontal frame part 11, such as the mold panel 50 By having a configuration including the engagement portion 12 that is in contact with the outer side surface of the configuration temporary frame material Ka,
This can be easily attached to and used on the temporary frame K, and the temporary holder H used to hold the anchor bolt 30 is used as the temporary frame material Ka such as the formwork panel 50 in the temporary frame K. It has the feature that it can be used as a connecting plate.
[0082]
Further, in the temporary holding tool H of the anchor bolt, two or more horizontal supports 10 provided between the constituent temporary frame members Ka such as the formwork panel 50 constituting the concrete placing temporary frame K are provided. By constructing the horizontal bodies 10Y and 10Y having the horizontal portions 11 capable of adjusting the assembly position of each other,
Even when there is a change in the concrete placement gap in the temporary frame K, the temporary holder H can be easily and reliably attached to each temporary frame K constructed. Using this temporary holder H, there is a feature that the anchor bolt 30 can be reliably assembled and held with respect to the temporary frame K.
[0083]
Next, in the temporary holding tool H for the anchor bolt, the holding tool 20 that holds the anchor bolt 30 in a vertical state with respect to the horizontal tool 10 is directed in the horizontal direction in the horizontal tool 10. By being configured to be freely movable,
After mounting the temporary holder H on the temporary frame K, the holder 20 provided on the temporary holder H is moved in the horizontal direction of the temporary holder H, whereby the anchor 20 is anchored to the temporary frame K. -It has the feature that positioning of the setting of the bolt 30 can be made.
[0084]
Furthermore, in the temporary holding tool H for the anchor bolt, the holding part 20 for holding the anchor bolt 30 in a vertical state with respect to the horizontal member 10 is inserted into the cylindrical part on the upper side of the anchor bolt 30. 21 and a fixing device 22 for fixing the insertion anchor bolt 30 to the cylindrical portion 21,
The anchor bolt 30 can be easily moved in the vertical direction with respect to the temporary holder H in the vertical state, and can be positioned and set at a predetermined height position. ing.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a state before assembly of a temporary holding tool H of an anchor bolt according to a first embodiment to a temporary frame K. FIG.
FIG. 2 is a sectional view of the temporary frame K provided with a temporary holding tool H and an anchor bolt 30.
FIG. 3 is an enlarged sectional view showing the same cut surface differently.
FIG. 4 is an enlarged cross-sectional view of the concrete 40 placed
FIG. 5 is an enlarged cross-sectional view showing a state in which a base 42 is attached to the concrete base 40 ′ having the same configuration.
FIG. 6 is a perspective view of a main part showing an assembled state of a base, a pillar and the like on the concrete base 40 ′ having the same configuration.
FIG. 7 is a perspective view showing a state before the anchor bolt temporary holder H according to the second embodiment is assembled to the temporary frame K;
FIG. 8 is a cross-sectional view of the temporary frame K provided with a temporary holding tool H and anchor bolts 30.
FIG. 9 is a perspective view showing a state before the anchor bolt temporary holder H according to the third embodiment is assembled to the temporary frame K;
10 is a cross-sectional view of the temporary frame K provided with a temporary holding tool H and anchor bolts 30. FIG.
FIG. 11 is a perspective view showing a state before the anchor bolt temporary holder H according to the fourth embodiment is assembled to the temporary frame K;
12 is a cross-sectional view of the temporary frame K provided with a temporary holder H and anchor bolts 30. FIG.
FIG. 13 is a perspective view showing a state before the anchor bolt temporary holder H according to the fifth embodiment is assembled to the temporary frame K;
14 is a cross-sectional view of the temporary frame K provided with a temporary holding tool H and anchor bolts 30. FIG.
[Explanation of symbols]
10 Horizontal bracket
10Y Horizontal body
11 Horizontal section
12 Section
20 Holder
21 Tube
22 Fixing tool
30 Anchor bolt
40 Pour concrete
40 'concrete foundation
K temporary frame
Ka temporary frame material

Claims (3)

コンクリートの打ち込み仮枠を構成する構成仮枠材間に亘って備えつけられる横架具と、
この横架具に対して、アンカーボルトを垂直状態に保持する保持具とを備えており、
前記横架具が、構成仮枠材の上端面に支承される横架部と、この横架部の両側端部又はいずれか一方の側端部にあって、前記構成仮枠材の外側面に当接される係当部とを備えていると共に、
前記保持具が、アンカーボルトの上部側の挿通される筒部と、この挿通アンカーボルトを該筒部に固定する固定具とを備えていることを特徴とするアンカーボルトの仮保持具。
A horizontal frame provided between the temporary frame members constituting the concrete driving temporary frame;
For this horizontal bracket, it has a holder that holds the anchor bolt in a vertical state ,
The horizontal frame is located on the horizontal frame supported by the upper end surface of the component temporary frame member, and the outer side surface of the component temporary frame member at both side ends or one side end of the horizontal frame unit. And an engaging portion that comes into contact with the
The temporary holding tool for an anchor bolt, wherein the holding tool includes a cylindrical portion to be inserted on an upper side of the anchor bolt and a fixing tool for fixing the inserted anchor bolt to the cylindrical portion .
コンクリートの打ち込み仮枠を構成する構成仮枠材間に亘って備えつけられる横架具が、2以上の、相互に組付け位置調節の可能な横架部を有する横架体の組み付けによって構成してあることを特徴とする請求項1記載に係るアンカーボルトの仮保持具。 The horizontal frame provided between the temporary frame members constituting the concrete placement temporary frame is configured by assembling two or more horizontal frames having horizontal sections whose assembly positions can be adjusted with respect to each other. temporary holder of the anchor bolt according to claim 1, wherein the certain. 横架具に対して、アンカーボルトを垂直状態に保持する保持具が、前記横架具における横架方向に向けて移動自在に備えられていることを特徴とする請求項1記載に係るアンカーボルトの仮保持具。 The anchor bolt according to claim 1 , wherein a holder for holding the anchor bolt in a vertical state with respect to the horizontal frame is provided so as to be movable in a horizontal direction of the horizontal frame. Temporary holding tool.
JP02487996A 1996-01-19 1996-01-19 Anchor bolt temporary holder Expired - Lifetime JP3640455B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP02487996A JP3640455B2 (en) 1996-01-19 1996-01-19 Anchor bolt temporary holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP02487996A JP3640455B2 (en) 1996-01-19 1996-01-19 Anchor bolt temporary holder

Publications (2)

Publication Number Publication Date
JPH09195283A JPH09195283A (en) 1997-07-29
JP3640455B2 true JP3640455B2 (en) 2005-04-20

Family

ID=12150487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP02487996A Expired - Lifetime JP3640455B2 (en) 1996-01-19 1996-01-19 Anchor bolt temporary holder

Country Status (1)

Country Link
JP (1) JP3640455B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459482B (en) * 2020-11-30 2022-07-22 晟通科技集团有限公司 Subsidence part template reinforcing assembly and subsidence part template frame

Also Published As

Publication number Publication date
JPH09195283A (en) 1997-07-29

Similar Documents

Publication Publication Date Title
US6591574B2 (en) Bracket assembly for installation of concrete forms for building foundations
JP4732915B2 (en) Foundation construction method and device, and anchor bolt support device for construction
JPS607108B2 (en) Curtain wall renovation method
JP3640455B2 (en) Anchor bolt temporary holder
JP3659766B2 (en) Surface plate construction method and apparatus for building pillars
JPH0738310U (en) Anchor bolt support device
JP3699548B2 (en) Anchor bolt installation bracket set
JP3740232B2 (en) Anchor bolt mounting bracket
JPH0138947B2 (en)
JP3025638B2 (en) Formwork equipment for fabric foundation
JP2716357B2 (en) Rising section formwork fixing jig
JP3000041U (en) Positioning plate for anchor bolts for building foundations
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
JPH0572503B2 (en)
JP3875910B2 (en) Connection structure of basic reinforcing steel / steel core unit and basic reinforcing steel / steel core unit
JPH0679837U (en) Anchor bolt fixing device for construction
JP3228470B2 (en) How to install the formwork of the seismic slitting device
JPH05239835A (en) Independent foundation with form
JP3940930B2 (en) Supporting device for fixed column base
JP2000038727A (en) Foundation concrete and execution therefor
JPH0132345B2 (en)
JP3004639U (en) Wall material mounting base structure
JPH0476117A (en) Supporting device for anchor bolt
JP2536742Y2 (en) Box mounting tube fittings for concrete casting
JP3047847U (en) Foundation mounting brackets and foundation mounting columns

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040831

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041022

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050118

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110128

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110128

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120128

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130128

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140128

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term