JPH0957555A - Assembly device for bearing member - Google Patents

Assembly device for bearing member

Info

Publication number
JPH0957555A
JPH0957555A JP21570395A JP21570395A JPH0957555A JP H0957555 A JPH0957555 A JP H0957555A JP 21570395 A JP21570395 A JP 21570395A JP 21570395 A JP21570395 A JP 21570395A JP H0957555 A JPH0957555 A JP H0957555A
Authority
JP
Japan
Prior art keywords
bearing member
bush
press
bearing
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21570395A
Other languages
Japanese (ja)
Inventor
Hiroyuki Sotodani
浩幸 外谷
Hideharu Sakimori
秀春 先森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mazda Motor Corp
Original Assignee
Mazda Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mazda Motor Corp filed Critical Mazda Motor Corp
Priority to JP21570395A priority Critical patent/JPH0957555A/en
Publication of JPH0957555A publication Critical patent/JPH0957555A/en
Pending legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)
  • Mounting Of Bearings Or Others (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve phase-matching accuracy, and simplify a phase-matching mechanism in a case where a ringlike bearing member, having an oil hole, is pressed into a bearing insertion hole by a pressing-in means to be assembled in a condition where the oil hole is made a given phase decision. SOLUTION: This device is provided with phase-matching units 11A-11C for retaining a bearing member to rotate it around the axis line of the bearing member, and a bearing member retaining unit 30 for inserting a pin into an oil hole at the time of the rotation of the bearing member to decide the phase of the oil hole of the bearing member to carry the bearing member from the phase-decision position to a delivering position to a press-in tool.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、油孔を有するリン
グ状軸受部材を上記油孔が所定の位相決めをされた状態
で圧入手段により軸受挿入孔に圧入して組付ける装置に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for assembling a ring-shaped bearing member having an oil hole by press-fitting it into a bearing insertion hole by a press-fitting device in a state where the oil hole has a predetermined phase.

【0002】[0002]

【従来の技術】従来、シリンダブロックにバランスシャ
フトを備えたエンジンにおいて、バランスシャフトの軸
受部材である油孔を備えたリング状ブッシュを圧入具を
用いてシリンダブロックのブッシュ挿入孔に圧入してい
るが、ブッシュ側の油孔がブッシュ挿入孔側の油孔に一
致するように、圧入工程に先立って位相決めステーショ
ンでブッシュの油孔の位相合わせを行なっている。
2. Description of the Related Art Conventionally, in an engine having a balance shaft in a cylinder block, a ring-shaped bush having an oil hole which is a bearing member of the balance shaft is press-fitted into a bush insertion hole of the cylinder block using a press-fitting tool. However, prior to the press-fitting process, the oil holes on the bush are aligned at the phase determining station so that the oil holes on the bush side coincide with the oil holes on the bush insertion hole side.

【0003】位相決めステーションでは、ブッシュをそ
の軸線の周りに回転させて位相決めを完了し、この位相
決めがなされたブッシュを、別のマニピュレータで位相
決めステーションから圧入ステーションに搬送し、圧入
具に移載するようにしていた。
At the phasing station, the bushing is rotated around its axis to complete the phasing, and the bush with this phasing is conveyed from the phasing station to the press-fitting station by another manipulator, and is inserted into the press-fitting tool. I was trying to transfer it.

【0004】なお、油孔を備えた軸受け部材の油孔の位
相決めに際し、軸受設置部の油孔にエアを供給して、軸
受部材の油孔が軸受設置部の油孔に対し位相が一致した
状態でをもって軸受部材が装着されたか否かをチェック
する方法が知られている(特開平2−152738号参
照)。
When determining the phase of the oil hole of the bearing member having the oil hole, air is supplied to the oil hole of the bearing installation portion so that the oil hole of the bearing member is in phase with the oil hole of the bearing installation portion. There is known a method of checking whether or not the bearing member is mounted in such a state (see JP-A-2-152738).

【0005】[0005]

【発明が解決しようとする課題】しかしながら、従来の
位相合わせ機構は構造が複雑な上に、位相決めが完了し
たブッシュを別のマニピュレータで把持する際やブッシ
ュを圧入具に移載する際にブッシュの油孔の位相ずれが
発生するという問題があった。
However, the conventional phase adjusting mechanism has a complicated structure, and when the bush whose phase has been determined is gripped by another manipulator or when the bush is transferred to the press fitting tool. However, there is a problem that the oil holes of the above are out of phase.

【0006】上述の事情に鑑み、本発明は、油孔を有す
るリング状軸受部材の位相合わせ精度の向上と、位相合
わせ機構の簡素化とを図ることができる軸受部材の組付
装置を提供することを目的とする。
In view of the above-mentioned circumstances, the present invention provides a bearing member assembling apparatus capable of improving the accuracy of phase matching of a ring-shaped bearing member having an oil hole and simplifying the phase matching mechanism. The purpose is to

【0007】[0007]

【課題を解決するための手段】本発明による軸受部材の
組付装置は、油孔を有する軸受部材を保持してその軸線
の周りに回転させる手段と、該回転手段による軸受部材
の回転時にその油孔にピンを挿入して軸受部材の油孔の
位相決めを行なう手段と、この油孔が位相決めされた軸
受部材を位相決め位置から圧入手段に対する受渡し位置
に搬送する手段と、を備えてなることを特徴とするもの
である。
A bearing member assembling apparatus according to the present invention comprises means for holding a bearing member having an oil hole and rotating the bearing member around its axis, and means for rotating the bearing member by the rotating means. A means for phase-determining the oil hole of the bearing member by inserting a pin into the oil hole; and means for conveying the bearing member with the oil hole phased from the phase-determining position to the delivery position for the press-fitting means. It is characterized by becoming.

【0008】上記油孔が位相決めされた軸受部材を位相
決め位置から上記圧入手段に対する受渡し位置に搬送す
る手段は、軸受部材の油孔に上記ピンを挿入したまま軸
受部材を搬送することが好ましい。
The means for transporting the bearing member with the oil holes phased from the phasing position to the delivery position for the press-fitting means preferably transports the bearing member with the pin inserted in the oil hole of the bearing member. .

【0009】上記油孔の位相決めを行なう手段が、軸受
部材を位相決め位置から受渡し位置に搬送する手段を兼
ねていることが好ましい。
It is preferable that the means for determining the phase of the oil hole also serves as means for conveying the bearing member from the phase determining position to the delivery position.

【0010】上記圧入手段は、上記軸受部材を受取る後
退位置と、該軸受部材を上記軸受挿入孔に圧入する前進
位置との間で往復動可能に構成されていることが好まし
い。また、上記圧入手段は、後退位置で複数の軸受部材
を同時に受取るように構成されていることが好ましく、
さらに上記圧入手段が、前進位置において複数の軸受部
材を同時に軸受挿入孔に圧入するように構成されている
ことが好ましい。
It is preferable that the press-fitting means is reciprocally movable between a retracted position for receiving the bearing member and an advanced position for pressing the bearing member into the bearing insertion hole. Further, the press-fitting means is preferably configured to simultaneously receive the plurality of bearing members in the retracted position,
Further, it is preferable that the press-fitting means is configured to press-fit a plurality of bearing members into the bearing insertion holes at the same time in the forward movement position.

【0011】本発明の一つの実施の形態においては、軸
受部材がエンジンのバランスシャフト軸受よりなり、そ
の場合のエンジンの一例として、各バランスシャフトに
対しそれぞれ3箇所の軸受挿入孔が設けられた2本のバ
ランスシャフトを備えている。その場合、上記圧入手段
は、後退位置で6個の軸受部材を同時に受取るように構
成され、かつ、前進位置において上記軸受部材を2個ず
つ軸受挿入孔に圧入し得るように、その前進方向に対し
直角方向に移動可能に設けられていりことが好ましい。
In one embodiment of the present invention, the bearing member is a balance shaft bearing of an engine, and as an example of the engine in that case, two bearing insertion holes are provided for each balance shaft. Equipped with a book balance shaft. In that case, the press-fitting means is configured to simultaneously receive the six bearing members in the retracted position, and in the advancing direction so that two of the bearing members can be press-fitted into the bearing insertion holes in the advancing position. It is preferable to be provided so as to be movable in the direction at right angles.

【0012】[0012]

【発明の効果】本発明によれば、回転手段による軸受部
材の回転時にその油孔にピンを挿入して軸受部材の油孔
を位相決めする手段を備えているので、油孔の正確な位
相合わせが可能になる。
According to the present invention, when the rotating means rotates the bearing member, a pin is inserted into the oil hole to phase the oil hole of the bearing member. Matching becomes possible.

【0013】特に、軸受部材の油孔に上記ピンを挿入し
たまま軸受部材を位相決め位置から上記圧入手段に対す
る受渡し位置に搬送するように構成されている場合は、
軸受部材の搬送時に油孔の位相ずれが生じる機会が皆無
になる利点がある。
Particularly, when the bearing member is configured to be conveyed from the phasing position to the delivery position for the press-fitting means while the pin is inserted into the oil hole of the bearing member,
There is an advantage that there is no chance that the phase shift of the oil hole occurs when the bearing member is transported.

【0014】また、油孔の位相決めを行なう手段が、軸
受部材を位相決め位置から受渡し位置に搬送する手段を
兼ねている場合は、装置全体の構成を簡素化できる利点
がある。
Further, when the means for determining the phase of the oil hole also serves as the means for conveying the bearing member from the phase determining position to the delivery position, there is an advantage that the structure of the entire apparatus can be simplified.

【0015】さらに、上記圧入手段が、後退位置で複数
の軸受部材を同時に受取るように構成されている場合、
および前進位置において複数の軸受部材を同時に軸受挿
入孔に圧入するように構成されている場合は、軸受部材
の圧入作業効率が向上する効果がある。
Further, when the press-fitting means is configured to simultaneously receive a plurality of bearing members in the retracted position,
In addition, when the plurality of bearing members are configured to be press-fitted into the bearing insertion holes at the same time at the forward position, the efficiency of press-fitting the bearing members is improved.

【0016】[0016]

【発明の実施の形態】以下、図面を参照して、本発明の
実施の形態について説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0017】先ず、本発明による軸受部材の組付装置の
構成の説明に先立って、この装置によって軸受部材(バ
ランスシャフトブッシュ)が組み付けられるエンジンの
シリンダブロックの構造について説明すると、図1はシ
リンダブロックの一部を省略した正面図、図2は図1の
II−II線に沿った断面図、図3は軸受部材の図4の III
−III 線に沿った拡大断面図、図4は図3のIV−IV線に
沿った断面図である。
First, prior to the description of the structure of the bearing member mounting apparatus according to the present invention, the structure of the cylinder block of the engine in which the bearing member (balance shaft bush) is mounted by this apparatus will be described. 2 is a front view in which a part of FIG.
A cross-sectional view taken along the line II-II, and FIG. 3 shows the bearing member III in FIG.
FIG. 4 is an enlarged sectional view taken along line III-III, and FIG. 4 is a sectional view taken along line IV-IV in FIG.

【0018】4個の気筒2a〜2dを備えた直列4気筒
エンジンのシリンダブロック1は、軸線L0 で示される
クランクシャフトの左右に、それぞれ軸線L1 ,L2
示されるクランクシャフトに平行な2本のバランスシャ
フトを備えている。
A cylinder block 1 of an in-line four-cylinder engine having four cylinders 2a to 2d is parallel to the left and right of the crankshaft indicated by the axis L 0 and the crankshaft indicated by the axes L 1 and L 2 , respectively. It has two balance shafts.

【0019】図2から明らかなように、シリンダブロッ
ク1は、クランクシャフトを回転自在に支承する5個の
軸受部3a〜3eを軸線L0 に沿って備えており、#1
軸受部3aはシリンダブロック1の前壁1aに、#5軸
受部3eはシリンダブロック1の後壁1eに、#2〜#
4軸受部3b〜3dは、シリンダブロック1の前壁1a
および後壁1eの間にそれぞれ軸線L0 に直交するよう
に設けられた隔壁1b〜1dにそれぞれ設けられてい
る。
As is apparent from FIG. 2, the cylinder block 1 is provided with five bearing portions 3a to 3e which rotatably support the crankshaft along the axis L 0 , and is # 1.
The bearing portion 3a is on the front wall 1a of the cylinder block 1, and the # 5 bearing portion 3e is on the rear wall 1e of the cylinder block 1.
4 bearing parts 3b-3d are the front walls 1a of the cylinder block 1.
And the partition walls 1b to 1d provided between the rear wall 1e and the rear wall 1e so as to be orthogonal to the axis L 0 .

【0020】軸線L1 を有する左方のバランスシャフト
は、3個のリング状ブッシュ4A1,4B1 ,4C1
よって回転自在に支承され、軸線L2 を有する右方のバ
ランスシャフトは、3個のリング状ブッシュ4A2 ,4
2 ,4C2 によって回転自在に支承されるようになっ
ており、ブッシュ4A1 ,4A2 の挿入孔5A1 ,5A
2 がシリンダブロック1の前壁1aに、ブッシュ4
1 ,4B2 の挿入孔5B1 ,5B2 が隔壁1cに、ブ
ッシュ4C1 ,4C2 の挿入孔5C1 ,5C2 が隔壁1
dにそれぞれ形成されている。
The left balance shaft having the axis L 1 is rotatably supported by the three ring bushes 4A 1 , 4B 1 and 4C 1 , and the right balance shaft having the axis L 2 is 3 pieces. Ring bushes 4A 2 , 4
It is rotatably supported by B 2 and 4C 2 , and has insertion holes 5A 1 and 5A for bushes 4A 1 and 4A 2.
2 is a bush 4 on the front wall 1a of the cylinder block 1.
B 1, 4B 2 of the insertion holes 5B 1, 5B 2 partition wall 1c, Bush 4C 1, insertion of 4C 2 holes 5C 1, 5C 2 partition wall 1
d are formed respectively.

【0021】各ブッシュ4A1 ,4B1 ,4C1 ;4A
2 ,4B2 ,4C2 は、図3,図4に示すように、ほぼ
180°の角度間隔を保って形成された2個の油孔6,
6と、これら油孔6,6が臨むように内周面に環状に形
成された油溝7とを備えている。そして、ブッシュ4A
1 〜4C1 ,4A2 〜4C2 の内径は、バランスシャフ
トをシリンダブロック1の前壁1a側から挿入し得るよ
うに4A1 =4A2 >4B1 =4B2 >4C1 =4C2
の関係に設定されており、また、ブッシュ挿入孔5A1
〜5C1 ,5A2 〜5C2 の内径も、ブッシュ4C1
4C2 →4B1,4B2 →4A1 ,4A2 の順に、すな
わち奥の方のブッシュから順に圧入具を用いてブッシュ
挿入孔に圧入し得るように5A1 =5A2 >5B1 =5
2 >5C1=5C2 の関係に設定され、これに応じ
て、ブッシュ4A1 〜4C1 ,4A2〜4C2 の外径も
同様な関係に設定されている。
Each bush 4A 1 , 4B 1 , 4C 1 ; 4A
As shown in FIGS. 3 and 4, two oil holes 2 , 4B 2 and 4C 2 have two oil holes 6 formed at an angular interval of about 180 °.
6 and an oil groove 7 formed annularly on the inner peripheral surface so that these oil holes 6 and 6 face. And Bush 4A
The inner diameters of 1 to 4C 1 and 4A 2 to 4C 2 are 4A 1 = 4A 2 > 4B 1 = 4B 2 > 4C 1 = 4C 2 so that the balance shaft can be inserted from the front wall 1a side of the cylinder block 1.
The bush insertion hole 5A 1
~ 5C 1 , 5A 2 ~ 5C 2 inner diameter, bush 4C 1 ,
4C 2 → 4B 1 , 4B 2 → 4A 1 , 4A 2 in order, that is, from the bush on the far side in order so that it can be press-fitted into the bush insertion hole using a press-fitting tool 5A 1 = 5A 2 > 5B 1 = 5
The relationship of B 2 > 5C 1 = 5C 2 is set, and accordingly, the outer diameters of the bushes 4A 1 to 4C 1 and 4A 2 to 4C 2 are also set to the same relationship.

【0022】因みに本実施の形態におけるブッシュの外
径寸法を示すと、4A1 ,4A2 =46mmφ ,4B1
=4B2 =44mmφ ,4C1 =4C2 =42mmφ に設
定され、厚さはすべて同一である。また、油孔6の内径
寸法は4mmである。
By the way, the outer diameter of the bush in this embodiment is shown as 4A 1 , 4A 2 = 46 mmφ , 4B 1
= 4B 2 = 44 mm φ , 4C 1 = 4C 2 = 42 mm φ , and the thicknesses are all the same. The inner diameter of the oil hole 6 is 4 mm.

【0023】図5は本発明による軸受部材の組付装置の
一実施の形態を示す平面図、図6はその側面図、図7は
図6の VII−VII 線に沿った断面図である。
FIG. 5 is a plan view showing an embodiment of a bearing member assembling apparatus according to the present invention, FIG. 6 is a side view thereof, and FIG. 7 is a sectional view taken along line VII-VII of FIG.

【0024】本装置は、位相合わせ装置10と、ブッシ
ュ保持ユニット30と、シリンダブロック位置決めユニ
ット40と、ブッシュ圧入装置50ととに大別される。
This device is roughly divided into a phase matching device 10, a bush holding unit 30, a cylinder block positioning unit 40, and a bush press-fitting device 50.

【0025】位相合わせ装置10は、図8および図9に
示すような位相合わせユニット11A,11B,11C
を、図7に示すように上下に整列させた態様で備えてお
り、油穴6,6をそれぞれ有するブッシュ4A1 〜4C
1 ,4A2 〜4C2 を3個ずつチャッキングして位相決
め位置に搬送し、かつ位相決め位置においてブッシュ4
1 〜4C1 ,4A2 〜4C2 を最大190°回転させ
る機能を有する。
The phase matching device 10 comprises phase matching units 11A, 11B and 11C as shown in FIGS.
Are arranged vertically as shown in FIG. 7, and bushes 4A 1 to 4C each having oil holes 6 and 6 are provided.
Three pieces of 1 and 4A 2 to 4C 2 are chucked and conveyed to the phase setting position, and the bush 4 is placed at the phase setting position.
It has a function of rotating A 1 to 4C 1 and 4A 2 to 4C 2 by a maximum of 190 °.

【0026】ブッシュ保持ユニット30は、図10およ
び図11に示すように、平坦な基板34の面上に3段2
列にマトリクス状に整列して配置された6箇のブッシュ
保持体33A1 ,33B1 ,33C1 ;33A2 ,33
2 ,33C2 を備えている。各ブッシュ保持体33A
1 〜33C1 ,33A2 〜33C2 は、各ブッシュ4A
1 〜4C1 ,4A2 〜4C2 の外周面をそれぞれ回転自
在に保持する円孔31を有し、かつ、ブッシュ4A1
4C1 ,4A2 〜4C2 の油孔6に挿入する位相決めピ
ン32を円孔31の内周面の所定位置にそれぞれ出没自
在に備えている。ブッシュ保持体33A1 〜33C1
33A2 〜33C2 の各円孔31の軸線間の水平方向の
間隔は、シリンダブロック1の軸線L1 ,L2 間の間隔
H に等しく、かつ垂直方向の間隔は、位相合わせユニ
ット11A,11B,11Cのチャック12(後述)の
軸線間の間隔DV に等しく設定されている。
As shown in FIGS. 10 and 11, the bush holding unit 30 has three stages 2 on the surface of the flat substrate 34.
Six bush holders 33A 1 , 33B 1 , 33C 1 ; 33A 2 , 33 arranged in rows and arranged in matrix
It is equipped with B 2 and 33C 2 . Each bush holder 33A
1 to 33C 1 , 33A 2 to 33C 2 are each bush 4A
1 to 4C 1 and 4A 2 to 4C 2 each have a circular hole 31 for rotatably holding the outer peripheral surface thereof, and the bushes 4A 1 to
4C 1, 4A and 2 ~4C phase determining pin 32 to be inserted into the oil hole 6 of 2 are respectively provided retractably in a predetermined position of the inner peripheral surface of the circular hole 31. Bush holders 33A 1 to 33C 1 ,
The horizontal spacing between the axes of the circular holes 31 of 33A 2 to 33C 2 is equal to the spacing DH between the axes L 1 and L 2 of the cylinder block 1, and the vertical spacing is the phase matching unit 11A, It is set to be equal to the distance D V between the axes of the chucks 12 (described later) of 11B and 11C.

【0027】ブッシュ保持ユニット30は、各ブッシュ
ブッシュ保持体33A1 〜33C1,33A2 〜33C
2 により、上記位相決め位置において位相合わせユニッ
ト11A〜11Cが回転させるブッシュ4A1 〜4
1 ,4A2 〜4C2 を回転自在に保持し、かつ回転す
るブッシュ4A1 〜4C1 ,4A2 〜4C2 の油孔6に
シリンダ35によって駆動された位相決めピン32を挿
入してブッシュ4A1 〜4C1 ,4A2 〜4C2 の油孔
6を位相決めした後、ブッシュ4A1 〜4C1 ,4A2
〜4C2 を、それらの油孔6に位相決めピン32を挿入
したまま、位相決め位置からブッシュ圧入ユニット50
に対するブッシュ受渡し位置に搬送する機能を有する。
The bush holding unit 30 includes bush holding members 33A 1 to 33C 1 and 33A 2 to 33C.
2 , the bushes 4A 1 to 4 rotated by the phase matching units 11A to 11C at the above-described phase determining position
C 1, 4A 2 ~4C 2 was rotatably held, and insert the bushing 4A 1 ~4C 1, 4A 2 ~4C phase determining pin 32 is driven by the cylinder 35 to the oil holes 6 of the 2 rotating bushing After phasing the oil holes 6 of 4A 1 to 4C 1 and 4A 2 to 4C 2 , the bushes 4A 1 to 4C 1 and 4A 2
4C 2 from the phasing position to the bush press-fitting unit 50 with the phasing pin 32 inserted in the oil holes 6.
It has a function of conveying to the bush delivery position with respect to.

【0028】シリンダブロック位置決めユニット40
は、コンベアで搬送されたシリンダブロック1を、図示
しないシリンダで持ち上げて、図5および図6に示すよ
うに、前壁1aをブッシュ圧入装置50側に向けた状態
でブッシュ圧入位置に固定する機能を有する。
Cylinder block positioning unit 40
Has a function of lifting the cylinder block 1 conveyed by the conveyor with a cylinder (not shown) and fixing the front wall 1a at the bush press-fitting position with the front wall 1a facing the bush press-fitting device 50 as shown in FIGS. 5 and 6. Have.

【0029】ブッシュ圧入装置50は、6本のブッシュ
圧入具51A1 ,51B1 ,51C 1 ;51A2 ,51
2 ,51C2 を3段2列に備えており、これらブッシ
ュ圧入具51A1 〜51C1 ,51A2 〜51C2 の軸
線間の水平方向の間隔も、シリンダブロック1の軸線L
1 ,L2 間の間隔DH に等しく、かつ垂直方向の間隔
も、位相合わせユニット11A,11B,11Cのチャ
ック12(後述)の軸線間の間隔DV に等しく設定され
ている。
The bush press-fitting device 50 includes six bushes.
Press fitting 51A1, 51B1, 51C 151A2, 51
B2, 51C2Equipped with 3 rows and 2 columns, these bushes
Press fitting tool 51A1~ 51C1, 51A2~ 51C2Axis
The horizontal spacing between the lines is also the axis L of the cylinder block 1.
1, L2Interval D betweenHEqual to and vertical spacing
Also the phase adjustment units 11A, 11B, 11C
Distance D between the axes of the rack 12 (described later)VIs set equal to
ing.

【0030】ブッシュ圧入具51A1 〜51C1 ,51
2 〜51C2 は、ブッシュ受渡し位置においてブッシ
ュ保持ユニット30からブッシュ4A1 〜4C1 ,4A
2 〜4C2 を同時に受取った後、2本ずつ作動されて、
シリンダブロック位置決めユニット40によって所定位
置に位置決めされているシリンダブロック1に対し、ブ
ッシュを4C1 ,4C2 ;4B1 ,4B2 ;4A1 ,4
2 の順に組付けるように構成されている。
Bush press fittings 51A 1 to 51C 1 , 51
A 2 to 51C 2 are the bush holding units 30 to the bushes 4A 1 to 4C 1 and 4A at the bush transfer position.
After receiving the 2 ~4C 2 simultaneously being actuated by two,
Bushings 4C 1 , 4C 2 ; 4B 1 , 4B 2 ; 4A 1 , 4 with respect to the cylinder block 1 positioned at a predetermined position by the cylinder block positioning unit 40.
It is configured to be assembled in the order of A 2 .

【0031】すなわち、最初に、バランスシャフトの軸
線L1 ,L2 に心合している最下段のブッシュ圧入具5
1C1 ,51C2 が軸線方向に駆動されて、ブッシュ4
1,4C2 が最も奥のブッシュ挿入孔5C1 ,5C2
にそれぞれ圧入され、次いで、ブッシュ圧入具51
1 ,51B2 が上記軸線L1 ,L2 に心合する位置に
下降し、かつ軸線方向に駆動されて、ブッシュ4B1
4B2 が中間のブッシュ挿入孔5B1 ,5B2 にそれぞ
れ圧入され、最後に最上段のブッシュ圧入具51A1
51A2 が上記軸線L1 ,L2 に心合する位置に下降
し、かつ軸線方向に駆動されて、ブッシュ4A1 ,4A
2 が最も手前のブッシュ挿入孔5A1 ,5A2にそれぞ
れ圧入されるように構成されている。
That is, first, the bush press-fitting tool 5 at the lowest stage aligned with the axis lines L 1 and L 2 of the balance shaft.
1C 1 and 51C 2 are driven in the axial direction, and the bush 4
C 1 and 4C 2 are the bush insertion holes 5C 1 and 5C 2 that are deepest
Respectively into the bush press-fitting tool 51.
B 1 and 51B 2 are lowered to a position where they are aligned with the axes L 1 and L 2 and are driven in the axial direction, so that the bushes 4B 1 and
4B 2 is press-fitted into the intermediate bush insertion holes 5B 1 and 5B 2 , respectively, and finally the uppermost bush press-fitting tool 51A 1 ,
51A 2 descends to a position aligned with the axes L 1 and L 2 and is driven in the axial direction so that the bushes 4A 1 and 4A
2 is press-fitted into the bush insertion holes 5A 1 and 5A 2 in the foremost position.

【0032】次に、各部の詳細構成およびその動作につ
いてさらに説明する。
Next, the detailed configuration of each unit and its operation will be further described.

【0033】先ず、位相合わせ装置10が備えている位
相合わせユニット11A(11B,11Cも同様)は、
図8(側面図)および図9(正面図)に示すように、ブ
ッシュ4A1 (4A2 )の内周面に当接してブッシュ4
1 (4A2 )を保持する3個の爪12aを備えた先端
のチャック12と、チャック12を最大190°回転さ
せるモータ13と、チャック12が取り付けられた支持
板14をチャック12の軸線方向に進退させるシリンダ
15と、シリンダ15が固定された基板16を主な構成
要素としている。爪12aの外縁には、ブッシュ4A1
〜4C1 ,4A2 〜4C2 の油孔6に挿入される位相決
めピン32との干渉を回避するために、凹部12bが形
成されている。
First, the phase matching unit 11A (the same applies to 11B and 11C) of the phase matching device 10 is
As shown in FIG. 8 (side view) and FIG. 9 (front view), the bush 4 is brought into contact with the inner peripheral surface of the bush 4A 1 (4A 2 ).
A chuck 12 at the tip equipped with three claws 12a for holding A 1 (4A 2 ), a motor 13 for rotating the chuck 12 at a maximum of 190 °, and a support plate 14 to which the chuck 12 is attached are attached to the chuck 12 in the axial direction. The main components are a cylinder 15 that moves forward and backward and a substrate 16 to which the cylinder 15 is fixed. At the outer edge of the claw 12a, the bush 4A 1
To avoid interference between the phase determining pin 32 which is inserted into the oil hole 6 of ~4C 1, 4A 2 ~4C 2, recesses 12b are formed.

【0034】ブッシュ圧入装置50のフレームを構成す
る複数対の柱のうちの最もシリンダブロック位置決めユ
ニット40寄りの1対52,52の一方には、位相合わ
せ装置10の基台17が固定されており、この基台17
は、ブッシュ圧入方向に対して直角方向にかつ水平に延
出され、基台17上には、2本のレール18,18がブ
ッシュ圧入方向に対して直角方向に延長して設けられて
いる。そして、図5および図7に示すように、3個の位
相合わせユニット11A,11B,11Cを、上方から
下方へ向かって11A,11B,11Cの順に固定した
支持台19がレール18,18上にスライド可能に配置
されている。位相合わせユニット11A,11B,11
Cの各チャック12の軸線間の上下方向の間隔DV は、
上述のように、図10に示すブッシュ保持ユニット30
のブッシュ保持体33A1 〜33C1 ,33A2 〜33
2 の各円孔31の軸線間の上下方向の間隔に一致して
いる。
The base 17 of the phase adjusting device 10 is fixed to one of the pair of columns 52, 52 closest to the cylinder block positioning unit 40 of the plurality of pairs of columns forming the frame of the bush press-fitting device 50. , This base 17
Extends horizontally in a direction perpendicular to the bush press-fitting direction, and two rails 18, 18 are provided on the base 17 so as to extend in a direction perpendicular to the bush press-fitting direction. Then, as shown in FIGS. 5 and 7, three phasing units 11A, 11B and 11C are fixed on the rails 18 and 18 in the order of 11A, 11B and 11C from the top to the bottom. It is arranged so that it can slide. Phase matching unit 11A, 11B, 11
The vertical distance D V between the axes of the chucks 12 of C is
As described above, the bush holding unit 30 shown in FIG.
Bush holder 33A of 1 ~33C 1, 33A 2 ~33
It corresponds to the vertical distance between the axes of the circular holes 31 of C 2 .

【0035】上記位相合わせユニット11A,11B,
11Cのスライド可能な支持台19は、シリンダ20に
よって駆動されて、レール18,18上を水平方向にス
ライドするようになっている。そして、この支持台19
は下記の3位置で停止し得るように構成されている。
The phase matching units 11A, 11B,
A slidable support 19 of 11C is driven by a cylinder 20 and slides horizontally on the rails 18, 18. And this support 19
Is configured so that it can be stopped at the following three positions.

【0036】すなわち、図5に示す平面図においては互
いに一致している位相合わせユニット11A,11B,
11Cのチャック12の水平方向の軸線位置が、ブッシ
ュエスケープ21から供給される大中小3種類のブッシ
ュをチャッキングし得る軸線位置L3 と、位相合わせユ
ニット11A,11B,11Cが3種類のブッシュを、
図5および図7に仮想線で示す位相決め位置にあるブッ
シュ保持ユニット30のブッシュ保持体33A1 ,33
1 ,33C1 に同時に受渡し得る軸線位置L4と、上
記3種類のブッシュを、ブッシュ保持ユニット30のブ
ッシュ保持体33A2 ,33B2 ,33C2 に同時に受
渡し得る軸線位置L5 とにそれぞれ一致する3位置で停
止するようになっている。
That is, in the plan view shown in FIG. 5, the phase matching units 11A, 11B,
The horizontal axis position of the chuck 12 of 11C is an axial position L 3 capable of chucking three types of large, medium and small bushes supplied from the bush escape 21, and three types of bushes by the phase matching units 11A, 11B and 11C. ,
Bush holders 33A 1 and 33A of the bush holding unit 30 at the phasing position shown by phantom lines in FIGS. 5 and 7.
B 1, the axis position L 4 to obtain transfer simultaneously 33C 1, the three types of bushings, the bushing holding member 33A 2 of the bush holding unit 30, 33B 2, 33C 2 respectively match with the axis position L 5 obtained transfer simultaneously It stops at three positions.

【0037】位相合わせ装置10およびブッシュ保持ユ
ニット30の動作は下記のとおりである。
The operations of the phase matching device 10 and the bush holding unit 30 are as follows.

【0038】(1) 先ず、位相合わせユニット11A〜1
1Cのチャック12の軸線の水平方向の位置がL3 に一
致する位置で各位相合わせユニット11A〜11Cのシ
リンダ15が作動してチャック12がブッシュエスケー
プ21に向かって図5の右方へ前進し、3種類のブッシ
ュをチャッキングして後退する。
(1) First, the phase matching units 11A to 1
The cylinder 15 of each phase adjusting unit 11A to 11C operates at a position where the horizontal position of the axis of the chuck 12 of 1C coincides with L 3 , and the chuck 12 advances toward the bush escape 21 to the right in FIG. Three kinds of bushes are chucked and retreat.

【0039】(2) 次いで支持台19がシリンダ20によ
り位相合わせユニット11A〜11Cのチャック12の
軸線の水平方向の位置がL4 に一致する位置まで図5の
下方(図7の右方)にスライドして停止する。
(2) Next, the support base 19 is moved downward by the cylinder 20 in FIG. 5 (to the right in FIG. 7) to a position where the horizontal position of the axis of the chuck 12 of the phase adjusting units 11A to 11C coincides with L 4 . Slide and stop.

【0040】(3) 再び各位相合わせユニット11A〜1
1Cのシリンダ15が作動して、ブッシュを3個の爪1
2aでチャッキングした位相合わせユニット11A〜1
1Cがシリンダ15によって前進して、ブッシュ4A1
〜4C1 をブッシュ保持ユニット30のブッシュ保持体
33A1 〜33C1 の位相決めピン32が引っ込められ
た状態にある円孔31内に挿入する。
(3) Each phase matching unit 11A to 1 again
The cylinder 1C of 1C operates and the bush has three claws 1.
Phase matching units 11A to 1 chucked by 2a
1C is moved forward by the cylinder 15, and the bush 4A 1
~4C 1 to be inserted into the circular hole 31 in which a phase determining pin 32 of the bushing holding member 33A 1 ~33C 1 bush holding unit 30 is retracted.

【0041】(4) 次に、各ブッシュ保持体33A1 〜3
3C1 のシリンダ35が作動して位相決めピン32の先
端がブッシュ4A1 〜4C1 の外周面に圧接された状態
で、各位相合わせユニット11A〜11Cのモータ13
が作動してブッシュ4A1 〜4C1 をブッシュ保持体3
3A1 〜33C1 の円孔31内で回転させる。この回転
によりブッシュ4A1 〜4C1 の油孔6が位相決めピン
32に一致すると、ピン32が油孔6に挿入されるの
で、ブッシュ4A1 〜4C1 はその油孔6が位相決めさ
れた位置で停止し、爪12aはブッシュ4A1 〜4C1
の内周面をスライドして停止し、ブッシュ4A1 〜4C
1 の油孔6の位相決めを完了する。
[0041] (4) Next, each bush holding body 33A 1 ~3
The motor 13 of each of the phase matching units 11A to 11C is operated with the cylinder 35 of 3C 1 operating and the tip of the phase determining pin 32 being pressed against the outer peripheral surfaces of the bushes 4A 1 to 4C 1.
Is activated and the bushes 4A 1 to 4C 1 are pushed to the bush holder 3
Rotate in the circular hole 31 of 3A 1 to 33C 1 . When this rotation oil hole 6 of the bushing 4A 1 ~4C 1 matches the phase determining pin 32, the pin 32 because it is inserted into the oil hole 6, the bushing 4A 1 ~4C 1 its oil hole 6 is determined phase stop at the pawl 12a Bush 4A 1 ~4C 1
Slides on the inner peripheral surface and stops, and bushes 4A 1 to 4C
The phase determination of the oil hole 6 of 1 is completed.

【0042】(5) 爪12aがブッシュ4A1 〜4C1
ら外され、チャック12が後退し、次いで支持台19が
シリンダ20により位相合わせユニット11A〜11C
のチャック12の軸線の水平方向の位置がL3 に一致す
る位置に戻る。
[0042] (5) the pawl 12a is removed from the bushing 4A 1 ~4C 1, the chuck 12 is retracted, then the phasing unit 11A~11C by the support base 19 is a cylinder 20
The position of the chuck 12 in the horizontal direction of the axis returns to the position corresponding to L 3 .

【0043】(6) (1) の動作が反復され、各チャック1
2にそれぞれブッシュをチャッキングする。
(6) The operation of (1) is repeated and each chuck 1
Chuck the bushes to 2 respectively.

【0044】(7) 支持台19がシリンダ20により位相
合わせユニット11A〜11Cのチャック12の軸線の
水平方向の位置がL5 に一致する位置まで図5の下方
(図7の右方)にスライドして停止する。
(7) The support base 19 is slid downwardly in FIG. 5 (to the right in FIG. 7) by the cylinder 20 to a position where the horizontal position of the axis of the chuck 12 of the phase adjusting units 11A to 11C coincides with L 5 . And stop.

【0045】(8) (3) 〜(5) の動作が反復され、各ブッ
シュ保持体33A2 〜33C2 に、油孔6に位相決めピ
ン32が挿入されてブッシュ4A2 〜4C2 の油孔6の
位相決めが完了する。6個のブッシュ4A1 〜4C1
4A2 〜4C2 は、図10に示すように、油孔6に位相
決めピン32が挿入されたままの状態でブッシュ保持ユ
ニット30に保持され、位相決めが完了する。
(8) The operations of (3) to (5) are repeated, and the phase determining pin 32 is inserted into the oil hole 6 in each of the bush holders 33A 2 to 33C 2 so that the oil of the bushes 4A 2 to 4C 2 is removed. The phasing of the holes 6 is completed. 6 bushes 4A 1 to 4C 1 ,
As shown in FIG. 10, 4A 2 to 4C 2 are held by the bush holding unit 30 with the phase determining pin 32 inserted in the oil hole 6, and the phase determination is completed.

【0046】(9) 位相決めが完了したブッシュ4A1
4C1 ,4A2 〜4C2 を、図10に示すように油孔6
に位相決めピン32が挿入されたままの状態で保持した
ブッシュ保持ユニット30は、図示しないシリンダによ
り、図5および図6に実線で示すブッシュ受渡し待機位
置に向かって、軸線L4 ,L5 を横切って水平移動す
る。
(9) Bushing 4A 1-
4C 1 and 4A 2 to 4C 2 are connected to the oil holes 6 as shown in FIG.
The bush holding unit 30 which holds the phasing pin 32 in the state where the phasing pin 32 is inserted into the bush holding unit 30 moves the axes L 4 and L 5 toward the bush delivery standby position shown by the solid lines in FIGS. Move horizontally across.

【0047】次に、ブッシュ圧入装置50の構成につい
てさらに説明すると、ブッシュ圧入装置50のフレーム
を構成する複数対の柱のうちの最もシリンダブロック位
置決めユニット40寄りの1対の柱52,52には、6
本のブッシュ圧入具51A1,51B1 ,51C1 ;51A
2 ,51B2 ,51C2 を軸線方向にスライド自在に保
持する保持体53が上下方向にスライド可能に設けられ
ている。柱52,52のシリンダブロック位置決めユニ
ット40側とは反対側の面上には、レール54がそれぞ
れ上下方向に延設されており、保持体板53は、ブッシ
ュ圧入装置50の基台55上に軸線を垂直方向にして立
設されたシリンダ56によって駆動されて、レール5
4,54上を上下方向にスライドするように構成されて
いる。
Next, the structure of the bush press-fitting device 50 will be further described. Among the plurality of pairs of columns forming the frame of the bush press-fitting device 50, one pair of columns 52, 52 closest to the cylinder block positioning unit 40 is provided. , 6
Bush press fittings 51A 1 , 51B 1 , 51C 1 ; 51A
A holding body 53, which holds 2 , 51B 2 and 51C 2 slidably in the axial direction, is provided slidably in the vertical direction. Rails 54 are vertically extended on the surfaces of the columns 52, 52 opposite to the cylinder block positioning unit 40 side, and the holding body plate 53 is mounted on a base 55 of the bush press-fitting device 50. The rail 5 is driven by a cylinder 56 that is erected so that the axis is vertical.
It is configured to slide up and down on 4, 54.

【0048】6本のブッシュ圧入具51A1 〜51
1 ,51A2 〜51C2 の各軸線相互間の間隔は、ブ
ッシュ保持ユニット30のブッシュ保持体33A1 〜3
3C1 ,33A2 〜33C2 の各軸線相互間の間隔DH
(水平方向),DV (垂直方向)と一致している。ま
た、最下段のブッシュ圧入具51C1 ,51C2 の外径
寸法は、それぞれシリンダブロック1のブッシュ挿入孔
5A1 ,5B1 および5A2,5B2 内を通過可能な寸
法に設定され、中段のブッシュ圧入具51B1 ,51B
2 の外径寸法は、それぞれシリンダブロック1のブッシ
ュ挿入孔5A1 および5A2 内を通過可能な寸法に設定
されている。
Six bush press-fitting tools 51A 1 to 51
The distance between the axes of C 1 and 51A 2 to 51C 2 is determined by the bush holding members 33A 1 to 3 of the bush holding unit 30.
3C 1, 33A 2 ~33C distance D H between the axes mutual 2
(Horizontal direction) and D V (vertical direction). The outer diameters of the bush press-fitting tools 51C 1 and 51C 2 in the lowermost stage are set so that they can pass through the bush insertion holes 5A 1 , 5B 1 and 5A 2 , 5B 2 of the cylinder block 1, respectively. Bush press fittings 51B 1 , 51B
2 outer diameter is set to a dimension that can pass through the bushing insertion hole 5A 1 and 5A 2 of the cylinder block 1, respectively.

【0049】そして、保持板53が最下スライド位置に
あるとき、ブッシュ圧入具51C1,51C2 の軸線
が、シリンダブロック位置決めユニット40によって所
定位置に位置決めされているシリンダブロック1のバラ
ンサシャフトの軸線L1 ,L2に一致し、かつ、ブッシ
ュ圧入具51C1 ,51C2 の軸線と、位相合わせユニ
ット11Cのチャック12の軸線と、位相決め位置にあ
るブッシュ保持ユニット30のブッシュ保持体33
1 ,33C2 の軸線とが、すべて同一水平平面上に存
在するように設定されている。
When the holding plate 53 is at the lowermost slide position, the axis lines of the bush press-fitting tools 51C 1 and 51C 2 are aligned with the axis line of the balancer shaft of the cylinder block 1 which is positioned at a predetermined position by the cylinder block positioning unit 40. L 1, coincides with the L 2, and bush press-fit tool 51C 1, 51C and the axis of the 2, the axis of the chuck 12 of the phase adjusting unit 11C, the bushing holder 33 of the bush holding unit 30 in the phase-determining position
The axes of C 1 and 33C 2 are set so that they are all on the same horizontal plane.

【0050】したがって、ブッシュ保持ユニット30
が、図5および図7に仮想線で示す位相決め位置から、
図5および図6に実線で示すブッシュ受渡し待機位置に
水平移動することにより、ブッシュ保持ユニット30に
保持されている6個のブッシュ4A1 〜4C1 ,4A2
〜4C2 の軸線が、6本のブッシュ圧入具51A1 〜5
1C1 ,51A2 〜51C2 の対応する軸線に一致する
ことになる。
Therefore, the bush holding unit 30
From the phasing position shown by the phantom lines in FIGS. 5 and 7,
The six bushes 4A 1 to 4C 1 and 4A 2 held by the bush holding unit 30 are horizontally moved to the bush delivery standby position shown by solid lines in FIGS. 5 and 6.
Axis of ~4C 2 is, six bushings press-fit tool 51A 1 to 5
It corresponds to the corresponding axis of 1C 1 , 51A 2 to 51C 2 .

【0051】ブッシュ圧入具51A1 〜51C1 ,51
2 〜51C2 の保持体53が上下方向にスライド可能
に設けられている一対の柱52,52の後方の一対の柱
57,57間には、2本のブッシュ圧入用シリンダ5
9,59がそれらの軸線をそれぞれ軸線L1 ,L2 に一
致させた態様で支持する部材58が固定されている。こ
れらシリンダ59,59のピストンロッド60の先端に
は、図5に示すように、上下方向から見てコ字状をなす
係合部材61が固定されている。そして、6本のブッシ
ュ圧入具51A1 〜51C1 ,51A2 〜51C2 の各
後端(図5,図6の左端)には、上記コ字状の係合部材
61と上下方向から係合し得るフランジ62が設けられ
ている。このフランジ62は、コ字状の係合部材61内
を上下方向に自由に通過可能であるが、シリンダ59の
ピストンロッド60の軸線と軸線が一致したブッシュ圧
入具のフランジ62のみが、ピストンロッド60の係合
部材61に係合することにより、ピストンロッド60の
進退に追従して、ブッシュ圧入具が軸線方向に駆動され
るように構成されている。
Bush press fittings 51A 1 to 51C 1 , 51
Two bush press-fitting cylinders 5 are provided between the pair of columns 57, 57 behind the pair of columns 52, 52 on which the holding bodies 53 of A 2 to 51 C 2 are slidable in the vertical direction.
A member 58 is fixed to support members 9 and 59 in such a manner that their axes coincide with the axes L 1 and L 2 , respectively. As shown in FIG. 5, an engaging member 61 having a U-shape when viewed from above and below is fixed to the tip of the piston rod 60 of each of the cylinders 59, 59. Then, six of the bush press-fitting tool 51A 1 ~51C 1, 51A 2 each rear end of ~51C 2 (FIG. 5, the left end in FIG. 6), engaging the vertical direction and the U-shaped engaging member 61 A possible flange 62 is provided. This flange 62 can freely pass through the inside of the U-shaped engaging member 61 in the vertical direction, but only the flange 62 of the bush press-fitting tool whose axis coincides with the axis of the piston rod 60 of the cylinder 59. By engaging with the engaging member 61 of 60, the bush press-fitting tool is configured to be driven in the axial direction following the forward / backward movement of the piston rod 60.

【0052】一方、ブッシュ圧入具51A1 〜51
1 ,51A2 〜51C2 の先端(図5,図6の右端)
には、対応するブッシュ4A1 〜4C1 ,4A2 〜4C
2 をそれぞれ嵌着し得る外径寸法を有するブッシュ保持
端部63A1 〜63C1 ,63A2〜63C2 が設けら
れている。そして、ブッシュ保持ユニット30が位相決
めが完了したブッシュ4A1 〜4C1 ,4A2 〜4C2
を、図10に示すように油孔6に位相決めピン32が挿
入されたままの状態で保持して、図5および図6に実線
で示すブッシュ受渡し待機位置に移動し、さらに図の左
方へ前進してブッシュ受渡し位置に達した際に、ブッシ
ュ保持端部63A1 〜63C1 ,63A2 〜63C
2 は、ブッシュ保持ユニット30から、ブッシュ4A1
〜4C1 ,4A2〜4C2 を受け取るようになってい
る。なお、ブッシュ保持端部63A1 〜63C1 ,63
2 〜63C2 の外周面の所定角度位置には、ブッシュ
4A1 〜4C1 ,4A2 〜4C2 が嵌着されるときに、
油孔6に挿入されてるままの状態にある位相決めピン3
2との干渉を回避するための軸線方向の溝(図示せず)
が形成されている。
On the other hand, bush press-fitting tools 51A 1 to 51
Tip of C 1 , 51A 2 to 51C 2 (right end of FIGS. 5 and 6)
The corresponding bushing 4A 1 to ~4C 1, 4A 2 ~4C
Bush holding end portions 63A 1 to 63C 1 and 63A 2 to 63C 2 having outer diameters capable of fitting the two are respectively provided. Then, the bushes 4A 1 to 4C 1 and 4A 2 to 4C 2 for which the bush holding unit 30 has completed the phase determination.
While holding the phase setting pin 32 inserted in the oil hole 6 as shown in FIG. 10, move to the bush delivery standby position shown by the solid line in FIGS. 5 and 6, and further to the left in the figure. When the bush reaches the bush transfer position, the bush holding ends 63A 1 to 63C 1 and 63A 2 to 63C.
2 is from the bush holding unit 30 to the bush 4A 1
~4C 1, adapted to receive 4A 2 ~4C 2. The bush holding ends 63A 1 to 63C 1 , 63
At a predetermined angular position of the outer peripheral surface of the A 2 ~63C 2, when the bushing 4A 1 ~4C 1, 4A 2 ~4C 2 is fitted,
Phase determining pin 3 still inserted in the oil hole 6
Axial groove (not shown) to avoid interference with 2
Are formed.

【0053】ブッシュ圧入装置50の動作およびこれに
関連する上記 (9)に続くブッシュ保持ユニット30の動
作は下記のとおりである。
The operation of the bush press-fitting device 50 and the related operation of the bush holding unit 30 following (9) above are as follows.

【0054】(10) 図5および図6に実線で示すブッシ
ュ受渡し待機位置に移動したブッシュ保持ユニット30
が、軸線L1 ,L2 に沿ってブッシュ受渡し位置まで図
5および図6の左方へ前進して、ブッシュブッシュ4A
1 〜4C1 ,4A2 〜4C2をブッシュ保持端部63A
1 〜63C1 ,63A2 〜63C2 に嵌着する。
(10) The bush holding unit 30 moved to the bush delivery standby position shown by the solid line in FIGS. 5 and 6.
Moves to the left side in FIGS. 5 and 6 along the axes L 1 and L 2 to the bush delivery position, and the bush bush 4A
1 to 4C 1 , 4A 2 to 4C 2 for bush holding end 63A
It fits in 1 to 63C 1 and 63A 2 to 63C 2 .

【0055】(11) ブッシュ保持体33A1 〜33
1 ,33A2 〜33C2 の各シリンダ35が作動され
て位相決めピン32が各ブッシュ4A1 〜4C1 ,4A
2 〜4C2 の油孔から脱出した後、ブッシュ保持ユニッ
ト30がブッシュ受渡し待機位置に後退し、次いで位相
決め位置へ戻る。
(11) Bush holder 33A 1 to 33
The cylinders C 1 , 33A 2 to 33C 2 are actuated so that the phasing pin 32 moves to the bushes 4A 1 to 4C 1 , 4A.
After escaping from 2 ~4C 2 oil hole, the bush holding unit 30 is retracted in the bush transfer standby position, then returns to the phase determination position.

【0056】(12) ブッシュ圧入用シリンダ59,59
が作動されて、最下段のブッシュ圧入具51C1 ,51
2 が図5および図6に示す原位置からシリンダブロッ
ク1に向かって前進し、ブッシュ挿入孔5A1 ,5B1
および5A2 ,5B2 内をそれぞれ通過して、ブッシュ
4C1 ,4C2 を最も奥のブッシュ挿入孔5C1 ,5C
2 にそれぞれ圧入した後、図5および図6に示す位置に
戻る。
(12) Cylinder 59 for press-fitting bush
Is operated, and the bush press-fitting tools 51C 1 and 51 at the lowest stage are
C 2 advances from the original position shown in FIGS. 5 and 6 toward the cylinder block 1, and the bush insertion holes 5A 1 and 5B 1
And 5A 2 and 5B 2 , respectively, and pass through the bushes 4C 1 and 4C 2 at the innermost bush insertion holes 5C 1 and 5C, respectively.
After press-fitting into 2 respectively, it returns to the position shown in FIG. 5 and FIG.

【0057】(13) シリンダ56が作動されて、中段の
ブッシュ圧入具51B1 ,51B2が軸線L1 ,L2
心合する位置まで保持体53が下降する。
(13) The cylinder 56 is actuated, and the holder 53 descends to a position where the bush press-fitting tools 51B 1 and 51B 2 in the middle stage are aligned with the axes L 1 and L 2 .

【0058】(14) ブッシュ圧入用シリンダ59,59
が作動されて、中段のブッシュ圧入具51B1 ,51B
2 が図5および図6に示す位置からシリンダブロック1
に向かって前進し、ブッシュ挿入孔5A1 および5A2
内をそれぞれ通過して、ブッシュ4B1 ,4LB2 を中
間のブッシュ挿入孔5B1 ,5B2 にそれぞれ圧入した
後、図5および図6に示す位置に戻る。
(14) Cylinders 59 for press-fitting bushes
Is operated, the middle-stage bush press-fitting tools 51B 1 and 51B
2 is the cylinder block 1 from the position shown in FIG. 5 and FIG.
Toward the bush insertion holes 5A 1 and 5A 2
After passing through the inside, press the bushes 4B 1 and 4LB 2 into the intermediate bush insertion holes 5B 1 and 5B 2 , respectively, and then return to the positions shown in FIGS. 5 and 6.

【0059】(15) シリンダ56が作動されて、最上段
のブッシュ圧入具51A1 ,51A2 が軸線L1 ,L2
に心合する位置まで保持体53が下降する。
(15) The cylinder 56 is actuated, and the uppermost bush press-fitting tools 51A 1 and 51A 2 are moved along the axis lines L 1 and L 2.
The holding body 53 descends to a position aligned with.

【0060】(16) ブッシュ圧入用シリンダ59,59
が作動されて、最上段のブッシュ圧入具51A1 ,51
2 が図5および図6に示す位置からシリンダブロック
1に向かって前進し、ブッシュ4A1 ,4A2 を最も手
前のブッシュ挿入孔5A1 ,5A2 にそれぞれ圧入した
後、図5および図6に示す位置に戻り、ブッシュ圧入が
終了する。
(16) Cushion for press fitting bush 59, 59
Is operated, the uppermost bush press-fitting tools 51A 1 , 51
A 2 advances from the position shown in FIGS. 5 and 6 toward the cylinder block 1 and presses the bushes 4A 1 and 4A 2 into the bush insertion holes 5A 1 and 5A 2 at the forefront, respectively. The position returns to the position shown in and the bush press-fitting ends.

【0061】(17) シリンダ56が作動されて、最下段
のブッシュ圧入具51C1 ,51C2 が軸線L1 ,L2
に心合する原位置まで保持体53が上昇する。
(17) The cylinder 56 is actuated, and the bush press-fitting tools 51C 1 and 51C 2 at the lowermost stage are moved along the axis lines L 1 and L 2.
The holding body 53 moves up to the original position where it is aligned with.

【0062】(18) ブッシュ圧入が終了したシリンダブ
ロック1が図5および図6に示す位置から搬出され、新
たなシリンダブロックが上記位置にセットされる。
(18) The cylinder block 1 for which the bush press-fitting has been completed is carried out from the position shown in FIGS. 5 and 6, and a new cylinder block is set at the above position.

【0063】(19) 上述の (1)〜(18)の動作が反復され
る。
(19) The above operations (1) to (18) are repeated.

【0064】以上の説明で、本発明による軸受部材の組
付装置の一実施の形態の構成およびその動作が明らかに
なったが、本実施の形態によれば、位相合わせユニット
11A〜11Cが、ブッシュ4A1 〜4C1 ,4A2
4C2 の内周面を3個の爪12aでチャッキングした状
態でブッシュ4A1 〜4C1 ,4A2 〜4C2 が回転さ
れるから、ブッシュ4A1 〜4C1 ,4A2 〜4C2
正確にセンタリングが確実に行なわれ、かつ位相決めピ
ン32の挿入によって、油孔6の位相合わせが行なわれ
るから、正確な位相合わせが可能になる。
Although the configuration and operation of an embodiment of the bearing member assembling apparatus according to the present invention have been clarified by the above description, according to the present embodiment, the phase matching units 11A to 11C are Bushings 4A 1 ~ 4C 1 , 4A 2 ~
Since 4C bushing 4A 1 ~4C 1 the inner circumferential surface while chucking with three claws 12a 2, 4A 2 ~4C 2 is rotated, the bush 4A 1 ~4C 1, 4A 2 ~4C of 2 accurate Since the centering of the oil hole 6 is surely performed and the phase of the oil hole 6 is adjusted by inserting the phase determining pin 32, accurate phase adjustment is possible.

【0065】また、ブッシュ4A1 〜4C1 ,4A2
4C2 が、その油孔6に位相決めピン32を挿入された
ままの状態で、位相決め位置からブッシュ圧入具51A
1 〜51C1 ,51A2 〜51C2 に対する受渡し位置
まで搬送され、かつ、そのままブッシュ保持端部63A
1 〜63C1 ,63A2 〜63C2 に嵌着されるように
構成されているので、搬送途中で油孔6の位相ずれが生
ずる機会は皆無になり、油孔6の位置合わせが高精度に
なされた状態で、ブッシュ4A1 〜4C1 ,4A2 〜4
2 を軸受挿入孔5A1 〜5C1 ,5A2 〜5C2 に組
付けることが可能になる。
Further, the bushes 4A 1 to 4C 1 and 4A 2 to
4C 2 with the phase setting pin 32 inserted in the oil hole 6 thereof, the bush press-fitting tool 51A from the phase setting position.
1 to 51C 1 , 51A 2 to 51C 2 are conveyed to the delivery position, and the bush holding end portion 63A as it is.
Since it is configured to be fitted to 1 to 63C 1 and 63A 2 to 63C 2 , there is no chance that the phase shift of the oil hole 6 occurs during transportation, and the position of the oil hole 6 can be aligned with high accuracy. The bushes 4A 1 to 4C 1 and 4A 2 to 4 in the state of being made.
It becomes possible to assemble C 2 into the bearing insertion holes 5A 1 to 5C 1 and 5A 2 to 5C 2 .

【0066】さらに、ブッシュ保持ユニット30が、位
相合わせユニット11A〜11Cとともにブッシュ4A
1 〜4C1 ,4A2 〜4C2 の油孔6の位相決めを行な
う手段と、ブッシュ4A1 〜4C1 ,4A2 〜4C2
位相決め位置からブッシュ圧入具51A1 〜51C1
51A2 〜51C2 に対する受渡し位置まで搬送する手
段を兼ねているので、装置全体の構成を簡素化できる利
点がある。
Further, the bush holding unit 30 together with the phase adjusting units 11A to 11C is used for the bush 4A.
1 to 4C 1 , 4A 2 to 4C 2 means for performing the phase determination of the oil holes 6 and the bushes 4A 1 to 4C 1 and 4A 2 to 4C 2 from the phase determining position to the bush press fittings 51A 1 to 51C 1 ,
Since it also serves as a means for transporting 51A 2 to 51C 2 to the delivery position, there is an advantage that the configuration of the entire apparatus can be simplified.

【0067】さらに、6個のブッシュ4A1 〜4C1
4A2 〜4C2 が、ブッシュ保持ユニット30によって
一挙に位相決め位置からブッシュ圧入具51A1 〜51
1,51A2 〜51C2 に対する受渡し位置に搬送さ
れ、かつ、ブッシュ圧入具51A1 〜51C1 ,51A
2 〜51C2 のブッシュ保持端部63A1 〜63C1
63A2 〜63C2 に同時に嵌着されるように構成され
ているので、ブッシュ圧入作業効率が向上する効果があ
る。
Further, six bushes 4A 1 to 4C 1 ,
4A 2 to 4C 2 are pressed by the bush holding unit 30 from the phasing position all at once to the bush press-fitting tools 51A 1 to 51.
C 1, is conveyed to the transfer position relative 51A 2 ~51C 2, and bush press-fit tool 51A 1 ~51C 1, 51A
2 to 51C 2 bush holding ends 63A 1 to 63C 1 ,
Since it is configured to be fitted into 63A 2 to 63C 2 at the same time, there is an effect that the bush press-fitting work efficiency is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による軸受部材の組付装置によって軸受
部材が組付けられるシリンダブロックの一部を省略した
正面図
FIG. 1 is a front view in which a part of a cylinder block to which a bearing member is assembled by a device for assembling a bearing member according to the present invention is omitted.

【図2】図1のII−II線に沿った断面図FIG. 2 is a sectional view taken along line II-II in FIG.

【図3】図4の III−III 線に沿った軸受部材の拡大断
面図
FIG. 3 is an enlarged sectional view of the bearing member taken along the line III-III in FIG.

【図4】図3のIV−IV線に沿った軸受部材の拡大断面図FIG. 4 is an enlarged sectional view of the bearing member taken along line IV-IV in FIG.

【図5】本発明による軸受部材の組付装置の一実施の形
態を示す平面図
FIG. 5 is a plan view showing an embodiment of an apparatus for assembling a bearing member according to the present invention.

【図6】同 側面図FIG. 6 is a side view of the same.

【図7】図6の VII−VII 線に沿った断面図FIG. 7 is a sectional view taken along the line VII-VII in FIG. 6;

【図8】本発明による軸受部材の組付装置の位相合わせ
ユニットの側面図
FIG. 8 is a side view of a phase matching unit of the bearing member assembling apparatus according to the present invention.

【図9】同 正面図FIG. 9 is a front view of the same.

【図10】本発明による軸受部材の組付装置のブッシュ
保持ユニットの正面図
FIG. 10 is a front view of a bush holding unit of the bearing member assembling apparatus according to the present invention.

【図11】図10のXI−XI線に沿った断面図11 is a sectional view taken along the line XI-XI in FIG.

【符号の説明】[Explanation of symbols]

1 シリンダブロック 4A1 〜4C1 ,4A2 〜4C2 ブッシュ(軸受部
材) 5A1 〜5C1 ,5A2 〜5C2 軸受挿入孔 6 ブッシュの油孔 10 位相合わせ装置 11A〜11C 位相合わせユニット 12 チャック 13 モータ 15 シリンダ 30 ブッシュ保持ユニット 32 位相決めピン 33A1 〜33C1 ,33A2 〜33C2 ブッシュ
保持体 35 シリンダ 40 シリンダブロック位置決めユニット 50 ブッシュ圧入装置 51A1 〜51C1 ,51A2 〜51C2 ブッシュ
圧入具 56,59 シリンダ 61 係合部材 62 フランジ 63A1 〜63C1 ,63A2 〜63C2 ブッシュ
保持端部
1 cylinder block 4A 1 ~4C 1, 4A 2 ~4C 2 bushing (bearing member) 5A 1 ~5C 1, 5A 2 ~5C 2 bearing insertion hole 6 bushing oil hole 10 phasing device 11A~11C phase alignment unit 12 chucks 13 motor 15 cylinder 30 bush holding unit 32 phasing pin 33A 1 to 33C 1 , 33A 2 to 33C 2 bush holder 35 cylinder 40 cylinder block positioning unit 50 bush press fitting device 51A 1 to 51C 1 , 51A 2 to 51C 2 bush press fitting ingredients 56 and 59 cylinder 61 engaging member 62 flange 63A 1 ~63C 1, 63A 2 ~63C 2 bushing holding end

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 油孔を有するリング状軸受部材を上記油
孔が所定の位相決めをされた状態で圧入手段により軸受
挿入孔に圧入して組付ける装置であって、 上記軸受部材を保持してその軸線の周りに回転させる手
段と、 該回転手段による上記軸受部材の回転時に上記油孔にピ
ンを挿入して上記軸受部材の油孔の位相決めを行なう手
段と、 上記油孔が位相決めされた軸受部材を位相決め位置から
上記圧入手段に対する受渡し位置に搬送する手段と、を
備えてなることを特徴とする軸受部材の組付装置。
1. A device for assembling a ring-shaped bearing member having an oil hole by press-fitting the ring-shaped bearing member into a bearing insertion hole by a press-fitting means in a state where the oil hole has a predetermined phase, and holding the bearing member. Means for rotating the bearing member about its axis, a means for inserting a pin into the oil hole to phase the oil hole of the bearing member when the bearing member is rotated by the rotating means, and the oil hole for determining the phase. And a means for transporting the formed bearing member from the phasing position to the delivery position for the press-fitting means.
【請求項2】 上記油孔が位相決めされた軸受部材を位
相決め位置から上記圧入手段に対する受渡し位置に搬送
する手段は、上記軸受部材の油孔に上記ピンを挿入した
まま上記軸受部材を搬送することを特徴とする請求項1
記載の軸受部材の組付装置。
2. The means for transporting the bearing member, in which the oil holes are phased, from the phasing position to the delivery position for the press-fitting means, transports the bearing member while inserting the pin into the oil hole of the bearing member. Claim 1 characterized by the above.
A bearing member assembling apparatus as described above.
【請求項3】 上記油孔の位相決めを行なう手段が、上
記軸受部材を位相決め位置から上記受渡し位置に搬送す
る手段を兼ねていることを特徴とする請求項1または2
記載の軸受部材の組付装置。
3. The means for deciding the phase of the oil hole also serves as means for conveying the bearing member from the phasing position to the delivery position.
A bearing member assembling apparatus as described above.
【請求項4】 上記圧入手段は、上記軸受部材を受取る
後退位置と、該軸受部材を上記軸受挿入孔に圧入する前
進位置との間で往復動可能に構成されてなることを特徴
とする請求項1ないし3のいずれか1項記載の軸受部材
の組付装置。
4. The press-fitting means is configured to be capable of reciprocating between a retracted position for receiving the bearing member and an advanced position for press-fitting the bearing member into the bearing insertion hole. Item 5. A device for assembling a bearing member according to any one of items 1 to 3.
【請求項5】 上記圧入手段は、上記後退位置で複数の
軸受部材を同時に受取るように構成されてなることを特
徴とする請求項4記載の軸受部材の組付装置。
5. The bearing member assembling apparatus according to claim 4, wherein the press-fitting means is configured to simultaneously receive a plurality of bearing members in the retracted position.
【請求項6】 上記圧入手段は、上記前進位置において
複数の軸受部材を同時に上記軸受挿入孔に圧入するよう
に構成されてなることを特徴とする請求項4または5記
載の軸受部材の組付装置。
6. The assembly of the bearing member according to claim 4, wherein the press-fitting means is configured to press-fit a plurality of bearing members into the bearing insertion hole at the same time in the forward movement position. apparatus.
【請求項7】 上記軸受部材がエンジンのバランスシャ
フトの軸受部材よりなることを特徴とする請求項1ない
し6のいずれか1項記載の軸受部材の組付装置。
7. The apparatus for assembling a bearing member according to claim 1, wherein the bearing member is a bearing member for a balance shaft of an engine.
【請求項8】 上記エンジンは、各バランスシャフトに
対しそれぞれ3箇所の軸受挿入孔が軸線方向に沿って設
けられた2本のバランスシャフトを備えており、上記圧
入手段は、上記後退位置で6個の軸受部材を同時に受取
るように構成され、かつ、上記前進位置において上記軸
受部材を2個ずつ上記軸受挿入孔に圧入し得るように、
その前進方向に対し直角方向に移動可能に設けられてな
ることを特徴とする請求項6記載の軸受部材の組付装
置。
8. The engine includes two balance shafts each having three bearing insertion holes provided along the axial direction for each balance shaft. A plurality of bearing members are received at the same time, and two of the bearing members can be press-fitted into the bearing insertion holes in the advanced position,
7. The bearing member assembling device according to claim 6, wherein the bearing member assembling device is provided so as to be movable in a direction perpendicular to the forward direction.
JP21570395A 1995-08-24 1995-08-24 Assembly device for bearing member Pending JPH0957555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21570395A JPH0957555A (en) 1995-08-24 1995-08-24 Assembly device for bearing member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21570395A JPH0957555A (en) 1995-08-24 1995-08-24 Assembly device for bearing member

Publications (1)

Publication Number Publication Date
JPH0957555A true JPH0957555A (en) 1997-03-04

Family

ID=16676769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21570395A Pending JPH0957555A (en) 1995-08-24 1995-08-24 Assembly device for bearing member

Country Status (1)

Country Link
JP (1) JPH0957555A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100645507B1 (en) * 2005-11-18 2006-11-14 (주)윈텍 Supplier of compressor for vehicle
US7757388B2 (en) 2005-09-02 2010-07-20 Honda Motor Co., Ltd. Apparatus for supplying and press-fitting part to work
TWI476330B (en) * 2012-02-17 2015-03-11 Hon Hai Prec Ind Co Ltd Assembly device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7757388B2 (en) 2005-09-02 2010-07-20 Honda Motor Co., Ltd. Apparatus for supplying and press-fitting part to work
KR100645507B1 (en) * 2005-11-18 2006-11-14 (주)윈텍 Supplier of compressor for vehicle
TWI476330B (en) * 2012-02-17 2015-03-11 Hon Hai Prec Ind Co Ltd Assembly device

Similar Documents

Publication Publication Date Title
JP4063557B2 (en) Automatic piston assembly device
CN111085853B (en) Full-automatic fitting assembly machine for automobile hub double-row angular contact ball bearing
JPS6159867B2 (en)
JPH0957555A (en) Assembly device for bearing member
GB2236270A (en) System and apparatus for and method of assembling workpieces
JP2658552B2 (en) Thrust metal assembly device
JPH08294832A (en) Cam shaft assembling machine
JP3438222B2 (en) Camshaft manufacturing equipment
JP3771730B2 (en) Cylinder head machining method
JP3523573B2 (en) Mass centering machine
JP2571047B2 (en) Article assembling method and article assembling apparatus
JP3282754B2 (en) Camshaft manufacturing equipment
JPH02243231A (en) Assembly device for locker arm
JPH01240234A (en) Device for assembling roller type universal joint and roller assembling unit
JP2785473B2 (en) Thrust metal assembly device
JP3457390B2 (en) Method and apparatus for caulking retainer in cylindrical roller bearing
JPH09323229A (en) Engine assembling method and device thereof
JP4255604B2 (en) Piston assembly method and device
JP4213888B2 (en) Work processing device
JPH1133847A (en) Piston inserting device
JP2855942B2 (en) Flexible transfer machine
JPS6237520A (en) Ball insertion method for uniform speed ball joint
CN114918649B (en) Automatic blanking detection device for disc spring bearing, method and assembly equipment thereof
CN211540203U (en) Automatic assembling machine for satellite shaft
JPH05262427A (en) Part delivery device