JPH0953243A - Permanent form of semi-finished product - Google Patents

Permanent form of semi-finished product

Info

Publication number
JPH0953243A
JPH0953243A JP23587195A JP23587195A JPH0953243A JP H0953243 A JPH0953243 A JP H0953243A JP 23587195 A JP23587195 A JP 23587195A JP 23587195 A JP23587195 A JP 23587195A JP H0953243 A JPH0953243 A JP H0953243A
Authority
JP
Japan
Prior art keywords
base
riser
forms
steel material
permanent forms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23587195A
Other languages
Japanese (ja)
Inventor
Akiyoshi Yabe
明義 矢部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUNABASHI KENCHIKU SEKKEI JIMU
FUNABASHI KENCHIKU SEKKEI JIMUSHO KK
Original Assignee
FUNABASHI KENCHIKU SEKKEI JIMU
FUNABASHI KENCHIKU SEKKEI JIMUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUNABASHI KENCHIKU SEKKEI JIMU, FUNABASHI KENCHIKU SEKKEI JIMUSHO KK filed Critical FUNABASHI KENCHIKU SEKKEI JIMU
Priority to JP23587195A priority Critical patent/JPH0953243A/en
Publication of JPH0953243A publication Critical patent/JPH0953243A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To set the base section of a foundation and the forms of a continuous footing section at a stretch, and to provide the forms of a semi-finished product, to which concrete can be placed simultaneously, by installing a base main- reinforcement corresponding steel material on a spacer in base permanent forms, fixing riser permanent forms with a riser main reinforcement by a reinforcing plate and mounting the riser permanent forms on the steel material. SOLUTION: Marking is conducted on leveling mortar 9, and base permanent forms 1 are installed. Spacers 7 are formed inside the base permanent forms 1, and a base main-reinforcement corresponding steel material 2 is mounted on the spacers 7. A base distributing bar 10a is arranged. Riser permanent forms 4 with riser main reinforcements 3 are set up onto the base main- reinforcement corresponding steel material 2, and a base distributing bar 10b and a riser distributing bar 11 are arranged. Concrete 12 is placed into the permanent forms 1, 4. Accordingly, processes are simplified, the time on a field is shortened because of materials for factory production, and transfer and transportation are also facilitated, cost can be reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、基礎の底盤部(5)と
布部(6)の型枠を一度にセットし、コンクリートの同
時打込み可能な半製品の捨て型枠に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a waste formwork for semi-finished products, in which the formwork of the base (5) and the cloth (6) of the foundation are set at once and concrete can be simultaneously poured.

【0002】[0002]

【従来の技術】従来は、木製、スチール製などの型枠を
用い、コンクリートが硬化した後、型枠をはずし使用し
ている。しかも、コンクリートは2度打ちである。
2. Description of the Related Art Conventionally, a mold made of wood, steel or the like is used, and after the concrete is hardened, the mold is removed and used. Moreover, concrete is hit twice.

【0003】[0003]

【発明が解決しようとする課題】コンクリートの2度の
打込みは、まず底盤部の型枠を設けコンクリートを打設
する。養生した後、その上部に布部の型枠を設置し、2
度目のコンクリートを打設する。その後型枠をはずし使
用するために、時間と労力が重み天候に左右されるなど
して、結果的に単価は高くなる。さらに底盤部と布部と
の接地面はコンクリートの打ち継ぎができるために、構
造的に不安定となりやすい。
In order to pour the concrete twice, first, the formwork of the bottom plate portion is provided and the concrete is poured. After curing, place the cloth formwork on top of it, and
Place the second concrete. After that, since the formwork is removed and used, time and labor are heavily influenced by the weather, and as a result, the unit price increases. Furthermore, the ground contact surface between the bottom plate part and the cloth part can be concretely spliced, so that the structure tends to be unstable.

【0004】[0004]

【課題を解決するための手段】ベース捨て型枠(1)内
におかれたスペーサー(7)上にベース主筋相当鋼材
(2)を設置し、補強プレート(8)により固定した立
上り主筋(3)付立上り捨て型枠(4)を、そのベース
主筋相当鋼材(2)上に設ける。本発明は、以上の構成
からなる半製品の捨て型枠である。
[Means for Solving the Problems] A steel bar (3) corresponding to a base main bar is installed on a spacer (7) placed in a base discarding form (1) and fixed by a reinforcing plate (8). ) An attached stand-up formwork (4) is provided on the steel material (2) corresponding to the base main bar. The present invention is a semi-finished waste formwork having the above-mentioned configuration.

【0005】[0005]

【作用】本発明を使用するときは、均シモルタル(9)
上に墨出しを行ない、ベース捨て型枠(1)を据え、そ
の内側へベース主筋相当鋼材(2)を据え、その上に立
上り捨て型枠(4)を設置し、ベース配力筋(10a、
10b)と立上り配力筋(11)を配筋する。ベース捨
て型枠(1)と立上り捨て型枠(4)内にコンクリート
(12)を打設し、基礎工事は終丁する。
When the present invention is used, a uniform mortar (9) is used.
Ink marking is performed on the top, the base discard form (1) is installed, the base main bar equivalent steel material (2) is installed on the inside, and the stand-up discard form (4) is installed on the base discard bar (10a). ,
10b) and the standing force distribution muscle (11) are arranged. Concrete (12) is placed in the base discard form (1) and the stand-up discard form (4), and the foundation work ends.

【0006】[0006]

【実施例】以下、本発明の実施例について説明する。ベ
ース捨て型枠(1)内におかれたスペーサー(7)上に
ベース主筋相当鋼材(2)を設置し、補強プレート
(8)により固定した立上り主筋(3)付立上り捨て型
枠(4)を、そのベース主筋相当鋼材(2)上に設け
る。本発明は、以上の構成よりなっている。これを使用
するときは、 (イ) 均シモルタル(9)上に墨出しを行ない、ベー
ス捨て型枠(1)を据え、その内側へスペーサー(7)
を設け、その上にベース主筋相当鋼材(2)を設置し、
ベース配力筋(10a)を配筋する。 (ロ) 立上り主筋(3)付立上り捨て型枠(4)を、
ベース主筋相当鋼材(2)上に設け、ベース配力筋(1
0b)と立上り配力筋(11)を配筋する。 (ハ) ベース捨て型枠(1)と立上り捨て型枠(4)
内にコンクリート(12)を打設し、基礎工事は終了す
る。 尚、本型枠は、立上り主筋(3)の底盤部(5)への定
着長さを変えることにより、偏芯基礎にも対応できる。
さらに独立基礎、ベタ基礎上の布部の捨て型枠としても
使用できる。また、接着剤を利用したり、溶接を施した
りして、立上り捨て型枠(4)とベース捨て型枠(1)
を一体化することは可能である。
Embodiments of the present invention will be described below. Standing-up formwork (4) with standing main-bars (3) fixed by reinforcing plate (8) by installing steel material (2) corresponding to the base main bar on the spacer (7) placed in the base-disposing formwork (1) Is provided on the steel material (2) corresponding to the base main bar. The present invention has the above configuration. When using this, (a) Inking is done on the uniform mortar (9), the base discard form (1) is installed, and the spacer (7) is placed inside it.
And the steel material (2) equivalent to the base main bar is installed on it.
The base distribution muscle (10a) is arranged. (B) Rise up the form (4) with the rising main bar (3),
It is provided on the steel material (2) equivalent to the base main bar, and the base distribution bar (1
0b) and the standing force distribution muscle (11) are arranged. (C) Base discard form (1) and stand-up discard form (4)
Concrete (12) is placed inside and the foundation work is completed. The formwork can also be applied to an eccentric foundation by changing the fixing length of the rising main bar (3) to the bottom plate (5).
Furthermore, it can also be used as a discarding form for cloth parts on independent foundations and solid foundations. Further, by using an adhesive or welding, the standing discard form (4) and the base discard form (1)
Can be integrated.

【0007】[0007]

【発明の効果】本発明の半製品の捨て型枠は、ほとんど
工場でつくられる構成材を持ちこむため、すでに施工に
必要な工程は、ほぼ終わっている。従って、墨出しに応
じ、捨て型枠をセットし、コンクリートを1回打込み、
型枠をはずすことなく基礎工事は終了する。しかも、と
りはずす金物類はない。このように工程は単純であり、
工場生産された構成材なので、現場での時間はあまり必
要とせず、あまり難しい技能と労力は必要としない。構
成材はほぼ矩形なので、コンパクトにまとまり、移動・
運搬などは容易である。結果的に、コストは下がる。
The semi-finished product discarding form of the present invention has almost all the steps required for construction since it carries the components made in the factory. Therefore, according to the marking, set the discarding form, drive the concrete once,
The foundation work is completed without removing the formwork. Moreover, there is no hardware to remove. Thus the process is simple,
Since it is a factory-made component, it does not require much time on site and does not require very difficult skills and labor. The components are almost rectangular, so they are compact and can be moved
Easy to transport. As a result, the cost is reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の半製品の捨て型枠の一使用例を示す斜
視図である。
FIG. 1 is a perspective view showing an example of use of a semi-finished product waste formwork of the present invention.

【図2】本発明の立上り捨て型枠である。FIG. 2 is a stand-up formwork of the present invention.

【図3】本発明のベース捨て型枠である。FIG. 3 is a base discarding mold of the present invention.

【図4】本発明のベース主筋相当鋼材である。FIG. 4 is a steel material equivalent to a base main bar of the present invention.

【図5】本発明の応用例を示す偏芯基礎の斜視図であ
る。
FIG. 5 is a perspective view of an eccentric foundation showing an application example of the present invention.

【符号の説明】[Explanation of symbols]

1 ベース捨て型枠 2 ベース主筋相当鋼材 3 立上り主筋 4 立上り捨て型枠 5 底盤部 6 布部 7 スペーサー 8 補強プレート 9 均シモルタル 10a ベース配力筋 10b ベース配力筋 11 立上り配力筋 12 コンクリート 13 割栗石 1 Base Abandoned Form 2 Base Main Bar Equivalent Steel 3 Standing Main Bar 4 Standing Abandoned Form 5 Bottom Plate 6 Cloth 7 Spacer 8 Reinforcement Plate 9 Uniform Simortar 10a Base Force Bar 10b Base Force Bar 11 Upright Bar 12 Concrete 13 Split stone

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 ベース捨て型枠(1)内にベース主筋相
当鋼材(2)を設置し、その上に立上り主筋(3)を付
属させた立上り捨て型枠(4)を設けた半製品の捨て型
枠。
1. A semi-finished product in which a base main bar equivalent steel material (2) is installed in a base discard form (1), and a rise discard form (4) provided with a rise main bar (3) is provided thereon. Abandoned formwork.
JP23587195A 1995-08-11 1995-08-11 Permanent form of semi-finished product Pending JPH0953243A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23587195A JPH0953243A (en) 1995-08-11 1995-08-11 Permanent form of semi-finished product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23587195A JPH0953243A (en) 1995-08-11 1995-08-11 Permanent form of semi-finished product

Publications (1)

Publication Number Publication Date
JPH0953243A true JPH0953243A (en) 1997-02-25

Family

ID=16992488

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23587195A Pending JPH0953243A (en) 1995-08-11 1995-08-11 Permanent form of semi-finished product

Country Status (1)

Country Link
JP (1) JPH0953243A (en)

Similar Documents

Publication Publication Date Title
JPH0953243A (en) Permanent form of semi-finished product
JP2004245035A (en) Underground beam construction frame and underground beam construction method using the same
JPH0921174A (en) Prefabricated permanent form
JPH0960001A (en) Panel type permanent form
JP3012326U (en) Integral discard formwork in masonry format
JP3824242B2 (en) Viaduct-free support construction method
JPH05339911A (en) Construction of concrete arch
JP2002069933A (en) Burying form for concrete for bridge construction and construction method of bridge using the same
CN209443770U (en) Post-cast strip side template
JPH08326063A (en) Piling type permanent form
JPH0931999A (en) Folding permanent form
JPH05278022A (en) Molding method of hollow precast concrete member
JPH08302707A (en) Permament form
JPH08326062A (en) Monolithic form
JPH0243688Y2 (en)
JP3009572U (en) Integral waste formwork for direct foundation concrete
JPH10325147A (en) Base permanent form
JPH08239840A (en) Integrated disposable mold frame
JPH09195285A (en) Permanent form
KR20040094208A (en) Concrete form device for manufacture of precast concrete beam
JP2640837B2 (en) Cutting method of the end part of lightweight cellular concrete mortar block
JPH0711140B2 (en) Formwork construction method in reverse construction method
JP3014179U (en) Two column base anchor bolts
JP2000160835A (en) Form fitting jig for forming support hole of guard rail fence or the like
JPH08209716A (en) Continuous footing for building, and construction thereof