JP2541963Y2 - Diversion base mortar formwork - Google Patents

Diversion base mortar formwork

Info

Publication number
JP2541963Y2
JP2541963Y2 JP10525491U JP10525491U JP2541963Y2 JP 2541963 Y2 JP2541963 Y2 JP 2541963Y2 JP 10525491 U JP10525491 U JP 10525491U JP 10525491 U JP10525491 U JP 10525491U JP 2541963 Y2 JP2541963 Y2 JP 2541963Y2
Authority
JP
Japan
Prior art keywords
mortar
frame
foundation
suspension
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP10525491U
Other languages
Japanese (ja)
Other versions
JPH0547213U (en
Inventor
鶴田  誠
均 有津
靖彦 長田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP10525491U priority Critical patent/JP2541963Y2/en
Publication of JPH0547213U publication Critical patent/JPH0547213U/en
Application granted granted Critical
Publication of JP2541963Y2 publication Critical patent/JP2541963Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、基礎上のベースモルタ
ルを形成する転用型ベースモルタル型枠に係るものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a diversion type base mortar form for forming a base mortar on a foundation.

【0002】[0002]

【従来の技術】従来のハイベース工法には、一般に、図
5に示すモルタル工法と、コンクリート同時打ち工法が
採用されている。モルタル工法は、図5に示すように、
立上り基礎aの上端中央に中心部モルタル(通称:マン
ジュウ)bを敷き、鉄骨柱dを建方して下端のベースe
をその中心部モルタルの上に載置するとともに、該ベー
スを立上り基礎aに植設したアンカーボルトfにて定着
させ、次いで、その中心部モルタルbの周りにベース下
モルタルcを注入し、硬化させるものである。なお、図
中、gは、打込みした定着板、hは、アンカーボルトf
に嵌合させたアンボンドスリーブである。コンクリート
同時打ち工法は、前記中心部モルタルに相当するもの
を、立上り基礎の打設コンクリートで同時打ちするもの
であり、この場合、不等辺山形鋼等による中心部モルタ
ル相当物を形成する型枠を、アンカーボルトの上部で又
はアンカーボルトの上部に架設した支持部材で支持して
捨板として用いる。
2. Description of the Related Art In general, a conventional mortar method and a simultaneous concrete casting method shown in FIG. The mortar method, as shown in FIG.
A center mortar (commonly known as “manju”) b is laid at the center of the upper end of the rising foundation a, and a steel column d is constructed to form a base e at the lower end.
Is placed on the mortar at the center thereof, and the base is fixed by anchor bolts f implanted on the rising foundation a. Then, the mortar c under the base is injected around the mortar b at the center to cure. It is to let. In the drawing, g is the driven fixing plate, and h is the anchor bolt f.
It is an unbonded sleeve fitted to. The simultaneous concrete casting method is to simultaneously cast the equivalent of the central mortar with the cast concrete of the rising foundation, and in this case, a formwork for forming the equivalent of the central mortar by unequal angle iron or the like is used. It is used as a discarded plate by being supported by an upper portion of the anchor bolt or by a support member erected above the anchor bolt.

【0003】[0003]

【考案が解決しようとする課題】しかし、モルタル工法
では、モルタルb,cが基礎aから剥離し易く、強度不
十分による崩壊を生ずるばかりでなく、かなりの左官手
間がかかり、モルタルに基礎コンクリートmと別途の養
生期間を要し、かつ、工程が多いことにより危険性も多
い等の欠点がある。また、コンクリート同時打ち工法で
は、各個に捨板としての型枠を要してコスト高となり、
更には、型枠の固定不十分、精度困難、取付けに手間が
かかる等の欠点がある。本考案は、これらの欠点を除去
しようとするものである。
However, in the mortar method, the mortars b and c are apt to peel off from the foundation a, not only to cause collapse due to insufficient strength, but also to take considerable plastering work, and the mortar requires foundation concrete m. However, there is a drawback in that a separate curing period is required, and the number of steps increases the risk. In addition, the simultaneous concrete casting method requires a formwork as a discarded plate for each piece, resulting in high costs,
Further, there are disadvantages such as insufficient fixing of the formwork, difficulty in accuracy, and troublesome mounting. The present invention seeks to eliminate these disadvantages.

【0004】[0004]

【課題を解決するための手段】かかる目的達成のため、
本考案は、基礎aのアンカーボルトfの上端部に枠体21
を介して着脱自在に装着する吊り枠22を設け、該吊り枠
から適数の吊りボルト3を垂下させて、該吊りボルトに
より型枠本体1をレベル調整自在に装備させたことを特
徴とする。
Means for Solving the Problems In order to achieve this object,
In the present invention, the frame 21 is attached to the upper end of the anchor bolt f of the foundation a.
A hanging frame 22 which is removably mounted through the hanging frame, an appropriate number of hanging bolts 3 are hung from the hanging frame, and the form main body 1 is equipped with the hanging bolts so as to be capable of level adjustment. .

【0005】[0005]

【作用】如上の構成であり、使用に当たっては、基礎コ
ンクリートの打設前において、要所に配置したアンカー
ボルトfの上端部に枠体21を介して吊り枠22を装着し、
該吊り枠から吊りボルト3を介して垂設した型枠本体1
を、各吊りボルト3によりレベル調整する。次に、基礎
コンクリートmを打設するが、この際、その型枠本体1
をレベラーとして用いて、型枠本体1下端まで基礎コン
クリートmを打設する。そして、この打設コンクリート
に流動性がなくなったところで、その型枠本体1中に更
にコンクリートを打設する(コンクリート同時打ち工
法)か、モルタルを充填して硬化させる。その後、吊り
枠22乃至型枠本体1を解体して取り外し、清掃して、他
へ転用する。また、こうしてできた中心部モルタル又は
中心部モルタル相当物bの上に鉄骨柱dを建方して、下
端のベースeをその中心部モルタル又は中心部モルタル
相当物上に載置するとともに、該ベースeを立上り基礎
aに植設したアンカーボルトfで定着させ、次いで、そ
の中心部モルタル又は中心部モルタル相当物bの周り
に、ベース下モルタルcを注入し、硬化させる。なお、
ベース下モルタルcは、あらかじめ配備させてもよい。
In operation, a suspension frame 22 is attached via a frame 21 to the upper end of an anchor bolt f disposed at a key point before the foundation concrete is cast.
Form body 1 suspended from the suspension frame via suspension bolts 3
Is adjusted with each hanging bolt 3. Next, the foundation concrete m is cast.
Is used as a leveler, and a foundation concrete m is cast to the lower end of the form body 1. Then, when the poured concrete loses fluidity, concrete is further poured into the form body 1 (concrete simultaneous casting method) or mortar is filled and hardened. Thereafter, the suspension frame 22 to the mold body 1 are disassembled and removed, cleaned, and diverted to another. Also, a steel column d is constructed on the center mortar or the center mortar equivalent b thus formed, and the lower end base e is placed on the center mortar or the center mortar equivalent, and The base e is fixed with the anchor bolt f implanted on the rising foundation a, and then the mortar c under the base is poured around the central mortar or the central mortar equivalent b and hardened. In addition,
The mortar c under the base may be deployed in advance.

【0006】[0006]

【実施例】図1乃至図4は、本考案の実施例を示してい
る。図において、aは、立上り基礎、1は、該立上り基
礎の上端中央に設ける中心部モルタルbを成形する型枠
本体、22は、立上り基礎aのアンカーボルトfの上端部
に枠体21を介して着脱自在に装着する吊り枠、3は、該
吊り枠から垂下して前記型枠本体1を垂設した適数の吊
りボルトである。立上り基礎aは、掘削した地盤面iに
捨てコンクリートjを打ち、この上にアングルによる脚
体kを介して定着板gを配し、該定着板から適数のアン
カーボルトfを起立させ、また、適宜に配筋pを施し、
前記アンカーボルトfの上部まで基礎コンクリートmを
打設して成る。型枠本体1は、アングルにより平面形状
ロ字状に形成するが、図3及び図4に示すように、L字
状に形成した一対の型枠部材11を互いに突き合わせて、
離間可能にボルト12にて接合し、また、四隅に袋ナット
13を起立させて、それぞれ吊りボルト3の下端を螺着さ
せるようにしている。吊り枠22は、一対の吊りアングル
から成り、平板で平面形状ロ字状に形成した枠体21の中
間部に締付け金物23で着脱自在に架設し、また、枠体21
の四隅に透孔を穿設して、前記アンカーボルトfに着脱
自在に嵌合させ、該アンカーボルトに螺合させたナット
nで締め付けるようにしている。なお、アンカーボルト
fは、下部にもナットnで締め付け且つ基礎コンクリー
トm中に埋め殺した枠体21を有しており、この枠体は、
上部の枠体21と一対のものである。袋ナット13に螺着し
た各吊りボルト3は、上部を前記吊り枠22の適所に穿設
した透孔に貫通させ、かつ、ナット31を螺合させて、吊
り枠22から垂下させ、ナット31の螺動により昇降調整で
きるようにしている。つまり、型枠本体1のレベル調整
ができるようにしているのである。勿論、分解も可能で
ある。
1 to 4 show an embodiment of the present invention. In the figure, a is a rising foundation, 1 is a mold body for forming a central mortar b provided at the center of the upper end of the rising foundation, and 22 is a frame body 21 at the upper end of an anchor bolt f of the rising foundation a. The hanging frame 3 which is detachably attached to the hanging frame 3 is an appropriate number of hanging bolts hanging down from the hanging frame and hanging the form body 1. The rising foundation a is constructed by placing a discarded concrete j on the excavated ground surface i, arranging a fixing plate g thereon via an angled leg k, and erecting an appropriate number of anchor bolts f from the fixing plate. , Applying the reinforcement p as appropriate,
The foundation concrete m is cast to the upper part of the anchor bolt f. The mold body 1 is formed in a flat rectangular shape by an angle. As shown in FIGS. 3 and 4, a pair of L-shaped mold members 11 are butted against each other,
Jointed with bolts 12 so that they can be separated, and cap nuts at the four corners
13 are raised, and the lower ends of the suspension bolts 3 are screwed. The suspension frame 22 is composed of a pair of suspension angles, and is detachably mounted on a middle part of a flat frame-shaped frame 21 formed with a flat plate with a fastening hardware 23.
Through holes are drilled at the four corners of the bracket, and are detachably fitted to the anchor bolts f, and are tightened with nuts n screwed to the anchor bolts. Note that the anchor bolt f also has a frame 21 which is fastened with a nut n and buried in the foundation concrete m at the lower portion.
It is a pair with the upper frame 21. Each of the suspension bolts 3 screwed to the cap nut 13 has an upper part penetrated through a through hole formed in an appropriate place of the suspension frame 22, and is screwed with a nut 31 to be suspended from the suspension frame 22. The vertical movement can be adjusted by screwing. That is, the level of the mold body 1 can be adjusted. Of course, disassembly is also possible.

【0007】[0007]

【考案の効果】本考案によれば、基礎コンクリートの打
設前において、アンカーボルトfの上端部に、吊りボル
ト3を介して型枠本体1を垂設した吊り枠22を装着する
ので、その組立てが極めて容易であり、また、各吊りボ
ルト3により型枠本体1のレベル調整をするので、型枠
本体1は定位置に的確に且つ安定に強固に位置させるこ
とができ、そして、その型枠本体1をレベラーとして型
枠本体1の下端まで基礎コンクリートmを打設できるの
で、打設が容易に行え、したがって、施工が容易かつ確
実に迅速に行え、手間も少なくてすみ、しかも、その基
礎コンクリートmに流動性がなくなったところで、その
型枠本体1内に更にコンクリートを打設するか、モルタ
ルを充填して硬化させるので、その中心部モルタル又は
中心部モルタル相当物bは強力に且つ一体的に剥離なく
設けることができ、短い期間で危険性少なく施工するこ
とができる。更に、型枠本体1は捨板として埋め殺す必
要なく、施工後に吊り枠22及び吊りボルト3とともに解
体して取り外し、他へ転用することができ、上述の事柄
と相まって大幅なコストダウンが可能となる。
According to the present invention, before the foundation concrete is cast, the suspension frame 22 on which the formwork body 1 is suspended via the suspension bolts 3 is attached to the upper end of the anchor bolt f. Since the assembling is extremely easy, and the level of the form body 1 is adjusted by each hanging bolt 3, the form body 1 can be firmly and precisely positioned in a fixed position, and Since the foundation concrete m can be cast to the lower end of the mold body 1 using the frame body 1 as a leveler, the casting can be easily performed, and therefore, the construction can be performed easily, reliably, quickly, and with less labor. When the fluidity of the foundation concrete m is lost, concrete is further poured into the form body 1 or mortar is filled and hardened, so that the central mortar or the central mortar phase is hardened. Object b can be provided strong and without integrally peeling, may be applied risk reduced in a short period. Further, the formwork body 1 does not need to be buried as a discarded plate, and can be disassembled and removed together with the suspension frame 22 and the suspension bolts 3 after construction, and can be diverted to another. Become.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の実施例を示す中央縦断正面図である。FIG. 1 is a front view of a central longitudinal section showing an embodiment of the present invention.

【図2】同例の一部截断平面図である。FIG. 2 is a partially cutaway plan view of the same example.

【図3】同例要部の分解斜視図である。FIG. 3 is an exploded perspective view of a main part of the example.

【図4】同例要部の分解平面図である。FIG. 4 is an exploded plan view of a main part of the example.

【図5】従来例を示す一部截断正面図である。FIG. 5 is a partially cutaway front view showing a conventional example.

【符号の説明】[Explanation of symbols]

1 型枠本体 3 吊りボルト 11 型枠部材 12 ボルト 13 袋ナット 21 枠体 22 吊り枠 23 締付け金物 31 ナット a 立上り基礎 b 中心部モルタル又は中心部モルタル相当物 c ベース下モルタル d 鉄骨柱 e ベース f アンカーボルト g 定着板 h アンボンドスリーブ i 掘削地盤面 j 捨てコンクリート k 脚体 m 基礎コンクリート n ナット p 配筋 DESCRIPTION OF SYMBOLS 1 Form body 3 Hanging bolt 11 Form member 12 Bolt 13 Cap nut 21 Frame body 22 Suspended frame 23 Clamping hardware 31 Nut a Rising foundation b Central mortar or equivalent mortar c Mortar under base d Steel column e Base f Anchor bolt g Fixing plate h Unbonded sleeve i Excavated ground surface j Discarded concrete k Leg m Foundation concrete n Nut p Reinforcing

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 基礎aのアンカーボルトfの上端部に枠
体21を介して着脱自在に装着する吊り枠22を設け、該吊
り枠から適数の吊りボルト3を垂下させて、該吊りボル
トにより型枠本体1をレベル調整自在に装備させたこと
を特徴とする転用型ベースモルタル型枠。
1. A suspension frame 22, which is removably mounted via a frame body 21, is provided at an upper end of an anchor bolt f of a foundation a, and an appropriate number of suspension bolts 3 are suspended from the suspension frame to form the suspension bolt. A diverted base mortar formwork characterized in that the form body 1 is equipped so that the level of the form body 1 can be adjusted.
JP10525491U 1991-11-26 1991-11-26 Diversion base mortar formwork Expired - Lifetime JP2541963Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10525491U JP2541963Y2 (en) 1991-11-26 1991-11-26 Diversion base mortar formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10525491U JP2541963Y2 (en) 1991-11-26 1991-11-26 Diversion base mortar formwork

Publications (2)

Publication Number Publication Date
JPH0547213U JPH0547213U (en) 1993-06-22
JP2541963Y2 true JP2541963Y2 (en) 1997-07-23

Family

ID=14402520

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10525491U Expired - Lifetime JP2541963Y2 (en) 1991-11-26 1991-11-26 Diversion base mortar formwork

Country Status (1)

Country Link
JP (1) JP2541963Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220096809A (en) * 2020-12-31 2022-07-07 (주)유창이앤씨 Anchor system for water proof sill of roof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220096809A (en) * 2020-12-31 2022-07-07 (주)유창이앤씨 Anchor system for water proof sill of roof
KR102646641B1 (en) * 2020-12-31 2024-03-12 (주)유창이앤씨 Anchor construction method for water proof sill of roof

Also Published As

Publication number Publication date
JPH0547213U (en) 1993-06-22

Similar Documents

Publication Publication Date Title
US4052031A (en) Adjustable concrete form apparatus
US5207931A (en) Brace for concrete form
US2684824A (en) Adjustable brace
US5186874A (en) Method for casting stairs within pools
US3355897A (en) Method and apparatus for monolithic casting of swimming pools or tanks
JP2541963Y2 (en) Diversion base mortar formwork
US2916245A (en) Adjustable scaffold bracket
JPH06173339A (en) Constructing method for joining section for column/beam
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JPH08144581A (en) Foundation structure for fence
JP3025638B2 (en) Formwork equipment for fabric foundation
JPH0572503B2 (en)
JP2001254495A (en) Internal stairway for building, and building method therefor
JPH0748751Y2 (en) Structural pillar construction auxiliary jig and its attachment
JP2759361B2 (en) Pillar support members for building reinforced concrete buildings
US3801060A (en) Collapsible crypt forming system
JPH05239835A (en) Independent foundation with form
JPH0735870Y2 (en) Formwork for slope concrete wall molding
JPH0345479Y2 (en)
JPH06346471A (en) Construction of reinforced concrete retaining wall by use of large size precast slab
JP2003082852A (en) Form holding fixture
JP2811211B2 (en) Flat slab construction method
JP2611917B2 (en) Pillar formwork equipment
JPH0410282Y2 (en)
JPH0476116A (en) Supporting device for anchor bolt