JPH0941891A - Repairing method for existing tunnel - Google Patents

Repairing method for existing tunnel

Info

Publication number
JPH0941891A
JPH0941891A JP7190586A JP19058695A JPH0941891A JP H0941891 A JPH0941891 A JP H0941891A JP 7190586 A JP7190586 A JP 7190586A JP 19058695 A JP19058695 A JP 19058695A JP H0941891 A JPH0941891 A JP H0941891A
Authority
JP
Japan
Prior art keywords
tunnel
grout
grout material
slide
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7190586A
Other languages
Japanese (ja)
Inventor
Hideaki Yazaki
英章 矢崎
Atsushi Tauchi
淳 田内
Junzo Seo
順三 瀬尾
Takashi Suzuki
隆 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAMAUCHI KOGYO KK
Sanei Kogyo KK
Original Assignee
YAMAUCHI KOGYO KK
Sanei Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAMAUCHI KOGYO KK, Sanei Kogyo KK filed Critical YAMAUCHI KOGYO KK
Priority to JP7190586A priority Critical patent/JPH0941891A/en
Publication of JPH0941891A publication Critical patent/JPH0941891A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To accelerate the work at low cost by removing the wall face of a deteriorated tunnel, arranging bars, using a slide center formwork, applying lining with quick hardening cement mortar, and heating and curing it. SOLUTION: The deteriorated wall face surface layer of a tunnel 1 is scraped off for each fixed distance by a mobile chipping machine 3, the tunnel 1 is washed by high-pressure water, reinforcing bars are arranged, and a slide center 8 having a transparent formwork board is arranged. A grout material 12 of highly fluidic quick hardening cement mortar is injected from the grout injection port 11 of the slide central 8, and it is densely filled with no defect. The injected grout material 12 is heated to accelerate its strengthening, and the mold releasing is accelerated to shorten the cycle time of the process. The modification work can be quickly conducted at a low cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は既設トンネルで老
朽化、劣化などした構造体を改修する方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of repairing a structure that has deteriorated or deteriorated in an existing tunnel.

【0002】[0002]

【発明が解決しようとする課題】従来から行なわれてい
る老朽化した既設トンネルの改修方法としては、一般に
劣化したトンネルの躯体全てを解体し、新たに同様の構
造躯体を築造する手段がとられていた。この方法はトン
ネル全断面を新規にやり替えるため、経済性、工期はも
とより安全性などに問題点が少なくなかった。
A conventional method for rehabilitating an aged existing tunnel is to take a means of disassembling all the deteriorated tunnel skeletons and newly building a similar structural skeleton. Was there. Since this method newly replaces the entire section of the tunnel, there were many problems in terms of not only economic efficiency and construction period but also safety.

【0003】トンネルによっては稼動を止めることがで
きない場合、あるいは水路トンネルのように間伐期に工
事を行なう必要があるものもあり、工期的に極めて短期
間に施工しなければならない場合などがあり、工期が短
い改修方法が求められていた。
Depending on the tunnel, the operation cannot be stopped, or there is the case where construction is required during the thinning period such as a waterway tunnel, and there are cases where construction must be carried out in an extremely short period of time. There was a need for a renovation method with a short construction period.

【0004】この発明は上記の事情に鑑みなされたもの
である。その目的は、改修工事の工期が短かく、欠損部
分が発生せず信頼性が高い改修ができ、かつ、施工時の
安全性が高い既設トンネルの改修方法を提案するにあ
る。
The present invention has been made in view of the above circumstances. The purpose of this is to propose a method for repairing an existing tunnel that has a short repair period, can be repaired with high reliability without loss, and has high safety during construction.

【0005】[0005]

【課題を解決するための手段】この既設トンネルの改修
方法は、既設トンネルのコンクリート壁面表層を移動式
ハツリ機により削りとりる削りとり工程、高圧水を噴射
し洗浄する洗浄工程、補強筋の配筋工程、移動式スライ
ドセントル型枠を用いたグラウト注入、養生工程を連続
して行なう工程サイクルを、トンネル所定長さ区間を単
位として繰返し改修を進め、前記スライドセントル型枠
に透明プラスチック型枠板を用い、流動性が高い急硬性
セメントモルタルからなるグラウト材を注入し、型枠内
の注入グラウト材を加温して養生し、硬化を促進するこ
とを特徴とする。
[Means for Solving the Problems] This method for rehabilitating an existing tunnel consists of a shaving step for shaving the concrete wall surface layer of the existing tunnel with a mobile chipping machine, a washing step for spraying high-pressure water for washing, and a reinforcing bar arrangement A process cycle in which the muscle process, the grout injection using the movable slide centle formwork, and the curing process are continuously performed is repeatedly improved in units of a predetermined length section of the tunnel, and a transparent plastic form plate is added to the slide centle formwork. Is used to inject a grout material made of a rapid-hardening cement mortar having high fluidity, and heat and cure the injected grout material in the mold to accelerate hardening.

【0006】[0006]

【作用】この発明は上記の構成からなり、次の作用を奏
する。
The present invention is constructed as described above and has the following effects.

【0007】 既設トンネル壁面表層の削りとり工
程、洗浄工程、配筋工程、グラウト注入、養生工程を連
続して行なう工程サイクルを、移動式ハツリ機、スライ
ドセントル型枠を用いて連続的機械化施工し、トンネル
長さ1.5m〜4.5m程度を単位区間にして繰返し、
改修を進めることにより、施工能率の大幅な向上を図る
ことができる。
[0007] A process cycle of continuously performing a scraping process, a cleaning process, a reinforcing bar process, a grout injection, and a curing process of the surface layer of an existing tunnel wall surface is continuously mechanized by using a mobile chiseling machine and a slide center frame. , Tunnel length of 1.5m-4.5m is repeated as a unit section,
By proceeding with the renovation, the construction efficiency can be greatly improved.

【0008】 流動性が高い急硬性セメントモルタル
のグラウト柱を注入するので、緻密で欠陥がない充填が
でき、更に注入したグラウト材を加温することにより、
早期に強度を発現させ、脱型を早め、工程サイクル時間
を短縮できる。
Since the grout columns of the rapid-hardening cement mortar with high fluidity are injected, it is possible to perform dense and defect-free filling, and by further heating the injected grout material,
Strength can be expressed early, demolding can be accelerated, and process cycle time can be shortened.

【0009】 透明プラスチック型枠板を用いること
により、施工中のグラウト材の充填度合を目視により確
認ができ、欠陥がなく、表面が平滑で緻密な壁面を形成
できる。 長さ1.5m程度の型枠ユニットを連結し
スライドセントル型枠を組立てることにより、トンネル
の緩やかな曲面にも対応できる型枠面を形成できる。
By using the transparent plastic form plate, it is possible to visually confirm the filling degree of the grout material during construction, and it is possible to form a dense and smooth wall surface without defects. By assembling the slide center formwork by connecting formwork units having a length of about 1.5 m, it is possible to form a formwork surface that can correspond to the gently curved surface of the tunnel.

【0010】 老朽化しているトンネル壁面表層部分
のみを改修するので崩壊事故などを防止でき、安全性が
高い。
Since only the surface layer of the aged tunnel wall surface is repaired, collapse accidents can be prevented and the safety is high.

【0011】[0011]

【発明の実施の形態】この発明の改修方法が対象とする
トンネルは馬蹄形、円形、楕円形など形状を問わない。
最も一般的な馬蹄形トンネルを対象とする実施例を図面
を用い説明する。
BEST MODE FOR CARRYING OUT THE INVENTION The tunnel targeted by the repairing method of the present invention may have any shape such as a horseshoe shape, a circular shape, an elliptical shape or the like.
An example of the most common horseshoe-shaped tunnel will be described with reference to the drawings.

【0012】図1においてトンネル1の巻立コンクリー
ト2の壁面表層部分を、走行作業台車に搭載してある移
動式のコンクリートハツリ機3のアーム先端の切削ハン
マー(スパイキーハンマー)を壁面に沿い移動させ、厚
さ3cm程度削りとる。削りとる厚さは、事前に巻立コン
クリート2の巻厚を削岩機、ボーリングマシン等を用い
調査し、その巻厚を基礎にして設定する。1回の削りと
り工程で削りとるトンネル単位長さは、後工程のグラウ
ト注入の単位長さ、すなわち後述するスライドセントル
型枠の長さに見合う長さとする。
In FIG. 1, the wall surface portion of the rolled concrete 2 of the tunnel 1 is moved along a wall surface by a cutting hammer (Spiky hammer) at the end of an arm of a mobile concrete chipping machine 3 mounted on a traveling work carriage. Shave off about 3 cm thick. The thickness to be shaved is set by investigating the roll thickness of the rolled concrete 2 in advance using a rock drilling machine, a boring machine, etc., and based on the roll thickness. The tunnel unit length to be scraped in one scraping step is a length corresponding to the unit length of the grout injection in the subsequent step, that is, the length of the slide centle frame described later.

【0013】なお壁面を削りとったハツリ屑5はバッテ
リーカー6でトンネル外に搬出する。
The chipped debris 5 from which the wall surface has been shaved is carried out of the tunnel by the battery car 6.

【0014】削りとった壁面はハツリ機3に付帯してい
る高圧水(最大圧力210kg/cm2)噴射装置から高圧
水を噴射し洗浄し(図示せず)、所定長さ区間を単位と
する削りとり工程、洗浄工程を終了する。引続きその次
の工程で削りとった壁面に補強筋となる溶接金網7を配
筋する。
The scraped wall surface is cleaned by injecting high-pressure water (maximum pressure 210 kg / cm 2 ) from a high-pressure water (maximum pressure 210 kg / cm 2 ) injection device attached to the chipping machine 3 (not shown), and taking a predetermined length section as a unit. The scraping process and the cleaning process are completed. Subsequently, a welded wire net 7 serving as a reinforcing bar is arranged on the wall surface cut in the next step.

【0015】次のグラウト材注入、養生工程は、溶接金
網7を配筋した位置に、レール上を走行するスライドセ
ントル型枠8を配置して行なう。図2に示すように、ス
ライドセントル型枠8は巻立コンクリート2の壁面に向
き合うポリカーボネート樹脂製の透明型枠板9を備え、
その内部には型枠板9の拡径あるいは縮径を調整する調
整ジャッキ10が取付けてあり、型枠板9の上側および
側部位置にはグラウト注入口11が設けてある。
The next grout material injection and curing step is performed by arranging a slide center frame 8 running on the rail at the position where the welding wire net 7 is laid. As shown in FIG. 2, the slide center formwork 8 includes a transparent formwork plate 9 made of polycarbonate resin facing the wall surface of the rolled concrete 2,
An adjustment jack 10 for adjusting the diameter expansion or contraction of the mold frame plate 9 is attached inside thereof, and a grout injection port 11 is provided at the upper and side positions of the mold frame plate 9.

【0016】スライドセントル型枠8の型枠板9を削り
とった壁面に所定の間隔を保つ位置に調整し、グラウト
材12を注入口11から注入する。グラウト材12は型
枠板9と壁面との間に、先行したグラウト硬化体13に
打継ぎ充填される。
The mold plate 9 of the slide center frame 8 is adjusted to a position where a predetermined interval is maintained on the scraped wall surface, and the grout material 12 is injected from the injection port 11. The grout material 12 is pasted and filled into the preceding grout hardened body 13 between the form plate 9 and the wall surface.

【0017】グラウト材は表1に示す急硬性のセメント
硬化材を用い水セメント比35〜38%程度の流動性が
高い、急硬性モルタルとする。図1においてレール上を
移動するグラウトミキサー・ポンプ車14でグラウト材
を調合し、これを 1.5kg/cm2 以下の圧力で厚さ3〜7
cmとなし注入、充填する。
As the grout material, a quick-hardening cement hardening material shown in Table 1 is used, and a quick-hardening mortar having a high fluidity with a water cement ratio of about 35 to 38% is used. In Fig. 1, grout material is mixed with a grout mixer pump wheel 14 that moves on a rail, and the grout material is mixed at a pressure of 1.5 kg / cm 2 or less to a thickness of 3 to 7
cm and no pouring, filling.

【0018】グラウト材を注入した型枠8の周縁をシー
ト類で覆い、注入したグラウト材を加温して養生し、早
期強度の発現を図った。グラウト材は約1時間の加温養
生で圧縮強度50kgf /cm2 以上となり調整ジャッキ1
0を緩め脱型することができ、グラウト注入、養生工程
を終了した。
The periphery of the mold 8 into which the grout material was injected was covered with sheets, and the injected grout material was heated and cured to develop early strength. Grout material has a compressive strength of 50 kgf / cm 2 or more after heating and curing for about 1 hour. Adjustment jack 1
0 could be loosened and demolded, and the grout injection and curing steps were completed.

【0019】なお。図1において、型枠板9の先端部
(図面において型枠8の右側)と壁面との間に妻ゴムパ
ッキン、型枠板9の下端部に妻止金具の代わりにゴムパ
ッキンを取付けてグラウト材の漏れを防止した。また、
図1において、15は排水用の水中ポンプ、16は照明
灯、17は坑内電気設備である。
Incidentally, In FIG. 1, a grate rubber packing is attached between the front end of the form frame plate 9 (the right side of the form frame 8 in the drawing) and the wall surface, and a rubber packing is attached to the lower end of the form frame plate 9 instead of the grate stopper to grout. Prevented material leakage. Also,
In FIG. 1, 15 is a submersible pump for drainage, 16 is an illuminating lamp, and 17 is underground electrical equipment.

【0020】スライドセントル型枠内のグラウトの加温
手段としては温風パネルヒーター、電熱線などを利用
し、型枠内あるいは外から行なうことができる。
As a means for heating the grout in the slide center mold, a hot air panel heater, a heating wire or the like can be used, and it can be performed from inside or outside the mold.

【0021】この改修方法は、前記した削りとり工程、
洗浄工程、補強筋の配筋工程およびグラウト注入、養生
工程を連続してなる工程サイクルを、型枠板の長さに見
合ったトンネル長さ1.5m〜4.5m程度を単位(図
1で点線で示す)として、移動式のハツリ機およびスラ
イドセントル型枠を用いて繰返すことにより、1日2サ
イクル以上の施工ができた。
This repairing method is based on the above-mentioned scraping step,
The cleaning process, reinforcing bar arrangement process, grout injection, and curing process are continuously performed in a unit of a tunnel length of about 1.5 m to 4.5 m corresponding to the length of the form plate (see FIG. 1). (Indicated by a dotted line), it was possible to carry out construction of 2 cycles or more per day by repeating using a movable chiseling machine and a slide center formwork.

【0022】[0022]

【表1】 [Table 1]

【0023】[0023]

【発明の効果】この発明は以上の通りであり、この改修
方法によると、工期の大幅な短縮を図ることができ、欠
陥がなく、仕上面が緻密な壁面と高強度の表面を形成で
きる。
The present invention is as described above, and according to this repairing method, the construction period can be greatly shortened, and there can be formed a wall surface having a fine finished surface and a high-strength surface with no defects.

【0024】また施工コストも安価で、施工時の安全性
も高い。
Also, the construction cost is low and the safety during construction is high.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例の改修方法を説明するトンネル断面図で
ある。
FIG. 1 is a tunnel cross-sectional view illustrating a repairing method of an embodiment.

【図2】図1のスライドセントル型枠部分の横断面図で
ある。
FIG. 2 is a cross-sectional view of the slide center mold portion of FIG.

【符号の説明】[Explanation of symbols]

1……トンネル、2……巻立コンクリート、3……コン
クリートハツリ機、4……切削ハンマー、5……ハツリ
屑、6……バッテリーカー、7……溶接金網、8……ス
ライドセントル型枠、9……型枠板、10……調整ジャ
ッキ、11……グラウト注入口、12……グラウト、1
3……グラウト硬化体、14……グラウトミキサー・ポ
ンプ車、15……水中ポンプ、16……照明灯、17…
…電気設備。
1 ... Tunnel, 2 ... Rolled concrete, 3 ... Concrete chipping machine, 4 ... Cutting hammer, 5 ... Chisel scrap, 6 ... Battery car, 7 ... Welded wire mesh, 8 ... Sliding center formwork , 9 ... form plate, 10 ... adjusting jack, 11 ... grout inlet, 12 ... grout, 1
3 ... Hardened grout, 14 ... Grout mixer / pump car, 15 ... Submersible pump, 16 ... Lighting, 17 ...
…electrical equipment.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 瀬尾 順三 埼玉県浦和市南浦和3−22−1 (72)発明者 鈴木 隆 群馬県利根郡月夜野町大字奈女沢167−1 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Junzo Seo 3-22-1 Minamiurawa, Urawa-shi, Saitama (72) Inventor Takashi Suzuki 167-1 Nanazawa, Tsukinoya-cho, Tone-gun, Gunma Prefecture

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 既設トンネルのコンクリート壁面表層を
移動式ハツリ機により削りとる削りとり工程、削りとり
面を高圧水を噴射し洗浄する洗浄工程、補強筋の配筋工
程、移動式スライドセントル型枠を用いたグラウト注
入、養生工程を連続して行なう工程サイクルを、トンネ
ル所定長さ区間を単位として繰返し改修を進め、前記ス
ライドセントル型枠に透明プラスチック型枠板を用い、
流動性が高い急硬性セメントモルタルからなるグラウト
材を注入し、型枠内部の注入グラウト材を加温して養生
し、硬化を促進することを特徴とする既設トンネルの改
修方法。
1. A shaving process of shaving a concrete wall surface layer of an existing tunnel with a mobile chipping machine, a rinsing process of spraying the shaving surface with high-pressure water for cleaning, a reinforcing bar arranging process, and a mobile slide centr frame. Injecting grout using, the process cycle of continuously performing the curing process, iteratively refurbishing in units of a predetermined length section of the tunnel, and using a transparent plastic form plate for the slide center form,
A method for rehabilitating an existing tunnel characterized by injecting grout material made of a rapid-hardening cement mortar with high fluidity, and heating and curing the injected grout material inside the formwork to accelerate hardening.
JP7190586A 1995-07-26 1995-07-26 Repairing method for existing tunnel Pending JPH0941891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7190586A JPH0941891A (en) 1995-07-26 1995-07-26 Repairing method for existing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7190586A JPH0941891A (en) 1995-07-26 1995-07-26 Repairing method for existing tunnel

Publications (1)

Publication Number Publication Date
JPH0941891A true JPH0941891A (en) 1997-02-10

Family

ID=16260535

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7190586A Pending JPH0941891A (en) 1995-07-26 1995-07-26 Repairing method for existing tunnel

Country Status (1)

Country Link
JP (1) JPH0941891A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038891A (en) * 2000-07-31 2002-02-06 Ohbayashi Corp Consecutive repair system of tunnel lining concrete
JP2009091751A (en) * 2007-10-04 2009-04-30 Nishimatsu Constr Co Ltd Form for tunnel
JP2017082484A (en) * 2015-10-28 2017-05-18 鹿島建設株式会社 Form device and construction method of lining concrete

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0742496A (en) * 1993-07-28 1995-02-10 Tokyo Electric Power Co Inc:The Repair method of tunnel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0742496A (en) * 1993-07-28 1995-02-10 Tokyo Electric Power Co Inc:The Repair method of tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002038891A (en) * 2000-07-31 2002-02-06 Ohbayashi Corp Consecutive repair system of tunnel lining concrete
JP2009091751A (en) * 2007-10-04 2009-04-30 Nishimatsu Constr Co Ltd Form for tunnel
JP2017082484A (en) * 2015-10-28 2017-05-18 鹿島建設株式会社 Form device and construction method of lining concrete

Similar Documents

Publication Publication Date Title
CN101139867B (en) Pressure-grouting construction method for structure consolidation
JPS6392409A (en) Manufacture and facility of building block imitating dry masonry of stone
CN110388092B (en) Construction method for repairing wall of historical building
CN107627436A (en) The production technology and production facility of concrete prefabricated element
KR101083272B1 (en) Sliding form system for constructing drainage canal and construction method of drainage canal using the system
CN109333800A (en) A kind of prefabricated components production line
CN108265981A (en) A kind of design method of building element production technology layout
EP1017552B1 (en) Building panel and method and apparatus of forming same
JPH0941891A (en) Repairing method for existing tunnel
CN112610240A (en) Secondary lining construction process for mountain tunnel
JP3897354B1 (en) Manhole repair and reinforcement methods
CN209491933U (en) A kind of prefabricated components production line
JP2007069367A (en) Manufacturing method of segment
CN205088625U (en) Wave wall concrete slipform device
CN212978682U (en) Concrete precast slab structure for building convenient to pour
CN114960978A (en) Waterproof method for concrete abutted seam without reserved embedded structure in reconstruction and extension structure
CN107780386A (en) For building the template construction machinery and its application method of tidal channel
CN100467729C (en) Quick integral wall forming process
CN109057824B (en) Tunnel cable trench forming device and forming method
CN104290188A (en) Constructing method for integrated precast concrete component
CN111733715A (en) Construction method for slightly widening adjacent high-speed railway platform
KR100380286B1 (en) A tunnel steel materials mold concrete operation equipment
CN110388091B (en) Historical building wall unit module hoisting and reinforcing system and construction method
US20240052743A1 (en) Automated method and processing train for lining tunnels
JPH09151470A (en) Work execution method for underground structure