JPH0941655A - Scaffold system - Google Patents
Scaffold systemInfo
- Publication number
- JPH0941655A JPH0941655A JP19216795A JP19216795A JPH0941655A JP H0941655 A JPH0941655 A JP H0941655A JP 19216795 A JP19216795 A JP 19216795A JP 19216795 A JP19216795 A JP 19216795A JP H0941655 A JPH0941655 A JP H0941655A
- Authority
- JP
- Japan
- Prior art keywords
- building
- scaffold
- vertical
- scaffolding
- scaffolds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、例えば、既設の建
物の外壁改修工事等を行うに際して用いて好適な足場シ
ステムに関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffolding system suitable for use in, for example, repairing an outer wall of an existing building.
【0002】[0002]
【従来の技術】周知のように、既設の建物の、例えば外
壁の改修や取替工事等を行うには、建物の外壁の全面に
沿って足場を組み立てて工事を行っている。2. Description of the Related Art As is well known, in order to repair or replace an outer wall of an existing building, scaffolds are assembled along the entire outer wall of the building.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上述し
たような従来の足場には、以下のような問題が存在して
いる。まず、言うまでもなく、足場の組立・解体に手間
がかかるうえ、このような足場は建物の外観も損なって
しまう。また、建物の外壁の全面にわたって組み立てる
ために、建物の窓も塞いでしまうことになる。ところ
が、このような既設の建物の改修工事は、建物内を通常
どおり使用しながら行うことが多く、窓を塞いでしまう
と採光や景観が遮られ、内部の使用に支障が生じること
もある。本発明は、以上のような点を考慮してなされた
もので、建物の使用や外観に支障を与えることなく工事
を行うことのできる足場システムを提供することを目的
とする。However, the conventional scaffolding as described above has the following problems. First, needless to say, it takes time and effort to assemble and dismantle scaffolds, and such scaffolds also impair the appearance of the building. Also, since the entire outer wall of the building is assembled, the windows of the building are also closed. However, such an existing building is often refurbished while the building is normally used, and if the windows are closed, the lighting and the scenery may be blocked, which may hinder the internal use. The present invention has been made in view of the above points, and an object of the present invention is to provide a scaffolding system capable of performing construction without affecting the use or appearance of the building.
【0004】[0004]
【課題を解決するための手段】本発明に係る足場システ
ムは、既設の建物を対象とした工事を行うときに用いる
足場システムであって、該足場システムが、前記建物の
外壁に沿って、間隔を隔てて立設された支柱と、互いに
隣接する前記支柱間に配置されて上下方向に昇降自在と
された昇降足場とから構成され、該昇降足場が、その両
側に位置する前記支柱に沿って昇降駆動される水平フレ
ームと、該水平フレームに一体に設けられて、前記建物
の外壁と平行な鉛直面内に位置する鉛直フレームと、該
鉛直フレームに、上下に複数段取り付けられて、それぞ
れ前記建物側に跳ね出した跳ね出し足場と、上方に開閉
自在な屋根と、該昇降足場を覆うよう張設された養生シ
ートとを備えた構成とされていることを特徴としてい
る。A scaffolding system according to the present invention is a scaffolding system used when performing construction on an existing building, wherein the scaffolding system has a space along an outer wall of the building. And a scaffold which is arranged between the columns adjacent to each other and is vertically movable up and down, and the scaffold extends along the columns located on both sides of the scaffold. A horizontal frame that is driven to move up and down, a vertical frame that is provided integrally with the horizontal frame and that is located in a vertical plane parallel to the outer wall of the building, and a plurality of vertically mounted stages on the vertical frame, and It is characterized in that it is provided with a spring-out scaffold that springs out toward the building side, a roof that can be opened and closed upward, and a curing sheet stretched to cover the elevating scaffold.
【0005】[0005]
【発明の実施の形態】以下、本発明に係る足場システム
の実施の一形態を、図1および図2に示す一例を参照し
て説明する。図1に示すように、足場システム1は、改
修すべき既設のビル(建物)2の外壁面に沿って、所定
間隔を隔てて例えば4箇所に立設された柱状足場3,
3,…と、互いに隣接する柱状足場3,3間に配設され
た昇降足場4,4,4とから構成されている。BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a scaffolding system according to the present invention will be described below with reference to an example shown in FIGS. 1 and 2. As shown in FIG. 1, a scaffolding system 1 includes columnar scaffolds 3, which are erected at, for example, four locations along an outer wall surface of an existing building (building) 2 to be refurbished at predetermined intervals.
, And up-and-down scaffolds 4, 4, 4 arranged between the columnar scaffolds 3, 3 adjacent to each other.
【0006】各柱状足場3は、地上に設置されて歩道を
覆う防護構台5上に、ビル2の上部にまで到達するよ
う、通常用いられている足場材や足場ユニット3aを用
いて組み立てられている。そして、この柱状足場3に
は、その外面全体を覆う養生シート6が張設されてい
る。Each pillar scaffold 3 is installed on the ground and is constructed by using scaffolding materials and scaffolding units 3a that are usually used on the protective pedestal 5 that covers the sidewalk so as to reach the upper part of the building 2. There is. A curing sheet 6 covering the entire outer surface of the columnar scaffold 3 is stretched.
【0007】各柱状足場3には、その側面に沿って、鉛
直方向に延在する二本一対のガイドレール(支柱)7が
ブラケット8を介して取り付けられている。A pair of two guide rails (struts) 7 extending in the vertical direction are attached to each of the columnar scaffolds 3 via brackets 8 along the side surface thereof.
【0008】図2に示すように、前記各昇降足場4に
は、ビル2の外壁面と平行な水平方向に延在する水平フ
レーム10が備えられている。この水平フレーム10
は、断面視ボックス状に形成されたパイプトラス構造か
らなり、その両端部が、両側に位置する柱状足場3のガ
イドレール7,7に、上下動自在に支持されている。そ
して、この水平フレーム10には、これをその両側のガ
イドレール7,7に沿って昇降駆動させるための、例え
ばウインチ等を駆動源とした昇降機構(図示なし)が備
えられている。As shown in FIG. 2, each elevating scaffold 4 is provided with a horizontal frame 10 extending in a horizontal direction parallel to the outer wall surface of the building 2. This horizontal frame 10
Has a pipe truss structure formed in a box shape in cross section, and both ends thereof are supported by guide rails 7 of the columnar scaffolds 3 located on both sides so as to be vertically movable. The horizontal frame 10 is provided with an elevating mechanism (not shown) using a winch or the like as a drive source for elevating and lowering the horizontal frame 10 along the guide rails 7, 7 on both sides thereof.
【0009】この水平フレーム10上には、ビル2の外
壁面側に延出する作業床11が設けられている。A work floor 11 is provided on the horizontal frame 10 and extends toward the outer wall surface of the building 2.
【0010】また、水平フレーム10には、ビル2の外
壁面と平行な面に位置して例えばビル2の1階分の高さ
を有する鉛直フレーム12,13が、支持部材14,1
4を介して設けられている。これら鉛直フレーム12,
13は、その中間部と上部において、連結部材15,1
5によって一体に連結されている。鉛直フレーム12の
上下方向の中間部と上部には、それぞれ、ビル2の外壁
面側に跳ね出した跳ね出し足場16,17が設けられて
いる。これら跳ね出し足場16,17は、ブラケット1
6a,17aを取り外すことによって容易に畳むことの
できる可倒式となっている。そして、梯子18が前記連
結部材15,15に取り付けられており、これによって
作業者が作業床11から跳ね出し足場16,17に移動
できるようになっている。Further, in the horizontal frame 10, vertical frames 12 and 13 positioned on a plane parallel to the outer wall surface of the building 2 and having a height of, for example, one floor of the building 2 are provided on the support members 14 and 1.
It is provided through 4. These vertical frames 12,
13 is a connecting member 15, 1 at its middle and upper parts.
5 are integrally connected. Bounce scaffolds 16 and 17 that are bounced out to the outer wall surface side of the building 2 are provided on the vertical middle portion and upper portion of the vertical frame 12, respectively. These rebound scaffolds 16 and 17 are attached to the bracket 1
It is a foldable type that can be easily folded by removing 6a and 17a. A ladder 18 is attached to the connecting members 15 and 15 so that a worker can jump out of the work floor 11 and move to the scaffolds 16 and 17.
【0011】また、鉛直フレーム12,13の上端部に
は、ブラケット19,20を介して、開閉機構を有した
屋根21が設けられている。この屋根21の開閉機構
は、開いた状態で、ビル2に取り付けるべきサッシ材や
カーテンウォール等を吊り込むことのできる開口寸法を
有している。A roof 21 having an opening / closing mechanism is provided on the upper ends of the vertical frames 12 and 13 via brackets 19 and 20. The opening / closing mechanism of the roof 21 has an opening size capable of suspending a sash material, a curtain wall, or the like to be attached to the building 2 in an open state.
【0012】そして、メッシュシート,ビニールシート
等の養生シート22が、昇降足場4の外面および上面を
覆うように鉛直フレーム13に張設されている。A curing sheet 22 such as a mesh sheet or a vinyl sheet is stretched around the vertical frame 13 so as to cover the outer surface and the upper surface of the lifting scaffold 4.
【0013】このような構成の足場システム1で既設の
ビル2の外壁を改修するに際しては、カーテンウォール
やサッシ材等の交換作業を行うべき階に昇降足場4を移
動させる。そして、作業が完了した後には、昇降足場を
上昇あるいは下降させて順次他の階に移動させていき、
各階において同様にしてカーテンウォールやサッシ材等
の交換作業を行う。When the outer wall of the existing building 2 is refurbished by the scaffolding system 1 having such a structure, the elevating scaffolding 4 is moved to a floor where a curtain wall, a sash material or the like should be replaced. Then, after the work is completed, the hoisting scaffolding is raised or lowered to sequentially move to another floor,
Curtain walls and sash materials are replaced on each floor in the same way.
【0014】上述した足場システム1では、この足場シ
ステム1が、ビル2の外壁に沿って立設された柱状足場
3,3,…に取り付けられたガイドレール7,7,…
と、昇降自在な昇降足場4とから構成され、この昇降足
場4が、互いに隣接するガイドレール7,7に沿って上
下方向に昇降駆動される水平フレーム10と、この水平
フレーム10に一体に設けられた鉛直フレーム12,1
3と、鉛直フレーム12に、上下2段に取り付けられて
ビル2側に跳ね出した跳ね出し足場16,17と、この
昇降足場4を覆う養生シート22とが備えられた構成と
なっている。これにより、外壁の補修作業を行う階のみ
に昇降足場4が位置するため、他の階においては平常と
同じ採光と景観を確保することができ、ビル2の使用に
対する影響を最小限に抑さえることができる。また、柱
状足場3と昇降足場4とが養生シート6,22によって
覆われているために、工事中の外観もスマートなものと
することができる。さらに、昇降足場4には、上下に例
えば2段の跳ね出し足場16,17が設けられているの
で、カーテンウォールやサッシ材の取替作業を行うに際
し、脚立やその他の仮設足場等を作業床11上に設置す
ることなく、作業を容易かつ安全に行うことができる。
しかも、この跳ね出し足場16,17は可倒式となって
いるので、昇降足場4の昇降時に畳むことによって、ビ
ル2との干渉を防ぐことができる。In the scaffolding system 1 described above, the scaffolding system 1 is mounted on the columnar scaffolds 3, 3, ... Standing along the outer wall of the building 2, and the guide rails 7, 7 ,.
And a vertically movable scaffolding 4, and the vertically movable scaffolding 4 is integrally provided on the horizontal frame 10 and a horizontal frame 10 vertically driven along adjacent guide rails 7, 7. Vertical frame 12,1
3, the vertical frame 12 is provided with upper and lower scaffolds 16 and 17 that are mounted in two steps in the vertical direction and that bounce toward the building 2, and a curing sheet 22 that covers the elevating scaffold 4. As a result, since the elevator scaffolding 4 is located only on the floor where the outer wall is repaired, it is possible to secure the same daylighting and scenery as on other floors, and to minimize the influence on the use of the building 2. be able to. Further, since the columnar scaffold 3 and the lifting scaffold 4 are covered with the curing sheets 6 and 22, the appearance during construction can be made smart. Further, since the elevating scaffolding 4 is provided with, for example, two-step projecting scaffolds 16 and 17 on the upper and lower sides, a stepladder and other temporary scaffolds are used as a work floor when performing the replacement work of the curtain wall or the sash material. The work can be performed easily and safely without installing on 11.
Moreover, since the flip-out scaffolds 16 and 17 are foldable, the folding scaffolding 4 can be folded up and down to prevent interference with the building 2.
【0015】また、昇降足場4の上方には、開閉自在な
屋根21が設けられた構成となっている。これにより、
カーテンウォールやサッシ材の吊り込み時のみ屋根21
を開くことによって、この昇降足場4内の作業環境を全
天候型とすることができ、工事を円滑に進行させること
ができる。Further, a roof 21 which can be freely opened and closed is provided above the lifting platform 4. This allows
Roof 21 only when hanging curtain wall or sash
By opening the, the working environment in the elevating scaffolding 4 can be made all weather type, and the construction can proceed smoothly.
【0016】加えて、この足場システム1の組立解体
は、従来のビルの全面に組み上げていた足場に比較して
容易に行うことができ、しかも昇降足場4については地
上に降ろして作業を行うことができるので、作業をより
一層容易かつ安全に行うことができる。In addition, assembling and disassembling the scaffolding system 1 can be carried out more easily than the conventional scaffolding assembled on the entire surface of the building, and the lifting scaffolding 4 can be lowered to the ground for the work. Therefore, the work can be performed more easily and safely.
【0017】なお、上記実施例において、昇降足場4の
鉛直フレーム12,13に備える跳ね出し足場16,1
7の段数は何段であってもよい。また、この鉛直フレー
ム12,13は、1階分の高さに限定するものではな
く、例えば改修すべきビル2が高層のものである場合に
は、2階分あるいはそれ以上の高さを有したものとして
もよい。また、養生シート6,22として、防音性を有
した防音パネル等を採用することも可能である。In the above embodiment, the scooping scaffolds 16 and 1 provided on the vertical frames 12 and 13 of the ascending and descending scaffolds 4, respectively.
The number of stages of 7 may be any number. Further, the vertical frames 12 and 13 are not limited to the height of one floor, and for example, when the building 2 to be rehabilitated is a high-rise building, it may have a height of two floors or more. It may be done. Further, as the curing sheets 6 and 22, it is possible to adopt a soundproof panel having soundproofing property.
【0018】[0018]
【発明の効果】以上説明したように、本発明に係る足場
システムによれば、この足場システムを、建物の外壁に
沿って間隔を隔てて立設された支柱と、互いに隣接する
支柱間において上下方向に昇降自在とされた昇降足場と
から構成し、この昇降足場を、前記支柱に沿って昇降駆
動される水平フレームと、水平フレームに一体に設けら
れた鉛直フレームと、上方に開閉自在な屋根と、該鉛直
フレームに上下に複数段取り付けられた跳ね出し足場
と、この昇降足場を覆う養生シートとを備える構成とし
た。これにより、外壁の補修作業等を行う階のみに昇降
足場が位置するため、他の階においては平常と同じ採光
と景観を確保することができ、建物内の使用に対する影
響を最小限とすることができる。また、カーテンウォー
ルやサッシ材の吊り込み時のみ屋根を開くことによっ
て、昇降足場内の作業環境を全天候型とすることがで
き、工事を円滑に進行させることができる。しかも、昇
降足場が養生シートによって覆われているために、工事
中の外観をスマートなものとすることができる。さら
に、昇降足場に上下に複数段設けた跳ね出し足場によっ
て、例えばカーテンウォールやサッシ材の取替作業を、
脚立やその他の仮設足場等を用いることなく、作業を容
易かつ安全に行うことができる。加えて、足場システム
の組立・解体作業も、従来に比較して容易に行うことが
可能である。As described above, according to the scaffolding system of the present invention, the scaffolding system is provided with the columns vertically installed along the outer wall of the building and the columns vertically adjacent to each other. And a scaffold that can be lifted up and down in any direction. The scaffold can be vertically moved along the pillars, a vertical frame integrally provided on the horizontal frame, and a roof that can be opened and closed upward. The scooping scaffolding is attached to the vertical frame in a plurality of upper and lower stages, and a curing sheet covering the elevating scaffolding. As a result, the elevator scaffolding is located only on the floors where the outer wall is repaired, so it is possible to secure the same daylighting and scenery as on other floors, and to minimize the impact on use inside the building. You can In addition, by opening the roof only when the curtain wall or the sash material is suspended, the working environment in the scaffolding can be made all weather type, and the construction can be smoothly progressed. Moreover, since the lifting scaffold is covered with the curing sheet, the appearance during construction can be made smart. In addition, for example, with the scooping scaffolding provided on the elevating scaffolding up and down, for example, replacement work of curtain wall or sash material,
Work can be performed easily and safely without using a stepladder or other temporary scaffolding. In addition, the scaffolding system can be assembled and disassembled more easily than ever before.
【図1】本発明に係る足場システムの実施の形態の一例
を示す図であって、外壁を改修するために前記足場シス
テムを既設のビルに設置した状態を示す立面図である。FIG. 1 is a diagram showing an example of an embodiment of a scaffolding system according to the present invention, and is an elevational view showing a state in which the scaffolding system is installed in an existing building to repair an outer wall.
【図2】前記足場システムの要部の構造を示す側断面図
である。FIG. 2 is a side sectional view showing a structure of a main part of the scaffolding system.
1 足場システム 2 ビル(建物) 4 昇降足場 7 ガイドレール(支柱) 10 水平フレーム 12,13 鉛直フレーム 16,17 跳ね出し足場 21 屋根 22 養生シート 1 Scaffolding system 2 Building (building) 4 Lifting scaffolding 7 Guide rails (posts) 10 Horizontal frame 12,13 Vertical frame 16,17 Jumping out scaffolding 21 Roof 22 Curing sheet
Claims (1)
に用いる足場システムであって、該足場システムが、前
記建物の外壁に沿って、間隔を隔てて立設された支柱
と、互いに隣接する前記支柱間に配置されて上下方向に
昇降自在とされた昇降足場とから構成され、該昇降足場
が、その両側に位置する前記支柱に沿って昇降駆動され
る水平フレームと、該水平フレームに一体に設けられ
て、前記建物の外壁と平行な鉛直面内に位置する鉛直フ
レームと、該鉛直フレームに、上下に複数段取り付けら
れて、それぞれ前記建物側に跳ね出した跳ね出し足場
と、上方に開閉自在な屋根と、該昇降足場を覆うよう張
設された養生シートとを備えた構成とされていることを
特徴とする足場システム。1. A scaffolding system for use when performing construction on an existing building, the scaffolding system being adjacent to each other with pillars standing upright along the outer wall of the building. A horizontal frame that is arranged between the columns and that is vertically movable up and down, and that the vertical platform is driven up and down along the columns that are located on both sides of the platform. A vertical frame that is integrally provided and that is located in a vertical plane parallel to the outer wall of the building, and a plurality of vertical steps attached to the vertical frame, and a scooping scaffold that springs out toward the building side, respectively. A scaffolding system comprising: a freely openable and closable roof; and a curing sheet stretched to cover the lifting scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19216795A JPH0941655A (en) | 1995-07-27 | 1995-07-27 | Scaffold system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19216795A JPH0941655A (en) | 1995-07-27 | 1995-07-27 | Scaffold system |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0941655A true JPH0941655A (en) | 1997-02-10 |
Family
ID=16286806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19216795A Pending JPH0941655A (en) | 1995-07-27 | 1995-07-27 | Scaffold system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0941655A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002349077A (en) * | 2001-05-22 | 2002-12-04 | Nishimatsu Constr Co Ltd | Method for repairing building |
JP2010203035A (en) * | 2009-02-27 | 2010-09-16 | Shimizu Corp | Building repair/demolition device and building repair/demolition method |
JP2019011663A (en) * | 2017-06-30 | 2019-01-24 | エスアールジータカミヤ株式会社 | Construction method of slope face and lifting type movable scaffold |
-
1995
- 1995-07-27 JP JP19216795A patent/JPH0941655A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002349077A (en) * | 2001-05-22 | 2002-12-04 | Nishimatsu Constr Co Ltd | Method for repairing building |
JP2010203035A (en) * | 2009-02-27 | 2010-09-16 | Shimizu Corp | Building repair/demolition device and building repair/demolition method |
JP2019011663A (en) * | 2017-06-30 | 2019-01-24 | エスアールジータカミヤ株式会社 | Construction method of slope face and lifting type movable scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2017221870B2 (en) | Improved frame for climbing screen | |
JP2019167813A (en) | Splash prevention cure system and splash prevention cure method | |
JP6712501B2 (en) | High-rise building demolition system and demolition method | |
JPH0941655A (en) | Scaffold system | |
JP7489101B2 (en) | Anti-scattering protection system | |
KR102592681B1 (en) | Ceiling structure construction method | |
JPH11343729A (en) | Slide rising type suspended scaffold | |
JP2957328B2 (en) | Peripheral holding self-elevating construction method | |
JPH0571225A (en) | Temporarily set roof of complete weather type | |
JPH08100517A (en) | Vertically movable scaffold | |
JP2905066B2 (en) | Openable temporary roof | |
JP7245472B2 (en) | Anti-scattering system and demolition method for existing buildings | |
JP3994648B2 (en) | Elevator apparatus and installation method thereof | |
JP3241896B2 (en) | Steel frame stair hang down method | |
JP3231511B2 (en) | Lift-up device for all-weather temporary roof | |
KR200241837Y1 (en) | Outer jumping platform easily and descending | |
JPH07292994A (en) | Roofed cover device for openable construction | |
JPH06248808A (en) | Disassembly method of outside curing coated body | |
JP3053143B2 (en) | Building shed for building construction with lift-up device | |
JPH0791078A (en) | Lifting type opening roof for mounting | |
AU2015100194A4 (en) | Perimeter Screens | |
JPH05311889A (en) | Roof structure of temporary beam assembling apparatus for building construction | |
JP3239154B2 (en) | Lift-up device for all-weather temporary roof | |
JP2001140473A (en) | Curing apparatus | |
JP2671967B2 (en) | High-rise building construction method and construction beam assembly equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20031014 |