JPH0941324A - Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie - Google Patents

Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie

Info

Publication number
JPH0941324A
JPH0941324A JP19525295A JP19525295A JPH0941324A JP H0941324 A JPH0941324 A JP H0941324A JP 19525295 A JP19525295 A JP 19525295A JP 19525295 A JP19525295 A JP 19525295A JP H0941324 A JPH0941324 A JP H0941324A
Authority
JP
Japan
Prior art keywords
pier
main
strap
steel
reinforcements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19525295A
Other languages
Japanese (ja)
Inventor
Seiji Mori
誠治 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP19525295A priority Critical patent/JPH0941324A/en
Publication of JPH0941324A publication Critical patent/JPH0941324A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To pile up bridge hoop ties per classification on a steel-made frame and facilitate hanging by slinging and a crane. SOLUTION: In a steel-made frame for piling up bridge pier hoop ties which pile up bride pier hoop ties 1 and 2, which are substantially L-shaped and envelop a semicircle area around bridge main reinforcements laid out along each side which forms a substantially rectangular shape, there is provided a frame member 11, which arranges steel materials (angle materials) 12 and 13 in a double cross by twos horizontally and vertically and fixes each other and loads bride pier hoop ties, which are substantially J-shaped, on the top. There are provided reinforcement support members 14 and 16 (support rods by the angle materials), which support from the lateral sides the bridge pier hoop ties 1 and 2, which are erectly provided on a spot to each of both ends symmetrically and piled up on the frame member 11 in the form of substantially J shape.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、橋脚用帯鉄筋の積
み重ね用鋼製枠と、その鋼製枠を用いて行う橋脚用帯鉄
筋の組立方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel frame for stacking pier straps and a method for assembling pier straps using the steel frame.

【0002】[0002]

【従来の技術】橋脚の柱鉄筋組立作業において、長方形
状の各辺に沿って柱主筋を配設して立てた後、先ず、そ
の柱主筋の周囲を囲む帯鉄筋を、長方形状のほぼ半周部
を囲むようにして交互に配筋する。そして、柱主筋が配
設された長方形状の長辺部間を中間部で結ぶ縦方向の帯
鉄筋を複数箇所に配筋する。さらに、同じく長辺部間を
短辺部側に沿って結ぶ縦方向の帯鉄筋を両短辺部側に配
筋し、また、同じく長方形状の短辺部間を長辺部側に沿
って結ぶ横方向の帯鉄筋を両長辺部側に配筋している。
2. Description of the Related Art In the work of assembling a pillar rebar of a pier, after arranging the pillar main bars along each side of the rectangular shape and standing it up, firstly, a strip reinforcing bar surrounding the pillar main bars is surrounded by a substantially rectangular shape. The parts are arranged alternately so as to surround the part. Then, vertical strip reinforcing bars that connect the long side portions of the rectangular shape in which the column main bars are arranged at the intermediate portion are arranged at a plurality of locations. Furthermore, longitudinal strips that connect the long sides along the short sides are also arranged on both short sides, and also between the short sides of the rectangular shape along the long sides. The horizontal strips that connect the bars are arranged on both long sides.

【0003】[0003]

【発明が解決しようとする課題】以上のように、橋脚の
柱鉄筋組立作業において、帯鉄筋組立作業は、縦横方向
の帯鉄筋を交互に配筋していく作業となっており、その
組立作業に要する手間と作業時間については、一般建築
における通常の柱鉄筋組立作業に比較して著しく手間が
かかり長い時間を要するものとなっていた。
As described above, in the work for assembling the pillar rebar of the pier, the work for assembling the band reinforcement is a work for alternately arranging the length and width directions of the band reinforcement. As for the labor and work time required for the construction, it is considerably laborious and requires a long time as compared with the ordinary column reinforcing bar assembling work in general construction.

【0004】そこで、本発明の目的は、橋脚用帯鉄筋を
種類別に積み重ねて、玉掛けおよびクレーンによる吊込
みを容易にするようにした橋脚用帯鉄筋の積み重ね用鋼
製枠を提供することにある。そして、本発明は、そのよ
うな鋼製枠を用いて、橋脚用帯鉄筋の組み立てに際して
作業時間の短縮と省力化が図れるようにした橋脚用帯鉄
筋の組立方法を提供することも目的としている。
Therefore, an object of the present invention is to provide a steel frame for stacking pier strap reinforcements by stacking the pier strap reinforcements by type and facilitating slinging and hanging by a crane. . Then, the present invention also aims to provide an assembling method of a bridge pier for a bridge pier by using such a steel frame so as to shorten the working time and save labor in assembling the bridge reinforcing bar for a pier. .

【0005】[0005]

【課題を解決するための手段】以上の課題を解決すべく
請求項1記載の発明は、ほぼ長方形状の各辺に沿って配
設される橋脚用柱主筋の周囲、例えば、ほぼ半周部分を
囲むほぼJ字形状をなす橋脚用帯鉄筋を積み重ねておく
ための橋脚用帯鉄筋の積み重ね用鋼製枠であって、縦横
2本ずつの鋼材、例えば、アングル材を井桁状に組んで
互いに固定され、上面にほぼJ字形状をなす前記橋脚用
帯鉄筋を載置する枠部材と、この枠部材の前記井桁状に
組んだ前記鋼材(アングル材等)の各両端寄り部上にそ
れぞれ対称的に起設され、前記枠部材上に積み重ねたほ
ぼJ字形状をなす前記橋脚用帯鉄筋を側方から支持する
鉄筋支持部材、例えば、アングル材による支柱棒と、か
らなる構成を特徴としている。
SUMMARY OF THE INVENTION In order to solve the above problems, the invention according to claim 1 defines a periphery of a main pier for a pier, for example, a substantially half-circumferential portion, which is arranged along each side of a substantially rectangular shape. A steel frame for stacking pier strap reinforcements for stacking pier strap reinforcements that form an almost J-shape that surrounds each other, and fix each other by constructing two horizontal and vertical steel materials, for example, angle materials in a cross beam shape. And a frame member on which the J-shaped strip reinforcing bar having a substantially J shape is placed, and the steel members (angle members, etc.) assembled in the girder-like shape of the frame member are symmetrically arranged on both sides of the frame member. And a reinforcing bar supporting member for laterally supporting the substantially J-shaped strip reinforcing bars stacked on the frame member, for example, a pillar rod made of an angle member.

【0006】このように、縦横2本ずつの鋼材を井桁状
に組んで互いに固定した枠部材を構成する井桁状に組ん
だ鋼材の各両端寄り部上にそれぞれ対称的に鉄筋支持部
材を起設してなる橋脚用帯鉄筋の積み重ね用鋼製枠なの
で、鋼材による井桁状の枠部材上に、ほぼ長方形状の各
辺に沿って配設される橋脚用柱主筋の周囲を囲む橋脚用
帯鉄筋を積み重ねて、その積み重ねた橋脚用帯鉄筋の周
囲を、井桁状に組んだ鋼材の各両端寄り部上にそれぞれ
対称的に起設した鉄筋支持部材により側方から支持でき
る。従って、この橋脚用帯鉄筋の積み重ね用鋼製枠を用
いれば、ほぼ長方形状の各辺に沿って配設される橋脚用
柱主筋の周囲を囲む橋脚用帯鉄筋を積み重ねた状態で、
玉掛けおよびクレーンによる吊込みが容易となり、橋脚
用帯鉄筋の積み重ね用鋼製枠を縦吊りして足場上に仮置
きしておくようなことも可能になる。また、以上の橋脚
用帯鉄筋の積み重ね用鋼製枠を用いて、ほぼ長方形状の
各辺に沿って配設される橋脚用柱主筋の周囲を囲む橋脚
用帯鉄筋を種類別に積み重ねたり、交互に重ね合わせる
ようなことも可能である。
As described above, the reinforcing bar supporting members are symmetrically provided on the respective end portions of the steel members assembled in a cross girder shape which form a frame member in which two vertical and horizontal steel members are assembled and fixed to each other. Since it is a steel frame for stacking pier rebars, the pier rebars that surround the main reinforcement of the pier pillars are arranged along each side of the rectangular shape on the steel girder-shaped frame member. Can be supported from the side by the reinforcing bar supporting members symmetrically erected on the parts of the steel members assembled in a cross girder pattern around the ends of the stacked reinforcing bars for bridge piers. Therefore, by using the steel frame for stacking the pier strap reinforcements, in the state where the pier strap reinforcements that surround the perimeter of the pier column main reinforcements arranged along each side of the substantially rectangular shape are stacked,
It will be easier to hang it with slings and cranes, and it will also be possible to suspend the steel frame for stacking the pier belt reinforcement vertically and temporarily place it on the scaffold. In addition, by using the steel frame for stacking the above-mentioned pier strap reinforcements, the pier strap reinforcements that surround the perimeter of the pier column main reinforcements that are arranged along each side of the rectangular shape can be stacked or alternated by type. It is also possible to superimpose on.

【0007】そして、請求項2記載の発明は、ほぼ長方
形状の各辺に沿って配設される橋脚用柱主筋の周囲、例
えば、ほぼ半周部分を囲む橋脚用帯鉄筋および内方を縦
横方向に結ぶ橋脚用帯鉄筋を組み立てていく橋脚用帯鉄
筋の組立方法であって、第1準備工程と、仮付け工程
と、第2準備工程と、第1組立工程と、第2組立工程
と、第3組立工程と、からなる工程順序を特徴としてい
る。先ず、第1準備工程は、前記橋脚用柱主筋の内方を
縦横方向に結ぶ橋脚用帯鉄筋を前記橋脚用柱主筋の周囲
を囲む足場上に仮置きしておく。続いて、仮付け工程で
は、前記橋脚用柱主筋が配設された長方形状の長辺部間
を中間部で結ぶ複数の橋脚用帯鉄筋、即ち、ほぼU字形
状をなす縦方向の橋脚用帯鉄筋を前記橋脚用柱主筋の上
部にそれぞれ仮に取り付けておく。次の第2準備工程で
は、前記橋脚用柱主筋の周囲のほぼ半周部分を囲むほぼ
J字形状をなす前記橋脚用帯鉄筋を予め積み重ねておい
た請求項1記載の前記橋脚用帯鉄筋の積み重ね用鋼製枠
を、玉掛けしてクレーンにより縦吊りして前記橋脚用柱
主筋が配設された長方形状の両側方の足場上にそれぞれ
仮置きしておく。
According to the second aspect of the present invention, the periphery of the main reinforcement for the pier, which is arranged along each side of the substantially rectangular shape, for example, the pier belt reinforcement that encloses a substantially half-circumferential portion, and the inward longitudinal and lateral directions. A method for assembling a pier strap reinforcing bar for connecting to a pier, comprising: a first preparing step, a tacking step, a second preparing step, a first assembling step, a second assembling step, It is characterized by a process sequence consisting of a third assembly process. First, in the first preparing step, the bridge rebars that connect the insides of the main pier columns to the longitudinal and lateral directions are temporarily placed on a scaffold surrounding the main pier columns. Subsequently, in the temporary attaching step, a plurality of pier strap reinforcements connecting the long side portions of the rectangular shape where the column main reinforcements for bridges are arranged at an intermediate portion, that is, for a longitudinal pier having a substantially U shape Temporarily attach the reinforcing bar to the upper part of the main bar of the pier. 2. The stacking of the pier rebars according to claim 1, wherein in the second preparatory step, the pier rebars having a substantially J-shape that surrounds an approximately half circumference of the pier column main rebar are stacked in advance. The steel frame for use is slung and vertically hung by a crane, and temporarily placed on the scaffolds on both sides of the rectangle in which the main pillars for the pier are arranged.

【0008】そして、第1組立工程は、前記両側方の足
場上にそれぞれ縦に仮置きしておいた前記橋脚用帯鉄筋
の積み重ね用鋼製枠からほぼJ字形状をなす前記橋脚用
帯鉄筋を横に倒して前記橋脚用柱主筋の周囲のほぼ半周
部分に交互に取り付けてそれぞれ固定する。次の第2組
立工程では、前記橋脚用柱主筋の上部に仮付けしておい
た前記複数の橋脚用帯鉄筋(ほぼU字形状をなす縦方向
の橋脚用帯鉄筋)を下げて前記橋脚用柱主筋の長辺部間
に中間部でそれぞれ固定する。最後の第3組立工程で、
前記橋脚用柱主筋の長辺部間を短辺部側に沿って結ぶ複
数の橋脚用帯鉄筋、即ち、ほぼ直線形状をなす縦方向の
橋脚用帯鉄筋を両短辺部側でそれぞれ固定すると共に、
前記橋脚用柱主筋の短辺部間を長辺部側に沿って結ぶ複
数の橋脚用帯鉄筋、即ち、ほぼ直線形状をなす横方向の
橋脚用帯鉄筋を両長辺部側でそれぞれ固定する。
In the first assembling step, the steel piers for bridge piers are formed into a substantially J-shape from a steel frame for stacking the pier straps that have been temporarily placed vertically on the scaffolds on both sides. Are laid down side by side, and alternately attached and fixed to approximately half-circumferences around the main reinforcement of the pier column. In the next second assembling step, the plurality of pier strap reinforcements (almost U-shaped vertical pier straps) temporarily attached to the upper part of the pier column main bar are lowered to be used for the pier. It is fixed at the middle part between the long sides of the main pillars. In the final third assembly step,
A plurality of pier strap rebars that connect the long sides of the main pier columns to each other along the short sides, that is, the substantially linear vertical pier straps are fixed at both short sides. With
A plurality of pier strap rebars that connect the short sides of the main pier columns to each other along the long sides, that is, the substantially straight lateral pier straps are fixed on both long sides. .

【0009】このように、橋脚用柱主筋の内方を縦横方
向に結ぶ橋脚用帯鉄筋を足場上に仮置きして、橋脚用柱
主筋が配設された長方形状の長辺部間を中間部で結ぶ複
数の橋脚用帯鉄筋を橋脚用柱主筋の上部にそれぞれ仮に
取り付けておいてから、橋脚用柱主筋の周囲を囲む橋脚
用帯鉄筋を予め積み重ねておいた請求項1記載の橋脚用
帯鉄筋の積み重ね用鋼製枠を縦吊りして橋脚用柱主筋が
配設された長方形状の両側方の足場上にそれぞれ仮置き
しておいた状態で、橋脚用帯鉄筋の組立作業を開始す
る。即ち、先ず、両側方の足場上にそれぞれ縦に仮置き
しておいた橋脚用帯鉄筋の積み重ね用鋼製枠から橋脚用
帯鉄筋を横に倒して橋脚用柱主筋の周囲に取り付けてそ
れぞれ固定してから、橋脚用柱主筋の上部に仮付けして
おいた複数の橋脚用帯鉄筋を下げて橋脚用柱主筋の長辺
部間に中間部でそれぞれ固定して、最後に、橋脚用柱主
筋の長辺部間を短辺部側に沿って結ぶ複数の橋脚用帯鉄
筋を両短辺部側でそれぞれ固定すると共に、橋脚用柱主
筋の短辺部間を長辺部側に沿って結ぶ複数の橋脚用帯鉄
筋を両長辺部側でそれぞれ固定するようにした橋脚用帯
鉄筋の組立方法なので、橋脚用帯鉄筋の組み立てに際し
て、作業時間を短縮できると共に、省力化できる。
As described above, the pier strap reinforcements that connect the insides of the pier column main bars in the vertical and horizontal directions are temporarily placed on the scaffold, and the long sides of the rectangular shape in which the pier column main bars are arranged are intermediate. The plurality of pier strap reinforcements to be connected at a section are temporarily attached to the upper part of the pier post reinforcement, and then the pier reinforcements surrounding the pier post reinforcement are stacked in advance. Start the assembling work of the pier rebars with the steel frame for stacking the piers suspended vertically and temporarily placed on the scaffold on both sides of the rectangle with the main rebar columns installed. To do. That is, first, the steel frames for stacking the pier rebars that have been temporarily placed vertically on the scaffolds on both sides are laid horizontally around the pier rebars and fixed around the main pier columns. Then, lower the multiple pier strap reinforcements temporarily attached to the upper part of the main pier columns, and fix them at the middle part between the long sides of the main pier columns, and finally, for the pier columns. Along the short side, connect the long sides of the main reinforcement along the short side.Fix the pier strap reinforcements on both short sides and connect the short sides of the main pier columns to the long side. Since this is a method of assembling the pier strap reinforcements in which a plurality of pier strap reinforcements to be connected are fixed on both long side portions, the work time can be shortened and labor can be saved when assembling the pier strap reinforcements.

【0010】[0010]

【発明の実施の形態】以下に、本発明に係る橋脚用帯鉄
筋の積み重ね用鋼製枠と橋脚用帯鉄筋の組立方法の実施
の形態例を図1から図3に基づいて説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a method for assembling a steel frame for stacking pier strap reinforcement and a pier strap reinforcement according to the present invention will be described below with reference to FIGS. 1 to 3.

【0011】<橋脚用帯鉄筋の積み重ね用鋼製枠>先
ず、図1は本発明を適用した一例としての橋脚用帯鉄筋
の積み重ね用鋼製枠を示すもので、(a)は使用状態の
平面図、(b)は使用状態の概略側面図である。この図
1(a)および(b)において、1,2は柱主筋の周囲
を囲む帯鉄筋、10は橋脚用帯鉄筋の積み重ね用鋼製
枠、11は枠部材、12,13は鋼材、14,16は鉄
筋支持部材(支持棒)、15,17は補強板である。
<Steel Steel Frame for Stacking Bridge Reinforcing Bars> First, FIG. 1 shows a steel frame for stacking pier belt reinforcing bars as an example to which the present invention is applied. A plan view and (b) are schematic side views of the usage state. 1 (a) and 1 (b), reference numerals 1 and 2 denote strip rebars surrounding the column main bars, 10 a steel frame for stacking pier rebar bars, 11 a frame member, 12 and 13 steel materials, 14 , 16 are reinforcing bar supporting members (supporting rods), and 15 and 17 are reinforcing plates.

【0012】橋脚用のほぼ長方形状の各辺に沿って配設
される図示しない柱主筋の周囲を囲む帯鉄筋1,2は、
そのほぼ長方形状の各辺に沿って配設される橋脚用柱主
筋の周囲のほぼ半周部分を囲むほぼJ字形状をなすもの
で、その両端部には内方への屈曲片1a,2a,1b,
2bがそれぞれ形成されている。なお、この帯鉄筋1,
2は、図示横方向(左右方向)の芯々間長さが、例え
ば、3,730mmで、図示縦方向(上下方向)の幅
が、例えば、2,680mmとなっている。
The strip reinforcing bars 1 and 2 which surround the periphery of a column main bar (not shown) which is arranged along each side of a substantially rectangular shape for a pier,
It has a substantially J-shape that encloses a substantially half-circumferential portion around the main reinforcement of the pier column arranged along each side of the substantially rectangular shape. At both ends thereof, inward bending pieces 1a, 2a, 1b,
2b are respectively formed. In addition, this belt rebar 1,
2, the center-to-center length in the horizontal direction in the drawing (horizontal direction) is, for example, 3,730 mm, and the width in the vertical direction in the drawing (vertical direction) is, for example, 2,680 mm.

【0013】橋脚用帯鉄筋の積み重ね用鋼製枠10は、
図1(a)および(b)に示すように、井桁状の枠部材
11の四隅部の近傍部分に、鉄筋支持部材14,14,
14,14,14,14,14,14,16,16,1
6,16を起設してなるものである。即ち、枠部材11
は、例えば、サイズ50×50×6(mm)のアングル
材による長尺の2本の鋼材12,12と短い2本の鋼材
13,13とを、図示のような縦横の井桁状に組んで溶
接により互いに固定してなる。そして、このような井桁
状の枠部材11の井桁状に組んだ鋼材12,12,1
3,13の各両端寄り部上に、所定間隔を空けた1組の
鉄筋支持部材14,14と1本の鉄筋支持部材16をそ
れぞれ対称的に起設している。
The steel frame 10 for stacking pier belt reinforcements is
As shown in FIGS. 1A and 1B, the reinforcing bar supporting members 14, 14,
14,14,14,14,14,14,16,16,1
6, 16 are provided upright. That is, the frame member 11
Is, for example, two long steel members 12, 12 and two short steel members 13, 13 made of an angle member having a size of 50 × 50 × 6 (mm) are assembled into a horizontal and vertical cross beam shape as shown in the drawing. They are fixed to each other by welding. Then, the steel members 12, 12, 1 assembled in the cross beam shape of the cross-shaped frame member 11 as described above.
A pair of reinforcing bar supporting members 14 and 14 and a reinforcing bar supporting member 16 which are spaced apart from each other by a predetermined distance are symmetrically provided on the portions of both sides of the coils 3 and 13, respectively.

【0014】鉄筋支持部材14,16は、例えば、鋼材
12,13と同じくサイズ50×50×6(mm)のア
ングル材による支持棒で、長さ(高さ)が、例えば、4
00mmである。図示例では、横方向の長い鋼材12の
両端寄り部上に、所定間隔を空けた1組の鉄筋支持部材
14,14を溶接によりそれぞれ固定して立てると共
に、このアングル材の支持棒による鉄筋支持部材14,
14の両側部と鋼材12とに補強板15,15を溶接に
よりそれぞれ固定している。また、縦方向の短い鋼材1
3の両端寄り部上には、1本の鉄筋支持部材16を溶接
により固定して立てると共に、このアングル材の支持棒
による鉄筋支持部材16の外側部と鋼材13とに補強板
17を溶接により固定している。
The reinforcing bar supporting members 14 and 16 are, for example, supporting rods made of an angle member having a size of 50 × 50 × 6 (mm) like the steel members 12 and 13 and having a length (height) of, for example, 4 mm.
It is 00 mm. In the illustrated example, a pair of reinforcing bar support members 14 and 14 spaced at predetermined intervals are respectively fixed by welding on the portions of the long steel material 12 in the lateral direction near both ends, and the reinforcing bars are supported by the supporting rods of the angle material. Member 14,
Reinforcing plates 15 and 15 are fixed to both side portions of 14 and the steel material 12 by welding. In addition, a steel material with a short vertical direction 1
One reinforcing bar support member 16 is fixed by welding on the portions near both ends of 3, and the reinforcing plate 17 is welded to the outer side of the reinforcing bar support member 16 and the steel material 13 by the supporting rod of the angle member by welding. It is fixed.

【0015】以上の橋脚用帯鉄筋の積み重ね用鋼製枠1
0において、図1(a)および(b)に示したように、
鋼材12,12,13,13からなる井桁状の枠部材1
1上に、前述したほぼ長方形状の各辺に沿って配設され
る橋脚用柱主筋の周囲のほぼ半周部分を囲むほぼJ字形
状をなす帯鉄筋1,2を、十分に積み重ねておけるもの
となっている。そして、横方向の長い鋼材12の両端寄
り部上にそれぞれ起設した1組の鉄筋支持部材14,1
4の間に、ほぼJ字形状をなす帯鉄筋1,2の図示縦棒
部および端部の屈曲片1a,2aをそれぞれ通しておけ
るものとなっており、また、縦方向の短い鋼材13の両
端寄り部上にそれぞれ起設した鉄筋支持部材16,16
の内側に、ほぼJ字形状をなす帯鉄筋1,2の図示横棒
部がそれぞれ当接するものとなっている。次に、以上の
ような橋脚用帯鉄筋の積み重ね用鋼製枠10を用いて行
う橋脚用帯鉄筋の組立方法について説明する。
Steel frame 1 for stacking the above-mentioned pier belt reinforcements
0, as shown in FIGS. 1 (a) and 1 (b),
A cross-shaped frame member 1 made of steel materials 12, 12, 13, and 13
One on which the J-shaped strip reinforcements 1 and 2 that surround the approximately half-circumference of the main pier column main bar arranged along each of the approximately rectangular sides described above can be sufficiently stacked. Has become. Then, a pair of reinforcing bar supporting members 14 and 1 erected on both side portions of the long steel material 12 in the lateral direction, respectively.
The bent bars 1a and 2a of the vertical bars and the ends of the strip rebars 1 and 2, which are substantially J-shaped, can be inserted between the four, respectively. Reinforcing bar support members 16 and 16 that are respectively erected on the portions near both ends
The illustrated horizontal bar portions of the band-shaped reinforcing bars 1 and 2, which are substantially J-shaped, respectively come into contact with the inside of the. Next, a method of assembling the pier strap reinforcements using the steel frame 10 for stacking pier strap reinforcements as described above will be described.

【0016】<橋脚用帯鉄筋の組立方法>図2は本発明
を適用した一例としての橋脚用帯鉄筋の組立方法による
鉄筋組立状態を示す平面図である。この図2において、
前述と同様に、1,2は柱主筋の周囲のほぼ半周部分を
囲むほぼJ字形状をなす帯鉄筋で、3,4は長辺部間を
中間部で結ぶ縦方向の帯鉄筋、5は長辺部間を短辺部側
に沿って結ぶ縦方向の帯鉄筋、6は短辺部間を長辺部側
に沿って結ぶ横方向の帯鉄筋である。
<Assembling Method of Bridge Reinforcing Bars for Bridge Piers> FIG. 2 is a plan view showing an assembled state of reinforcing bars by the method for assembling pier belt reinforcing bars as an example to which the present invention is applied. In FIG.
Similarly to the above, 1 and 2 are strip rebars having a substantially J-shape that surrounds a semi-circumferential portion around the column main bar, and 3 and 4 are vertical rebars that connect the long side portions at the intermediate portion. A vertical strip rebar connecting the long side portions along the short side portion side, and a horizontal strip rebar 6 connecting the short side portions along the long side portion side.

【0017】即ち、ほぼJ字形状をなす帯鉄筋1,2
は、図3(a)に示すように、ほぼ長方形状の各辺に沿
って配設される橋脚用柱主筋の周囲のほぼ半周部分を囲
むようにしてそれぞれ取り付けられるもので、その横方
向に長い方の端部の屈曲片1a,2a側に、他の横方向
に短い方の端部の屈曲片1b,2bがそれぞれ並ぶよう
になる。また、ほぼ長方形状の各辺に沿って配設される
橋脚用柱主筋の長辺部間を中間部で結ぶ縦方向の帯鉄筋
3,4は、図3(b)に示すように、ほぼU字形状をな
すもので、その二股となる両端部に内方への屈曲片3
a,3a,4a,4aを共に有している。このようなほ
ぼU字形状をなす縦方向の帯鉄筋3,4は、その屈曲片
3a,3aと屈曲片4a,4aとを互いに反対方向に向
けるようにして、橋脚用柱主筋の内方の中間部左右にそ
れぞれ取り付けられる。
That is, the strip rebars 1 and 2 having a substantially J-shape
As shown in FIG. 3 (a), are attached so as to enclose approximately half of the circumference of the main reinforcement of the pier column arranged along each side of the substantially rectangular shape. On the side of the bent pieces 1a, 2a at the ends of the bent pieces, the bent pieces 1b, 2b at the other ends that are shorter in the lateral direction are arranged. Further, as shown in FIG. 3 (b), the vertical reinforcing bars 3 and 4 connecting the long side portions of the main reinforcements for the piers arranged along each side of the substantially rectangular shape are almost as shown in FIG. It has a U-shape, and inwardly bent pieces 3 are formed on both ends of the fork.
It has a, 3a, 4a, 4a together. Such vertical U-shaped strip reinforcing bars 3 and 4 are arranged so that the bending pieces 3a and 3a and the bending pieces 4a and 4a are directed in mutually opposite directions, so that the inside of the column main bar for the pier is It is attached to the left and right of the middle part.

【0018】そして、ほぼ長方形状の各辺に沿って配設
される橋脚用柱主筋の長辺部間を短辺部側に沿って結ぶ
縦方向の帯鉄筋5は、図3(c)に示すように、ほぼ直
線形状をなすもので、その両端部に一側方への短い屈曲
片5a,5aを有している。このようなほぼ直線形状を
なす縦方向の帯鉄筋5は、その屈曲片5a,5aを互い
に向かい合うようにして、橋脚用柱主筋の内方の左右両
側部(短辺部)に沿ってそれぞれ取り付けられる。さら
に、ほぼ長方形状の各辺に沿って配設される橋脚用柱主
筋の短辺部間を長辺部側に沿って結ぶ横方向の帯鉄筋6
は、図4(d)に示すように、ほぼ直線形状をなす長い
もので、その両端部に一側方への短い屈曲片6a,6a
を有している。このようなほぼ直線形状をなす横方向の
長い帯鉄筋6は、その屈曲片6a,6aを互いに向かい
合うようにして、橋脚用柱主筋の内方の前後両側部(長
辺部)に沿ってそれぞれ取り付けられる。
The longitudinal strips 5 connecting the long side portions of the main pier column reinforcements arranged along the substantially rectangular sides along the short side portions are shown in FIG. 3 (c). As shown, it has a substantially linear shape, and has short bent pieces 5a, 5a on one side at both ends thereof. Such vertical strip reinforcing bars 5 having a substantially linear shape are attached along both inward left and right sides (short sides) of the pier column main bar so that the bent pieces 5a, 5a face each other. To be Further, a lateral strip reinforcing bar 6 that connects the short side portions of the main reinforcements for the piers arranged along the substantially rectangular sides along the long side portion 6
As shown in FIG. 4 (d), is a long straight line and has short bent pieces 6a, 6a at both ends thereof.
have. Such a laterally long strip-shaped reinforcing bar 6 having a substantially linear shape is arranged along the inner front and rear side portions (long side portions) of the main pillar reinforcement for the pier so that the bent pieces 6a, 6a face each other. It is attached.

【0019】次に、以上の橋脚用帯鉄筋1,2,3,
4,5,6の組立方法について順序を追って説明する。 「第1準備工程」先ず、ほぼ長方形状の各辺に沿って配
設される橋脚用柱主筋の内方を縦横方向に結ぶ橋脚用帯
鉄筋3,4,5,6を、橋脚用柱主筋の周囲を囲む図示
しない足場上に、組立作業に必要十分な量だけそれぞれ
仮置きしておく。 「仮付け工程」続いて、ほぼ長方形状の各辺に沿って配
設される橋脚用柱主筋が配設された長方形状の長辺部間
を中間部で結ぶほぼU字形状をなす縦方向の橋脚用帯鉄
筋3,4を、橋脚用柱主筋の上部にそれぞれ仮に取り付
けておく(図2参照)。
Next, the above-mentioned pier belt reinforcements 1, 2, 3,
The method of assembling 4, 5, and 6 will be described step by step. "First preparation step" First, the pier belt reinforcements 3, 4, 5 and 6 that connect the inside of the pier column main bars arranged along each side of the substantially rectangular shape in the vertical and horizontal directions Each of them is temporarily placed on a scaffold (not shown) that surrounds the circumference of each of them in an amount sufficient for assembly work. "Temporary attaching process" Subsequently, a substantially U-shaped longitudinal direction connecting the long side portions of the rectangular shape where the main reinforcements for the piers are arranged along each side of the substantially rectangular shape with an intermediate portion. Temporarily attach the pier strap reinforcements 3 and 4 to the upper part of the pier column main reinforcement (see Fig. 2).

【0020】「第2準備工程」そして、ほぼ長方形状の
各辺に沿って配設される橋脚用柱主筋の周囲のほぼ半周
部分を囲むほぼJ字形状をなす橋脚用帯鉄筋1,2を、
各々予め積み重ねておいた橋脚用帯鉄筋の積み重ね用鋼
製枠10,10を、その枠部材11,11に各々玉掛け
して図示しないクレーンにより縦吊りして、橋脚用柱主
筋が配設された左右両側方の足場上にそれぞれ仮置きし
ておく。以上のような第1準備工程、仮付け工程、第2
準備工程を経て、次に説明するような組立作業を行う。
[Second Preparation Step] Then, the pier strap rebars 1 and 2 each having a substantially J shape surrounding a substantially half circumference part of the main reinforcement of the pier column arranged along each side of the substantially rectangular shape. ,
The steel frames 10 for stacking the steel bars for the bridge piers, which have been stacked in advance, are respectively slid on the frame members 11 and 11 and vertically hung by a crane (not shown) to arrange the main pillars for the piers. Temporarily place each on the left and right scaffolds. First preparation step, temporary attachment step, second
After the preparation process, the assembly work as described below is performed.

【0021】「第1組立工程」先ず、前述した第2準備
工程において、左右両側方の足場上にそれぞれ縦に仮置
きしておいた橋脚用帯鉄筋の積み重ね用鋼製枠10,1
0からほぼJ字形状をなす橋脚用帯鉄筋1,2を交互に
横に倒して、図2に示すように、橋脚用柱主筋の周囲の
ほぼ半周部分に、そのほぼJ字形状をなす橋脚用帯鉄筋
1,2を交互に取り付けてそれぞれ溶接により固定す
る。 「第2組立工程」そして、前述した仮付け工程におい
て、橋脚用柱主筋の上部に仮付けしておいたほぼU字形
状をなす縦方向の橋脚用帯鉄筋3,4を下げて、図2に
示すように、橋脚用柱主筋の内方の中間部左右におい
て、屈曲片3a,3aと屈曲片4a,4aとを互いに反
対方向に向けるようにして、橋脚用柱主筋の長辺部間
に、ほぼU字形状をなす縦方向の橋脚用帯鉄筋3,4を
溶接によりそれぞれ固定する。
[First Assembly Step] First, in the above-mentioned second preparation step, the steel frames 10 and 1 for stacking the pier strap reinforcements temporarily placed vertically on the scaffolds on the left and right sides respectively.
Alternately lay down the pier strap rebars 1 and 2 that are almost J-shaped from 0, and as shown in FIG. 2, in the approximately half-circumference around the main pier columns, the piers that are almost J-shaped. The belt reinforcing bars 1 and 2 are attached alternately and fixed by welding. [Second Assembly Step] Then, in the above-mentioned temporary attaching step, the vertical U-shaped strip reinforcements 3 and 4 having a substantially U shape temporarily attached to the upper part of the main reinforcement for the pier are lowered to As shown in Fig. 4, the bending pieces 3a, 3a and the bending pieces 4a, 4a are oriented in opposite directions to each other between the long side portions of the main pillars for the piers on the left and right of the inner middle portion of the main bars for the piers. , U-shaped vertical pier strap reinforcements 3 and 4 are fixed by welding.

【0022】「第3組立工程」その後、橋脚用柱主筋の
長辺部間を短辺部側に沿って結ぶほぼ直線形状をなす縦
方向の橋脚用帯鉄筋5,5を、図2に示すように、橋脚
用柱主筋の内方の左右両短辺部側に沿ってそれぞれ溶接
により固定する。さらに、橋脚用柱主筋の短辺部間を長
辺部側に沿って結ぶほぼ直線形状をなす横方向の長い橋
脚用帯鉄筋6,6を、図2に示すように、橋脚用柱主筋
の内方の前後両長辺部側に沿ってそれぞれ溶接により固
定する。
"Third Assembling Step" After that, FIG. 2 shows the vertical pier strap rebars 5 and 5 having a substantially straight line shape connecting the long side portions of the main pier column reinforcements along the short side portions. As shown in the figure, they are fixed by welding along the left and right short sides of the main pier column. Further, as shown in FIG. 2, long horizontal pier strap rebars 6, 6 that form a substantially straight line connecting the short side portions of the main pier column reinforcement along the long side are used as shown in FIG. It is fixed by welding along both the front and rear long sides.

【0023】以上により、橋脚用帯鉄筋1,2,3,
4,5,6の1サイクルの組立作業が完了する。以降
は、以上のようなサイクルによる橋脚用帯鉄筋1,2,
3,4,5,6の組立作業を繰り返して、図示しない配
筋図による所定間隔をもって組み立てて行く。以上の通
り、本発明の実施の形態例によれば、橋脚用帯鉄筋1,
2を種類別に積み重ね、さらには、交互に重ね合わすこ
ともできる鋼製枠10を製作したので、玉掛けおよびク
レーンによる吊込みが容易なものとなり、また、この鋼
製枠10を使用して、橋脚用帯鉄筋1,2,3,4,
5,6の組立方法を改善したことによって、作業時間の
短縮と省力化も達成できる。
From the above, the pier strap rebars 1, 2, 3,
One cycle assembly work of 4, 5, 6 is completed. After that, pier belt reinforcements 1, 2,
The assembling work of 3, 4, 5 and 6 is repeated to assemble at predetermined intervals according to the bar arrangement diagram not shown. As described above, according to the embodiment of the present invention, the pier strap reinforcement 1,
Since the steel frame 10 that can be stacked two by type and further stacked alternately can be manufactured, it can be easily slung by a sling and a crane. Band rebar 1, 2, 3, 4,
By improving the assembling methods of 5 and 6, it is possible to shorten the working time and save labor.

【0024】なお、以上の実施の形態例においては、組
立方法に関して6種類の橋脚用帯鉄筋1,2,3,4,
5,6を使用するものとしたが、本発明はこれに限定さ
れるものではなく、さらに多い種類の橋脚用帯鉄筋を使
用したり、或いは少ない種類の橋脚用帯鉄筋を使用して
もよい。また、橋脚用帯鉄筋の形状や、その積み重ね用
鋼製枠の形状等も任意であり、例えば、井桁状の枠部材
を組む鋼材は、アングル材に限らずC形チャンネル材等
でもよく、その他、諸元寸法を含めて具体的な細部構造
等についても適宜に変更可能であることは勿論である。
In the above embodiment, six types of pier strap rebars 1, 2, 3, 4, with respect to the assembling method are used.
Although 5 and 6 are used, the present invention is not limited to this, and more types of pier strap rebars may be used, or less types of pier strap rebars may be used. . Further, the shape of the steel reinforcement for the bridge pier, the shape of the stacking steel frame, and the like are arbitrary. For example, the steel material forming the frame member in the shape of a double girder is not limited to the angle material, and may be the C-shaped channel material or the like. Needless to say, it is possible to appropriately change specific detailed structures including specification dimensions.

【0025】[0025]

【発明の効果】以上のように、請求項1記載の発明に係
る橋脚用帯鉄筋の重ね合わせ用鋼製枠によれば、ほぼ長
方形状の各辺に沿って配設される橋脚用柱主筋の周囲を
囲む橋脚用帯鉄筋を積み重ねた状態で、玉掛けおよびク
レーンによる吊込みを容易に行うことができるようにな
り、橋脚用帯鉄筋の積み重ね用鋼製枠を縦吊りして足場
上に仮置きしておくようなこともできるようになる。ま
た、以上のようなほぼ長方形状の各辺に沿って配設され
る橋脚用柱主筋の周囲を囲む橋脚用帯鉄筋を種類別に積
み重ねたり、交互に重ね合わせるようなこともできるよ
うになる。
As described above, according to the steel frame for superimposing the pier strap reinforcements according to the invention of claim 1, the main pier columns for bridge piers are arranged along each side of a substantially rectangular shape. It becomes possible to easily hang slings and cranes while stacking the pier strap reinforcements surrounding the building, and suspend the steel frame for stacking pier strap reinforcements vertically to temporarily suspend it on the scaffolding. It will also be possible to leave it. Further, it becomes possible to stack the pier band reinforcements surrounding the main pier column bars arranged along each side of the substantially rectangular shape as described above by type or alternately stack them.

【0026】そして、請求項2記載の発明に係る橋脚用
帯鉄筋の組立方法によれば、特に、両側方の足場上にそ
れぞれ縦に仮置きしておいた橋脚用帯鉄筋の積み重ね用
鋼製枠から橋脚用帯鉄筋を横に倒して橋脚用柱主筋の周
囲に取り付けてそれぞれ固定して、次に、橋脚用柱主筋
の上部に仮付けしておいた複数の橋脚用帯鉄筋を下げて
橋脚用柱主筋の長辺部間に中間部でそれぞれ固定してか
ら、橋脚用柱主筋の長辺部間を短辺部側に沿って結ぶ複
数の橋脚用帯鉄筋を両短辺部側でそれぞれ固定すると共
に、橋脚用柱主筋の短辺部間を長辺部側に沿って結ぶ複
数の橋脚用帯鉄筋を両長辺部側でそれぞれ固定するよう
にしたため、橋脚用帯鉄筋の組み立てに際して、作業時
間を短縮することができると共に、省力化を達成するこ
とができる。
Further, according to the method for assembling the pier strap reinforcements according to the second aspect of the present invention, particularly, the steel for stacking the pier strap reinforcements that has been temporarily placed vertically on the scaffolds on both sides, respectively. Tilt the pier straps sideways from the frame and attach them around the pier column main reinforcements, and then fix each, then lower the multiple pier reinforcements temporarily attached to the top of the pier pillar reinforcements. After fixing each of the long sides of the main pier columns for the pier at the middle part, connect the long sides of the main pier columns for the pier along the short sides to connect the multiple pier strap reinforcements on both short sides. When assembling the pier rebars, the two main pier rebars that connect the short sides of the main pier columns to the pier columns are fixed along the long sides. The working time can be shortened and labor saving can be achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明を適用した一例としての橋脚用帯鉄筋の
積み重ね用鋼製枠を示すもので、(a)は使用状態の平
面図、(b)は使用状態の概略側面図である。
FIG. 1 shows a steel frame for stacking strip reinforcing bars for bridge piers as an example to which the present invention is applied, in which (a) is a plan view in a used state and (b) is a schematic side view in a used state.

【図2】本発明を適用した一例としての橋脚用帯鉄筋の
組立方法による鉄筋組立状態を示す平面図である。
FIG. 2 is a plan view showing an assembled state of reinforcing bars by a method of assembling pier strap reinforcing bars as an example to which the present invention is applied.

【図3】図2の組み立てに使用する帯鉄筋の種類を示す
もので、(a)は長方形状の各辺に沿って配設される柱
主筋の周囲を囲む帯鉄筋を示す概略平面図、(b)は同
じく柱主筋が配設される長方形状の長辺部間を中間部複
数箇所で結ぶ縦方向の帯鉄筋の平面図、(c)は同じく
長辺部間を短辺部側に沿って結ぶ縦方向の帯鉄筋の平面
図、(d)は同じく長方形状の短辺部間を長辺部側に沿
って結ぶ横方向の帯鉄筋の平面図である。
FIG. 3 is a schematic plan view showing types of strip reinforcing bars used in the assembly of FIG. 2, in which (a) shows strip reinforcing bars surrounding a column main bar arranged along each side of a rectangle; Similarly, (b) is a plan view of a vertical strip reinforcing bar that connects the rectangular long side portions where the column main bars are arranged at a plurality of intermediate portions, and (c) is the short side portion between the long side portions. FIG. 3D is a plan view of a vertical strip reinforcing bar connected along the vertical direction, and FIG. 7D is a plan view of a horizontal strip reinforcing bar connecting between the short sides of the rectangular shape along the long side.

【符号の説明】[Explanation of symbols]

1,2 柱主筋の周囲を囲む帯鉄筋 3,4 長辺部間を中間部で結ぶ縦方向の帯鉄筋 5 長辺部間を短辺部側に沿って結ぶ縦方向の帯鉄筋 6 短辺部間を長辺部側に沿って結ぶ横方向の帯鉄筋 10 橋脚用帯鉄筋の積み重ね用鋼製枠 11 枠部材 12,13 鋼材 14,16 鉄筋支持部材(支持棒) 15,17 補強板 1, 2 Reinforcing strips around the main bars 3, 4 Longitudinal strips connecting the long sides at the middle part 5 Longitudinal strips connecting the long sides along the short sides 6 Short sides Lateral strip reinforcing bars that connect parts along the long side 10 Steel frames for stacking strip reinforcing bars for piers 11 Frame members 12, 13 Steel materials 14, 16 Reinforcing bar support members (supporting rods) 15, 17 Reinforcing plates

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ほぼ長方形状の各辺に沿って配設される
橋脚用柱主筋の周囲を囲む橋脚用帯鉄筋を積み重ねてお
くための鋼製枠であって、 縦横2本ずつの鋼材を井桁状に組んで互いに固定され、
上面に前記橋脚用帯鉄筋を載置する枠部材と、 この枠部材の前記井桁状に組んだ前記鋼材の各両端寄り
部上にそれぞれ対称的に起設され、前記枠部材上に積み
重ねた前記橋脚用帯鉄筋を側方から支持する鉄筋支持部
材と、からなることを特徴とする橋脚用帯鉄筋の積み重
ね用鋼製枠。
1. A steel frame for stacking pier belt reinforcements surrounding the main reinforcement of a pier arranged along each side of a substantially rectangular shape, the steel frame comprising two vertical and horizontal steel members. It is assembled in a cross beam and fixed to each other.
A frame member for mounting the strip rebar for the pier on the upper surface, and symmetrically erected on each of the both ends of the steel material assembled in the girder-like shape of the frame member, and stacked on the frame member. A steel frame for stacking pier belt reinforcements, comprising a reinforcing bar supporting member for laterally supporting the pier belt reinforcements.
【請求項2】 ほぼ長方形状の各辺に沿って配設される
橋脚用柱主筋の周囲を囲む橋脚用帯鉄筋および内方を縦
横方向に結ぶ橋脚用帯鉄筋を組み立てていく方法であっ
て、 前記橋脚用柱主筋の内方を縦横方向に結ぶ橋脚用帯鉄筋
を前記橋脚用柱主筋の周囲を囲む足場上に仮置きしてお
く第1準備工程と、 前記橋脚用柱主筋が配設された長方形状の長辺部間を中
間部で結ぶ複数の橋脚用帯鉄筋を前記橋脚用柱主筋の上
部に仮に取り付けておく仮付け工程と、 前記橋脚用柱主筋の周囲を囲む前記橋脚用帯鉄筋を予め
積み重ねておいた請求項1記載の前記橋脚用帯鉄筋の積
み重ね用鋼製枠を縦吊りして前記橋脚用柱主筋が配設さ
れた長方形状の両側方の足場上にそれぞれ仮置きしてお
く第2準備工程と、 前記両側方の足場上にそれぞれ縦に仮置きしておいた前
記橋脚用帯鉄筋の積み重ね用鋼製枠から前記橋脚用帯鉄
筋を横に倒して前記橋脚用柱主筋の周囲に交互に取り付
けてそれぞれ固定する第1組立工程と、 前記橋脚用柱主筋の上部に仮付けしておいた前記複数の
橋脚用帯鉄筋を下げて前記橋脚用柱主筋の長辺部間に中
間部でそれぞれ固定する第2組立工程と、 前記橋脚用柱主筋の長辺部間を短辺部側に沿って結ぶ複
数の橋脚用帯鉄筋を両短辺部側でそれぞれ固定すると共
に、前記橋脚用柱主筋の短辺部間を長辺部側に沿って結
ぶ複数の橋脚用帯鉄筋を両長辺部側でそれぞれ固定する
第3組立工程と、からなることを特徴とする橋脚用帯鉄
筋の組立方法。
2. A method for assembling a pier strap reinforcing bar surrounding a main pier column reinforcement arranged along each side of a substantially rectangular shape, and a pier strap reinforcing bar connecting the insides in the vertical and horizontal directions. A first preparation step of temporarily placing a pier strap reinforcing bar connecting the inside of the pier column main bar in the vertical and horizontal directions on a scaffold surrounding the pier column main bar, and arranging the pier column main bar A temporary attaching step of temporarily attaching a plurality of pier strap reinforcements connecting the long sides of the rectangular shape to the middle of the bridge pier, and for the pier surrounding the pier column main reinforcement The steel frame for stacking the pier rebars according to claim 1 in which the pier rebars have been stacked in advance, and the steel frames for vertically stacking the piers are hung vertically on the scaffolds on both sides of the rectangle in which the pillar main bars for the pier are arranged The second preparatory step to set it up, and the temporary placement vertically on the scaffolds on both sides. A first assembling step of tilting the pier straps horizontally from the steel frame for stacking the pier straps that has been set aside and alternately attaching and fixing them around the pier column main bars, and the pier column A second assembling step of lowering the plurality of pier strap reinforcements temporarily attached to the upper part of the main reinforcement and fixing the piers at the intermediate portion between the long sides of the pier main reinforcement, and the length of the pier main reinforcement. A plurality of pier strap reinforcements that connect the sides along the short sides are fixed on both short sides, respectively, and a plurality of the short bars between the main pier columns are connected along the long sides. And a third assembling step of fixing the pier strap reinforcing bars on both sides of the long sides, respectively, and a method of assembling the pier strap reinforcing bars.
JP19525295A 1995-07-31 1995-07-31 Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie Pending JPH0941324A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19525295A JPH0941324A (en) 1995-07-31 1995-07-31 Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19525295A JPH0941324A (en) 1995-07-31 1995-07-31 Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie

Publications (1)

Publication Number Publication Date
JPH0941324A true JPH0941324A (en) 1997-02-10

Family

ID=16338047

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19525295A Pending JPH0941324A (en) 1995-07-31 1995-07-31 Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie

Country Status (1)

Country Link
JP (1) JPH0941324A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535197A (en) * 2020-05-21 2020-08-14 中冶建工集团有限公司 Pier column construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535197A (en) * 2020-05-21 2020-08-14 中冶建工集团有限公司 Pier column construction method
CN111535197B (en) * 2020-05-21 2021-12-14 中冶建工集团有限公司 Pier column construction method

Similar Documents

Publication Publication Date Title
JP2002089043A (en) Reinforced concrete structure and construction method for steel framed reinforced concrete, structure
JP2006063718A (en) Method of constructing overhung bridge using corrugated steel plate web
JPH0941324A (en) Piling up steel-made frame of bridge pier hoop tie and assembling method of bridge pier hoop tie
KR101360287B1 (en) Assembled gang form
JPH08144413A (en) Permanent form unit for floor slab
JP3032052U (en) Construction equipment for pier reinforcement work
JPH06218473A (en) Automatic reinforcing bar building-up device
JP6713419B2 (en) Suspension method and suspension structure
JP3564059B2 (en) Arrangement method of main bar and hoop bar in steel column
JP3326724B2 (en) Construction method of concrete cable-stayed bridge and form support trolley used for it
CN211369560U (en) Novel cloth beam stirrup device
JP2002089042A (en) Construction method for steel framed reinforced concrete structure wall and hoisting device for steel framed reinforced concrete form unit
JPH07166539A (en) Construction method for steel framed reinforced concrete continuous underground wall
JP2001200594A (en) Method for constructing structure consisting of column with large section and beam
JPH02140348A (en) Iron reinforcement unit and arranged reinforcement construction method
JPH0730564B2 (en) Construction method of underground structure
JPH06322721A (en) Construction method of steel pipe/concrete composite construction bridge pier
JPH06307010A (en) Beam member for src building
JP2001065174A (en) Tie hoop assembling method for reinforcements
JPH0626200A (en) Execution method for thick mat slab
JP4421420B2 (en) Columnar structure construction method and suspension jig
CN205529930U (en) Bridge pier column rebar installation handling frame
JPH0617509A (en) Reinforced truss and semi-pc plate therewith
JPH05263526A (en) Construction method of rc construction beam
JPH0711771A (en) Reinforced crate assembly and built-up device