JPH09279569A
JPH09279569A JP8119624A JP11962496A JPH09279569A JP H09279569 A JPH09279569 A JP H09279569A JP 8119624 A JP8119624 A JP 8119624A JP 11962496 A JP11962496 A JP 11962496A JP H09279569 A JPH09279569 A JP H09279569A
Authority
JP
Japan
Prior art keywords
pile
piles
retaining wall
constructing
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8119624A
Other languages
Japanese (ja)
Other versions
JP3673977B2 (en
Inventor
Toru Miyazawa
徹 宮澤
Kazuharu Fujito
一治 藤戸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GROUND SYST KK
Taisei Corp
Original Assignee
GROUND SYST KK
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GROUND SYST KK, Taisei Corp filed Critical GROUND SYST KK
Priority to JP11962496A priority Critical patent/JP3673977B2/en
Publication of JPH09279569A publication Critical patent/JPH09279569A/en
Application granted granted Critical
Publication of JP3673977B2 publication Critical patent/JP3673977B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To enhance economical efficiency by constructing a land slide protection wall by contacting a pile and a pile with other in a water stop unnecessary depth directional section, and constructing the land slide protection wall by partially superposing cross sections of the pile and the pile on each other in a water stop necessary section. SOLUTION: In an earth's surface side clay layer composed of the water impermeable ground, excavation is performed still in a diameter of a screw head arranged on the tip of a rotary rod. Cement milk or mortar is delivered from the tip of a pipe arranged inside of the rotary rod, and is mixed with surrounding earth and sand, and a column-rowed land slide protection wall of soil cement or mortar is constructed in a condition where a pile and a pile are contacted with each other. When reaching a water permeable sand layer by penetrating through a clay layer, excavation is performed by expanding an expansible blade having a diameter larger than the screw head. The cement milk or the like is delivered from the tip of a pipe arranged inside the rotary rod, and is mixed with surrounding earth and sand, and the column-rowed land slide protection wall of soil cement or the like is constructed in a condition where cross sections of a pile and a pile are partially superposed on each other.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、止水性山留壁の構
築方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a waterproof still mountain wall.

【0002】[0002]

【従来の技術】従来の柱列式の止水性山留壁は、多数本
の杭を多少の寸法だけ重ね合わせる状態で並べて壁面を
構築する方法である。この構築方法では各杭の直径が頭
部から先端まで同じ寸法で構成してあり、すべての断面
において隣接する杭と杭を重ねて構築するものであっ
た。
2. Description of the Related Art A conventional column-type waterproofing mountain retaining wall is a method of constructing a wall surface by arranging a large number of piles in a state of being piled up by a certain size. In this construction method, the diameters of the piles were the same from the head to the tip, and piles were constructed by stacking adjacent piles on all cross sections.

【0003】[0003]

【本発明が解決しようとする課題】しかし実際の地層の
堆積状態をみると、砂質土と粘性土が互層になっている
場合が多く、地下水の流れがあるのは主に砂質土の層で
ある。したがって山留壁を止水性の高いものにする必要
があるのは、主に地下水の流れのある砂質土層である。
しかるに公知の山留壁はその直径がすべて一定であり、
全長にわたって同一寸法だけ隣接杭と重ね合わせて構築
する方法であるから、止水壁を構築する必要のない粘性
土層にも止水壁を構築するという不経済なものであっ
た。
However, looking at the actual state of sedimentation of the stratum, the sandy soil and the cohesive soil are often in alternating layers, and the flow of groundwater is mainly due to the sandy soil. It is a layer. Therefore, it is mainly the sandy soil layer where groundwater flows that needs to make the retaining wall highly waterproof.
However, the diameter of all known Yamadome walls is constant,
Since it is a method of constructing the same size by stacking it with adjacent piles over the entire length, it was uneconomical to construct a water stop wall even in a cohesive soil layer where it is not necessary to construct a water stop wall.

【0004】本発明は上記したような従来の問題を解決
するためになされたもので、止水性の要求される部分に
だけ、止水性の山留壁を構築することができる、経済的
な止水山留壁の構築方法を提供することを目的とする。
The present invention has been made in order to solve the above-mentioned conventional problems, and is an economical stopping method in which a waterproofing retaining wall can be constructed only in a portion where waterproofing is required. The purpose is to provide a method of constructing a Mizuyama retaining wall.

【0005】[0005]

【課題を解決するための手段】上記のような目的を達成
するために、本発明の止水性山留壁の構築方法は、地中
に多数本の杭を隣接させて山留壁を構築する方法であっ
て、止水性を必要としない深さ方向の区間では、杭と杭
とを接触させて山留壁を構築し、止水性を必要とする深
さ方向の区間では、杭と杭との断面を一部重ね合わせて
山留壁を構築する、止水性山留壁の構築方法を特徴とし
たものである。
In order to achieve the above-mentioned object, a method of constructing a waterproofing mooring wall of the present invention is to construct a mooring wall by arranging a large number of piles adjacent to each other in the ground. In the depth direction section that does not require water stoppage, the pile and pile are contacted to construct a mountain retaining wall, and in the depth direction section where water stoppage is required, piles and piles It features a method of constructing a waterproofing mountain retaining wall by partially overlapping the cross sections of the above to construct a mountain retaining wall.

【0006】[0006]

【本発明の実施の態様】以下図面を参照しながら本発明
の止水性山留壁の構築方法の実施例について説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a method for constructing a waterproof still mountain wall according to the present invention will be described below with reference to the drawings.

【0007】<イ>使用する装置。 本発明の構築方法では図2、3に示すような削孔装置を
使用する。すなわち、回転ロッド1の先端にスクリュー
ヘッド12を設け、回転ロッド1の外周にはスクリュー
11を取り付けた構造である。先端のスクリューヘッド
12と、後方のスクリュー11との間には、スクリュー
ヘッド12よりも直径の大きい拡大翼13を取り付け
る。この拡大翼は、その基端をロッド1にピン14で取
り付けてある。そして通常は拡大翼13はロッド1と平
行に畳まれている。必要のあるときには油圧の供給その
他の方法によって拡大翼13をピン14を中心に90度
回転させる。すると拡大翼13は外周に向けて突出し、
スクリューヘッド12よりも大きい直径の削孔を行うこ
とができる装置である。なお、回転ロッド1の内部に硬
化剤を圧送するパイプ15を貫通しておき、先端付近か
ら外側に向けてセメントミルクやモルタルを吐出して周
囲の土砂と混合してソイルセメントやモルタルの柱列山
留壁を構築する工程は、公知の方法と同様である。
<A> Equipment used. The construction method of the present invention uses a drilling device as shown in FIGS. That is, the screw head 12 is provided at the tip of the rotating rod 1, and the screw 11 is attached to the outer periphery of the rotating rod 1. An enlarged blade 13 having a diameter larger than that of the screw head 12 is attached between the front screw head 12 and the rear screw 11. This expansion wing has its base end attached to the rod 1 by a pin 14. The expansion wings 13 are normally folded in parallel with the rod 1. When necessary, the expanding blade 13 is rotated by 90 degrees about the pin 14 by supplying hydraulic pressure or another method. Then, the expansion wings 13 project toward the outer periphery,
This is a device capable of making a hole having a diameter larger than that of the screw head 12. It should be noted that a pipe 15 for pumping the curing agent is pierced into the inside of the rotary rod 1 and cement milk or mortar is discharged from the vicinity of the tip toward the outside and mixed with the surrounding earth and sand to form a column of soil cement or mortar. The process of constructing the mountain retaining wall is similar to the known method.

【0008】<ロ>対象とする地盤。 前記したように本発明の構築方法の対象とする地盤は、
砂質土と粘性土とが互層になっているような、透水層と
不透水層とが交互に存在している地盤である。このよう
な地盤において、地中に多数本の杭を隣接させて柱列山
留壁を構築する方法である。
<B> Target ground. As mentioned above, the ground that is the target of the construction method of the present invention,
It is a ground in which permeable layers and impermeable layers are alternately present, such as sandy soil and cohesive soil in alternate layers. In such a ground, it is a method of constructing a column-row mountain retaining wall by adjoining many piles in the ground.

【0009】<ハ>不透水層の深さ方向の区間。 前記した削孔装置を使用して山留壁の構築を行うが、地
盤の状況は事前のボーリングによって、どの深さ方向の
区間の深さに粘土層、砂層が存在するか分かっている。
簡単にするために地表側に粘土層、中間に砂層、その下
に粘土層が交互に存在する地盤を例として説明する。
(図1) 地表側の粘土層は不透水性の地盤であるから、隣接する
杭と杭とを重ねて構築する必要はない。そのために削孔
装置の拡大翼13を使用することなく、先端のスクリュ
ーヘッド12の直径のまま掘削する。このように、止水
性を必要としない深さ方向の区間では、スクリューヘッ
ド12の直径に等しい範囲で、杭と杭とが接点で接触す
るか、わずかに重ね合わせた状態で山留壁を構築する。
したがってこの範囲では止水性は乏しく、土圧だけを負
担できる柱列山留壁を構築することができる。
<C> A section in the depth direction of the impermeable layer. The mountain retaining wall is constructed using the above-described drilling device, and it is known from the boring in advance that the depth of the section in the depth direction where the clay layer and the sand layer exist.
For the sake of simplicity, an explanation will be given by taking as an example a ground in which clay layers are present on the surface side, sand layers are in the middle, and clay layers are alternately present below.
(Fig. 1) Since the clay layer on the ground side is impermeable, it is not necessary to build it by stacking adjacent piles. Therefore, the diameter of the screw head 12 at the tip is excavated without using the enlarged blade 13 of the hole drilling device. In this way, in the section in the depth direction that does not require water shutoff, the pile retaining wall is constructed in a state where the pile and the pile are in contact with each other at a contact point or slightly overlapped with each other within a range equal to the diameter of the screw head 12. To do.
Therefore, in this range, the waterproofness is poor and it is possible to construct a column-row mountain retaining wall that can bear only earth pressure.

【0010】<ニ>透水層の深さ方向の区間。 粘土層を貫通して砂層に至ると、この区間では柱列山留
壁には止水性が要求される。そのために、止水性を必要
とする深さ方向の区間に至った段階でスクリューヘッド
12よりも大きい直径の拡大翼13を油圧などの作用に
よって拡大する。 すると、隣接する杭の範囲まで削孔
することになり、杭と杭との断面はその一部を重ね合わ
せた状態の止水性の柱列山留壁を構築することができ
る。以上の杭群は、内部にH鋼やコンクリート杭などの
芯材を挿入して柱列山留壁の構築を終了する。こうして
柱列山留壁の深さ方向に、任意の区間だけを止水性を有
する柱列山留壁とし、他の区間を止水性のない柱列山留
壁として自由に選択して構築することができる。
<D> A section in the depth direction of the permeable layer. When the clay layer is penetrated to reach the sand layer, the columnar mountain retaining wall is required to have water stoppage in this section. For this reason, the expanding blade 13 having a diameter larger than that of the screw head 12 is expanded by the action of hydraulic pressure or the like at the stage when the section in the depth direction where water stopping is required is reached. Then, holes will be drilled to the range of the adjacent piles, and the cross-section of the piles and the piles can construct a water-stopping column-row mountain retaining wall with a part of them being overlapped. In the pile group described above, core materials such as H steel and concrete piles are inserted inside to complete the construction of the column-row retaining wall. In this way, in the depth direction of the pillar row mountain retaining wall, it is possible to freely select and construct only an arbitrary section as a column row mountain retaining wall having water stopping ability and other sections as a column row mountain retaining wall having no water stopping ability. You can

【0011】[0011]

【本発明の効果】本発明の止水性柱列山留壁の構築方法
は以上説明したようになるから次のような効果を得るこ
とができる。 <イ>従来の柱列山留壁のように、全長にわたって同一
の直径でオーバーラップさせて構築する必要がない。地
下水の流出が予想される深さ方向の区間だけを止水性の
ある柱列山留壁として構築し、他の深さ方向の区間は止
水性を備えない単に接触しているだけの柱列山留壁を構
築すれば良い。 <ロ>このように対象地盤に応じた構造の切り替えを、
一工程の連続作業で完成させることができる。そのため
に施工の作業時間を短縮することができ、工事費も大幅
に低減することができる構築方法である。
EFFECTS OF THE INVENTION Since the method of constructing the waterproof column row mountain retaining wall of the present invention is as described above, the following effects can be obtained. <A> It is not necessary to construct by overlapping with the same diameter over the entire length unlike the conventional column-row mountain retaining wall. Only the section in the depth direction where groundwater is expected to be run is constructed as a column-mountain retaining wall with water stop, and the other section in the depth direction does not have water stop and is simply in contact. Just build a retaining wall. <B> Switching the structure according to the target ground in this way,
It can be completed by one-step continuous operation. Therefore, the construction work time can be shortened and the construction cost can be significantly reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の止水性柱列山留壁の構築方法の実施例
の説明図
FIG. 1 is an explanatory view of an embodiment of a method of constructing a waterproofing column row mountain retaining wall of the present invention.

【図2】削孔装置の実施例の説明図FIG. 2 is an explanatory view of an embodiment of a hole drilling device.

【図3】削孔装置の拡大翼を拡大した状態の説明図FIG. 3 is an explanatory view of a state in which the enlarged blade of the hole drilling device is enlarged.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】地中に多数本の杭を隣接させて山留壁を構
築する方法であって、 止水性を必要としない深さ方向の区間では、杭と杭とを
接触させて山留壁を構築し、 止水性を必要とする深さ方向の区間では、杭と杭との断
面を一部重ね合わせて連続して山留壁を構築する、 止水性山留壁の構築方法
1. A method for constructing a mountain retaining wall by adjoining a large number of piles in the ground, wherein piles and piles are brought into contact with each other in a depth direction section where waterproofing is not required. A method of constructing a still water retaining wall in which a wall is constructed, and pile sections are piled up to partially overlap each other to construct a mountain retaining wall continuously in the depth direction section where water stopping is required.
【請求項2】地中に多数本の杭を隣接させて山留壁を構
築する方法であって、 止水性を必要としない深さ方向の区間では、杭と杭とを
接触させて山留壁を構築し、 止水性を必要とする深さ方向の区間では、杭と杭との断
面を一部重ね合わせて連続して山留壁を構築し、 杭の全部または一部の内部には鋼材、コンクリート杭な
どを芯材として挿入して行う、 止水性山留壁の構築方法
2. A method for constructing a mountain retaining wall by adjoining a large number of piles in the ground, wherein piles and piles are brought into contact with each other in a depth direction section where waterproofing is not required. In the section of the depth direction where the wall is constructed and waterproofing is required, pile piles and piles are partially overlapped to form a mountain retaining wall continuously. Construction method of waterproofing mountain retaining wall by inserting steel material, concrete pile, etc. as core material
【請求項3】地中に多数本の杭を隣接させて山留壁を構
築する方法であって、 止水性を必要としない深さ方向の区間では、拡大しない
掘削装置によって削孔して、 杭と杭とを接触させて山留壁を構築し、 止水性を必要とする深さ方向の区間では、大きい直径に
拡大した掘削装置によって削孔して、 杭と杭との断面を一部重ね合わせて連続して山留壁を構
築する、 止水性山留壁の構築方法
3. A method of constructing a mountain retaining wall by adjoining a large number of piles in the ground, wherein a section in the depth direction which does not require waterproofing is drilled by a drilling device that does not expand, A pile retaining wall is constructed by contacting piles with each other, and in sections in the depth direction where water cutoff is required, holes are drilled with a drilling device enlarged to a large diameter to partially cut the cross section of piles and piles. Constructing a still water retaining wall by stacking and constructing a continuous retaining wall
JP11962496A 1996-04-17 1996-04-17 Construction method of water-stopping mountain retaining wall Expired - Fee Related JP3673977B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11962496A JP3673977B2 (en) 1996-04-17 1996-04-17 Construction method of water-stopping mountain retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11962496A JP3673977B2 (en) 1996-04-17 1996-04-17 Construction method of water-stopping mountain retaining wall

Publications (2)

Publication Number Publication Date
JPH09279569A true JPH09279569A (en) 1997-10-28
JP3673977B2 JP3673977B2 (en) 2005-07-20

Family

ID=14766056

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11962496A Expired - Fee Related JP3673977B2 (en) 1996-04-17 1996-04-17 Construction method of water-stopping mountain retaining wall

Country Status (1)

Country Link
JP (1) JP3673977B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793024A (en) * 2010-03-31 2010-08-04 中交二航局第三工程有限公司 Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit
CN110158626A (en) * 2019-06-20 2019-08-23 广东宏丰建设工程有限公司 A kind of water stop curtain structure
CN110512616A (en) * 2019-08-26 2019-11-29 中国十七冶集团有限公司 A kind of girder steel connection concrete core cement soil barricade combination supporting system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04203017A (en) * 1990-11-30 1992-07-23 Taisei Corp Column-line sheathing wall and its construction
JPH07109732A (en) * 1993-10-13 1995-04-25 Tenox Corp Construction device of soil cement column with knot

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04203017A (en) * 1990-11-30 1992-07-23 Taisei Corp Column-line sheathing wall and its construction
JPH07109732A (en) * 1993-10-13 1995-04-25 Tenox Corp Construction device of soil cement column with knot

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793024A (en) * 2010-03-31 2010-08-04 中交二航局第三工程有限公司 Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit
CN110158626A (en) * 2019-06-20 2019-08-23 广东宏丰建设工程有限公司 A kind of water stop curtain structure
CN110158626B (en) * 2019-06-20 2020-11-24 广东宏丰建设工程有限公司 Waterproof curtain structure
CN110512616A (en) * 2019-08-26 2019-11-29 中国十七冶集团有限公司 A kind of girder steel connection concrete core cement soil barricade combination supporting system

Also Published As

Publication number Publication date
JP3673977B2 (en) 2005-07-20

Similar Documents

Publication Publication Date Title
KR101868086B1 (en) drive rod apparatus for a drilling and grouting
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN113153306A (en) Excavation supporting construction method for large-diameter vertical shaft
US6241426B1 (en) Method for forming an interconnected underground structure
CA2456303C (en) Continuous method of realization of underground tunnels including peripheral perforations
JPH09279569A (en) Construction method of water stopping land slide protection wall
JPH08311864A (en) Earth retaining wall and construction method therefor
CN214997645U (en) Be applicable to subway station goes out inlet pipe curtain construction pipe curtain structure
KR102297853B1 (en) Mortar pile formation method that can reduce the occurrence of floating soil
CN205475253U (en) Supporting structure of foundation pit
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
JP5284168B2 (en) Excavation member for earth retaining member construction and earth retaining member construction method
CN209129532U (en) The constructing device of underground anti-seepage curtain
JP2002047881A (en) Pipeline construction method
CN205857212U (en) Corrugated steel cofferdam borehole hollow pile
JPH09302654A (en) Construction method and device for driving steel pipe pile
JPH11222848A (en) Constructing method of cutoff earth retaining wall
CN108019211A (en) Waterproof of man and its construction method in a kind of pilot tunnel of rich water sand-pebble layer
KR100956316B1 (en) Grouting method using composite drawdown well for confined aquifer
EP2009225B1 (en) Method for providing a slab-shaped underground structure
CN106930285A (en) A kind of pressure-bearing type boulder and cobble soil layer enlarging anchor rod and its construction method
JP3170604B2 (en) Steel pipe construction method by medium digging method
JP2006037491A (en) Expanded head pile and construction method of expanded head pile
JP2000328561A (en) Underground water flowing construction method in soil cement column row earth retaining wall
JPH05125891A (en) Large bore underground wall and its constructing method, and pipe burying excavator

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050329

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050415

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees