JPH09256797A - Segment conveying method and segment conveying device - Google Patents

Segment conveying method and segment conveying device

Info

Publication number
JPH09256797A
JPH09256797A JP8070093A JP7009396A JPH09256797A JP H09256797 A JPH09256797 A JP H09256797A JP 8070093 A JP8070093 A JP 8070093A JP 7009396 A JP7009396 A JP 7009396A JP H09256797 A JPH09256797 A JP H09256797A
Authority
JP
Japan
Prior art keywords
segment
transfer device
rail
erector
transported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8070093A
Other languages
Japanese (ja)
Other versions
JP3300223B2 (en
Inventor
Zenichi Ishikawa
善一 石川
Katsuhiro Ishimura
勝宏 石村
Yoshiaki Tamura
義昭 田村
Yukihisa Hirasawa
幸久 平沢
Yasuo Mori
泰雄 森
Hisanori Hashimoto
久儀 橋本
Takami Kusaki
貴巳 草木
Takeshi Kamei
亀井  健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Hitachi Construction Machinery Co Ltd
Original Assignee
Kajima Corp
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Hitachi Construction Machinery Co Ltd filed Critical Kajima Corp
Priority to JP07009396A priority Critical patent/JP3300223B2/en
Publication of JPH09256797A publication Critical patent/JPH09256797A/en
Application granted granted Critical
Publication of JP3300223B2 publication Critical patent/JP3300223B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To make it possible to accurately supply segments to a supply position even in case of curve execution and to eliminate a position adjustment of the segments caused by the curve execution by hanging segments conveyed to a backward truck on rails to directily convey the segments to the supply position for a segment holding device of an erector. SOLUTION: Two right and left hoist rails 10 are built between a backward truck 11 and a backward deck 14 of a shield main body 1A, and a segment transferring device 12 is hung on the hoist rails 10. The segment transferring device 12 is equipped with a segment mounting holder having a fork section 13a, the holder is traveled along the hoist rails 10, and it is so constructed that slant movement and up the down motion can be made. An assembled segment 5 conveyed to the backward truck 11 from a tunnel outlet by a segment carrying truck 20 is mounted on the fork section 13a of the segment transferring device 12, and it is directly conveyed to a segment supply position along the hoist rails 10. Accordingly, even in case of curve execution, the segment can be accurately supplied to the supply position.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、シールド掘進機の
セグメント搬送方法及びその装置に係り、特に、シール
ド掘進機の後方台車まで運ばれてきたセグメントを、エ
レクターのセグメント把持装置に対する供給位置まで搬
送するためのセグメント搬送方法及びその装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for transporting a segment of a shield machine, and more particularly to transporting a segment transported to a rear carriage of a shield machine to a supply position for a segment gripping device of an erector. The present invention relates to a segment transporting method and a device therefor.

【0002】[0002]

【従来の技術】シールド掘進機により地山を掘削してト
ンネルを構築する際、シールド掘進機で掘削したトンネ
ル壁内面を補強するために複数のセグメントを順次リン
グ状に組み立てて行く。このとき、セグメントの組み立
てはシールド掘進機に設置されているエレクターにより
行う。一般的なセグメントの組み立て手順としては、ま
ずこれから組み立てようとするセグメント(以下、組立
セグメント)をセグメント搬送台車によりトンネル坑口
からシールド掘進機の後方台車まで運び、続いてホイス
ト等の搬送装置により組立セグメントを後方台車からエ
レクター近傍まで搬送し、その後エレクターの把持装置
で組立セグメントを把持して所定位置まで持って行き組
み立てる。
2. Description of the Related Art When a tunnel excavator excavates a natural ground to construct a tunnel, a plurality of segments are sequentially assembled in a ring shape in order to reinforce an inner surface of a tunnel wall excavated by the shield excavator. At this time, the segment is assembled by the erector installed in the shield machine. As a general segment assembly procedure, first, the segment to be assembled (hereinafter referred to as an assembly segment) is carried by the segment carrier from the tunnel entrance to the rear carrier of the shield machine, and then by the carrier device such as a hoist. Is transported from the rear carriage to the vicinity of the erector, and then the erector's gripping device grips the assembly segment to bring it to a predetermined position for assembly.

【0003】このようなセグメントの組み立てにおいて
は、エレクターの把持装置による組立セグメントの把持
作業を迅速に行うために、搬送装置により組立セグメン
トを後方台車からエレクター近傍まで搬送する際、エレ
クターの把持装置に対する供給位置に正確に搬送するこ
とが必要であり、そのための装置として例えば実開昭6
3−71299号公報に開示のものが知られている。
In the assembly of such a segment, in order to quickly perform the work of gripping the assembly segment by the gripping device of the erector, when the assembly segment is transported from the rear carriage to the vicinity of the erector by the transport device, the gripping device of the erector is It is necessary to accurately convey the material to the supply position.
The one disclosed in Japanese Patent Publication No. 3-71299 is known.

【0004】上記実開昭63−71299号公報に記載
されている装置は、シールド本体の上部に1本のホイス
トレールを取り付け、このホイストレールにホイストを
懸架すると共に、シールド本体の中央部に2本のビーム
を取り付け、このビームにストッパを備えたセグメント
搬入機を懸架し、まずホイストによりセグメント搬送台
車上の組立セグメントを吊り上げ、組立セグメントの長
手方向をトンネル軸方向に合わせた状態でホイストをホ
イストレールに沿ってセグメント搬入機まで移動させ、
その位置でホイストに吊り下げられた組立セグメントを
90度回転させてセグメント搬入機に下ろし、続いてセ
グメント搬入機をビームに沿って前方に移動させ、組立
セグメントの吊金具がエレクターの吊ビームの吊金物の
直下位置まで来たら、ストッパによりセグメント搬入機
を停止させるものである。
In the device disclosed in Japanese Utility Model Laid-Open No. 63-71299, one hoist rail is attached to the upper part of the shield main body, the hoist is suspended on this hoist rail, and two hoist rails are installed at the center of the shield main body. Attach the beam of the book, suspend the segment carry-in machine equipped with the stopper on this beam, first hoist the assembly segment on the segment carrier by the hoist, and hoist the hoist with the longitudinal direction of the assembly segment aligned with the tunnel axis direction. Move along the rail to the segment loading machine,
Rotate the assembly segment suspended by the hoist at that position by 90 degrees and lower it to the segment carry-in machine, and then move the segment carry-in machine forward along the beam. The segment carry-in machine is stopped by the stopper when it reaches the position directly below the metal object.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記従
来技術には以下のような問題点がある。 1)ホイスト用のホイストレールはシールド本体と後方
台車との間に渡され、セグメント搬入機用のビームはシ
ールド本体に固定されるため、シールド掘進機が直線掘
進する場合はホイストレールとビームとは並行となる
が、シールド掘進機がカーブ掘進する場合は両者間の並
行関係にずれが生じる。また、エレクターの近傍には、
送排泥管(またはスクリューコンベア)、後方デッキ、
真円保持器等が設置されているため、ホイストからセグ
メント搬入機への組立セグメントの受け渡しはエレクタ
ーから離れたところで行わなければならない。
However, the above-mentioned prior art has the following problems. 1) The hoist rail for the hoist is passed between the shield main body and the rear bogie, and the beam for the segment carry-in machine is fixed to the shield main body. It is parallel, but when the shield machine excavates a curve, the parallel relationship between the two is displaced. Also, near the erector,
Mud pipe (or screw conveyor), rear deck,
Since the perfect circle cage etc. are installed, the transfer of the assembled segment from the hoist to the segment carry-in machine must be done away from the erector.

【0006】従って、曲線施工時の組立セグメントの搬
送においては、エレクターから離れた位置でホイストに
より運ばれてきた組立セグメントをセグメント搬入機に
下ろした後、セグメント搬入機がストッパにより停止す
る位置まで移動させたとき、組立セグメントの吊金具の
位置が吊ビームの吊金物の直下位置からずれてしまう。
このようなずれが生じると、吊ビームの吊金物が組立セ
グメントの吊金具の真上に来るように手動操作により吊
ビームを動かす必要があり、エレクターが組立セグメン
トを把持するのに時間がかかる。そこで、組立セグメン
トの吊金具の位置が吊ビームの吊金物の直下位置からず
れないようにセグメント搬入機上で位置調整する必要が
ある。しかし、この場合には組立セグメントの位置調整
をするための装置が必要となり、そのためにシールド掘
進機内下部のスペースがとられる。
Therefore, in the transportation of the assembly segment at the time of curve construction, after the assembly segment carried by the hoist at a position away from the erector is lowered onto the segment carry-in machine, the segment carry-in machine is moved to a position where it is stopped by the stopper. When this is done, the position of the hanging metal fitting of the assembly segment is displaced from the position directly below the hanging metal object of the hanging beam.
When such a shift occurs, it is necessary to manually move the suspension beam so that the suspended metal member of the suspension beam is directly above the suspension metal fitting of the assembly segment, and it takes time for the erector to grip the assembly segment. Therefore, it is necessary to adjust the position on the segment carry-in machine so that the position of the hanging metal fitting of the assembly segment does not deviate from the position directly below the hanging object of the hanging beam. However, in this case, a device for adjusting the position of the assembly segment is required, which requires a space under the shield machine.

【0007】2)上記のようにエレクターの後方にはホ
イスト用のホイストレール及びセグメント搬入機用のビ
ームといった2種類のレールが配設されているが、既に
述べたようにエレクターの後方には多くの機器が設置さ
れているため、ホイストとセグメント搬入機が干渉する
ことなく組立セグメントを受け渡すことができるように
2種類のレールを配置するのは難しい。
2) As described above, two types of rails, such as a hoist rail for hoists and a beam for a segment carry-in machine, are provided behind the erector, but as already mentioned, many are behind the erector. Since the equipment is installed, it is difficult to arrange the two types of rails so that the hoist and the segment carry-in machine can transfer the assembled segment without interference.

【0008】3)ホイストからセグメント搬入機に組立
セグメントを受け渡す際には、組立セグメントを90度
回転させるスペースが必要となるため、セグメント搬入
機を少なくともそのスペース分だけ後方に移動させる必
要があり、その分ビームが長くなる。
3) When the assembly segment is transferred from the hoist to the segment carry-in machine, a space for rotating the assembly segment by 90 degrees is required. Therefore, it is necessary to move the segment carry-in machine backward by at least that space. , The beam becomes longer by that amount.

【0009】4)セグメント搬入機はホイストから組立
セグメントを受け取った後、ビームに沿って前方に移動
してエレクターに組立セグメントを受け渡すが、この際
セグメント搬入機がシールド掘進機内の下部空間を占有
するため、作業員の行き来、資材の搬送がしづらい。ま
た、セグメント搬入機が移動する区間には通常真円保持
器が設置されているため、その区間でセグメント搬入機
を移動させるには、真円保持器を取り付けないか、ある
いは真円保持器の形状を例えば上突っ張りタイプのもの
に変更する必要がある。
4) The segment carry-in machine, after receiving the assembled segment from the hoist, moves forward along the beam and delivers the assembled segment to the erector, where the segment carry-in machine occupies the lower space in the shield machine. Therefore, it is difficult for workers to come and go and materials to be transported. In addition, since the perfect circle holder is usually installed in the section where the segment carry-in machine moves, in order to move the segment carry-in machine in that section, either the perfect circle holder is not attached or the perfect circle holder is installed. It is necessary to change the shape to, for example, an upper strut type.

【0010】本発明の目的は、コンパクトでスペースを
とらず、曲線施工に起因する位置調整が不要なセグメン
ト搬送方法及びその装置を提供することにある。
An object of the present invention is to provide a segment transfer method and its apparatus which are compact and do not occupy space and do not require position adjustment due to curved construction.

【0011】[0011]

【課題を解決するための手段】[Means for Solving the Problems]

1)上記の目的を達成するために、本発明は、シールド
掘進機のエレクターによりセグメントを順次リング状に
組み立てる際、セグメント搬送台車によりシールド掘進
機の後方台車まで運ばれてきたセグメントを、前記エレ
クターのセグメント把持装置に対する供給位置まで搬送
するセグメント搬送方法において、前記後方台車から前
記エレクターの近くまで伸びるレールを設け、前記後方
台車まで運ばれてきたセグメントを前記レールに懸架さ
れて移動するセグメント移送装置により直接、前記供給
位置まで搬送するものとする。
1) In order to achieve the above-mentioned object, the present invention relates to the erector when the segment is sequentially assembled into a ring shape by the erector of the shield machine, and the segment carried by the segment carrier is to the rear carriage of the shield machine. In the segment transporting method for transporting to a supply position for the segment gripping device, a segment transfer device is provided, in which a rail extending from the rear carriage to a position near the erector is provided, and a segment transported to the rear carriage is suspended and moved by the rail. Is directly conveyed to the supply position.

【0012】以上のように構成した本発明のセグメント
搬送方法においては、後方台車まで運ばれてきたセグメ
ントをセグメント移送装置によりレールに沿って直接、
供給位置まで搬送することにより、曲線施工時において
もセグメントを正確に供給位置に供給することができ、
曲線施工に起因するセグメントの位置調整を行う必要は
なく、そのための装置を取り付ける必要はない。また、
後方台車からエレクターの近くまで伸びるレールを設け
るだけなので、従来のようにエレクターの後方に2種類
のレールを設けた場合に比べて、シールド掘進機内の占
有スペースを少なくすることができる。
In the segment transfer method of the present invention configured as described above, the segment transferred to the rear carriage is directly transferred along the rail by the segment transfer device.
By transporting to the supply position, it is possible to accurately supply the segment to the supply position even during curved construction.
It is not necessary to adjust the position of the segment due to the curved construction, and it is not necessary to attach a device for that purpose. Also,
Since only the rail extending from the rear bogie to the vicinity of the erector is provided, the occupied space in the shield machine can be reduced as compared with the conventional case where two types of rails are provided behind the erector.

【0013】2)上記セグメント搬送方法において、好
ましくは、前記後方台車にセグメント仮受け台を設け、
前記後方台車まで運ばれてきたセグメントを一旦そのセ
グメント仮受け台に仮受けし、その後この仮受けしたセ
グメントを前記セグメント移送装置により直接、前記供
給位置まで搬送する。
2) In the above segment transfer method, preferably, the rear carriage is provided with a segment temporary receiving base,
The segment that has been conveyed to the rear carriage is temporarily received by the temporary holder for the segment, and then the temporarily received segment is directly conveyed to the supply position by the segment transfer device.

【0014】3)また、好ましくは、前記後方台車の位
置で前記レールと所定の位置関係にセグメント位置決め
台を固定し、前記後方台車まで運ばれてきたセグメント
を前記レールに懸架されて移動するセグメント移設装置
により一旦前記セグメント位置決め台に移設して位置決
めし、その後この位置決めされたセグメントを前記セグ
メント移送装置により直接、前記供給位置まで搬送す
る。
3) Further, preferably, a segment positioning base is fixed at a position of the rear carriage in a predetermined positional relationship with the rail, and a segment carried to the rear carriage is suspended and moved by the rail. The segment transfer device temporarily transfers the segment to the segment positioning table and positions it, and then the segment transfer device directly conveys the segment to the supply position.

【0015】4)また、上記の目的を達成するために、
本発明は、シールド掘進機のエレクターによりセグメン
トを順次リング状に組み立てる際、セグメント搬送台車
によりシールド掘進機の後方台車まで運ばれてきたセグ
メントを、前記エレクターのセグメント把持装置に対す
る供給位置まで搬送するセグメント搬送装置において、
前記後方台車から前記エレクターの近くまで渡されたレ
ールと、前記レールに移動可能に懸架され、前記後方台
車まで運ばれてきたセグメントを直接、前記供給位置ま
で搬送するセグメント移送装置とを備え、前記セグメン
ト移送装置は、前方に突き出したフォーク部を有するセ
グメント載置用の架台と、前記レールに係合する走行装
置と、前記架台を前記走行装置に対して上下動させる上
下動装置とを備えるものとする。
4) Further, in order to achieve the above object,
The present invention, when the segments are sequentially assembled into a ring shape by the erector of the shield machine, the segment conveyed by the segment carrier to the rear carriage of the shield machine is transported to the supply position for the segment gripping device of the erector. In the transport device,
A rail passed from the rear carriage to near the erector, and a segment transfer device that is movably suspended on the rail and directly conveys the segment conveyed to the rear carriage to the supply position; The segment transfer device includes a segment mounting base having a fork portion protruding forward, a traveling device that engages with the rail, and a vertical movement device that vertically moves the platform with respect to the traveling device. And

【0016】以上のように構成した本発明のセグメント
搬送装置においては、セグメント移送装置の上下動装置
によりセグメント載置用の架台を走行装置に対して上下
動させて後方台車まで運ばれてきたセグメントを架台に
載置し、その状態で走行装置をレールに沿って走行させ
て架台に載置されたセグメントを直接、供給位置に搬送
することにより、上述のセグメント搬送方法を実施する
ことができる。また、上下動装置により架台は走行装置
に対して上下動するので、従来のようにシールド掘進機
内の下部空間が占有されることはなく、作業員の行き
来、資材の搬送がしやすくなる。また、セグメント移送
装置をレールに沿って前方に移動させる際、真円保持器
を越えるまでは架台を上げた状態で移動させ、真円保持
器を越えてからは架台を下げて移動させることができ、
真円保持器の形状を変更する必要はなく、従来の真円保
持器をそのまま使用できる。
In the segment transfer device of the present invention having the above-mentioned structure, the segment moving device moves the segment mounting base up and down with respect to the traveling device and is transported to the rear carriage. The segment transfer method described above can be carried out by placing the vehicle on the gantry, traveling the traveling device along the rail in that state, and directly transporting the segment laid on the gantry to the supply position. Further, since the gantry moves up and down with respect to the traveling device by the vertical movement device, the lower space inside the shield machine is not occupied unlike the conventional case, and it becomes easy for workers to come and go and convey materials. Also, when moving the segment transfer device forward along the rail, it may be moved with the pedestal raised until it passes over the perfect circle retainer, and it may be lowered by moving it after passing over the perfect retainer. You can
There is no need to change the shape of the perfect circle holder, and the conventional perfect circle holder can be used as it is.

【0017】5)上記セグメント搬送装置において、好
ましくは、前記レールは前記後方台車から前記エレクタ
ーの近くに至る間に下方傾斜部を有し、前記セグメント
移送装置は、前記架台を前記走行装置に対して傾動可能
に支持する傾動支持装置を更に備える。
5) In the above segment transfer device, preferably, the rail has a downward sloping portion between the rear carriage and the vicinity of the erector, and the segment transfer device positions the gantry with respect to the traveling device. And a tilting support device for tiltably supporting the device.

【0018】6)また、好ましくは、前記後方台車に設
けられ、前記後方台車まで運ばれてきたセグメントを一
旦仮受けするセグメント仮受け台を更に備える。
6) Further, preferably, it further comprises a segment temporary receiving base which is provided on the rear bogie and temporarily receives the segment carried to the rear bogie.

【0019】7)さらに、好ましくは、前記後方台車の
位置で前記レールと所定の位置関係に設置されたセグメ
ント位置決め台と、前記セグメント移送装置より後方で
前記レールに移動可能に懸架され、前記後方台車まで運
ばれてきたセグメントを前記セグメント位置決め台まで
移送して移設するセグメント移設装置とを更に備える。
7) Further, preferably, a segment positioning base installed in a predetermined positional relationship with the rail at the position of the rear carriage, and a segment positioning base suspended on the rail so as to be movable behind the segment transfer device, And a segment transfer device for transferring and transferring the segment carried to the cart to the segment positioning table.

【0020】8)この場合、好ましくは、前記セグメン
ト位置決め台は、前記レールに固定して吊り下げられた
枠組みと、前記枠組みの下部に設けられ、前記セグメン
ト移設装置より移送されたセグメントが載るベース部
と、このベース部に設けられ、前記セグメントが載ると
きにセグメントをガイドして定位置に位置決めする位置
決めブラケットとを有し、前記位置決めブラケットは上
端に内側に傾斜するガイド面を有する。
8) In this case, preferably, the segment positioning base is a frame which is fixed and suspended on the rail, and a base which is provided below the frame and on which the segment transferred by the segment transfer device is placed. And a positioning bracket that is provided on the base and that guides and positions the segment at a fixed position when the segment is mounted, and the positioning bracket has a guide surface that is inclined inward at the upper end.

【0021】[0021]

【発明の実施の形態】以下、本発明の実施形態を図面を
参照して説明する。まず、本発明の第1の実施形態を図
1〜図9により説明する。本実施形態のセグメント搬送
装置は、図1に示すようなシールド掘進機1に備えられ
るものであり、シールド掘進機1はシールド本体1Aを
有し、このシールド本体1Aの後方にはエレクター2が
設置されている。
Embodiments of the present invention will be described below with reference to the drawings. First, a first embodiment of the present invention will be described with reference to FIGS. The segment carrier of this embodiment is provided in a shield machine 1 as shown in FIG. 1, and the shield machine 1 has a shield body 1A, and an erector 2 is installed behind the shield body 1A. Has been done.

【0022】エレクター2は、シールド掘進機1により
地山を掘削してトンネルを構築する際、掘削したトンネ
ル壁内面を補強するために複数のセグメントを順次リン
グ状に組み立てていくものであり、これから組み立てよ
うとするセグメント(以下、組立セグメント)5を把持
装置4で把持し、続いて旋回モータ3によりその把持装
置4を旋回させて組立セグメント5を所定の位置に位置
決めし組み立てることによりセグメントリング30を順
次組み上げていく。ここで、把持装置4の下部には把持
用ネジ4aが設けられ、組立セグメント5の中心部には
把持用ネジ4aに合致するグラウト穴5aが設けられて
おり、把持装置4は把持用ネジ4aをグラウト穴5aに
ねじ込んで組立セグメント5を把持する。
When the shield machine 1 excavates the ground to construct a tunnel, the erector 2 sequentially assembles a plurality of segments in a ring shape to reinforce the inner surface of the excavated tunnel wall. A segment ring 30 is formed by gripping a segment to be assembled (hereinafter referred to as an assembly segment) 5 with a gripping device 4, and then rotating the gripping device 4 by a turning motor 3 to position and assemble the assembly segment 5 at a predetermined position. Will be assembled in sequence. Here, a gripping screw 4a is provided in the lower portion of the gripping device 4, and a grout hole 5a that matches the gripping screw 4a is provided in the center of the assembly segment 5, and the gripping device 4 has the gripping screw 4a. Is screwed into the grout hole 5a to grip the assembly segment 5.

【0023】シールド本体1Aの後方には、油圧機器や
電気機器等を搭載するための後方台車11が配置され、
この後方台車11は図2に示すように、セグメントリン
グ30に取り付けられた枕木6上に敷設されたレール9
に沿って走行可能である。なお、図示はしないが、枕木
6上には、トンネル坑口から後方台車11まで組立セグ
メント5を運ぶターンテーブル付きのセグメント搬送台
車20が移動するためのレールも敷設されている。
Behind the shield body 1A, a rear carriage 11 for mounting hydraulic equipment and electric equipment is arranged.
As shown in FIG. 2, the rear bogie 11 has rails 9 laid on the sleepers 6 attached to the segment rings 30.
You can drive along. Although not shown, rails are also laid on the sleepers 6 for moving a segment carrier 20 with a turntable that carries the assembly segment 5 from the tunnel well to the rear carrier 11.

【0024】後方台車11からエレクター2の近くまで
は左右2本のホイストレール10が渡され、このホイス
トレール10は、エレクター2側ではシールド本体1A
に取り付けられた後方デッキ14にピン結合され、後方
台車11側では上フレーム11aにピン結合され、後方
台車11からエレクター2の近くに至る間に下方傾斜部
10aを有している。
From the rear carriage 11 to the vicinity of the erector 2, two left and right hoist rails 10 are passed, and the hoist rail 10 has a shield body 1A on the side of the erector 2.
It is pin-connected to the rear deck 14 attached to the rear deck 11, and is pin-connected to the upper frame 11a on the rear bogie 11 side, and has a downward inclined portion 10a between the rear bogie 11 and the vicinity of the erector 2.

【0025】ホイストレール10にはセグメント移送装
置12が懸架され、このセグメント移送装置12はホイ
ストレール10に沿って後方台車11の位置からエレク
ター2の近くまで移動し、セグメント搬送台車20によ
りトンネル坑口から後方台車11まで運ばれてきた組立
セグメント5をセグメント供給位置まで搬送する。ここ
で、セグメント供給位置とは、エレクター2の把持装置
4が図1に示す位置(以下、初期位置)にあるときに、
セグメント移送装置12の架台13(後述)に載置され
た組立セグメント5のグラウト穴5aが把持装置4の把
持用ネジ4aのほぼ直下に来る位置(図1の2点鎖線A
の位置)である。
A segment transfer device 12 is suspended on the hoist rail 10. The segment transfer device 12 moves along the hoist rail 10 from the position of the rear carriage 11 to the vicinity of the erector 2 and is moved from the tunnel well by the segment transfer carriage 20. The assembly segment 5 that has been transported to the rear carriage 11 is transported to the segment supply position. Here, the segment supply position means that when the gripping device 4 of the erector 2 is at the position shown in FIG. 1 (hereinafter, initial position),
The position where the grout hole 5a of the assembly segment 5 placed on the frame 13 (described later) of the segment transfer device 12 is almost directly below the gripping screw 4a of the gripping device 4 (two-dot chain line A in FIG. 1).
Position).

【0026】セグメント移送装置12は、図3及び図4
に示すように、前方に突き出したフォーク部13aを有
するセグメント載置用の架台13と、ホイストレール1
0に係合する走行装置34と、架台13を走行装置34
に対して傾動可能に支持する傾動支持装置35と、架台
13を走行装置34に対して上下動させる上下動装置3
6とを有している。
The segment transfer device 12 is shown in FIGS.
As shown in FIG. 1, a segment mounting base 13 having a fork portion 13a protruding forward, and a hoist rail 1
The traveling device 34 that engages with the
And a vertical movement device 3 for vertically moving the gantry 13 with respect to the traveling device 34.
6.

【0027】走行装置34は上フレーム40を有し、こ
の上フレーム40にはホイストレール10に係合するガ
イドホイール48が取り付けられている。また、上フレ
ーム40には電動機47が取り付けられ、この電動機4
7には、ホイストレール10の下部に取り付けられたラ
ック49にかみ合う駆動ピニオン46が取り付けられ、
電動機47を回転させると駆動ピニオン46が回転駆動
してラック49上を移動し、これに伴い上フレーム40
がガイドホイール48にガイドされてホイストレール1
0上を走行する。
The traveling device 34 has an upper frame 40, and a guide wheel 48 engaging with the hoist rail 10 is attached to the upper frame 40. An electric motor 47 is attached to the upper frame 40, and the electric motor 4
7, a drive pinion 46 that engages with a rack 49 attached to the bottom of the hoist rail 10 is attached,
When the electric motor 47 is rotated, the drive pinion 46 is rotationally driven to move on the rack 49, and accordingly, the upper frame 40
Is guided by the guide wheel 48 and the hoist rail 1
Run over 0.

【0028】傾動支持装置35は、上フレーム40にピ
ン50を介して連結された下フレーム41と、上フレー
ム40と下フレーム41との間に設けられた油圧ジャッ
キ51とを有し、ホイストレール10が傾斜している時
は、上フレーム40に設けられた図示しない傾斜計の検
出値に基づき、図1の2点鎖線Bに示す水平位置に架台
13が保たれるように油圧ジャッキ51を制御する。
The tilt support device 35 has a lower frame 41 connected to the upper frame 40 via a pin 50 and a hydraulic jack 51 provided between the upper frame 40 and the lower frame 41. When 10 is tilted, the hydraulic jack 51 is set so that the pedestal 13 is kept at the horizontal position shown by the two-dot chain line B in FIG. 1 based on the detection value of the inclinometer (not shown) provided on the upper frame 40. Control.

【0029】上下動装置36は下フレーム41より垂下
するガイドポスト42を有し、このガイドポスト42に
架台13が上下動可能に取り付けられている。また、上
下動装置36は下フレーム41上に取り付けられたウィ
ンチ43を有し、このウィンチ43がシーブ44を介し
てワイヤ45を巻取ることで架台13はガイドポスト4
2にガイドされ上下動する。
The vertical movement device 36 has a guide post 42 hanging from the lower frame 41, and the pedestal 13 is attached to the guide post 42 so as to be vertically movable. Further, the vertical movement device 36 has a winch 43 mounted on the lower frame 41, and the winch 43 winds the wire 45 through the sheave 44, so that the gantry 13 is moved to the guide post 4 and
It is guided by 2 and moves up and down.

【0030】架台13は下フレーム41よりも前方に突
きだした2本のフォーク部13aを有し、このフォーク
部13aの上に組立セグメント5を載置する。なお、走
行装置34の走行及び架台13の上下動の制御は、オペ
レータが図示しないペンダントスイッチを操作すること
により行う。
The pedestal 13 has two fork portions 13a protruding forward from the lower frame 41, and the assembly segment 5 is placed on the fork portions 13a. The traveling of the traveling device 34 and the vertical movement of the gantry 13 are controlled by an operator operating a pendant switch (not shown).

【0031】また、エレクター2の後方には、組み立て
られたセグメントリング30を真円に保持する真円保持
器7が設置され、シールド本体1Aには図示しないカッ
ターで掘削した土砂をシールド本体1Aの後方に排出す
るスクリューコンベア8が設置されている。
A perfect circle holder 7 for holding the assembled segment ring 30 in a perfect circle is installed behind the erector 2, and earth and sand excavated by a cutter not shown in the shield body 1A is provided in the shield body 1A. A screw conveyor 8 that discharges backward is installed.

【0032】以上のように構成したセグメント搬送装置
により、組立セグメント5をセグメント供給位置まで搬
送する方法を説明する。まずトンネル坑口にて組立セグ
メント5をセグメント搬送台車20に載せ、そのセグメ
ント搬送台車20を後方台車11まで移動させる。この
とき、組立セグメント5は長手方向をトンネル軸方向に
向けた状態で運び、後方台車11の位置で組立セグメン
ト5を90度回転させて長手方向をトンネル円周方向に
向ける。図2は組立セグメント5を90度回転させた後
の状態を示している。
A method of transporting the assembled segment 5 to the segment supply position by the segment transporting device configured as described above will be described. First, the assembly segment 5 is placed on the segment carrier 20 at the tunnel entrance, and the segment carrier 20 is moved to the rear carrier 11. At this time, the assembly segment 5 is carried with its longitudinal direction oriented in the tunnel axial direction, and the assembly segment 5 is rotated 90 degrees at the position of the rear carriage 11 so that the longitudinal direction is oriented in the tunnel circumferential direction. FIG. 2 shows a state after the assembly segment 5 is rotated 90 degrees.

【0033】次に、オペレータがペンダントスイッチ
(図示せず)を操作して、セグメント移送装置12をセ
グメント搬送台車20の後方まで移動させる。次いで、
架台13のフォーク部13aを組立セグメント5とセグ
メント搬送台車20の間に入り込むのが可能な高さまで
下げてからセグメント移送装置12を前方に移動させ、
フォーク部13aが組立セグメント5とセグメント搬送
台車20の間に入り込んだらフォーク部13aを上げて
組立セグメント5をすくい上げる。次いで、セグメント
移送装置12を真円保持器7を越える位置まで前進させ
る。
Next, the operator operates a pendant switch (not shown) to move the segment transfer device 12 to the rear of the segment carrier truck 20. Then
Lower the fork portion 13a of the gantry 13 to a height at which it can be inserted between the assembly segment 5 and the segment transport carriage 20, and then move the segment transfer device 12 forward,
When the fork portion 13a enters between the assembly segment 5 and the segment carrier truck 20, the fork portion 13a is raised to scoop up the assembly segment 5. Then, the segment transfer device 12 is advanced to a position beyond the perfect circle holder 7.

【0034】次いで、組立セグメント5をエレクター2
の把持装置4に供給できる高さまでフォーク部13aを
下げてから、セグメント移送装置12をセグメント供給
位置まで前進させて待機する。ここで、セグメント移送
装置12は、走行装置34及び傾動支持装置35よりも
前方に突き出されたフォーク部13aの上に組立セグメ
ント5を載せる構造としているため、走行装置34及び
傾動支持装置35をエレクター2の旋回範囲に入れず
に、組立セグメント5を把持装置4の下に供給すること
が可能である。つまり、エレクター2が前のセグメント
を組み立てている最中に、セグメント移送装置12がフ
ォーク部13aに組立セグメント5を載せてセグメント
供給位置まで前進し、待機していることが可能である。
Next, the assembly segment 5 is attached to the erector 2.
After lowering the fork portion 13a to a height at which it can be supplied to the gripping device 4, the segment transfer device 12 is advanced to the segment supply position and stands by. Here, since the segment transfer device 12 has a structure in which the assembly segment 5 is placed on the fork portion 13a protruding forward of the traveling device 34 and the tilt supporting device 35, the traveling device 34 and the tilt supporting device 35 are mounted on the erector. It is possible to feed the assembly segment 5 below the gripping device 4 without going into the swiveling range of 2. That is, while the erector 2 is assembling the previous segment, the segment transfer device 12 can put the assembly segment 5 on the fork portion 13a, advance to the segment supply position, and stand by.

【0035】エレクター2により前セグメントの組み立
てが終了すると、把持装置4を旋回させて初期位置(前
述)まで戻し、続いて把持用ネジ4aを回転させながら
把持装置4を下方に移動させ、セグメント供給位置にあ
る組立セグメント5を把持し、続いて把持装置4を所定
位置まで旋回させてその組立セグメント5の組み立てを
行う。
When the assembly of the front segment is completed by the erector 2, the gripping device 4 is swung to return to the initial position (described above), and then the gripping device 4 is moved downward while rotating the gripping screw 4a to supply the segment. The assembly segment 5 in the position is gripped, and then the gripping device 4 is rotated to a predetermined position to assemble the assembly segment 5.

【0036】ここで、比較例として、実開昭63−71
299号公報に記載されている装置を応用したセグメン
ト搬送装置を用いて組立セグメントをセグメント供給位
置まで搬送する方法を説明する。
Here, as a comparative example, the actual construction of Shokai Sho 63-71 is used.
A method of transporting an assembly segment to a segment supply position using a segment transport device to which the device described in Japanese Patent No. 299 is applied will be described.

【0037】図5に上記公報に記載されている装置を応
用したセグメント搬送装置を示す。図5において、シー
ルド掘進機80のシールド本体80Aと後方台車81の
間には1本のホイストレール83が渡され、このホイス
トレール83にはホイスト84が懸架され、このホイス
ト84は吊金具85aが取り付けられた組立セグメント
85をセグメント搬送台車87から吊り上げてホイスト
レール83に沿って前方へ移動する。ホイストレール8
3の下方には2本のビーム90がシールド本体80Aに
一体に取り付けられ、これらのビーム90にはセグメン
ト搬入機91が懸架されている。このセグメント搬入機
91は、停止ストッパ99及び位置決めストッパ98が
設けられ組立セグメント85を載置する腕部93と、こ
の腕部93に載置された組立セグメント85を位置決め
ストッパ98側に引き寄せる位置決め装置94とを有
し、ホイスト84から組立セグメント85を受け取って
からビーム90に沿って、組立セグメント85の吊金具
85aがエレクター95の吊ビーム96の下部に設けら
れている吊金物96aのほぼ直下に来る位置まで移動す
る。
FIG. 5 shows a segment transfer device to which the device described in the above publication is applied. In FIG. 5, one hoist rail 83 is passed between the shield body 80A of the shield machine 80 and the rear bogie 81, and a hoist 84 is suspended on the hoist rail 83. The attached assembly segment 85 is lifted from the segment carrier 87 and moved forward along the hoist rail 83. Hoist rail 8
Two beams 90 are integrally attached to the shield main body 80A below 3, and a segment carry-in device 91 is suspended on these beams 90. This segment carry-in machine 91 is provided with a stop stopper 99 and a positioning stopper 98, and an arm portion 93 on which the assembly segment 85 is mounted, and a positioning device for pulling the assembly segment 85 mounted on the arm portion 93 toward the positioning stopper 98. 94, and along with the beam 90 after receiving the assembly segment 85 from the hoist 84, the hanging metal fitting 85a of the assembly segment 85 is provided substantially directly below the hanging metal object 96a provided under the hanging beam 96 of the erector 95. Move to the position where you come.

【0038】上記のように構成したセグメント搬送装置
を用いてセグメント搬送を行う場合の手順は以下のよう
になる。 1)セグメント搬送台車87上の組立セグメント85を
ホイスト84により吊り上げる。 2)組立セグメント85の長手方向をトンネル軸方向に
向けた状態で、ホイスト84を図中実線位置にあるセグ
メント搬入機91の前方まで移動させる。 3)ホイスト84に吊り下げられた組立セグメント85
を90度回転させて長手方向を円周方向に向ける。 4)ホイスト84とセグメント搬入機91のトンネル軸
方向位置を合わせ、組立セグメント85をセグメント搬
入機91の腕部93に下ろす。 5)位置決め装置94により腕部93に載置された組立
セグメント85を位置決めストッパ98側に引き寄せ
る。 6)停止ストッパ99がエレクター95に当たるまでセ
グメント搬入機91を前方に移動させる。 7)エレクター95によりセグメント搬入機91上の組
立セグメント85を把持する。
The procedure for carrying a segment by using the segment carrying device configured as described above is as follows. 1) The assembly segment 85 on the segment carrier truck 87 is lifted by the hoist 84. 2) With the longitudinal direction of the assembly segment 85 oriented in the tunnel axis direction, the hoist 84 is moved to the front of the segment carry-in machine 91 at the solid line position in the figure. 3) Assembly segment 85 suspended from hoist 84
Is rotated 90 degrees to orient the longitudinal direction in the circumferential direction. 4) Align the hoist 84 and the segment carry-in machine 91 in the tunnel axial direction, and lower the assembly segment 85 to the arm portion 93 of the segment carry-in machine 91. 5) The positioning device 94 pulls the assembly segment 85 placed on the arm 93 toward the positioning stopper 98. 6) The segment carry-in machine 91 is moved forward until the stop stopper 99 hits the erector 95. 7) The assembled segment 85 on the segment carry-in machine 91 is gripped by the erector 95.

【0039】以上において、ホイストレール83は、シ
ールド本体80A及び後方台車81にピン結合され、ビ
ーム90はシールド本体80Aに固定される。このた
め、シールド掘進機80が直線掘進する場合には、図6
(a)に示すように、ホイストレール83とビーム90
とは並行となるので、ホイスト84により運ばれてきた
セグメント85をセグメント搬入機91に下ろすと、2
点鎖線で示したように組立セグメント85の吊金具85
a(図中S)がセグメント搬入機91の中心線O(掘進
経路に一致)上に位置し、この状態でセグメント搬入機
91を停止ストッパ99がエレクター95に当たるまで
移動させたときには、実線で示したように組立セグメン
ト85の吊金具85aは吊ビーム96の吊金物96aの
直下位置(図中K)に来る。
In the above, the hoist rail 83 is pin-coupled to the shield body 80A and the rear carriage 81, and the beam 90 is fixed to the shield body 80A. Therefore, when the shield machine 80 travels straight,
As shown in (a), the hoist rail 83 and the beam 90
Since it is in parallel with, when the segment 85 carried by the hoist 84 is lowered to the segment carry-in machine 91,
As shown by the dotted line, the hanging metal fitting 85 of the assembly segment 85
a (S in the figure) is located on the center line O (corresponding to the excavation route) of the segment loading machine 91, and in this state, when the segment loading machine 91 is moved until the stop stopper 99 hits the erector 95, it is indicated by a solid line. As described above, the hanging metal fitting 85a of the assembly segment 85 comes to a position (K in the figure) immediately below the hanging metal object 96a of the hanging beam 96.

【0040】しかし、シールド掘進機1がカーブ掘進す
る場合には、図6(b)に示すようにホイストレール8
3とビーム90と間の並行関係にずれが生じるので、ホ
イスト84により運ばれてきたセグメント85をセグメ
ント搬入機91に下ろすと、2点鎖線で示したように組
立セグメント85の吊金具85a(図中S)がセグメン
ト搬入機91の中心線Oからずれ、この状態でセグメン
ト搬入機91を停止ストッパ99がエレクター95に当
たるまで移動させたときには、実線で示したように組立
セグメント85の吊金具85a(図中S*)が吊ビーム
96の吊金物96aの直下位置(図中K)からずれてし
まう。
However, when the shield machine 1 excavates a curve, as shown in FIG. 6B, the hoist rail 8 is used.
Since the parallel relationship between the beam No. 3 and the beam 90 is deviated, when the segment 85 carried by the hoist 84 is lowered to the segment carry-in machine 91, the hanging metal fitting 85a of the assembly segment 85 (Fig. Medium S) deviates from the center line O of the segment carry-in machine 91, and when the segment carry-in machine 91 is moved in this state until the stop stopper 99 hits the erector 95, the hanging metal fitting 85a (of the assembly segment 85 as shown by the solid line ( S *) in the figure is displaced from the position (K in the figure) immediately below the hanging metal piece 96a of the hanging beam 96.

【0041】このとき、ホイスト84からセグメント搬
入機91への組立セグメント85の受け渡しがエレクタ
ー95の近傍で行うことができれば、セグメント位置の
ずれは小さくて済むが、エレクター95の近傍には送排
泥管(またはスクリューコンベア)、後方デッキ、真円
保持器等が設置されているため、組立セグメント85の
受け渡しは、図5に示すようなエレクター95から離れ
た位置で行わなければならない。従って、組立セグメン
ト85の吊金具85aが吊ビーム96の吊金物96aの
直下位置からずれることは避けられず、この場合には吊
金物96aが吊金具85aの真上に来るように、手動操
作により吊ビーム96を動かす必要があり、エレクター
95が組立セグメント85を把持するのに時間がかか
る。そこで、吊金具85aの位置が吊金物96aの直下
位置からずれないようにセグメント搬入機91上で位置
調整することも考えられるが、この場合には組立セグメ
ント85の位置調整をするための装置が必要となり、シ
ールド掘進機80内下部のスペースがとられる。
At this time, if the assembly segment 85 can be delivered from the hoist 84 to the segment carry-in machine 91 in the vicinity of the erector 95, the displacement of the segment position can be small. Since the pipe (or screw conveyor), the rear deck, the perfect circular holder, and the like are installed, the assembly segment 85 must be delivered at a position away from the erector 95 as shown in FIG. Therefore, it is inevitable that the hanging metal fitting 85a of the assembly segment 85 deviates from the position directly below the hanging metal fitting 96a of the hanging beam 96. In this case, the hanging metal fitting 96a is manually operated so as to come directly above the hanging metal fitting 85a. The suspension beam 96 needs to be moved and it takes time for the erector 95 to grip the assembly segment 85. Therefore, it is possible to adjust the position on the segment carry-in device 91 so that the position of the hanging metal fitting 85a does not deviate from the position directly below the hanging hardware 96a. In this case, however, a device for adjusting the position of the assembly segment 85 is used. It is necessary, and the space below the shield machine 80 is taken.

【0042】また、エレクター95の近傍には、上記の
ように多くの機器が設置されていてスペースが少ないた
め、ホイスト84とセグメント搬入機91が干渉せずに
セグメント85を受け渡すことができるように、ホイス
トレール83及びビーム90を配置するのは難しい。ま
た、ホイスト84からセグメント搬入機91にセグメン
ト85を受け渡す際には、セグメント85を90度回転
させるスペースが必要となるため、セグメント搬入機9
1を少なくともそのスペース分だけ後方に移動させる必
要があり、ビーム90が長くなる。さらに、セグメント
搬入機91はホイスト84から組立セグメント85を受
け取った後、ビーム90に沿って前方に移動してエレク
ター95に組立セグメント85を受け渡すが、この場合
セグメント搬入機91がシールド掘進機1内の下部空間
を占有するため、作業員の行き来、資材の搬送がしづら
い。また、セグメント搬入機91が移動する区間には通
常真円保持器が設置されているため、その区間でセグメ
ント搬入機91を移動させるには、真円保持器を取り付
けないようにするか、あるいは真円保持器の形状を例え
ば上突っ張りタイプのものに変更する必要がある。
Since many devices are installed near the erector 95 and the space is small as described above, the hoist 84 and the segment carry-in machine 91 can deliver the segment 85 without interfering with each other. In addition, it is difficult to arrange the hoist rail 83 and the beam 90. In addition, when the segment 85 is transferred from the hoist 84 to the segment carry-in machine 91, a space for rotating the segment 85 by 90 degrees is required.
1 must be moved backwards by at least that space, which lengthens beam 90. Further, after the segment carry-in machine 91 receives the assembly segment 85 from the hoist 84, it moves forward along the beam 90 and delivers the assembly segment 85 to the erector 95. In this case, the segment carry-in machine 91 is operated by the shield machine 1 Since it occupies the lower space inside, it is difficult for workers to come and go and transport materials. Further, since the perfect circle holder is usually installed in the section where the segment carry-in machine 91 moves, in order to move the segment carry-in machine 91 in that section, the perfect circle holder is not attached, or It is necessary to change the shape of the perfect circle retainer to, for example, an upper strut type.

【0043】これに対し本実施形態においては、後方台
車11まで運ばれてきた組立セグメント5をセグメント
移送装置12のフォーク部13a上に載せ、その状態の
ままセグメント移送装置12をホイストレール10に沿
って直接エレクター2の位置まで移動させるので、図7
(a),(b)に示すように、シールド掘進機1がカー
ブ掘進する場合も、直線掘進する場合と同様に、組立セ
グメント5をセグメント供給位置に確実に搬送すること
ができる。これにより、曲線施工に起因する組立セグメ
ント5の位置調整を行う必要はなく、比較例のようなセ
グメント搬入機上で組立セグメントを位置調整するため
の装置を取り付ける必要がなく、シールド掘進機1内下
部のスペースを確保できる。
On the other hand, in the present embodiment, the assembly segment 5 carried to the rear carriage 11 is placed on the fork portion 13a of the segment transfer device 12, and the segment transfer device 12 is placed along the hoist rail 10 in that state. Since it is moved directly to the position of Erector 2,
As shown in (a) and (b), even when the shield machine 1 excavates in a curve, the assembly segment 5 can be reliably conveyed to the segment supply position, as in the case of straight line excavation. Thereby, it is not necessary to adjust the position of the assembly segment 5 due to the curved construction, and it is not necessary to install a device for adjusting the position of the assembly segment on the segment carry-in machine as in the comparative example. You can secure the space at the bottom.

【0044】また、シールド本体1Aの後方デッキ14
と後方台車11との間にホイストレール10を配置する
だけなので、シールド掘進機1内の機器設置空間が少な
くてすみ、ホイストレール10及びセグメント移送装置
12の配置が容易である。さらに、セグメント移送装置
12のフォーク部13aは上フレーム40に設けられた
ウィンチ43により上下動するので、比較例のようにシ
ールド掘進機内の下部空間が占有されることはなく、作
業員の行き来、資材の搬送がしやすくなる。また、セグ
メント移送装置12をホイストレール10に沿って前方
に移動させる際、真円保持器7を越えるまではフォーク
部13aを上げた状態で移動させ、真円保持器7を越え
てからはフォーク部13aを下げて移動させることがで
き、真円保持器7の形状を変更する必要はなく、従来の
真円保持器7をそのまま使用できる。
The rear deck 14 of the shield body 1A
Since only the hoist rail 10 is arranged between the rear bogie 11 and the rear bogie 11, the equipment installation space in the shield machine 1 is small, and the hoist rail 10 and the segment transfer device 12 can be arranged easily. Further, since the fork portion 13a of the segment transfer device 12 is moved up and down by the winch 43 provided on the upper frame 40, the lower space in the shield machine is not occupied unlike the comparative example, and the workers come and go. It facilitates the transportation of materials. Further, when moving the segment transfer device 12 forward along the hoist rail 10, the segment transfer device 12 is moved in a state where the fork portion 13a is raised until it passes over the perfect circle holder 7, and after moving over the perfect circle holder 7, the fork is moved. The part 13a can be lowered and moved, and it is not necessary to change the shape of the perfect circle holder 7, and the conventional perfect circle holder 7 can be used as it is.

【0045】また、エレクター2が前セグメントを組み
立てている最中にセグメント移送装置12がセグメント
供給位置まで前進し、待機することができるので、エレ
クター2が前セグメントを組み立て終わったらすぐに次
セグメントを把持しに行くことができ、セグメント組立
時間を短縮することができる。
Further, since the segment transfer device 12 can advance to the segment supply position and wait while the erector 2 is assembling the front segment, the next segment is immediately transferred after the erector 2 has assembled the front segment. It is possible to go to grip and reduce the segment assembly time.

【0046】本発明の第2の実施形態を図8及び図9に
より説明する。第1の実施形態は、セグメント移送装置
12がセグメント搬送台車20によりトンネル坑口から
後方台車11まで運ばれてきた組立セグメント5を受け
取る際に、セグメント搬送台車20から直接受け取るタ
イプのものであるが、この場合は、セグメント移送装置
12が組立セグメント5を受け取るまで、セグメント搬
送台車20は動くことができない。そこで本実施形態
は、セグメント搬送台車20により運ばれてきた組立セ
グメント5を一旦セグメント仮受け台21に仮受けする
ようにしたものである。図中、図1及び図2に示す部材
と同等の部材には同じ符号を付し、その説明を省略す
る。
A second embodiment of the present invention will be described with reference to FIGS. In the first embodiment, when the segment transfer device 12 receives the assembly segment 5 carried from the tunnel wellhead to the rear bogie 11 by the segment carrier 20, the segment carrier 12 directly receives from the segment carrier 20. In this case, the segment carrier 20 cannot move until the segment transfer device 12 receives the assembly segment 5. Therefore, in this embodiment, the assembled segment 5 carried by the segment carrier 20 is temporarily received by the segment temporary receiving table 21. In the figure, the same members as those shown in FIGS. 1 and 2 are designated by the same reference numerals, and the description thereof will be omitted.

【0047】図8及び図9において、後方台車11の前
部にはセグメント仮受け台21が設けられ、このセグメ
ント仮受け台21は油圧ジャッキ21aにより上下させ
ることによってセグメント搬送台車20上の組立セグメ
ント5をすくい上げることができる。このような構成に
おいては、セグメント搬送台車20により運ばれてきた
組立セグメント5を一旦セグメント仮受け台21ですく
い上げて仮受けし、セグメント搬送台車20には次の組
立セグメント5を取りに行かせ、その後セグメント移送
装置12のフォーク部13aでセグメント仮受け台21
に仮受けされた組立セグメント5をすくい上げ、第1の
実施形態と同様にしてセグメント供給位置まで搬送す
る。
In FIGS. 8 and 9, a segment temporary receiving base 21 is provided at the front part of the rear carriage 11 and the segment temporary receiving base 21 is moved up and down by a hydraulic jack 21a to assemble a segment on the segment transfer carriage 20. You can pick up 5. In such a configuration, the assembly segment 5 carried by the segment carrier 20 is temporarily picked up by the segment temporary receiving base 21 and temporarily received, and the segment carrier 20 is made to pick up the next assembly segment 5. Then, the fork portion 13a of the segment transfer device 12 is used to temporarily hold the segment holder 21.
The assembling segment 5 temporarily received by the above is picked up and conveyed to the segment supply position in the same manner as in the first embodiment.

【0048】以上のように構成した本実施形態によれ
ば、セグメント搬送台車20で運んできた組立セグメン
ト5をセグメント仮受け台21に受け渡したら、セグメ
ント搬送台車20に次の組立セグメント5を取りに行か
せることができ、セグメント搬送時間を短縮することが
できる。
According to the present embodiment configured as described above, when the assembly segment 5 carried by the segment carrier 20 is delivered to the segment temporary receiving base 21, the next assembly segment 5 is picked up by the segment carrier 20. Therefore, it is possible to shorten the segment transport time.

【0049】なお、本実施形態においては、セグメント
仮受け台21を油圧ジャッキ21aにより上下させて組
立セグメント5をセグメント仮受け台21に仮受けする
ものとしたが、油圧ジャッキ21aの代わりに、電動モ
ータでセグメント仮受け台21を上下させる機構を用い
てもよい。また、組立セグメント5をホイストで吊って
セグメント仮受け台21に載置してもよい。
In the present embodiment, the temporary segment holder 21 is moved up and down by the hydraulic jack 21a to temporarily receive the assembled segment 5 on the temporary segment holder 21, but instead of the hydraulic jack 21a, an electric motor is used. You may use the mechanism which raises and lowers the segment temporary stand 21 with a motor. Further, the assembly segment 5 may be hung by a hoist and placed on the segment temporary receiving base 21.

【0050】本発明の第3の実施形態を図10〜図15
により説明する。第1の実施形態においては、セグメン
ト移送装置12のフォーク部13aに組立セグメント5
を載置する際、組立セグメント5が常にセグメント搬送
台車20の決まった位置(ここではセグメント供給位置
への搬送を可能にする位置)に載置されていれば、組立
セグメント5をセグメント供給位置に確実に搬送するこ
とができるが、組立セグメント5がセグメント搬送台車
20の決まった位置に載置されていないと、組立セグメ
ント5をセグメント供給位置に搬送できなくなる。そこ
で本実施形態は、組立セグメント5がセグメント搬送台
車20に置かれている位置が一定でない場合でも、組立
セグメント5をセグメント供給位置に確実に搬送できる
ようにしたものである。図中、図1、図2及び図8に示
す部材と同等の部材には同じ符号を付し、その説明を省
略する。
A third embodiment of the present invention is shown in FIGS.
This will be described below. In the first embodiment, the assembly segment 5 is attached to the fork portion 13a of the segment transfer device 12.
If the assembly segment 5 is always placed at a fixed position of the segment transfer carriage 20 (here, a position that enables transportation to the segment supply position), the assembly segment 5 is placed at the segment supply position. Although it can be reliably transported, the assembly segment 5 cannot be transported to the segment supply position unless the assembly segment 5 is placed at a fixed position on the segment transport carriage 20. Therefore, in the present embodiment, even when the position where the assembly segment 5 is placed on the segment transfer carriage 20 is not constant, the assembly segment 5 can be reliably transferred to the segment supply position. In the figure, the same members as those shown in FIGS. 1, 2 and 8 are designated by the same reference numerals, and the description thereof will be omitted.

【0051】図10において、ホイストレール10上の
セグメント移送装置12よりも後方にはセグメント移設
装置15が移動可能に懸架され、ホイストレール10上
の後方台車11から所定距離だけ前方に離れた位置には
セグメント位置決め台16が懸架されている。
In FIG. 10, a segment transfer device 15 is movably suspended behind the segment transfer device 12 on the hoist rail 10, and is located at a position forward from the rear carriage 11 on the hoist rail 10 by a predetermined distance. The segment positioning table 16 is suspended.

【0052】セグメント移設装置15は、後方台車11
まで運ばれてきた組立セグメント5をホイストレール1
0に沿ってセグメント位置決め台16まで移送して移設
するものであり、図11及び図12に示すように、上フ
レーム60を有し、この上フレーム60にはホイストレ
ール10に係合するガイドホイール68が取り付けられ
ている。また上フレーム60には電動機67が取り付け
られ、この電動機67には、ホイストレール10の下部
に取り付けられたラック69にかみ合う駆動ピニオン6
6が取り付けられ、電動機67を回転させると駆動ピニ
オン66が回転駆動してラック69上を移動し、これに
伴い上フレーム60がガイドホイール68にガイドされ
てホイストレール10上を走行する。上フレーム60は
ワイヤ65を介して下フレーム61を吊り下げており、
上フレーム60に設けられたウィンチ63によりワイヤ
65を巻取ることで下フレーム61を上下動させる。下
フレーム61には、組立セグメント5を把持する把持金
具62が取り付けられかつ把持した組立セグメント5の
回り止めを行う位置決め用の側枠61Aが設けられてい
る。上フレーム60の走行及び下フレーム61の上下動
の制御は、オペレータが図示しないペンダントスイッチ
を操作することにより行う。
The segment relocating device 15 includes the rear carriage 11
Assembly segment 5 that has been transported to hoist rail 1
0 is to be transferred to the segment positioning base 16 and transferred, and has an upper frame 60 as shown in FIGS. 11 and 12, and a guide wheel for engaging the hoist rail 10 on the upper frame 60. 68 is attached. An electric motor 67 is attached to the upper frame 60, and a drive pinion 6 that engages with a rack 69 attached to the lower part of the hoist rail 10 is attached to the electric motor 67.
6 is attached, and when the electric motor 67 is rotated, the drive pinion 66 is rotationally driven to move on the rack 69, and accordingly, the upper frame 60 is guided by the guide wheel 68 and travels on the hoist rail 10. The upper frame 60 suspends the lower frame 61 via a wire 65,
The lower frame 61 is moved up and down by winding the wire 65 with the winch 63 provided on the upper frame 60. On the lower frame 61, a grip fitting 62 for gripping the assembly segment 5 is attached, and a side frame 61A for positioning is provided to prevent the grip of the assembly segment 5 from rotating. The traveling of the upper frame 60 and the vertical movement of the lower frame 61 are controlled by an operator operating a pendant switch (not shown).

【0053】セグメント位置決め台16は、後方台車1
1まで運ばれてきた組立セグメント5をセグメント移送
装置12のフォーク部13a上の定位置に載置されるよ
う組立セグメント5を位置決めする。ここで、組立セグ
メント5の載置位置は、セグメント移送装置12により
組立セグメント5を搬送したときに、組立セグメント5
がちょうどセグメント供給位置に来るような位置であ
る。
The segment positioning base 16 is the rear carriage 1.
The assembly segment 5 that has been transported to 1 is positioned so that it is placed at a fixed position on the fork portion 13a of the segment transfer device 12. Here, the mounting position of the assembly segment 5 is such that when the assembly segment 5 is conveyed by the segment transfer device 12,
Is a position just like the segment supply position.

【0054】セグメント位置決め台16は、図13に示
すように、ホイストレール10に固定して吊り下げられ
た枠組み19と、この枠組み19の下部に設けられ、セ
グメント移設装置15により移送された組立セグメント
5が載るベース部25と、このベース部25に設けら
れ、組立セグメント5が載るときに組立セグメント5を
ガイドしてフォーク部13a上の定位置に位置決めする
位置決めブラケット17とを有している。位置決めブラ
ケット17の上端には、図14に示すように、内側に傾
斜するテーパー状のガイド面18が設けられている。
As shown in FIG. 13, the segment positioning base 16 is a frame 19 fixed to the hoist rail 10 and hung, and an assembly segment provided under the frame 19 and transferred by the segment transfer device 15. 5 has a base portion 25 on which it rests, and a positioning bracket 17 which is provided on this base portion 25 and which guides the assembly segment 5 when it is placed and positions it at a fixed position on the fork portion 13a. As shown in FIG. 14, a taper-shaped guide surface 18 that is inclined inward is provided at the upper end of the positioning bracket 17.

【0055】また、後方台車11にはセグメント仮受け
台21が設けられ、その他の構成は図1に示すものと同
じである。
Further, the rear carriage 11 is provided with a segment temporary receiving base 21, and the other structure is the same as that shown in FIG.

【0056】以上のように構成したセグメント搬送装置
により、組立セグメント5をセグメント供給位置まで搬
送する方法を説明する。まず、オペレータはペンダント
スイッチ(図示せず)を操作して、セグメント移設装置
15を動かしセグメント仮受け台21に仮置きされた組
立セグメント5を吊り上げる(図10の位置A)。
A method of transporting the assembled segment 5 to the segment supply position by the segment transporting device configured as described above will be described. First, the operator operates a pendant switch (not shown) to move the segment transfer device 15 to suspend the assembled segment 5 temporarily placed on the temporary segment receiving base 21 (position A in FIG. 10).

【0057】次いで、セグメント移設装置15をホイス
トレール10に沿ってセグメント位置決め台16の位置
まで前進させ、吊り上げた組立セグメント5をセグメン
ト位置決め台16に下ろす(図15の位置C)。セグメ
ント位置決め台16の位置決めブラケット17の上端部
にはガイド面18が付けられているので、セグメント移
設装置15からセグメント位置決め台16に組立セグメ
ント5を下ろすと、その組立セグメント5はガイド面1
8に沿って移動してフォーク部13a上の定位置に載置
されるよう位置決めされる。その後セグメント移設装置
15をセグメント仮受け台21の位置まで移動させ、次
セグメントを吊り上げる動作に入る。
Next, the segment transfer device 15 is moved forward along the hoist rail 10 to the position of the segment positioning base 16 and the suspended assembly segment 5 is lowered onto the segment positioning base 16 (position C in FIG. 15). Since the guide surface 18 is attached to the upper end portion of the positioning bracket 17 of the segment positioning base 16, when the assembly segment 5 is lowered from the segment transfer device 15 to the segment positioning base 16, the assembly segment 5 is guided by the guide surface 1.
8 and is positioned so as to be placed at a fixed position on the fork portion 13a. After that, the segment transfer device 15 is moved to the position of the segment temporary receiving base 21, and the operation for lifting the next segment is started.

【0058】次いで、セグメント移送装置12をセグメ
ント位置決め台16の後方まで移動させ(図10の位置
B)、フォーク部13aを下ろして組立セグメント5を
すくい上げる。
Next, the segment transfer device 12 is moved to the rear of the segment positioning base 16 (position B in FIG. 10), the fork portion 13a is lowered, and the assembly segment 5 is scooped up.

【0059】次いで、第1の実施形態と同様にしてセグ
メント移送装置12をセグメント供給位置まで移動させ
る(図15の位置D)。このとき、組立セグメント5は
常にフォーク部13a上の定位置に載置された状態で搬
送されるので、組立セグメント5をセグメント搬送台車
20に置く位置が一定でなくても、組立セグメント5と
エレクター2との相対位置は常に一定であり、組立セグ
メント5は常にセグメント供給位置に確実に搬送され
る。
Then, as in the first embodiment, the segment transfer device 12 is moved to the segment supply position (position D in FIG. 15). At this time, the assembly segment 5 is always conveyed in a state of being placed in a fixed position on the fork portion 13a, so that even if the position where the assembly segment 5 is placed on the segment carrier 20 is not constant, the assembly segment 5 and the erector The relative position with respect to 2 is always constant, and the assembly segment 5 is always reliably conveyed to the segment supply position.

【0060】以上のように構成した本実施形態によれ
ば、セグメント位置決め台16により組立セグメント5
をフォーク部13a上の定位置に位置決めするので、セ
グメント搬送台車20上の組立セグメント5の載置位置
が一定でなくても、組立セグメント5をセグメント供給
位置に確実に搬送することができる。また、セグメント
位置決め台16は、ベース部25にテーパー状のガイド
面18を設けた位置決めブラケット17を取り付けただ
けの構成なので、簡単な構造で組立セグメント5をフォ
ーク部13a上の定位置に位置決めすることができる。
According to the present embodiment configured as described above, the assembly segment 5 is assembled by the segment positioning base 16.
Is positioned at a fixed position on the fork portion 13a, the assembly segment 5 can be reliably transported to the segment supply position even if the mounting position of the assembly segment 5 on the segment transport carriage 20 is not constant. Further, since the segment positioning base 16 has a structure in which the positioning bracket 17 provided with the tapered guide surface 18 is attached to the base portion 25, the assembly segment 5 is positioned at a fixed position on the fork portion 13a with a simple structure. be able to.

【0061】なお、本実施形態では、セグメント搬送台
車20で運んできた組立セグメント5をセグメント仮受
け台21に仮置きし、その後セグメント移設装置15で
セグメント仮受け台21に仮置きされた組立セグメント
5を吊り上げるものとしたが、これに限らず、セグメン
ト搬送台車20に置かれた組立セグメント5をセグメン
ト移設装置15で吊り上げてセグメント位置決め台16
に移送してもよい。
In this embodiment, the assembly segment 5 carried by the segment carrier 20 is temporarily placed on the segment temporary receiving base 21 and then the assembly segment 5 is temporarily placed on the segment temporary receiving base 21 by the segment transfer device 15. However, the present invention is not limited to this, and the assembly segment 5 placed on the segment carrier 20 is hoisted by the segment transfer device 15 to lift the segment positioning table 16
May be transferred to.

【0062】[0062]

【発明の効果】本発明によれば次のような効果が得られ
る。
According to the present invention, the following effects can be obtained.

【0063】1)セグメント移送装置はセグメント搬送
台車により後方台車まで運ばれてきたセグメントを、レ
ールに沿ってエレクターのセグメント把持装置に対する
供給位置まで直接搬送するので、曲線施工に起因するセ
グメントの位置調整を行う必要はなく、そのための装置
をシールド掘進機内に設置する必要はない。
1) Since the segment transfer device directly conveys the segment carried by the segment carrier to the rear carrier to the supply position for the segment holding device of the erector along the rail, the position adjustment of the segment due to the curved construction is performed. There is no need to carry out the above, and it is not necessary to install a device therefor in the shield machine.

【0064】2)シールド掘進機のシールド本体と後方
台車との間に1種類のレールを配置するだけなので、従
来のようなシールド本体の後方に2種類のレールを配置
した場合に比べてシールド掘進機内の占有空間が少なく
てすみ、シールド掘進機内の機器同士の干渉等が少な
く、機器配置が容易になる。
2) Since only one type of rail is arranged between the shield body and the rear bogie of the shield machine, the shield excavation is performed as compared with the conventional case where two types of rails are arranged behind the shield body. The space occupied in the machine is small, the interference between devices in the shield machine is small, and the devices can be easily arranged.

【0065】3)従来のようなセグメント搬入機が不要
となるので、構造が簡単になるとともに、作業員の行き
来、資材の搬送などがしやすくなる。
3) Since the conventional segment carry-in machine is not required, the structure is simple, and it is easy for workers to come and go and to convey materials.

【0066】4)真円保持器を越えるまではセグメント
移送装置の架台を上げ、真円保持器を越えてからはセグ
メント移送装置の架台を下げることができ、真円保持器
の形状を変更する必要はなく、従来の真円保持器を使用
できる。
4) The gantry of the segment transfer device can be raised until it goes over the perfect circle holder, and the gantry of the segment transfer device can be lowered after it goes over the perfect circle holder to change the shape of the perfect circle holder. It is not necessary and a conventional perfect circular cage can be used.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1の実施形態によるセグメント搬送
装置を備えたシールド掘進機の全体図である。
FIG. 1 is an overall view of a shield machine having a segment transfer device according to a first embodiment of the present invention.

【図2】図1のII−II線断面図である。FIG. 2 is a sectional view taken along line II-II of FIG.

【図3】図1に示すセグメント移送装置の全体図であ
る。
3 is an overall view of the segment transfer device shown in FIG. 1. FIG.

【図4】図3のIV−IV線断面図である。FIG. 4 is a sectional view taken along line IV-IV of FIG. 3;

【図5】従来の装置を応用した比較例のセグメント搬送
装置を備えたシールド掘進機の全体図である。
FIG. 5 is an overall view of a shield machine equipped with a segment transfer device of a comparative example to which a conventional device is applied.

【図6】図5に示す比較例によるセグメント搬送の様子
を示す図である。
FIG. 6 is a diagram showing a state of segment transport according to the comparative example shown in FIG.

【図7】本発明の第1の実施形態によるセグメント搬送
の様子を示す図である。
FIG. 7 is a diagram showing a state of segment transport according to the first embodiment of the present invention.

【図8】本発明の第2の実施形態によるセグメント搬送
装置を備えたシールド掘進機の全体図である。
FIG. 8 is an overall view of a shield machine having a segment transfer device according to a second embodiment of the present invention.

【図9】図8のIX−IX線断面図である。FIG. 9 is a sectional view taken along line IX-IX of FIG. 8;

【図10】本発明の第3の実施形態によるセグメント搬
送装置を備えたシールド掘進機の全体図である。
FIG. 10 is an overall view of a shield machine having a segment transfer device according to a third embodiment of the present invention.

【図11】図10に示すセグメント移設装置の全体図で
ある。
11 is an overall view of the segment transfer device shown in FIG.

【図12】図11のXII−XII線断面図である。FIG. 12 is a sectional view taken along line XII-XII of FIG. 11;

【図13】図10に示すセグメント位置決め台の全体図
である。
13 is an overall view of the segment positioning base shown in FIG.

【図14】図11のXIV−XIV線断面図である。14 is a sectional view taken along line XIV-XIV in FIG.

【図15】本発明の第3の実施形態によるセグメント搬
送の様子を示す図である。
FIG. 15 is a diagram showing a state of segment transportation according to a third embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 シールド掘進機 2 エレクター 4 把持装置 4a 把持用ネジ 5 組立セグメント 10 ホイストレール 10a 下方傾斜部 11 後方台車 12 セグメント移送装置 13 架台 13a フォーク部 15 セグメント移設装置 16 セグメント位置決め台 17 位置決めブラケット 18 ガイド面 19 枠組み 20 セグメント搬送台車 21 セグメント仮受け台 21a 油圧ジャッキ 25 ベース部 34 走行装置 35 傾動支持装置 36 上下動装置 40 上フレーム 41 下フレーム 42 ガイドポスト 43 ウィンチ 44 シーブ 45 ワイヤ 46 駆動ピニオン 47 電動機 48 ガイドホイール 49 ラック 50 ピン 51 油圧ジャッキ DESCRIPTION OF SYMBOLS 1 shield excavator 2 erector 4 gripping device 4a gripping screw 5 assembly segment 10 hoist rail 10a downward sloping part 11 rear bogie 12 segment transfer device 13 mount 13a fork part 15 segment transfer device 16 segment positioning base 17 positioning bracket 18 guide surface 19 Frame 20 Segment transport cart 21 Segment temporary support 21a Hydraulic jack 25 Base part 34 Traveling device 35 Tilt support device 36 Vertical movement device 40 Upper frame 41 Lower frame 42 Guide post 43 Winch 44 Sheave 45 Wire 46 Drive pinion 47 Electric motor 48 Guide wheel 49 rack 50 pin 51 hydraulic jack

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田村 義昭 大阪府大阪市西区阿波座一丁目3番15号 鹿島建設株式会社関西支店内 (72)発明者 平沢 幸久 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)発明者 森 泰雄 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)発明者 橋本 久儀 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)発明者 草木 貴巳 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)発明者 亀井 健 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Yoshiaki Tamura 1-3-15 Awaza, Nishi-ku, Osaka City, Osaka Prefecture Kashima Construction Co., Ltd., Kansai Branch (72) Inventor, Yukihisa Hirasawa, 650 Kandachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Company Tsuchiura Factory (72) Inventor Yasuo Mori 650 Jinrachicho, Tsuchiura City, Ibaraki Prefecture Hitachi Construction Machinery Company Tsuchiura Factory (72) Inventor Hisashi Hashimoto 650 Kintatemachi, Tsuchiura City Ibaraki Hitachi Construction Machinery Incorporated company Tsuchiura Plant (72) Inventor Takami Kusagi 650 Kandamachi, Tsuchiura City, Ibaraki Prefecture Hitachi Construction Machinery Incorporated Tsuchiura Plant (72) Inventor Ken Kamei 650 Kandamachi, Tsuchiura City Ibaraki Hitachi Construction Machinery Ceremony Company Tsuchiura Factory

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 シールド掘進機のエレクターによりセグ
メントを順次リング状に組み立てる際、セグメント搬送
台車によりシールド掘進機の後方台車まで運ばれてきた
セグメントを、前記エレクターのセグメント把持装置に
対する供給位置まで搬送するセグメント搬送方法におい
て、 前記後方台車から前記エレクターの近くまで伸びるレー
ルを設け、前記後方台車まで運ばれてきたセグメントを
前記レールに懸架されて移動するセグメント移送装置に
より直接、前記供給位置まで搬送することを特徴とする
セグメント搬送方法。
1. When the segments are sequentially assembled in a ring shape by the erector of the shield machine, the segments transported by the segment carrier to the rear carriage of the shield machine are transported to a supply position for the segment gripping device of the erector. In the segment transfer method, a rail extending from the rear carriage to the vicinity of the erector is provided, and the segment transported to the rear carriage is directly transported to the supply position by a segment transfer device that is suspended and moved by the rail. A segment transfer method characterized by the following.
【請求項2】 請求項1記載のセグメント搬送方法にお
いて、前記後方台車にセグメント仮受け台を設け、前記
後方台車まで運ばれてきたセグメントを一旦そのセグメ
ント仮受け台に仮受けし、その後この仮受けしたセグメ
ントを前記セグメント移送装置により直接、前記供給位
置まで搬送することを特徴とするセグメント搬送方法。
2. The segment transfer method according to claim 1, wherein the rear trolley is provided with a segment temporary cradle, the segments transported to the rear trolley are temporarily tentatively received on the segment tentative cradle, and then the temporary trolley is temporarily received. The segment transfer method, wherein the received segment is directly transferred to the supply position by the segment transfer device.
【請求項3】 請求項1記載のセグメント搬送方法にお
いて、前記後方台車の位置で前記レールと所定の位置関
係にセグメント位置決め台を固定し、前記後方台車まで
運ばれてきたセグメントを前記レールに懸架されて移動
するセグメント移設装置により一旦前記セグメント位置
決め台に移設して位置決めし、その後この位置決めされ
たセグメントを前記セグメント移送装置により直接、前
記供給位置まで搬送することを特徴とするセグメント搬
送方法。
3. The segment transfer method according to claim 1, wherein a segment positioning base is fixed in a predetermined positional relationship with the rail at the position of the rear carriage, and the segment carried to the rear carriage is suspended on the rail. A segment transfer method characterized in that the segment transfer device is moved and moved to the segment positioning base for positioning, and then the positioned segment is directly transferred to the supply position by the segment transfer device.
【請求項4】 シールド掘進機のエレクターによりセグ
メントを順次リング状に組み立てる際、セグメント搬送
台車によりシールド掘進機の後方台車まで運ばれてきた
セグメントを、前記エレクターのセグメント把持装置に
対する供給位置まで搬送するセグメント搬送装置におい
て、 前記後方台車から前記エレクターの近くまで渡されたレ
ールと、 前記レールに移動可能に懸架され、前記後方台車まで運
ばれてきたセグメントを直接、前記供給位置まで搬送す
るセグメント移送装置とを備え、 前記セグメント移送装置は、前方に突き出したフォーク
部を有するセグメント載置用の架台と、前記レールに係
合する走行装置と、前記架台を前記走行装置に対して上
下動させる上下動装置とを備えることを特徴とするセグ
メント搬送装置。
4. When the segments are sequentially assembled in a ring shape by the erector of the shield machine, the segments transported by the segment carrier to the rear carriage of the shield machine are transported to a supply position for the segment gripping device of the erector. In the segment transfer device, a rail that is passed from the rear carriage to a position near the erector, and a segment transfer device that is movably suspended on the rail and that directly transports a segment that has been transported to the rear carriage to the supply position. The segment transfer device includes a segment mounting frame having a fork portion protruding forward, a traveling device engaging with the rail, and a vertical movement for vertically moving the frame with respect to the traveling device. And a device for transporting the segment.
【請求項5】 請求項4記載のセグメント搬送装置にお
いて、前記レールは前記後方台車から前記エレクターの
近くに至る間に下方傾斜部を有し、前記セグメント移送
装置は、前記架台を前記走行装置に対して傾動可能に支
持する傾動支持装置を更に備えることを特徴とするセグ
メント搬送装置。
5. The segment transfer device according to claim 4, wherein the rail has a downward sloping portion between the rear carriage and the vicinity of the erector, and the segment transfer device sets the gantry to the traveling device. A segment transfer device, further comprising a tilting support device that tiltably supports the segment transfer device.
【請求項6】 請求項4記載のセグメント搬送装置にお
いて、前記後方台車に設けられ、前記後方台車まで運ば
れてきたセグメントを一旦仮受けするセグメント仮受け
台を更に備えることを特徴とするセグメント搬送装置。
6. The segment transfer device according to claim 4, further comprising a segment temporary receiving base provided on the rear bogie and temporarily receiving a segment transported to the rear bogie. apparatus.
【請求項7】 請求項4記載のセグメント搬送装置にお
いて、前記後方台車の位置で前記レールと所定の位置関
係に設置されたセグメント位置決め台と、前記セグメン
ト移送装置より後方で前記レールに移動可能に懸架さ
れ、前記後方台車まで運ばれてきたセグメントを前記セ
グメント位置決め台まで移送して移設するセグメント移
設装置とを更に備えることを特徴とするセグメント搬送
装置。
7. The segment transfer device according to claim 4, wherein a segment positioning table installed in a predetermined positional relationship with the rail at the position of the rear carriage, and movable to the rail behind the segment transfer device. A segment transfer device further comprising: a segment transfer device that transfers a segment that has been suspended and has been transported to the rear carriage to the segment positioning base to transfer the segment.
【請求項8】 請求項7記載のセグメント搬送装置にお
いて、前記セグメント位置決め台は、前記レールに固定
して吊り下げられた枠組みと、前記枠組みの下部に設け
られ、前記セグメント移設装置より移送されたセグメン
トが載るベース部と、このベース部に設けられ、前記セ
グメントが載るときにセグメントをガイドして定位置に
位置決めする位置決めブラケットとを有し、前記位置決
めブラケットは上端に内側に傾斜するガイド面を有する
ことを特徴とするセグメント搬送装置。
8. The segment transfer device according to claim 7, wherein the segment positioning base is provided on a frame that is fixed and suspended on the rail, and is provided below the frame, and is transferred from the segment transfer device. A base part on which the segment rests, and a positioning bracket which is provided on the base part and guides the segment to position it at a fixed position when the segment rests, the positioning bracket has a guide surface inclined inward at the upper end. A segment transfer device having.
JP07009396A 1996-03-26 1996-03-26 Segment transport method and segment transport device Expired - Fee Related JP3300223B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07009396A JP3300223B2 (en) 1996-03-26 1996-03-26 Segment transport method and segment transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07009396A JP3300223B2 (en) 1996-03-26 1996-03-26 Segment transport method and segment transport device

Publications (2)

Publication Number Publication Date
JPH09256797A true JPH09256797A (en) 1997-09-30
JP3300223B2 JP3300223B2 (en) 2002-07-08

Family

ID=13421588

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07009396A Expired - Fee Related JP3300223B2 (en) 1996-03-26 1996-03-26 Segment transport method and segment transport device

Country Status (1)

Country Link
JP (1) JP3300223B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010196443A (en) * 2009-02-27 2010-09-09 Ihi Corp Shield machine
CN102305088A (en) * 2011-08-05 2012-01-04 大连华锐股份有限公司 Duct piece transporter for small-diameter shield machine and operating method of duct piece transporter
CN102381635A (en) * 2011-06-22 2012-03-21 北京市三一重机有限公司 Tube segment shipping and trolley towing integrated device of shield machine
JP2015155602A (en) * 2014-02-20 2015-08-27 川崎重工業株式会社 Segment carrier device
CN111608686A (en) * 2020-05-29 2020-09-01 中铁工程装备集团有限公司 Pipe piece assembling system and working method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01119500U (en) * 1988-01-29 1989-08-14
JPH01263397A (en) * 1988-04-15 1989-10-19 Hazama Gumi Ltd Device for conveying segment
JPH0681596A (en) * 1992-09-04 1994-03-22 Ishikawajima Harima Heavy Ind Co Ltd Centering device for segment
JPH06108800A (en) * 1992-09-30 1994-04-19 Ishikawajima Harima Heavy Ind Co Ltd Segment supply device
JPH06185297A (en) * 1992-12-16 1994-07-05 Okumura Corp Segment carry-out device
JPH0791196A (en) * 1993-09-24 1995-04-04 Ishikawajima Harima Heavy Ind Co Ltd Segment supply device
JPH08158800A (en) * 1994-12-07 1996-06-18 Kensetsusho Kanto Chiho Kensetsu Kyokucho Conveyance device of segment etc.
JPH08312296A (en) * 1995-05-18 1996-11-26 Kensetsusho Kanto Chiho Kensetsu Kyokucho Follow-up device of conveying truck for segment and the like

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01119500U (en) * 1988-01-29 1989-08-14
JPH01263397A (en) * 1988-04-15 1989-10-19 Hazama Gumi Ltd Device for conveying segment
JPH0681596A (en) * 1992-09-04 1994-03-22 Ishikawajima Harima Heavy Ind Co Ltd Centering device for segment
JPH06108800A (en) * 1992-09-30 1994-04-19 Ishikawajima Harima Heavy Ind Co Ltd Segment supply device
JPH06185297A (en) * 1992-12-16 1994-07-05 Okumura Corp Segment carry-out device
JPH0791196A (en) * 1993-09-24 1995-04-04 Ishikawajima Harima Heavy Ind Co Ltd Segment supply device
JPH08158800A (en) * 1994-12-07 1996-06-18 Kensetsusho Kanto Chiho Kensetsu Kyokucho Conveyance device of segment etc.
JPH08312296A (en) * 1995-05-18 1996-11-26 Kensetsusho Kanto Chiho Kensetsu Kyokucho Follow-up device of conveying truck for segment and the like

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010196443A (en) * 2009-02-27 2010-09-09 Ihi Corp Shield machine
CN102381635A (en) * 2011-06-22 2012-03-21 北京市三一重机有限公司 Tube segment shipping and trolley towing integrated device of shield machine
CN102305088A (en) * 2011-08-05 2012-01-04 大连华锐股份有限公司 Duct piece transporter for small-diameter shield machine and operating method of duct piece transporter
JP2015155602A (en) * 2014-02-20 2015-08-27 川崎重工業株式会社 Segment carrier device
CN111608686A (en) * 2020-05-29 2020-09-01 中铁工程装备集团有限公司 Pipe piece assembling system and working method thereof
CN111608686B (en) * 2020-05-29 2022-02-22 中铁工程装备集团有限公司 Pipe piece assembling system and working method thereof

Also Published As

Publication number Publication date
JP3300223B2 (en) 2002-07-08

Similar Documents

Publication Publication Date Title
JP2001200700A (en) Segment conveying method and device for small-diameter shield
KR102252642B1 (en) Segment auto feed and erector auto assembly system
JPH09256797A (en) Segment conveying method and segment conveying device
CN113982360A (en) Electric pole mounting integrated machine
JP2001206671A (en) Portal carriage for burying pipe
JPH11310921A (en) Steel pipe pile driving device and method
JPH08158800A (en) Conveyance device of segment etc.
EP0964979B1 (en) An advancing tailpiece
TWI740251B (en) Low-headroom excavator and assembly method thereof
JP3884825B2 (en) Carrying system for lining segments for tunnel construction
JPH0322399Y2 (en)
JP3401704B2 (en) Hanging transfer device
JP2001329799A (en) Method for carrying in segment
JP2794378B2 (en) Transport system for large heavy objects such as steam generators in nuclear power plants, apparatus and method therefor
JP3320885B2 (en) Segment loading device
JP3280713B2 (en) Segment feeder
JP4804676B2 (en) Piping installation method and apparatus in tunnel
JP2003193799A (en) Conveying apparatus and method of conveying subject to be conveyed
JP2924548B2 (en) Method and apparatus for laying piping for tunnel construction
JP2581772Y2 (en) Roof shield device
JPH0886196A (en) Segment supply equipment
JPH0749758B2 (en) Excavator for buried pipe propulsion
JP2023180002A (en) Internal structural material installation device
JPH06185297A (en) Segment carry-out device
JPH10131700A (en) Pipe laying truck for tunnel and pipe laying method into tunnel

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees