JPH09221916A - Column node joint setting method and setting jig - Google Patents

Column node joint setting method and setting jig

Info

Publication number
JPH09221916A
JPH09221916A JP5667796A JP5667796A JPH09221916A JP H09221916 A JPH09221916 A JP H09221916A JP 5667796 A JP5667796 A JP 5667796A JP 5667796 A JP5667796 A JP 5667796A JP H09221916 A JPH09221916 A JP H09221916A
Authority
JP
Japan
Prior art keywords
erection
column
pillar
piece
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5667796A
Other languages
Japanese (ja)
Inventor
Yasuhisa Suzuki
康久 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP5667796A priority Critical patent/JPH09221916A/en
Publication of JPH09221916A publication Critical patent/JPH09221916A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve workability by providing a column member receiving base on which column members above node and below node can be placed concentrically in response to various pipe diameters and providing an erection set base for holding an erection piece in radial direction in a position adjustable manner. SOLUTION: This column node joint setting jig is constituted with a column member receiving base 3, erection set base 4 and a backing strip set plate 5. Then, a column member above node 1A and a column member below node 1B are concentrically placed by using adjusting pieces on a plurality of column member receiving bases 3. Next, an erection set base 4 is located between the end portions of the column 1A and column 1B, and insertion attitude of the backing strip is corrected by a backing strip set plate 5 located between the bases 4. Then, the erection pieces 6 and 7 are attached by adjusting the radial position to erection receiving members 16A and 16B provided on the bases 4 at the position of almost 45 degrees from the horizontal position and are welded to corresponding columns 1A and 1B. By doing this, all erection pieces can be accurately welded in one process.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、鋼管製柱材相互
の柱節ジョイントとなるエレクションピースを各柱材に
溶接するときの柱節ジョイントセット方法およびセット
治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column-joint joint setting method and a setting jig for welding an erection piece, which serves as a column-joint joint between steel pipe column members, to each column member.

【0002】[0002]

【従来の技術】従来、鋼管製柱材相互を柱節で溶接ジョ
イントする場合、現場でジョイント作業するのに先立
ち、工場において図6に示す工程により、柱節ジョイン
トとなるエレクションピース41,42を各柱材40
A,40Bに溶接している。すなわち、先ず節上側柱材
40Aに柱材40Aの内側に嵌まる裏当金43をセット
する(図6(A))。次に、上記節上側柱材40Aと節
下側柱材40Bを、前記裏当金43が節下側柱材40B
にもセットされるように定盤上の治具(図示せず)にセ
ットする(図6(B),(C))。次に両柱材40A,
40Bの両側に近い位置にエレクションセット台44を
配置して、このエレクションセット台44上に両柱材4
0A,40Bの両側に仮付けする各エレクションピース
41,42を水平姿勢に載置し、このセット状態で各エ
レクションピース41,42を対応する柱材40A,4
0Bの両側にそれぞれ溶接する(図6(C),
(D))。この場合に、両柱材40A,40Bの上面に
は、ケガキ45によりエレクションピース41,42の
位置出しを行い、それぞれ対応する柱材40A,40B
の上面にエレクションピース41,42を溶接する(図
6(C),(D))。以上の作業完了後、両柱材40
A,40Bを治具から外して、両柱材40A,40Bの
残る一面が表向きとなるように柱材40A,40Bを反
転させ、残る一面にエレクションピース41,42を溶
接する。
2. Description of the Related Art Conventionally, when welding steel pipe column members to each other by welding with column joints, the erection pieces 41 and 42 to be the column joints are manufactured by a process shown in FIG. Each pillar material 40
Welded to A and 40B. That is, first, the back metal 43 that fits inside the pillar 40A is set on the node-side pillar 40A (FIG. 6A). Next, the above-mentioned node upper side pillar material 40A and the below-node side pillar material 40B are
It is also set on a jig (not shown) on the surface plate so that it is also set (FIGS. 6B and 6C). Next, both pillars 40A,
The erection set pedestals 44 are arranged at positions close to both sides of the 40B, and both pillar members 4 are placed on the erection set pedestals 44.
Each erection piece 41, 42 temporarily attached to both sides of 0A, 40B is placed in a horizontal posture, and in this set state, each erection piece 41, 42 is attached to a corresponding pillar member 40A, 4
Weld to both sides of OB (Fig. 6 (C),
(D)). In this case, the erection pieces 41 and 42 are positioned on the upper surfaces of the two pillar members 40A and 40B by the scribing 45, and the corresponding pillar members 40A and 40B are respectively positioned.
The erection pieces 41, 42 are welded to the upper surface of the (FIG. 6 (C), (D)). After completing the above work, both pillars 40
A and 40B are removed from the jig, the column members 40A and 40B are inverted so that the remaining one surface of both column members 40A and 40B is facing up, and the erection pieces 41 and 42 are welded to the remaining one surface.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記方法によ
るエレクションピースの仮付け作業では、工程数が多く
なるので作業に長時間を要する。また、一部のエレクシ
ョンピース41,42については、ケガキ45により位
置出しして仮付けするので誤差が生じやく、節上側柱材
40Aと節下側柱材40Bとの組合せを自由に変えるこ
とができない。そのため、現場での節ジョイント作業に
制約が生じ、作業に時間がかかる。また、管径の異なる
柱材について同様のエレクションピース仮付け作業を行
う場合、その管径に応じた別の治具やエレクションセッ
ト台44を用意する必要があり、治具やエレクションセ
ット台44の種類が多くなる。
However, the temporary attachment work of the erection piece by the above method requires a long time because of the large number of steps. Further, some of the erection pieces 41, 42 are positioned by the marking 45 and temporarily attached, so that an error is likely to occur, and the combination of the node upper side column member 40A and the node lower side column member 40B can be freely changed. Can not. Therefore, there is a restriction on the joint joint work at the site, and the work takes time. In addition, when performing the same erection piece tacking work on the pillar materials having different pipe diameters, it is necessary to prepare another jig or erection set table 44 corresponding to the pipe diameter. There are many types.

【0004】この発明の目的は、エレクションピース仮
付け作業を簡単にかつ精度よく行うことができ、管径の
異なる柱材のエレクションピース仮付け作業を一種類の
治具で行うことのできる柱節ジョイントセット方法およ
びセット治具を提供することである。
An object of the present invention is to make a column joint capable of easily and accurately performing the erection piece temporary attaching work and performing the erection piece temporary attaching work of the column materials having different pipe diameters by one kind of jig. A joint setting method and a setting jig are provided.

【0005】[0005]

【課題を解決するための手段】この発明の柱節ジョイン
トセット方法は、鋼管製柱材相互の溶接時仮固定用の柱
節ジョイントとなるエレクションピースを各柱材に溶接
するときのセット方法であって、以下の工程により行
う。先ず、節上側柱材および節下側柱材を同心位置に所
定間隔を開けて柱材受け台上に載置し、両柱材の四側に
各々溶接する各エレクションピースを水平姿勢から略4
5°回転させた位置でエレクションセット台に取付け
る。前記柱材受け台には、柱材の管径が変わっても常に
同心位置に支持可能なものを用いる。前記エレクション
セット台には、柱材の管径に応じてエレクションピース
の取付位置を柱材の半径方向に変更可能なものを用い
る。この構成によれば、柱材を反転させることなく、一
工程で全エレクションピースを柱材の四側に精度良く仮
付けできる。また、仮付け精度が良いので、節上側柱材
と節下側柱材との組合せを自由に変えて節ジョイントで
き、ジョイント作業が大幅に向上する。さらに、柱材の
管径が変わる場合でも同じ治具で対応できる。
A method for setting a column joint according to the present invention is a method for welding an erection piece to be a column joint for temporary fixing of steel pipe columns to each other. Therefore, the following steps are performed. First, the nodal upper column member and the nodal upper column member are placed on the column member pedestal at concentric positions with a predetermined interval, and each erection piece to be welded to each of the four sides of both column members from the horizontal position is approximately 4
Attach it to the erection set base at the position rotated by 5 °. As the column member cradle, one that can always be supported in a concentric position even if the pipe diameter of the column member changes. As the erection set table, one that can change the mounting position of the erection piece in the radial direction of the pillar material according to the pipe diameter of the pillar material is used. According to this configuration, all the erection pieces can be accurately and temporarily attached to the four sides of the pillar material in one step without inverting the pillar material. Further, since the tacking accuracy is good, the joints can be jointed by freely changing the combination of the nodal upper side column members and the lower nodal side column members, and the joint work is greatly improved. Furthermore, even if the pipe diameter of the pillar material changes, the same jig can be used.

【0006】この発明の柱節ジョイントセット治具は、
鋼管製柱材相互の溶接時仮固定用の柱節ジョイントとな
るエレクションピースを各柱材に溶接するときの位置決
め用治具であって、節上側柱材および節下側柱材を同心
位置に所定間隔を開けて載置する柱材受け台と、前記エ
レクションピースを保持するエレクションセット台とを
備えたものである。前記柱材受け台は、柱材に当接させ
る調節片を受け台本体に取付位置変更可能に取付けたも
のとし、柱材を管径が異なっても同心に位置決め可能と
する。前記エレクションセット台は、前記柱材受け台に
載せられた節上側柱材および節下側柱材の端部近傍に各
々位置する一対のセット台本体間にわたって4本のエレ
クション受け材を設けたものとする。各エレクション受
け材は、柱材外周の水平面から略45°回転させた4側
の位置に対応設置されて柱材の半径方向に平行な取付面
を有し、かつこの取付面に前記エレクションピースをボ
ルト止めする取付孔を半径方向に離して複数設けたもの
とする。この構成によれば、節上側柱材および節下側柱
材を柱材受け台上に載置することにより両柱材を同心位
置に所定間隔を開けて配置でき、かつ各エレクションピ
ースをこれらのボルト孔を利用してエレクションセット
台の4本のエレクション受け材にボルト止めすることに
より、両柱材の四側の水平位置から略45°回転させた
位置に位置決めできる。また、柱材受け台の受け台本体
に、柱材の管径に合うように調節片を取付けることによ
り、異なる管径の柱材に対しても同じ柱材受け台で両柱
材を同心位置に載置できる。前記柱節ジョイントセット
治具において、上側2本のエレクション受け材を、前記
セット台本体に固定された受け材本体と、この受け材本
体に着脱自在に設けられて前記エレクションピースの取
付孔を有するライナとで構成してもよい。この構成によ
ると、エレクションピースを仮付け後、エレクション受
け材の受け材本体からライナを取り外すことにより、エ
レクション受け材と干渉することなく柱材をエレクショ
ンセット台からその上方に取り外すことができる。前記
柱節ジョイントセット治具において、前記両セット台本
体間に柱材軸方向へ移動可能に裏当金セットプレートを
設け、この裏当金セットプレートは、前記柱材受け台に
載置可能な最大径の柱材の管径に略等しい径の中央開口
を有し、かつこの中央開口の内周の複数箇所に、前記柱
材の端部に挿入された裏当金の端面を当接させる密着確
認片を有するものとしてもよい。この構成によれば、前
記柱材の端部に挿入された裏当金の端面に、裏当金セッ
トプレートの密着確認片が全て当接するように、全周に
わたって裏当金の挿入度合いを調整することにより、裏
当金を適正に柱材の端部に挿入できる。
The column-joint joint set jig of the present invention is
This is a positioning jig for welding the erection piece that serves as a column joint for temporary fixing of steel pipe column members to each other, and the node upper column member and the node lower column member are concentric. It is provided with a column member receiving stand on which a predetermined interval is placed and an erection set stand for holding the erection piece. The column member pedestal is mounted on the pedestal body so that the adjustment piece that comes into contact with the column member can be changed in mounting position, and the column member can be positioned concentrically even if the pipe diameters are different. The erection set base is provided with four erection receiving members between a pair of set base bodies respectively located near the ends of the nodal upper side column members and the nodal lower side column members placed on the column member receiving base. And Each erection receiving member has a mounting surface parallel to the radial direction of the column member, which is installed corresponding to a position on the four sides rotated about 45 ° from the horizontal plane of the outer periphery of the column member, and the erection piece is attached to this mounting surface. It is assumed that a plurality of mounting holes for bolting are provided in a radially separated manner. According to this configuration, by placing the nodal upper side column member and the nodal side column member on the column member cradle, both column members can be arranged at concentric positions with a predetermined interval, and each erection piece is By bolting to the four erection receiving members of the erection set base using the bolt holes, it is possible to position the pillar members at a position rotated by about 45 ° from the horizontal position on the four sides. Also, by installing an adjustment piece on the pedestal body of the pillar pedestal to match the pipe diameter of the pillar material, both pillar materials can be concentrically positioned with the same pillar material cradle even for pillar materials of different pipe diameters. Can be placed on. In the post joint joint setting jig, the upper two erection receiving members have a receiving member main body fixed to the set base main body, and a mounting hole for the erection piece detachably provided in the receiving member main body. You may comprise with a liner. According to this configuration, after the erection piece is temporarily attached, the liner can be removed from the receiving material body of the erection receiving material, so that the pillar material can be removed from the erection set table above the erection receiving material without interfering with the erection receiving material. In the column joint joint setting jig, a backing metal set plate is provided between the two setting base bodies so as to be movable in the axial direction of the pillar material, and the backing metal set plate can be placed on the pillar material receiving base. It has a central opening with a diameter substantially equal to the pipe diameter of the largest diameter pillar material, and abuts the end surface of the backing metal inserted into the end of the pillar material at a plurality of locations on the inner periphery of this central opening. You may have a contact confirmation piece. According to this structure, the degree of insertion of the backing plate is adjusted over the entire circumference so that all the contact confirmation pieces of the backing plate set plate come into contact with the end surface of the backing plate inserted into the end of the pillar member. By doing so, the backing metal can be properly inserted into the end portion of the column member.

【0007】[0007]

【発明の実施の形態】この発明の一実施形態を図1ない
し図4に基づいて説明する。図1は柱節で溶接ジョイン
トする丸形鋼管製の節上側柱材と節下側柱材とを、この
実施形態の柱節ジョイントセット治具に載置した状態を
示す側面図である。柱節ジョイントセット治具2は、節
上側柱材1Aおよび節下側柱材1Bを同心位置に所定間
隔を開けて載置する複数個の柱材受け台3と、前記両柱
材1A,1B相互の溶接時仮固定用の柱節ジョイントと
なるエレクションピース6,7(図4)を支持するエレ
クションセット台4と、例えば節上側柱材1Aの端部に
挿入した裏当金8(図4)の挿入状態を確認するための
裏当金セットプレート5とからなる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a side view showing a state in which a nodal upper side column member and a nodal side column member made of a round steel pipe to be weld-joined at a column node are placed on a column node joint setting jig of this embodiment. The column-joint joint set jig 2 includes a plurality of column-member receiving pedestals 3 on which the node-side upper column members 1A and the node-side column members 1B are placed at concentric positions at predetermined intervals, and the column members 1A and 1B. An erection set base 4 that supports the erection pieces 6 and 7 (FIG. 4) that are column joints for temporary fixing during mutual welding, and a backing plate 8 (FIG. 4) inserted at the end of the node upper column member 1A, for example. ) And a backing metal set plate 5 for confirming the inserted state.

【0008】柱材受け台3は、図2(A)に正面図で示
すように、縦片部9aと横片部9bとからなる概形L字
状の受け台本体9と、この受け台本体9に着脱自在に取
付けられる概形L字状の2種類の調整片10A,10B
とで構成される。受け台本体9には、前記調整片10
A,10Bを取付位置変更可能にボルト止めする複数の
取付孔11,12が形成されると共に、その横片部9b
上縁には、載置予定の柱材1A,1Bのうち、最大管径
の柱材1A,1Bの外周面に倣う曲率の円弧部9b1
形成されており、この円弧部9b1 と縦片部9aの内側
縁とで柱材1A,1Bが支持される。柱材1A,1Bの
前記縦片部9aによる支持部と反対側の側部は、必要に
応じて、別の補助支持部材13,14(図2(A))で
支持される。補助支持部材14は楔状片からなる。前記
調整片10A,10Bは、最大管径より小さい管径の柱
材1A’,1B’、1A”,1B”を、最大管径の柱材
1A,1Bの場合と同心位置に支持するのに使用するも
のであり、受け台本体9と同様に縦片部10aと横片部
10bとを有すると共に、受け台本体9の取付孔11に
整合する複数の取付孔12を有する。その横片部10b
には載置予定の管径の柱材1A’,1B’、1A”,1
B”の外周面に倣う曲率の円弧部10b1 が形成されて
おり、この円弧部10b1 と縦片部10aの内側縁とで
柱材1A’,1B’、1A”,1B”が支持される。な
お、前記L形の一体物の調整片10A,10Bの代わり
に、その縦片部10aのみ、および横片部10bのみか
らなる分割型の調整片をそれぞれスライド自在に前記受
け台本体9にボルト止めして、各小管径の柱材1A’,
1B’、1A”,1B”に共用するようにしてもよい。
As shown in the front view of FIG. 2 (A), the pillar-shaped pedestal 3 is a pedestal main body 9 of a generally L-shape having a vertical piece 9a and a horizontal piece 9b, and this pedestal. Two types of roughly L-shaped adjustment pieces 10A and 10B that are detachably attached to the main body 9.
It is composed of The adjustment piece 10 is provided on the cradle main body 9.
A plurality of mounting holes 11 and 12 for bolting A and 10B so that the mounting position can be changed are formed, and the lateral piece portion 9b thereof.
The upper edge, pillar 1A of intended mounting, among 1B, pillar 1A of the largest tube diameter, the circular arc portion 9b 1 of curvature to follow the outer peripheral surface of 1B is formed, the arc portion 9b 1 and the vertical The column members 1A and 1B are supported by the inner edge of the piece 9a. The side portions of the column members 1A and 1B opposite to the supporting portions by the vertical piece portions 9a are supported by other auxiliary supporting members 13 and 14 (FIG. 2A), if necessary. The auxiliary support member 14 is a wedge-shaped piece. The adjustment pieces 10A and 10B support the column members 1A ', 1B', 1A "and 1B" having a diameter smaller than the maximum pipe diameter at the concentric position as in the case of the column members 1A, 1B having the maximum pipe diameter. It has a vertical piece 10a and a horizontal piece 10b like the pedestal body 9, and also has a plurality of mounting holes 12 that are aligned with the mounting holes 11 of the pedestal body 9. The lateral piece 10b
Column materials 1A ', 1B', 1A ", 1 of the pipe diameter to be placed
An arc portion 10b 1 having a curvature that follows the outer peripheral surface of B ″ is formed, and the pillar members 1A ′, 1B ′, 1A ″, 1B ″ are supported by the arc portion 10b 1 and the inner edge of the vertical piece portion 10a. Instead of the L-shaped integral adjusting pieces 10A and 10B, a split type adjusting piece including only the vertical piece 10a and the horizontal piece 10b is slidably slidable. Bolted to the column material of each small pipe 1A ',
You may make it common to 1B ', 1A ", and 1B".

【0009】前記エレクションセット台4は、前記柱材
受け台3に載せられた節上側柱材1A,1A’,1A”
および節下側柱材1B,1B’,1B”の端部近傍に各
々位置する断面概形がU字状の一対のセット台本体1
5,15(図2(B))間にわたって4本のエレクショ
ン受け材16A,16Bを設けたものである。各エレク
ション受け材16A,16Bは、柱材外周の水平面から
略45°回転させた四側の各位置に対応設置されて柱材
の半径方向に平行な取付面16a,16bを有する。ま
た、この取付面16a,16bには、前記エレクション
ピース6,7をボルト止めする取付孔17(図1)が半
径方向に離して複数形成されている。前記エレクション
受け材16A,16Bのうち、上側の2本のエレクショ
ン受け材16Aは、セット台本体15の上端に固定され
た受け材本体18と、この受け材本体18に着脱自在に
設けられたライナ19とで構成される。前記受け材本体
18には、前記ライナ19をボルト止めする取付孔20
(図1)が形成されている。また、このライナ19に
は、受け材本体18の取付孔20に整合する取付孔21
(図1)と、前記エレクションピース取付用の取付孔1
7(図1)とが形成されている。このライナ19の上面
が、エレクション受け材16Aの取付面16aとなる。
The erection set base 4 has the nodal upper side pillar members 1A, 1A ', 1A "mounted on the pillar member receiving base 3.
And a pair of set base bodies 1 each having a U-shaped cross section and located near the ends of the node-side pillars 1B, 1B ′, 1B ″.
The four erection receiving members 16A and 16B are provided between Nos. 5 and 15 (FIG. 2B). Each erection receiving member 16A, 16B has mounting surfaces 16a, 16b which are installed corresponding to respective positions on the four sides rotated by about 45 ° from the horizontal plane of the outer circumference of the pillar material and which are parallel to the radial direction of the pillar material. Further, a plurality of mounting holes 17 (FIG. 1) for bolting the erection pieces 6, 7 are formed in the mounting surfaces 16a, 16b so as to be separated in the radial direction. Of the erection receiving members 16A and 16B, the upper two erection receiving members 16A are a receiving member main body 18 fixed to the upper end of the set base main body 15 and a liner detachably attached to the receiving member main body 18. And 19. An attachment hole 20 for bolting the liner 19 is formed in the receiving material body 18.
(FIG. 1) is formed. In addition, the liner 19 has a mounting hole 21 that is aligned with the mounting hole 20 of the receiving material body 18.
(FIG. 1) and a mounting hole 1 for mounting the erection piece
7 (FIG. 1) are formed. The upper surface of the liner 19 becomes the mounting surface 16a of the erection receiving material 16A.

【0010】図1の裏当金セットプレート5は、前記エ
レクションセット台4の両セット台本体15,15間に
柱材軸方向へ移動可能に設けられる。このプレート5
は、図2(C)に正面図で示すように、前記柱材受け台
3に載置可能な最大径の柱材1A,1Bの管径に略等し
い径の中央開口22を有する。この中央開口22の内周
の複数箇所には、前記柱材1A〜1A”の端部に挿入さ
れた裏当金8の端面に当接させる密着確認片22aが等
間隔で形成されている。また、この裏当金セットプレー
ト5の上辺部および下辺部の左右には、前記エレクショ
ンセット台5の4本のエレクション受け材16A,16
Bおよび、これら受け材に取付けたエレクションピース
7の通しを許容する切欠部5aが形成されている。
The backing metal set plate 5 shown in FIG. 1 is provided between the two set base bodies 15, 15 of the erection set base 4 so as to be movable in the axial direction of the column member. This plate 5
As shown in the front view in FIG. 2 (C), has a central opening 22 having a diameter substantially equal to the pipe diameter of the pillar materials 1A and 1B having the largest diameter that can be mounted on the pillar material receiving base 3. At a plurality of locations on the inner circumference of the central opening 22, close contact confirmation pieces 22a are formed at equal intervals so as to come into contact with the end surface of the backing plate 8 inserted into the end portions of the column members 1A to 1A ″. The four erection receiving members 16A, 16 of the erection set base 5 are provided on the left and right sides of the upper and lower sides of the backing metal set plate 5.
B and a notch 5a which allows the erection piece 7 attached to these receiving members to pass therethrough are formed.

【0011】次に、前記柱節ジョイントセット治具2を
使用した柱節ジョイントセット方法の手順を説明する。
図1のように、相互に溶接する丸形鋼管製の節上側柱材
1Aおよび節下側柱材1Bを、同心位置に所定間隔を開
けて複数の柱材受け台3の上に載置する。このとき、両
柱材1A,1Bの端部間にわたって前記エレクションセ
ット台4が位置する。両柱材1A,1Bが載置可能な最
大管径の柱材の場合は、柱材受け台3として、受け台本
体9だけを使用する。また、これよりも管径の小さい柱
材1A’,1B’,1A”,1B”を載置する場合に
は、図2(A)に鎖線で示すように、その管径に応じた
調整片10A,10Bを、ボルト止めにより受け台本体
9に取付けて対応する。
Next, the procedure of the column joint joint setting method using the column joint joint setting jig 2 will be described.
As shown in FIG. 1, a nodal upper side column member 1A and a below-node side column member 1B made of round steel pipes to be welded to each other are placed on a plurality of column member receiving pedestals 3 at concentric positions with predetermined intervals. . At this time, the erection set table 4 is located between the ends of the two pillar members 1A and 1B. In the case of a pillar material having a maximum pipe diameter on which both pillar materials 1A and 1B can be placed, only the cradle main body 9 is used as the pillar material cradle 3. Further, when the column members 1A ', 1B', 1A ", 1B" having a smaller tube diameter than this are mounted, as shown by the chain line in Fig. 2 (A), the adjustment piece corresponding to the tube diameter is used. 10A and 10B are attached to the pedestal main body 9 by bolting to correspond.

【0012】前記エレクションセット台4の両セット台
本体15,15(図1)間には、前記裏当金セットプレ
ート5を柱材軸方向へ移動可能に配置しておく。このと
き、裏当金セットプレート5の上辺部および下辺部の左
右には切欠部5aが形成してあるので、裏当金セットプ
レート5がエレクションセット台4の4本のエレクショ
ン受け材16A,16Bと干渉することはない。両柱材
1A,1Bの一方、例えば節上側柱材1Aの端部には裏
当金8(図4)を挿入する。この裏当金8の端面に前記
裏当金セットプレート5の中央開口22の内周の密着確
認片22aを当接させる。このとき、裏当金8の端面に
当接していない密着確認片22aはないかを調べ、全て
の密着確認片22aが裏当金8の端面に当接するように
裏当金8の挿入姿勢を矯正する。これにより、裏当金8
を適正に挿入できる。
The backing metal set plate 5 is arranged between the two set table bodies 15 and 15 (FIG. 1) of the erection set table 4 so as to be movable in the axial direction of the column member. At this time, since the cutouts 5a are formed on the left and right sides of the upper and lower sides of the backing metal set plate 5, the backing metal set plate 5 includes the four erection receiving members 16A and 16B of the erection set table 4. Will not interfere with. The backing plate 8 (FIG. 4) is inserted into one of the two pillar members 1A and 1B, for example, the end of the node upper pillar member 1A. The close contact confirmation piece 22a on the inner periphery of the central opening 22 of the backing metal set plate 5 is brought into contact with the end surface of the backing metal 8. At this time, it is checked whether there are any contact confirmation pieces 22a that are not in contact with the end surface of the backing plate 8, and the insertion position of the backing plate 8 is set so that all the contact confirmation pieces 22a contact the end surface of the backing plate 8. to correct. With this, the back deposit 8
Can be inserted properly.

【0013】前記設置状態で、エレクションセット台4
のエレクション受け材16A,16Bの取付面16a,
16bに、図2(B)のようにエレクションピース6,
7を取付ける。すなわち、エレクション受け材16A,
16Bの取付面16a,16bの、節上側柱材1Aの端
部に対向する所定位置には対応するエレクションピース
6を、また節下側柱材1Bの端部に対向する所定位置に
は対応するエレクションピース7をそれぞれボルト止め
してセットする。このとき、上側のエレクション受け材
16Aでは、受け材本体18にライナ19をボルト止め
し、このライナ19にエレクションピース6,7をボル
ト止めする。エレクションピース6,7のボルト止めで
は、そのピース6,7のボルト挿通孔23,24(図
4)を取付孔として利用する。また、管径の小さい柱材
1A’,1B’,1A”,1B”に仮固定するエレクシ
ョンピース6,7の場合には、ライナ18やエレクショ
ン受け材16Bの取付孔17のうち、管径に応じた寸法
だけ柱材軸心方向に近い取付孔17を選択してボルト止
めする。このとき、節下側柱材1Bに仮固定するエレク
ションピース7の内側縁には溶接作業を許容するための
切欠部7a(図4)が形成されているので、この切欠部
7aと、裏当金セットプレート5の切欠部5aの存在に
より、エレクションピース7が裏当金セットプレート5
と干渉するのを回避できる。このようにセットした状態
で、各エレクションピース6,7を対応する柱材1A,
1Bに溶接する。以上の手順により、柱材1A,1Bへ
のエレクションピース6,7の仮固定を一工程で精度良
く行うことができる。図4(A)は各エレクションピー
ス6,7を柱材1A,1Bに仮固定した状態を示す。
In the installed state, the erection set base 4
Mounting surfaces 16a of the erection receiving members 16A and 16B,
16b, the erection piece 6, as shown in FIG.
7 is installed. That is, the erection receiving member 16A,
The erection pieces 6 corresponding to the predetermined positions of the mounting surfaces 16a and 16b of the 16B facing the ends of the node-side columnar members 1A, and the predetermined positions facing the ends of the node-side columnar members 1B. Set each erection piece 7 by bolting it. At this time, in the upper erection receiving member 16A, the liner 19 is bolted to the receiving member main body 18, and the erection pieces 6 and 7 are bolted to the liner 19. When bolting the erection pieces 6 and 7, the bolt insertion holes 23 and 24 (FIG. 4) of the pieces 6 and 7 are used as mounting holes. Further, in the case of the erection pieces 6 and 7 which are temporarily fixed to the pillar materials 1A ′, 1B ′, 1A ″, 1B ″ having a small pipe diameter, the liner 18 or the erection receiving member 16B is attached to the pipe diameter of the mounting hole 17. Select a mounting hole 17 that is closer to the axial direction of the pillar material by a suitable size and bolt it. At this time, since the notch 7a (FIG. 4) for allowing the welding work is formed on the inner edge of the erection piece 7 temporarily fixed to the sub-node side member 1B, the notch 7a and the backing Due to the presence of the cutout portion 5a of the gold set plate 5, the erection piece 7 becomes the backing metal set plate 5.
You can avoid interfering with. With the erection pieces 6 and 7 set in this way, the corresponding column members 1A,
Weld to 1B. According to the above procedure, the erection pieces 6 and 7 can be temporarily fixed to the pillar materials 1A and 1B accurately in one step. FIG. 4A shows a state in which the erection pieces 6 and 7 are temporarily fixed to the pillar materials 1A and 1B.

【0014】このようにエレクションピース6,7を仮
固定した柱材1A,1Bは、例えば図3に示すような鉄
骨造建物30のA部のような箇所において、溶接により
節ジョイントすることにより1本の鋼管柱とされる。す
なわち、図4(B)に示すように、節上側柱材1Aの下
端部から露出する裏当金8の端部が節下側柱材1Bに挿
入され、両柱材1A,1Bの端部間に溶接のためのルー
ト間隔Gが確保できるように両柱材1A,1Bを上下に
略突き合わせると共に、両柱材1A,1Bの対応するエ
レクションピース6,7を同一平面内で隣接するように
合わせる。これらエレクションピース6,7にまたがっ
て両面に添え板26を重ね、その重なり部分をボルト3
1で接合する。この接合状態で、ジョイント部を溶接し
て両柱材1A,1Bを節ジョイントする。仮固定した各
エレクションピース6,7は、建物の鉄骨組が完成した
後、切断除去される。なお、図3の鉄骨造建物では、上
部と下部とで管径が異なる柱材が用いられるが、このよ
うな複数種類の管径の柱材につき、同じ治具でエレクシ
ョンピースのセットができる。
The pillar members 1A and 1B to which the erection pieces 6 and 7 are temporarily fixed in this way are jointed by welding at a portion such as a portion A of the steel frame building 30 as shown in FIG. It is supposed to be a steel pipe column. That is, as shown in FIG. 4 (B), the end of the backing metal 8 exposed from the lower end of the node-side pillar 1A is inserted into the node-side pillar 1B, and the ends of both pillars 1A and 1B are inserted. Both pillar members 1A and 1B are substantially butted up and down so that a root gap G for welding can be secured therebetween, and corresponding erection pieces 6 and 7 of both pillar members 1A and 1B are adjacent to each other in the same plane. To match. The attachment plates 26 are laid on both sides of the erection pieces 6 and 7, and the overlapping portion is attached to the bolt 3
Join at 1. In this joined state, the joint portions are welded to jointly join the two pillar members 1A and 1B. The temporarily fixed erection pieces 6 and 7 are cut and removed after the steel frame of the building is completed. In the steel-framed building of FIG. 3, column materials having different pipe diameters are used in the upper portion and the lower portion, but the erection pieces can be set with the same jig for the column materials having a plurality of types of pipe diameters.

【0015】図5(A)〜(C)は、角形鋼管製柱材に
使用する柱節ジョイントセット治具における柱材受け台
の正面図、エレクションセット台の正面図断面図、およ
び裏当金セットプレートの正面図である。柱材受け台3
は、縦片部9aと横片部9bとを有する概形L字状の受
け台本体9と、この受け台本体9に着脱自在にボルト止
めする調整片10A,10Bとからなる。前記横片部9
bの上縁には柱材1’A,1’Bの角部に倣うV字溝9
2 が形成されている。調整片10A,10Bも受け台
本体9と同様に、縦片部10aと横片部10bとを有す
る概形L字状であり、横片部10bには、小管径の柱材
1’A’,1’B’,1’A”,1’B”の角部に倣う
V字溝10b2 が形成されている。その他の構成は前記
実施形態の場合と同様である。
FIGS. 5 (A) to 5 (C) are front views of a column member receiving stand, a front view cross-sectional view of an erection set table, and a backing metal in a column joint joint setting jig used for a square steel pipe column member. It is a front view of a set plate. Pillar cradle 3
Includes a pedestal body 9 having a substantially L-shape having a vertical piece portion 9a and a horizontal piece portion 9b, and adjusting pieces 10A and 10B detachably bolted to the pedestal body 9. The side piece 9
At the upper edge of b, a V-shaped groove 9 that follows the corners of the pillars 1'A, 1'B
b 2 is formed. The adjustment pieces 10A and 10B are also generally L-shaped, each having a vertical piece portion 10a and a horizontal piece portion 10b, like the cradle main body 9, and the horizontal piece portion 10b has a column member 1'A having a small pipe diameter. V-shaped grooves 10b 2 are formed to follow the corners of ', 1'B', 1'A ", 1'B". Other configurations are the same as those in the above embodiment.

【0016】この柱節ジョイントセット治具2の場合
も、先の実施形態の場合と同様に、角形鋼管製柱材1’
A〜1’B”へのエレクションプレート6,7の仮止め
作業を、柱材の反転を行うことなく、一工程で容易にか
つ精度良く行うことができる。
In the case of this column-joint joint set jig 2, as in the case of the previous embodiment, the column member 1'of square steel pipe is used.
The work of temporarily fixing the erection plates 6 and 7 to A to 1′B ″ can be easily and accurately performed in one step without inverting the pillar material.

【0017】[0017]

【発明の効果】この発明の柱節ジョイントセット方法
は、節上側柱材および節下側柱材を同心位置に所定間隔
を開けて柱材受け台上に載置し、両柱材の四側に各々溶
接する各エレクションピースを水平姿勢から略45°回
転させた位置でエレクションセット台に取付け、前記柱
材受け台には、柱材の管径が変わっても常に同心位置に
支持可能なものを用い、前記エレクションセット台には
柱材の管径に応じてエレクションピースの取付位置を柱
材の半径方向に変更可能なものを用いるようにしたた
め、柱材の反転を行うことなく、一工程で全エレクショ
ンピースを柱材の4側に精度良く仮付けできる。また、
仮付け精度が良いので、節上側柱材と節下側柱材との組
合せを自由に変えて節ジョイントでき、ジョイント作業
の効率が大幅に向上する。さらに、柱材の管径が変わる
場合でも同じ治具で対応できる。また、この発明の柱節
ジョイントセット治具は、節上側柱材および節下側柱材
を同心位置に所定間隔を開けて載置する柱材受け台と、
前記エレクションピースを保持するエレクションセット
台とを設け、前記柱材受け台は、柱材に当接させる調節
片を受け台本体に取付位置変更可能に取付けて柱材を管
径が異なっても同心に位置決め可能とし、前記エレクシ
ョンセット台は、前記柱材受け台に載せられた節上側柱
材および節下側柱材の端部近傍に各々位置する一対のセ
ット台本体間にわたって4本のエレクション受け材を設
けたものとし、各エレクション受け材は、柱材外周の水
平面から略45°回転させた4側の位置に対応設置され
て柱材の半径方向に平行な取付面を有し、かつこの取付
面に前記エレクションピースをボルト止めする取付孔を
半径方向に離して複数有するものとしたので、次のよう
に使用できる。すなわち、節上側柱材および節下側柱材
を柱材受け台上に載置することにより両柱材を同心位置
に所定間隔を開けて配置し、各エレクションピースをこ
れらのボルト孔を利用してエレクションセット台の4本
のエレクション受け材にボルト止めすることにより、各
エレクションピースを、両柱材の四側の水平位置から略
45°回転させた位置に位置決めできる。また、柱材受
け台の受け台本体に、柱材の管径に合った調節片を取付
けることにより、異なる管径の柱材に対しても同じ柱材
受け台で両柱材を同心位置に載置できる。前記柱節ジョ
イントセット治具において、上側2本のエレクション受
け材を、前記セット台本体に固定された受け材本体と、
この受け材本体に着脱自在に設けられて前記エレクショ
ンピースの取付孔を有するライナとで構成した場合は、
エレクションピースを仮付け後、エレクション受け材の
受け材本体からライナを取り外すことにより、エレクシ
ョン受け材と干渉することなく柱材をエレクションセッ
ト台からその上方へ取り外すことができる。前記柱節ジ
ョイントセット治具において、前記両セット台本体間に
柱材軸方向へ移動可能に裏当金セットプレートを設け、
この裏当金セットプレートは、前記柱材受け台に載置可
能な最大径の柱材の管径に略等しい径の中央開口を有
し、かつこの中央開口の内周の複数箇所に、前記柱材の
端部に挿入された裏当金の端面を当接させる密着確認片
を有するものとした場合は、前記柱材の端部に挿入され
た裏当金の端面に、裏当金セットプレートの密着確認片
が全て当接するように、全周にわたって裏当金の挿入度
合いを調整することにより、裏当金を適正に柱材の端部
に挿入できる。
According to the method of setting the column joints of the present invention, the column upper column members and the node lower column members are mounted on the column member receiving bases at concentric positions with a predetermined interval, and the four sides of both column members are placed. Attaching each erection piece to be welded to the erection set base at a position rotated by approximately 45 ° from the horizontal posture, and the pillar base can always be supported in the concentric position on the pillar base even if the diameter of the pillar is changed. Since the erection set base is such that the mounting position of the erection piece can be changed in the radial direction of the pillar material according to the pipe diameter of the pillar material, it is possible to perform one step without reversing the pillar material. Thus, all erection pieces can be temporarily and accurately attached to the 4 side of the pillar. Also,
Since the tacking accuracy is good, it is possible to freely change the combination of the nodal upper side column material and the nodal side column material, and the joint work efficiency is greatly improved. Furthermore, even if the pipe diameter of the pillar material changes, the same jig can be used. Further, the post joint joint setting jig of the present invention, a post material pedestal for placing the nodal upper side column material and the nodal side column material at concentric positions with a predetermined interval,
An erection set base for holding the erection piece is provided, and the pillar material receiving base is mounted concentrically even if the diameter of the pillar material is different by attaching an adjusting piece to be brought into contact with the pillar material to the main body of the receiving base. And the erection set base includes four erection receivers arranged between a pair of set base bodies respectively located near ends of the nodal upper side column members and the nodal lower side column members placed on the column member receiving base. Each erection receiving member is provided with a mounting surface parallel to the radial direction of the column member, which is installed at a position on the four sides rotated about 45 ° from the horizontal plane of the outer periphery of the column member. Since the mounting surface is provided with a plurality of mounting holes for bolting the erection piece in the radial direction, it can be used as follows. That is, by placing the nodal upper side pillar material and the nodal side pillar material on the pillar material receiving base, both pillar materials are arranged at a predetermined interval at concentric positions, and each erection piece is utilized by utilizing these bolt holes. By bolting to the four erection receiving members of the erection set table, each erection piece can be positioned at a position rotated by about 45 ° from the horizontal position on the four sides of both pillar members. Also, by installing an adjustment piece that matches the pipe diameter of the pillar material to the pedestal body of the pillar material cradle, even for pillar materials with different pipe diameters, both pillar materials can be placed in the concentric position with the same pillar material cradle. Can be placed. In the column joint joint setting jig, an upper two pieces of erection receiving material are fixed to the set base body,
In the case where the liner is detachably provided on the receiving member body and has a mounting hole for the erection piece,
By temporarily attaching the erection piece and then removing the liner from the main body of the erection receiving material, the pillar material can be removed upward from the erection set table without interfering with the erection receiving material. In the post joint joint setting jig, a backing metal set plate is provided between the two set base bodies so as to be movable in the axial direction of the post material,
The backing metal set plate has a central opening having a diameter substantially equal to the pipe diameter of the largest diameter pillar material that can be placed on the pillar material cradle, and at a plurality of locations on the inner circumference of the central opening, When the backing metal inserted into the end of the pillar has an adhesion check piece that abuts the end of the backing, the backing metal set on the end of the backing metal inserted into the end of the pillar. By adjusting the insertion degree of the backing plate over the entire circumference so that all the contact confirmation pieces of the plate come into contact with each other, the backing plate can be properly inserted into the end portion of the column member.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施形態にかかる柱節ジョイント
セット治具に、丸形鋼管製の節上側柱材と節下側柱材と
を載置した状態を示す側面図である。
FIG. 1 is a side view showing a state where a column-joint joint set jig according to an embodiment of the present invention is mounted with an upper-side node member and a lower-side column member made of a round steel pipe.

【図2】(A)は同治具における柱材受け台の正面図、
(B)は同治具におけるエレクションセット台の破断正
面図、(C)は同治具における裏当金セットプレートの
正面図である。
FIG. 2 (A) is a front view of a column member cradle in the jig,
(B) is a front view of the erection set table in the same jig, which is cut away, and (C) is a front view of a backing metal set plate in the same jig.

【図3】節ジョイント柱材を使用した建物の鉄骨組の正
面図である。
FIG. 3 is a front view of a steel frame of a building using joint joint pillars.

【図4】(A)は前記治具でエレクションピースを仮固
定した柱材の斜視図、(B)は前記柱材の接続状態を示
す斜視図である。
FIG. 4A is a perspective view of a pillar member in which an erection piece is temporarily fixed by the jig, and FIG. 4B is a perspective view showing a connected state of the pillar member.

【図5】(A)はこの発明の他の実施形態にかかる柱節
ジョイントセット治具における柱材受け台の正面図、
(B)は同治具におけるエレクションセット台の正面断
面図、(C)は同治具における裏当金セットプレートの
正面図である。
FIG. 5 (A) is a front view of a column member cradle in a column joint joint setting jig according to another embodiment of the present invention,
(B) is a front sectional view of an erection set table in the same jig, and (C) is a front view of a backing metal set plate in the same jig.

【図6】従来例の説明図である。FIG. 6 is an explanatory diagram of a conventional example.

【符号の説明】 1A…節上側柱材、1B…節下側柱材、2…柱節ジョイ
ントセット治具、3…柱材受け台、4…エレクションセ
ット台、5…裏当金セットプレート、6,7…エレクシ
ョンピース、8…裏当金、9…受け台本体、10A,1
0B…調整片、15…セット台本体、16A,16B…
エレクション受け材、16a,16b…取付面、17…
取付孔、18…受け材本体、19…ライナ、22…中央
開口、22a…密着確認片
[Explanation of Codes] 1A ... Node-side column member, 1B ... Node-side column member, 2 ... Column-joint joint set jig, 3 ... Column member cradle, 4 ... Erection set table, 5 ... Backing metal set plate, 6, 7 ... Erection piece, 8 ... Back metal, 9 ... Cradle body, 10A, 1
0B ... Adjustment piece, 15 ... Set base body, 16A, 16B ...
Erection receiving material, 16a, 16b ... Mounting surface, 17 ...
Mounting hole, 18 ... Receiving material body, 19 ... Liner, 22 ... Central opening, 22a ... Adhesion confirmation piece

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 鋼管製柱材相互の溶接時仮固定用の柱節
ジョイントとなるエレクションピースを各柱材に溶接す
るときのセット方法であって、節上側柱材および節下側
柱材を同心位置に所定間隔を開けて柱材受け台上に載置
し、両柱材の四側に各々溶接する各エレクションピース
を水平姿勢から略45°回転させた位置でエレクション
セット台に取付け、前記柱材受け台には、柱材の管径が
変わっても常に同心位置に支持可能なものを用い、前記
エレクションセット台には柱材の管径に応じてエレクシ
ョンピースの取付位置を柱材の半径方向に変更可能なも
のを用いる柱節ジョイントセット方法。
1. A method for setting an erection piece, which is a column-joint joint for temporary fixing of steel pipe-shaped column members to each other at the time of welding, to a method of setting each of the column members. The erection pieces are placed on concentric positions with a predetermined interval on the column base, and each erection piece to be welded to the four sides of both column members is attached to the erection set base at a position rotated approximately 45 ° from the horizontal position. For the pillar material cradle, use one that can be supported in a concentric position at all times even if the diameter of the pillar material changes.For the erection set pedestal, the mounting position of the erection piece can be changed depending on the diameter of the pillar material. A column joint joint setting method using a changeable radial direction.
【請求項2】 鋼管製柱材相互の溶接時仮固定用の柱節
ジョイントとなるエレクションピースを各柱材に溶接す
るときの位置決め用治具であって、節上側柱材および節
下側柱材を同心位置に所定間隔を開けて載置する柱材受
け台と、前記エレクションピースを保持するエレクショ
ンセット台とを備え、前記柱材受け台は、柱材に当接さ
せる調節片を受け台本体に取付位置調整可能に取付けて
柱材を管径が異なっても同心に位置決め可能とし、前記
エレクションセット台は、前記柱材受け台に載せられた
節上側柱材および節下側柱材の端部近傍に各々位置する
一対のセット台本体間にわたって4本のエレクション受
け材を設けたものとし、各エレクション受け材は、柱材
外周の水平面から略45°回転させた4側の位置に対応
設置されて柱材の半径方向に平行な取付面を有し、かつ
この取付面に前記エレクションピースをボルト止めする
取付孔を半径方向に離して複数設けたものとした柱節ジ
ョイントセット治具。
2. A positioning jig for welding an erection piece, which serves as a column-joint joint for temporarily fixing steel pipe column members to each other when welding, to a column upper column member and a column lower column column. A column material pedestal for mounting the material at concentric positions at a predetermined interval and an erection set table for holding the erection piece are provided. It is possible to position the pillars concentrically even if they are attached to the main body so that the mounting position can be adjusted, and the erection set base is composed of the nodal upper side pillar material and the nodal side pillar material placed on the pillar material receiving base. It is assumed that four erection receiving materials are provided between a pair of set table main bodies located near the ends, and each erection receiving material corresponds to a position on the 4 side rotated approximately 45 ° from the horizontal plane of the outer periphery of the pillar material. Half of the pillars installed Having parallel mounting surface in the direction, and the pillar section joint set jig mounting holes apart in the radial direction is that plurality bolting the erection piece to the mounting surface.
【請求項3】 上側2本のエレクション受け材を、前記
セット台本体に固定された受け材本体と、この受け材本
体に着脱自在に設けられて前記エレクションピースの取
付孔を有するライナとで構成した請求項2記載の柱節ジ
ョイントセット治具。
3. The upper two erection receiving members are constituted by a receiving member main body fixed to the set base main body, and a liner detachably provided on the receiving base main body and having a mounting hole for the erection piece. The column-joint joint set jig according to claim 2.
【請求項4】 前記両セット台本体間に柱材軸方向へ移
動可能に裏当金セットプレートを設け、この裏当金セッ
トプレートは、前記柱材受け台に載置可能な最大径の柱
材の管径に略等しい径の中央開口を有し、かつこの中央
開口の内周の複数箇所に、前記柱材の端部に挿入された
裏当金の端面を当接させる密着確認片を有するものとし
た請求項2または請求項3記載の柱節ジョイントセット
治具。
4. A backing metal set plate is provided between the two setting base bodies so as to be movable in the axial direction of the pillar material, and the backing metal set plate is a pillar having a maximum diameter mountable on the pillar material receiving base. A close contact confirmation piece having a central opening having a diameter substantially equal to the pipe diameter of the material, and contacting the end surface of the backing metal inserted into the end of the pillar material at a plurality of locations on the inner periphery of the central opening. The column-and-joint joint set jig according to claim 2 or 3, which is provided.
JP5667796A 1996-02-19 1996-02-19 Column node joint setting method and setting jig Pending JPH09221916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5667796A JPH09221916A (en) 1996-02-19 1996-02-19 Column node joint setting method and setting jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5667796A JPH09221916A (en) 1996-02-19 1996-02-19 Column node joint setting method and setting jig

Publications (1)

Publication Number Publication Date
JPH09221916A true JPH09221916A (en) 1997-08-26

Family

ID=13034065

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5667796A Pending JPH09221916A (en) 1996-02-19 1996-02-19 Column node joint setting method and setting jig

Country Status (1)

Country Link
JP (1) JPH09221916A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839022A (en) * 2010-06-08 2010-09-22 甘秀明 Node installation equipment
CN112196121A (en) * 2020-09-27 2021-01-08 青岛理工大学 Bamboo joint type energy-consumption concrete filled steel tube column base node and installation method
CN112376686A (en) * 2021-01-05 2021-02-19 安徽一品小院建筑科技有限公司 General steel tenon connecting joint for prefabricated concrete structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101839022A (en) * 2010-06-08 2010-09-22 甘秀明 Node installation equipment
CN112196121A (en) * 2020-09-27 2021-01-08 青岛理工大学 Bamboo joint type energy-consumption concrete filled steel tube column base node and installation method
CN112376686A (en) * 2021-01-05 2021-02-19 安徽一品小院建筑科技有限公司 General steel tenon connecting joint for prefabricated concrete structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN104162759A (en) Cartridge receiver welding method and clamp applied to same
JPH09221916A (en) Column node joint setting method and setting jig
KR20150021703A (en) Jig for maintaining turret circularity and Method for turret installation using the same
JPH0724595A (en) Method and jig for tack welding of stainless steel steel pipe
JPH09150264A (en) Positioning jig and welding equipment for welding steel segment
JP4737739B2 (en) Piping butt welding positioning jig
JP2511433Y2 (en) Jig for temporary attachment of end plate
CN109128665B (en) Welding positioning device
JPH07100695A (en) Method and device for mounting traveling rail for welding robot
JP2559166B2 (en) Diaphragm welding method
JPH0815695B2 (en) End plate setting device
JPH09234562A (en) In-site welding method using band piece
JP7090787B1 (en) How to align steel pipes with jigs and steel pipes
JPH0731910Y2 (en) Temporary jig for pipe welding
JPH08267289A (en) Temporary assembly jig for piping for welding execution
JP6942680B2 (en) Construction method of temporary bridge
JP2000263292A (en) Aligning jig for steel tube welding
JPH07108456B2 (en) Diaphragm welding method
CN112091501A (en) Positioning tool for welding underframe
JPS60228040A (en) Fabricating method of outer wall material
JP3204997B2 (en) End plate welding method
JP2021161725A (en) Dry type joint structure of column member and building
JPH081380A (en) Welding equipment, and mechanism and method for positioning groove part
JP3195363U (en) Solar panel support frame and pipe joint
JP2004034848A (en) Jig for assembling vehicle body and method for assembling vehicle body