JPH09234562A - In-site welding method using band piece - Google Patents

In-site welding method using band piece

Info

Publication number
JPH09234562A
JPH09234562A JP4082596A JP4082596A JPH09234562A JP H09234562 A JPH09234562 A JP H09234562A JP 4082596 A JP4082596 A JP 4082596A JP 4082596 A JP4082596 A JP 4082596A JP H09234562 A JPH09234562 A JP H09234562A
Authority
JP
Japan
Prior art keywords
steel
erection
band metal
joint
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP4082596A
Other languages
Japanese (ja)
Inventor
Takashi Sato
孝 佐藤
Takeya Taguchi
猛也 田口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tomoe Corp
Original Assignee
Tomoe Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tomoe Corp filed Critical Tomoe Corp
Priority to JP4082596A priority Critical patent/JPH09234562A/en
Publication of JPH09234562A publication Critical patent/JPH09234562A/en
Pending legal-status Critical Current

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

PROBLEM TO BE SOLVED: To realize the repeated use of a member to be used for temporary connection, and to reduce the working period at a low cost with an absolutely required number of temporarily connected members to be cut after a joint part is welded. SOLUTION: A plurality of erection piece 2 are fixed to an outer circumference in the vicinity of each joint part 6 of steel frame members 1A, 1B such as steel tubes divided into upper and lower parts, a band piece 3 on which more joint plates 4 than the erection pieces 2 are projected is fitted to the erection pieces 2, and the joint plates 4 which are opposite to each other in the vertical direction are temporarily connected by a splice plate 5 to weld the joint parts 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、建築構造物や塔状
構造物における鋼管等の鉄骨柱や梁を現場にて溶接する
際のバンド金物を用いた現場溶接工法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a field welding method using band metal fittings for welding steel columns or beams such as steel pipes in building structures or tower structures on site.

【0002】[0002]

【従来の技術】従来から、建築構造物や塔状構造物等の
構造物における鉄骨部材等の継手部溶接面をガスシール
ドアーク溶接等により行うことはよく知られている。図
7(A)に示したものは、継手部Jの溶接接合によって
順次上下の鋼管等鉄骨部材10A、10Bが塔状に構築
されていくものであり、これを簡単に説明すると、図7
(A)における継手部J周辺のG部拡大図である図7
(B)に示すように、上下に分割された鋼管等鉄骨部材
10A、10Bの各継手部J近傍の外周に複数、例えば
円周上90°毎に溶接等により固定された各4つのエレ
クションピース21A・・・および21B・・・を設置
し、これらエレクションピース21A・・・、21B・
・・の上下に対向する各エレクションピース21A、2
1B同士をスプライスプレート22・・によってボルト
連結23をすることで上下の鋼管等鉄骨部材10A、1
0Bを仮連結し、前記継手部Jの上方の外周に走行レー
ル20を設置し、該走行レール20上を走行する走行台
車30に搭載の溶接ロボット10の溶接トーチ102に
よって前記継手部Jを溶接接合するものである。
2. Description of the Related Art Conventionally, it is well known that a welded surface of a joint portion of a steel frame member or the like in a structure such as a building structure or a tower structure is subjected to gas shield arc welding or the like. In FIG. 7 (A), upper and lower steel members such as steel pipes 10A and 10B are sequentially constructed in a tower shape by welding and joining the joint portions J, which will be briefly described as follows.
FIG. 7 is an enlarged view of G around the joint J in FIG.
As shown in (B), a plurality of, for example, four erection pieces each fixed by welding or the like to the outer periphery of each steel frame member 10A, 10B divided into upper and lower parts in the vicinity of each joint portion J, for example, every 90 ° on the circumference. 21A ... and 21B ... are installed, and these erection pieces 21A.
..Electric pieces 21A, 2 facing each other above and below
By connecting the 1Bs to each other with the splice plates 22 and the bolts 23, the upper and lower steel pipes and other steel members 10A, 1
0B is temporarily connected, the traveling rail 20 is installed on the outer periphery above the joint J, and the joint J is welded by the welding torch 102 of the welding robot 10 mounted on the traveling carriage 30 traveling on the traveling rail 20. It is to join.

【0003】図8は、前記図7におけるエレクションピ
ース21Aとスプライスプレート22により仮連結され
た上下鋼管等のパイプ10A、10B間の継手部Jの詳
細を示す図であり、少なくともスプライスプレート2
2、22間で仕切られた対向面を、本溶接した後、前記
スプライスプレート22を取り外して、残された継手部
の全周の溶接を行う。溶接完了後、上下パイプ10A、
10Bにそれぞれ固定されていた各エレクションピース
21A、21Bの根元10mm程度を残して切断部21
C・・・をガス切断する。これらの切断部21C・・・
に残存するエレクションピース21A、21Bを研磨機
等で研磨し、防錆塗装する。
FIG. 8 is a view showing details of a joint portion J between the pipes 10A and 10B such as upper and lower steel pipes which are temporarily connected to the erection piece 21A and the splice plate 22 shown in FIG.
After the main surface is welded to the facing surface partitioned by the space 2 and 22, the splice plate 22 is removed, and the entire circumference of the remaining joint is welded. After welding is completed, the upper and lower pipes 10A,
The cutting portion 21 leaving the roots of about 10 mm of the erection pieces 21A and 21B fixed to 10B, respectively.
Gas cutting of C ... These cutting parts 21C ...
The remaining erection pieces 21A and 21B are polished with a polishing machine or the like, and rust-preventive coating is applied.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、このよ
うな従来の仮連結による現場溶接工法では、上下の鋼管
等鉄骨部材間でそれらの軸心が互いにぶれることなく一
直線状に正確に位置させるためには、前記エレクション
ピースを連結すべき上下の鋼管等鉄骨部材の円周上に正
確に多数設置する必要があり、これらの設置のための作
業が増大する他、継手部の溶接完了後においてもこれら
多数のエレクションピースの切断除去およびそれらの残
存部の研磨の際にもまた多くの時間を要した。さらに
は、切断除去された多数のエレクションピースの地上へ
の下げ降しやエレクションピースの再利用はきわめて困
難であり、これらの部材を無駄に廃棄しなければならな
かった。
However, in the conventional field welding method by temporary connection as described above, in order to accurately position the shaft centers of steel members such as upper and lower steel pipes in a straight line without mutual deviation. It is necessary to accurately install a large number on the circumference of steel members such as upper and lower steel pipes to which the erection piece should be connected, and the work for installing these increases, and even after the welding of the joint portion is completed, A lot of time was also required for cutting and removing a large number of erection pieces and polishing the remaining portions thereof. Furthermore, it is extremely difficult to lower and drop a large number of erection pieces that have been cut and removed to the ground, and to reuse the erection pieces, and these members must be wastefully discarded.

【0005】このため、本発明では、これら従来の現場
溶接工法における諸課題を解決して、仮連結に使用する
部材の繰り返しての利用を可能にするとともに、継手部
の溶接連結後に切断される仮連結部材を必要最小限にし
て、低コストで工期短縮が図れるバンド金物を用いた現
場溶接工法を提供する。
Therefore, in the present invention, various problems in these conventional field welding methods are solved, the members used for temporary connection can be repeatedly used, and the joint portion is cut after the welding connection. (EN) Provided is an on-site welding method using a band metal fitting that can reduce the construction period at a low cost by minimizing the number of temporary connection members.

【0006】[0006]

【課題を解決するための手段】このため本発明は、上下
に分割された鋼管等鉄骨部材の各継手部近傍の外周に複
数のエレクションピースを固定し、これらエレクション
ピースに該エレクションピースより多数の接合プレート
を突設したバンド金物を取り付けるとともに、前記接合
プレートの上下に対向するもの同士をスプライスプレー
トによって仮連結して継手部を溶接接合することを特徴
とするものである。また本発明は、前記エレクションピ
ースを少なくとも鋼管等鉄骨部材の1つの直径方向にの
み対向配置したことを特徴とするものである。さらに本
発明は、前記バンド金物はそれぞれ2つの接合プレート
が突設され前記鋼管等鉄骨部材の直径方向に対向配置さ
れた2つの半円弧状体から構成されたことを特徴とする
もので、これらを課題解決のための手段とするものであ
る。
Therefore, according to the present invention, a plurality of erection pieces are fixed to the outer periphery in the vicinity of each joint of a steel frame member such as a steel pipe which is divided into upper and lower parts. It is characterized in that a band metal having a joining plate provided in a protruding manner is attached, and upper and lower opposing members of the joining plate are temporarily connected by a splice plate to join the joints by welding. Further, the present invention is characterized in that the erection pieces are arranged so as to face each other in at least one diametrical direction of a steel frame member such as a steel pipe. Further, the present invention is characterized in that each of the band metal fittings is composed of two semi-circular arc-shaped bodies provided with two joining plates protruding from each other and arranged to face each other in a diametrical direction of a steel frame member such as a steel pipe. Is a means for solving the problem.

【0007】[0007]

【実施の形態】以下本発明の1実施の形態を図面に基づ
いて説明する。図1〜6は本発明のバンド金物を用いた
現場溶接工法の1実施の形態を示すもので、図1はバン
ド金物によって鋼管等鉄骨部材である上下パイプが仮連
結される際の分解斜視図を示し、図2は建築構造物の屋
根トラス架構における腹材に適用された側面図を示し、
図3は上パイプにエレクションピースが固定された図を
示し、図4は接合プレートが突設されたバンド金物を示
し、図5はバンド金物が取り付けられた一部断面および
要部の拡大図である。図6は上下パイプの仮連結が終了
した状態を示す図である。図2(A)に示すように、建
築構造物の屋根トラス架構は上弦材8Aおよび下弦材8
Bとこれらの間にジグザグ状に配置された断面円形で中
空の腹材1とから構成される。前記腹材1は図2(A)
に示したような短い直線状の分割された上パイプ1Aと
下パイプ1Bとが継手部6によって溶接接合されるもの
や、図2(B)に示したような脚部の継手部6に用いら
れるもの、さらには図2(C)に示したような上弦材8
Aや下弦材8Bの継手部6によって溶接接合されるもの
等種々の形態の鋼管等鉄骨部材の現場溶接に採用され
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. 1 to 6 show one embodiment of a field welding method using a band metal fitting of the present invention, and FIG. 1 is an exploded perspective view when upper and lower pipes, which are steel frame members such as steel pipes, are temporarily connected by the band metal fitting. FIG. 2 shows a side view applied to the abdominal material in the roof truss frame of the building structure,
FIG. 3 shows a view in which an erection piece is fixed to an upper pipe, FIG. 4 shows a band metal object with a joining plate protruding, and FIG. 5 is a partial cross-section with the band metal object attached and an enlarged view of a main part. is there. FIG. 6 is a diagram showing a state in which the upper and lower pipes are temporarily connected. As shown in FIG. 2A, the roof truss frame of the building structure has an upper chord member 8A and a lower chord member 8
B and a hollow abdomen 1 having a circular cross section and arranged in a zigzag shape therebetween. The abdomen 1 is shown in FIG.
Used for welding the short linear divided upper pipe 1A and lower pipe 1B as shown in Fig. 2 by a joint portion 6, or for the joint portion 6 of a leg portion as shown in Fig. 2B. The upper chord member 8 as shown in FIG. 2 (C).
It is used for field welding of steel frame members such as steel pipes of various forms such as those that are welded and joined by the joint portion 6 of A or the lower chord member 8B.

【0008】図3に示すように、先ず、上下に分割され
た鋼管等鉄骨部材である上パイプ1Aの継手部6の近傍
の外周に複数のエレクションピース2を溶接等によって
固定する。本実施の形態では、少なくとも上パイプ1A
の1つの直径方向にのみ対向してエレクションピース
2、2が配置されている。2Hはボルト孔である。図示
は省略されているが、継手部6を対称にして下パイプに
も同様にエレクションピース2が固定される。そして、
図4に示すようにほぼ円周角で90°隔離されて2個放
射状に突設された接合プレート4、4を有する一対の半
円弧状体のバンド金物3が、図1および図5(B)、図
5(C)の上半分にて明瞭に示されるように、互いに上
パイプ1Aの直径方向に向かい合って対向配置されその
両端部の取付フランジ3Fが前記エレクションピース2
を挟持するごとくボルトナット等の取付具によって取り
付けられる。つまり、バンド金物3にはエレクションピ
ース2より多数(倍)の接合プレート4が突設されたこ
とになる。またその際、図5(B)に拡大して示される
ように、エレクションピース2とバンド金物3のフラン
ジ3Fとの間には間隙7を存在せしめ、後述する接合プ
レート4にスプライスプレート5を取り付ける際に生じ
た誤差を吸収できるように構成される。前記バンド金物
3の本体部の内周面は上パイプ1Aの外周面に適合すべ
く同じ曲率に形成されている。図5および図1に示すよ
うに、上パイプ1Aと同様にして下パイプ1Bにもエレ
クションピース2およびバンド金物3が取り付けられる
とともに、図6に示すように、これら上下および直径方
向に対向して設置された2対の計4個のバンド金物3・
・に突設されている前記接合プレート4・・の上下に対
向するもの同士をスプライスプレート5、5によって挟
持してボルトナット等の取付具によって仮連結を完了す
るものである。
As shown in FIG. 3, first, a plurality of erection pieces 2 are fixed to the outer periphery in the vicinity of the joint portion 6 of the upper pipe 1A which is a steel frame member such as a steel pipe divided into upper and lower parts by welding or the like. In the present embodiment, at least the upper pipe 1A
The erection pieces 2 and 2 are arranged so as to face each other only in one diametrical direction. 2H is a bolt hole. Although illustration is omitted, the erection piece 2 is similarly fixed to the lower pipe by making the joint portion 6 symmetrical. And
As shown in FIG. 4, a pair of semi-arcuate band metal fittings 3 having two bonding plates 4 and 4 radially protruding from each other and being separated from each other by 90 ° at a circumferential angle are shown in FIGS. ), As clearly shown in the upper half of FIG. 5 (C), the erection piece 2 is provided with the mounting flanges 3F at both ends thereof facing each other in the diametrical direction of the upper pipe 1A.
It is attached by a mounting tool such as a bolt and nut as if it is sandwiched between. That is, the band metal piece 3 is provided with a larger number (double) of the joining plates 4 than the erection piece 2. At that time, as shown in an enlarged view in FIG. 5B, a gap 7 is made to exist between the erection piece 2 and the flange 3F of the band metal fitting 3, and the splice plate 5 is attached to the joint plate 4 described later. It is configured to be able to absorb the error that has occurred. The inner peripheral surface of the main body of the band metal fitting 3 is formed to have the same curvature so as to match the outer peripheral surface of the upper pipe 1A. As shown in FIGS. 5 and 1, the erection piece 2 and the band metal fitting 3 are attached to the lower pipe 1B similarly to the upper pipe 1A, and as shown in FIG. 2 pairs of installed metal fittings for 4 bands
The upper and lower surfaces of the joining plate 4 protruding from the upper and lower sides are sandwiched by the splice plates 5 and 5, and the temporary connection is completed by a fixture such as a bolt and nut.

【0009】かく構成されてバンド金物3における接合
プレート4を介してスプライスプレート5によって仮連
結された上下のパイプ1A、1Bの接合部6の外周の開
先状部をガスシールドアーク溶接等により少なくともス
プライスプレート5、5間で仕切られた対向面を本溶接
により接合し、次いで、前記バンド金物3に取り付けら
れたスプライスプレート5を取り外し、残された継手部
全周の溶接を行う。溶接後、バンド金物3を取り外し、
次いで上下パイプ1A、1Bに取り付けられたエレクシ
ョンピース2を根元10mm程度を残して切断部2Cを
ガス切断等により切断してパイプから取り除く。その
後、パイプ上におけるエレクションピース2の残存部や
継手部6の溶接余剰部をサンダー等により平滑に研磨し
て作業を終了する。
The grooved portions on the outer periphery of the joints 6 of the upper and lower pipes 1A and 1B, which are constructed as described above and are temporarily connected by the splice plate 5 via the joint plate 4 of the band metal 3, are at least formed by gas shield arc welding or the like. The opposing surfaces partitioned by the splice plates 5 and 5 are joined together by main welding, and then the splice plate 5 attached to the band metal fitting 3 is removed, and the remaining circumference of the joint portion is welded. After welding, remove the band metal 3,
Next, the erection piece 2 attached to the upper and lower pipes 1A and 1B is removed from the pipe by cutting the cutting portion 2C by gas cutting or the like, leaving a root of about 10 mm. After that, the remaining portion of the erection piece 2 and the weld surplus portion of the joint portion 6 on the pipe are smoothly polished by a sander or the like, and the work is finished.

【0010】以上本発明の1実施の形態について説明し
てきたが、本発明の趣旨の範囲内で、鋼管等鉄骨部材の
断面形状(必ずしも円形や中空でなくてもよい)、継手
部の開先形状および溶接形態、鋼管等鉄骨部材に対する
エレクションピースの設置形態、エレクションピースの
数、エレクションピースとバンド金物との関連構成、バ
ンド金物の形状、バンド金物における接合プレートの設
置形態、数、接合プレートとスプライスプレートとの関
連構成、スプライスプレートの形状、これら部材間にお
けるボルト孔の数等については適宜のものが採用できる
ことは言うまでもなく、さらには、建築構造物のトラス
架構や塔状構造物における鋼管等の鉄骨柱のみに限ら
ず、その他種々の継手部の現場にての溶接にも採用でき
るものである。
Although one embodiment of the present invention has been described above, the cross-sectional shape of the steel frame member such as a steel pipe (not necessarily circular or hollow) and the groove of the joint are within the scope of the gist of the present invention. Shape and welding form, installation form of erection piece on steel frame member such as steel pipe, number of erection pieces, related configuration of erection piece and band metal fittings, shape of band metal fittings, installation mode, number, joining plate of band metal fittings on band metal fittings It goes without saying that appropriate configurations can be adopted for the configuration related to the splice plate, the shape of the splice plate, the number of bolt holes between these members, and further, steel pipes for truss frames of building structures and tower structures. The present invention is not limited to steel columns, but can also be used for welding various other joints in the field.

【0011】[0011]

【発明の効果】以上詳細に説明してきたように本発明に
よれば、比較的少ない数のエレクションピースを被連結
部材である鋼管等鉄骨部材の外周面に溶接等により固定
するだけで、該エレクションピースに該エレクションピ
ースより数の多い接合プレートを突設したバンド金物を
鋼管等鉄骨部材の外周面に確実で着脱自在に取り付ける
ことができるので、これら比較的多数の接合プレートを
利用して多数のスプライスプレートを取り付けることに
より上下に分割された被連結部材である鋼管等鉄骨部材
を軸心がぶれることなく、1本の心の通ったパイプとし
て精度よく仮連結することが可能となる。したがって、
精度よく軸心が整合されて仮連結された上下のパイプの
接合部を溶接することによって高精度で品質の高い長大
な鋼管等鉄骨部材の連結体が現場にて得られる。しか
も、多数のスプライスプレートを使用して軸心精度の高
い連結を行ったにもかかわらず、前記連結体の完成後に
は比較的少ない数(最小で上下各2個)のエレクション
ピースを鋼管等鉄骨部材から切断して取り除けばよく、
エレクションピースの残存部の研磨等も含めて作業が短
時間で容易に行える。しかも、前記バンド金物はスプラ
イスプレートとともにエレクションピースから取り外し
た後は、これを繰り返して使用することができるので、
無駄がなく低コストにて現場溶接をすることができる。
また、バンド金物はエレクションピースに対して着脱自
在に取り付けられるように構成されていることによっ
て、接合プレートの数や形状が使用目的に応じて適宜に
選定されたバンド金物を数種類準備することによって、
多様な仮連結の形態が得られる。
As described in detail above, according to the present invention, a relatively small number of erection pieces can be fixed to the outer peripheral surface of a steel frame member such as a steel pipe by welding or the like. Since it is possible to securely and removably attach a band metal object in which a joining plate having a larger number of joining plates than the erection piece to the piece is securely attached to the outer peripheral surface of the steel pipe or the like, a large number of these joining plates are used. By attaching the splice plate, it is possible to accurately temporarily connect the steel frame members such as steel pipes, which are the members to be connected vertically, as a pipe having a single core without shaking the shaft center. Therefore,
By welding the joints of the upper and lower pipes whose axes are accurately aligned and temporarily connected to each other, it is possible to obtain a highly accurate and high-quality connected body of steel members such as long steel pipes in the field. Moreover, despite the fact that a large number of splice plates are used for connection with high axial accuracy, a relatively small number of erection pieces (minimum 2 pieces each at the top and bottom) after the completion of the connection body is constructed of steel pipes or other steel frames. Just cut and remove it from the member,
Work including polishing of the remaining portion of the erection piece can be performed easily in a short time. Moreover, since the band metal fittings can be used repeatedly after being removed from the erection piece together with the splice plate,
On-site welding can be performed without waste and at low cost.
Further, the band hardware is configured to be removably attached to the erection piece, and by preparing several types of band hardware, the number and shape of the joining plates are appropriately selected according to the purpose of use,
Various forms of temporary connection are obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の1実施の形態に係り、バンド金物によ
って鋼管等鉄骨部材である上下パイプが仮連結される際
の継手部近傍の分解斜視図である。
FIG. 1 is an exploded perspective view of the vicinity of a joint portion when upper and lower pipes, which are steel frame members such as steel pipes, are temporarily connected by a band metal fitting according to an embodiment of the present invention.

【図2】本発明の1実施の形態に係り、建築構造物の屋
根トラス架構における腹材に適用された側面図である。
FIG. 2 is a side view applied to a belly member in a roof truss frame of a building structure according to one embodiment of the present invention.

【図3】本発明の1実施の形態に係り、上パイプにエレ
クションピースが固定された図である。
FIG. 3 is a diagram in which an erection piece is fixed to an upper pipe according to the embodiment of the present invention.

【図4】本発明の1実施の形態に係り、接合プレートが
突設されたバンド金物を示す図である。
FIG. 4 is a diagram showing a band metal object on which a joining plate is provided in a projecting manner according to one embodiment of the present invention.

【図5】本発明の1実施の形態に係り、バンド金物が取
り付けられた一部断面および要部の拡大図である。
FIG. 5 is an enlarged view of a partial cross section and a main part to which a band metal fitting is attached according to an embodiment of the present invention.

【図6】本発明の1実施の形態に係り、上下パイプの仮
連結が終了した状態を示す図である。
FIG. 6 is a diagram showing a state in which temporary connection of the upper and lower pipes is completed according to the embodiment of the present invention.

【図7】塔状構造物における鋼管等を現場にて溶接する
従来の仮連結法の継手部近傍を示す図である。
FIG. 7 is a view showing the vicinity of a joint portion of a conventional temporary connection method for welding a steel pipe or the like in a tower-like structure on site.

【図8】従来の仮連結法の継手部近傍を示す拡大図であ
る。
FIG. 8 is an enlarged view showing the vicinity of a joint portion of a conventional temporary connection method.

【符号の説明】[Explanation of symbols]

1・・・パイプ(鋼管等鉄骨部材) 1A・・・上パイプ 1B・・・下パイプ 2・・・エレクションピース 2H・・・ボルト孔 3・・・バンド金物 3F・・・取付フランジ 4・・・接合プレート 5・・・スプライスプレート 6・・・継手部 1 ... Pipe (steel frame member such as steel pipe) 1A ... Upper pipe 1B ... Lower pipe 2 ... Erection piece 2H ... Bolt hole 3 ... Band metal fitting 3F ... Mounting flange 4 ...・ Joint plate 5 ・ ・ ・ Splice plate 6 ・ ・ ・ Joint part

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 上下に分割された鋼管等鉄骨部材の各継
手部近傍の外周に複数のエレクションピースを固定し、
これらエレクションピースに該エレクションピースより
多数の接合プレートを突設したバンド金物を取り付ける
とともに、前記接合プレートの上下に対向するもの同士
をスプライスプレートによって仮連結して継手部を溶接
接合することを特徴とするバンド金物を用いた現場溶接
工法。
1. A plurality of erection pieces are fixed to the outer periphery of the upper and lower divided steel pipe and other steel frame members in the vicinity of respective joints,
A band metal object having a larger number of joining plates protruding from the erection pieces is attached to these erection pieces, and upper and lower parts of the joining plates that are opposed to each other are temporarily connected by a splice plate to weld and join the joint portions. On-site welding method using band metal fittings.
【請求項2】 前記エレクションピースを少なくとも鋼
管等鉄骨部材の1つの直径方向にのみ対向配置したこと
を特徴とする請求項1に記載のバンド金物を用いた現場
溶接工法。
2. The on-site welding method using a band metal fitting according to claim 1, wherein the erection pieces are arranged to face each other only in one diametrical direction of at least one steel frame member such as a steel pipe.
【請求項3】 前記バンド金物はそれぞれ2つの接合プ
レートが突設され前記鋼管等鉄骨部材の直径方向に対向
配置された2つの半円弧状体から構成されたことを特徴
とする請求項2に記載のバンド金物を用いた現場溶接工
法。
3. The band metal fitting is composed of two semi-circular arc-shaped bodies, each of which is provided with two joining plates protruding from each other and arranged to face each other in the diametrical direction of the steel frame member such as a steel pipe. In-situ welding method using the band hardware described.
JP4082596A 1996-02-28 1996-02-28 In-site welding method using band piece Pending JPH09234562A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4082596A JPH09234562A (en) 1996-02-28 1996-02-28 In-site welding method using band piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4082596A JPH09234562A (en) 1996-02-28 1996-02-28 In-site welding method using band piece

Publications (1)

Publication Number Publication Date
JPH09234562A true JPH09234562A (en) 1997-09-09

Family

ID=12591449

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4082596A Pending JPH09234562A (en) 1996-02-28 1996-02-28 In-site welding method using band piece

Country Status (1)

Country Link
JP (1) JPH09234562A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007237206A (en) * 2006-03-07 2007-09-20 Ihi Corp Method of manufacturing tank panel board on site, tank panel board assembly and temporary frame for assembling panel board to be used for the method
KR20140028448A (en) * 2012-08-29 2014-03-10 대우조선해양 주식회사 Suspension device for provisional bonding prior to welding
WO2021205858A1 (en) * 2020-04-10 2021-10-14 株式会社神戸製鋼所 Gas shield arc welding method and steel pipe manufacturing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007237206A (en) * 2006-03-07 2007-09-20 Ihi Corp Method of manufacturing tank panel board on site, tank panel board assembly and temporary frame for assembling panel board to be used for the method
KR20140028448A (en) * 2012-08-29 2014-03-10 대우조선해양 주식회사 Suspension device for provisional bonding prior to welding
WO2021205858A1 (en) * 2020-04-10 2021-10-14 株式会社神戸製鋼所 Gas shield arc welding method and steel pipe manufacturing method
JP2021167012A (en) * 2020-04-10 2021-10-21 株式会社神戸製鋼所 Gas-shield arc welding method and manufacturing method for steel pipe
CN114981031A (en) * 2020-04-10 2022-08-30 株式会社神户制钢所 Gas-shielded arc welding method and method for manufacturing steel pipe

Similar Documents

Publication Publication Date Title
WO2019061891A1 (en) Tower portion, tower, wind turbine generator assembly and method for manufacturing tower portion
JP2015229173A (en) Welding jig for steel material and welding method
JPH09234562A (en) In-site welding method using band piece
CN107012951B (en) Connection node structure and method for main truss and secondary truss in space pipe truss
JPH08311989A (en) Joint structure of steel skeleton building construction
JP3308395B2 (en) Steel pipe joint and joint structure of steel pipe using the same
JP6653945B2 (en) Welding method and steel welding jig
JP2004068385A (en) Adjustment structure for erection of steel pipe pole
CN111364677B (en) Assembling and disassembling method for assembled steel structure main beam
JP2003307032A (en) Connection method for columnar steel pipe and fixture for fixing
JPS62271643A (en) Pipe flange assembly device
CN114850628B (en) Combined construction method for butt joint of double 90-degree bent pipes with S-shaped structures
JPH0893965A (en) Jig for piping assembling and welding
CN220362198U (en) High-precision butt joint device of steel casing
JP6942680B2 (en) Construction method of temporary bridge
JP2021161725A (en) Dry type joint structure of column member and building
JP4296546B2 (en) Pillar jig
JPS60187477A (en) Method for assembling box-shaped sectional member and its auxiliary means
JP3801577B2 (en) Steel structure using steel pipe columns
JP2002180540A (en) Manufacturing method for structural body for square steel pipe column
KR100252420B1 (en) Adjusting jig and manufacture method of adjusting pipe
JP2007100383A (en) Divided structure of large steel h beam, and method of assembling the same
JPH08177237A (en) Erection adjusting method of column and adjusting device therefor
JPS5865532A (en) Manufacture of steel segment
CN115928561A (en) Flange plate, connecting mechanism and flange connecting method for arch rib chord pipe joint