JPH09205886A - Unit and method for constructing flower bed, gatepost and the like - Google Patents
Unit and method for constructing flower bed, gatepost and the likeInfo
- Publication number
- JPH09205886A JPH09205886A JP8045387A JP4538796A JPH09205886A JP H09205886 A JPH09205886 A JP H09205886A JP 8045387 A JP8045387 A JP 8045387A JP 4538796 A JP4538796 A JP 4538796A JP H09205886 A JPH09205886 A JP H09205886A
- Authority
- JP
- Japan
- Prior art keywords
- frame body
- frame
- construction
- gatepost
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Cultivation Of Plants (AREA)
- Fencing (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、建築現場におい
て、本体工事に付して行なわれる花壇や門柱等の外構工
事に用いる施工ユニットと施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction unit and a construction method used for exterior construction work such as flower beds and gate stanchions, which is carried out at the construction site and is attached to the main body construction.
【0002】[0002]
【従来の技術】例えば、建物の周囲や近辺に花壇を構築
する従来の施工方法としては、現場で型枠を組み立てて
コンクリートを打設する現場施工方法と、工場製産によ
るPC化施工方法が知られている。2. Description of the Related Art For example, as a conventional construction method for constructing flower beds around or in the vicinity of a building, there are an on-site construction method of assembling a formwork and pouring concrete on-site and a PC construction method by factory production. Are known.
【0003】前者の現場施工方法は、設置場所に根掘り
を行ない、その底部に砕石を入れて締め固め、コンクリ
ートを流して捨てコンクリートの基礎を作った後、基礎
の上に型枠を組み、型枠内に鉄筋を組んでコンクリート
を打設し、コンクリートの凝固後に型枠を解体して枠状
のコンクリート躯体を形成し、この躯体の外面に石やタ
イル等の仕上げ材を貼付けることによって花壇を完成す
るものである。In the former construction method, the root is dug at the installation site, crushed stones are put into the bottom of the ground to compact it, and the concrete is poured away to form a concrete foundation, and then a formwork is assembled on the foundation. By placing the reinforcing bars in the formwork and placing concrete, after the solidification of the concrete, the formwork is disassembled to form a frame-shaped concrete skeleton, and finishing materials such as stones and tiles are attached to the outer surface of this skeleton. The flowerbed is completed.
【0004】また、後者のPC化施工方法は、コンクリ
ート躯体を工場で製作し、これを現場に運搬し、設置場
所に根掘りを行なって現場施工方法と同様に捨てコンク
リートの基礎を作った後、上設コンクリート躯体を基礎
上に設置することにより花壇を完成する。In the latter PC construction method, after a concrete skeleton is manufactured in a factory, it is transported to the site, root digging is carried out at the installation site, and the foundation of the discarded concrete is made in the same manner as the site construction method. , The flower bed is completed by installing the upper concrete skeleton on the foundation.
【0005】[0005]
【発明が解決しようとする課題】ところで、前者の現場
施工方法は、工期がかかると同時に、土工、鉄筋工、型
枠工、タイルや石工など多くの職種の人がかかわるため
コストがかかり責任が明確化されないと共に、職人の技
能力によって出来上った製品に差が出るという問題があ
る。[Problems to be Solved by the Invention] By the way, the former on-site construction method requires a long construction period, and at the same time, it is costly and liable because it involves many types of workers such as earthwork, reinforcing bars, formwork, tiles and masonry. There is a problem that it is not clarified and there is a difference in the finished product depending on the skill of the craftsman.
【0006】また、躯体をブロックで製造することも考
えられるが、強度の問題があり、地震時等の安全性に欠
ける。It is also possible to manufacture the skeleton from a block, but there is a problem of strength and the safety is poor in the event of an earthquake.
【0007】これに対し、後者のPC化施工方法は、躯
体を現場に運搬して設置すればよいので工期短縮が可能
となる利点はあるが、工場での製造時や脱型時の強度等
の問題で製品の板厚を薄くすることができず、必要以上
の製品板厚となってしまうため、製品重量が重くなり、
施工にクレーン等の重機が必要になり、コストアップの
要因になっている。On the other hand, the latter PC construction method has the advantage that the construction period can be shortened because the skeleton can be transported to the site and installed, but the strength at the time of manufacturing at the factory or at the time of demolding, etc. Due to the problem of, it is not possible to reduce the thickness of the product, and the product thickness becomes more than necessary, so the product weight becomes heavy,
Heavy equipment such as cranes is required for construction, which is a factor of cost increase.
【0008】また、施工現場が狭い場合、クレーン等の
駐車スペースがとれないことがあり、しかも運搬コスト
が大幅にかかり、更に土木現場では図面通りに現場施工
が行なわれないため、工場で製造した製品が小さかった
り大きかったりしてしまい、この場合、製品板厚が厚い
ため、現場でのカット作業等が困難である。If the construction site is small, a parking space for a crane or the like may not be available, and the transportation cost will be high, and the construction site will not be constructed according to the drawing. The product may be small or large, and in this case, since the product plate thickness is thick, it is difficult to perform cutting work on site.
【0009】また、PC化は製造時に複雑な型枠が必要
になり、コストアップになってしまうと共に、PC化で
も施工には現場施工と同様の工事部分が必要になる。Further, the PC construction requires a complicated formwork at the time of manufacturing, resulting in an increase in cost, and the PC construction requires the same construction part as the on-site construction.
【0010】そこで、この発明の課題は、従来の現場施
工方法とPC化方法の問題点を解決し、両工法の長所の
組み合わせによる理想的な施工ユニットと施工方法を提
供することにある。Therefore, an object of the present invention is to solve the problems of the conventional on-site construction method and PC method, and to provide an ideal construction unit and construction method by combining the advantages of both construction methods.
【0011】即ち、花壇や門柱の施工における要望を列
挙すると以下の如くである。 (1)製品が軽量で施工に重機を使用しないこと。 (2)現場施工が簡単で、出来るだけ少ない専門職及び
職種で施工が行なえること。 (3)コストが安く、施工が安全で、施工管理が容易で
あること。 (4)製品を標準化でき、少ない部品の組み合わせで種
々な現場に対応でき、現場の寸法変更に容易に対応出来
ること。 (5)工期が在来工法に比較して大幅に短縮でき、種々
な化粧材の使用が可能であること。 (6)設計時に化粧材料が決定されなくても構造体を先
行して施工しておくことができ、化粧材料が決まった段
階で短期間で対応出来ること。That is, the requirements for construction of flower beds and gate posts are listed below. (1) The product is lightweight and does not use heavy machinery for construction. (2) On-site construction is easy, and construction can be carried out with as few professionals and occupations as possible. (3) Cost is low, construction is safe, and construction management is easy. (4) Products can be standardized, various parts can be handled with a combination of few parts, and dimensional changes at the site can be easily handled. (5) The construction period can be greatly shortened compared to the conventional construction method, and various cosmetic materials can be used. (6) Even if the decorative material is not decided at the time of design, the structure can be constructed in advance, and the decorative material can be dealt with in a short period of time when it is decided.
【0012】この発明は、以上のような要望にことごと
く対応できる施工ユニットと施工方法を提供することに
ある。The present invention is to provide a construction unit and a construction method which can meet all of the above demands.
【0013】[0013]
【課題を解決するための手段】上記のような課題を解決
するため、請求項1の発明は、適宜材料を用いて枠状に
形成され、その周壁に貫通穴が設けられた枠体と、前記
枠体の周壁外面に取付けられる外装材とからなり、外装
材が貫通穴を利用して枠体に固定されるようになってい
る構成を採用したものであるIn order to solve the above-mentioned problems, the invention according to claim 1 is a frame body which is formed in a frame shape by using an appropriate material and has a through hole in its peripheral wall, The exterior material is attached to the outer surface of the peripheral wall of the frame body, and the exterior material is fixed to the frame body through the through hole.
【0014】請求項2の発明は、請求項1の発明におい
て、外装材が枠体の外面を囲む複数枚の組み合せからな
り、各外装材はパネルの外面に化粧材を一体化して形成
されている構成を採用したものである。According to a second aspect of the present invention, in the first aspect of the present invention, the exterior material is a combination of a plurality of sheets surrounding the outer surface of the frame body, and each exterior material is formed by integrally forming a decorative material on the outer surface of the panel. It adopts the structure that has.
【0015】請求項3の発明は、請求項1の発明におい
て、外装材が枠体の外面に並べる複数枚のパネルの組み
合せによって形成され、各パネルが枠体に貫通穴を利用
して固定されるようになっている構成を採用したもので
ある。According to a third aspect of the present invention, in the first aspect of the present invention, the exterior material is formed by a combination of a plurality of panels arranged on the outer surface of the frame body, and each panel is fixed to the frame body through the through holes. This is the structure adopted.
【0016】請求項4の発明は、適宜材料を用いて枠状
に形成され、その周壁に貫通穴が設けられた枠体と、前
記枠体の周壁外面に取付けられる外装材とからなり、外
装材が枠体の周壁外面に固定した取付金具間に嵌め込む
ことによって枠体に固定化されるようになっている構成
を採用したものである。According to a fourth aspect of the present invention, there is provided an exterior body, which comprises a frame body formed of a proper material in a frame shape and having a through hole in a peripheral wall thereof, and an exterior material attached to an outer surface of the peripheral wall of the frame body. The material is fixed to the frame body by fitting it between fittings fixed to the outer surface of the peripheral wall of the frame body.
【0017】請求項5の発明は、請求項1乃至4の発明
において、枠体が、コンクリート、合成樹脂、FRP、
アルミ、鉄等の金属、鋳物の何れかを用い、多角形や方
円形の枠状に形成され、周壁の貫通穴は枠体の重量を軽
減させるための上下方向の長穴に形成されている構成を
採用したものである。According to a fifth aspect of the present invention, in the first to fourth aspects, the frame is made of concrete, synthetic resin, FRP,
It is made of a metal such as aluminum or iron, or a casting, and is formed in a polygonal or rectangular frame shape, and the through hole of the peripheral wall is formed as a vertically elongated hole for reducing the weight of the frame body. The configuration is adopted.
【0018】請求項6の発明は、請求項1乃至5の発明
において、貫通穴は、外側が狭く、内側が広い段付きの
断面形状になっている構成を採用したものである。According to a sixth aspect of the present invention, in the first to fifth aspects of the invention, the through hole has a stepped sectional shape with a narrow outer side and a wide inner side.
【0019】請求項7の発明は、請求項1乃至3の発明
において、貫通穴が多数の円形穴又は角形穴によって形
成され、外装材の裏面側に貫通穴へ挿入して外装材を枠
体に固定する複数の取付け金物を設けた構成を採用した
ものである。According to a seventh aspect of the present invention, in the first to third aspects, the through hole is formed by a large number of circular holes or rectangular holes, and the exterior material is inserted into the through hole on the back surface side of the exterior material to form the frame material. This is a structure in which a plurality of mounting hardware to be fixed to is provided.
【0020】請求項8の発明は、請求項7の発明におい
て、外装材の裏面側に設けた取付け金物が位置調整可能
になっている構成を採用したものである。According to an eighth aspect of the invention, in the invention of the seventh aspect, the mounting hardware provided on the back surface side of the exterior material is positionally adjustable.
【0021】請求項9の発明は、請求項1乃至8の発明
において、枠体の上端に取付ける笠石を備え、枠体と笠
石が両者に設けた一対の係止部材で固定化するようにな
っている構成を採用したものである。According to a ninth aspect of the present invention, in the first to eighth aspects of the present invention, a cap stone attached to the upper end of the frame body is provided, and the frame body and the cap stone are fixed by a pair of locking members provided on both. This is the structure adopted.
【0022】請求項10の発明は、請求項1乃至9の発
明の施工ユニットを用い、枠体の対向する貫通穴間に鉄
筋を差し込み、これを締め固めた地面に接地し、外面に
外装材を取付けた枠体内にコンクリートを流し込んで基
礎を同時に施工する方法を採用したものである。A tenth aspect of the present invention uses the construction unit according to the first to ninth aspects of the present invention, in which reinforcing bars are inserted between the through holes of the frame body which are opposed to each other, and the reinforcing bars are grounded, and the outer surface is covered with an exterior material. This is a method of pouring concrete into the frame with the attached and constructing the foundation at the same time.
【0023】請求項11の発明は、請求項10の発明に
おいて、平面的に並べて配置した複数の枠体を互の貫通
穴の部分でボルトによって結合する方法を採用したもの
である。The eleventh aspect of the present invention is the invention of the tenth aspect, which employs a method in which a plurality of frame bodies arranged side by side in a plane are joined together by bolts at their through holes.
【0024】請求項12の発明は、請求項10の発明に
おいて、平面的に並べて配置した複数の枠体を互の貫通
穴の部分でボルトによって結合し、接続した枠体の全長
を、上記ボルトの部分又は枠体の切断によって設置場所
の条件に合わせるようにした方法を採用したものであ
る。According to a twelfth aspect of the present invention, in the tenth aspect of the present invention, a plurality of frame bodies arranged side by side in a plane are joined by bolts at their through-holes, and the total length of the connected frame bodies is determined by the above bolts. This method adopts a method adapted to the conditions of the installation place by cutting the part or the frame.
【0025】請求項13の発明は、請求項10乃至12
の発明において、地面に固定した枠体上に枠体を積み重
ね、上下枠体を互に結合する方法を採用したものであ
る。The thirteenth aspect of the present invention provides the tenth to twelfth aspects.
In the above invention, the method of stacking the frame bodies on the frame body fixed to the ground and connecting the upper and lower frame bodies to each other is adopted.
【0026】請求項14の発明は、請求項10乃至13
の発明において、地面に枠体を固定した後、化粧材打込
みパネルを立てかけ、枠体とパネルを貫通穴の部分を利
用して結合し、パネルを塀や擁壁とする方法を採用した
ものである。The invention of claim 14 is based on claims 10 to 13.
In the invention, after the frame is fixed to the ground, the decorative material-implanted panel is erected, the frame and the panel are joined together by utilizing the through holes, and the panel is used as a fence or a retaining wall. is there.
【0027】請求項15の発明は、請求項10乃至14
の発明において、地面に設置する枠体を複数の調整ボル
トで支持して高さを調整するようにした方法を採用した
ものである。The invention of claim 15 is based on claims 10 to 14.
In the invention described above, a method is adopted in which a frame body installed on the ground is supported by a plurality of adjustment bolts to adjust the height.
【0028】請求項16の発明は、請求項10乃至13
の発明において、枠体を設置する地面が傾斜している場
合、枠体の下部を傾斜に合わせて切断した後、設置する
方法を採用したものである。The invention of claim 16 is based on claims 10 to 13.
In the invention, when the ground on which the frame is to be installed is inclined, a method of cutting the lower part of the frame according to the inclination and then installing the frame is adopted.
【0029】請求項17の発明は、請求項10乃至16
の発明において、地面に設置した枠体の内部に内枠を入
れ、この内枠内に土を充填して植栽を行なうようにした
方法を採用したものである。The invention of claim 17 is based on claims 10 to 16.
In the invention, a method is adopted in which an inner frame is placed inside a frame body installed on the ground, and the inner frame is filled with soil for planting.
【0030】請求項18の発明は、請求項10乃至13
の発明において、枠体を間隔をおいて地面に設置し、枠
体間に板状又はアングル状の製品を取り付けて、この板
状又はアングルに化粧材を打設した板を取り付けて花壇
や住宅塀とする方法を採用したものである。The invention of claim 18 is based on claims 10 to 13.
In the invention, the frame body is installed on the ground at intervals, a plate-shaped or angled product is attached between the frame bodies, and a plate in which a decorative material is cast is attached to the plate-shaped or angled flowerbed or a house. This is a method that uses a fence.
【0031】請求項19の発明は、請求項10乃至13
の発明において、枠体の単体に化粧板や化粧用パネルを
取り付け、下部に板を設置することによりフラワーポッ
トとする方法を採用したものである。The invention of claim 19 relates to claims 10 to 13.
In the invention, a method is adopted in which a decorative plate or a decorative panel is attached to a single frame body, and a plate is placed at the bottom to form a flower pot.
【0032】請求項20の発明は、請求項10乃至13
の発明において、複数の枠体を接合する場合にPC鋼棒
を挿入して緊張して固定し、枠体の強度を上げる方法を
採用したものである。The invention of claim 20 is based on claims 10 to 13.
In the invention of (1), when joining a plurality of frame bodies, a method is adopted in which a PC steel rod is inserted and tensioned and fixed to increase the strength of the frame bodies.
【0033】[0033]
【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。図1乃至図14に示す第1の実施
形態において、施工ユニットは、平面矩形の枠状に形成
された枠体1と、この枠体1の外面に取付ける外装材2
との組み合せからなり、枠体1は、コンクリートや合成
樹脂、FRP、アルミ、鋳物、鉄等の何れかを材料に用
い、工場で製作されている。Embodiments of the present invention will be described below with reference to the drawings. In the first embodiment shown in FIGS. 1 to 14, the construction unit includes a frame body 1 formed in a rectangular frame shape in plan view, and an exterior material 2 attached to an outer surface of the frame body 1.
The frame body 1 is manufactured in a factory using any of concrete, synthetic resin, FRP, aluminum, casting, iron, etc. as a material.
【0034】上記枠体1の四周壁には、上下方向に長い
貫通穴3が、相対向する壁で対向するよう複数ずつ設け
られ、各貫通穴3は外側が狭く内側が広い段付きの断面
形状になっており、この貫通穴3は枠体1の重量を軽減
させると同時に枠体1の使用材料の削減を図り、かつ、
枠体1に対する外装材2の取付け用として利用される。A plurality of through holes 3 which are long in the vertical direction are provided on the four peripheral walls of the frame body 1 so as to oppose each other on opposite walls, and each through hole 3 has a stepped cross section with a narrow outer side and a wide inner side. The through hole 3 reduces the weight of the frame body 1 and at the same time reduces the material used for the frame body 1, and
It is used for attaching the exterior material 2 to the frame body 1.
【0035】前記外装材2は、コンクリートや合成樹
脂、発泡ウレタン樹脂等を用いたパネル4の外面に、タ
イルや石材等を用いた化粧材5を先付け固定した構造を
有し、この外装材2は枠体1と同様工場製産されると共
に、パネル4の裏面側には貫通穴3の上下長さや配置間
隔に合わせて複数の取付けボルト6やワンタッチで接合
出来る金物等が突出状に埋込み固定されている。The exterior material 2 has a structure in which a decorative material 5 such as a tile or a stone material is fixed in advance on the outer surface of a panel 4 made of concrete, synthetic resin, urethane foam resin or the like. Is manufactured in the same factory as the frame 1, and on the back side of the panel 4, a plurality of mounting bolts 6 and metal objects that can be joined with one touch are embedded and fixed in a protruding shape in accordance with the vertical length of the through holes 3 and the arrangement interval. Has been done.
【0036】図15と図16に示す第2の実施形態は、
枠体1に取付ける外装材2の他の例を示し、外装材2
は、L形に屈曲するコーナ用2aと平面部2bの組み合
せからなり、これらは、コンクリートや合成樹脂等から
なるパネル4の表面にタイルや石材等の化粧材5を固定
し、パネル4の裏面に複数の取付けボルト6を貫通穴3
の条件に合わせて突設した構造を有し、枠体1の外面に
固定することにより、縦目地及び横目地を形成するよう
に仕上げることができる。The second embodiment shown in FIGS. 15 and 16 is
Another example of the exterior material 2 attached to the frame 1 will be described.
Consists of a combination of a corner portion 2a that bends in an L shape and a flat surface portion 2b. These are made by fixing a decorative material 5 such as a tile or a stone material to the surface of a panel 4 made of concrete, synthetic resin, etc. A plurality of mounting bolts 6 on the through hole 3
By having a structure projecting according to the condition of (1) and fixing to the outer surface of the frame body 1, it is possible to finish so as to form vertical joints and horizontal joints.
【0037】図17と図18に示す第3の実施形態は、
枠体1の外面に対する外装材2の取付け構造の異なった
例を示し、外装材2は第1の実施形態と同様、枠体1の
各面に対応する大きさに形成され、上端縁と下端縁に係
止用凹溝7が設けられ、枠体1の外面で上下数個所の位
置に取付金具8が固定されている。The third embodiment shown in FIGS. 17 and 18 is
An example of a different mounting structure of the exterior material 2 on the outer surface of the frame 1 is shown. The exterior material 2 is formed in a size corresponding to each surface of the frame 1 as in the first embodiment, and the upper edge and the lower edge are formed. Engagement grooves 7 are provided on the edges, and mounting brackets 8 are fixed on the outer surface of the frame 1 at several positions above and below.
【0038】上記取付金具8は、弾性金属板を用い、枠
体1の外面に重ねてボルト9で固定する取付部10の一
端に円弧状となって湾曲する弾性部11を連成し、取付
部10の他端側に直角状に屈曲し、先端に凹溝7への係
合片12を設けた構造を有し、この取付金具8を枠体1
の外面で上下に固定した後、上下取付金具8間に外装材
2を押し込んで嵌め合わせれば、外装材2の裏面が弾性
部11に圧接して上下の凹溝7が係合片12に係合し、
枠体1の外面に外装材2が固定化される。The mounting metal fitting 8 is made of an elastic metal plate and is formed by connecting an elastic portion 11 which is curved in an arc shape to one end of a mounting portion 10 which is superposed on the outer surface of the frame 1 and fixed by a bolt 9. It has a structure in which the other end of the portion 10 is bent at a right angle and an engaging piece 12 for engaging the groove 7 is provided at the tip.
After the upper and lower parts are fixed on the outer surface of the outer casing 2, the outer casing member 2 is pushed between the upper and lower mounting brackets 8 to be fitted to each other, the rear face of the outer casing member 2 is brought into pressure contact with the elastic portion 11, and the upper and lower recessed grooves 7 are engaged with the engaging pieces 12. Together,
The exterior material 2 is fixed to the outer surface of the frame body 1.
【0039】図19乃至図22に示す第3の実施形態に
おいて、枠体1の各壁面に設ける貫通穴3を、多数の円
形穴又は角形穴に形成し、この枠体1の外面に並べて取
付ける外装材2は、パネル4の表面に化粧材5を固定
し、パネル4の裏面に複数の取付け金物13を貫通穴3
の間隔に合わせて突設した構造になっている。In the third embodiment shown in FIGS. 19 to 22, the through holes 3 provided in each wall surface of the frame body 1 are formed into a large number of circular holes or square holes, and are attached to the outer surface of the frame body 1 side by side. As for the exterior material 2, the decorative material 5 is fixed on the front surface of the panel 4, and a plurality of mounting hardware 13 is formed on the back surface of the panel 4 through the through holes 3
It has a structure protruding according to the interval.
【0040】上記取付け金物13は、図19と図20の
場合ボルト6を用い、貫通穴3に挿入したボルト6に枠
体1の内部からナット14を螺締することによって外装
材2の取付けを行なうようになっている。The mounting hardware 13 uses the bolt 6 in the case of FIGS. 19 and 20, and the nut 6 is screwed into the bolt 6 inserted into the through hole 3 from the inside of the frame body 1 to mount the exterior material 2. I am supposed to do it.
【0041】図21と図22に示す取付け金物13は、
プレート4に突設した軸体15にスプリング16とワッ
シャ17を外嵌挿すると共に、軸体15の先端に折り畳
みと拡開が自在となる弾性係合片18を取付けて形成さ
れ、この係合片18を折り畳んだ状態で軸体15を貫通
穴3内に挿入すると、貫通穴3を貫通した係合片18が
スプリング16の押圧で自動的に拡開し、貫通穴3に対
して抜け止め状となることにより、外装材2の取付けが
行なえる。The mounting hardware 13 shown in FIGS. 21 and 22 is
A spring 16 and a washer 17 are externally fitted to a shaft 15 projecting from the plate 4, and an elastic engagement piece 18 that can be folded and expanded is attached to the tip of the shaft 15 to form the engagement. When the shaft body 15 is inserted into the through hole 3 with the piece 18 folded, the engaging piece 18 penetrating through the through hole 3 automatically expands by the pressing force of the spring 16 to prevent the engagement with the through hole 3. With the shape, the exterior material 2 can be attached.
【0042】図22は、上記取付け金物13を貫通穴3
の間隔に合わせて位置調整できるようにしたものであ
り、プレート4の裏面側にガイドレール19を埋設し、
このレール19で取付け金物13の頭部側を抜け止め状
に保持すると共に、レール19に沿って移動自在とした
ものである。FIG. 22 shows the mounting hardware 13 through the through hole 3
The position of the guide rail 19 is embedded in the back side of the plate 4,
The head side of the mounting hardware 13 is held by the rail 19 so as to prevent the metal fitting 13 from coming off, and is movable along the rail 19.
【0043】図13に示す第4の実施形態は、枠体1を
上下に積み重ねた場合の接続構造を示し、枠体1の上部
にナット部材20を埋設すると共に、枠体1の下部にボ
ルト21の挿通穴22を設け、上下に重ねた枠体1と1
をナット部材20に螺合したボルト21の締付けによっ
て結合するようになっている。A fourth embodiment shown in FIG. 13 shows a connecting structure in which the frame bodies 1 are vertically stacked, in which a nut member 20 is embedded in the upper portion of the frame body 1 and a bolt is provided in the lower portion of the frame body 1. 21 through holes 22 are provided, and the frame bodies 1 and 1 are vertically stacked.
Are coupled by tightening a bolt 21 screwed to the nut member 20.
【0044】図14に示す第5の実施形態は、枠体1の
高さや水平の調整が行なえるようにしたものであり、枠
体1の下部にナット部材23を埋設し、このナット部材
23に調整用の接地ボルト24を螺合するようになって
いる。The fifth embodiment shown in FIG. 14 is such that the height and horizontal of the frame 1 can be adjusted. A nut member 23 is embedded in the lower portion of the frame 1 and the nut member 23 is used. A grounding bolt 24 for adjustment is screwed into the.
【0045】図8乃至図12に示す第6の実施形態は、
複数の枠体1を平面的に並べて配置する場合の接続構造
を示し、図8と図9の如く、両枠体1、1の重なり合う
壁面を両者の貫通穴3にわたって挿入したボルト25と
これに螺合したナット26の締結によって結合するよう
になっている。The sixth embodiment shown in FIGS. 8 to 12 is
The connection structure in the case of arranging a plurality of frame bodies 1 side by side in a plane is shown, and as shown in FIGS. 8 and 9, bolts 25 in which overlapping wall surfaces of both frame bodies 1 and 1 are inserted over both through holes 3 and It is adapted to be coupled by fastening a screwed nut 26.
【0046】図10は上記ボルト25に寸法調整ボルト
を使用し、現場の寸法が大きい場合に、枠体1と1の接
続間隔を調整できるようにしている。In FIG. 10, a dimension adjusting bolt is used for the bolt 25 so that the connection interval between the frame bodies 1 can be adjusted when the size of the site is large.
【0047】図11は、現場の寸法が小さい場合の対応
構造を示し、一方枠体1をダイヤモンドカッター等を用
いて切断し、長さを短かくするようにしている。FIG. 11 shows a corresponding structure in the case where the size of the site is small. On the other hand, the frame 1 is cut with a diamond cutter or the like so that the length is shortened.
【0048】図12(A)は、枠体1の設置部分が傾斜
している場合の対応構造を示し、枠体1の下部を傾斜に
合わせて傾斜状に切断している。FIG. 12A shows a corresponding structure when the installation portion of the frame body 1 is inclined, and the lower portion of the frame body 1 is cut in an inclined shape in accordance with the inclination.
【0049】なお、枠体1は貫通穴3を設けることによ
り、上記のような切断部分は小径軸状になっており、切
断作業が簡単に行なうことができると共に、この枠体1
の外面に取付ける外装材3も上記カッターで必要な大き
さに現場で切断できる厚さに形成しておく。By providing the through hole 3 in the frame body 1, the above-mentioned cutting portion has a small diameter shaft shape, and the cutting work can be easily performed, and at the same time, the frame body 1
The exterior material 3 to be attached to the outer surface of is also formed in a thickness that can be cut on site by the cutter with a required size.
【0050】図12(B)は、枠体1を間隔をおいて地
面に設置し、枠体間に板状又はアングル状の支持体41
を取り付けて、この支持体41に内側からパネル4と外
側から化粧材パネル5を接続した外装材2を用いて花壇
や住宅塀を施工する。この様に施工すると枠体1の数が
少なくて経済的に施工が行なえる。In FIG. 12 (B), the frame 1 is installed on the ground with a space, and a plate-shaped or angled support 41 is provided between the frames.
The exterior material 2 in which the panel 4 is connected to the inside of the support 41 and the decorative material panel 5 is connected to the outside of the support 41, and a flowerbed or a housing wall is constructed. When the construction is performed in this way, the number of the frame bodies 1 is small, and the construction can be economically performed.
【0051】図23と図24に示す第7の実施形態は、
枠体1上に固定する笠石27の取付け構造を示し、笠石
27の下面で枠体1の周壁上面に重なる部分に断面台形
状の係合部材28を突出状に固定すると共に、枠体1の
周壁上面に上記係合部材28を弾力的に係合保持する二
又状のスプリング金物29を複数固定し、枠体1上に笠
石27を載置すると係合部材28とスプリング金物29
が係合するようになっている。The seventh embodiment shown in FIGS. 23 and 24 is
The mounting structure of the capstone 27 fixed on the frame body 1 is shown. The trapezoidal engaging member 28 having a trapezoidal cross section is fixed to a portion of the lower surface of the capstone 27 that overlaps with the upper surface of the peripheral wall of the frame body 1, and at the same time, When a plurality of bifurcated spring metal fittings 29 that elastically engage and hold the engaging member 28 are fixed on the upper surface of the peripheral wall, and the cap stone 27 is placed on the frame body 1, the engaging member 28 and the spring metal fitting 29 are mounted.
Are adapted to engage.
【0052】なお、図示とは逆に、係止部材28を枠体
1上に固定すると共に、笠石27の下面にスプリング金
物29を設けて笠石27の固定を行なうようにしてもよ
い。Contrary to the illustration, the locking member 28 may be fixed on the frame body 1, and the spring hardware 29 may be provided on the lower surface of the cap stone 27 to fix the cap stone 27.
【0053】次に、上記各実施形態の施工ユニットを用
いた施工方法のいくつかを説明する。Next, some of the construction methods using the construction unit of each of the above embodiments will be described.
【0054】図3乃至図7は第1の実施形態の施工ユニ
ットを用いて花壇を構築する場合の例を示し、地面の構
築せんとする位置に、枠体1の下部が納まる大きさと深
さの根掘りを行ない、その底部に砕石31を入れて締め
固めを行なう。3 to 7 show an example of a case where a flower bed is constructed by using the construction unit of the first embodiment, and the size and the depth at which the lower part of the frame 1 can be accommodated at the position where the ground is constructed. The root digging is performed, and the crushed stone 31 is put in the bottom part and compacted.
【0055】現場に搬入した枠体1の対向する貫通穴3
間の下部に鉄筋32を差し込み、この枠体1の下部を根
掘り内に入れて砕石31上に設置する。Through holes 3 facing each other of the frame body 1 carried into the site
A reinforcing bar 32 is inserted in the lower part of the space, and the lower part of the frame body 1 is put into the root digging and installed on the crushed stone 31.
【0056】次に、枠体1内の下部にコンクリートを適
当な高さとなるよう打込み、貫通穴3を介して枠体1の
内外で一体となる基礎33を形成し、この後、枠体1の
外面に各面に該当する大きさに形成された外装材2を重
ね、各外装材2はボルト6を貫通穴3に挿入し、枠体1
内からナット26を螺締することによって固定する。Next, concrete is poured into the lower part of the frame body 1 so as to have an appropriate height to form a base 33 which is integrated inside and outside the frame body 1 through the through holes 3, and then the frame body 1 is formed. The exterior material 2 formed to have a size corresponding to each surface is superposed on the outer surface of the frame 1, and each exterior material 2 has a bolt 6 inserted into the through hole 3 to form the frame 1
It is fixed by screwing the nut 26 from the inside.
【0057】上記のように、外装材2で枠体1の四周面
を囲むように仕上げ、内側にコンクリートパネルや発泡
スチロールパネル、合成樹脂パネルを取り付け、枠体1
内に土を充填して植栽を行なえば花壇が完成する。As described above, the exterior member 2 is finished so as to surround the four peripheral surfaces of the frame body 1, and the concrete panel, the styrofoam panel, and the synthetic resin panel are attached to the inside of the frame body 1.
A flower bed will be completed if it is filled with soil and planted.
【0058】図6は、枠体1を利用して塀や擁壁を構築
する例を示し、地面に枠体1が納まる深さと大きさの根
掘りを行ない、底部に砕石31を敷設した後、貫通穴3
間の下部に鉄筋32を挿入した枠体1を根掘り内に設置
し、パネル34の表面に化粧材35を打込んだ壁材36
を立て込み、この壁材36に埋設したボルト37を貫通
穴3に挿入し、ナット38の締付けにより該壁材36を
枠体1に固定化し、この枠体1内にコンクリート39を
投入すればよく、地中に位置する枠体1が壁材36の支
持構造物となる。FIG. 6 shows an example of constructing a fence or a retaining wall using the frame body 1. After digging a depth and a size that the frame body 1 can fit in the ground, and laying crushed stones 31 on the bottom. , Through hole 3
The frame body 1 in which the reinforcing bars 32 are inserted in the lower part of the space is installed in the root digging, and the wall material 36 in which the decorative material 35 is driven on the surface of the panel 34
The wall material 36 is fixed to the frame body 1 by inserting the bolt 37 embedded in the wall material 36 into the through hole 3 and tightening the nut 38, and the concrete 39 is put into the frame body 1. Often, the frame body 1 located in the ground serves as a support structure for the wall member 36.
【0059】図7は、花壇と塀や擁壁を一体に構築する
例を示し、図6の場合と同様に地面に枠体1を設置した
後、この枠体1上に枠体1を積み重ねて結合し、両枠体
1、1に重なるよう立てかけた壁材36を枠体1、1と
結合すると共に、下部の枠体1内にコンクリート39を
投入し、上部枠体1の外面に外装材2を取付け、上部枠
体1の内部に収納した合成樹脂枠体40内に土を入れて
植栽を行なえば、花壇と塀や擁壁が同時に構築できる。FIG. 7 shows an example of integrally constructing a flower bed and a fence or retaining wall. After the frame 1 is installed on the ground as in the case of FIG. 6, the frame 1 is stacked on the frame 1. And the wall material 36 leaning against both the frame bodies 1 and 1 to be joined together with the frame bodies 1 and 1, and concrete 39 is put into the lower frame body 1, and the outer surface of the upper frame body 1 is covered. If the material 2 is attached and soil is put in the synthetic resin frame 40 housed inside the upper frame 1 for planting, a flowerbed and a fence or retaining wall can be constructed at the same time.
【0060】門柱を構築する場合は、図4と同様に地面
に設置した枠体1上に枠体1を必要な高さになるよう順
次積み重ねて図13の如く結合し、重ねた枠体1の外周
面に外装材2を取付けた後、枠体1の内部空間にコンク
リートを打込めば、必要な高さを有する角柱状の門柱を
構築することができる。In the case of constructing a gate pillar, as in FIG. 4, the frame bodies 1 are sequentially stacked on the frame body 1 installed on the ground so as to have a required height, and are joined as shown in FIG. After mounting the exterior material 2 on the outer peripheral surface of the, the concrete space is poured into the inner space of the frame body 1 to construct a prismatic gate post having a required height.
【0061】図25乃至図31は、上記した花壇や門柱
を構築する枠体の変形例を示し、これら枠体の組み合せ
を選択することにより、平面的に形状や大きさの異なる
花壇を構築できる。25 to 31 show modified examples of the frame for constructing the above-mentioned flower beds and gate posts. By selecting a combination of these frame bodies, it is possible to construct flower beds having different shapes and sizes in plan view. .
【0062】図25に示す枠体1aは平面方円形で円形
部分のみを高くしたものを示し、図26乃至図29の枠
体1b乃至1eは、平面矩形の枠状であるが、周壁の一
辺乃至三辺の何れかを低くしたものを示し、図30と図
31はこれらの枠体1a乃至1eを用いた平面形状の組
合せ例を示している。The frame body 1a shown in FIG. 25 is a plane rectangular shape with only the circular portion raised, and the frame bodies 1b to 1e of FIG. 26 to FIG. 29 are rectangular in plan view, but one side of the peripheral wall. To FIGS. 30 and 31 show examples of combinations of planar shapes using these frames 1a to 1e.
【0063】[0063]
【発明の効果】以上のように、この発明によると、以下
に列挙する効果がある。As described above, according to the present invention, there are the effects listed below.
【0064】(1)枠体の組合せと外装材の取付けによ
り、種々の形状及び大きさに対応でき、枠体の軽量化が
可能になり、現場では重機を用いることなく容易に積み
重ねたり並べたりすることができ、在来工法とPC工法
の長所を有効に生かした理想的な施工が行なえる。(1) By combining frame members and attaching exterior materials, various shapes and sizes can be accommodated, the weight of the frame members can be reduced, and they can be easily stacked and arranged on site without using heavy equipment. Therefore, ideal construction can be performed by effectively utilizing the advantages of the conventional construction method and the PC construction method.
【0065】(2)枠体は強度が強い反面、ダイヤモン
ドカッター等で切断でき、現場での加工が容易にでき、
外装材も同様に加工できるようにすることにより、現場
の条件に応じた施工が簡単に行なえる。(2) Although the frame has a high strength, it can be cut with a diamond cutter or the like and can be easily processed on site,
By allowing the exterior material to be processed in the same manner, it is possible to easily perform construction according to the conditions of the site.
【0066】(3)枠体を現場に設置してコンクリート
を投入すればよいので、現場での型枠の組立て解体が不
要となり、外装材も簡単に枠体へ取付けることができる
ので、美しい仕上りが得られると共に、工期の短縮が可
能になる。(3) Since the frame can be installed on site and concrete is put into it, there is no need to assemble and disassemble the formwork on site, and the exterior material can be easily attached to the frame, resulting in a beautiful finish. And the construction period can be shortened.
【0067】(4)枠体を工場において製造するので精
度が高く、強度的にも優れたものが得られると共に、枠
体と外装材をボルトで結合することにより、強固な固定
状態が得られ、安全でメンテナンスも容易である。(4) Since the frame is manufactured in a factory, it is possible to obtain a product with high precision and excellent strength, and by connecting the frame and the exterior material with bolts, a strong fixed state can be obtained. Safe and easy to maintain.
【0068】(5)枠体の精度が優れ、平面的及び積重
ね方向の誤差が少なく、精度の高い花壇や門柱等を構築
できる。(5) It is possible to construct a highly accurate flowerbed, gatepost, etc. with excellent accuracy of the frame body and little error in planar and stacking directions.
【0069】(6)枠体と外装材を同時に施工しなくて
も、工期に合わせて施工できるため、現場管理が容易で
ある。(6) Since it is possible to construct the frame body and the exterior material at the same time without constructing them at the same time, site management is easy.
【図1】施工ユニットの第1の実施形態を示す分解斜視
図。FIG. 1 is an exploded perspective view showing a first embodiment of a construction unit.
【図2】同上における枠体の一部切欠平面図。FIG. 2 is a partially cutaway plan view of the frame body of the above.
【図3】同上に鉄筋をセットした平面図。FIG. 3 is a plan view in which reinforcing bars are set on the same.
【図4】同上を地面に設置したコンクリート打設状態の
縦断面図。FIG. 4 is a vertical cross-sectional view of a concrete pouring state where the same is installed on the ground.
【図5】同上を用いて花壇を施工した縦断面図。FIG. 5 is a vertical cross-sectional view of a flowerbed constructed using the same as above.
【図6】同上を用いて塀を構築した縦断面図。FIG. 6 is a vertical cross-sectional view of a fence constructed using the same as above.
【図7】同じく花壇と塀を構築した縦断面図。FIG. 7 is a vertical cross-sectional view of a flowerbed and a fence constructed in the same manner.
【図8】枠体を並べて配置した正面図。FIG. 8 is a front view in which frame bodies are arranged side by side.
【図9】同上の結合部分を拡大した断面図。FIG. 9 is an enlarged cross-sectional view of a coupling portion of the above.
【図10】並べた枠体の間隔調整部分を示す一部切欠正
面図。FIG. 10 is a partially cutaway front view showing a space adjusting portion of the arranged frame bodies.
【図11】並べた枠体の長さ調整の例を示す正面図。FIG. 11 is a front view showing an example of adjusting the lengths of the frame bodies arranged.
【図12】(A)は枠体を傾斜部分に設置する場合の例
を示す正面図。(B)は枠体の間に支持体を設け、この
支持体に外装材を取り付けた平面図。FIG. 12A is a front view showing an example in which the frame body is installed on an inclined portion. FIG. 6B is a plan view in which a support is provided between the frames and an exterior material is attached to the support.
【図13】上下に積み重ねた枠体の結合部分を示す拡大
断面図。FIG. 13 is an enlarged cross-sectional view showing a joined portion of frame bodies that are vertically stacked.
【図14】枠体の高さ調整構造を示す拡大断面図。FIG. 14 is an enlarged cross-sectional view showing a frame body height adjusting structure.
【図15】外装材の他の例を示す正面図。FIG. 15 is a front view showing another example of the exterior material.
【図16】同上の分解斜視図。FIG. 16 is an exploded perspective view of the above.
【図17】外装材取付けの他の例を示す一部切欠正面
図。FIG. 17 is a partially cutaway front view showing another example of mounting the exterior material.
【図18】(A)同上の拡大縦断面図、(B)は取付金
具の斜視図。FIG. 18 (A) is an enlarged vertical sectional view of the above, and FIG. 18 (B) is a perspective view of a mounting member.
【図19】枠体と外装材の他の例を示す分解斜視図。FIG. 19 is an exploded perspective view showing another example of the frame body and the exterior material.
【図20】同上の横断面図。FIG. 20 is a transverse sectional view of the above.
【図21】外装材取付け金具を示す横断面図。FIG. 21 is a transverse cross-sectional view showing an exterior material mounting bracket.
【図22】同上の縦断面図。FIG. 22 is a vertical sectional view of the above.
【図23】枠体と笠石の固定構造を示す縦断面図。FIG. 23 is a vertical cross-sectional view showing a fixing structure of a frame and a capstone.
【図24】同上の分解斜視図。FIG. 24 is an exploded perspective view of the above.
【図25】枠体の他の例を示す斜視図。FIG. 25 is a perspective view showing another example of the frame body.
【図26】枠体の他の例を示す斜視図。FIG. 26 is a perspective view showing another example of the frame body.
【図27】枠体の他の例を示す斜視図。FIG. 27 is a perspective view showing another example of the frame body.
【図28】枠体の他の例を示す斜視図。FIG. 28 is a perspective view showing another example of the frame body.
【図29】枠体の他の例を示す斜視図。FIG. 29 is a perspective view showing another example of the frame body.
【図30】枠体の組合せ例を示す斜視図。FIG. 30 is a perspective view showing an example of a combination of frame bodies.
【図31】枠体の組合せ例を示す平面図。FIG. 31 is a plan view showing an example of a combination of frame bodies.
1 枠体 2 外装材 3 貫通穴 6 ボルト 7 係止用凹溝 8 取付金具 13 取付け金物 19 ガイドレール 20 ナット部材 24 接地ボルト DESCRIPTION OF SYMBOLS 1 Frame 2 Exterior material 3 Through hole 6 Bolt 7 Recessed groove 8 for locking 8 Mounting bracket 13 Mounting hardware 19 Guide rail 20 Nut member 24 Ground bolt
───────────────────────────────────────────────────── フロントページの続き (72)発明者 朴 香美 茨城県下館市大字玉戸1336番地の223 (72)発明者 金澤 勇八郎 大阪府門真市大字岸和田460番地の16 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kami Park, 1336, Tamado, Shimodate, Ibaraki Prefecture 223 (72) Inventor, Yuhachiro Kanazawa 16, 460, Kishiwada, Kadoma, Osaka
Claims (20)
周壁に貫通穴が設けられた枠体と、前記枠体の周壁外面
に取付けられる外装材とからなり、外装材が貫通穴を利
用して枠体に固定されるようになっている花壇や門柱等
の施工ユニット。1. A frame body made of an appropriate material and having a through hole in its peripheral wall, and an exterior material attached to the outer surface of the peripheral wall of the frame body. The exterior material has a through hole. Construction units such as flower beds and gate posts that are fixed to the frame by using them.
合せからなり、各外装材はパネルの外面に化粧材を一体
化して形成されている請求項1記載の花壇や門柱等の施
工ユニット。2. The construction of a flower bed, gatepost, etc. according to claim 1, wherein the exterior material is a combination of a plurality of sheets surrounding the outer surface of the frame body, and each exterior material is formed by integrally forming a decorative material on the outer surface of the panel. unit.
ネルの組み合せによって形成され、各パネルが枠体に貫
通穴を利用して固定されるようになっている請求項1記
載の花壇や門柱等の施工ユニット。3. The flower bed according to claim 1, wherein the exterior material is formed by a combination of a plurality of panels arranged on the outer surface of the frame body, and each panel is fixed to the frame body through a through hole. Construction unit for gates and gates.
周壁に貫通穴が設けられた枠体と、前記枠体の周壁外面
に取付けられる外装材とからなり、外装材が枠体の周壁
外面に固定した取付金具間に嵌め込むことによって枠体
に固定化されるようになっている花壇や門柱等の施工ユ
ニット。4. A frame body made of an appropriate material, the frame body having a through hole in its peripheral wall, and an exterior material attached to the outer surface of the peripheral wall of the frame body. A construction unit such as a flowerbed or gatepost that is fixed to the frame by being fitted between mounting brackets fixed to the outer surface of the peripheral wall.
P、アルミ、鉄等の金属、鋳物の何れかを用い、多角形
や方円形の枠状に形成され、周壁の貫通穴は枠体の重量
を軽減させるための上下方向の長穴に形成されている請
求項1乃至4記載の花壇や門柱等の施工ユニット。5. The frame body is concrete, synthetic resin, FR
Using a metal such as P, aluminum, or iron, or a casting, it is formed into a polygonal or rectangular frame shape, and the through hole of the peripheral wall is formed as a vertically elongated hole for reducing the weight of the frame body. 5. A construction unit such as a flower bed or gatepost according to claim 1.
きの断面形状になっている請求項1乃至5記載の花壇や
門柱等の施工ユニット。6. The construction unit for a flower bed, gatepost or the like according to claim 1, wherein the through hole has a stepped sectional shape with a narrow outer side and a wide inner side.
て形成され、外装材の裏面側に貫通穴へ挿入して外装材
を枠体に固定する複数の取付け金物を設けた請求項1乃
至3記載の花壇や門柱等の施工ユニット。7. The through hole is formed by a large number of circular holes or square holes, and a plurality of mounting hardware for inserting the through hole into the through hole and fixing the outside material to the frame body are provided on the back side of the outside material. Construction units such as flower beds and gate posts described in 3.
置調整可能になっている請求項7記載の花壇や門柱等の
施工ユニット。8. The construction unit for a flower bed, gatepost or the like according to claim 7, wherein the mounting hardware provided on the back side of the exterior material is positionally adjustable.
と笠石が両者に設けた一対の係止部材で固定化するよう
になっている請求項1乃至8記載の花壇や門柱等の施工
ユニット。9. A flower bed, a gatepost, etc. according to claim 1, further comprising a capstone attached to the upper end of the frame body, wherein the frame body and the capstone are fixed by a pair of locking members provided on both. Construction unit.
用い、枠体の対向する貫通穴間に鉄筋を差し込み、砕石
を締め固めた地面に接地し、枠体内にコンクリートを流
し込んで基礎を同時に施工したのち外面に外装材を取り
つけて施工することを特徴とする花壇や門柱等の施工方
法。10. The construction unit according to any one of claims 1 to 9, wherein reinforcing bars are inserted between opposing through holes of a frame body, grounded on compacted crushed stone, and concrete is poured into the frame body to simultaneously form a foundation. A construction method for flower beds, gate posts, etc., which is characterized in that the exterior material is attached to the outer surface after construction.
互の貫通穴の部分でボルトによって結合することを特徴
とする請求項10記載の花壇や門柱等の施工方法。11. The method for constructing a flower bed, gatepost, etc. according to claim 10, wherein a plurality of frame bodies arranged side by side on a plane are joined by bolts at portions of the through holes.
互の貫通穴の部分でボルトによって結合し、接続した枠
体の全長を、上記ボルトの部分又は枠体の切断によって
設置場所の条件に合わせるようにした請求項10記載の
花壇や門柱等の施工方法。12. A plurality of frame bodies arranged side by side on a plane are joined together by bolts at through-hole portions, and the total length of the connected frame bodies is determined by the cutting of the bolt portions or the frame body at the installation site. The method for constructing a flower bed, gatepost, etc. according to claim 10, which is adapted to the above.
ね、上下枠体を互に結合することを特徴とする請求項1
0乃至12記載の花壇や門柱等の施工方法。13. The frame body is stacked on a frame body fixed to the ground, and the upper and lower frame bodies are connected to each other.
Construction method for flower beds and gate posts described in 0 to 12.
みパネルを立てかけ、枠体とパネルを貫通穴の部分を利
用して結合し、パネルを塀や擁壁とする請求項10乃至
13記載の花壇や門柱等の施工方法。14. After fixing the frame body to the ground, the decorative material-implanted panel is erected and the frame body and the panel are joined together by utilizing the through holes, and the panel is used as a fence or a retaining wall. How to construct the flowerbeds and gateposts mentioned.
トで支持して高さを調整するようにした請求項10乃至
13記載の花壇や門柱等の施工方法。15. The method of constructing a flower bed, gatepost or the like according to claim 10, wherein the frame body installed on the ground is supported by a plurality of adjusting bolts to adjust the height.
合、枠体の下部を傾斜に合わせて切断した後、設置する
ことを特徴とする請求項10乃至13記載の花壇や門柱
等の施工方法。16. The flower bed, gatepost, etc. according to claim 10, wherein when the ground on which the frame is to be installed is inclined, the lower part of the frame is cut to match the inclination and then installed. Construction method.
れ、この内枠内に土を充填して植栽を行なうようにした
請求項10乃至16記載の花壇や門柱等の施工方法。17. The method of constructing a flower bed, gatepost, etc. according to claim 10, wherein an inner frame is placed inside a frame body installed on the ground, and the inner frame is filled with soil for planting. .
体間に板状又はアングル状の製品を取り付けて、この板
状又はアングルに化粧材を打設した板を取り付けて花壇
や住宅塀を施工する請求項10乃至13記載の施工方
法。18. A flowerbed or a flowerbed, wherein frame bodies are installed on the ground at intervals, plate-like or angle-like products are attached between the frame bodies, and a plate in which a decorative material is cast is attached to the plate-like or angle. The construction method according to claim 10, wherein the housing wall is constructed.
ルを取り付け、下部に板を設置することによりフラワー
ポットを製作する請求項10乃至13記載の施工方法。19. The construction method according to claim 10, wherein a decorative material or a decorative panel is attached to the frame body alone, and a flower pot is manufactured by installing a plate in the lower part.
を挿入して緊張して固定し、これによって枠体の強度を
より上げる請求項10乃至13記載の施工方法。20. The construction method according to claim 10, wherein when joining a plurality of frames, a PC steel rod is inserted and tensioned and fixed, whereby the strength of the frames is further increased.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8045387A JPH09205886A (en) | 1996-02-06 | 1996-02-06 | Unit and method for constructing flower bed, gatepost and the like |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8045387A JPH09205886A (en) | 1996-02-06 | 1996-02-06 | Unit and method for constructing flower bed, gatepost and the like |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH09205886A true JPH09205886A (en) | 1997-08-12 |
Family
ID=12717867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8045387A Pending JPH09205886A (en) | 1996-02-06 | 1996-02-06 | Unit and method for constructing flower bed, gatepost and the like |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH09205886A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593047A (en) * | 2019-09-27 | 2019-12-20 | 上海城建市政工程(集团)有限公司 | Prefabricated terrace for bridge stand column prefabricated large-scale template and application method thereof |
-
1996
- 1996-02-06 JP JP8045387A patent/JPH09205886A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593047A (en) * | 2019-09-27 | 2019-12-20 | 上海城建市政工程(集团)有限公司 | Prefabricated terrace for bridge stand column prefabricated large-scale template and application method thereof |
CN110593047B (en) * | 2019-09-27 | 2024-04-19 | 上海城建市政工程(集团)有限公司 | Prefabricated terrace for prefabricating large formwork for bridge upright posts and application method of prefabricated terrace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0982450B1 (en) | Ready-mixed concrete placing method and formwork unit used for the method | |
KR100873266B1 (en) | Prefabricated pillar structure | |
WO2011036928A1 (en) | House foundation panel unit, house foundation structure, and method for forming a house foundation | |
JPH09205886A (en) | Unit and method for constructing flower bed, gatepost and the like | |
JPH11323968A (en) | Concrete panel and execution method of building/ constructed body therewith | |
JPH11323970A (en) | Execution method for fence, flower bed, retaining wall, gatepost | |
JP2003074137A (en) | Panel mounting structure | |
JP2000220150A (en) | Bundled stone-like body, and forming method for pressure-resisting board type foundation | |
KR20070053375A (en) | A building making and construction using precast concrete prefab box | |
JPH116332A (en) | Assembled exterior wall construction | |
JP2004285581A (en) | Steel framed foundation material for building and formation method of concrete foundation for building making use of steel framed base foundation material | |
JP2013236459A (en) | Installation structure of solar cell panel | |
JP7213150B2 (en) | Fixing method of pillars and concrete floor slabs and construction method of retaining walls | |
JP2978618B2 (en) | Plastic fence | |
JPH11323958A (en) | Execution method of building and concrete product used therefor | |
JPH0551961A (en) | Panel for construction | |
JP2577642B2 (en) | How to build underground structures | |
JP2612415B2 (en) | Pillar construction materials | |
JP3451274B2 (en) | Soil unit and integrated prefabricated house unit | |
KR100352983B1 (en) | Picket Head Reinforcement Unit of H beam | |
JPH08105062A (en) | Footing structure and executing method thereof | |
JP2022149501A (en) | Steel square backing column and fixing structure and fixing method of aluminum cover material | |
JPH05239835A (en) | Independent foundation with form | |
JP3807968B2 (en) | Exterior structure | |
JPH04128433A (en) | Construction method of foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20071108 |