JPH09198448A - System and device for automatically ordering commodity - Google Patents

System and device for automatically ordering commodity

Info

Publication number
JPH09198448A
JPH09198448A JP2604896A JP2604896A JPH09198448A JP H09198448 A JPH09198448 A JP H09198448A JP 2604896 A JP2604896 A JP 2604896A JP 2604896 A JP2604896 A JP 2604896A JP H09198448 A JPH09198448 A JP H09198448A
Authority
JP
Japan
Prior art keywords
sales
week
day
period
previous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2604896A
Other languages
Japanese (ja)
Inventor
Seiji Notomi
誠治 納富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SYST DESIGN KK
NIPPON SYSTEM DESIGN
Original Assignee
NIPPON SYST DESIGN KK
NIPPON SYSTEM DESIGN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SYST DESIGN KK, NIPPON SYSTEM DESIGN filed Critical NIPPON SYST DESIGN KK
Priority to JP2604896A priority Critical patent/JPH09198448A/en
Publication of JPH09198448A publication Critical patent/JPH09198448A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To calculate the optimum number of composites to be ordered, and to automatically order commodities while keeping proper stock by predicting the amount of commodities to be ordered from a predictive index found from the index of the next week and a corrected value and a result value for each latest day of a week. SOLUTION: First of all, the result in the previous year corresponding to a predictive week is compared with the result of the next week in the last year and the index of the next week in the last year is found. Namely, it is made into index how the index of the next week in the last year changes at the same period the last year. In order to consider the fluctuation transition of this year, the corrected value is provided by comparing the weighted mean of closest three weeks in this year with the weighted mean of the same period in the last year (of closest three weeks in the last year). The prediction index is found from the next week index in the last year and the correction value. When there is a sales result as shown in the figure and the number of displays at starting time is '400', for example, in the case of order on Monday and delivery on Wednesday, the number of commodities to be ordered becomes the total of sales of the last week from Monday to Sunday, namely, 20+10+30+35+40+60+80=275. Thus, stock efficiency is improved as well and the optimum amount of commodities to be ordered can be decided without sold out commodities.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は売上予測型自動商品
発注システム及び自動商品発注装置に関するものであ
り、特に、季節変動や店休及び販売促進等の売上変動を
考慮した単品毎の自動発注システムに関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sales forecast type automatic merchandise ordering system and an automatic merchandise ordering device, and in particular, an automatic ordering system for each individual product in consideration of sales fluctuations such as seasonal fluctuations, store holidays and sales promotion. It is about.

【0002】[0002]

【従来の技術】ホームセンターやスーパーマーケット等
では取り扱う商品が極めて多く、また補充発注が頻繁に
行われている。これらの補充発注に対して、POSシス
テムを導入することにより、販売情報を早期かつ的確に
行う努力がなされていた。
2. Description of the Related Art There are an extremely large number of products handled in home centers and supermarkets, and replenishment orders are frequently made. With respect to these supplementary orders, efforts have been made to introduce sales information quickly and accurately by introducing a POS system.

【0003】しかしながら現実には、欠陥の多い定点補
充発注方式や売上実績発注方式等の発注方式が採用され
ていた。
However, in reality, an ordering method such as a fixed point replenishment ordering method or a sales record ordering method, which has many defects, has been adopted.

【0004】定点補充発注方式は、各商品毎に最大陳列
量と発注点数量と発注点数量を定め、在庫が発注点を下
回った場合に、最大陳列量との不足分を発注する方式で
ある。例えば、商品Aについて最大陳列量を30個とし
た場合には、現在の商品が8個であれば、(30−8)
=22(個)を発注する方式である。
The fixed point replenishment ordering system is a system in which the maximum display quantity, the ordering point quantity, and the ordering point quantity are determined for each product, and when the inventory falls below the ordering point, the shortage with the maximum display quantity is ordered. . For example, if the maximum display quantity for product A is 30, and the current product is 8, then (30-8)
= 22 (pieces).

【0005】また、売上実績発注方式は、単純に直近の
販売数をそのまま発注する方式である。
The sales record ordering system is a system in which the latest sales quantity is simply ordered.

【0006】[0006]

【発明が解決しようとする課題】上記定点補充発注方式
は、売上の実績を直接考慮しないため、年間で大きく変
化することの多い季節変動に対応することができず、更
に、店休や祝日等のカレンダー調整等の細かな日々の売
れ行きのトレンドを補充発注に反映させることができな
いという問題点があった。また、販売促進による特異な
売上変化等に対応することができないという致命的な問
題点があった。
The fixed point replenishment ordering system described above does not directly consider the sales record, and therefore cannot deal with seasonal fluctuations that often change greatly during the year. There is a problem that it is not possible to reflect the detailed daily sales trends such as calendar adjustment in the replenishment order. In addition, there is a fatal problem that it is impossible to deal with a peculiar change in sales due to sales promotion.

【0007】特に祝日は、平日の売上の3倍にも達する
場合があり、更に、近年のバーゲンセール、ちらし等の
宣伝、販促効果は有効性を増しており、これらの販促効
果を除外して管理する対応の補充発注方式でないと、か
えって在庫の不適性を招くという致命的な問題点があ
り、殆ど採用されていない。
In particular, holidays may reach three times as much as sales on weekdays, and in addition, advertising and sales promotion effects such as bargain sales and leaflets have become more effective in recent years, and these sales promotion effects are excluded. Unless it is a replenishment ordering system that can be managed, there is a fatal problem of inadequate inventory, and it is rarely used.

【0008】また売上実績発注方式は、在庫データを使
用しないので、比較的システムコストが低く抑えること
ができるが、適正な在庫を管理する機能を有さず、品切
れや過剰在庫の防止効果が期待できず、1部の十分な大
量陳列商品でしか適用できないという問題点があった。
Further, the sales record ordering system does not use inventory data, so that the system cost can be kept relatively low, but it does not have a function of managing proper inventory, and is expected to prevent out-of-stock and excess inventory. This is not possible, and there is a problem in that it can be applied only to a sufficiently large number of products on display.

【0009】更に、ハンディターミナルを利用した現場
での実態把握型の在庫チェック方式では、売場スタッフ
に対して日常業務の1/3にも及ぶ作業負担を強いるこ
ととなり、極めて経済性と精度が低いという問題点があ
った。
[0009] Further, the inventory check method of grasping the actual situation at the site using the handy terminal imposes a work burden on the sales floor staff, which is one-third of the daily work, resulting in extremely low economic efficiency and accuracy. There was a problem.

【0010】そこで殆どの商品に対応することができ、
補充発注を売上の変動を考慮して最適な発注数を算出し
て、かつ適正在庫を維持しながら、自動的に発注を行う
ことのできる自動商品発注システム及び自動商品発注装
置の開発が強く望まれていた。
Therefore, most products can be handled,
It is strongly desired to develop an automatic merchandise ordering system and an automatic merchandise ordering system that can calculate the optimal number of replenishment orders in consideration of sales fluctuations and automatically place orders while maintaining proper inventory. It was rare.

【0011】[0011]

【課題を解決するための手段】本発明は上記課題に鑑み
案出されたもので、売上予測の対象となる予測週に対応
する前年の一週間の売上実績である前年同週実績と、こ
の対応する前年の週の次週の売上実績である前年次週実
績を比較した前年次週指数(前年次週実績/前年同週実
績)を演算する第1工程と、予測する年の直近一定期間
の加重平均と、前年の対応する同時期の週の加重平均を
比較した補正値(当年直近3週加重平均指数/前年直近
3週加重平均指数)を演算する第2工程と、前記次週指
数と補正値とを掛け合わせ、予測指数を演算する第3工
程と、この予測指数と、直近の各曜日の実績値とから発
注量を予測することを特徴としている。
[Means for Solving the Problems] The present invention has been devised in view of the above problems, and includes the same-year sales result of the same week of the previous year, which is the sales performance of a week corresponding to the forecast week of the sales forecast. The first process that calculates the previous week's next week's index (the previous year's next week's results / the previous year's same week's results), which compares the sales results for the next week of the corresponding previous year's week, and the weighted average for the latest certain period of the predicted year , The second step of calculating a correction value (weighted average index of the last 3 weeks of the current year / weighted average index of 3 weeks of the previous year) comparing the weighted averages of the corresponding weeks of the previous year, and the index of the next week and the correction value It is characterized in that the ordering quantity is predicted from the third step of multiplying and calculating the prediction index, the prediction index, and the actual value of each latest day of the week.

【0012】また本発明の一定期間の加重平均を行う際
の一定期間は3月であり、予測指数と直近の各曜日の実
績値とを掛け合わせることにより、発注量を予測するこ
ともできる。
In addition, the fixed period when the weighted average of the fixed period of the present invention is performed is March, and the order quantity can also be predicted by multiplying the forecast index by the actual value of each latest day of the week.

【0013】更に本発明は、予測対応発注日の納品日の
翌日から次回発注による納品日までに対応する前週の各
曜日の売上を計上する第1工程と、これらの各曜日の売
り上げを合計し、この合計売上数を発注数とする第2工
程とから構成されている。
Further, according to the present invention, the first step of recording the sales on each day of the previous week corresponding to the day after the delivery date of the forecasted ordering date to the delivery date of the next order and the sales on each of these days are totaled. , And a second step in which the total number of sales is the number of orders.

【0014】そして本発明は、前週の対応日が店休日で
あって、予測対応日が営業日の場合には、前々週が営業
日の場合にはその売上を計上し、前々週の対応日が店休
日であれば、前週の店休日の翌日の売上を計上すること
もできる。
According to the present invention, when the corresponding day of the previous week is a store holiday and the predicted corresponding day is a business day, the sales are recorded if the week before the business day is the business day before, and the sales of the week before the last day are recorded. If the corresponding day is a store holiday, it is possible to count the sales on the day following the store holiday of the previous week.

【0015】また本発明は、前週の対応日が営業日であ
って、予測対応日が店休日の場合には、売上をゼロとす
ることもできる。
Further, according to the present invention, when the corresponding day of the previous week is a business day and the predicted corresponding day is a store holiday, the sales can be zero.

【0016】更に本発明は、前週の対応日が平日であっ
て、予測対応日が祝日の場合には、売上を直近の日曜日
の売上とすることもできる。
Further, according to the present invention, when the corresponding day of the previous week is a weekday and the predicted corresponding day is a holiday, the sales can be the sales of the latest Sunday.

【0017】そして本発明は、前週の対応日が祝日であ
って、予測対応日が平日の場合には、前週の祝日の翌日
(平日)の売上を計上することもできる。
Further, according to the present invention, when the corresponding day of the previous week is a holiday and the predicted corresponding day is a weekday, it is possible to record the sales on the next day (weekday) of the holiday of the previous week.

【0018】また本発明は、販売促進期間の場合には、
バイヤーが販売促進期間の増加売上数を予測し、その増
加分を別に発注し、通常販売時の在庫数に対して、前記
販売促進期間の残存在庫を加えるか、或いは、不足分を
差し引き、販売促進期間は、前週の同曜日の売上を計上
することもできる。
In the case of the sales promotion period, the present invention also provides
The buyer forecasts the number of sales that will increase during the promotion period, orders the increase separately, and either adds the remaining inventory during the promotion period to the number of stocks at the time of normal sales, or deducts the shortfall, and sells. For the promotion period, sales can be recorded on the same day of the previous week.

【0019】更に本発明は、現在在庫から、設定した発
注から納品までの期間販売数を減じて、納品日までの期
間の販売数Wを算出する第1工程(納品日在庫数W=現
在在庫V−期間販売数)と、期間売上数を期間日数で割
り、期間平均売上数Xを決定する第2工程と、前記納品
日在庫数Wを期間平均売上数Xで割り、納品日在庫数の
納品日在庫日数を算出する第3工程と、設定されている
標準在庫日数Uと、前記納品日在庫日数を引き、在庫日
数ギャップYを演算する第4工程(在庫日数ギャップY
=U−W)と、期間販売数を在庫日数ギャップYで補正
して発注量(期間販売数+(在庫日数ギャップY*期間
平均売上数X)を演算することもできる。
Further, according to the present invention, the first step of calculating the number of sales W in the period up to the delivery date by subtracting the number of period sales from the set order to the delivery from the current inventory (delivery date inventory number W = current inventory) V-the number of sales per period) and the number of sales per period divided by the number of days per period to determine the average number of sales per period X, and the number of delivery days inventory W divided by the average number of sales per period X to determine the number of units per day of delivery. Third day of calculating the delivery day inventory days, the set standard inventory days U, and the delivery day inventory days are subtracted to calculate the inventory days gap Y. Fourth step (inventory days gap Y
= U−W) and the period sales quantity is corrected by the inventory day gap Y to calculate the order quantity (period sales quantity + (stock days gap Y * period average sales quantity X)).

【0020】そして本発明は、品切れに伴う在庫が0の
場合には、前週又は前前週の同曜日の実績に振り返るこ
ともできる。
The present invention can also look back on the results of the previous week or the same day of the previous week when the stock due to the out of stock is zero.

【0021】また本発明は、の期間販売数は、請求項1
〜8で算出された発注量を使用することもできる。
According to the present invention, the number of items sold during the period is
It is also possible to use the order quantity calculated in ~ 8.

【0022】そして本発明は、売上予測の対象となる予
測週に対応する前年の一週間の売上実績である前年同週
実績と、この対応する前年の週の次週の売上実績である
前年次週実績を比較した前年次週指数(前年次週実績/
前年同週実績)を演算する第1工程と、予測する年の直
近一定期間の加重平均と、前年の対応する同時期の週の
加重平均を比較した補正値(当年直近3週加重平均指数
/前年直近3週加重平均指数)を演算する第2工程と、
前記次週指数と補正値とを掛け合わせ、予測指数を演算
する第3工程と、この各曜日毎の予測指数を求め、直近
の曜日の売上数と掛け合わせ、総和する第4工程と、過
去一定期間の売上平均値に対して、設定されているクラ
ス別安全在庫日数Uを掛け、安全在庫数を算出する第5
工程(安全在庫数Y=(過去一定期間売上数W/在庫日
数)*クラス別安全在庫日数U)と、これらの演算値か
ら、(安全在庫数Y+次週売上予測数X)−(現在庫数
V−発注後在庫変動数)を演算し、この値を発注する第
6工程とから構成されている。
According to the present invention, the sales result of the same week of the previous year corresponding to the forecast week which is the target of the sales forecast, and the sales result of the corresponding week of the previous week corresponding to the same week of the previous year corresponding to the sales result of the corresponding week of the previous year. Next week's index comparing
Compensated value (weighted average index for the last 3 weeks of the current year) that compares the weighted average of the latest certain period of the year to be predicted with the 1st process for calculating the same week of the previous year) The second step to calculate the weighted average index for the last 3 weeks of the previous year, and
The third step of calculating the forecast index by multiplying the next week index and the correction value, the fourth step of obtaining the forecast index for each day of the week, multiplying it by the number of sales on the most recent day of the week, and summing it, and the past constant Number of safety stock days is calculated by multiplying the average sales value for the period by the set safety stock days U for each class
From the process (safety stock quantity Y = (sales quantity in the past fixed period W / stock days) * safety stock day quantity U by class) and these calculated values, (safety stock quantity Y + next week sales forecast quantity X)-(current stock quantity) V-the number of fluctuations in inventory after ordering), and the sixth step of ordering this value.

【0023】また本発明は、第5工程の安全在庫数Yの
演算は、Y=(平均売数/稼働日数)*(標準在庫日数
+安全在庫日数)で演算することもできる。
In the present invention, the safety stock quantity Y in the fifth step can also be calculated by Y = (average sale quantity / operating days) * (standard inventory days + safety inventory days).

【0024】更に本発明の自動商品発注装置は、基準在
庫日数U等を入力するための入力手段と、前年の各日の
売上が記憶されている記憶手段と、売上予測の対象とな
る予測週に対応する前年の一週間の売上実績である前年
同週実績と、この対応する前年の週の次週の売上実績で
ある前年次週実績から、前年次週指数(前年次週実績/
前年同週実績)を演算する第1の演算処理手段と、予測
する年の直近一定期間の加重平均と、前年の対応する同
時期の週の加重平均とから補正値(当年直近3週加重平
均指数/前年直近3週加重平均指数)を演算する第2の
演算処理手段と、前記次週指数と前記補正値とを掛け合
わせ、予測指数を演算するための第3の演算処理手段
と、現在庫数から設定した発注から納品までの期間販売
数を減じて、納品日までの期間の販売数W(納品日在庫
数W=(現在在庫V−期間販売数)を算出する第4の演
算処理手段と、期間売上数を期間日数で割り、期間平均
売上数Xを決定する第5の演算処理手段と、前記納品日
在庫数Wを期間平均売上数Xで割り、納品日在庫数の納
品日在庫日数を算出する第6の演算処理手段と、設定さ
れている基準在庫日数Uと、前記納品日在庫日数を引
き、在庫日数ギャップY(在庫日数ギャップY=U−
W)を演算する第7の演算処理手段と、期間販売数を在
庫日数ギャップYで補正して発注量(期間販売数+(在
庫日数ギャップY*期間平均売上数X)を演算する第8
の演算処理手段とからなり、期間販売数を、前記予測指
数と直近の曜日の売上数を乗じた値とすることを特徴と
している。
Further, the automatic merchandise ordering apparatus of the present invention has an input means for inputting the standard inventory days U and the like, a storage means for storing the sales of each day of the previous year, and a forecast week as a target of the sales forecast. Corresponding to the previous week's same week's sales results for the previous year and the corresponding previous week's next week's sales results for the previous week, the previous year's index (the previous week's actual
Correction value (weighted average of the last 3 weeks of the current year) from the first arithmetic processing means for calculating the same week of the previous year), the weighted average of the most recent fixed period of the year to be predicted, and the weighted average of the corresponding corresponding week of the previous year Index / three most recent year weighted average index) second arithmetic processing means, third arithmetic processing means for multiplying the next week index and the correction value to calculate a predicted index, and a current storage Fourth arithmetic processing means for calculating the number of sales W (delivery date inventory number W = (current inventory V-period sales number)) by subtracting the number of period sales from ordering to delivery set from the number And a fifth arithmetic processing means for dividing the number of period sales by the number of period days to determine the average number of period sales X, and the number of delivery day inventory W divided by the average number of period sales X, and the delivery date inventory of the number of delivery date inventory Sixth arithmetic processing means for calculating the number of days and the set standard stock date And U, pulling the delivery date inventory days, inventory days gap Y (inventory days gap Y = U-
W) and a seventh arithmetic processing means for calculating an order quantity (period sales number + (stock days gap Y * average period sales number X)) by correcting the period sales number by the inventory days gap Y.
It is characterized in that the period sales quantity is a value obtained by multiplying the forecast index by the sales quantity on the most recent day of the week.

【0025】更に本発明の自動商品発注装置は、安全在
庫日数U等を入力するための入力手段と、前年の各日の
売上が記憶されている記憶手段と、売上予測の対象とな
る予測週に対応する前年の一週間の売上実績である前年
同週実績と、この対応する前年の週の次週の売上実績で
ある前年次週実績から、前年次週指数(前年次週実績/
前年同週実績)を演算する第1の演算処理手段と、予測
する年の直近一定期間の加重平均と、前年の対応する同
時期の週の加重平均とから補正値(当年直近3週加重平
均指数/前年直近3週加重平均指数)を演算する第2の
演算処理手段と、前記次週指数と前記補正値とを掛け合
わせ、予測指数を演算するための第3の演算処理手段
と、この予測指数を各曜日毎に求め、直近の曜日の売上
数と掛け合わせ、総和する第9の演算処理手段と、過去
一定期間の売上平均値に対して、設定されているクラス
別安全在庫日数Uを掛け、安全在庫数Y(安全在庫数Y
=(過去一定期間売上数W/在庫日数)*クラス別安全
在庫日数U)を算出する第10の演算処理手段と、これ
らの演算値から、(安全在庫数Y+次週売上予測数X)
−(現在庫数V−発注後在庫変動数)を演算して発注量
とする第11の演算処理手段とから構成されている。
Further, the automatic merchandise ordering apparatus of the present invention has an input means for inputting the number of days of safety stock U and the like, a storage means for storing the sales of each day of the previous year, and a forecast week which is a target of the sales forecast. Corresponding to the previous week's same week's sales results for the previous year and the corresponding previous week's next week's sales results for the previous week, the previous year's index (the previous week's actual
Correction value (weighted average of the last 3 weeks of the current year) from the first arithmetic processing means for calculating the same week of the previous year), the weighted average of the most recent fixed period of the year to be predicted, and the weighted average of the corresponding corresponding week of the previous year Index / previous 3 weeks weighted average index) second arithmetic processing means, third arithmetic processing means for multiplying the next week index and the correction value, and calculating a prediction index, and the prediction An index is calculated for each day of the week, multiplied by the number of sales on the most recent day of the week, and summed, and the set safety stock days U by class is set for the average sales value for the past certain period. Multiply, safety stock number Y (safety stock number Y
= (The number of sales in the past fixed period W / the number of days in stock) * the number of days of safety stock in class U) and the tenth arithmetic processing means, and from these calculated values, (the number of safety stock Y + the number of sales forecast next week X)
-(Current number of stocks V-Number of stock changes after order) is calculated to obtain the order quantity.

【0026】そして本発明の自動商品発注装置は、第1
0の演算処理手段による安全在庫数Yの演算が、Y=
(平均売数/稼働日数)*(基準在庫日数+安全在庫日
数)で演算とすることもできる。
The automatic merchandise ordering device of the present invention is the first
The calculation of the safety stock number Y by the calculation processing unit of 0 is Y =
It is also possible to calculate by (average number of sold days / operating days) * (standard inventory days + safety inventory days).

【0027】[0027]

【発明の実施の形態】以上の様に構成された本発明は、
第1工程で、売上予測の対象となる予測週に対応する前
年の一週間の売上実績である前年同週実績と、この対応
する前年の週の次週の売上実績である前年次週実績を比
較した前年次週指数(前年次週実績/前年同週実績)を
演算し、第2工程で、予測する年の直近一定期間の加重
平均と、前年の対応する同時期の週の加重平均を比較し
た補正値(当年直近3週加重平均指数/前年直近3週加
重平均指数)を演算し、第3工程で、前記次週指数と補
正値とを掛け合わせ、予測指数を演算し、この予測指数
と、直近の各曜日の実績値とから発注量を予測すること
ができる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention constructed as described above
In the 1st process, the previous year's same week results, which are the sales results for the previous week corresponding to the forecast week that is the target of the sales forecast, and the corresponding sales results for the following week of the corresponding previous week, were compared. Compensation value that calculates the previous week's next week index (previous year's next week actual / previous year's same week actual) and compares the weighted average for the latest certain period of the year to be predicted with the corresponding weighted average for the same period of the previous year in the second process (The most recent 3 week weighted average index of the current year / the most recent 3 week weighted average index of the previous year) is calculated, and in the third step, the next week index is multiplied by the correction value to calculate the predicted index, and the predicted index and the latest index are calculated. The order quantity can be predicted from the actual value on each day of the week.

【0028】また本発明の一定期間の加重平均を行う際
の一定期間は3月であり、予測指数と直近の各曜日の実
績値とを掛け合わせることにより、発注量を予測するこ
ともできる。
Further, the fixed period when the weighted average of the fixed period of the present invention is performed is March, and the order quantity can be predicted by multiplying the forecast index and the actual value of each latest day of the week.

【0029】更に本発明は、第1工程で、予測対応発注
日の納品日の翌日から次回発注による納品日までに対応
する前週の各曜日の売上を計上し、第2工程で、これら
の各曜日の売り上げを合計し、この合計売上数を発注数
とすることもできる。
Further, in the present invention, in the first step, the sales on each day of the previous week corresponding to the next day from the delivery date of the forecast corresponding order date to the delivery date of the next order are recorded, and in the second step, each of these sales is recorded. It is also possible to total the sales on the day of the week and use the total number of sales as the number of orders.

【0030】そして本発明は、前週の対応日が店休日で
あって、予測対応日が営業日の場合には、前々週が営業
日の場合にはその売上を計上し、前々週の対応日が店休
日であれば、前週の店休日の翌日の売上を計上すること
もできる。
According to the present invention, if the corresponding day of the previous week is a store holiday and the predicted corresponding day is a business day, the sales are recorded if the week before the business day is the business day before, and the sales of the week before the last day are recorded. If the corresponding day is a store holiday, it is possible to count the sales on the day following the store holiday of the previous week.

【0031】また本発明は、前週の対応日が営業日であ
って、予測対応日が店休日の場合には、売上をゼロとす
ることもできる。
Further, according to the present invention, when the corresponding day of the previous week is a business day and the predicted corresponding day is a store holiday, the sales can be zero.

【0032】更に本発明は、前週の対応日が平日であっ
て、予測対応日が祝日の場合には、売上を直近の日曜日
の売上とすることもできる。
Further, in the present invention, when the corresponding day of the previous week is a weekday and the predicted corresponding day is a holiday, the sales can be the sales of the most recent Sunday.

【0033】そして本発明は、前週の対応日が祝日であ
って、予測対応日が平日の場合には、前週の祝日の翌日
(平日)の売上を計上することもできる。
Further, according to the present invention, when the corresponding day of the previous week is a holiday and the predicted corresponding day is a weekday, the sales on the day after the holiday of the previous week (weekday) can be recorded.

【0034】また本発明は、販売促進期間の場合には、
バイヤーが販売促進期間の増加売上数を予測し、その増
加分を別に発注し、通常販売時の在庫数に対して、販売
促進期間の残存在庫を加えるか、或いは、不足分を差し
引き、販売促進期間は、前週の同曜日の売上を計上する
こともできる。
In the case of the sales promotion period, the present invention is
The buyer predicts the number of sales that will increase during the sales promotion period, orders the increased amount separately, and either adds the remaining inventory during the sales promotion period to the number of stocks at the time of normal sales, or deducts the shortfall, and promotes the sales. For the period, it is possible to record sales on the same day of the previous week.

【0035】更に本発明は、第1工程では、現在在庫か
ら、設定した発注から納品までの期間販売数を減じて、
納品日までの期間の販売数Wを算出し、第2工程では、
期間売上数を期間日数で割り、期間平均売上数Xを決定
し、第3工程では、納品日在庫数Wを期間平均売上数X
で割り、納品日在庫数の納品日在庫日数を算出し、第4
工程では、設定されている標準在庫日数Uと、納品日在
庫日数を引き、在庫日数ギャップYを演算し、第5工程
では、期間販売数を在庫日数ギャップYで補正して発注
量を演算することもできる。
Further, according to the present invention, in the first step, the number of items sold during the period from the set order to the delivery is subtracted from the current inventory,
Calculate the number of sales W until the delivery date, and in the second step,
The period sales number is divided by the period days to determine the average period sales number X, and in the third process, the delivery day inventory number W is set to the period average sales number X.
Divide by to calculate the number of days to deliver and the number of days to deliver
In the process, the set standard inventory days U and the delivery day inventory days are subtracted to calculate the inventory days gap Y, and in the fifth process, the period sales quantity is corrected by the inventory days gap Y to calculate the order quantity. You can also

【0036】そして本発明は、在庫が0の場合には、前
週又は前前週の同曜日の実績とすることもできる。
Further, in the present invention, when the stock is 0, it is possible to use the results of the previous week or the same day of the previous week.

【0037】また本発明の期間販売数は、請求項1〜8
で算出された発注量を使用することもできる。
Further, the number of products sold in a period according to the present invention is defined in claims 1 to 8.
It is also possible to use the order quantity calculated in.

【0038】そして本発明は、第4工程で予測指数を各
曜日毎に求め、直近の曜日の売上数と掛け合わせ、総和
するし、第5工程では、過去一定期間の売上平均値に対
して、設定されているクラス別安全在庫日数Uを掛け、
安全在庫数を算出し、第6工程では、これらの演算値か
ら、(安全在庫数Y+次週売上予測数X)−(現在庫数
V−発注後在庫変動数)を演算し、この値を発注量とす
ることもできる。
In the present invention, the predictive index is calculated for each day of the week in the fourth step, multiplied by the number of sales on the most recent day of the week, and summed up. In the fifth step, the average sales value in the past fixed period is calculated. , Multiply the set safety stock days U by class,
The safety stock quantity is calculated, and in the sixth step, (safety stock quantity Y + next week sales forecast quantity X) − (current stock quantity V−stock fluctuation quantity after order) is calculated, and this value is ordered. It can also be a quantity.

【0039】また本発明は、第5工程の安全在庫数Yの
演算は、Y=(平均売数/稼働日数)*(標準在庫日数
+安全在庫日数)で演算することもできる。
According to the present invention, the safety stock quantity Y in the fifth step can also be calculated by Y = (average number of sold days / operating days) * (standard inventory days + safety inventory days).

【0040】更に本発明の自動商品発注装置は、入力手
段が、基準在庫日数U等を入力し、記憶手段が、前年の
各日の売上が記憶し、第1の演算処理手段が、売上予測
の対象となる予測週に対応する前年の一週間の売上実績
である前年同週実績と、この対応する前年の週の次週の
売上実績である前年次週実績から、前年次週指数(前年
次週実績/前年同週実績)を演算し、第2の演算処理手
段が、予測する年の直近一定期間の加重平均と、前年の
対応する同時期の週の加重平均とから補正値(当年直近
3週加重平均指数/前年直近3週加重平均指数)を演算
し、第3の演算処理手段が、次週指数と前記補正値とを
掛け合わせ、予測指数を演算し、第4の演算処理手段
が、現在庫数から設定した発注から納品までの期間販売
数を減じて、納品日までの期間の販売数Wを算出し、第
5の演算処理手段が、期間売上数を期間日数で割り、期
間平均売上数Xを決定し、第6の演算処理手段が、納品
日在庫数Wを期間平均売上数Xで割り、納品日在庫数の
納品日在庫日数を算出し、第7の演算処理手段が、設定
されている標準在庫日数Uと、納品日在庫日数を引き、
在庫日数ギャップYを演算し、第8の演算処理手段が、
期間販売数を在庫日数ギャップYで補正して発注量を演
算し、第9の演算処理手段が、期間販売数を、予測指数
と直近の曜日の売上数を乗じた値とすることができる。
Further, in the automatic merchandise ordering apparatus of the present invention, the input means inputs the standard inventory days U and the like, the storage means stores the sales of each day of the previous year, and the first arithmetic processing means makes the sales forecast. From the same week last year that is the sales result for the previous week corresponding to the forecast week that is subject to the above, and the previous week next week that is the sales result for the corresponding week of the previous year. The second arithmetic processing unit calculates the correction value (weighted for the last three weeks of the current year) from the weighted average of the predicted latest fixed period of the year and the weighted average of the corresponding corresponding week of the previous year. Average index / weighted average index of the last 3 weeks of the previous year), the third calculation processing means multiplies the next week index and the correction value to calculate a prediction index, and the fourth calculation processing means calculates the current stock. From the number of items set to the period from ordering to delivery And the fifth arithmetic processing unit divides the number of period sales by the number of period days to determine the average number of period sales X, and the sixth arithmetic processing unit determines the number of delivery date stock W Is divided by the period average sales number X to calculate the delivery date inventory days of the delivery date inventory number, and the seventh arithmetic processing means subtracts the set standard inventory days U from the delivery date inventory days,
The eighth calculation processing means calculates the inventory days gap Y, and
The order sales quantity can be calculated by correcting the period sales quantity by the inventory day gap Y, and the ninth arithmetic processing means can set the period sales quantity to a value obtained by multiplying the forecast index by the sales quantity of the nearest day of the week.

【0041】更に本発明の自動商品発注装置は、入力手
段が、安全在庫日数U等を入力し、第9の演算処理手段
が、予測指数を各曜日毎に求め、直近の曜日の売上数と
掛け合わせて総和し、第10の演算処理手段が、過去一
定期間の売上平均値に対して、設定されている安全在庫
日数Uを掛け、安全在庫数Yを算出し、第11の演算処
理手段が、これらの演算値から、(安全在庫数Y+次週
売上予測数X)−(現在庫数V−発注後在庫変動数)を
演算して発注量とする様になっている。
Further, in the automatic merchandise ordering apparatus of the present invention, the input means inputs the safety stock days U, etc., and the ninth arithmetic processing means obtains the forecast index for each day of the week, and obtains the sales number of the most recent day of the week. The tenth arithmetic processing means calculates the safety stock quantity Y by multiplying the sales average value in the past fixed period by the set safety stock days U, and the eleventh arithmetic processing means. However, from these calculated values, (safety stock quantity Y + next week sales forecast quantity X)-(current stock quantity V-post-order inventory fluctuation quantity) is calculated as the order quantity.

【0042】そして本発明の自動商品発注装置は、第1
0の演算処理手段による安全在庫数Yの演算が、Y=
(平均売数/稼働日数)*(標準在庫日数+安全在庫日
数)で演算とすることもできる。
The automatic merchandise ordering device of the present invention is the first
The calculation of the safety stock number Y by the calculation processing unit of 0 is Y =
It is also possible to calculate by (average number of sales / days of operation) * (standard number of days of inventory + number of days of safety inventory).

【0043】[0043]

【売上予測数の演算】[Calculation of sales forecast]

【0044】ここで、売上予測数の演算について説明す
る。
Here, the calculation of the sales forecast number will be described.

【0045】「予測指数設定日」[Prediction index setting date]

【0046】まず、予測指数を自動設定するタイミング
を説明する。図 に示す様に、各週の最終日の日次締め
処理を行い、通常、日曜日を設定し、その後、1週間を
この予測データを使用することとする。
First, the timing for automatically setting the prediction index will be described. As shown in the figure, daily closing processing is performed on the last day of each week, Sunday is usually set, and then this forecast data is used for one week.

【0047】なお、予測指数を常時変更可能となってい
る。
The prediction index can always be changed.

【0048】まず、予測週に対応する前年の実績と、前
年の次週の実績を比較し、前年次週指数を演算する。
First, the result of the previous year corresponding to the predicted week and the result of the next week of the previous year are compared to calculate the previous week's index.

【0049】 前年次週指数=(前年次週実績/前年同週実績) ・・・・・第1式Previous year's next week index = (previous year's next week result / previous year's same week result) ... Formula 1

【0050】即ち、前年次週指数は、前年度の同時期で
はどの様に変動したかを指数化する。
That is, the previous year's next week index is an index of how the index fluctuates during the same period of the previous year.

【0051】そして、当年の変動推移を考慮するため
に、当年直近3週の加重平均と、前年の同時期(前年の
直近3週)の加重平均を比較して補正値を得る。
Then, in order to take into consideration the change in the current year, the weighted average of the latest 3 weeks of the current year and the weighted average of the same period of the previous year (the latest 3 weeks of the previous year) are compared to obtain a correction value.

【0052】 補正値=当年直近3週加重平均指数/前年直近3週加重平均指数 ・・・・・第2式Correction value = weighted average index for the last 3 weeks of the current year / weighted average index of 3 weeks for the previous year ... Formula 2

【0053】更に、第1式の前年次週指数と、第2式の
補正値とから、予測指数を演算することができる。
Furthermore, the predicted index can be calculated from the previous week's index of the first formula and the correction value of the second formula.

【0054】 予測指数=前年次週指数*補正値 ・・・・・第3式Prediction index = previous week's week index * correction value ... Formula 3

【0055】また、実際の発注数は、第3式の予測指数
と、発注日直近の各曜日の実績値とから、発注数を決定
することができる。
The actual number of orders can be determined from the prediction index of the third formula and the actual value of each day of the week immediately before the order date.

【0056】(A)「売上引型自動発注」(A) "Sales discount type automatic ordering"

【0057】売上引型自動発注は、「売上予測型自動発
注」のロジックと「基準在庫日数」チェックによる適正
在庫チェック機能を省略することにより、中小小売りチ
ェーンに多い、単品在庫管理ができない店用に簡略した
ものであり、低コストで運営でき、従来方式とは格段に
精度を向上させた方式である。今回の発注量は、在庫の
確保に関し、各商品の発注納品パターンより決定するも
のである。なお、確保する発注量は、今回発注に対する
納品日の翌日より、次回発注に対する納品日までの期間
の販売数を直近の各曜日の売上実績により、各種の変動
要素を調整した上で設定し、設定した販売数の合計値を
発注ロット数がある場合には、それに対応して丸めた値
を発注数としている。
Sales-subscription type automatic ordering is for stores that are often used in small and medium-sized retail chains and cannot manage individual items, by omitting the logic of "sales forecast type automatic ordering" and the appropriate stock check function by checking "standard inventory days". It is simple and can be operated at low cost, and the conventional method is a method with significantly improved accuracy. The order quantity this time is determined based on the order and delivery pattern of each product with respect to securing the inventory. In addition, the order quantity to be secured is set by adjusting the various variable factors by the sales results of the most recent days from the day following the delivery date for this order until the delivery date for the next order, When the total value of the set sales numbers is the number of order lots, the rounded value is set as the order number.

【0058】この場合、毎回丸め処理で発注しないか、
逆に切り上げにより過剰発注を防止する目的で、2回目
の発注計算時に、その切り上げ/切り下げ分を繰り越す
ことにより、バランスを保っている。
In this case, whether the order is rounded every time,
On the contrary, in order to prevent over-ordering by rounding up, the balance is maintained by carrying over the rounding up / down of the second order calculation.

【0059】例えば、図1に示す様な売上実績があり、
開始時陳列数が400である場合には、月曜発注、水曜
納品であれば、
For example, there is a sales record as shown in FIG.
If the number of displays at the start is 400, if Monday ordering, Wednesday delivery,

【0060】 発注数=月曜日〜日曜日の前週売上の合計 =20+10+30+35+40+60+80 =275個Orders = Total sales of the previous week from Monday to Sunday = 20 + 10 + 30 + 35 + 40 + 60 + 80 = 275

【0061】となる。Is obtained.

【0062】更に、月曜日発注、水曜納品、木曜発注、
土曜納品の週2回発注の場合には、図2に示す様に、
Furthermore, Monday order, Wednesday delivery, Thursday order,
When ordering twice a week for Saturday delivery, as shown in Figure 2,

【0063】月曜発注数=木・金・土の「売上数」=3
5+40+60=135個 木曜発注数=日〜水の「売上数」=80+20+10+
30=140個 となる。
Monday Orders = "Sales" on Thursday, Friday and Saturday = 3
5 + 40 + 60 = 135 pieces Thursday's order quantity = day to “sales quantity” = 80 + 20 + 10 +
30 = 140.

【0064】「カレンダー調整」[Calendar adjustment]

【0065】ここで、カレンダー調整を説明する。Here, the calendar adjustment will be described.

【0066】即ち、次週に店休日、祝日が入った場合に
は、過去週と同一曜日で異なる場合には、自動的に過去
実績が補正される様になっている。
That is, when a store holiday or a holiday is entered in the next week, the past performance is automatically corrected if it is different from the past week on the same day.

【0067】(1)前週が店休日で、今週が営業日の場
(1) When the previous week is a store holiday and this week is a business day

【0068】図3に示す様に、前々週が営業日であれ
ば、その実績を代入し、店休日であれば、前週の店休日
の翌日の実績を代入する。
As shown in FIG. 3, if the week before last is a business day, the result is substituted, and if it is a store holiday, the result of the day after the store holiday of the previous week is substituted.

【0069】即ち、前々週が営業日であれば20個とな
り、店休日であれば前週の水曜日の実績である25個を
採用する。
That is, if the last two business days is a business day, the number is 20, and if it is a store holiday, the number 25, which is the result of the previous Wednesday, is adopted.

【0070】(2)前週が営業日であって、今週が店休
日の場合
(2) When the previous week is a business day and this week is a store holiday

【0071】図4に示す様に、ゼロを代入する。As shown in FIG. 4, zero is substituted.

【0072】(3)前週が平日で、今週が祝日の場合(3) When the previous week is a weekday and this week is a holiday

【0073】図5に示す様に、前週が平日で、今週が祝
日の場合には、直近の日曜日の実績を代入する。
As shown in FIG. 5, when the previous week is a weekday and this week is a holiday, the actual results of the latest Sunday are substituted.

【0074】(4)前週が祝日で、今週が平日の時(4) When the previous week is a holiday and this week is a weekday

【0075】図6に示す様に、前々週が平日ならば、そ
の実績を採用し、祝日、店休日の場合には、前週の祝日
の翌日(平日)の実績を採用する。
As shown in FIG. 6, if the week before last is a weekday, the result is adopted, and if it is a holiday or a store holiday, the result on the day after the holiday of the previous week (weekday) is adopted.

【0076】即ち、前々週が平日ならば、20個を採用
し、祝日、店休日の場合には、祝日の翌日(平日)であ
る木曜日の25個を採用する。
That is, if the week before the second week is a weekday, 20 pieces are adopted, and if it is a holiday or a store holiday, 25 pieces on Thursday, which is the next day (weekday) of the holiday, is adopted.

【0077】「ロットのまるめ処理」“Lot rounding”

【0078】入数に対する端数は、四捨五入する。即
ち、入数が12の場合には、
Fractions with respect to the included number are rounded off. That is, if the number of pieces is 12,

【0079】発注数=27の場合には、27−12*2
=3(次回に繰り越し) で切り捨てて、24個発注
し、
When the number of orders = 27, 27-12 * 2
= 3 (carry over next time), round down, order 24 pieces,

【0080】発注数=29の場合には、29−12*2
=5(次回に繰り越し) で切り上げて、36個発注
する。
When the number of orders = 29, 29-12 * 2
Round up to 5 (carry over next time) and order 36 pieces.

【0081】「販促時補正」[Correction at the time of sales promotion]

【0082】販売促進期間の場合には、バイヤーが販売
促進期間の増加売上数を予測し、その増加分を別に発注
し、通常販売時の在庫数に対して、販売促進期間の残存
在庫を加えるか、或いは、不足分を差し引き、販売促進
期間は、前週の同曜日の売上を計上することもできる。
In the case of the sales promotion period, the buyer predicts the increased number of sales in the sales promotion period, orders the increased amount separately, and adds the remaining inventory of the sales promotion period to the number of stocks at the time of normal sales. Alternatively, the shortfall can be deducted, and the sales promotion period can be recorded as sales on the same day of the previous week.

【0083】即ち、図7に示す様に、プロパー在庫が1
00個で、特売発注が30個の場合には、特売在庫がな
くなった2日目から、30個を越えた売上を、プロパー
在庫から引く様にする。
That is, as shown in FIG. 7, the proper inventory is 1
In the case of 00 pieces and the special sale order is 30, the sales exceeding 30 pieces are subtracted from the proper inventory from the second day when the special sale inventory is exhausted.

【0084】なお、前週に特売が入った場合には、その
前の週の実績に入れ換える。
When the special sale comes in the previous week, the actual result of the previous week is replaced.

【0085】「適正在庫」"Proper inventory"

【0086】この「売上引型自動発注」システムは、シ
ステムスタート時の在庫数を基準として、常時、最初の
在庫に戻る様になっており、本来のあるべき陳列在庫数
を別途の実績データの分析により、適正在庫陳列数レポ
ートを月毎に出力することで、予測型や在庫回転型の機
能を補完している。
This "sales-based automatic ordering" system always returns to the first stock based on the stock quantity at the time of system start. Through analysis, an appropriate inventory display quantity report is output every month, which complements the forecast type and inventory rotation type functions.

【0087】(B)「在庫回転型自動発注」(B) "Inventory rotation type automatic ordering"

【0088】在庫回転型自動発注は、売上引型自動発注
に商品毎に予め設定した基準在庫日数とのギャップ分を
補正する工程を加えたシステムであり、「予測型」から
予測の工程を省略したものである。
The inventory rotation type automatic ordering is a system in which a step of correcting a gap between the sales discount type automatic ordering and the standard stock days set in advance for each product is added, and the step of predicting from the "prediction type" is omitted. It was done.

【0089】まず、現在在庫から設定した発注から納品
までの期間販売数を減じ、納品日までの期間の販売数を
算出する。即ち図8に示す様に、
First, the number of items sold from the current inventory to the time of delivery from the set order is subtracted, and the number of items sold until the date of delivery is calculated. That is, as shown in FIG.

【0090】 納品日在庫数W=現在在庫V−期間販売数 ・・・・・・第4式Inventory on delivery date W = current inventory V−number of items sold per period ··· Formula 4

【0091】なお、図8の例では、発注後在庫変動数=
A+B+C
In the example of FIG. 8, the number of inventory changes after ordering =
A + B + C

【0092】期間販売数=D+E+FPeriod sales = D + E + F

【0093】次に、期間売上数を期間日数で割り、期間
平均売上数を決定する。
Next, the period sales number is divided by the period days to determine the period average sales number.

【0094】 期間平均売上数X=(D+E+F)/3 ・・・・・・第5式Average number of sales in period X = (D + E + F) / 3 ... Formula 5

【0095】更に、第4式の納品日在庫数Wを期間平均
売上数Xで割り、納品日在庫数の納品日在庫日数を算出
する。
Further, the delivery day inventory quantity W of the fourth formula is divided by the period average sales quantity X to calculate the delivery day inventory quantity of the delivery date inventory quantity.

【0096】そして、各ライン別に設定されている基準
在庫日数Uと、第4式の納品日在庫日数を引き、在庫日
数ギャップを演算する。
Then, the standard inventory days U set for each line and the delivery date inventory days of the fourth formula are subtracted to calculate the inventory days gap.

【0097】 在庫日数ギャップY=U−W ・・・・・・第6式Inventory Days Gap Y = U−W ··· Formula 6

【0098】そして、発注数は、期間販売数を在庫日数
ギャップで補正し、在庫回転型発注数を算出し発注ロッ
トで丸めた値を発注数とする。
Regarding the number of orders, the period sales number is corrected by the inventory days gap, the inventory rotation type order number is calculated, and the rounded value is set as the order number.

【0099】発注数=期間販売数+(在庫日数ギャップ
*期間平均売上数)
Number of orders = number of sales per period + (gap in inventory days * average number of sales per period)

【0100】即ち、本実施例では、That is, in this embodiment,

【0101】発注数=(D+E+F)+(Y*X)Order quantity = (D + E + F) + (Y * X)

【0102】となる。It becomes

【0103】なお、期間販売数=D+E+Fは、上記
「売上引型自動発注」で演算することもできる。
Note that the number of items sold per period = D + E + F can be calculated by the above-mentioned “sales discount type automatic ordering”.

【0104】また在庫が0の場合には、前週又は前前週
の同曜日の実績とすることもできる。
Further, when the stock is 0, it is possible to use the results of the previous week or the same day of the previous week.

【0105】(C)「売上予測型自動発注」(C) "Sales forecast type automatic ordering"

【0106】前年の実績、傾向と今年の傾向を加味した
予測数値を用いて、売上予測数量を算出するものであ
り、更に、安全在庫日数を考慮に入れて発注するもので
ある。図9に基づいて説明する。
The forecasted sales quantity is calculated using the forecasted values in which the previous year's results and trends and this year's trends are taken into consideration, and the ordering is performed in consideration of the safety stock days. This will be described with reference to FIG.

【0107】まず、第1式の前年次週指数を算出し、第
2式の補正値を使用して、第3式に示す予測指数を算出
する。そして、直近の曜日別の販売数に、曜日別の予測
指数を掛け合わせ、総和することにより、次週売上予測
数を計算する。
First, the previous week's next week index is calculated, and the predicted index shown in the third formula is calculated using the correction value of the second formula. Then, the latest weekly sales quantity is calculated by multiplying the latest daily sales quantity by the day-of-week forecast index and summing.

【0108】即ち、That is,

【0109】 次週売上予測数=シグマ(直近曜日別売上数*売上予測指数) ・・・・・・第7式Next Week Sales Forecast Number = Sigma (Sales Number by Last Day of Week * Sales Forecast Index) ... Formula 7

【0110】ここで、月曜日の予測指数をaとし、火曜
日の予測指数をb・・・・日曜日の予測指数をgとし、
直近の月曜日の売上数をE、直近の火曜日の売上数を
F、直近の水曜日の売上数をG、直近の木曜日の売上数
をA、直近の金曜日の売上数をB、直近の土曜日の売上
数をC、直近の日曜日の売上数をDとすれば、
Here, the prediction index of Monday is a, the prediction index of Tuesday is b ... The prediction index of Sunday is g,
Last Monday's sales is E, last Tuesday's sales is F, last Wednesday's sales is G, last Thursday's sales is A, last Friday's sales is B, last Saturday's sales If the number is C and the number of sales on the last Sunday is D,

【0111】次週売上予測数X=(E*a)+(F*
b)+(G*c)+(A*d)+(B*e)+(C*
f)+(D*g)
Next week sales forecast X = (E * a) + (F *
b) + (G * c) + (A * d) + (B * e) + (C *
f) + (D * g)

【0112】なお、この曜日の予測指数は、週単位で指
数の調整を行う様になっている。
The forecast index for this day of the week is adjusted on a weekly basis.

【0113】次に、過去2週間の売上平均値にクラス別
に設定されている安全在庫日数Uを掛け、安全在庫日数
を算出する。
Next, the average number of sales in the past two weeks is multiplied by the safety stock days U set for each class to calculate the safety stock days.

【0114】 安全在庫数=(過去2週間売上数/在庫日数)*クラス別安全在庫日数 ・・・・・第8式Safety Stock Number = (Sales Number in Past Two Weeks / Inventory Days) * Safety Stock Days by Class ・ ・ ・ ・ ・ Equation 8

【0115】本実施例の場合には、稼働日数を13とす
れば、
In the case of this embodiment, if the number of working days is 13,

【0116】安全在庫数Y=(過去2週間売上数W/1
3)*安全在庫日数U
Safety stock quantity Y = (Sales quantity W / 1 for the past two weeks)
3) * Safety inventory days U

【0117】そして、現在庫数V、安全在庫数Y等より
発注数を計算する。
Then, the number of orders is calculated from the current number V of stocks, the number Y of safety stocks, and the like.

【0118】発注数=(安全在庫数Y+次週売上予測数
X)−(現在庫数V−発注後在庫変動数)
Order quantity = (Safety stock quantity Y + Next week's sales forecast quantity X)-(Current stock quantity V-Number of stock fluctuations after order)

【0119】・・・・・第9式...... Formula 9

【0120】なお安全在庫数Yは、Y=(平均売数/稼
働日数)*(基準在庫日数+安全在庫日数)で演算とす
ることもできる。
The safety stock number Y can be calculated by Y = (average number of sales / number of working days) * (reference number of days of inventory + safety number of days).

【0121】図10は、自動商品発注装置100000
の構成を示すもので、本実施例の入力手段100は、基
準在庫日数U等を入力するものであり、記憶手段200
が、前年の各日の売上が記憶している。
FIG. 10 shows an automatic commodity ordering apparatus 100000.
The input means 100 of the present embodiment is for inputting the standard inventory days U and the like, and the storage means 200.
But I remember the sales of each day of the previous year.

【0122】第1の演算処理手段1000は、売上予測
の対象となる予測週に対応する前年の一週間の売上実績
である前年同週実績と、この対応する前年の週の次週の
売上実績である前年次週実績から、前年次週指数(前年
次週実績/前年同週実績)を演算するものである。
The first arithmetic processing means 1000 uses the same week last year's sales record, which is the sales record for the previous week corresponding to the forecast week subject to the sales forecast, and the sales record for the corresponding week's next week. The previous year's next week index (the previous year's next week result / the same year's same week result) is calculated from a certain previous year's next week result.

【0123】第2の演算処理手段2000は、予測する
年の直近一定期間の加重平均と、前年の対応する同時期
の週の加重平均とから補正値(当年直近3週加重平均指
数/前年直近3週加重平均指数)を演算するものであ
る。
The second arithmetic processing means 2000 corrects the weighted average of the latest certain period of the year to be predicted and the weighted average of the corresponding corresponding week of the previous year (the most recent three-week weighted average index / the most recent previous year). 3 week weighted average index) is calculated.

【0124】第3の演算処理手段3000は、次週指数
と前記補正値とを掛け合わせ、予測指数を演算するため
のものである。
The third arithmetic processing means 3000 is for multiplying the next-week index and the correction value to calculate the predicted index.

【0125】第4の演算処理手段4000は、設定した
期間販売数と現在庫数から、発注後、納品日までの在庫
変動数を減じて、納品日までの期間の販売数Wを算出す
るためのものである。
The fourth arithmetic processing means 4000 calculates the number of sales W in the period up to the delivery date by subtracting the number of inventory fluctuations after the ordering and the delivery date from the set period sales number and the current number of stocks. belongs to.

【0126】第5の演算処理手段5000は、期間売上
数を期間日数で割り、期間平均売上数Xを決定するため
のものである。
The fifth arithmetic processing means 5000 is for dividing the number of period sales by the number of period days to determine the average number X of period sales.

【0127】第6の演算処理手段6000は、納品日在
庫数Wを期間平均売上数Xで割り、納品日在庫数の納品
日在庫日数を算出するためのものである。
The sixth arithmetic processing means 6000 is for dividing the number of delivery days inventories W by the period average sales number X to calculate the number of delivery days inventory days of the number of delivery days inventory.

【0128】第7の演算処理手段7000は、設定され
ている基準在庫日数Uと、納品日在庫日数を引き、在庫
日数ギャップYを演算するためのものである。
The seventh arithmetic processing means 7000 is for calculating the inventory day gap Y by subtracting the set standard inventory day U and delivery date inventory days.

【0129】第8の演算処理手段8000は、期間販売
数を在庫日数ギャップYで補正して発注量を演算するた
めのものである。
The eighth calculation processing means 8000 is for calculating the order quantity by correcting the period sales quantity by the inventory day gap Y.

【0130】上述に記載した「在庫回転型自動発注」の
方法により演算を行えば、発注量を算出できる。なお、
第1の演算処理手段1000〜第9の演算処理手段90
00までは、一つの電子計算機により実行することもで
きる。
The order quantity can be calculated by performing the calculation by the method of "stock-turning type automatic ordering" described above. In addition,
First arithmetic processing means 1000 to ninth arithmetic processing means 90
Up to 00, it can also be executed by one electronic computer.

【0131】図11は、自動商品発注装置200000
の構成を示すもので、本実施例の入力手段100は、安
全在庫日数U等を入力するものであり、記憶手段200
が、前年の各日の売上が記憶している。
FIG. 11 shows an automatic merchandise ordering device 200,000.
The input means 100 of the present embodiment is for inputting the safety stock days U and the like, and the storage means 200.
But I remember the sales of each day of the previous year.

【0132】第9の演算処理手段9000は、予測指数
を各曜日毎に求め、直近の曜日の売上数と掛け合わせて
総和するためのものである。
The ninth arithmetic processing means 9000 is for obtaining a prediction index for each day of the week and multiplying it by the number of sales of the most recent day of the week and summing them.

【0133】第10の演算処理手段10000は、過去
一定期間の売上平均値に対して、設定されている安全在
庫日数Uを掛け、安全在庫数Yを算出するものである。
The tenth arithmetic processing means 10000 calculates the safety stock number Y by multiplying the average sales value in the past fixed period by the set safety stock days U.

【0134】第11の演算処理手段11000は、これ
らの演算値から、(安全在庫数Y+次週売上予測数X)
−(現在庫数V−発注後在庫変動数)を演算して発注量
を計算するためのものである。
The eleventh arithmetic processing means 11000 calculates (the number of safety stock Y + the number of sales forecast next week X) from these calculated values.
This is for calculating − (current stock number V−number of inventory fluctuations after order) to calculate the order quantity.

【0135】上述に記載した「売上予測型自動発注」の
方法により演算を行えば、発注量を算出できる。なお、
第1の演算処理手段1000〜第11の演算処理手段1
1000までは、一つの電子計算機により実行すること
もできる。
The order quantity can be calculated by performing the calculation by the method of "sales forecast type automatic order" described above. In addition,
First arithmetic processing means 1000 to eleventh arithmetic processing means 1
Up to 1000 can be executed by one electronic computer.

【0136】なお、第1の演算処理手段1000〜第3
の演算処理手段3000までは、自動商品発注装置10
0000と同様であるから説明を省略する。
Incidentally, the first arithmetic processing means 1000 to the third
The automatic merchandise ordering apparatus 10 up to the calculation processing means 3000
The description is omitted because it is the same as 0000.

【0137】なお、自動商品発注装置100000及び
自動商品発注装置200000は、演算した発注量を自
動的に通信回線で仕入先に電送することもできる。
The automatic merchandise ordering apparatus 100000 and the automatic merchandise ordering apparatus 200000 can also automatically transmit the calculated order quantity to the supplier through the communication line.

【0138】[0138]

【効果】以上の様に構成された本発明は、売上予測の対
象となる予測週に対応する前年の一週間の売上実績であ
る前年同週実績と、この対応する前年の週の次週の売上
実績である前年次週実績を比較した前年次週指数(前年
次週実績/前年同週実績)を演算する第1工程と、予測
する年の直近一定期間の加重平均と、前年の対応する同
時期の週の加重平均を比較した補正値(当年直近3週加
重平均指数/前年直近3週加重平均指数)を演算する第
2工程と、前記次週指数と補正値とを掛け合わせ、予測
指数を演算する第3工程と、この予測指数と、直近の各
曜日の実績値とから発注量を予測する構成を有するの
で、発注量を現場作業者のカンに頼ることなく、季節変
化や、売れ行きのトレンドに合わせて、在庫効率もよ
く、しかも品切れのない最適な発注量を決定することが
できるという効果がある。
[Effect] According to the present invention configured as described above, the sales result of the same week of the previous year corresponding to the forecast week which is the target of the sales forecast and the sales amount of the corresponding week of the previous year corresponding to the same week. The 1st process that calculates the previous year's next week index (the previous year's next week result / the previous year's same week result) that compares the actual results of the previous year's next week, the weighted average of the latest certain period of the year to be predicted, and the corresponding same week of the previous year The second step of calculating a correction value (weighted average index of the last 3 weeks of the current year / weighted average index of the last 3 weeks of the previous year) by comparing the weighted averages of the second step and the second step of calculating the prediction index by multiplying the next week index and the correction value It has a structure that predicts the order quantity from three processes, this forecast index, and the actual value of each latest day of the week, so that the order quantity can be adjusted to seasonal changes and sales trends without relying on field workers. Good inventory efficiency, and not out of stock There is an effect that it is possible to determine the optimum order quantity.

【0139】そして本発明は、現在在庫から、設定した
発注から納品までの期間販売数を減じて、納品日までの
期間の販売数Wを算出する第1工程(納品日在庫数W=
現在在庫V−期間販売数)と、期間売上数を期間日数で
割り、期間平均売上数Xを決定する第2工程と、前記納
品日在庫数Wを期間平均売上数Xで割り、納品日在庫数
の納品日在庫日数を算出する第3工程と、設定されてい
る標準在庫日数Uと、前記納品日在庫日数を引き、在庫
日数ギャップYを演算する第4工程(在庫日数ギャップ
Y=U−W)と、期間販売数を在庫日数ギャップYで補
正して発注量(期間販売数+(在庫日数ギャップY*期
間平均売上数X)を演算する様に構成されているので、
店毎に品揃えが自動的に修正され、最適な商品を備えた
店舗を実現することができる。
Then, according to the present invention, the first step (the delivery date inventory number W = the delivery date inventory number W = is calculated by subtracting the period sales number from the set order to the delivery to the delivery date) from the current inventory.
(Current inventory V-number of period sales) and the number of period sales divided by the number of period days to determine the average period sales number X, and the delivery date inventory number W divided by the average period sales number X to obtain the delivery date inventory Number of days of delivery, the third step of calculating the number of days of inventory, the set standard number of days of inventory U, and the number of days of inventory of the date of delivery are subtracted, and the fourth step of calculating the number of days of inventory gap Y (the number of days of inventory gap Y = U− W) and the period sales quantity are corrected by the inventory days gap Y to calculate the order quantity (period sales quantity + (inventory days gap Y * period average sales quantity X).
The product lineup is automatically modified for each store, and a store with optimal products can be realized.

【0140】また本発明は、週単位で予測された各曜日
の予測指数を求め、直近の曜日の売上数と掛け合わせ、
総和する第4工程と、過去一定期間の売上平均値に対し
て、設定されているクラス別安全在庫日数Uを掛け、安
全在庫数を算出する第5工程(安全在庫数Y=(過去一
定期間売上数W/在庫日数)*クラス別安全在庫日数
U)と、これらの演算値から、(安全在庫数Y+次週売
上予測数X)−(現在庫数V−発注後在庫変動数)を演
算し、この値をEOSシステム等と連動して発注する第
6工程とからなるので、現場スタッフの作業が完全に省
力化でき、大幅なコストダウンを図ることができるとい
う卓越した効果がある。
The present invention also obtains a prediction index for each day of the week predicted for each week and multiplies it by the number of sales of the most recent day of the week,
Fifth step of calculating the safety stock quantity by multiplying the fourth step to sum up and the average sales value in the past constant time period by the set safety stock days U by class (safety stock quantity Y = (past constant time period Sales quantity W / stock days) * Safety stock days by class U), and from these calculated values, (safety stock quantity Y + next week forecast sales quantity X)-(current stock quantity V-stock fluctuation quantity after order) is calculated. Since this value consists of the sixth step of ordering in conjunction with the EOS system and the like, there is an outstanding effect that the work of the on-site staff can be completely labor-saving and a significant cost reduction can be achieved.

【0141】[0141]

【図面の簡単な説明】[Brief description of drawings]

【図1】売上引型自動発注を説明する図である。FIG. 1 is a diagram for explaining sales-based automatic ordering.

【図2】売上引型自動発注を説明する図である。FIG. 2 is a diagram for explaining sales-based automatic ordering.

【図3】カレンダー調整を説明する図である。FIG. 3 is a diagram illustrating calendar adjustment.

【図4】カレンダー調整を説明する図である。FIG. 4 is a diagram illustrating calendar adjustment.

【図5】カレンダー調整を説明する図である。FIG. 5 is a diagram illustrating calendar adjustment.

【図6】カレンダー調整を説明する図である。FIG. 6 is a diagram illustrating calendar adjustment.

【図7】販売促進時の調整を説明する図である。FIG. 7 is a diagram illustrating adjustment during sales promotion.

【図8】在庫回転型自動発注を説明する図である。FIG. 8 is a diagram illustrating an inventory revolving type automatic order.

【図9】売上予測型自動発注を説明する図である。FIG. 9 is a diagram illustrating sales forecast type automatic ordering.

【図10】自動商品発注装置100000の構成を示す
図である。
FIG. 10 is a diagram showing a configuration of an automatic product ordering device 100000.

【図11】自動商品発注装置200000の構成を示す
図である。
FIG. 11 is a diagram showing a configuration of an automatic product ordering device 200000.

【符号の説明】[Explanation of symbols]

100000 自動商品発注装置 200000 自動商品発注装置 100 入力手段 200 記憶手段 1000 第1の演算処理手段 2000 第2の演算処理手段 3000 第3の演算処理手段 4000 第4の演算処理手段 5000 第5の演算処理手段 6000 第6の演算処理手段 7000 第7の演算処理手段 8000 第8の演算処理手段 9000 第9の演算処理手段 10000 第10の演算処理手段 11000 第11の演算処理手段 100000 Automatic commodity ordering apparatus 200000 Automatic commodity ordering apparatus 100 Input means 200 Storage means 1000 First arithmetic processing means 2000 Second arithmetic processing means 3000 Third arithmetic processing means 4000 Fourth arithmetic processing means 5000 Fifth arithmetic processing Means 6000 6th arithmetic processing means 7000 7th arithmetic processing means 8000 8th arithmetic processing means 9000 9th arithmetic processing means 10000 10th arithmetic processing means 11000 11th arithmetic processing means

Claims (16)

【特許請求の範囲】[Claims] 【請求項1】 売上予測の対象となる予測週に対応する
前年の一週間の売上実績である前年同週実績と、この対
応する前年の週の次週の売上実績である前年次週実績を
比較した前年次週指数(前年次週実績/前年同週実績)
を演算する第1工程と、予測する年の直近一定期間の加
重平均と、前年の対応する同時期の週の加重平均を比較
した補正値(当年直近3週加重平均指数/前年直近3週
加重平均指数)を演算する第2工程と、前記次週指数と
補正値とを掛け合わせ、予測指数を演算する第3工程
と、この予測指数と、直近の各曜日の実績値とから発注
量を予測する自動商品発注システム。
[Claim 1] The same week previous year sales results corresponding to the forecast week that is the target of the sales forecast and the corresponding previous week next year sales results corresponding to the corresponding previous week are compared. Last week's index (previous week's results / previous week's results)
Compensated value comparing the weighted average of the first certain period of the year for which the calculation is performed and the weighted average of the latest certain period of the year predicted, and the weighted average of the corresponding week of the same period of the previous year Predict the order quantity from the second step of calculating the average index), the third step of calculating the forecast index by multiplying the next week index and the correction value, the forecast index, and the actual value of each latest day of the week Automatic product ordering system.
【請求項2】 一定期間の加重平均を行う際の一定期間
は3月であり、予測指数と直近の各曜日の実績値とを掛
け合わせることにより、発注量を予測する請求項1記載
の自動商品発注システム。
2. The automatic order according to claim 1, wherein the fixed period when performing the weighted average of the fixed period is March, and the order quantity is predicted by multiplying the forecast index by the actual value of each latest day of the week. Product ordering system.
【請求項3】 予測対応発注日の納品日の翌日から次回
発注による納品日までに対応する前週の各曜日の売上を
計上する第1工程と、これらの各曜日の売り上げを合計
し、この合計売上数を発注数とする第2工程とからなる
自動商品発注システム。
[Claim 3] The first step of recording the sales on each day of the previous week corresponding to the day after the delivery date of the forecast corresponding order date to the delivery date of the next order, and the sum of the sales on each of these days, and the total is obtained. An automatic merchandise ordering system consisting of a second process in which the number of sales is the number of orders.
【請求項4】 第1工程において、前週の対応日が店休
日であって、予測対応日が営業日の場合には、前々週が
営業日の場合にはその売上を計上し、前々週の対応日が
店休日であれば、前週の店休日の翌日の売上を計上する
請求項3記載の自動商品発注システム。
4. In the first step, if the corresponding day of the previous week is a store holiday and the predicted corresponding day is a business day, the sales are recorded if the week before the second day is a business day, and the sales are recorded before and after. 4. The automatic product ordering system according to claim 3, wherein if the corresponding day of the week is a store holiday, the sales of the day following the store holiday of the previous week are recorded.
【請求項5】 第1工程において、前週の対応日が営業
日であって、予測対応日が店休日の場合には、売上をゼ
ロとする請求項3記載の自動商品発注システム。
5. The automatic merchandise ordering system according to claim 3, wherein, in the first step, when the corresponding day of the previous week is a business day and the predicted corresponding day is a store holiday, the sales are zero.
【請求項6】 第1工程において、前週の対応日が平日
であって、予測対応日が祝日の場合には、 売上を直近
の日曜日の売上とする請求項3記載の自動商品発注シス
テム。
6. The automatic merchandise ordering system according to claim 3, wherein, in the first step, if the corresponding day of the previous week is a weekday and the predicted corresponding day is a holiday, the sales are the sales of the most recent Sunday.
【請求項7】 第1工程において、前週の対応日が祝日
であって、予測対応日が平日の場合には、前週の祝日の
翌日(平日)の売上を計上する請求項3記載の自動商品
発注システム。
7. The automatic product according to claim 3, wherein in the first step, if the corresponding day of the previous week is a holiday and the predicted corresponding day is a weekday, the sales on the day following the holiday of the previous week (weekday) are recorded. Ordering system.
【請求項8】 別に販売促進期間の場合には、バイヤー
が販売促進期間の増加売上数を予測し、その増加分を別
に発注し、通常販売時の在庫数に対して、前記販売促進
期間の残存在庫を加えるか、或いは、不足分を差し引
き、販売促進期間は、前週の同曜日の売上を計上する請
求項3〜7記載の自動商品発注システム。
8. In the case of a sales promotion period separately, the buyer predicts the increased number of sales during the sales promotion period, orders the increased amount separately, and compares the sales amount of the above-mentioned sales promotion period with the stock number at the time of normal sales. 8. The automatic product ordering system according to claim 3, wherein the remaining inventory is added or the shortage is deducted, and sales are recorded on the same day of the previous week during the sales promotion period.
【請求項9】 現在在庫から、設定した発注から納品ま
での期間販売数を減じて、納品日までの期間の販売数W
を算出する第1工程(納品日在庫数W=現在在庫V−期
間販売数)と、期間売上数を期間日数で割り、期間平均
売上数Xを決定する第2工程と、前記納品日在庫数Wを
期間平均売上数Xで割り、納品日在庫数の納品日在庫日
数を算出する第3工程と、設定されている標準在庫日数
Uと、前記納品日在庫日数を引き、在庫日数ギャップY
を演算する第4工程(在庫日数ギャップY=U−W)
と、期間販売数を在庫日数ギャップYで補正して発注量
(期間販売数+(在庫日数ギャップY*期間平均売上数
X)を演算する自動商品発注システム。
9. The number of sales W from the current inventory to the delivery date by subtracting the number of sales from the set order to delivery.
And the second step of determining the period average sales number X by dividing the period sales number by the period days, and the delivery date inventory number. W is divided by the period average sales number X to calculate the delivery day inventory days of the delivery day inventory number, the set standard inventory days U and the delivery date inventory days are subtracted, and the inventory day gap Y is calculated.
4th step of calculating (gap of inventory days Y = U−W)
And an automatic product ordering system that calculates the order quantity (period sales number + (stock days gap Y * average period sales number X)) by correcting the period sales number by the inventory days gap Y.
【請求項10】 品切れに伴う在庫が0の場合には、前
週又は前前週の同曜日の売上実績に振替える請求項9記
載の自動商品発注システム。
10. The automatic merchandise ordering system according to claim 9, wherein when the stock due to the out of stock is 0, it is transferred to the sales record of the previous week or the same day of the previous week.
【請求項11】 期間販売数は、請求項1〜8で算出さ
れた発注量を使用する請求項9記載の自動商品発注シス
テム。
11. The automatic merchandise ordering system according to claim 9, wherein the order sales quantity calculated in any one of claims 1 to 8 is used as the period sales quantity.
【請求項12】 売上予測の対象となる予測週に対応す
る前年の一週間の売上実績である前年同週実績と、この
対応する前年の週の次週の売上実績である前年次週実績
を比較した前年次週指数(前年次週実績/前年同週実
績)を演算する第1工程と、予測する年の直近一定期間
の加重平均と、前年の対応する同時期の週の加重平均を
比較した補正値(当年直近3週加重平均指数/前年直近
3週加重平均指数)を演算する第2工程と、前記次週指
数と補正値とを掛け合わせ、予測指数を演算する第3工
程と、この各曜日毎の予測指数を求め、直近の曜日の売
上数と掛け合わせ、総和する第4工程と、過去一定期間
の売上平均値に対して、設定されているクラス別安全在
庫日数Uを掛け、安全在庫数を算出する第5工程(安全
在庫数Y=(過去一定期間売上数W/在庫日数)*クラ
ス別安全在庫日数U)と、これらの演算値から、(安全
在庫数Y+次週売上予測数X)−(現在庫数V−発注後
在庫変動数)を演算し、この値を発注する第6工程とか
らなる自動商品発注システム。
12. The sales result of the same week of the previous year corresponding to the forecast week which is the target of the sales forecast is compared with the sales result of the corresponding week of the previous week corresponding to the same week of the previous year. Correction value that compares the 1st process to calculate the previous week's next week index (the previous year's next week result / the previous year's same week result), the weighted average for the latest certain period of the year to be predicted, and the weighted average for the corresponding corresponding week of the previous year ( The second step of calculating the weighted average index of the last 3 weeks of the current year / the weighted average index of 3 weeks of the previous year) and the third step of calculating the prediction index by multiplying the index of the next week and the correction value, and for each day of the week Calculate the forecast index, multiply it by the number of sales on the most recent day of the week, and add up the fourth step, and the average sales value for the past certain period by the set safety stock days U by class to obtain the safety stock number. Fifth step to calculate (safety stock quantity Y = (constant in the past Period sales number W / stock days) * Safety stock days by class U), and from these calculated values, calculate (Safety stock number Y + Sales forecast for next week X)-(Current stock number V-Stock fluctuation after ordering) Then, an automatic product ordering system consisting of a sixth step of ordering this value.
【請求項13】 第5工程の安全在庫数Yの演算は、Y
=(平均売数/稼働日数)*(標準在庫日数+安全在庫
日数)で演算される請求項12記載の自動商品発注シス
テム。
13. The calculation of the safety stock quantity Y in the fifth step is Y
13. The automatic merchandise ordering system according to claim 12, which is calculated by: (average number of sales / number of working days) * (standard number of days of inventory + number of days of safety inventory).
【請求項14】 基準在庫日数U等を入力するための入
力手段と、前年の各日の売上が記憶されている記憶手段
と、売上予測の対象となる予測週に対応する前年の一週
間の売上実績である前年同週実績と、この対応する前年
の週の次週の売上実績である前年次週実績から、前年次
週指数(前年次週実績/前年同週実績)を演算する第1
の演算処理手段と、予測する年の直近一定期間の加重平
均と、前年の対応する同時期の週の加重平均とから補正
値(当年直近3週加重平均指数/前年直近3週加重平均
指数)を演算する第2の演算処理手段と、前記次週指数
と前記補正値とを掛け合わせ、予測指数を演算するため
の第3の演算処理手段と、現在在庫から設定した発注か
ら納品までの期間販売数を減じて、納品日までの期間の
販売数W(納品日在庫数W=現在在庫V−期間販売数)
を算出する第4の演算処理手段と、期間売上数を期間日
数で割り、期間平均売上数Xを決定する第5の演算処理
手段と、前記納品日在庫数Wを期間平均売上数Xで割
り、納品日在庫数の納品日在庫日数を算出する第6の演
算処理手段と、設定されている基準在庫日数Uと、前記
納品日在庫日数を引き、在庫日数ギャップY(在庫日数
ギャップY=U−W)を演算する第7の演算処理手段
と、期間販売数を在庫日数ギャップYで補正して発注量
(期間販売数+(在庫日数ギャップY*期間平均売上数
X)を演算する第8の演算処理手段とからなり、期間販
売数を、前記予測指数と直近の曜日の売上数を乗じた値
とすることを特徴とする自動商品発注装置。
14. An input means for inputting a standard inventory days U, a storage means for storing sales of each day of the previous year, and a week of the previous year corresponding to a forecast week which is a target of sales forecast. The previous year's next week index (the previous year's previous week result / the previous year's same week result) is calculated from the previous year's same week's sales result and the corresponding previous year's next week's next week's sales result.
Corrected value from the weighted average of the latest certain period of the year to be predicted and the weighted average of the corresponding corresponding weeks of the previous year (the most recent 3 week weighted average index of the current year / the most recent 3 week weighted average index of the previous year) A second calculation processing means for calculating, a third calculation processing means for calculating the forecast index by multiplying the next-week index and the correction value, and a period sale from the current stock to the set order to delivery. Decrease the number and sell W for the period up to the delivery date (delivery date inventory number W = current inventory V-period sale number)
And a fifth arithmetic processing means for determining the period average number of sales X by dividing the period sales number by the period average number of days, and the delivery date inventory number W divided by the period average number of sales X. The sixth arithmetic processing means for calculating the delivery day inventory number of the delivery date inventory number, the set standard inventory days U and the delivery date inventory days are subtracted to obtain the inventory day gap Y (inventory day gap Y = U -W) and a seventh arithmetic processing means for calculating the order quantity (period sales number + (stock days gap Y * period average sales number X)) by correcting the period sales number with the inventory days gap Y An automatic commodity ordering device, comprising: the calculation processing means of (1), and the period sales quantity is a value obtained by multiplying the forecast index by the sales quantity of the nearest day of the week.
【請求項15】 安全在庫日数U等を入力するための入
力手段と、前年の各日の売上が記憶されている記憶手段
と、売上予測の対象となる予測週に対応する前年の一週
間の売上実績である前年同週実績と、この対応する前年
の週の次週の売上実績である前年次週実績から、前年次
週指数(前年次週実績/前年同週実績)を演算する第1
の演算処理手段と、予測する年の直近一定期間の加重平
均と、前年の対応する同時期の週の加重平均とから補正
値(当年直近3週加重平均指数/前年直近3週加重平均
指数)を演算する第2の演算処理手段と、前記次週指数
と前記補正値とを掛け合わせ、予測指数を演算するため
の第3の演算処理手段と、この予測指数を各曜日毎に求
め、直近の曜日の売上数と掛け合わせ、総和する第9の
演算処理手段と、過去一定期間の売上平均値に対して、
設定されているクラス別安全在庫日数Uを掛け、安全在
庫数Y(安全在庫数Y=(過去一定期間売上数W/在庫
日数)*クラス別安全在庫日数U)を算出する第10の
演算処理手段と、これらの演算値から、(安全在庫数Y
+次週売上予測数X)−(現在庫数V−発注後在庫変動
数)を演算して発注量とする第11の演算処理手段とか
らなる自動商品発注装置。
15. An input means for inputting the safety stock days U and the like, a storage means for storing the sales of each day of the previous year, and a week of the previous year corresponding to a forecast week which is a target of sales forecast. The previous year's next week index (the previous year's previous week result / the previous year's same week result) is calculated from the previous year's same week's sales result and the corresponding previous year's next week's next week's sales result.
Correction value (weighted average index for the last 3 weeks of the current year / weighted average index of the last 3 weeks of the previous year) from the weighted average of the most recent fixed period of the predicted year and the weighted average of the corresponding corresponding weeks of the previous year And a third arithmetic processing means for calculating the prediction index by multiplying the next-week index and the correction value, and the prediction index for each day of the week. The ninth arithmetic processing means for multiplying by the number of sales on the day of the week and summing up, and the average sales value for the past certain period,
The tenth arithmetic processing for calculating the safety stock quantity Y (safety stock quantity Y = (number of sales in past fixed period W / stock day quantity) * safety stock day quantity U by class U) by multiplying the set safety stock day quantity U by class From the means and these calculated values,
An automatic merchandise ordering device including an eleventh arithmetic processing means that calculates + the next week's sales forecast number X)-(current stock number V-number of inventory changes after ordering) to obtain an order quantity.
【請求項16】 第10の演算処理手段による安全在庫
数Yの演算は、Y=(平均売数/稼働日数)*(基準在
庫日数+安全在庫日数)で演算される請求項15記載の
自動商品発注装置。
16. The automatic calculation according to claim 15, wherein the calculation of the safety stock quantity Y by the tenth calculation processing means is carried out by Y = (average number of sales / operating days) * (reference stock days + safe stock days) Product ordering device.
JP2604896A 1996-01-21 1996-01-21 System and device for automatically ordering commodity Pending JPH09198448A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2604896A JPH09198448A (en) 1996-01-21 1996-01-21 System and device for automatically ordering commodity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2604896A JPH09198448A (en) 1996-01-21 1996-01-21 System and device for automatically ordering commodity

Publications (1)

Publication Number Publication Date
JPH09198448A true JPH09198448A (en) 1997-07-31

Family

ID=12182813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2604896A Pending JPH09198448A (en) 1996-01-21 1996-01-21 System and device for automatically ordering commodity

Country Status (1)

Country Link
JP (1) JPH09198448A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999048024A1 (en) * 1998-03-18 1999-09-23 Fujitsu Limited Data-coping apparatus and storage medium stored with program for allowing the date-coping apparatus to do processing
JP2001282906A (en) * 2000-04-03 2001-10-12 Nippon Syst Design Kk Processing system for calculating predicted value of number of sales and order quantity
JP2001350826A (en) * 2000-06-09 2001-12-21 Nec Corp Device for calculating reasonable inventory quantity
JP2003316872A (en) * 2002-04-24 2003-11-07 Fujitsu Ltd Automatic order processing method and system for commodity
US7328168B2 (en) 2001-03-29 2008-02-05 Fujitsu Limited Daily delivered articles order optimization support system, method, and storage medium therefor
JP2009181475A (en) * 2008-01-31 2009-08-13 Teraoka Seiko Co Ltd Commercial goods ordering system
JP2015501986A (en) * 2011-11-23 2015-01-19 スターバックス・コーポレイション Cooking management
JP2015032267A (en) * 2013-08-06 2015-02-16 東芝テック株式会社 Demand prediction apparatus and program
JP2016012224A (en) * 2014-06-27 2016-01-21 東芝テック株式会社 Demand prediction device and program
US9820603B2 (en) 2013-11-20 2017-11-21 Starbucks Corporation Cooking system power management

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999048024A1 (en) * 1998-03-18 1999-09-23 Fujitsu Limited Data-coping apparatus and storage medium stored with program for allowing the date-coping apparatus to do processing
JPH11265370A (en) * 1998-03-18 1999-09-28 Fujitsu Ltd Date correspondence processor and storage medium
JP2001282906A (en) * 2000-04-03 2001-10-12 Nippon Syst Design Kk Processing system for calculating predicted value of number of sales and order quantity
JP2001350826A (en) * 2000-06-09 2001-12-21 Nec Corp Device for calculating reasonable inventory quantity
US7328168B2 (en) 2001-03-29 2008-02-05 Fujitsu Limited Daily delivered articles order optimization support system, method, and storage medium therefor
JP2003316872A (en) * 2002-04-24 2003-11-07 Fujitsu Ltd Automatic order processing method and system for commodity
JP2009181475A (en) * 2008-01-31 2009-08-13 Teraoka Seiko Co Ltd Commercial goods ordering system
JP2015501986A (en) * 2011-11-23 2015-01-19 スターバックス・コーポレイション Cooking management
US10219651B2 (en) 2011-11-23 2019-03-05 Starbucks Corporation Cooking management
US10709289B2 (en) 2011-11-23 2020-07-14 Starbucks Corporation Cooking management
US11317759B2 (en) 2011-11-23 2022-05-03 Starbucks Corporation Cooking management
JP2015032267A (en) * 2013-08-06 2015-02-16 東芝テック株式会社 Demand prediction apparatus and program
US9820603B2 (en) 2013-11-20 2017-11-21 Starbucks Corporation Cooking system power management
US9930987B2 (en) 2013-11-20 2018-04-03 Starbucks Corporation Apparatuses, systems, and methods for brewing a beverage
JP2016012224A (en) * 2014-06-27 2016-01-21 東芝テック株式会社 Demand prediction device and program

Similar Documents

Publication Publication Date Title
US7552066B1 (en) Method and system for retail store supply chain sales forecasting and replenishment shipment determination
JP2735213B2 (en) Automatic ordering system
US7133848B2 (en) Dynamic pricing system
US6609101B1 (en) Method and system for determining time-phased product sales forecasts and projected replenishment shipments for a retail stores supply chain
US5459656A (en) Business demand projection system and method
US7480623B1 (en) Method and system for determining time-phased product sales forecasts and projected replenishment shipments for a retail store supply chain
US7092929B1 (en) Method and apparatus for planning analysis
US20130179220A1 (en) Computer program product and method for sales forecasting and adjusting a sales forecast
WO2003054757A2 (en) Sales optimization
WO2019053821A1 (en) Ordering assistance system, ordering assistance program, and ordering assistance method
JP2001084239A (en) Method for analyzing and predicting merchandise sales quantity, method for deciding merchandise order quantity and storage medium with program stored therein
JP2001282906A (en) Processing system for calculating predicted value of number of sales and order quantity
JPH09198448A (en) System and device for automatically ordering commodity
KR20030043678A (en) Sales forecasting apparatus and sales forecasting method
US7457766B1 (en) Methods and systems for determining daily weighting factors for use in forecasting daily product sales
JPWO2003027926A1 (en) Product sales forecast system
JPH11120255A (en) Method and device for managing inventory
JP2006018777A (en) Method and device for determining ordering quantity of article, and computer program
JPH04353970A (en) Optimum stocking prediction system
JP2500194B2 (en) Product ordering system
JP7387422B2 (en) Order recommendation system, order recommendation method, and program
JP6809718B2 (en) Information processing device
CN108604325B (en) Production equipment investment planning auxiliary system and commodity production system
JP2003178356A (en) Sales prediction method
JP3577914B2 (en) How to calculate sales plan quantity or production plan quantity of goods

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040727

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040924

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20041026

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050113

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050315

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20050422

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20050520