JPH09165767A - Device technology for adjusting height of cover for manhall therefor - Google Patents

Device technology for adjusting height of cover for manhall therefor

Info

Publication number
JPH09165767A
JPH09165767A JP7326013A JP32601395A JPH09165767A JP H09165767 A JPH09165767 A JP H09165767A JP 7326013 A JP7326013 A JP 7326013A JP 32601395 A JP32601395 A JP 32601395A JP H09165767 A JPH09165767 A JP H09165767A
Authority
JP
Japan
Prior art keywords
height
adjusting
receiving frame
coil spring
lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7326013A
Other languages
Japanese (ja)
Inventor
Mikio Oraku
幹夫 大楽
Hiromasa Shimura
博正 志村
Isamu Yuki
勇 結城
Masatoshi Utano
正敏 歌野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hakko Co Ltd
Nagashima Foundry Co Ltd
Nichikon KK
Original Assignee
Hakko Co Ltd
Nagashima Foundry Co Ltd
Nichikon KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hakko Co Ltd, Nagashima Foundry Co Ltd, Nichikon KK filed Critical Hakko Co Ltd
Priority to JP7326013A priority Critical patent/JPH09165767A/en
Publication of JPH09165767A publication Critical patent/JPH09165767A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate readjustment after the completion of the execution of works by using a sponge material, in which a coil spring is contained, as an elastic body for adjusting the height of a manhole cover. SOLUTION: Adjusting bolts 10 are disposed in upright at a plurality of places on the top faces of upper concrete blocks 3, and elastic bodies 12 are inserted to the adjusting bolts 10. The elastic bodies 12 are inserted to the adjusting bolts 10 so that the diametrical expanding sections of coil springs 12b are positioned at upper sections. An inner mold 6 is disposed, washers are inserted to the adjusting bolts 10, and inserting holes 4b bored to the flange section 4a of a cover receiving frame 4 are put into the adjusting bolts 10 and the cover receiving frame 4 is set. Adjusting nut 11 are screwed to the adjusting bolts 10, the quantities of the adjusting nuts 11 screwed are adjusted and the height of a cover is controlled so that a manhole cover 5 coincides with a road surface while shrinking the elastic bodies 12. An outer mold 7 is arranged, and the clearance of height adjustment is filled with mortar.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、道路下のマンホール築
造の際に、マンホールの蓋受枠の高さを調整するように
したマンホールの蓋受枠の高さ調整装置及び工法に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a manhole cover receiving frame height adjusting device and method for adjusting a height of a manhole cover receiving frame when a manhole is constructed under a road.

【0002】[0002]

【従来の技術】従来、道路下のマンホール築造の際に、
マンホールの蓋部は路面の傾斜等に合わせて上下に調整
する必要があり、このためにマンホールの蓋受枠の高さ
を調整する工法又は調整装置が各種提案されている。
2. Description of the Related Art Conventionally, when building a manhole under a road,
The lid portion of the manhole needs to be adjusted up and down according to the inclination of the road surface, etc. Therefore, various construction methods or adjusting devices for adjusting the height of the lid receiving frame of the manhole have been proposed.

【0003】その一例として、特開昭62−24871
6号公報に記載されるような調整ボルトを用いたものが
知られている。これは図7に示すように、路盤51を開
削して設けられたマンホール本体52のマンホール上部
53の上面に、複数の高さ調整ボルト54を立設し、該
調整ボルト54に調整ナット55を螺合し、該調整ナッ
トの上に蓋受枠56を設置する。そして前記調整ナット
55の螺合量を調整して蓋受枠56が所定の高さ及び傾
きになるようにし、固定ナット57で蓋受枠56を固定
する。その後、マンホール上部53の上面と蓋受枠56
との間に形成される調整間隙にコンクリート58を打設
し固化させるものである。
As an example thereof, Japanese Patent Laid-Open No. 62-24871.
There is known one using an adjusting bolt as described in Japanese Patent Publication No. As shown in FIG. 7, a plurality of height adjusting bolts 54 are erected on the upper surface of the manhole upper portion 53 of the manhole main body 52 provided by excavating the roadbed 51, and the adjusting nuts 55 are attached to the adjusting bolts 54. The lid receiving frame 56 is installed on the adjusting nut by screwing. Then, the screwing amount of the adjusting nut 55 is adjusted so that the lid receiving frame 56 has a predetermined height and inclination, and the lid receiving frame 56 is fixed by the fixing nut 57. After that, the upper surface of the manhole upper portion 53 and the lid receiving frame 56
The concrete 58 is poured into the adjustment gap formed between and to solidify.

【0004】また別の例として、特開平2−28252
4号公報に記載されるような、高さ調整のためにばね等
の弾性体を用いたものが知られている。これは図8に示
すように、マンホールの上部コンクリートブロック61
に固定ボルト62を立設させ、この固定ボルト62に、
コイルバネ63を挿通させ、さらに蓋受枠64のフラン
ジ部64aのボルト穴を挿通させて蓋受枠64を設置し
ている。そして前記フランジ部64aの上側からナット
65を前記固定ボルト62に螺装し、該ナット65を締
め付け又は緩めることによって、前記コイルバネ63を
弾性変形させながら前記蓋受枠64を上下調節して路面
60と面合わせする。その後、上部コンクリートブロッ
ク61と上記蓋受枠64の外周面及び内周面に沿って外
型枠66及び内型枠67を配設し、上部コンクリートブ
ロック61と上記蓋受枠64との高さ調整間隙にモルタ
ル等を充填して硬化させることによって蓋受枠64を位
置決め固定するものである。
As another example, JP-A-2-28252
There is known one using an elastic body such as a spring for height adjustment as described in Japanese Patent Publication No. As shown in FIG. 8, this is an upper concrete block 61 of a manhole.
The fixing bolt 62 is erected on the
The coil spring 63 is inserted, and the bolt hole of the flange portion 64a of the lid receiving frame 64 is also inserted to install the lid receiving frame 64. Then, a nut 65 is screwed onto the fixing bolt 62 from the upper side of the flange portion 64a, and the nut 65 is tightened or loosened so that the coil spring 63 is elastically deformed and the lid receiving frame 64 is adjusted up and down. Meet face to face. After that, the outer form 66 and the inner form 67 are arranged along the outer peripheral surface and the inner peripheral surface of the upper concrete block 61 and the lid receiving frame 64, and the height adjusting gap between the upper concrete block 61 and the lid receiving frame 64. The lid receiving frame 64 is positioned and fixed by filling mortar or the like and hardening it.

【0005】[0005]

【発明が解決しようとする課題】上述した従来例におけ
るマンホールの蓋受枠の高さ調整工法では、マンホール
上部と蓋受枠との高さ調整間隙に、高さ調整の後に、蓋
受枠の横ずれ,または車両通過に伴う強度を考慮して、
コンクリート又はモルタルを充填して硬化させ蓋受枠の
位置を固定している。
SUMMARY OF THE INVENTION In the above-described conventional method for adjusting the height of the lid receiving frame of the manhole, in the height adjusting gap between the upper portion of the manhole and the lid receiving frame, after the height adjustment, the lid receiving frame is laterally displaced, or Considering the strength of passing vehicles,
The position of the lid receiving frame is fixed by filling concrete or mortar and hardening it.

【0006】ところで、一旦、路面に対してマンホール
の蓋受枠高さを調整して施工を完了した後にも、経時的
に路面が陥没したり、路面の舗装のやり直し等によって
路面自体の高さが変化してしまい、再度蓋受枠の高さ調
整をやり直す必要がある。この際、マンホール上部と蓋
受枠との高さ調整間隙にコンクリート又はモルタルを充
填して硬化させて蓋受枠の位置固定を行った場合には、
調整ボルト,調整のためのナット,或はバネ等の調整治
具はコンクリートまたはモルタルと一緒に埋め殺されて
しまっているので再利用ができない。そのため、新たに
調整治具を用意しなくてはならず、施工費用が割高にな
ってしまう問題点が派生する。
By the way, even after the height of the lid receiving frame of the manhole is once adjusted with respect to the road surface and the construction is completed, the height of the road surface itself may be lowered due to the depression of the road surface or the re-paving of the road surface. It has changed and it is necessary to readjust the height of the lid receiving frame again. At this time, when the height adjustment gap between the upper part of the manhole and the lid receiving frame is filled with concrete or mortar and hardened to fix the position of the lid receiving frame,
Adjustment bolts, adjustment nuts, or adjustment jigs such as springs cannot be reused because they are buried together with concrete or mortar. Therefore, a new adjustment jig must be prepared, which causes a problem that the construction cost becomes expensive.

【0007】また高さ調整の施工後に、蓋受枠の高さ調
整の微調整を行うにしても、前記高さ調整治具、特にバ
ネがコンクリートまたはモルタルと一緒に埋め殺されて
しまっていることから、バネの弾性支持による蓋受枠の
上下調整ができない。そのため、微調整にも関わらず、
硬化したコンクリート又はモルタルを破壊しなければな
らず、作業に多大な時間と労力を要する問題点が派生す
る。
Further, even if fine adjustment of the height adjustment of the lid receiving frame is performed after the height adjustment work, the height adjustment jig, especially the spring, is buried together with concrete or mortar. Therefore, it is not possible to vertically adjust the lid receiving frame by elastically supporting the spring. Therefore, despite the fine adjustment,
The hardened concrete or mortar must be destroyed, resulting in the problem that the work is time consuming and labor intensive.

【0008】本発明は、上述の問題を解決するために提
案されたものであって、一旦施工を完了した後に再度蓋
高さの調整をする際にも、作業時間の短縮と労力の軽減
を図ると共に、高さ調整治具の再利用を可能にすること
を目的とする。
The present invention has been proposed in order to solve the above-mentioned problems, and shortens the working time and labor even when the lid height is adjusted again after the construction is completed. The purpose is to make it possible to reuse the height adjustment jig.

【0009】[0009]

【課題を解決するための手段】上記目的を達成するため
に、本発明によるマンホールの蓋高さ調整装置として
は、道路下のマンホール築造の際に、マンホール上部の
コンクリートブロックに対して、高さ調整装置を用いて
蓋受枠を上下に移動させ、蓋部の高さを調節するように
したマンホールの蓋高さ調整装置において、上記調整装
置は、上記コンクリートブロックの上面に立設する調整
ボルトと、前記コンクリートブロックと蓋受枠との間に
介在され、コイルバネをスポンジ材に内装した弾性体
と、前記蓋受枠の上側から前記調整ボルトに螺合される
ナットと、を具備してなることを特徴とするものであ
る。
In order to achieve the above-mentioned object, a manhole cover height adjusting device according to the present invention has a height relative to a concrete block above a manhole when constructing a manhole under a road. In the manhole cover height adjusting device, in which the lid receiving frame is moved up and down by using the adjusting device to adjust the height of the lid part, the adjusting device is an adjusting bolt that stands on the upper surface of the concrete block. An elastic body that is interposed between the concrete block and the lid receiving frame and has a coil spring embedded in a sponge material; and a nut screwed to the adjusting bolt from the upper side of the lid receiving frame. It is what

【0010】また、上記弾性体は中空筒状のスポンジ材
の中空域にテーパー状のコイルバネを配置してなること
を特徴とする。
Further, the elastic body is characterized in that a tapered coil spring is arranged in a hollow region of a hollow cylindrical sponge material.

【0011】さらに、上記弾性体は、コイルバネを内装
したスポンジ材の外表面に、遮水性を有するシート材を
一体形成してなることを特徴とする。
Further, the elastic body is characterized in that a sheet material having a water-blocking property is integrally formed on the outer surface of a sponge material containing a coil spring.

【0012】また本発明によるマンホールの蓋高さ調整
工法としては、道路下のマンホール築造の際に、マンホ
ール上部のコンクリートブロックに対して、高さ調整装
置を用いて蓋受枠を上下に移動させ、蓋部の高さを調節
するようにしたマンホールの蓋高さ調整工法において、
上記コンクリートブロック上面の複数箇所に調整ボルト
を立設し、コイルバネをスポンジ材に内装した弾性体
を、該コイルバネが前記調整ボルトに挿通するように設
置し、前記蓋受枠のフランジ部に設けられた連結孔に前
記調整ボルトを挿通させ、前記蓋受枠の上側から前記調
整ボルトにナットを螺装し、該ナットの螺合量を調整し
て前記弾性体を伸縮させながら蓋受枠の高さを調整し、
前記コンクリートブロック上面と蓋受枠との間に形成さ
れる高さ調整間隙にモルタルを充填して硬化させること
を特徴とする。
Further, as a manhole cover height adjusting method according to the present invention, when a manhole is constructed under a road, a cover receiving frame is moved up and down with respect to a concrete block above the manhole by using a height adjusting device. In the manhole cover height adjustment method that adjusts the height of the lid part,
Adjusting bolts were erected at a plurality of points on the top surface of the concrete block, and an elastic body in which a coil spring was embedded in a sponge material was installed so that the coil spring could be inserted into the adjusting bolt, and provided on a flange portion of the lid receiving frame. Insert the adjustment bolt into the connection hole, screw a nut onto the adjustment bolt from the upper side of the lid receiving frame, adjust the screwing amount of the nut to adjust the height of the lid receiving frame while expanding and contracting the elastic body. Then
It is characterized in that the height adjusting gap formed between the concrete block upper surface and the lid receiving frame is filled with mortar and hardened.

【0013】また、弾性体を、中空筒状のスポンジ材の
中空域にテーパー状のコイルバネを配置したものとし、
該弾性体を、コイルバネが前記調整ボルトに挿通するよ
うに設置する際に、テーパの拡径部が上方に位置するよ
うに設置することを特徴とする。
Further, the elastic body has a tapered coil spring arranged in the hollow region of a hollow cylindrical sponge material,
When the elastic body is installed so that the coil spring is inserted into the adjustment bolt, the elastic body is installed so that the enlarged diameter portion of the taper is located above.

【0014】[0014]

【作用】本発明によるマンホールの蓋高さ調整装置は、
弾性体としてコイルバネをスポンジ材に内装したものを
使用している。このスポンジ材は弾性力を有しているこ
とからコイルバネと共に伸縮し、該スポンジ材に内装さ
れているコイルバネにコンクリートまたはモルタル等が
付着するのを防止する。またスポンジ材の材質または密
度を調整することで、コンクリートまたはモルタル等の
吸収率を調整することができる。
The manhole cover height adjusting device according to the present invention is
As the elastic body, a coil spring inside a sponge material is used. Since this sponge material has an elastic force, it expands and contracts together with the coil spring, and prevents concrete, mortar, or the like from adhering to the coil spring embedded in the sponge material. Further, by adjusting the material or density of the sponge material, it is possible to adjust the absorption rate of concrete or mortar.

【0015】本発明によるマンホールの蓋高さ調整工法
では、上述したようにマンホールの上部を構成するコン
クリートブロック上面に調整ボルトを立設し、コイルバ
ネをスポンジ材に内装した上記弾性体を、該コイルバネ
が前記調整ボルトに挿通するように設置し、ナットの螺
合量を調整して前記弾性体を伸縮させながら蓋受枠の高
さを調整した後、高さ調整間隙にモルタルを充填して硬
化させている。この際モルタルは多少スポンジ材に含侵
するが、モルタルがコイルスプリング及び調整ボルトに
付着することはない。また、スポンジ材の外表面に遮水
性を有するシート材を一体形成しておくことで、スポン
ジ材にモルタルが含侵するのを確実に防止することがで
きる。
In the manhole cover height adjusting method according to the present invention, as described above, the adjusting bolt is erected on the upper surface of the concrete block constituting the upper part of the manhole, and the elastic body in which the coil spring is embedded in the sponge material is used as the coil spring. Is installed so as to pass through the adjustment bolt, and the height of the lid receiving frame is adjusted while adjusting the screwing amount of the nut to expand and contract the elastic body, and then the height adjustment gap is filled with mortar and cured. ing. At this time, the mortar slightly impregnates the sponge material, but the mortar does not adhere to the coil spring and the adjusting bolt. Further, by integrally forming a sheet material having water-blocking properties on the outer surface of the sponge material, it is possible to reliably prevent the sponge material from being impregnated with mortar.

【0016】上述の高さ調整施工後に再び高さ調整を行
う場合、前記コイルスプリング及び調整ボルトはスポン
ジ材によってモルタルから保護されているため、コイル
スプリングの弾性効果は喪失していない。そのため、モ
ルタル硬化後に再びナットを緩めても、蓋受枠はコイル
バネによって弾性支持されていることで上方に高さ調整
を行うことができ、再高さ調整後に、新たに出来た高さ
調整間隙にモルタルを充填硬化させて施工を完了するこ
とができる。また、蓋受枠を下方に高さ調整する場合に
も、硬化したモルタルの全部を破壊する必要はなく、上
部,すなわち蓋受枠の下方への移動量のみのモルタルを
削り取って下方に高さ調整をし、再高さ調整後に、新た
に出来た高さ調整間隙にモルタルを充填硬化させて施工
を完了することができる。
When the height is adjusted again after the above height adjustment, the coil spring and the adjusting bolt are protected from the mortar by the sponge material, so that the elastic effect of the coil spring is not lost. Therefore, even if the nut is loosened again after the mortar is hardened, the lid receiving frame is elastically supported by the coil spring, so that the height can be adjusted upward, and after the height is adjusted again, the newly created height adjustment gap can be adjusted. The mortar can be filled and hardened to complete the construction. Also, when adjusting the height of the lid receiving frame downward, it is not necessary to destroy all of the hardened mortar, and the height adjustment is performed by scraping off the mortar which is the upper part, that is, the moving amount of the lid receiving frame only. Then, after the height adjustment is performed again, the mortar can be filled and cured in the newly formed height adjustment gap to complete the construction.

【0017】また、コイルバネにモルタルが付着してい
ないことから、高さ調整間隙にモルタル充填硬化後に、
蓋受枠を取り外してコイルスプリングのみを取り外すこ
ともできる。この場合、テーパ状のコイルスプリングの
拡径部が上方に位置するように設置してあれば、コイル
スプリングを取り外し易くなる。その結果、コイルスプ
リングを他のマンホールの蓋高さ調整に用いることがで
き、施工費用の低減化を図ることが出来る。
Since the mortar does not adhere to the coil spring, after the mortar is filled and cured in the height adjusting gap,
It is also possible to remove the lid receiving frame and remove only the coil spring. In this case, if the expanded diameter portion of the tapered coil spring is installed so as to be located above, the coil spring can be easily removed. As a result, the coil spring can be used for adjusting the lid height of other manholes, and the construction cost can be reduced.

【0018】[0018]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。図1は本発明の第1実施例を示すマンホールの
蓋高さ調整工法の部分側断面図で、図において、符号1
は道路の地下に築造された,通称プレホールといわれる
下水道用組立てマンホールで、このマンホール1内の下
部には、図示しないが例えば下水道管が貫通,接続され
ている。マンホール1の築造に当たっては、まず路面か
らの高さが確認され、設置される。
An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a partial side sectional view of a manhole cover height adjusting method showing a first embodiment of the present invention.
Is a sewer assembly manhole built under the road, which is commonly called a prehole, and a lower part of the manhole 1 has a sewer pipe (not shown) penetrating and connected thereto. When constructing the manhole 1, the height from the road surface is first confirmed and then installed.

【0019】上記マンホール1は、基礎杭、グリ石等で
固められた基礎の上に各種のコンクリートリング2を順
に積み上げ、それぞれの接合部にエポキシ樹脂含浸体等
を配設して接着し、ずれ止めして設置される。そして前
記コンクリートリング2の最上段には上部コンクリート
ブロック3が配設されている。
The manhole 1 is constructed by stacking various concrete rings 2 on a foundation piled with foundation piles and ground stones in order, arranging an epoxy resin impregnated body or the like at each joint and adhering them. It is stopped and installed. An upper concrete block 3 is arranged on the uppermost stage of the concrete ring 2.

【0020】符号4は金属製の蓋受枠で、該蓋受枠4に
は円周フランジ4aが形成されており、該円周フランジ
4aには挿通孔4bが複数個設けられている。また、蓋
受枠4の外周径は前記上部コンクリートブロック3の外
周径と略同径に形成されており、該蓋受枠4には鉄製の
マンホール蓋5が設置されている。
Reference numeral 4 denotes a metal lid receiving frame, which has a circumferential flange 4a formed therein, and the circumferential flange 4a is provided with a plurality of insertion holes 4b. The outer diameter of the lid receiving frame 4 is formed to be substantially the same as the outer diameter of the upper concrete block 3, and an iron manhole lid 5 is installed on the lid receiving frame 4.

【0021】符号6は前記蓋受枠4の内周面と前記コン
クリートブロック3の内周面との間に架設される内型枠
で、該内型枠6は、ゴム材等の可撓性を有する材質で形
成されている。
Reference numeral 6 denotes an inner mold frame that is installed between the inner peripheral surface of the lid receiving frame 4 and the inner peripheral surface of the concrete block 3, and the inner mold frame 6 is made of a flexible material such as rubber. It is formed of a material having.

【0022】符号7は前記蓋受枠4の外周面と前記上部
コンクリートブロック3の外周面との間に架設される外
型枠で、該外型枠7は、前記内型枠6と同様に可撓性を
有する材質で形成されている。
Reference numeral 7 is an outer mold frame that is installed between the outer peripheral surface of the lid receiving frame 4 and the outer peripheral surface of the upper concrete block 3, and the outer mold frame 7 can be the same as the inner mold frame 6. It is made of a flexible material.

【0023】また本発明におけるマンホールの蓋高さ調
整装置としては、前記コンクリートブロック3の上面に
立設される調整ボルト10と、前記蓋受枠4の上側から
前記調整ボルト10に螺合される調整ナット11と、前
記コンクリートブロック3と前記蓋受枠4との間に介在
される弾性体12とで構成されている。
As the manhole cover height adjusting device of the present invention, the adjusting bolt 10 which is erected on the upper surface of the concrete block 3 and the adjusting bolt 10 which is screwed from the upper side of the lid receiving frame 4 to the adjusting bolt 10. It is composed of a nut 11 and an elastic body 12 interposed between the concrete block 3 and the lid receiving frame 4.

【0024】前記弾性体12は、図2(a)の斜視図,
図2(b)の上面図に示すように、スポンジ材12aに
テーパ状のコイルスプリング12bを内装したものであ
る。前記スポンジ材12aは所要高さを有する中空円筒
状に形成され、該スポンジ材12aの中空域に、スポン
ジ材12aと同等の高さを有するコイルスプリング12
bが配置されている。そして弾性体12、すなわちスポ
ンジ材12aとコイルスプリング12bとは共に連動し
て伸縮するようになっている。また、前記スポンジ材1
2aの外表面には、遮水性を有するフィルムのようなシ
ート材12cが一体形成されている。
The elastic body 12 is a perspective view of FIG.
As shown in the top view of FIG. 2B, the sponge material 12a is internally provided with a tapered coil spring 12b. The sponge material 12a is formed in a hollow cylindrical shape having a required height, and the coil spring 12 having the same height as the sponge material 12a is provided in the hollow area of the sponge material 12a.
b is arranged. Then, the elastic body 12, that is, the sponge material 12a and the coil spring 12b are interlocked with each other to expand and contract. Also, the sponge material 1
On the outer surface of 2a, a sheet material 12c such as a film having a water blocking property is integrally formed.

【0025】また、弾性体12の他の例としては、図3
の断面図に示すように、外形が円錐テーパ状に形成さ
れ、中心軸にボルト挿通孔が形成されたスポンジ材12
aに、テーパ状のコイルスプリング12bが内装されて
いる。すなわち、スポンジ材12aの内部にコイルスプ
リング12bが螺旋状に埋込まれているように構成さ
れ、上述と同様に、スポンジ材12aとコイルスプリン
グ12bとは共に連動して伸縮するようになっている。
Another example of the elastic body 12 is shown in FIG.
As shown in the cross-sectional view of FIG. 1, the sponge material 12 has an outer shape formed into a conical taper shape and has a bolt insertion hole formed in the central axis.
A tapered coil spring 12b is provided inside a. That is, the coil spring 12b is embedded in the sponge material 12a in a spiral shape, and the sponge material 12a and the coil spring 12b both expand and contract in the same manner as described above. .

【0026】次に上述した蓋高さ調整装置を用いたマン
ホールの蓋高さ調整工法を説明する。まず上部コンクリ
ートブロック3の上面で複数箇所に調整ボルト10を立
設する。次に弾性体12を前記調整ボルト10に挿通す
るが、この際コイルスプリング12bの拡径部が上方に
位置するようにコイルスプリング12bを調整ボルト1
0に挿通させる。そして内型枠6を配設し、ワッシャを
調整ボルト10に装通させてから、蓋受枠4のフランジ
部4aに穿孔されている挿通孔4bを前記調整ボルト1
0に挿通させて蓋受枠4をセットする。次に調整ナット
11を前記調整ボルト10に螺装し、該ナット11の螺
合量を調整して前記弾性体12(スポンジ材12a及び
コイルスプリング12b)を収縮させながらマンホール
蓋5が路面に一致するように蓋高さ調整を行う。
Next, a manhole cover height adjusting method using the above-described cover height adjusting device will be described. First, the adjustment bolts 10 are erected at a plurality of points on the upper surface of the upper concrete block 3. Next, the elastic body 12 is inserted into the adjusting bolt 10. At this time, the coil spring 12b is adjusted so that the expanded diameter portion of the coil spring 12b is located above.
0 is inserted. Then, the inner formwork 6 is arranged, the washer is passed through the adjustment bolt 10, and then the insertion hole 4b formed in the flange portion 4a of the lid receiving frame 4 is inserted into the adjustment bolt 1.
The lid receiving frame 4 is set by inserting it through 0. Next, the adjusting nut 11 is screwed onto the adjusting bolt 10, the screwing amount of the nut 11 is adjusted, and the elastic body 12 (sponge material 12a and coil spring 12b) is contracted, so that the manhole cover 5 matches the road surface. Adjust the lid height so that

【0027】そして蓋高さ調整後に外型枠7を配設し、
コンクリートブロック3と蓋受枠4との間に生起した高
さ調整間隙にモルタルを充填する。この際、モルタルは
前記弾性体12のスポンジ材12aに多少は含侵するも
のの、モルタルの粘性とスポンジ材の密度の関係から、
内部(中空域)までは含侵しない。そのため、スポンジ
材12aに内装されているコイルスプリング12b及び
調整ボルト10には、モルタルは付着しない。また、ス
ポンジ材12aの外表面にシート材12cが一体形成さ
れたものを使用すれば、モルタルは該シート材12cに
よってスポンジ材12aへの含侵が遮断され、コイルス
プリング12b及び調整ボルト10にモルタルが付着す
るのを確実に防止することができる。そしてモルタルが
硬化した後にマンホール蓋5の周辺を埋め戻して施工が
完了する。
After adjusting the height of the lid, the outer frame 7 is arranged,
The height adjusting gap generated between the concrete block 3 and the lid receiving frame 4 is filled with mortar. At this time, although the mortar slightly impregnates the sponge material 12a of the elastic body 12, due to the relationship between the viscosity of the mortar and the density of the sponge material,
Does not impregnate the inside (hollow region). Therefore, the mortar does not adhere to the coil spring 12b and the adjusting bolt 10 which are installed in the sponge material 12a. If a sheet material 12c is integrally formed on the outer surface of the sponge material 12a, the sheet material 12c prevents the sponge material 12a from impregnating the mortar, so that the coil spring 12b and the adjusting bolt 10 have mortar. It can be surely prevented from adhering. Then, after the mortar is hardened, the periphery of the manhole cover 5 is backfilled to complete the construction.

【0028】次に、路面の舗装のやり直し等によって、
再度マンホール蓋の高さ調整を行う場合について説明す
る。上述したようにコイルスプリング12bにはモルタ
ルが付着していないことから、コイルスプリング12b
の弾性効果は喪失していない。そのため、図4に示すよ
うに、調整ナット11の螺装を解除して蓋受枠4を取り
外すと、モルタルは初期の高さ調整間隙内で硬化してい
るが、コイルスプリング12bは元の高さに復元する。
Next, by re-paving the road surface,
A case where the height of the manhole cover is adjusted again will be described. As described above, since the mortar does not adhere to the coil spring 12b, the coil spring 12b
Has not lost its elastic effect. Therefore, as shown in FIG. 4, when the adjustment nut 11 is unscrewed and the lid receiving frame 4 is removed, the mortar is hardened in the initial height adjustment gap, but the coil spring 12b has the original height. Restore to.

【0029】前述の状態で、マンホール蓋5を上方に高
さ調整する場合には、図5に示すように、内型枠6を装
着し、新たに中空筒状のスポンジ材12a’でコイルス
プリング12bを内装し、蓋受枠4をセットする。そし
て調整ナット11の螺合量を調整して、スポンジ材12
a’及びコイルスプリング12bを伸縮させつつマンホ
ール蓋5が路面に一致するように蓋受枠4の再高さを調
整する。そして外型枠7を装着した後、硬化したモルタ
ルの上面と蓋受枠4との間に新たに出来た高さ調整間隙
にモルタルを充填して硬化させる。そしてモルタル硬化
後にマンホール蓋5の周辺を埋め戻して施工を完了させ
る。
When the height of the manhole cover 5 is adjusted upward in the above-mentioned state, as shown in FIG. 5, the inner formwork 6 is mounted and a coil spring is newly added with a hollow cylindrical sponge material 12a '. 12b is installed and the lid receiving frame 4 is set. Then, by adjusting the screwing amount of the adjusting nut 11, the sponge material 12
The height of the lid receiving frame 4 is adjusted so that the manhole lid 5 is aligned with the road surface while expanding and contracting a'and the coil spring 12b. Then, after mounting the outer mold 7, the mortar is filled in the height adjusting gap newly formed between the upper surface of the cured mortar and the lid receiving frame 4 and cured. After the mortar is hardened, the manhole cover 5 is backfilled to complete the construction.

【0030】また、モルタルを硬化させた後マンホール
蓋5を下方に高さ調整する場合には、図6に示すよう
に、硬化したモルタルを全部破壊せずに、調整量,すな
わち蓋受枠4を下方へ高さ調整移動させるために必要な
分の硬化モルタルを削り取る。そして前述したと同様
に、再高さ調整後に、削り取られたモルタルの上面と蓋
受枠4との間に新たに出来た高さ調整間隙にモルタルを
充填硬化させ、マンホール蓋5の周辺を埋め戻して施工
を完了させる。
When the height of the manhole cover 5 is adjusted downward after hardening the mortar, as shown in FIG. 6, the adjustment amount, that is, the lid receiving frame 4 is set without destroying all the hardened mortar. Scrap off the hardened mortar required for the height adjustment movement downward. Then, in the same manner as described above, after the height is adjusted again, the mortar is filled and hardened in the height adjusting gap newly formed between the upper surface of the mortar and the lid receiving frame 4, and the periphery of the manhole lid 5 is backfilled. Complete the construction.

【0031】さらに、初段の蓋高さ調整工法において、
モルタル硬化後に、コイルスプリング12bにはモルタ
ルが付着していないことから、蓋受枠4を取り外して該
コイルスプリング12bを取り外すことができる。この
際、該コイルスプリング12bは図1,図4に示すよう
に、テーパの拡径部が上方に位置しているため、コイル
スプリング12bを上方に引き抜いて取り外す際に,取
り外し易いメリットがある。そして再蓋高さ調整を行う
場合に、再びコイルスプリング12bをスポンジ材12
aに内装するように配設して蓋高さ調整を行う。このよ
うにコイルスプリング12bを取り外すことで、該コイ
ルスプリング12bは他のマンホールの蓋高さ調整に用
いることができ、施工費用の低減化を図ることが出来
る。
Further, in the lid height adjusting method of the first stage,
Since the mortar does not adhere to the coil spring 12b after the mortar is hardened, the coil spring 12b can be removed by removing the lid receiving frame 4. At this time, as shown in FIGS. 1 and 4, the coil spring 12b has a taper expanded portion located above, so that there is an advantage that the coil spring 12b can be easily removed when the coil spring 12b is pulled out upward and removed. When the lid height is adjusted again, the coil spring 12b is again attached to the sponge material 12
The height of the lid is adjusted by arranging it so that it is placed inside a. By removing the coil spring 12b in this manner, the coil spring 12b can be used for adjusting the lid height of other manholes, and the construction cost can be reduced.

【0032】上述したように初段の蓋高さ調整後に再度
蓋高さ調整を行う際に、初段の蓋高さ調整で用いた高さ
調整装置,特にコイルスプリング12b及び調整ボルト
10を再利用できる。そのため、準備段階として硬化モ
ルタルを全部破壊する必要がなく、作業労力を低減する
ことができる。また、再蓋高さ調整を行うに際し、新た
な高さ調整装置が不要になるため、施工費用の低減化を
図ることが出来る。
As described above, when the lid height is adjusted again after the first-stage lid height adjustment, the height adjusting device used for the first-stage lid height adjustment, particularly the coil spring 12b and the adjusting bolt 10, can be reused. . Therefore, it is not necessary to completely destroy the hardened mortar as a preparatory step, and the work labor can be reduced. Further, when the lid height is adjusted again, a new height adjusting device is not required, so that the construction cost can be reduced.

【0033】[0033]

【発明の効果】以上説明したように本発明は、コイルバ
ネを内装したスポンジ材を弾性体として使用するため、
高さ調整間隙に充填されるモルタル等が前記コイルバネ
に付着することがないため、コイルバネを再利用するこ
とができ、再蓋高さ調整を行う場合にも、硬化したモル
タルを全部破壊することなく再蓋高さ調整を行うことが
できる。その結果、作業労力の低減化,作業時間の短縮
化を図ることができ、さらには、高さ調整装置が再利用
できることから、作業コストの低減化を図ることが出来
る。
As described above, according to the present invention, since the sponge material containing the coil spring is used as the elastic body,
Since the mortar etc. filled in the height adjustment gap does not adhere to the coil spring, the coil spring can be reused, and even when the lid height is adjusted again, the hardened mortar is not destroyed. The lid height can be adjusted again. As a result, it is possible to reduce the work labor and the work time, and further, since the height adjusting device can be reused, it is possible to reduce the work cost.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のマンホールの蓋高さ調整工法の部分側
断面図である。
FIG. 1 is a partial side sectional view of a manhole cover height adjusting method of the present invention.

【図2】弾性体の説明図である。FIG. 2 is an explanatory diagram of an elastic body.

【図3】蓋高さ調整後に蓋受枠を取り外した状態説明図
である。
FIG. 3 is an explanatory view of a state in which a lid receiving frame is removed after the lid height is adjusted.

【図4】蓋高さ調整後に蓋受枠を取り外した状態説明図
である。
FIG. 4 is an explanatory view of a state in which the lid receiving frame is removed after the lid height is adjusted.

【図5】再蓋高さ調整工法の説明図である。FIG. 5 is an explanatory diagram of a lid height adjusting method.

【図6】再蓋高さ調整工法の説明図である。FIG. 6 is an explanatory diagram of a lid height adjusting method.

【図7】従来例を示す説明図である。FIG. 7 is an explanatory diagram showing a conventional example.

【図8】従来例を示す説明図である。FIG. 8 is an explanatory diagram showing a conventional example.

【符号の説明】[Explanation of symbols]

1 マンホール 2 コンクリートリング 3 上部コンクリートブロック 4 蓋受枠 4a フランジ 4b 挿通孔 5 マンホール蓋 6 内型枠 7 外型枠 10 調整ボルト 11 調整ナット 12 弾性体 12a スポンジ材 12b コイルスプリング 12c シート材 G 高さ調整間隙 1 Manhole 2 Concrete ring 3 Upper concrete block 4 Lid receiving frame 4a Flange 4b Insertion hole 5 Manhole lid 6 Inner formwork 7 Outer formwork 10 Adjustment bolt 11 Adjustment nut 12 Elastic body 12a Sponge material 12b Coil spring 12c Sheet material G Height adjustment gap

───────────────────────────────────────────────────── フロントページの続き (72)発明者 志村 博正 東京都目黒区鷹番1−10−6 株式会社ハ ッコー内 (72)発明者 結城 勇 神奈川県大和市代官3丁目18番3号 株式 会社ハッコー技術開発センター内 (72)発明者 歌野 正敏 神奈川県川崎市中原区新丸子町751 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiromasa Shimura 1-10-6 Takaban, Meguro-ku, Tokyo Hakko Co., Ltd. (72) Inventor Isamu Yuki 3-18-3 Daikan, Kanagawa Prefecture Hakko Co., Ltd. (72) Inventor Masatoshi Utano 751 Shin-Maruko-cho, Nakahara-ku, Kawasaki-shi, Kanagawa

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 道路下のマンホール築造の際に、マンホ
ール上部のコンクリートブロックに対して、高さ調整装
置を用いて蓋受枠を上下に移動させ、蓋部の高さを調節
するようにしたマンホールの蓋高さ調整装置において、 上記調整装置は、上記コンクリートブロックの上面に立
設する調整ボルトと、 前記コンクリートブロックと蓋受枠との間に介在され、
コイルバネをスポンジ材に内装した弾性体と、 前記蓋受枠の上側から前記調整ボルトに螺合されるナッ
トと、 を具備してなることを特徴とするマンホールの蓋高さ調
整装置。
1. A manhole for adjusting a height of a lid part when a manhole is constructed under a road, by moving a lid receiving frame up and down by using a height adjusting device with respect to a concrete block above the manhole. In the lid height adjusting device, the adjusting device is interposed between the adjusting bolt standing on the upper surface of the concrete block, and the concrete block and the lid receiving frame,
A manhole cover height adjusting device comprising: an elastic body having a coil spring embedded in a sponge material; and a nut screwed to the adjusting bolt from above the lid receiving frame.
【請求項2】 上記弾性体は中空筒状のスポンジ材の中
空域にテーパー状のコイルバネを配置してなることを特
徴とする請求項1記載のマンホールの蓋高さ調整装置。
2. The manhole cover height adjusting device according to claim 1, wherein the elastic body is formed by arranging a tapered coil spring in a hollow region of a hollow cylindrical sponge material.
【請求項3】 上記弾性体は、コイルバネを内装したス
ポンジ材の外表面に、遮水性を有するシート材を一体形
成してなることを特徴とする請求項1,2記載のマンホ
ールの蓋高さ調整装置。
3. The manhole cover height according to claim 1, wherein the elastic body is formed by integrally forming a sheet material having water impermeability on an outer surface of a sponge material containing a coil spring. Adjustment device.
【請求項4】 道路下のマンホール築造の際に、マンホ
ール上部のコンクリートブロックに対して、高さ調整装
置を用いて蓋受枠を上下に移動させ、蓋部の高さを調節
するようにしたマンホールの蓋高さ調整工法において、 上記コンクリートブロック上面の複数箇所に調整ボルト
を立設し、 コイルバネをスポンジ材に内装した弾性体を、該コイル
バネが前記調整ボルトに挿通するように設置し、 前記蓋受枠のフランジ部に設けられた連結孔に前記調整
ボルトを挿通させ、 前記蓋受枠の上側から前記調整ボルトにナットを螺装
し、該ナットの螺合量を調整して前記弾性体を伸縮させ
ながら蓋受枠の高さを調整し、 前記コンクリートブロック上面と蓋受枠との間に形成さ
れる高さ調整間隙にモルタルを充填して硬化させること
を特徴とするマンホールの蓋高さ調整工法。
4. A manhole for adjusting a height of a lid part when a manhole is built under a road, by moving a lid receiving frame up and down with respect to a concrete block above the manhole by using a height adjusting device. In the lid height adjusting method, the adjusting bolts are erected at a plurality of positions on the concrete block upper surface, and an elastic body having a coil spring embedded in a sponge material is installed so that the coil spring is inserted into the adjusting bolt. The adjustment bolt is inserted into the connection hole provided in the flange portion of the receiving frame, the nut is screwed onto the adjustment bolt from the upper side of the lid receiving frame, and the elastic amount is expanded and contracted by adjusting the screwing amount of the nut. While adjusting the height of the lid receiving frame, a mortar is filled in the height adjusting gap formed between the upper surface of the concrete block and the lid receiving frame to cure the mortar. Lid height adjustment method of Lumpur.
【請求項5】 請求項4記載の弾性体を、中空筒状のス
ポンジ材の中空域にテーパー状のコイルバネを配置した
ものとし、 該弾性体を、コイルバネが前記調整ボルトに挿通するよ
うに設置する際に、テーパの拡径部が上方に位置するよ
うに設置することを特徴とする請求項4記載のマンホー
ルの蓋高さ調整工法。
5. The elastic body according to claim 4, wherein a tapered coil spring is arranged in a hollow region of a hollow cylindrical sponge material, and the elastic body is installed so that the coil spring is inserted into the adjusting bolt. 5. The manhole cover height adjusting method according to claim 4, wherein the taper expanded portion is installed so as to be located at the upper side.
JP7326013A 1995-12-14 1995-12-14 Device technology for adjusting height of cover for manhall therefor Pending JPH09165767A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7326013A JPH09165767A (en) 1995-12-14 1995-12-14 Device technology for adjusting height of cover for manhall therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7326013A JPH09165767A (en) 1995-12-14 1995-12-14 Device technology for adjusting height of cover for manhall therefor

Publications (1)

Publication Number Publication Date
JPH09165767A true JPH09165767A (en) 1997-06-24

Family

ID=18183127

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7326013A Pending JPH09165767A (en) 1995-12-14 1995-12-14 Device technology for adjusting height of cover for manhall therefor

Country Status (1)

Country Link
JP (1) JPH09165767A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107900289A (en) * 2017-12-12 2018-04-13 重庆乐迪机车车辆配件有限公司 A kind of mould for being used to cast disk class multicolumn shaped cast part

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107900289A (en) * 2017-12-12 2018-04-13 重庆乐迪机车车辆配件有限公司 A kind of mould for being used to cast disk class multicolumn shaped cast part

Similar Documents

Publication Publication Date Title
RU2266370C2 (en) Method for manhole chimney and cover replacement
JP2003055984A (en) Column base connecting structure
KR102163522B1 (en) Precast floor plate having level correction unit and construction method of the same
JP3134114B2 (en) Reinforcement method of pier base
JPH09165767A (en) Device technology for adjusting height of cover for manhall therefor
JP3096349B2 (en) Manhole cover height adjustment method
JPH0784763B2 (en) Squirrel-framed formwork for the steel column support in the building
JP3074062B2 (en) Manhole cover height adjustment method
JP3171675U (en) Anti-sinking floor slab with maneuvering prevention function
JP6345328B1 (en) Original position building method and original position structure
JP2977364B2 (en) Manhole cover height adjustment method
JPH09144041A (en) Method of cover-height adjusting construction of manhole
JP3513784B2 (en) How to reinforce pillars of viaduct
JP2516066B2 (en) Manhole cover height adjustment device
JP7271819B1 (en) How to replace a columnar structure
JP2782278B2 (en) Manhole bulk height adjustment method
JPH08120700A (en) Opening device for manhole or hand-hole and construction method for manhole or hand-hole in paving surface making use thereof
JP2680555B2 (en) How to adjust the height of the top surface of the existing manhole
JP2590633Y2 (en) Concrete structure coupling equipment
KR960004916B1 (en) Overlay method for height adjustable manhole
JP3074063B2 (en) Manhole cover height adjustment method
JP3731682B2 (en) Seismic isolation method for existing buildings
JP2005273230A (en) Leg material fixing method of building
JP2782283B2 (en) Manhole cover height adjustment method
JP2926003B2 (en) Height adjustment method for repair of underground structures and height adjustment tools used in the method