JPH09147014A - Scheduling method for operation work - Google Patents

Scheduling method for operation work

Info

Publication number
JPH09147014A
JPH09147014A JP30099395A JP30099395A JPH09147014A JP H09147014 A JPH09147014 A JP H09147014A JP 30099395 A JP30099395 A JP 30099395A JP 30099395 A JP30099395 A JP 30099395A JP H09147014 A JPH09147014 A JP H09147014A
Authority
JP
Japan
Prior art keywords
information
business
scheduling
execution time
function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP30099395A
Other languages
Japanese (ja)
Inventor
Takeshi Marushima
毅 丸島
Yoichi Mukoyama
洋一 向山
Shoichi Aso
昌一 麻生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP30099395A priority Critical patent/JPH09147014A/en
Publication of JPH09147014A publication Critical patent/JPH09147014A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To schedule the operation works more properly and to reduce the working of a maintenance man by setting information, which is the base for scheduling of operation works, again in accordance with the actual result of operation. SOLUTION: Plural kinds of operation works A which are executed in the maintenance operation system for a network consisting of equipments of plural production vendors are scheduled based on execution time base information C corresponding to respective processes constituting each operation work. Information F related to each operation work executed in the maintenance operation system is stored, and is statistically processed, and the operation work is most suitably scheduled in accordance with the actual result of operation based on statistical information H related to the work, and it is systematized, thereby feeding back the execution result of the system.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、異なるオペレーシ
ョン業務の対象となる複数の設備から構成されるシステ
ムに対する保守運用システムに関し、特にオペレーショ
ン業務のスケジューリング方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a maintenance operation system for a system composed of a plurality of facilities which are targets of different operation work, and more particularly to a method of scheduling operation work.

【0002】[0002]

【従来の技術】従来、ネットワークの設備に対する保守
運用システムで実行するオペレーション業務のスケジュ
ーリングは設備の保守者によってドキュメントで管理さ
れており、各業務を矛盾なく実施するための調整は設備
の保守者が行っていた。この際、ネットワークの設備に
対する保守運用システムは業務を実行するためのツール
であり、システムで業務の順序を制御する機能を持って
いなかった。
2. Description of the Related Art Conventionally, the scheduling of operation work executed in a maintenance and operation system for network equipment is managed in a document by a maintenance person of the equipment, and the maintenance work of the equipment is done by the maintenance person of the equipment to make adjustments to execute each work consistently. I was going. At this time, the maintenance and operation system for network equipment is a tool for executing work, and does not have a function of controlling the order of work in the system.

【0003】[0003]

【発明が解決しようとする課題】上記従来技術では、複
数の製造ベンダの設備から構成されるネットワークに対
する保守運用システムで実行する複数種類のオペレーシ
ョン業務を、同一設備に重複することなく割り当てるこ
とが設備の保守者によって行われているため、設備の保
守者に対して大変な負荷がかかる。また、業務を構成す
る各工程の実行時間の割り当てが、開発元が設定した業
務工程別実行時間基礎情報の初期値のままでは、最適な
実行時間を割り当てたシステムの運用になっていない。
よって、運用実績を基に各種のオペレーション業務にか
かる時間を見直してスケジュールする必要がある。更
に、ある業務にスケジュール変更が発生すると、他の業
務のスケジュールを全てチェックし、重複しないように
割り当てる必要がある。本発明の目的は、このような問
題点を改善し、オペレーション業務のスケジューリング
時の基になる情報を運用実績に合わせて再設定すること
ができ、より適切なオペレーション業務のスケジューリ
ングを可能とすることにある。また本発明の目的は、ス
ケジュールの変更とそれに伴う再スケジューリングをシ
ステム内に持つことで、保守者稼働の削減を可能とする
ことにある。
In the above-mentioned conventional technique, it is possible to allocate a plurality of types of operation jobs to be executed in the maintenance operation system to the network composed of the equipment of a plurality of manufacturing vendors to the same equipment without duplication. This is done by the maintenance personnel of, so that a great load is imposed on the maintenance personnel of the equipment. Further, the allocation of the execution time of each process constituting the business is not the operation of the system to which the optimum execution time is allocated when the initial value of the business process-specific execution time basic information set by the developer is left unchanged.
Therefore, it is necessary to review and schedule the time required for various operation jobs based on the operation results. Furthermore, when a schedule change occurs in a certain work, it is necessary to check the schedules of other works and allocate them so that they do not overlap. An object of the present invention is to improve such problems, and to reconfigure the information that is the basis for the scheduling of operation work according to the operation record, and to enable more appropriate operation work scheduling. It is in. Another object of the present invention is to reduce maintenance work by having a schedule change and a rescheduling associated therewith in the system.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するた
め、請求項1記載の発明では、複数の製造ベンダの設備
から構成されるネットワークに対する保守運用システム
で実行する複数種類のオペレーション業務を各オペレー
ション業務を構成する各工程に対応した実行時間基礎情
報を基にスケジューリングを行い、保守運用システムで
実行する各オペレーション業務の業務に関する情報を蓄
積し、蓄積された業務に関する情報を統計処理し、その
業務に関する統計情報を基に運用実績に合わせて各オペ
レーション業務の最適なスケジューリングを行うと共に
これをシステム化することで、システムの実行結果をフ
ィードバックする機構をシステム内に持つ。また請求項
2記載の発明では、請求項1記載の前記スケジューリン
グ方法において、スケジューリングの変更を受け付け、
変更したい工程と変更先に割り当てられた工程とが同時
に実行可能かどうか判断し、同時に実行不可能な場合に
は変更先に割り当てられていた工程のスケジューリング
を再度起動する機構をシステム内に持つ。
In order to achieve the above object, in the invention according to claim 1, a plurality of types of operation work to be executed by a maintenance operation system for a network composed of equipment of a plurality of manufacturing vendors are performed. Scheduling is performed based on the execution time basic information corresponding to each process that constitutes a business, the information about the business of each operation business executed in the maintenance operation system is accumulated, the information about the accumulated business is statistically processed, and the business is performed. The system has a mechanism to feed back the execution result of the system by optimally scheduling each operation work according to the operation record based on the statistical information about and systematizing this. Further, in the invention according to claim 2, in the scheduling method according to claim 1, a change in scheduling is accepted.
The system has a mechanism for determining whether the process to be changed and the process assigned to the change destination can be executed at the same time, and if they cannot be executed at the same time, the scheduling of the process assigned to the change destination is restarted.

【0005】[0005]

【発明の実施の形態】本発明においては、複数の製造ベ
ンダの設備から構成されるネットワークに対する保守運
用システムで実行される複数種類のオペレーション業務
のスケジューリング時に、運用実績を反映した情報を用
いてスケジューリングすることで、各ネットワーク設備
に対するオペレーション業務の最適なスケジューリング
が可能となり、オペレーション業務の実行時間を最適に
することができる。ネットワーク設備に対するオペレー
ション業務のスケジューリングとそれを変更する機構を
システム化することでシステム管理者の稼働を削減でき
る。各種のオペレーション業務に関する情報を統計処理
し蓄積しているので、業務の実行頻度を分析でき業務改
善が期待できる。
BEST MODE FOR CARRYING OUT THE INVENTION According to the present invention, at the time of scheduling a plurality of types of operation jobs executed in a maintenance operation system for a network composed of equipment of a plurality of manufacturing vendors, scheduling is performed using information reflecting operation results. By doing so, it is possible to optimally schedule the operation work for each network facility, and to optimize the execution time of the operation work. The system administrator can reduce the operation by systematizing the scheduling of operation work for network equipment and the mechanism for changing it. Since information about various operation jobs is statistically processed and accumulated, the execution frequency of jobs can be analyzed and business improvement can be expected.

【0006】[0006]

【実施例】以下、本発明の一実施例を図面により説明す
る。 (第1の実施例)図1は、複数の製造ベンダの設備で構
成されるネットワークに対する保守運用システムを表
し、請求項1記載の発明の実施例を説明する図である。
図1において、A、B、J、G、Iはシステムの各処理
部機能を示し、C〜F、Hはシステムの記憶部に格納さ
れた各種情報を示す。また、(1)〜(10)は業務工
程別実行時間基礎情報を再設定する手順を示す。本実施
例においては、各種の「A:オペレーション業務」は
「B:業務工程別スケジューリング」を起動する(手順
(1))。「B:業務工程別スケジューリング」は、各
種オペレーション業務の各工程の実施時間の基礎情報を
管理している「C:業務工程別実行時間基礎情報」と、
オペレーション業務の各工程が他の工程と同時に実施し
てよいかどうかを管理している「D:工程の競合情報」
と、ネットワーク設備毎に実施される工程のスケジュー
ル情報を蓄積管理している「E:スケジュール情報」を
基にスケジューリングを行う(手順(2)、(2)’、
(2)”)。各種オペレーション業務の「B:業務工程
別スケジューリング」はスケジューリングした結果を
「E:スケジュール情報」に登録する(手順(3))。
「J:業務工程制御」は「E:スケジュール情報」を常
に監視していて、「E:スケジュール情報」に登録され
ている時刻になると(手順(4))、登録しているオペ
レーション業務の工程を起動する(手順(5))。
「J:業務工程制御」に起動された「A:オペレーショ
ン業務」は、業務実施後の実行結果を「F:業務情報」
に蓄積すると共に各工程が終了したということを「E:
スケジュール情報」に登録する(手順(6)、
(6)’)。「G:業務情報統計処理」は各オペレーシ
ョン業務の各工程の平均実施時間等を管理している業務
統計情報を作成するために、「F:業務情報」を基に各
工程の内容に沿った統計処理を実行し、結果を「H:業
務統計情報」に蓄積する(手順(7)、(8))。
「I:業務工程別実行時間基礎情報再設定」は、運用実
績に合わせた業務工程別の実行時間基礎情報を作成する
ために、「H:業務統計情報」を基に各オペレーション
業務の工程別に実行時間基礎情報を見直し、結果を
「C:業務工程別実行時間基礎情報」に再設定する(手
順(9)、(10))。これにより、次から実行される
各種の「A:オペレーション業務」が各「B:業務工程
別スケジューリング」を起動する際に、「B:業務工程
別スケジューリング」が参照している「C:業務工程別
実行時間基礎情報」が、運用実績に合わせた再設定され
た「C:業務工程別実行時間基礎情報」となるので、最
適なオペレーション業務のスケジューリングが可能とな
る。
An embodiment of the present invention will be described below with reference to the drawings. (First Embodiment) FIG. 1 shows a maintenance and operation system for a network composed of equipment of a plurality of manufacturing vendors, and is a diagram for explaining an embodiment of the invention according to claim 1.
In FIG. 1, A, B, J, G, and I indicate functions of respective processing units of the system, and C to F and H indicate various information stored in the storage unit of the system. Further, (1) to (10) show a procedure for resetting the execution time basic information for each business process. In this embodiment, various "A: operation work" activates "B: business process-based scheduling" (procedure (1)). "B: Scheduling by business process" is "C: Execution time basic information by business process" that manages basic information on the execution time of each process of various operations.
"D: Competing information of process" that manages whether each process of operation work may be performed at the same time as other processes
Then, scheduling is performed based on “E: Schedule information” that accumulates and manages schedule information of processes performed for each network facility (procedures (2), (2) ′,
(2) "). For" B: Scheduling by business process "of various operation jobs, the scheduling result is registered in" E: Schedule information "(procedure (3)).
The “J: Business process control” constantly monitors the “E: Schedule information”, and when the time registered in the “E: Schedule information” comes (procedure (4)), the process of the registered operational work is performed. Is started (procedure (5)).
"A: Operation business" started in "J: Business process control" shows the execution result after business execution as "F: Business information".
"E:
Schedule information ”(procedure (6),
(6) '). "G: Business information statistical processing" follows the contents of each process based on "F: Business information" in order to create business statistical information that manages the average execution time of each process of each operation business. The statistical processing is executed, and the result is stored in “H: Business statistical information” (procedures (7) and (8)).
"I: Execution time basic information reset by business process" is for each operation process based on "H: Business statistical information" in order to create execution time basic information for each business process according to the operation record. The execution time basic information is reviewed and the result is reset to "C: business process-specific execution time basic information" (procedures (9) and (10)). As a result, when various “A: operation jobs” to be executed next start each “B: business process-specific scheduling”, “C: business process-specific scheduling” referred to by “B: business process-specific scheduling”. Since the "separate execution time basic information" becomes the reset "C: business process-specific execution time basic information" according to the operation result, it is possible to optimally schedule the operation work.

【0007】具体的な「C:業務工程別実行時間基礎情
報」、「F:業務情報」、「G:業務情報統計処理」を
示したものが図2である。図2に示した情報を参照し、
図3、図4を用いて具体的な「C:業務工程別実行時間
基礎情報」の再設定処理について説明する。「C:業務
工程別実行時間基礎情報」は、業務のスケジューリング
時に用いる基礎情報を各業務における工程とネットワー
ク設備の製造ベンダ毎に管理している。「C:業務工程
別実行時間基礎情報」の初期値は、開発元でネットワー
ク設備の製造ベンダに対応させて各工程毎に決められた
値を設定しておく。最初、「B:業務工程別スケジュー
リング」は、開発元で設定してある初期値の「C:業務
工程別実行時間基礎情報」を用いて各工程に必要な実行
時間を算出する(ステップ301)。実行時間の算出で
は、各工程の内容に沿って、固定的な情報を基に実行時
間を算出する場合と算出式を用いて計算した結果を基に
実行時間を算出する場合がある。固定的な情報を基にす
る場合の例として、ファイル更新業務でのファイル更新
工程を説明する。この工程においては、同じファイルを
同じ製造ベンダの設備で更新する時の処理時間は同じと
考えられるので、製造ベンダに対して固定的な時間を持
たせ、これを工程の実行時間とする。次に、算出式を用
いて計算した結果を基にする場合の例として、ファイル
更新業務でのファイル転送工程を説明する。この工程で
は、ファイルの容量を変数にした算出式で実行時間を導
出する。この場合、「C:業務工程別実行時間基礎情
報」には、算出の根拠となる実効転送速度を管理する。
ファイル転送工程の実行時間は、実効転送速度に転送す
るファイル容量を掛けた結果となる。このように、
「B:業務工程別スケジューリング」は必要な時間を算
出後、「E:スケジュール情報」を参照して実施可能な
空き時間を検索し、工程の実施日時を割り当てる(ステ
ップ303、304)。この際、保守運用システムでは
様々なオペレーション業務が実施されるので、「B:業
務工程別スケジューリング」は対象となるネットワーク
設備に対してスケジューリングしようとする業務の工程
が競合しないかどうかを「D:工程の競合情報」を基に
チェックして(ステップ302)、矛盾なくオペレーシ
ョン業務が実行できる時間帯にスケジュールする。ネッ
トワーク設備に対してオペレーション業務を実施する
時、「A:オペレーション業務」が開始時間、終了時間
等の実行結果を「F:業務情報」に蓄積する(ステップ
309)。「G:業務情報統計処理」は各工程の開始時
間、終了時間等が蓄積されている「F:業務情報」を基
に各工程での条件に沿った平均実行時間等の値を計算し
(ステップ310)、その結果を「H:業務統計情報」
に蓄積する(ステップ311)。「I:業務工程別実行
時間基礎情報再設定」は、「C:業務工程別実行時間基
礎情報」を運用実験に沿った情報に再設定するために、
「H:業務統計情報」に蓄積されている平均実行時間等
の情報を基に、各工程に合った値を算出し(ステップ3
12)、「C:業務工程別実行時間基礎情報」を再設定
する(ステップ313)。
FIG. 2 shows concrete "C: basic information of execution time by business process", "F: business information", and "G: statistical processing of business information". Referring to the information shown in Figure 2,
A specific process of resetting “C: business process-specific execution time basic information” will be described with reference to FIGS. 3 and 4. “C: Business process execution time basic information” manages the basic information used at the time of business scheduling for each process and network equipment manufacturing vendor in each business. The initial value of “C: business process-based execution time basic information” is set to a value determined for each process in correspondence with the manufacturer of the network equipment by the developer. First, "B: Scheduling by business process" calculates the execution time required for each process by using "C: Execution time basic information by business process" which is an initial value set by the developer (step 301). . In the calculation of the execution time, there are cases where the execution time is calculated based on fixed information and cases where the execution time is calculated based on the result calculated using a calculation formula according to the content of each process. A file updating process in a file updating operation will be described as an example in the case of using fixed information. In this process, the processing time when updating the same file by the equipment of the same manufacturing vendor is considered to be the same, so a fixed time is given to the manufacturing vendor and this is taken as the execution time of the process. Next, a file transfer process in a file update operation will be described as an example in the case of using the result calculated by using a calculation formula. In this step, the execution time is derived by a calculation formula using the file size as a variable. In this case, the effective transfer rate, which is the basis of the calculation, is managed in "C: Business process-based execution time basic information".
The execution time of the file transfer process is the result of multiplying the effective transfer rate by the file capacity to be transferred. in this way,
After "B: Scheduling by business process" calculates a necessary time, referring to "E: Schedule information", a free time that can be carried out is searched for and a process execution date and time is assigned (steps 303 and 304). At this time, since various operation works are carried out in the maintenance operation system, "B: Scheduling by business process" is performed by checking "D: Scheduling of the business process to be scheduled with respect to the target network equipment". Check based on "process competition information" (step 302), and schedule in a time zone in which the operation work can be executed consistently. When the operation work is performed on the network equipment, the execution result of "A: operation work" such as start time and end time is stored in "F: work information" (step 309). "G: Business information statistical processing" calculates values such as average execution time according to conditions in each process based on "F: Business information" in which start time, end time, etc. of each process are accumulated ( Step 310), and the result is "H: business statistics information".
(Step 311). “I: Business process execution time basic information reset” is for resetting “C: Business process execution time basic information” to information according to the operation experiment.
A value suitable for each process is calculated based on the information such as the average execution time accumulated in “H: Business statistical information” (step 3
12), "C: Execution time basic information by business process" is reset (step 313).

【0008】(第2の実施例)図5〜図7は請求項2記
載の発明の実施例を説明するための図である。図5にお
いて、(1)〜(6)は本実施例における再スケジュー
リングの手順を示し、Kは本実施例のシステムの処理部
機能を示す。本実施例では、「K:スケジュール変更」
が変更する工程と変更後の実行時間を受け付ける(ステ
ップ501)。「K:スケジュール変更」は、「E:ス
ケジュール情報」から変更する工程の実行時間を取得
し、更に変更先の時間に割り当てられている工程を
「E:スケジュール情報」より取得し(ステップ50
2、手順(1)’)、「D:工程の競合情報」を参照し
て(ステップ503、手順(1))、変更する工程と変
更先に割り当てられている工程とが同時に実行可能であ
るかを判断する(ステップ504)。同時実行が可能な
場合には、そのまま、「J:業務工程制御」からの起動
を待つ。同時実行が不可能な場合には、変更先にあった
工程の「B:業務工程別スケジューリング」を起動する
(手順(2))。「B:業務工程別スケジューリング」
は、「C:業務工程別実行時間基礎情報」と「D:工程
の競合情報」と「E:スケジュール情報」を基にスケジ
ューリングを行い(ステップ505〜507、手順
(2)’、(2)”)、その結果を「E:スケジュール
情報」に登録し(ステップ508、手順(3))、
「K:スケジュール変更」に終了通知を行う(手順
(3)’)。「K:スケジュール変更」は、受け付けた
変更する工程のスケジュールを「E:スケジュール情
報」に登録すると共に、変更のある元のスケジュールを
「E:スケジュール情報」から削除する(ステップ50
9、手順(1)”)。「J:業務工程制御」は「E:ス
ケジュール情報」を常に監視していて(ステップ51
1、512)、「E:スケジュール情報」に登録されて
いる時刻になると(手順(4))、登録しているオペレ
ーション業務の工程を起動する(ステップ513、手順
(5))。「J:業務工程制御」に起動された「A:オ
ペレーション業務」は、業務実施後の実行結果を「F:
業務情報」に蓄積すると共に各工程が終了したという事
を「E:スケジュール情報」に登録する(ステップ51
0、手順(6)、(6)’)。以上のように、ある工程
のスケジュールの変更を受け付け、変更先の工程の種類
によっては更なるスケジュールの変更までを自動的に行
う機構をシステム内に持つことで、保守者稼働の削減が
可能となる。
(Second Embodiment) FIGS. 5 to 7 are views for explaining an embodiment of the present invention. In FIG. 5, (1) to (6) show the rescheduling procedure in this embodiment, and K shows the processing unit function of the system of this embodiment. In this embodiment, "K: change schedule"
Receives the process to be changed and the execution time after the change (step 501). "K: Schedule change" acquires the execution time of the process to be changed from "E: Schedule information", and further acquires the process assigned to the change destination time from "E: Schedule information" (step 50).
2, procedure (1) ′) and “D: conflict information of process” (step 503, procedure (1)), the process to be changed and the process assigned to the change destination can be executed simultaneously. It is determined (step 504). If simultaneous execution is possible, the system waits for activation from “J: Business process control” as it is. If simultaneous execution is not possible, “B: Business process-specific scheduling” of the process at the change destination is activated (procedure (2)). "B: Scheduling by business process"
Performs scheduling on the basis of "C: business process execution time basic information", "D: process competition information", and "E: schedule information" (steps 505 to 507, steps (2) ', (2)). "), And register the result in" E: Schedule information "(step 508, procedure (3)),
An end notice is sent to "K: Change schedule" (procedure (3) '). The "K: schedule change" registers the received schedule of the process to be changed in "E: schedule information", and deletes the changed original schedule from "E: schedule information" (step 50).
9. Procedure (1) ")" J: Business process control "constantly monitors" E: Schedule information "(step 51).
1, 512), and when the time registered in “E: Schedule information” is reached (procedure (4)), the registered operation task process is activated (step 513, procedure (5)). "A: Operation business" started in "J: Business process control" shows the execution result after business execution as "F:
The fact that each process is completed is registered in "E: Schedule information" while being accumulated in "Business information" (step 51).
0, procedure (6), (6) '). As described above, by having a mechanism in the system that accepts a schedule change for a certain process and automatically changes the schedule even further depending on the type of the change destination process, it is possible to reduce the maintenance personnel's operation. Become.

【0009】[0009]

【発明の効果】以上説明したように、請求項1記載の発
明によれば、従来変化させることのできなかったオペレ
ーション業務のスケジューリング時の基になる情報を運
用実績に合わせて再設定することができ、より適切なオ
ペレーション業務のスケジューリングが可能となる。ま
た、請求項2記載の発明によれば、スケジュールの変更
とそれに伴う再スケジューリングをシステム内に持つこ
とで、保守者稼働の削除が可能となる。
As described above, according to the first aspect of the present invention, the basic information at the time of scheduling the operation work, which has not been changed in the past, can be reset according to the operation record. It is possible to schedule more appropriate operation work. According to the second aspect of the present invention, the maintenance operation can be deleted by having the schedule change and the rescheduling accompanying it in the system.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施例における保守運用システ
ムの構成と各オペレーション業務がスケジューリングを
行う時に参照する業務工程別実行時間基礎情報を再設定
する流れを表す図である。
FIG. 1 is a diagram showing a configuration of a maintenance operation system according to a first embodiment of the present invention and a flow of resetting execution time basic information for each business process, which is referred to when each operation business performs scheduling.

【図2】本発明の第1の実施例におけるスケジューリン
グ方法で蓄積管理する情報の内、処理について参考にな
る情報C、F、Hについて表す図である。
FIG. 2 is a diagram showing information C, F, and H that is helpful in processing among information stored and managed by the scheduling method according to the first embodiment of this invention.

【図3】本発明の第1の実施例におけるスケジューリン
グ方法のシーケンス図の一部である。
FIG. 3 is a part of a sequence diagram of a scheduling method in the first exemplary embodiment of the present invention.

【図4】本発明の第1の実施例におけるスケジューリン
グ方法のシーケンス図の一部である。
FIG. 4 is a part of a sequence diagram of a scheduling method in the first exemplary embodiment of the present invention.

【図5】本発明の第2の実施例における保守運用システ
ムの構成と再スケジューリングを行う流れを示す図であ
る。
FIG. 5 is a diagram showing a configuration of a maintenance operation system and a flow for performing rescheduling in a second embodiment of the present invention.

【図6】本発明の第2の実施例におけるスケジューリン
グ方法のシーケンス図の一部である。
FIG. 6 is a part of a sequence diagram of a scheduling method in the second exemplary embodiment of the present invention.

【図7】本発明の第2の実施例におけるスケジューリン
グ方法のシーケンス図の一部である。
FIG. 7 is a part of a sequence diagram of a scheduling method in the second exemplary embodiment of the present invention.

【符号の説明】[Explanation of symbols]

A:オペレーション業務、B:業務工程別スケジューリ
ング、C:業務工程別実行時間基礎情報、D:工程の競
合情報、E:スケジュール情報、F:業務情報、G:業
務情報統計処理、H:業務統計情報、I:業務工程別実
行時間基礎情報再設定、J:業務工程制御、K:スケジ
ュール変更。
A: Operation business, B: Business process-based scheduling, C: Business process-based execution time basic information, D: Process competition information, E: Schedule information, F: Business information, G: Business information statistical processing, H: Business statistics Information, I: resetting execution time basic information for each business process, J: business process control, K: schedule change.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 異なるオペレーション業務の対象となる
複数の設備から構成されるシステムに対して保守運用シ
ステムを用いて、複数の工程から構成されるオペレーシ
ョン業務を複数実施する際に、競合の起きないようにオ
ペレーション業務の順序を制御するためのスケジューリ
ング方法であって、 各オペレーション業務を構成する各工程とシステムを構
成する複数の設備に対応した業務工程別実行時間基礎情
報と各工程の競合情報と工程のスケジュール情報を基に
スケジューリングを行う機能と、スケジューリングした
結果をスケジュール情報に登録する機能と、スケジュー
ル情報に登録された情報を読み各工程を起動する機能
と、起動された各工程の結果をスケジュール情報と業務
情報に蓄積する機能と、蓄積された業務情報を統計処理
する機能と、統計処理した結果を業務統計情報に蓄積す
る機能と、業務統計情報に蓄積された情報を基にオペレ
ーション業務の各工程とシステムを構成する複数の設備
に対応した業務工程別実行時間基礎情報を再設定する機
能を有し、 前記システムに対して保守運用システムで実現する複数
種類のオペレーション業務を実施する際のスケジューリ
ングに用いる業務工程別実行時間基礎情報を、保守運用
システムの運用実績に合わせて再設定することを特徴と
するオペレーション業務のスケジューリング方法。
1. A conflict does not occur when a maintenance operation system is used to perform a plurality of operation jobs including a plurality of processes for a system including a plurality of facilities that are targets of different operation jobs. As described above, the scheduling method for controlling the order of operation work includes basic information on execution time by business process corresponding to each process constituting each operation work and a plurality of facilities constituting the system, and competition information of each process. The function to perform scheduling based on the schedule information of the process, the function to register the scheduling result in the schedule information, the function to read the information registered in the schedule information and activate each process, and the result of each activated process Function to store schedule information and business information, and statistical processing of the stored business information Based on the information stored in the business statistical information, and the execution time for each business process corresponding to each process of the operation business and multiple facilities that make up the system based on the information accumulated in the business statistical information. It has a function to reset the basic information, and the execution time basic information by business process used for scheduling when performing multiple types of operation business realized in the maintenance operation system for the system, the operation record of the maintenance operation system. A method for scheduling operation operations, which is characterized by resetting according to the above.
【請求項2】 請求項1記載のオペレーション業務のス
ケジューリング方法において、 割り当てられたスケジューリングを変更する機能と、変
更する工程と変更先に割り当てられている工程とが同時
に実行可能かどうかを工程の競合情報により判断する機
能と、同時に実行できない場合に、業務工程別実行時間
基礎情報と各工程の競合情報と工程のスケジュール情報
を基に再設定する機能とを備え、 スケジューリングの変更を受け付け、変更したい工程と
変更先に割り当てられた工程とが同時に実行可能かどう
か判断し、同時に実行不可能な場合には変更先に割り当
てられていた工程のスケジューリングを再度起動するこ
とを特徴とするオペレーション業務のスケジューリング
方法。
2. The method of scheduling an operation task according to claim 1, wherein the function of changing the assigned scheduling, and whether or not the changing step and the step assigned to the change destination can be simultaneously executed, the process conflicts. It has a function to judge by information and a function to reset based on business process execution time basic information, competition information of each process, and process schedule information when they cannot be executed simultaneously. Scheduling of operation work characterized by determining whether the process and the process assigned to the change destination can be executed at the same time, and if they cannot be executed simultaneously, the scheduling of the process assigned to the change destination is restarted. Method.
JP30099395A 1995-11-20 1995-11-20 Scheduling method for operation work Pending JPH09147014A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30099395A JPH09147014A (en) 1995-11-20 1995-11-20 Scheduling method for operation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30099395A JPH09147014A (en) 1995-11-20 1995-11-20 Scheduling method for operation work

Publications (1)

Publication Number Publication Date
JPH09147014A true JPH09147014A (en) 1997-06-06

Family

ID=17891544

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30099395A Pending JPH09147014A (en) 1995-11-20 1995-11-20 Scheduling method for operation work

Country Status (1)

Country Link
JP (1) JPH09147014A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004534340A (en) * 2001-07-10 2004-11-11 コーニンクレッカ フィリップス エレクトロニクス エヌ ヴィ Forecast calendar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004534340A (en) * 2001-07-10 2004-11-11 コーニンクレッカ フィリップス エレクトロニクス エヌ ヴィ Forecast calendar

Similar Documents

Publication Publication Date Title
US11379272B2 (en) Autoscaling using file access or cache usage for cluster machines
US5642508A (en) Distributed control method and apparatus for job execution
JP4571819B2 (en) Predictive and preemptive planning and scheduling for systems and methods with different job priorities
US5946663A (en) Method of planning a production schedule and an apparatus for planning a production schedule
US5212793A (en) Generic initiators
US7065567B1 (en) Production server for automated control of production document management
US6591262B1 (en) Collaborative workload management incorporating work unit attributes in resource allocation
US7233405B2 (en) Planning and scheduling reconfigurable systems with regular and diagnostic jobs
US7080105B2 (en) System and method for data backup
US5870604A (en) Job execution processor changing method and system, for load distribution among processors
JPH04192512A (en) Production control method, production control apparatus and manufacturing apparatus in production system of semiconductor device
CN114840304B (en) Container scheduling method, electronic equipment and storage medium
CN112910937B (en) Object scheduling method and device in container cluster, server and container cluster
JPH03188528A (en) Method and system for job execution management
JP4199444B2 (en) Partition configuration change method, partition configuration change method, and partition configuration change program
Hastings et al. Job oriented production scheduling
US20020184000A1 (en) Method of managing workflow in a computer-based system
JPH09147014A (en) Scheduling method for operation work
JP2002014829A (en) Parallel processing control system, method for the same and medium having program for parallel processing control stored thereon
JP2005182685A (en) Production planning method and program
JP2988472B1 (en) Production system
JP2000040099A (en) Device and method for preparing schedule, selecting method for job and recording medium recording software of schedule preparation
JP2731079B2 (en) Schedule creation device
JP2873869B2 (en) Operation planning equipment for production machines
Galvin Automated scheduling by families. Part II: Job shop and flow shop scheduling