JPH0913368A - Screw joint pile structure and method for constructing the same - Google Patents

Screw joint pile structure and method for constructing the same

Info

Publication number
JPH0913368A
JPH0913368A JP16484795A JP16484795A JPH0913368A JP H0913368 A JPH0913368 A JP H0913368A JP 16484795 A JP16484795 A JP 16484795A JP 16484795 A JP16484795 A JP 16484795A JP H0913368 A JPH0913368 A JP H0913368A
Authority
JP
Japan
Prior art keywords
pile
screw
jig
thread
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16484795A
Other languages
Japanese (ja)
Other versions
JP3039326B2 (en
Inventor
Gen Mori
玄 森
Kimihisa Takano
公寿 高野
Toshio Shinohara
敏雄 篠原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP7164847A priority Critical patent/JP3039326B2/en
Publication of JPH0913368A publication Critical patent/JPH0913368A/en
Application granted granted Critical
Publication of JP3039326B2 publication Critical patent/JP3039326B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To screw-threadedly engage an upper pile with a lower pile by means of a simple jig by a method wherein a thread of the same pitch as a thread of the lower pile is provided at the upper end of the upper pile, and a hanger is provided around a screw joint jig and a thread adapted to be threadedly engaged with the thread provided at the upper end of the upper pile is provided at the lower end of the upper pile. CONSTITUTION: For screw-threadedly engaging an upper pile 3 with a lower pile 1 using a tower 21, an external thread 8 of a screw joint jig 7 is threaded into an internal thread 5 of the pile 3 beforehand so as to be joined. And the jig 7 is attached to a hanger jig 20 through a hanger 9 on the ground and a motor-operated winch 22 is actuated to lift the pile 3 joined integral to the jig 7 and an external thread 4 is brought close to an internal thread 2 of the lower pile 1 and the winch 22 is stopped and the jig 7 is fixed to the tower 21 so as not to be rotated. And the pile 3 is rotated to thread the thread 4 into the thread 2 of the pile 1, whereby the pile 3 is drawn out from the jig 7 as the pile 3 rotates. Further the winch 22 is driven a little to lift the jig 7 connected, the pile 3, and the pile 1 altogether, and a hanger 6a is removed and the pile 1 and the pile 3 joined thereto are inserted into a hole formed in the ground.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ねじ継手により継ぎ杭
される、地すべり抑止杭を含む杭及び鋼管杭ならびに鋼
管矢板(以下これらを総称して鋼管杭という)をねじ込
み接合する継手杭構造及びその施工方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint pile structure in which a pile including a landslide prevention pile and a steel pipe pile and a steel pipe sheet pile (hereinafter collectively referred to as a steel pipe pile) which are jointed by a screw joint are screwed and joined. It relates to the construction method.

【0002】[0002]

【従来の技術】地すべり抑止鋼管杭を含むすべてのねじ
継手式鋼管杭の施工において、上杭に設けたねじを下杭
に設けたねじにねじ込み接合する際に、ねじ山のピッチ
に合わせて上杭を微降下させる必要がある。
2. Description of the Related Art In the construction of all threaded joint type steel pipe piles including landslide prevention steel pipe piles, when the screws provided on the upper pile are screwed into the screws provided on the lower pile, the upper piles are adjusted according to the pitch of the threads. It is necessary to slightly lower the stake.

【0003】図4は従来のねじ継手杭の施工方法の一例
を示すもので、1は杭端部(上端部)にめねじ2を有
し、地盤に設けた孔に挿入され仮設構台23に保持され
た下杭、3は杭端部(下端部)におねじ4を有し、下杭
1にねじ接合する上杭で、上部には吊り金具6bが取付
けられている。15はクレーン車、16は吊り荷重計
で、ジブ17に沿って繰出されたワイヤ18の先端部に
はフック19が取付けられており、フック19には吊り
下げ具20が掛けられている。
FIG. 4 shows an example of a conventional method for constructing a threaded joint pile, in which 1 has a female screw 2 at the pile end (upper end), and is inserted into a hole provided in the ground to a temporary gantry 23. The held lower piles 3 are upper piles that have screws 4 on the ends (lower ends) of the piles and are screwed to the lower piles 1, and suspending metal fittings 6b are attached to the upper portions. Reference numeral 15 is a mobile crane, 16 is a suspension load meter, and a hook 19 is attached to the tip of a wire 18 drawn out along the jib 17, and a hanging tool 20 is hung on the hook 19.

【0004】上記のようにクレーン車15を用いて上杭
3を下杭1にねじ接合するにあたっては、先ず、地上に
おいて上杭3の吊り金具6bを吊り下げ具20にワイヤ
等で取付け、ジブ17を上昇させて上杭3を下杭1上に
位置させ、例えば、チェーントングにより上杭3を人力
により回転させながらねじ2,4のピッチに合わせて微
下降させ、上杭3のおねじ4を下杭1のめねじ2に螺合
し、両者を接合する。この場合、上杭3を吊り込むため
のクレーン車15の運転士と、上杭3のねじ込み接合を
行う作業者の意思疎通のもとに、上杭3の微降下をクレ
ーン車15の運転士の腕に頼っていた。なお、クレーン
車15の運転席には吊り荷重計16が設けられており、
運転士はこれを参考にしていた。
When the upper pile 3 is screwed to the lower pile 1 by using the crane vehicle 15 as described above, first, the hanging metal fitting 6b of the upper pile 3 is attached to the suspending tool 20 by a wire or the like on the ground. 17 is moved up to position the upper pile 3 on the lower pile 1, and for example, the upper pile 3 is slightly lowered according to the pitch of the screws 2 and 4 while manually rotating the upper pile 3 by chain tongs, and 4 is screwed into the female screw 2 of the lower pile 1 to join them. In this case, the operator of the crane vehicle 15 is allowed to slightly descend the upper pile 3 under the communication of the operator of the crane vehicle 15 for suspending the upper pile 3 and the operator who screw-joins the upper pile 3. I depended on his arm. In addition, a suspension load meter 16 is provided in the driver's seat of the crane vehicle 15,
The driver was referring to this.

【0005】また、現場によってはクレーン車を持込む
ことが困難なため、杭の吊り込みに図5に示すような櫓
21を使用するケースもある。この場合は、電動ウイン
チ22により上杭3を操作するため吊り荷重の管理はで
きず、また、クレーン車のように微細な調節も困難なた
め、上杭3のねじ込み作業がうまく行かないこともあ
る。
Since it is difficult to bring in a mobile crane at some sites, there is also a case where a turret 21 as shown in FIG. 5 is used for suspending a pile. In this case, since the upper pile 3 is operated by the electric winch 22, the suspension load cannot be controlled, and since it is difficult to make fine adjustments like a mobile crane, the work of screwing the upper pile 3 may not be successful. is there.

【0006】[0006]

【発明が解決しようとする課題】以上述べたように、地
すべり抑止杭を含む現場での継ぎ杭作業においては、上
杭のねじ込み作業時に上杭を回転させると同時に微降下
させなければならないため、上杭の回転と微降下が同調
しないとねじがかじって接合できなくなるおそれがあっ
た。
As described above, in the joint pile work in the field including the landslide prevention pile, the upper pile must be rotated and slightly lowered at the time of screwing the upper pile. If the rotation of the upper pile and the slight drop were not synchronized, there was a risk that the screws would bite and the joint could not be made.

【0007】本発明は上述の課題を解決すべくなされた
もので、簡単な治具を使用することにより、ねじのかじ
りもなく、短時間で確実にねじ継手杭を接合することの
できるねじ継手杭構造及びその施工方法を得ることを目
的としたものである。
The present invention has been made to solve the above problems, and by using a simple jig, it is possible to reliably join a threaded joint pile in a short period of time without screw galling. The purpose is to obtain a pile structure and its construction method.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

(1)本発明に係るねじ継手杭構造は、上端部に下杭の
ねじと同じピッチのねじを有する上杭と、外周に吊り金
具を有し下端部に上杭の上端部に設けたねじに螺合する
ねじが設けられた継手治具とを備えたものである。 (2)また、上記(1)の継手治具のねじ部のねじ長さ
を、下杭及び上杭のねじ部のねじ長さより長く形成した
ものである。
(1) The threaded joint pile structure according to the present invention has an upper pile having a screw having the same pitch as the screw of the lower pile at the upper end, and a hanging metal fitting on the outer periphery, and a screw provided at the upper end of the upper pile at the lower end. And a joint jig provided with a screw to be screwed into. (2) Further, the thread length of the thread portion of the joint jig of the above (1) is formed longer than the thread lengths of the thread portions of the lower pile and the upper pile.

【0009】(3)また、本発明に係るねじ継手杭の施
工方法は、継手治具の下端部に設けたねじを上杭の上端
部に下杭のねじと同じピッチで設けたねじに螺合したの
ち吊上げて継手治具を回転不能に拘束し、ついで上杭を
回転して下杭にねじ接合するようにしたものである。
(3) Further, in the method for constructing a threaded joint pile according to the present invention, the screw provided on the lower end of the joint jig is screwed on the screw provided on the upper end of the upper pile at the same pitch as the screw of the lower pile. After they are combined, they are lifted to restrain the joint jig from rotating, and then the upper pile is rotated and screwed to the lower pile.

【0010】[0010]

【作用】あらかじめ工場又は現場で継手治具を上杭にね
じ接合する。そして上杭と一体化された継手治具をクレ
ーン車などで吊上げて上杭の下端部のねじを下杭のねじ
に臨ませると共に、継手治具を回転不能に拘束する。次
いで上杭をチェーントングなどを利用して回転させ、上
杭のねじを下杭のねじに螺合して上杭を微降下させて両
者をねじ接合する。このとき、上杭は回転に伴って継手
治具から抜け始めるが、上杭と下杭がねじ接合されても
上杭はなお継手治具に連結されている。
[Operation] The joint jig is screwed to the upper pile in advance at the factory or on site. Then, the joint jig integrated with the upper pile is lifted by a crane truck or the like so that the screw at the lower end of the upper pile faces the screw of the lower pile, and the joint jig is constrained so as not to rotate. Next, the upper pile is rotated using a chain tongue or the like, the screw of the upper pile is screwed into the screw of the lower pile, the upper pile is slightly lowered, and both are screw-joined. At this time, the upper pile begins to come out of the joint jig as it rotates, but even if the upper pile and the lower pile are screw-joined, the upper pile is still connected to the joint jig.

【0011】[0011]

【実施例】【Example】

実施例1.図1は本発明の第1の実施例を説明するため
の模式図、図2はその作用説明図、図3は図1の下杭、
上杭及び継手治具の斜視図である。なお、図5、図6で
説明した従来例と同じ部分にはこれと同じ符号を付し、
説明を省略する。
Embodiment 1 FIG. FIG. 1 is a schematic diagram for explaining the first embodiment of the present invention, FIG. 2 is an explanatory diagram of its action, FIG. 3 is the lower pile of FIG.
It is a perspective view of an upper pile and a joint jig. The same parts as those of the conventional example described in FIGS. 5 and 6 are designated by the same reference numerals,
Description is omitted.

【0012】3は上杭で、下端部には下杭1のめねじ2
に螺入するおねじ4が設けられており、上端部には下杭
1のめねじ2と同じピッチのめねじ5が設けられてい
る。7は継手治具で、下杭1と上杭3とほぼ同じ外径の
鋼管からなり、下端部には下杭1のめねじ2、上杭3の
おねじ4及びめねじ5と同じピッチのおねじ8が設けら
れており、上部外周には吊り金具9が取付けられてる。
なお、継手治具7のおねじ8のねじ部の長さは、下杭1
のめねじ2、上杭3のおねじ4及びめねじ5のねじ部の
長さより長く形成されている。但し、上杭3のめねじ5
の下端部は、めねじ5の内径より大きい内径の中空部に
連続している。
Reference numeral 3 is an upper pile, and female threads 2 of the lower pile 1 are provided at the lower end.
A male screw 4 to be screwed in is provided, and a female screw 5 having the same pitch as the female screw 2 of the lower pile 1 is provided at the upper end portion. Numeral 7 is a joint jig, which is made of a steel pipe having substantially the same outer diameter as the lower pile 1 and the upper pile 3, and has the same pitch as the female thread 2, the male thread 4 and the female thread 5 of the upper pile 3 at the lower end. A male screw 8 is provided, and a hanging metal fitting 9 is attached to the outer periphery of the upper portion.
In addition, the length of the thread portion of the male screw 8 of the joint jig 7 is equal to that of the lower pile 1.
The internal thread 2, the upper screw 3, the external thread 4 and the internal thread 5 are formed to be longer than the threaded portions. However, the female screw 5 of the upper pile 3
The lower end portion of is continuous with a hollow portion having an inner diameter larger than the inner diameter of the female screw 5.

【0013】上記のように構成した本実施例において、
例えば、櫓21を用いて下杭1に上杭3をねじ接合する
には、あらかじめ、工場又は現場において上杭3のめね
じ5に継手治具7のおねじ8を螺入し、接合しておく。
そして、地上で継手治具7を吊り金具9を介して吊り下
げ具20に取付け、電動ウインチ22を駆動して図1に
示すように、継手治具7と一体に接合された上杭3を吊
上げ、そのおねじ4を下杭1のめねじ2に臨ませて電動
ウインチ22を停止し、継手治具7及び上杭3をその位
置に保持すると共に、継手治具7を例えば破線で示すよ
うに櫓21に拘束し、回転不能に保持する。
In this embodiment configured as described above,
For example, in order to screw-join the upper pile 3 to the lower pile 1 using the turret 21, the male screw 8 of the joint jig 7 is screwed into the female screw 5 of the upper pile 3 in advance in a factory or on-site to be joined. Keep it.
Then, the joint jig 7 is attached to the suspending tool 20 via the hanging metal fitting 9 on the ground, and the electric winch 22 is driven to move the upper pile 3 integrally joined to the joint jig 7 as shown in FIG. The electric winch 22 is lifted, the electric winch 22 is exposed to the female screw 2 of the lower pile 1, the electric winch 22 is stopped, the joint jig 7 and the upper pile 3 are held in that position, and the joint jig 7 is shown by a broken line, for example. Thus, it is restrained by the turret 21 and held non-rotatably.

【0014】ついで、例えば、チェーントングなどを用
いて上杭3を回転し、そのおねじ4を下杭1のめねじ2
にねじ込む。このとき、継手治具7は回転が拘束されて
いるため、上杭3は回転に伴って継手治具7から抜け始
める。前述のように、継手治具7のおねじ8は下杭1、
上杭3の各ねじ2,4,5と同じピッチに形成されてい
るため、上杭3は下杭1にねじ込まれる速度に等しい速
度で継手治具7から徐々に抜け出し、ねじ込みに必要な
微降下が得られ、両杭1,3のねじ接合が終了する。こ
のとき、継手治具7のおねじ8のねじ部の長さは、前述
のように下杭1及び上杭3の各ねじ2,4,5のねじ部
の長さより長く形成されているので、上杭3と継手治具
7は依然として連結状態にある。
Then, the upper pile 3 is rotated using, for example, a chain tongue, and the male screw 4 of the upper pile 3 is rotated to the female screw 2 of the lower pile 1.
Screwed in. At this time, since the joint jig 7 is restrained from rotating, the upper pile 3 begins to come out of the joint jig 7 as the joint pile 7 rotates. As described above, the male screw 8 of the joint jig 7 is the lower pile 1,
Since the screws 2, 4 and 5 of the upper pile 3 are formed at the same pitch, the upper pile 3 gradually comes out of the joint jig 7 at a speed equal to the speed at which it is screwed into the lower pile 1, and the fine amount required for screwing in. A descent is obtained, and the screw joining of both piles 1 and 3 is completed. At this time, the length of the thread portion of the male screw 8 of the joint jig 7 is formed longer than the length of the screw portion of the screws 2, 4, 5 of the lower pile 1 and the upper pile 3 as described above. The upper pile 3 and the joint jig 7 are still connected.

【0015】ついで、電動ウインチ22を少量巻上げ
て、連結されている継手治具7、上杭3及び下杭1を一
体に上昇させ、下杭1に取付けられている吊り金具6a
を撤去し、下杭1及びこれに接合された上杭3を地盤に
設けた孔中に挿入する。次に、上杭3に取付けた吊り金
具6bを利用して下杭1及び上杭3を仮設構台23から
孔中に吊下げる。そして、継手治具7を回転させて上杭
3から取外す。以上の作業が終ったときは、継手治具7
のおねじ8を他の杭の上端部に設けためねじに螺入して
連結し、再び電動ウインチ22を巻上げて継手治具7及
びこれに連結された杭を吊上げ、この杭を前述の要領で
上杭3にねじ接合する。このようにして、連続して継ぎ
杭作業を行う。
Then, the electric winch 22 is slightly wound up to raise the joint jig 7, the upper pile 3 and the lower pile 1 which are connected together, and the hanging metal fitting 6a attached to the lower pile 1.
Is removed and the lower pile 1 and the upper pile 3 joined thereto are inserted into the holes provided in the ground. Next, the lower pile 1 and the upper pile 3 are suspended from the temporary gantry 23 into the hole by using the suspension metal fittings 6b attached to the upper pile 3. Then, the joint jig 7 is rotated and removed from the upper pile 3. When the above work is completed, the joint jig 7
The male screw 8 is screwed into the screw to connect it to the upper end of another pile, and the electric winch 22 is wound again to hang up the joint jig 7 and the pile connected thereto, and the pile is connected to the above-mentioned procedure. Then, it is screwed to the upper pile 3. In this way, the continuous pile work is performed.

【0016】このように、本発明によれば、簡単な構造
の継手治具7を用いることにより、下杭1のめねじ2と
上杭3のおねじ4とをねじがかじることもなく、短時間
でスムーズにねじ込み接合することができる。なお、上
記の説明では、櫓21を用いて下杭1に上杭3を接合す
る場合を示したが、クレーン車15を用いても同様にし
て下杭1と上杭3を接合することができる。
As described above, according to the present invention, by using the joint jig 7 having a simple structure, the female screw 2 of the lower pile 1 and the male screw 4 of the upper pile 3 are prevented from being galled. Can be smoothly screwed and joined in a short time. In the above description, the case where the upper pile 3 is joined to the lower pile 1 by using the turret 21 is shown, but the lower pile 1 and the upper pile 3 can be joined in the same manner even when the crane vehicle 15 is used. it can.

【0017】上記の説明では、主として鋼管杭をねじ接
合する際に本発明を実施した場合を示したが、上下端部
にねじを有するコンクリート杭あるいはPC杭をねじ接
合する場合にも本発明を実施することができる。また、
上記の説明では下杭1の上端部にめねじ2を、上杭3の
下端部におねじ4、上端部にめねじ5を設け、また、継
手治具7の下端部におねじ8を設けた例を示したが、め
ねじをおねじに、おねじをめねじに適宜変えてもよい。
In the above description, the case where the present invention is mainly carried out when the steel pipe pile is screwed is shown. However, the present invention is also applied when the concrete pile having the screws at the upper and lower ends or the PC pile is screwed. It can be carried out. Also,
In the above description, the female screw 2 is provided on the upper end of the lower pile 1, the male screw 4 is provided on the lower end of the upper pile 3, the female screw 5 is provided on the upper end, and the female screw 8 is provided on the lower end of the joint jig 7. Although the example in which it is provided is shown, the female screw may be changed to a male screw, and the male screw may be changed to a female screw.

【0018】[0018]

【発明の効果】【The invention's effect】

(1)本発明に係るねじ継手杭構造は、上端部に下杭の
ねじと同じピッチのねじを有する上杭と、外周に吊り金
具を有し下端部に上杭の上端部に設けたねじに螺合する
ねじが設けられた継手治具とによって構成したので、き
わめて簡単な治具により上杭を下杭にねじ接続すること
ができる。
(1) The threaded joint pile structure according to the present invention has an upper pile having a screw having the same pitch as the screw of the lower pile at the upper end, and a hanging metal fitting on the outer periphery, and a screw provided at the upper end of the upper pile at the lower end. The upper pile can be screwed to the lower pile by a very simple jig because it is configured with a joint jig provided with a screw to be screwed into.

【0019】(2)また、上記の継手治具のねじ部のね
じ長さを、下杭及び上杭のねじ部の長さより長く形成
し、上杭を下杭にねじ接合しても継手治具は上杭に連結
されているようにしたので、ねじ接合に続く連結された
上杭と下杭の吊上げ、孔中への挿入等を容易に行うこと
ができる。
(2) Further, even if the thread length of the thread portion of the above-mentioned joint jig is formed longer than the thread portions of the lower pile and the upper pile, and the upper pile is screw-joined to the lower pile, the joint is fixed. Since the tool is adapted to be connected to the upper pile, it is possible to easily carry out the lifting of the connected upper pile and the lower pile and the insertion into the hole subsequent to the screw connection.

【0020】(3)また、本発明に係るねじ継手杭の施
工方法は、継手治具の下端部に設けたねじを上杭の上端
部に下杭のねじと同じピッチで設けたねじに螺合したの
ち吊上げて継手治具を回転不能に拘束し、ついで上杭を
回転して下杭にねじ接合するようにしたので、上杭の回
転と同時に上杭を微降下させることができ、ねじ継手部
に過大な荷重が負荷されたり、ねじがかじったりするお
それがなく、上杭をスムーズに下杭にねじ接合すること
ができる。
(3) Further, in the method for constructing a threaded joint pile according to the present invention, the screw provided on the lower end of the joint jig is screwed on the screw provided on the upper end of the upper pile at the same pitch as the screw of the lower pile. After fitting, it was lifted to restrain the joint jig from rotating, and then the upper pile was rotated and screwed to the lower pile, so that the upper pile can be slightly lowered at the same time as the rotation of the upper pile. It is possible to smoothly screw the upper pile to the lower pile without fear that an excessive load is applied to the joint portion or the screw is scuffed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施例を説明するための説明図
である。
FIG. 1 is an explanatory diagram for explaining a first embodiment of the present invention.

【図2】図1の作用説明図である。FIG. 2 is an operation explanatory view of FIG. 1;

【図3】図1の下杭、上杭及び継手治具の斜視図であ
る。
3 is a perspective view of a lower pile, an upper pile and a joint jig of FIG. 1. FIG.

【図4】従来のねじ継手杭の施工方法の一例の説明図で
ある。
FIG. 4 is an explanatory diagram of an example of a conventional method for constructing a threaded joint pile.

【図5】従来のねじ継手杭の施工方法の他の例の説明図
である。
FIG. 5 is an explanatory diagram of another example of a conventional method for constructing a threaded joint pile.

【符号の説明】 1 下杭 2,5 めねじ 3 上杭 4,8 おねじ 7 継手治具 6a,6b,9 吊り金具 15 クレーン車 20 吊り下げ具 21 櫓 23 仮設構台[Explanation of symbols] 1 Lower pile 2,5 Female thread 3 Upper pile 4,8 Male thread 7 Joint jig 6a, 6b, 9 Hanging metal fittings 15 Crane vehicle 20 Hanging tool 21 Turret 23 Temporary gantry

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 下杭に設けたねじに上杭に設けたねじを
螺合して下杭と上杭を接合するねじ継手杭において、 上端部に前記下杭のねじと同じピッチのねじを有する上
杭と、 外周に吊り金具を有し、下端部に前記上杭の上端部に設
けたねじに螺合するねじが設けられた継手治具とを備え
たことを特徴とするねじ継手杭構造。
1. A screw joint pile for joining a lower pile and an upper pile by screwing a screw provided on the lower pile with a screw provided on the upper pile, wherein a screw having the same pitch as the screw of the lower pile is provided at the upper end portion. A threaded joint pile, comprising: an upper pile having the above; and a fitting jig having a hanging metal fitting on the outer periphery and a lower end portion provided with a screw that is screwed with a screw provided at the upper end portion of the upper pile. Construction.
【請求項2】 継手治具のねじ部のねじ長さを、下杭及
び上杭のねじ部のねじ長さより長く形成したことを特徴
とする請求項1記載のねじ継手杭構造。
2. The threaded joint pile structure according to claim 1, wherein the thread length of the threaded portion of the joint jig is formed longer than the thread lengths of the threaded portions of the lower pile and the upper pile.
【請求項3】 下杭に設けたねじに上杭に設けたねじを
螺合して下杭と上杭を接合するねじ継手杭において、 継手治具の下端部に設けたねじを、上杭の上端部に前記
下杭のねじと同じピッチで設けたねじに螺合したのち吊
上げて前記継手治具を回転不能に拘束し、ついで前記上
杭を回転して下杭にねじ接合することを特徴とするねじ
継手杭の施工方法。
3. A threaded joint pile for joining a lower pile and an upper pile by screwing a screw provided on the lower pile with a screw provided on the upper pile, wherein the screw provided on the lower end of the joint jig is the upper pile. After being screwed to the screw provided at the same pitch as the screw of the lower pile at the upper end of the lower pile, the joint jig is rotatably restrained by lifting, and then the upper pile is rotated and screwed to the lower pile. A method of constructing a characteristic screw joint pile.
JP7164847A 1995-06-30 1995-06-30 Screw joint pile structure and its construction method Expired - Fee Related JP3039326B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7164847A JP3039326B2 (en) 1995-06-30 1995-06-30 Screw joint pile structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7164847A JP3039326B2 (en) 1995-06-30 1995-06-30 Screw joint pile structure and its construction method

Publications (2)

Publication Number Publication Date
JPH0913368A true JPH0913368A (en) 1997-01-14
JP3039326B2 JP3039326B2 (en) 2000-05-08

Family

ID=15801057

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7164847A Expired - Fee Related JP3039326B2 (en) 1995-06-30 1995-06-30 Screw joint pile structure and its construction method

Country Status (1)

Country Link
JP (1) JP3039326B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001342628A (en) * 2000-03-30 2001-12-14 Kubota Corp Jig for positioning steel pipe and method for immersing steel pipe
JP2009052399A (en) * 2000-03-30 2009-03-12 Kubota Corp Jig for steel pipe positioning and method for steel pipe immersion
KR101321954B1 (en) * 2012-04-09 2013-10-28 (주)신영기초개발 Rolling method for connecting part of casing Micropile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001342628A (en) * 2000-03-30 2001-12-14 Kubota Corp Jig for positioning steel pipe and method for immersing steel pipe
JP2009052399A (en) * 2000-03-30 2009-03-12 Kubota Corp Jig for steel pipe positioning and method for steel pipe immersion
KR101321954B1 (en) * 2012-04-09 2013-10-28 (주)신영기초개발 Rolling method for connecting part of casing Micropile

Also Published As

Publication number Publication date
JP3039326B2 (en) 2000-05-08

Similar Documents

Publication Publication Date Title
CN116516837B (en) Prefabricated box girder paving device and paving method
JP2007022789A (en) Suspension tool and vertical pipe construction method
CN104233959A (en) Device and method for assembling, fixing, detaching and moving overhead road and bridge concrete guardrail templates
CN114180456A (en) Hoisting posture adjusting method for giant laterally inclined truss structure
JPH0913368A (en) Screw joint pile structure and method for constructing the same
JP2618614B2 (en) Hanging bracket for pile
CN217172942U (en) Hoist device is used in installation of prefabricated stair of assembled
JP4062131B2 (en) Method of joining steel pipes with mechanical joints and steel pipes with mechanical joints used therefor
CN211036987U (en) Draw device of removing stake core sand fast
CN114382015A (en) Construction method for vertical rotation of special-shaped steel main tower of cable-stayed bridge
JP2004270273A6 (en) Method of joining steel pipes with mechanical joints and steel pipes with mechanical joints used therefor
CN111056422A (en) Lifting appliance for mounting large flywheel and using method thereof
JPH072549Y2 (en) Crane lifting equipment
CN217458465U (en) Precast beam is with hanging clamping utensil
CN218145361U (en) Gallows structure is used in building engineering construction
CN216360354U (en) Building engineering building material hoist device
CN215439273U (en) Pipe jacking pipe joint lifting and overturning device
JP2551442Y2 (en) Steel pipe suspension system
JPH061581Y2 (en) Crane lifting equipment
CN111993569B (en) Method for automatically erecting lifting hook and forming equipment
CN115611139B (en) Lifting equipment for road laying construction
CN212222248U (en) Riser hoisting device
CN217102703U (en) Bridge girder erection machine upset hoist of pier hoist and mount
JP2907576B2 (en) Panel lifting method and panel therefor
JP7301762B2 (en) Slope Drilling Machine Movement Auxiliary Machine, Slope Drilling Device, and Method for Moving Slope Drilling Device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees