JPH09125370A - Reinforcing steel installation device - Google Patents

Reinforcing steel installation device

Info

Publication number
JPH09125370A
JPH09125370A JP7306689A JP30668995A JPH09125370A JP H09125370 A JPH09125370 A JP H09125370A JP 7306689 A JP7306689 A JP 7306689A JP 30668995 A JP30668995 A JP 30668995A JP H09125370 A JPH09125370 A JP H09125370A
Authority
JP
Japan
Prior art keywords
main
bar
wire
frame
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7306689A
Other languages
Japanese (ja)
Inventor
Yasuaki Yano
康明 矢野
Fukuo Shimizu
福夫 清水
Shigeki Komiyama
茂樹 小宮山
Sakae Nakai
栄 中井
Masataka Uozumi
雅孝 魚住
Yuji Nagano
祐司 長野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Tokyo Electric Power Company Holdings Inc
Original Assignee
Mitsui Construction Co Ltd
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd, Tokyo Electric Power Co Inc filed Critical Mitsui Construction Co Ltd
Priority to JP7306689A priority Critical patent/JPH09125370A/en
Publication of JPH09125370A publication Critical patent/JPH09125370A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate carrying works in a construction site. SOLUTION: A plurality of installation legs 60 are provided in the circumference of a frame main body 6a via a beam unit 62 and the beam unit 62 comprises a beam main body 62a which connects respective installation legs 60 to the frame main body 6a, and a reinforcing plate member 63 detachably provided to the beam main body 62a so as to reinforce the beam main body 62a. A main reinforcement arrangement means 70 is provided on the frame main body 6a, a plurality of main reinforcement arrangement parts are so provided around the main reinforcement means 70 that the main reinforcements 37a can be vertically guided respectively, a bottom frame 9 is provided in the bottom of the main reinforcement arrangement means 70 so as to vertically move, a main reinforcement end holding part 31 is so provided in the bottom frame 9 as to be matched to the main reinforcement arrangement part, and an elevating device 54 is so provided in the frame main body 6a that the bottom frame 9 is vertically moved, driven, and freely positioned.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、現場打設コンクリート
によって深礎杭を構築する際に適用するのに好適な鉄筋
建て込み装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar erection device suitable for application when constructing deep foundation piles by using cast-in-place concrete.

【0002】[0002]

【従来の技術】コンクリート杭を補強するための鉄筋を
縦穴中に建て込む際には、大型のクレーンや運搬車を必
要とすることなく、小スペースで鉄筋の建て込みを行え
る鉄筋建て込み装置が望まれており、その一例として、
特願平7−216877号に開示されている鉄筋建て込
み装置などがある。
2. Description of the Related Art When building a reinforcing bar for reinforcing concrete piles in a vertical hole, there is a reinforcing bar building device that can build a reinforcing bar in a small space without the need for a large crane or truck. It is desired, and as an example,
There is a reinforcing bar building device disclosed in Japanese Patent Application No. 7-216877.

【0003】[0003]

【発明が解決しようとする課題】ところで、このような
鉄筋建て込み装置の運搬時の重量や寸法を極力小さく
し、例えば施工現場が山岳地などであったりする場合に
も、該鉄筋建て込み装置の現場への搬入作業が極力容易
に行えるようにすることが望まれている。そこで本発明
は上記事情に鑑み、現場への搬入作業が極力容易に行え
る鉄筋建て込み装置を提供するものである。
By the way, when the weight and size of such a reinforcing bar building device during transportation are made as small as possible, for example, when the construction site is in a mountainous area, the reinforcing bar building device is the same. It is desirable to make it as easy as possible to carry in the work to the site. Therefore, in view of the above circumstances, the present invention provides a reinforcing bar erection device that can be carried into a work site as easily as possible.

【0004】[0004]

【課題を解決するための手段】即ち本発明のうち第1の
発明は、地面(2a)から掘り下げられた縦穴(3)
に、複数の主筋(37a)と配力筋(37b)によるコ
ンクリート補強用の鉄筋組立体(37)を建て込む際に
使用する鉄筋建て込み装置(5)において、フレーム本
体(6a)を有し、前記フレーム本体(6a)の周囲に
複数の設置手段(60)を、接続梁部材(62)を介し
てそれぞれ設け、前記接続梁部材(62)は、前記各設
置手段(60)と前記フレーム本体(6a)との間を接
続する梁部材本体(62a)及び、該梁部材本体(62
a)に、該梁部材本体(62a)を補強する形で着脱自
在に設けられた補強部材(63)からなり、前記フレー
ム本体(6a)に主筋配筋手段(70)を設け、前記主
筋配筋手段(70)に複数の主筋ガイド部(71、71
X)を、前記主筋(37a)を上下方向にそれぞれガイ
ドし得るように設け、前記主筋配筋手段(70)の下方
に主筋保持手段(9)を、上下に移動自在に設け、前記
主筋保持手段(9)に主筋端部保持部(31)を、前記
主筋配筋手段(70)の主筋ガイド部(71、71X)
に対応した形で設け、前記フレーム本体(6a)に昇降
装置(54)を、前記主筋保持手段(9)を上下に移動
駆動位置決め自在に設けて構成される。
That is, the first aspect of the present invention is to provide a vertical hole (3) dug down from the ground (2a).
In the reinforcing bar building device (5) used when building a reinforcing bar assembly (37) for concrete reinforcement by a plurality of main reinforcing bars (37a) and distribution bars (37b), a frame body (6a) is provided. , A plurality of installation means (60) are provided around the frame body (6a) via connection beam members (62), and the connection beam member (62) is provided with the installation means (60) and the frame. A beam member main body (62a) connecting between the main body (6a) and the beam member main body (62)
a) is a reinforcing member (63) detachably provided to reinforce the beam member body (62a), and main frame arrangement means (70) is provided on the frame body (6a). The muscle means (70) has a plurality of main muscle guide portions (71, 71).
X) is provided so as to guide the main bar (37a) in the vertical direction, and a main bar holding means (9) is provided below the main bar arranging means (70) so as to be movable in the vertical direction. The means (9) is provided with a main bar end holding portion (31), and the main bar guide means (71, 71X) of the main bar arrangement means (70).
The frame main body (6a) is provided with an elevating device (54) and the main bar holding means (9) so as to be vertically movable and positionable.

【0005】また本発明のうち第2の発明は、第1の発
明による鉄筋建て込み装置(5)において、前記接続梁
部材(62)は、断面の長手方向を上下方向に向けて配
置した板状部材からなる。
A second invention of the present invention is the reinforcing bar building apparatus (5) according to the first invention, wherein the connecting beam member (62) is a plate arranged with its longitudinal direction of its cross section facing up and down. It consists of a member.

【0006】また本発明のうち第3の発明は、地面(2
a)から掘り下げられた縦穴(3)に、複数の主筋(3
7a)と配力筋(37b)によるコンクリート補強用の
鉄筋組立体(37)を建て込む際に使用する鉄筋建て込
み装置(5)において、フレーム(6)を有し、前記フ
レーム(6)に主筋配筋手段(70)を設け、前記主筋
配筋手段(70)に複数の主筋ガイド部(71、71
X)を、前記主筋(37a)を上下方向にそれぞれガイ
ドし得るように設け、前記フレーム(6)上に、ワイヤ
(11)を繰り出し・巻取り自在なウインチユニット
(53)及び、該ウインチユニット(53)からのワイ
ヤ(11)が接続されたワイヤ支持手段(44)を設
け、前記フレーム(6)のワイヤ支持手段(44)の下
方に、吊下用動滑車収納空間(65)を、上下方向に貫
通した形で形成し、前記ワイヤ(11)に吊下用動滑車
(10)を、前記ウインチユニット(53)と前記ワイ
ヤ支持手段(44)とにより、前記吊下用動滑車収納空
間(65)と前記フレーム(6)の下方との間を上下方
向に昇降駆動自在に吊下し、前記吊下用動滑車(10)
に主筋保持手段(9)を吊下し、前記主筋保持手段
(9)に主筋端部保持部(31)を、前記主筋配筋手段
(70)の主筋ガイド部(71、71X)に対応した形
で設けて構成される。
A third aspect of the present invention is the ground (2
In the vertical hole (3) dug down from a), a plurality of main bars (3
7a) and a reinforcing bar (37b) are used for building a reinforcing bar assembly (37) for concrete reinforcement, the reinforcing bar building device (5) having a frame (6), wherein the frame (6) is A main bar arrangement means (70) is provided, and a plurality of main bar guide portions (71, 71) are provided in the main bar arrangement means (70).
X) is provided so that the main bars (37a) can be respectively guided in the vertical direction, and a winch unit (53) that can reel out and wind the wire (11) on the frame (6), and the winch unit. A wire supporting means (44) to which the wire (11) from the (53) is connected is provided, and a hanging pulley storage space (65) is provided below the wire supporting means (44) of the frame (6). It is formed so as to pass through in the up-down direction, and the hanging pulley (10) is attached to the wire (11), and the hanging pulley is accommodated by the winch unit (53) and the wire supporting means (44). The space between the space (65) and the lower part of the frame (6) is hung vertically so that it can be driven up and down, and the hanging movable pulley (10).
The main bar holding means (9) is suspended in the main bar holding means (9), and the main bar end holding part (31) corresponds to the main bar holding part (9) and the main bar guide part (71, 71X) of the main bar arranging means (70). Formed and configured.

【0007】また本発明のうち第4の発明は、第3の発
明による鉄筋建て込み装置(5)において、前記ウイン
チユニット(53)はワイヤドラム(56)を有してお
り、前記ワイヤドラム(56)には、2つのワイヤ巻取
り部(56b、56b)が、該ワイヤドラム(56)の
回転軸(KJ)方向に並列して形成されており、前記各
ワイヤ巻取り部(56b)には、ワイヤ(11)の始端
側と終端側とがそれぞれ繰り出し・巻取り自在に設けら
れており、前記各ワイヤ巻取り部(56b)の前記ワイ
ヤ(11)は、前記吊下用動滑車(10)の前記吊下用
動滑車収納空間(65)内への収納時に、該ワイヤ(1
1)の巻取り位置(KD)が前記ワイヤドラム(53)
の内方に向かうように巻かれている。
A fourth aspect of the present invention is the reinforcing bar building apparatus (5) according to the third aspect, wherein the winch unit (53) has a wire drum (56). 56), two wire winding portions (56b, 56b) are formed in parallel in the direction of the rotation axis (KJ) of the wire drum (56). Is provided such that the starting end side and the terminating end side of the wire (11) can be respectively unwound and wound, and the wire (11) of each wire winding portion (56b) is the hanging pulley ( At the time of storing 10) in the hanging pulley storage space (65), the wire (1
The winding position (KD) of 1) is the wire drum (53).
It is wound so that it goes inward.

【0008】また本発明のうち第5の発明は、第4の発
明による鉄筋建て込み装置(5)において、前記ワイヤ
ドラム(53)には、前記2つのワイヤ巻取り部(56
b、56b)を仕切る形で仕切部(56a)が設けられ
ている。
A fifth aspect of the present invention is the reinforcing bar building apparatus (5) according to the fourth aspect, wherein the wire drum (53) has the two wire winding portions (56).
The partition part (56a) is provided in the form of partitioning b, 56b).

【0009】なお、( )内の番号等は、図面における
対応する要素を示す、便宜的なものであり、従って、本
記述は図面上の記載に限定拘束されるものではない。以
下の作用の欄についても同様である。
The numbers and the like in parentheses indicate the corresponding elements in the drawings for convenience, and therefore, the present description is not limited to the description on the drawings. The same applies to the following operation columns.

【0010】[0010]

【作用】上記した構成により、本発明のうち第1の発明
では、鉄筋建て込み装置(5)の現場(1)への搬入な
どの運搬時には、補強部材(63)を梁部材本体(62
aから取外して別個に運搬する。
With the above-described structure, in the first aspect of the present invention, the reinforcing member (63) is attached to the beam member main body (62) when carrying the reinforcing bar building device (5) to the site (1).
Remove from a and transport separately.

【0011】また本発明のうち第2の発明では、接続梁
部材(62)は、構造上、その強度を極力維持しつつ、
その水平方向の厚さを極力小さくしている。
In the second aspect of the present invention, the connecting beam member (62) has a structure that maintains its strength as much as possible,
Its horizontal thickness is minimized.

【0012】また本発明のうち第3の発明では、鉄筋建
て込み装置(5)を運搬するような場合には、吊下用動
滑車(10)を吊下用動滑車収納空間(65)に収納し
た状態で、従って極力コンパクトな状態で運搬する。
Further, in the third aspect of the present invention, when the reinforcing bar erection device (5) is carried, the hanging pulley (10) is placed in the hanging pulley storage space (65). Transport in the stored condition, and therefore in the most compact condition possible.

【0013】また本発明のうち第4の発明では、ワイヤ
(10)の始端側と終端側とがそれぞれ2つのワイヤ巻
取り部(56b、56b)に別個に巻かれている。
In the fourth aspect of the present invention, the starting end side and the terminating end side of the wire (10) are separately wound around the two wire winding portions (56b, 56b).

【0014】また本発明のうち第5の発明では、一方の
ワイヤ巻取り部(56b)のワイヤ(11)が他方のワ
イヤ巻取り部(56b)に誤って巻かれるようなこと
が、防止される。
Further, in the fifth aspect of the present invention, it is possible to prevent the wire (11) of the one wire winding portion (56b) from being mistakenly wound around the other wire winding portion (56b). It

【0015】[0015]

【実施例】図1は、本発明による鉄筋建て込み装置の一
実施例を用いて鉄筋建て込み作業を行っている杭施工現
場の様子を示す一部破断斜視図、図2は、図1に示す鉄
筋建て込み装置の梁ユニット付近を示す斜視図、図3
は、図1に示す鉄筋建て込み装置のフレームを示す側面
図、図4は、図3のI矢視図、図5は、図4に示す上部
ゲージディスクのIV矢視部分の拡大図、図6は、図3の
X1−Y1線断面図、図7は、図6に示す下部ゲージデ
ィスクの拡大図、図8は、ワイヤドラムと滑車との関係
を示した模式図、図9は、図3のX2−Y2線断面図、
図10は、穴底に載置された状態の下部フレーム枠を示
した図、図11は、穴底に載置された状態の下部フレー
ム枠を示した断面拡大図、図12は、主筋吊り具を示し
た斜視図、図13(a)乃至図13(c)は、配力筋の
設置作業の手順を示した図、図14は、図3に示すフレ
ームにおいて、滑車を収納した状態を示した図、図15
は、別の形で構成された下部ゲージディスクを示した
図、図16は、別の形で構成された下部ゲージディスク
を示した図、図17は、別の形で構成された上部ゲージ
ディスクを示した図、図18は、別の形で構成された上
部ゲージディスクを示した図、図19は、別の形で構成
されたフランジ部を示した図、図20は、別の形で構成
されたフランジ部を示した図、図21は、図20に示す
フランジ部を有した下部フレーム枠が穴底に載置された
状態を示した断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a partially cutaway perspective view showing a state of a pile construction site where a reinforcing bar erection work is being carried out using an example of a reinforcing bar erection device according to the present invention, and FIG. 3 is a perspective view showing the vicinity of a beam unit of the reinforcing bar building device shown in FIG.
Is a side view showing the frame of the reinforcing bar building device shown in FIG. 1, FIG. 4 is a view taken in the direction of arrow I in FIG. 3, and FIG. 5 is an enlarged view taken in the direction of arrow IV of the upper gauge disc shown in FIG. 6 is a cross-sectional view taken along line X1-Y1 of FIG. 3, FIG. 7 is an enlarged view of the lower gauge disc shown in FIG. 6, FIG. 8 is a schematic view showing the relationship between the wire drum and the pulley, and FIG. X2-Y2 line sectional view of 3,
10 is a view showing the lower frame frame mounted on the bottom of the hole, FIG. 11 is an enlarged cross-sectional view showing the lower frame frame mounted on the bottom of the hole, and FIG. 13 (a) to 13 (c) are views showing the procedure of installation work of the force distribution muscles, and FIG. 14 shows a state in which the pulley is stored in the frame shown in FIG. Figure shown, FIG.
FIG. 16 is a diagram showing a lower gauge disc configured in another form, FIG. 16 is a diagram showing a lower gauge disc configured in another form, and FIG. 17 is an upper gauge disc configured in another form. FIG. 18, FIG. 18 is a view showing an upper gauge disk configured in a different shape, FIG. 19 is a view showing a flange portion configured in another shape, and FIG. 20 is a different shape. 21 is a cross-sectional view showing a state where the lower frame frame having the flange portion shown in FIG. 20 is placed on the hole bottom.

【0016】杭施工を行っている現場1には、図1に示
すように、後に杭30になるための縦穴3が、地面2a
から地中2に掘り下げられた形で、所定の径D1をなす
円柱状に形成されており、縦穴3の側壁3cには仮支保
用のモルタル36が、該縦穴3の口元部分である坑口3
aと穴底3b(図10、図11等に図示)を接続する形
で、円環状に吹き付け打設されている。また、現場1に
は、鉄筋建て込み装置5が、上記杭30のため、即ちコ
ンクリート補強用の鉄筋を鉄筋組立体である鉄筋籠37
として、縦穴3中に建て込みするために設けられてお
り、鉄筋籠37は、その全体外観形状が円筒状をなすよ
うに形成されている。鉄筋籠37は、その各々が上下方
向即ち縦に伸延する形で縦穴3の側壁3cに沿って並ぶ
複数の主筋37aと、その各々が該複数の主筋37aに
交差する形で横に伸延するよう、これ等複数の主筋37
aに溶接接続された複数の配力筋37bによって構成さ
れており、いま、鉄筋籠37は、鉄筋建て込み装置5を
介して、主筋37aと配力筋37bの接続作業を行いな
がら、縦穴3中に建て込みされつつある。なお、配力筋
37bは、その現場1への搬入形状が、例えばそれぞれ
半円状をなす形に形成されており(図示せず)、該半円
状の配力筋37bを2本1対にして円形状にラップ溶接
することによって、1本の配力筋37bが構成されるも
のである。
As shown in FIG. 1, a vertical hole 3 for later becoming a pile 30 is provided on the ground 2a at the site 1 where piles are being constructed.
A mortar 36 for temporary support is formed on the side wall 3c of the vertical hole 3 in a shape of a cylinder having a predetermined diameter D1 in the form of a pit 3
It is sprayed in an annular shape by connecting a and the bottom 3b of the hole (shown in FIGS. 10 and 11). Further, in the site 1, the reinforcing bar building device 5 is a reinforcing bar cage 37 which is a reinforcing bar assembly for the piles 30, that is, concrete reinforcing bars.
Is provided to be built in the vertical hole 3, and the reinforcing bar cage 37 is formed so that its entire external shape is a cylindrical shape. The rebar cage 37 has a plurality of main bars 37a arranged along the side wall 3c of the vertical hole 3 in the form of extending in the vertical direction, that is, in the vertical direction, and each of the main bars 37a extends laterally so as to intersect with the plurality of main bars 37a. , These multiple main lines 37
It is composed of a plurality of force distribution bars 37b welded to a, and now the rebar cage 37 is connected to the vertical hole 3 while connecting the main bar 37a and the force distribution bar 37b through the rebar building device 5. It is being built inside. In addition, the distribution muscles 37b are formed such that the carrying-in shape to the site 1 is, for example, a semicircular shape (not shown), and two semicircular distribution muscles 37b are paired one by one. Then, one force distribution line 37b is formed by lap welding in a circular shape.

【0017】鉄筋建て込み装置5は、図1乃至図3に示
すように、フレーム6を有しており、フレーム6は、フ
レーム本体6a及び、該フレーム本体6aの周囲に設け
られた4つの設置脚60を有している。即ち、各設置脚
60は支柱61を有しており、支柱61は、その下端で
ある各脚部61aを介して地面2a上に立設支持されて
いる。また、フレーム本体6aは、鋼材などにより組み
立てられた下部架台50を有しており、下部架台50と
各支柱61とはそれぞれ梁本体62aを介して一体的に
接続されている。即ち、下部架台50は、4つの梁本体
62aを介して4本の支柱61により支持されている。
また、各梁本体62aには、図2に示すように、鉛直断
面が逆U字型の補強板部材63が、該補強板部材63の
逆U字型に窪んだ部位に梁本体62aを挿入した形で着
脱自在に装着されて設けられており、梁本体62aと補
強板部材63の間は、取外し自在なボルト、ナット等の
取付け部材63a(図3で図示)によって締結されてい
る。つまり、梁本体62aは補強板部材63により補強
されている。なお、梁本体62a及び補強板部材63に
より梁ユニット62が構成されており、従ってフレーム
本体6aと各設置脚60は梁ユニット62を介してそれ
ぞれ接続されていることになる。なお、各梁本体62a
及び該梁本体62aに補強板部材63を装着した梁ユニ
ット62は、その断面の長手方向を上下方向に向けて配
置した板状部材からなっている。つまり、梁本体62a
或いは梁ユニット62は所定の強度を有しつつ、その水
平方向の厚さが極力小さくなるようになっている。
As shown in FIG. 1 to FIG. 3, the reinforcing bar building device 5 has a frame 6, and the frame 6 includes a frame body 6a and four installations provided around the frame body 6a. It has legs 60. That is, each installation leg 60 has a pillar 61, and the pillar 61 is erected and supported on the ground 2a via each leg portion 61a which is the lower end thereof. Further, the frame main body 6a has a lower mount 50 assembled from a steel material or the like, and the lower mount 50 and each of the columns 61 are integrally connected via the beam main body 62a. That is, the lower mount 50 is supported by the four columns 61 via the four beam bodies 62a.
Further, as shown in FIG. 2, a reinforcing plate member 63 having an inverted U-shaped vertical cross section is inserted into each beam main body 62a, and the beam main body 62a is inserted into a portion of the reinforcing plate member 63 recessed in the inverted U-shape. The beam main body 62a and the reinforcing plate member 63 are fastened by a detachable mounting member 63a (illustrated in FIG. 3) such as a bolt or a nut. That is, the beam main body 62 a is reinforced by the reinforcing plate member 63. The beam unit 62 is constituted by the beam main body 62a and the reinforcing plate member 63. Therefore, the frame main body 6a and each installation leg 60 are connected to each other via the beam unit 62. In addition, each beam main body 62a
Further, the beam unit 62 in which the reinforcing plate member 63 is attached to the beam main body 62a is a plate-shaped member in which the longitudinal direction of its cross section is oriented in the vertical direction. That is, the beam main body 62a
Alternatively, the beam unit 62 has a predetermined strength and its horizontal thickness is as small as possible.

【0018】下部架台50の下端部には、中抜け円盤状
に形成された下部ゲージディスク7が水平に接合されて
設けられており、下部ゲージディスク7には、図6及び
図7に示すように、複数の主筋配置部71が、該下部ゲ
ージディスク7の外周に沿って所定のピッチP1毎に形
成されている。下部ゲージディスク7に形成された複数
の主筋配置部71は、建て込むべき主筋37aの配筋ピ
ッチに対応した形で形成されており、実施例において
は、主筋配置部71の形成ピッチが5cm程度に形成され
ていることによって、主筋37aの配筋ピッチを10、
15、20cm等の5の整数倍ピッチから選択し得るよう
になっている。下部ゲージディスク7の各主筋配置部7
1には、図6及び図7に示すように、杭30の配筋主筋
径に対応した径の主筋37aが、それぞれ1本づつ収容
自在になっており、また主筋配置部71は、主筋37a
を図6及び図7紙面と交差方向である上下方向に移動自
在にそれぞれ保持し得る、即ちガイドし得るようになっ
ている。さらに、下部ゲージディスク7には板バネ等か
らなるストッパ72が、主筋固定具として主筋配置部7
1の形成数量だけそれぞれの主筋配置部71に設けられ
ており、ストッパ72は、プレート73によってその一
端側を下部ゲージディスク7に固着された形で設けられ
ている(なお、図1や図3、図6等には簡単のためスト
ッパ72及びプレート73が省略されている。)。そし
て、各ストッパ72は、図7一点鎖線で示すように、内
方側即ち該主筋配置部71側に向かってのみ自在に撓む
ことが出来るようになっており、これによって、ストッ
パ72は、複数の主筋配置部71の各々に前記主筋37
aを水平方向に入れ込み自在(即ち図7矢印A方向に向
けて嵌入させ得るよう)になっている。
A lower gauge disk 7 formed in a hollow disk shape is horizontally joined to the lower end of the lower mount 50, and the lower gauge disk 7 has a lower gauge disk 7 as shown in FIGS. 6 and 7. In addition, a plurality of main bar arrangement portions 71 are formed along the outer circumference of the lower gauge disk 7 at a predetermined pitch P1. The plurality of main bar arrangement portions 71 formed on the lower gauge disc 7 are formed in a shape corresponding to the bar arrangement pitch of the main bar 37a to be built. In the embodiment, the formation pitch of the main bar arrangement section 71 is about 5 cm. By being formed in, the bar arrangement pitch of the main bar 37a is 10,
The pitch can be selected from an integer multiple of 5, such as 15 or 20 cm. Each main bar arrangement portion 7 of the lower gauge disk 7
As shown in FIGS. 6 and 7, in FIG. 1, one main bar 37a having a diameter corresponding to the main bar diameter of the pile 30 can be accommodated, and the main bar disposition portion 71 has a main bar 37a.
6 can be movably held, that is, can be guided in the up-down direction which is a direction intersecting with the paper surface of FIGS. 6 and 7. Further, the lower gauge disk 7 is provided with a stopper 72 formed of a leaf spring or the like as a main bar fixing member as a main bar arranging portion 7.
1 is provided in each main bar arrangement portion 71, and the stopper 72 is provided such that one end thereof is fixed to the lower gauge disk 7 by a plate 73 (see FIGS. 1 and 3). 6, the stopper 72 and the plate 73 are omitted for simplicity. As shown by the alternate long and short dash line in FIG. 7, each stopper 72 can freely bend only toward the inner side, that is, toward the main bar disposition portion 71 side. The main bar 37 is provided in each of the plurality of main bar arrangement portions 71.
A can be inserted horizontally (that is, it can be inserted in the direction of arrow A in FIG. 7).

【0019】また、前記下部架台50には、図1及び図
3及び図6に示すように、4本の支持柱51が立設され
ており、これら支持柱51には、上述した下部ゲージデ
ィスク7と略同様に構成された、中抜け円盤状の上部ケ
ージディスク52が水平に支持されている。即ち、上部
ゲージディスク52には、図3及び図4に示すように、
複数の主筋配置部71Xが、前記下部ゲージディスク7
の場合と同様の所定のピッチP1毎に形成されている。
なお、上部ゲージディスク52と下部ゲージディスク7
との間では、各主筋配置部71、71Xの位置が上下方
向に1対1で整合対応している。また、上部ゲージディ
スク52の各主筋配置部71Xには、図5に示すように
主筋37aが、上下方向に移動自在に、それぞれ1本づ
つ収容自在になっており、上部ゲージディスク52には
板バネ等からなるストッパ72Xが、各主筋配置部71
Xごとに設けられている。ストッパ72Xは、プレート
73Xによってその一端側を上部ゲージディスク52に
固着された形で設けられている(なお、図1や図3、図
4等には簡単のためストッパ72X及びプレート73X
が省略されている。)。そして、各ストッパ72Xは、
図5一点鎖線で示すように、内方側即ち該主筋配置部7
1X側に向かってのみ自在に撓むことが出来るようにな
っており、これによって、ストッパ72Xは、複数の主
筋配置部71Xの各々に前記主筋37aを水平方向に入
れ込み自在(即ち図5矢印A’方向に向けて嵌入させ得
るよう)になっている。なお、上述した上部ゲージディ
スク52及び下部ゲージディスク7により主筋配筋手段
70が構成されている。つまり、フレーム本体6a(従
ってフレーム6)に設けられた主筋配筋手段70に、複
数の主筋配置部71、71Xが設けられていることにな
る。
Further, as shown in FIGS. 1, 3 and 6, four supporting columns 51 are erected on the lower mount 50, and these supporting columns 51 have the above-mentioned lower gauge disk. A hollow disk-shaped upper cage disk 52, which is configured substantially in the same manner as 7, is horizontally supported. That is, in the upper gauge disc 52, as shown in FIGS.
The plurality of main bar arrangement portions 71X are the lower gauge discs 7
It is formed at every predetermined pitch P1 similar to the case.
The upper gauge disc 52 and the lower gauge disc 7
Between and, the positions of the main bar arrangement portions 71, 71X are aligned in a one-to-one correspondence in the vertical direction. Further, as shown in FIG. 5, the main bars 37a of the upper gauge disc 52 are accommodated in the respective main bar arrangement portions 71X so that the main bars 37a can be moved in the vertical direction. The stopper 72X made of a spring or the like is used for each main bar placement portion 71.
It is provided for each X. The stopper 72X is provided in such a manner that one end thereof is fixed to the upper gauge disk 52 by a plate 73X (note that the stopper 72X and the plate 73X are simply shown in FIGS. 1, 3, 4 and the like.
Has been omitted. ). And each stopper 72X is
As shown by the alternate long and short dash line in FIG.
The stopper 72X can freely bend only toward the 1X side, whereby the stopper 72X can freely insert the main bar 37a into each of the plurality of main bar arrangement portions 71X in the horizontal direction (that is, arrow A in FIG. 5). 'So that it can be inserted in the direction). The upper gauge disc 52 and the lower gauge disc 7 described above constitute a main reinforcing bar arrangement means 70. That is, a plurality of main reinforcement arrangement portions 71, 71X are provided in the main reinforcement arrangement means 70 provided in the frame body 6a (hence, the frame 6).

【0020】また、前記下部架台50上には、図1及び
図3及び図6に示すように、所定のウインチユニット5
3が設けられている。ウインチユニット53は、電動モ
ータ等の公知の駆動源55及び、該駆動源55からの動
力をベルト等を介して受け、受けた動力により水平な回
転軸KJを中心に図の矢印K、J方向に回転駆動自在と
なったワイヤドラム56から構成されている。即ち、ワ
イヤドラム56は、図6及び図8に示すように、該回転
軸KJを中心に図の矢印K、J方向に回転駆動自在とな
った、従って該回転軸KJに沿って伸延した円柱状に形
成されており、ワイヤドラム56には、その略中央部に
おいて、つば状の仕切板56aが設けられている。この
仕切板56aによって仕切られる形で、ワイヤドラム5
6には、該仕切板56aの両側(即ち、前記回転軸KJ
に平行な方向を矢印E、F方向とすると、矢印E側及び
矢印F側、従って図8の紙面左右両側)に、ワイヤ巻き
部56b、56bが形成されている。各ワイヤ巻き部5
6bには、1本のワイヤ11の始端側と終端側が、ワイ
ヤドラム56の図の矢印K方向の回転駆動により繰り出
しされ、ワイヤドラム56の図の矢印J方向の回転駆動
により巻取りされる形で巻かれている。なお、ワイヤ巻
き部56b、56bの間では、各ワイヤ巻き部56bに
巻かれたワイヤ11の巻取り位置KDが、これらワイヤ
11の巻取り量等に関係無く、前記仕切板56aを中心
に図の矢印E、F方向に対称な位置に配置されるように
なっている。
A predetermined winch unit 5 is mounted on the lower mount 50 as shown in FIGS. 1, 3 and 6.
3 are provided. The winch unit 53 receives a well-known drive source 55 such as an electric motor and the power from the drive source 55 via a belt or the like, and receives the power around a horizontal rotation axis KJ in the directions of arrows K and J in the figure. It is composed of a wire drum 56 which can be rotationally driven. That is, as shown in FIGS. 6 and 8, the wire drum 56 can be driven to rotate about the rotation axis KJ in the directions of arrows K and J in the figure, and therefore the circle extended along the rotation axis KJ. The wire drum 56 is formed in a columnar shape, and a brim-shaped partition plate 56a is provided in the wire drum 56 at a substantially central portion thereof. The wire drum 5 is partitioned by the partition plate 56a.
6 includes both sides of the partition plate 56a (that is, the rotation axis KJ).
Assuming that the directions parallel to the arrow E and F are the arrow E and F directions, wire winding portions 56b and 56b are formed on the arrow E side and the arrow F side, that is, both left and right sides of the paper surface of FIG. Each wire winding part 5
In 6b, the starting end side and the terminating end side of one wire 11 are fed out by the rotational drive of the wire drum 56 in the direction of arrow K in the figure, and are wound by the rotational drive of the wire drum 56 in the direction of arrow J in the figure. It is wrapped with. In addition, between the wire winding portions 56b and 56b, the winding position KD of the wire 11 wound around each wire winding portion 56b is shown centering around the partition plate 56a regardless of the winding amount of these wires 11 and the like. Are arranged at positions symmetrical with respect to the arrow E and F directions.

【0021】ところで、下部架台50には、図3及び図
6に示すように、ワイヤ支持手段44が設けられてい
る。ワイヤ支持手段44は下部架台50に立設された滑
車支持フレーム8を有しており、該滑車支持フレーム8
には所定の上部滑車45が固定されて設けられている。
なお、上部滑車45はワイヤドラム56よりも上方の位
置に配置されている。そして、前記ワイヤドラム56の
ワイヤ巻き部56b、56bからのワイヤ11は、この
上部滑車45に接続されている。また、下部架台50に
は、その中央部付近に、該下部架台50を上下に貫通す
る形のワイヤ挿通穴57が形成されており、このワイヤ
挿通穴57は前記下部ゲージディスク7の中央の挿通穴
7aの上方に配置されている。前記ワイヤ11のうち、
ワイヤドラム56と上部滑車45との間の部位は、これ
らワイヤ挿通穴57及び挿通穴7aを貫通する形で、下
部架台50及び下部ゲージディスク7の下方に垂れ下が
っており、このワイヤ11の垂れ下がった部位には、図
3及び図8に示すように、動滑車である滑車10が吊る
されている。つまり、ワイヤドラム56によりワイヤ1
1を巻き取ることにより滑車10が、縦穴3中を上昇駆
動され、ワイヤドラム56によりワイヤ11を繰り出す
ことにより滑車10が、縦穴3中を下降するようになっ
ている。従って、上述したウインチユニット53、ワイ
ヤ支持手段44、ワイヤ11、滑車10によって後述す
る下部フレーム枠9を上下に昇降移動駆動させ得る昇降
装置54が構成されている。なお、本実施例では、ワイ
ヤドラム56から滑車10を経て上部滑車45に至った
各ワイヤ11は、該上部滑車45において巻き掛けられ
て再び滑車10に至り、更に該滑車10において巻き掛
けられて再び上部滑車45に至っている。つまり、滑車
10は上部滑車45との間で1本のワイヤ11を6重に
する形で吊るされており、従って滑車10は、ワイヤ1
1を6重にした分、極力大きな荷重を吊下することがで
きるようになっている。一方、前記下部架台50のワイ
ヤ支持手段44の下方、従って該下部架台50のワイヤ
挿通穴57の位置には、図3に示すように、上下に貫通
する形で収納空間65が形成されており、前記滑車10
は上方に移動して、図14に示すように、該収納空間6
5に収納され得るようになっている。つまり、前記滑車
10の移動は、該収納空間65と下部ゲージディスク7
の下方との間で行われるようになっている。
By the way, the lower mount 50 is provided with wire supporting means 44 as shown in FIGS. The wire supporting means 44 has a pulley supporting frame 8 erected on the lower mount 50.
A predetermined upper pulley 45 is fixedly provided in the.
The upper pulley 45 is arranged above the wire drum 56. The wire 11 from the wire winding portions 56b and 56b of the wire drum 56 is connected to the upper pulley 45. Further, the lower mount 50 has a wire insertion hole 57 formed in the vicinity of the center thereof so as to vertically penetrate the lower mount 50. The wire insertion hole 57 is formed at the center of the lower gauge disk 7. It is arranged above the hole 7a. Of the wire 11
A portion between the wire drum 56 and the upper pulley 45 hangs down the lower mount 50 and the lower gauge disk 7 so as to penetrate the wire insertion hole 57 and the insertion hole 7a, and the wire 11 hangs down. As shown in FIGS. 3 and 8, a pulley 10, which is a moving pulley, is hung on the portion. That is, the wire 1 is made by the wire drum 56.
The pulley 10 is driven upward in the vertical hole 3 by winding 1 and the pulley 10 is lowered in the vertical hole 3 by feeding out the wire 11 by the wire drum 56. Therefore, the winch unit 53, the wire support means 44, the wire 11, and the pulley 10 described above constitute an elevating device 54 that can vertically drive the lower frame frame 9 to be described later. In the present embodiment, each wire 11 from the wire drum 56 to the upper pulley 45 via the pulley 10 is wound around the upper pulley 45, reaches the pulley 10 again, and is further wound around the pulley 10. It has reached the upper pulley 45 again. That is, the pulley 10 is hung between the upper pulley 45 and the wire 11 in a six-fold manner.
It is possible to suspend a load as large as possible by multiplying 1 by 6. On the other hand, as shown in FIG. 3, a storage space 65 is formed vertically below the wire supporting means 44 of the lower mount 50, and thus at the position of the wire insertion hole 57 of the lower mount 50. , The pulley 10
Moves upward and, as shown in FIG. 14, the storage space 6
5 can be stored. In other words, the movement of the pulley 10 depends on the storage space 65 and the lower gauge disk 7.
It is supposed to be held between the lower part of the room and the lower part of.

【0022】滑車10には、図1及び図3に示すよう
に、下部フレーム枠9が垂設されている。下部フレーム
枠9は、図3に示すように、滑車10に垂設された吊下
枠体46を有しており、吊下枠体46には、複数の吊下
ワイヤ47を介してフレーム枠本体49が吊下されてい
る。フレーム枠本体49は、図3及び図9及び図10に
示すように、前記モルタル36が吹き付けされた状態の
縦穴3の内径より若干小さな径の水平な円環状に形成さ
れており、フレーム枠本体49の下端には、図11に示
すように、該フレーム枠本体49を、縦穴3の穴底3b
に載置させることができる載置脚9aが複数(例えば3
つ以上、但し図11では1つのみ図示、なお、図3、図
10等では載置脚9aは簡単のため省略されている)下
方に突出して形成されている。また、フレーム枠本体4
9の下端には、これら載置脚9a以外の箇所において水
平な下端面9bが形成されており、フレーム枠本体49
には、複数の鉄筋支持治具32が垂設されている。即
ち、各鉄筋支持治具32は、水平棒状の治具本体33を
有しており、該治具本体33の上面33aと前記フレー
ム枠本体49の下端面9bとの間には上下方向に所定の
鉄筋支持間隔TSが形成されている。また、治具本体3
3は、例えば、その略両端部位においてボルト等の締結
部材35、35を介してフレーム枠本体49に着脱自在
に取り付けられている。なお、フレーム枠本体49を、
縦穴3の穴底3bに載置させた際には、載置脚9aの上
下方向の高さによって、治具本体33と穴底3bの間
に、上下方向の所定の作業間隔SKが形成されるように
なっている。フレーム枠本体49の上端側には、図9乃
至図11に示すように、該フレーム枠本体49の外周側
に、つば状に水平に突出したフランジ部9cが形成され
ており、該フランジ部9cには、その外周に沿って所定
のピッチP1毎に主筋配置部9s(上述した主筋配置部
71、71Xと略同様のもの)が形成されている。な
お、主筋配置部9sの位置と主筋配置部71の位置、及
び主筋配置部71Xの位置は上下方向に対応整合してい
る。フレーム枠本体49には、縦穴3の側壁3cに沿っ
て並ぶ複数の主筋37aが、フランジ部9cに形成され
た主筋配置部9sを貫通する形で搭載されており、これ
ら搭載された主筋37aの下端部位37cはL字型に屈
曲している。即ち、下端部位37cのうち水平な部位
は、前記治具本体33の上面33aと前記フレーム枠本
体49の下端面9bとの間の鉄筋支持間隔TSを内方に
向けて通る形で、治具本体33の上面33aに載置支持
されている。このように、下部フレーム枠9のうち、フ
ランジ部9cの複数の主筋配置部9s及び、鉄筋支持間
隔TSを形成する治具本体33の上面33aとフレーム
枠本体49の下端面9bとは、主筋37aの下端部位3
7cを保持し得る主筋端部保持部31となっている。
As shown in FIGS. 1 and 3, the pulley 10 is provided with a lower frame 9 vertically. As shown in FIG. 3, the lower frame frame 9 has a suspension frame body 46 suspended from the pulley 10, and the suspension frame body 46 has a plurality of suspension wires 47 interposed therebetween. The main body 49 is suspended. As shown in FIGS. 3, 9 and 10, the frame body 49 is formed in a horizontal annular shape having a diameter slightly smaller than the inner diameter of the vertical hole 3 in a state where the mortar 36 is sprayed. As shown in FIG. 11, the frame frame main body 49 is provided at the lower end of the vertical hole 49 at the bottom 3 b of the vertical hole 3.
A plurality of mounting legs 9a (for example, 3
11 or more, but only one is shown in FIG. 11, and the mounting legs 9a are omitted in FIGS. 3 and 10 for the sake of simplicity). Also, the frame body 4
A horizontal lower end surface 9b is formed at a lower end of the frame 9 except the mounting legs 9a.
A plurality of reinforcing bar support jigs 32 are vertically provided in the. That is, each reinforcing bar support jig 32 has a horizontal rod-shaped jig body 33, and a predetermined vertical direction is provided between the upper surface 33 a of the jig body 33 and the lower end surface 9 b of the frame body 49. Reinforcing bar support intervals TS are formed. Also, the jig body 3
3 is detachably attached to the frame main body 49 via fastening members 35, 35 such as bolts at substantially both ends thereof. In addition, the frame main body 49,
When mounted on the hole bottom 3b of the vertical hole 3, a predetermined vertical work interval SK is formed between the jig body 33 and the hole bottom 3b due to the height of the mounting leg 9a in the vertical direction. It has become so. As shown in FIGS. 9 to 11, on the upper end side of the frame frame main body 49, a flange portion 9c horizontally protruding like a brim is formed on the outer peripheral side of the frame frame main body 49. The main reinforcement placement portions 9s (substantially the same as the main reinforcement placement portions 71 and 71X described above) are formed along the outer periphery of the main reinforcement arrangement at predetermined pitches P1. The positions of the main reinforcement placement portion 9s, the positions of the main reinforcement placement portion 71, and the positions of the main reinforcement placement portion 71X are matched and aligned in the vertical direction. A plurality of main reinforcements 37a arranged along the side wall 3c of the vertical hole 3 are mounted on the frame body 49 so as to penetrate the main reinforcement placement portion 9s formed on the flange portion 9c. The lower end portion 37c is bent in an L shape. That is, the horizontal portion of the lower end portion 37c is a jig that passes through the reinforcing bar support interval TS between the upper surface 33a of the jig main body 33 and the lower end surface 9b of the frame main body 49 inward. It is placed and supported on the upper surface 33a of the main body 33. As described above, in the lower frame frame 9, the plurality of main reinforcement placement portions 9s of the flange portion 9c, the upper surface 33a of the jig main body 33 and the lower end surface 9b of the frame main body 49 that form the reinforcing bar support interval TS are the main reinforcements. Lower end portion 3 of 37a
It is a main bar end holding portion 31 capable of holding 7c.

【0023】また、フレーム枠本体49には、図11に
示すように、いくつかのフック保持具12が装着されて
おり、各フック保持具12には、フック係合突起12a
が、下部フレーム枠9の放射方向内方において、下側に
突する形でそれぞれ設けられている。そして、フック保
持具12は、フレーム枠本体49に接続された部分とフ
ック係合突起12aとの間にフック配置溝12bが形成
されており、フック保持具12には、フック配置溝12
bの下側からフック係合突起12aに引掛けられた形
で、前記吊下ワイヤ47の下端部に接続された吊輪13
が係合保持されている。なお、吊下ワイヤ47と吊輪1
3の間には、図11に示すように、レベル調整ジャッキ
15が、該吊下ワイヤ47の図11の矢印B、C方向の
長さを調整し得るように設けられており、該レベル調整
ジャッキ15を介して、フレーム枠本体49の平衡状
態、即ち該フレーム枠本体49に搭載支持された主筋3
7a、従って鉄筋籠37の平衡状態が調整保持され得る
ようになっている。
As shown in FIG. 11, several hook holders 12 are mounted on the frame body 49, and each hook holder 12 has a hook engaging projection 12a.
Are provided so as to protrude downward inward in the radial direction of the lower frame frame 9. The hook holder 12 has a hook arrangement groove 12b formed between the portion connected to the frame body 49 and the hook engagement protrusion 12a. The hook holder 12 has a hook arrangement groove 12b.
The suspension ring 13 connected to the lower end of the suspension wire 47 in a form hooked on the hook engagement protrusion 12a from the lower side of b.
Are held in engagement. In addition, the hanging wire 47 and the hanging ring 1
11, a level adjusting jack 15 is provided so as to adjust the length of the suspending wire 47 in the directions of arrows B and C in FIG. 11, as shown in FIG. Through the jack 15, the frame frame main body 49 is in an equilibrium state, that is, the main bars 3 mounted and supported on the frame frame main body 49.
7a, and therefore the equilibrium state of the rebar cage 37 can be adjusted and held.

【0024】さらに、鉄筋建て込み装置5のフレーム6
には、図13(a)に示すように、前記下部架台50の
底側に垂設装着された形で図示しない4ヶの油圧ジャッ
キが設けられており、それぞれの油圧ジャッキには、配
力筋保持手段である配力筋受け治具17が、チェーン2
0を介してそれぞれ吊下されている。各配力筋受け治具
17は、前記油圧ジャッキを介して上下方向に所定長さ
分だけ移動自在な形になっており、また、配力筋受け治
具17は、前記油圧ジャッキの真下に吊下されている際
の位置から、図13(a)の矢印G方向に示す放射方向
外方向に移動し、配力筋37bの配筋時に該配力筋受け
治具17を配置させるべき位置まで移動自在な形になっ
ている。そして、配力筋受け治具17には、複数の配力
筋保持部である掛け具191が、前記配力筋37bの配
筋ピッチに対応したピッチで上下方向に所定の間隔をな
すよう複数設けられており、各配力筋受け治具17の上
下方向に並ぶ複数の掛け具191は、ガイド19を介し
て連結された形で、該ガイド19の操作によって、放射
方向内外方向である図の矢印H、G方向に所定ストロー
ク分だけ突出後退自在な形になっている。そして、配力
筋受け治具17は、複数の掛け具191のそれぞれに1
本づつの配力筋37bが搭載保持され得るようになって
いる。
Further, the frame 6 of the reinforcing bar building device 5
As shown in FIG. 13 (a), is provided with four hydraulic jacks (not shown) vertically mounted on the bottom side of the lower pedestal 50. Each hydraulic jack has a power distribution. The distribution force receiving jig 17 that is a muscle holding means is used for the chain 2
It hangs through 0 respectively. Each of the force distribution receiving jigs 17 is configured to be movable in the vertical direction by a predetermined length via the hydraulic jacks, and the force distribution receiving jigs 17 are provided directly below the hydraulic jacks. A position at which the force distribution receiving jig 17 is to be arranged when the force distribution muscle 37b is laid out from the position where it is hung, to the radial outward direction indicated by the arrow G in FIG. 13 (a). It has a shape that can be moved up to. A plurality of hooks 191 which are a plurality of force distribution muscle holding portions are arranged in the force distribution muscle receiving jig 17 so as to form a predetermined interval in the vertical direction at a pitch corresponding to the bar arrangement pitch of the force distribution muscles 37b. A plurality of hooks 191 provided in the vertical direction of each force distribution jig 17 are connected to each other via a guide 19 and are arranged in a radial direction inside and outside by operating the guide 19. It is configured such that it can be projected and retracted by a predetermined stroke in the directions of arrows H and G. Then, the force distribution receiving jig 17 is provided for each of the plurality of hanging devices 191.
The force distribution muscles 37b for each book can be mounted and held.

【0025】ところで、現場1には、図1に示すよう
に、クレーン車40が、縦穴3付近に位置する形で配置
されており、クレーン車40のフックブロック41に
は、鉄筋吊り下げ治具である主筋吊り具21が装着吊下
されている。主筋吊り具21は、図1及び図12に示す
ように、実施例においては3ヶの鞘管22を有してお
り、各鞘管22の内部には、鉄筋挿通空間である主筋挿
通空間22sが、前記主筋37aを該主筋37aの材軸
方向に沿って(即ち上下に)移動自在に挿通させ得る形
で形成されている。3ヶの鞘管22は、連結部材23を
介して、前記主筋37aの配筋ピッチに対応したピッチ
で水平方向に並ぶように連結されており、主筋吊り具2
1の3ヶの鞘管22は、連結部材23に装着された牽引
ワイヤ25、束ね治具26を介して、前記フックブロッ
ク41に吊下されている。従って、これ等、連結部材2
3、牽引ワイヤ25、束ね治具26は、3ヶの鞘管22
に設けられた吊下係合手段を構成する形になっており、
該吊下係合手段によって、主筋吊り具21がフックブロ
ック41に吊下支持されている。
By the way, as shown in FIG. 1, a crane truck 40 is arranged at the site 1 so as to be located in the vicinity of the vertical hole 3, and a hook block 41 of the crane truck 40 has a reinforcing bar hanging jig. The main bar suspension 21 is attached and hung. As shown in FIG. 1 and FIG. 12, the main bar suspension 21 has three sheath tubes 22 in the embodiment, and inside each sheath tube 22, a main bar insertion space 22 s which is a reinforcing bar insertion space. However, the main bar 37a is formed so that the main bar 37a can be inserted along the axial direction of the main bar 37a (that is, vertically). The three sheath pipes 22 are connected via a connecting member 23 so as to be arranged in a horizontal direction at a pitch corresponding to the bar arrangement pitch of the main bar 37a.
The three sheath tubes 22 of No. 1 are hung from the hook block 41 via the pulling wire 25 attached to the connecting member 23 and the bundling jig 26. Therefore, these are the connecting members 2
3, the pulling wire 25, and the bundling jig 26 are three sheath tubes 22.
Is configured to configure the hanging engagement means provided in,
The main bar suspension 21 is suspended and supported by the hook block 41 by the suspension engagement means.

【0026】また、主筋吊り具21には、図12に示す
ように、前記主筋37aを把持自在な鉄筋クランプであ
るクランプ27が、3ヶの鞘管22の下方において、該
鞘管22と1対1をなすように、前記連結部材23、牽
引ワイヤ25、束ね治具26が形成している吊下係合手
段に3ヶ設けられており、各クランプ27は長さL1を
なす接続ワイヤ29を介して前記連結部材23に吊下さ
れた形で、それぞれの鞘管22と連結接続されている。
即ち、主筋吊り具21は、これが前記吊下係合手段によ
って、クレーン車40のフックブロック41に吊下され
ている状態下において、各鞘管22と各クランプ27
が、該クランプ27の重量によって、所定の間隔L1を
鉛直方向に保持し得る形になっており、このとき、3ヶ
の鞘管22は、クレーンの牽引力内に介在配置する形
で、該3ヶの鞘管22と3ヶのクランプ27が鉛直方向
に並ぶように配置し、これによって、主筋吊り具21は
図1に示すように、主筋37aをその材軸方向を鉛直方
向に向けた形で保持し得るようになっている。
Further, as shown in FIG. 12, a clamp 27, which is a reinforcing bar clamp capable of gripping the main bar 37a, is provided on the main bar suspender 21 under the three sheath pipes 22 and 1 respectively. The connecting member 23, the pulling wire 25, and the bundling jig 26 are provided in three pieces so as to form a pair, and each clamp 27 has a connecting wire 29 having a length L1. It is connected and connected to each of the sheath tubes 22 in a form of being suspended from the connecting member 23 via the.
That is, the main bar suspension 21 has the sheath pipes 22 and the clamps 27 in a state in which it is suspended by the suspension engagement means on the hook block 41 of the crane vehicle 40.
However, due to the weight of the clamp 27, a predetermined distance L1 can be maintained in the vertical direction. At this time, the three sheath pipes 22 are arranged so as to be interposed in the traction force of the crane. The sheath tubes 22 and the three clamps 27 are arranged so as to be aligned in the vertical direction, so that the main bar suspension 21 has a shape in which the main bar 37a is oriented with its material axis direction in the vertical direction, as shown in FIG. Can be held at.

【0027】現場1は以上のような構成を有しているの
で、該現場1において杭30を構築する際には、縦穴3
を地面2aの所定の位置から所定の径D1をなすように
所定深さ分だけ掘り下げ形成し、その側壁3cにモルタ
ル36を所定厚さに吹き付け施工したところで、鉄筋建
て込み装置5を用いて、該縦穴3に複数の主筋37aと
複数の配力筋37bによる鉄筋籠37を鉄筋組立体とし
て建て込む作業を行う。そこでまず、4つの設置脚60
を、図1に示すように、鉄筋籠5を建て込みすべき縦穴
3の坑口3aを包囲するように地面2aに設置し、フレ
ーム本体6aを縦穴3に整合対応させて、従って下部フ
レーム枠9が該縦穴3中を下降自在な形で鉄筋建て込み
装置5を設置する。この際、鉄筋建て込み装置5は、フ
レーム6の中心CL1が、縦穴3の中心CT1に一致し
た形になるように設置する。
Since the site 1 has the above-mentioned structure, when the pile 30 is constructed in the site 1, the vertical hole 3 is formed.
Is formed by digging from a predetermined position on the ground 2a by a predetermined depth so as to form a predetermined diameter D1, and the mortar 36 is sprayed on the side wall 3c to a predetermined thickness. A work of building a reinforcing bar cage 37 having a plurality of main bars 37a and a plurality of force distribution bars 37b into the vertical hole 3 as a reinforcing bar assembly is performed. Therefore, first, four installation legs 60
1 is installed on the ground 2a so as to surround the wellhead 3a of the vertical hole 3 in which the rebar cage 5 is to be built, and the frame body 6a is aligned with the vertical hole 3 and accordingly the lower frame 9 Installs a reinforcing bar erection device 5 in such a manner that it can descend in the vertical hole 3. At this time, the reinforcing bar building device 5 is installed so that the center CL1 of the frame 6 matches the center CT1 of the vertical hole 3.

【0028】そこで、第1に、所定配筋本数の主筋37
aを、その各々の配筋位置に対応させた形で下部フレー
ム枠9に縦に保持させる作業を行う。そこでまず、主筋
吊り具21の3ヶの鞘管22の各々の主筋挿通空間22
sに、図1右奥部に示すように寝かせた状態の主筋37
aを挿通させると共に、該主筋37aの所定の位置(即
ち該主筋37aを縦にしたときに下部になる位置)にク
ランプ27を取り付ける。こうして、3ヶのクランプ2
7に3本の主筋37aを把持させた形にしておいて、束
ね治具26をクレーン車40のフックブロック41に係
合させてから、クレーン操作によって、該フックブロッ
ク41を上方に移動させる。すると、主筋吊り具21
は、主筋37aを把持している各クランプ27が、3ヶ
の鞘管23に設けられた連結部材23、牽引ワイヤ2
7、束ね治具26を吊り下げ係合手段としてクレーン4
0に吊下された形で、縦になる。このように、主筋37
aを寝かせた状態から縦に起こすとき、3本の主筋37
aは、3本の鞘管22によって、水平方向の移動を拘束
された形で起き上がり、また、縦になった主筋37a
は、当該3本の鞘管22による水平方向の拘束力と3本
の主筋37aの自重によってその材軸方向を鉛直方向に
向けるよう保持された形で、3ヶのクランプ27を介し
て主筋吊り具21に吊下された形になる。これによっ
て、3本の主筋37aは、図1に示すように、各主筋3
7aの材軸が撓むことなく、安定的に、主筋吊り具21
を介してフックブロック41に吊下保持される。
Therefore, firstly, a predetermined number of main bars 37 are arranged.
The work of vertically holding a on the lower frame frame 9 in a form corresponding to the respective bar arrangement positions is performed. Therefore, first, the main muscle insertion space 22 of each of the three sheath tubes 22 of the main muscle suspender 21 is inserted.
s, the main bar 37 in a state of being laid down as shown in the right back part of FIG.
A is inserted, and the clamp 27 is attached to a predetermined position of the main bar 37a (that is, a position which becomes a lower part when the main bar 37a is set vertically). In this way, 3 clamps 2
7, the three main bars 37a are gripped, the bundling jig 26 is engaged with the hook block 41 of the crane vehicle 40, and then the hook block 41 is moved upward by the crane operation. Then, the main bar suspension 21
The clamps 27 holding the main bars 37a are connected to the connecting members 23 provided on the three sheath tubes 23 and the pulling wire 2
7, the crane 4 as a bundling jig 26 as a suspension engagement means
It hangs at 0 and becomes vertical. In this way, the main line 37
When a is laid down vertically and raised vertically, the three main bars 37
a is raised in a form in which horizontal movement is restrained by the three sheath tubes 22 and is a vertical main bar 37a.
Is held in such a manner that its axial direction is oriented vertically by the restraining force of the three sheath tubes 22 in the horizontal direction and the own weight of the three main bars 37a, and the main bars are suspended via the three clamps 27. It becomes the form hung on the tool 21. As a result, the three main bars 37a, as shown in FIG.
The main rod suspending device 21 is stably provided without bending the shaft of 7a.
It is hung and held by the hook block 41 via.

【0029】この状態で、さらにクレーン操作を介して
フックブロック41を適宜移動させ、該3本の主筋37
aを、上部ゲージディスク52、下部ゲージディスク
7、下部フレーム枠9間にそれぞれセットする。これに
は、まず、各主筋37aの下端部位37cを下部フレー
ム枠9の主筋端部保持部31に保持させて搭載する形に
してから、該主筋37aの上端部を、上部ゲージディス
ク52及び下部ゲージディスク7の所定位置の主筋配置
部71及び主筋配置部71Xに入り込み配置させる。こ
の際、各主筋配置部71、71Xにはストッパ72、7
2Xが設けられているので、該ストッパ72、72Xを
主筋37aによって図7の矢印A方向及び図5の矢印
A’方向に押す形で、該主筋37aを主筋配置部71、
71Xに水平方向から入り込みさせる。すると、ストッ
パ72、72Xは、該ストッパ72、72Xが保有して
いるバネ力によって図7及び図5の実線で示すようにプ
レート73、73X側に復元する形で、主筋37aが入
り込み配置された主筋配置部71、71Xを直ちに塞
ぐ。即ち、該主筋配置部71、71Xから主筋37aが
放射方向外側に外れるのを防止する。これによって、主
筋配置部71、71Xには、主筋37aが、該主筋配置
部71、71Xに対して上下に移動自在に、従って上下
にガイド自在に保持された形になる。
In this state, the hook block 41 is further appropriately moved through the operation of the crane so that the three main bars 37
a is set between the upper gauge disc 52, the lower gauge disc 7, and the lower frame frame 9, respectively. For this purpose, first, the lower end portion 37c of each main bar 37a is held and mounted on the main bar end holding portion 31 of the lower frame frame 9, and then the upper end of the main bar 37a is attached to the upper gauge disc 52 and the lower part. The main bar arranging part 71 and the main bar arranging part 71X at predetermined positions of the gauge disk 7 are inserted and arranged. At this time, the stoppers 72, 7 are attached to the respective main bar arrangement portions 71, 71X.
Since 2X is provided, the stoppers 72, 72X are pushed by the main reinforcement 37a in the arrow A direction of FIG. 7 and the arrow A ′ direction of FIG.
Enter the 71X from the horizontal direction. Then, the stoppers 72, 72X are arranged so that the main bars 37a are inserted in such a manner that the stoppers 72, 72X are restored to the plates 73, 73X side by the spring force held by the stoppers 72, 72X as shown by the solid lines in FIGS. 7 and 5. Immediately close the main muscle placement portions 71, 71X. That is, the main bar 37a is prevented from coming off from the main bar arrangement portions 71, 71X in the radial direction. As a result, the main bar 37a is held in the main bar placement parts 71, 71X so as to be vertically movable with respect to the main bar placement parts 71, 71X, and thus vertically guided.

【0030】こうして、主筋32aを順次3本づつ、下
部フレーム枠9の主筋端部保持部31に保持搭載し、上
部ゲージディスク52及び下部ゲージディスク7の主筋
配置部71、71Xに配置させながら、クレーン操作に
よって、主筋吊り具21を下降させると、該主筋吊り具
21による吊下支持状態が解除された3本の主筋37a
は、その自重によって、下部フレーム枠9に縦に保持さ
れた形になる。そこで、主筋吊り具21の3ヶのクラン
プ27を順次主筋37aから取り外す。さらに、クレー
ン操作によってフックブロック41を上昇させる。する
と、クランプ27が主筋37aから取り外された状態の
主筋吊り具21は、3ヶの鞘管22が、各主筋挿通空間
22sを介して主筋37aに対して相対的に上方に移動
する形で、該主筋37aからその上側に抜けるように外
れる。従って、主筋吊り具21を用いれば、寝かせた状
態の主筋37aにクランプ27を取付けてクレーンを操
作するだけで、簡単に該主筋37aを縦にすることが出
来る。また、該クランプ27を縦になった主筋37aか
ら取り外すだけで、簡単に主筋吊り具21を主筋37a
から取り外すことが出来、これらの作業に高所作業や作
業の煩雑さが伴わない。
In this way, three main bars 32a are sequentially held and mounted on the main bar end holding section 31 of the lower frame 9, and are arranged in the main bar disposing sections 71 and 71X of the upper gauge disc 52 and the lower gauge disk 7, respectively. When the main bar suspension 21 is lowered by a crane operation, the three main bars 37a in which the suspension supporting state by the main bar suspension 21 is released
Is held vertically by the lower frame frame 9 due to its own weight. Therefore, the three clamps 27 of the main bar suspension 21 are sequentially removed from the main bar 37a. Further, the hook block 41 is raised by operating the crane. Then, in the main muscle suspending device 21 with the clamp 27 removed from the main muscle 37a, the three sheath tubes 22 move upward relative to the main muscle 37a via the respective main muscle insertion spaces 22s. It comes off from the main bar 37a so as to come out to the upper side. Therefore, if the main bar suspension 21 is used, the main bar 37a can be easily made to be vertical only by attaching the clamp 27 to the laid main bar 37a and operating the crane. The main bar suspension 21 can be easily attached to the main bar 37a simply by removing the clamp 27 from the vertical main bar 37a.
It is possible to remove from the work, and these works do not involve work at heights and complexity of work.

【0031】こうして、上述した主筋37aを上部ゲー
ジディスク52、下部ゲージディスク7、下部フレーム
枠9間にセットする作業を繰返すことによって、所定配
筋本数の主筋37aを、その各々の配筋位置に対応させ
た形で、下部フレーム枠9に縦に搭載保持したところ
で、図11に示すように、レベル調整ジャッキ15を駆
動操作して、各吊下ワイヤ47の長さを調整する形で、
下部フレーム枠9のレベル調整を行う。これによって、
該下部フレーム枠9に搭載保持された所定本数の主筋3
7aは、その各々が材軸方向を鉛直方向に向けた形にな
るように平衡保持される。そこで次に、該所定本数の主
筋37aに配力筋37bを接続する作業を行う。
By repeating the above-described operation of setting the main reinforcement 37a between the upper gauge disc 52, the lower gauge disc 7 and the lower frame frame 9, a predetermined number of main reinforcements 37a are placed at their respective reinforcement positions. In a corresponding manner, when vertically mounted on the lower frame frame 9, as shown in FIG. 11, the level adjusting jack 15 is driven and operated to adjust the length of each hanging wire 47.
The level of the lower frame 9 is adjusted. by this,
A predetermined number of main bars 3 mounted and held on the lower frame 9
7a are equilibrated so that each of them has a shape in which the material axis direction is oriented in the vertical direction. Therefore, next, work for connecting the force distribution muscles 37b to the predetermined number of main muscles 37a is performed.

【0032】当該配力筋37bの主筋37aへの接続作
業時には、配力筋受け治具17を用いるが、鉄筋籠37
における最下部部分に位置する配力筋37bを主筋37
aに接続する際には、該主筋37aの下端に配力筋受け
治具17の下端部を合わせてセットする。そして、これ
より上側位置の配力筋37bを主筋37aに接続する際
には、図13(a)に示すように、既に主筋37aに接
続された配力筋37bの上方に各配力筋受け治具17を
位置決めセットする。なお、配力筋受け治具17の位置
決めは、最下端部の掛け具191を、既に主筋37aに
接続済みの配力筋37b等に係合保持させた形にしてお
いて、各配力筋受け治具17を吊下している図示しない
4ヶの油圧ジャッキをそれぞれ駆動操作することによっ
て行う。
At the time of connecting the main muscle 37a of the distribution muscle 37b, the distribution muscle receiving jig 17 is used.
The force distribution muscle 37b located at the bottom of the
When connecting to a, the lower end of the force distribution receiving jig 17 is set to the lower end of the main bar 37a. Then, when connecting the force distribution muscles 37b located above this to the main muscles 37a, as shown in FIG. 13 (a), the force distribution muscles 37b already connected to the main muscles 37a are located above the respective force distribution muscles 37b. The jig 17 is positioned and set. The positioning of the force distribution muscle receiving jig 17 is performed by setting the hanging tool 191 at the lowermost end to be engaged with and held by the force distribution muscles 37b already connected to the main muscles 37a. This is performed by driving and operating four hydraulic jacks (not shown) that suspend the receiving jig 17.

【0033】こうして位置決めした4ヶの配力筋受け治
具17のそれぞれは、下部フレーム枠9上に保持された
ことによって輪状になっている複数の主筋37aの内側
に配置する形になっている。そこで次に図13(b)に
示すように、配力筋受け治具17を放射方向外側に若干
移動させると共に、ガイド19を介して複数の掛け具1
91を図13の矢印G方向に突出させる形にして、主筋
37aの外側に該複数の掛け具191を突出配置させ
る。この際、配力筋受け治具17の複数の掛け具191
のうち最下部に位置する掛け具191を、既に主筋37
aに接続済で最上部に位置していた配力筋37bに引掛
けるようにすると、配力筋受け治具17は、主筋37a
の内方側に的確に保持される。このとき配力筋受け治具
17には掛け具191が、配力筋37bの配筋ピッチに
対応した形で設けられているので、配力筋37bを配筋
すべき位置が、複数の掛け具191の配置位置によって
直ちに検出される。
Each of the four force distribution bracing jigs 17 thus positioned is arranged inside a plurality of ring-shaped main braces 37a held by the lower frame 9. . Then, as shown in FIG. 13B, the force distribution receiving jig 17 is slightly moved outward in the radial direction, and a plurality of hooks 1 are provided via the guide 19.
The plurality of hooks 191 are arranged so as to project outside the main bar 37a by forming 91 in the direction of arrow G in FIG. At this time, the plurality of hooks 191 of the force distribution receiving jig 17
The hook 191 located at the bottom of the
When it is hooked on the force distribution muscle 37b which is already connected to a and is located at the uppermost portion, the force distribution muscle receiving jig 17 moves to the main muscle 37a.
It is properly retained on the inner side of. At this time, since the hooks 191 are provided on the force distribution muscle receiving jig 17 in a shape corresponding to the bar arrangement pitch of the force distribution muscles 37b, the positions where the force distribution muscles 37b should be arranged are plural. The position of the tool 191 is immediately detected.

【0034】そこで、配力筋受け治具17を、その掛け
具191が主筋37aの外側に突出する形になるように
セットしたところで、半円状になっている配力筋37b
を、引き続き図13(b)に示すように、配力筋受け治
具17の各掛け具191上に引掛ける形で係合保持させ
る。そして、該配力筋37bを、その1本1本が円周状
になるように、2本の半円状の配力筋37b、37bの
各両端部をラップさせながら、主筋37aに該主筋37
aと交差する形になるようそれぞれ溶接接続していく。
すると、当該複数の主筋37aへの配力筋37bの接続
作業を繰返すことによって、鉄筋組立体である鉄筋籠3
7を形成することが出来、このための鉄筋組立作業は、
坑口3a付近の地面2a上において、坑外作業で行うこ
とが出来る。
Therefore, when the distribution force receiving jig 17 is set so that the hanging member 191 thereof projects to the outside of the main reinforcement 37a, the distribution muscle 37b having a semicircular shape is formed.
Then, as shown in FIG. 13 (b), they are engaged and held in a form of being hooked on each hanging tool 191 of the force distribution receiving jig 17. Then, each of the force distribution muscles 37b is wrapped around each end portion of the two semicircular force distribution muscles 37b, 37b so that each of the distribution muscles 37b has a circular shape. 37
Weld and connect them so that they intersect with a.
Then, by repeating the work of connecting the force distribution bars 37b to the plurality of main bars 37a, the rebar cage 3 which is the rebar assembly.
7 can be formed, and the rebar assembly work for this is
It can be performed outside the mine on the ground 2a near the mine mouth 3a.

【0035】こうして、先にセットした配力筋受け治具
17の全ての段の掛け具191に係合させた配力筋37
bを主筋37aに溶接接続して、1サイクル分の配力筋
接続作業を終えたなら、次に図13(c)に示すよう
に、配力筋受け治具17を主筋37a(即ち組立中の鉄
筋籠37)と切り離す。これには、各配力筋受け治具1
7を吊下している図示しない油圧ジャッキを解放して、
それぞれの配力筋受け治具17を若干づつ下方に移動さ
せる。すると、該配力筋受け治具17は、直ちに主筋3
7aより放射方向内方側である図の矢印H方向に戻る形
で、図13(c)に示すように、主筋37aの内側に復
元配置する。
In this way, the force distribution muscles 37 engaged with the hooks 191 of all the steps of the force distribution muscle receiving jig 17 set previously.
When b is welded to the main bar 37a and the work for connecting the force distribution muscles for one cycle is completed, the force distribution receiving jig 17 is then connected to the main bar 37a (that is, during assembly) as shown in FIG. 13 (c). Separate it from the reinforced basket 37). For this, each force receiving jig 1
Release the hydraulic jack (not shown) that suspends 7,
Each of the force distribution receiving jigs 17 is moved slightly downward. Then, the distribution force receiving jig 17 immediately causes the main bar 3 to move.
As shown in FIG. 13 (c), it is restored and arranged inside the main bar 37a so as to return to the direction of the arrow H in the figure, which is the inner side of the radial direction from 7a.

【0036】このようにして、配力筋受け治具17の全
ての段の掛け具191の分だけ配力筋37bを主筋37
aに接続する作業を行うと、該配力筋受け治具17の長
さに対応した分だけの鉄筋籠組立作業が進行したことに
なる。そこで、このように配力筋受け治具17を用いて
鉄筋籠37を組み立てる作業を行いながら、所定のサイ
クルで、昇降装置54を駆動し、ワイヤドラム56から
ワイヤ11を繰り出していく形で、下部フレーム枠9を
縦穴3中に少しづつ下降させていく。すると、下部フレ
ーム枠9上に搭載保持された形で、該下部フレーム枠9
と上部ゲージディスク52及び下部ゲージディスク7の
間にセットされている所定本数の主筋37aは、先に述
べたように、該主筋37aに接続された配力筋37bと
共に、鉄筋籠37の組立済部分として、縦穴3内に降ろ
されていく。従って、坑口3a付近の地面2a上で作業
員が昇降装置54を駆動操作することによって、主筋3
7aと配力筋37bを、鉄筋籠37にした状態で、縦穴
3内に建て込む作業を行うことが出来る。なお、こうし
て鉄筋籠37の組立済部分を、縦穴3内に降ろしていく
際に、該鉄筋籠37を形成している各主筋37aは、上
部ゲージディスク52及び下部ゲージディスク7の各主
筋配置部71X、71に対して相対的に下降移動する形
になり、このときに、該それぞれの主筋配置部71X、
71にはストッパ72X、72が設けられていることに
よって、それぞれの主筋37aは主筋配置部71X、7
1から放射方向外側に外れることなく、円滑に上部ゲー
ジディスク52及び下部ゲージディスク7に対して下降
移動することが出来る。また、主筋37aが下降して、
該主筋37aの上端が上部ゲージディスク52の主筋配
置部71Xから下方に外れても、該主筋37aは該上部
ゲージディスク52の下方にある下部ゲージディスク7
の主筋配置部71によりガイドされるので、主筋37a
のガイドが極力広い範囲に亙って可能なので都合がよ
い。
In this way, the distribution muscles 37b are provided as the main reinforcements 37 by the amount of the hooks 191 on all the steps of the distribution muscle receiving jig 17.
When the work for connecting to a is performed, it means that the rebar cage assembling work has proceeded by the amount corresponding to the length of the force distribution receiving jig 17. Therefore, while performing the work of assembling the reinforcing bar cage 37 using the force distribution receiving jig 17 in this manner, the lifting device 54 is driven and the wire 11 is paid out from the wire drum 56 in a predetermined cycle. The lower frame 9 is gradually lowered into the vertical hole 3. Then, the lower frame 9 is mounted and held on the lower frame 9.
The predetermined number of main bars 37a set between the upper gauge disk 52 and the lower gauge disk 7 and the distribution bars 37b connected to the main bars 37a are already assembled to the rebar cage 37, as described above. As a part, it is lowered into the vertical hole 3. Therefore, when the worker drives and operates the lifting device 54 on the ground 2a near the pit entrance 3a, the main bar 3
It is possible to perform the work of building in the vertical hole 3 in a state where the reinforcing bar 37 is formed by the 7a and the distribution muscle 37b. When the assembled portion of the reinforcing bar cage 37 is lowered into the vertical hole 3 in this way, the main reinforcing bars 37a forming the reinforcing bar cage 37 are the main reinforcing bar arrangement portions of the upper gauge disk 52 and the lower gauge disk 7. 71X, 71, so that it moves downward relative to each other.
Since the stoppers 72X and 72 are provided at 71, the respective main bars 37a can be connected to the main bar placement portions 71X and 7X.
It is possible to smoothly move downward with respect to the upper gauge disc 52 and the lower gauge disc 7 without coming off from the outer side in the radial direction. Also, the main bar 37a descends,
Even if the upper end of the main bar 37a is disengaged downward from the main bar arrangement portion 71X of the upper gauge disc 52, the main bar 37a is located below the upper gauge disc 52.
The main bar 37a is guided by the main bar arrangement portion 71 of
It is convenient because the guide can be used over as wide a range as possible.

【0037】その後、下部フレーム枠9側を介して既に
搭載されている主筋37aの上端が、上部ゲージディス
ク52と下部ゲージディスク7の間に位置した際に、更
に前記主筋吊り具21を介して新たな主筋37aを、3
本づつ、今度は上部ゲージディスク52のみにセットし
ていく。上部ゲージディスク52のみにセットされた主
筋37aは、該主筋37aの下端が、既に搭載されてい
る主筋37aの上端に整合対応されるようになるまで、
上部ゲージディスク52の主筋配置部71Xによりガイ
ドされる形で、そのまま主筋吊り具21を介して降下さ
れる。そして、これら整合対応された主筋37a、37
aは図示しないカップラ等を介して順次接合していく。
所定本数の新たな主筋37aを接合した後、昇降装置5
4の駆動操作によって下部フレーム枠9を下降させなが
ら、これら新たに接合された主筋37aに配力筋37b
を接続して、鉄筋籠37を更に延長して組み立てる作業
を行う。このようにして、所定配筋本数の新たな主筋3
7aを、その各々の配筋位置に対応させた形で上部ゲー
ジディスク52の主筋配置部71Xにセットし、セット
したこれら主筋37aを既に搭載されている主筋37a
の上に接合し、該所定本数の新たな主筋37aに配力筋
37bを接続して、鉄筋籠37を延長して組み立てなが
ら、昇降装置54の駆動操作によって下部フレーム枠9
を鉄筋籠37を組み立てた長さ分づつ下降させていく、
即ち組み立てられた鉄筋籠37を順次縦穴3に送りこむ
作業を、所定のサイクルで繰り返すことによって、縦穴
3に主筋37aと配力筋37bを、これ等を接続した鉄
筋籠37の状態で建て込むことが出来る。すると、当該
鉄筋籠組立及び建て込み作業を坑口3a付近の地面2a
上で行うことが出来、鉄筋組立のために縦穴3の坑内に
作業員が降りたり、縦穴3上に足場を仮設して高所作業
を行う必要がない。
After that, when the upper end of the main bar 37a already mounted via the lower frame frame 9 side is located between the upper gauge disc 52 and the lower gauge disc 7, the main bar suspension 21 is further inserted. 3 new main muscles 37a
One by one, this time set only on the upper gauge disc 52. The main bar 37a set only on the upper gauge disc 52 is aligned until the lower end of the main bar 37a is aligned with the upper end of the already mounted main bar 37a.
While being guided by the main bar arrangement portion 71X of the upper gauge disc 52, the main gauge disc 52 is lowered through the main bar suspension 21 as it is. Then, the main bars 37a, 37 to which these alignments are made correspond
a is sequentially joined via a coupler or the like (not shown).
After joining a predetermined number of new main bars 37a, the lifting device 5
While lowering the lower frame 9 by the drive operation of 4, the force distribution muscles 37b are added to the newly joined main muscles 37a.
, And the rebar cage 37 is further extended and assembled. In this way, the new main bars 3 with a predetermined number of bars are arranged.
7a are set in the main bar arrangement portion 71X of the upper gauge disc 52 in a form corresponding to the respective bar arrangement positions, and the set main bars 37a are already mounted on the main bar 37a.
The lower frame frame 9 by driving the elevating device 54 while joining the upper part and connecting the distribution bars 37b to the predetermined number of new main bars 37a to extend and assemble the reinforcing bar cage 37.
Is lowered by the length of the assembled rebar cage 37,
That is, by repeating the work of sequentially sending the assembled rebar cages 37 to the vertical holes 3 in a predetermined cycle, the main bars 37a and the force distribution bars 37b are built in the vertical holes 3 in the state of the rebar cages 37 connecting these. Can be done. Then, the rebar cage assembling and building work is performed on the ground 2a near the wellhead 3a.
It is possible to perform the above work, and it is not necessary for a worker to get down in the pit of the vertical hole 3 for assembling the reinforcing bar or to perform a work at a high position by temporarily installing a scaffold on the vertical hole 3.

【0038】さらに、このようにして、所定長さ分の鉄
筋籠37を、組立済状態で、縦穴37に建て込み設置す
ると、該鉄筋建て込みのために縦穴3を下降させた下部
フレーム枠9は、図11に示すように、穴底3bに到達
する。これによって、下部フレーム枠9の載置脚9aを
介して、鉄筋籠37が穴底3bに支持された形になる。
その後、穴底3bにいる作業員により、下部フレーム枠
9の鉄筋支持治具32の締結部材35を取外し、治具本
体33と穴底3bとの間の作業間隔SKを利用する形で
治具本体33を取り外し回収する。すると、下部フレー
ム枠9に保持されていた主筋37aの下端部位37cの
水平部位に対して、これを支持していたものが無くなる
ので、主筋37aは落下して下端部位37cの水平部位
が穴底3bに載る(なお、治具本体33は、主筋37a
の下端部位37cに敷かれる形で回収できない場合もあ
る。)。次いで、昇降装置54を駆動して下部フレーム
枠9を上昇させると、主筋37aの、主筋端部保持部3
1による保持が既に解除されているので、下部フレーム
枠9は、これら主筋37aを置き去りにする形で上昇さ
れ回収される。つまり、下部フレーム枠9を構成する部
材は殆ど回収され、従って他の現場での転用などが可能
になるので都合がよい。
Further, when the reinforcing bar cage 37 of a predetermined length is assembled and installed in the vertical hole 37 in this manner, the lower frame frame 9 in which the vertical hole 3 is lowered for the reinforcing bar to be installed. Reaches the hole bottom 3b as shown in FIG. As a result, the reinforcing bar cage 37 is supported by the hole bottom 3b via the mounting legs 9a of the lower frame 9.
After that, an operator at the bottom 3b of the hole removes the fastening member 35 of the reinforcing bar supporting jig 32 of the lower frame 9, and the working space SK between the jig body 33 and the bottom 3b of the jig is used. The main body 33 is removed and collected. Then, since the horizontal portion of the lower end portion 37c of the main bar 37a held by the lower frame frame 9 loses what supports it, the main bar 37a falls and the horizontal portion of the lower end part 37c is opened at the bottom of the hole. 3b (it should be noted that the jig body 33 has a main bar 37a).
In some cases, it cannot be collected in the form of being laid on the lower end portion 37c. ). Next, when the elevating device 54 is driven to raise the lower frame frame 9, the main bar end holding portion 3 of the main bar 37a.
Since the holding by 1 has already been released, the lower frame 9 is raised and recovered with these main bars 37a left behind. That is, most of the members constituting the lower frame 9 are recovered, and therefore, they can be diverted to other sites, which is convenient.

【0039】次いで、鉄筋建て込み装置5を縦穴3から
撤去すれば、直ちに該縦穴3にコンクリートを打設する
作業を行うことが出来る。また、撤去した鉄筋建て込み
装置5を、未だ鉄筋籠37が建て込みされていない縦穴
3に転用し、新たな鉄筋建て込み作業を開始することが
出来る。従って、施工効率が良く、杭施工を行うことが
出来る。なお、こうした鉄筋建て込み装置5の移設や、
先に述べた主筋37aの鉄筋建て込み装置5へのセット
には、クレーン車40を使用するが、鉄筋建て込み装置
5は、鉄筋籠37を保持していない状態で設置或いは移
設され、また、主筋37aのセットは3本づつ行われる
ので、該クレーン車40は小型のもので十分である。ま
た、鉄筋籠37は、坑口3a付近で組み立てられる形
で、その組立以前には、主筋37aと半円形の配力筋3
7bを、寝かせた状態で重ねて保管しておくことが出来
る。よって、こうしたクレーン車40の設置や主筋37
a、配力筋37b等の鉄筋の保管のために、広範な場所
が占有されることはない。
Next, by removing the reinforcing bar building device 5 from the vertical hole 3, it is possible to immediately perform the work of placing concrete in the vertical hole 3. Further, the removed reinforcing bar building device 5 can be diverted to the vertical hole 3 in which the reinforcing bar cage 37 has not been built yet, and a new reinforcing bar building work can be started. Therefore, the construction efficiency is good and the pile construction can be performed. In addition, such relocation of the reinforcing bar building device 5,
A crane truck 40 is used to set the main bar 37a to the reinforcing bar building device 5 described above, but the reinforcing bar building device 5 is installed or relocated without holding the reinforcing bar cage 37, and Since the main bars 37a are set in groups of three, a small crane vehicle 40 is sufficient. The rebar cage 37 is assembled near the wellhead 3a, and before the assembly, the main bar 37a and the semicircular force distribution bar 3 are assembled.
7b can be stacked and stored in a lying state. Therefore, installation of such a crane truck 40 and the main line 37
a, a wide area is not occupied for the storage of the reinforcing bars such as the power distribution muscles 37b.

【0040】なお、上述した実施例においては、円柱形
状の縦穴3にその側壁3cに沿った円筒状の鉄筋籠37
を建て込みする例を述べたが、縦穴3及び鉄筋籠37の
形状は、これに限定されるものではない。従って、縦穴
3の真中部分にも鉄筋籠37等の鉄筋組立体を建て込み
しても構わない。また、その全体形状が板状をなす鉄筋
組立体を壁状の縦穴に建て込みしても構わない。
In the above-described embodiment, the cylindrical rebar cage 37 along the side wall 3c of the cylindrical vertical hole 3 is formed.
However, the shapes of the vertical hole 3 and the reinforcing bar cage 37 are not limited to this. Therefore, a reinforcing bar assembly such as the reinforcing bar cage 37 may be built in the center of the vertical hole 3. Further, a reinforcing bar assembly having a plate shape as a whole may be built in the wall-shaped vertical hole.

【0041】また、本発明による鉄筋建て込み装置は、
主筋を束ねて建て込む場合にも適用できる。但し、その
場合には下部ゲージディスク7、上部ゲージディスク5
2、主筋端部保持部31のフランジ部9cは上述した実
施例と異なった形で構成される。例えば、主筋37aを
鉄筋籠37の周方向に並ぶ形で2本づつ束ねて建て込む
場合には、下部ゲージディスク7Pは、図15に示すよ
うに、前記下部ゲージディスク7と略同様の複数の主筋
配置部71が、該下部ゲージディスク7Pの外周に沿っ
て所定のピッチ毎に形成されている。但し各主筋配置部
71には、該主筋配置部71を、周方向に並んだ2つの
部位71a、71aに分割する形で仕切る仕切板74が
設けられており、これら部位71a、71aに主筋37
a、37aが、それぞれ1本づつ収容自在になってい
る。つまり、1つの主筋配置部71の部位71a、71
aに収容された主筋37a、37aは、束ねられた状態
になっている。なお、下部ゲージディスク7Pには適宜
なストッパ72が、各主筋配置部71ごとに2つづつ、
即ち1つの主筋配置部71の各部位71aごとに1つづ
つ設けられている。また、下部ゲージディスク7Pと略
同様に上部ケージディスク52Pは、図17に示すよう
に、複数の主筋配置部71Xが、該上部ケージディスク
52Pの外周に沿って所定のピッチ毎に形成されてい
る。但し各主筋配置部71Xには、該主筋配置部71X
を、周方向に並んだ2つの部位71Xa、71Xaに分
割する形で仕切る仕切板74Xが設けられており、これ
ら部位71Xa、71Xaに主筋37a、37aが、そ
れぞれ1本づつ収容自在になっている。つまり、1つの
主筋配置部71Xの部位71Xa、71Xaに収容され
た主筋37a、37aは、束ねられた状態になってい
る。なお、上部ゲージディスク52Pには適宜なストッ
パ72Xが、各主筋配置部71Xごとに2つづつ、即ち
1つの主筋配置部71Xの各部位71Xaごとに1つづ
つ設けられている。また主筋端部保持部31のフランジ
部9cPは、図19に示すように、その外周に沿って所
定のピッチ毎に主筋配置部9sが形成されている。主筋
配置部9sには仕切板等は設けられていないが、1つの
主筋配置部9sに2本の主筋37aが保持されるように
なっている。そして、上述した下部ゲージディスク7
P、上部ケージディスク52P、フランジ部9cP間に
おいて、主筋配置部71の位置と主筋配置部71Xの位
置、及び主筋配置部9sの位置は上下方向に対応整合し
ている。上述した下部ゲージディスク7P、上部ケージ
ディスク52P、フランジ部9cPを採用することによ
り、主筋37aを鉄筋籠37の周方向に並ぶ形で2本づ
つ束ねて建て込む作業が容易に行えるようになる。な
お、下部ゲージディスク7Pの主筋配置部71、上部ケ
ージディスク52Pの主筋配置部71X、フランジ部9
cPの主筋配置部9sにそれぞれ主筋37aを1本づつ
のみ保持させることにより、主筋37aを束ねずに建て
込む作業も容易に行える。
Further, the reinforcing bar building device according to the present invention is
It can also be applied when bundling main bars. However, in that case, the lower gauge disc 7 and the upper gauge disc 5
2. The flange portion 9c of the main bar end holding portion 31 is configured differently from the above-described embodiment. For example, in the case where two main bars 37a are lined up in the circumferential direction of the rebar cage 37 and built, the lower gauge discs 7P include a plurality of substantially the same as the lower gauge discs 7 as shown in FIG. The main bar arrangement portions 71 are formed along the outer circumference of the lower gauge disk 7P at predetermined pitches. However, a partition plate 74 for partitioning the main reinforcement placement portion 71 into two portions 71a, 71a arranged side by side in the circumferential direction is provided in each main reinforcement placement portion 71, and the main reinforcement 37 is provided in these portions 71a, 71a.
Each of a and 37a can be accommodated one by one. That is, the parts 71a, 71 of the one main bar placement portion 71
The main bars 37a, 37a housed in a are in a bundled state. It should be noted that the lower gauge disc 7P has two appropriate stoppers 72 for each main bar placement portion 71,
That is, one is provided for each part 71a of one main bar placement portion 71. Further, as in the lower gauge disc 7P, the upper cage disc 52P has a plurality of main bar arrangement portions 71X formed at predetermined pitches along the outer periphery of the upper cage disc 52P, as shown in FIG. . However, each main bar placement section 71X has
Is provided with a partition plate 74X for partitioning into two parts 71Xa, 71Xa arranged side by side in the circumferential direction, and main bars 37a, 37a can be accommodated in these parts 71Xa, 71Xa, respectively. . That is, the main bars 37a and 37a housed in the parts 71Xa and 71Xa of the one main bar arrangement portion 71X are in a bundled state. It should be noted that the upper gauge disk 52P is provided with two appropriate stoppers 72X for each main bar arrangement portion 71X, that is, one for each part 71Xa of one main bar arrangement portion 71X. Further, as shown in FIG. 19, the flange portion 9cP of the main bar end holding portion 31 has main bar arrangement portions 9s formed along the outer periphery thereof at predetermined pitches. No partition plate or the like is provided in the main reinforcement placement portion 9s, but one main reinforcement placement portion 9s holds two main reinforcements 37a. And the lower gauge disc 7 described above
Between P, the upper cage disc 52P, and the flange portion 9cP, the positions of the main reinforcement placement portion 71, the main reinforcement placement portion 71X, and the positions of the main reinforcement placement portion 9s are aligned in the vertical direction. By adopting the lower gauge disc 7P, the upper cage disc 52P, and the flange portion 9cP described above, it is possible to easily carry out the work of bundling the two main reinforcements 37a in a line in the circumferential direction of the reinforcing cage 37. In addition, the main bar arrangement portion 71 of the lower gauge disk 7P, the main bar arrangement portion 71X of the upper cage disk 52P, and the flange portion 9
By holding only one main bar 37a at each main bar arrangement portion 9s of the cP, the work of building the main bar 37a without bundling can be easily performed.

【0042】また、例えば、主筋37aを鉄筋籠37の
放射方向に並ぶ形で2本づつ束ねて建て込む場合には、
下部ゲージディスク7Qは、図16に示すように、前記
下部ゲージディスク7と略同様の複数の主筋配置部71
が、該下部ゲージディスク7Qの外周に沿って所定のピ
ッチ毎に形成されている。但し各主筋配置部71には、
放射方向に並んだ形で主筋37a、37aが収容自在に
なっている。つまり、1つの主筋配置部71に収容され
た主筋37a、37aは、束ねられた状態になってい
る。なお、下部ゲージディスク7Qには適宜なストッパ
72が、各主筋配置部71ごとに設けられている。ま
た、下部ゲージディスク7Qと略同様に上部ケージディ
スク52Qは、図18に示すように、複数の主筋配置部
71Xが、該上部ケージディスク52Qの外周に沿って
所定のピッチ毎に形成されている。但し各主筋配置部7
1Xには、放射方向に並んだ形で主筋37a、37aが
収容自在になっている。つまり、1つの主筋配置部71
Xに収容された主筋37a、37aは、束ねられた状態
になっている。なお、上部ゲージディスク52Qには適
宜なストッパ72Xが、各主筋配置部71Xごとに設け
られている。また主筋端部保持部31のフランジ部9c
Qは、図20に示すように、その外周に沿って所定のピ
ッチ毎に主筋配置部9sが形成されている。1つの主筋
配置部9sには2本の主筋37aが保持されるようにな
っている。そして、上述した下部ゲージディスク7Q、
上部ケージディスク52Q、フランジ部9cQ間におい
て、主筋配置部71の位置と主筋配置部71Xの位置、
及び主筋配置部9sの位置は上下方向に対応整合してい
る。なお、フランジ部9cQを有した主筋端部保持部3
1における、束ねられた主筋37a、37aの保持状態
は、図21に示すように、例えば主筋37a、37aの
下端部位37c、37cの屈曲した水平部位が互いに上
下に重なった形で配置される。上述した下部ゲージディ
スク7Q、上部ケージディスク52Q、フランジ部9c
Qを採用することにより、主筋37aを鉄筋籠37の放
射方向に並ぶ形で2本づつ束ねて建て込む作業が容易に
行えるようになる。なお、下部ゲージディスク7Qの主
筋配置部71、上部ケージディスク52Qの主筋配置部
71X、フランジ部9cQの主筋配置部9sにそれぞれ
主筋37aを1本づつのみ保持させることにより、主筋
37aを束ねずに建て込む作業も容易に行える。
In addition, for example, in the case where two main bars 37a are lined up in the radial direction of the reinforcing bar cage 37 and are assembled in a bundle,
As shown in FIG. 16, the lower gauge disc 7Q includes a plurality of main bar arrangement portions 71 that are substantially the same as the lower gauge disc 7.
Are formed at a predetermined pitch along the outer circumference of the lower gauge disc 7Q. However, in each main bar placement section 71,
The main bars 37a, 37a are housed in a line in the radial direction. That is, the main bars 37a, 37a housed in the one main bar arrangement portion 71 are in a bundled state. It should be noted that the lower gauge disc 7Q is provided with an appropriate stopper 72 for each main bar arrangement portion 71. Further, as in the lower gauge disc 7Q, the upper cage disc 52Q has a plurality of main bar arrangement portions 71X formed along the outer periphery of the upper cage disc 52Q at a predetermined pitch, as shown in FIG. . However, each main bar placement section 7
The main bars 37a, 37a can be accommodated in the 1X in a line in the radial direction. That is, one main bar placement unit 71
The main bars 37a and 37a housed in X are in a bundled state. The upper gauge disc 52Q is provided with an appropriate stopper 72X for each main bar arrangement portion 71X. Further, the flange portion 9c of the main bar end holding portion 31
As shown in FIG. 20, Q has main bar arrangement portions 9s formed along the outer periphery thereof at a predetermined pitch. Two main bars 37a are held in one main bar arrangement portion 9s. Then, the lower gauge disk 7Q described above,
Between the upper cage disc 52Q and the flange portion 9cQ, the position of the main bar arrangement portion 71 and the position of the main bar arrangement portion 71X,
The positions of the main-streak arranging portions 9s are aligned in the vertical direction. In addition, the main bar end holding portion 3 having the flange portion 9cQ
In the holding state of the bundled main muscles 37a, 37a in Fig. 1, for example, the bent horizontal portions of the lower end portions 37c, 37c of the main muscles 37a, 37a are arranged so as to vertically overlap each other, as shown in FIG. Lower gauge disc 7Q, upper cage disc 52Q, flange portion 9c described above.
By adopting Q, the work of assembling the main bars 37a by bundling two main bars 37a in a line in the radial direction of the reinforcing bar cage 37 can be easily performed. In addition, by holding only one main bar 37a at each of the main bar placement part 71 of the lower gauge disc 7Q, the main bar placement part 71X of the upper cage disc 52Q, and the main bar placement part 9s of the flange part 9cQ, the main bars 37a are not bundled. You can easily build it.

【0043】[0043]

【発明の効果】以上説明したように本発明のうち第1の
発明によれば、地面2a等の地面から掘り下げられた縦
穴3等の縦穴に、複数の主筋37a等の主筋と配力筋3
7b等の配力筋によるコンクリート補強用の鉄筋籠37
等の鉄筋組立体を建て込む際に使用する鉄筋建て込み装
置において、フレーム本体6a等のフレーム本体を有
し、前記フレーム本体の周囲に設置脚60等の複数の設
置手段を、梁ユニット62等の接続梁部材を介してそれ
ぞれ設け、前記接続梁部材は、前記各設置手段と前記フ
レーム本体との間を接続する梁本体62a等の梁部材本
体及び、該梁部材本体に、該梁部材本体を補強する形で
着脱自在に設けられた補強板部材63等の補強部材から
なり、前記フレーム本体に主筋配筋手段70等の主筋配
筋手段を設け、前記主筋配筋手段に複数の主筋配置部7
1、71X等の主筋ガイド部を、前記主筋を上下方向に
それぞれガイドし得るように設け、前記主筋配筋手段の
下方に下部フレーム枠9等の主筋保持手段を、上下に移
動自在に設け、前記主筋保持手段に主筋端部保持部31
等の主筋端部保持部を、前記主筋配筋手段の主筋ガイド
部に対応した形で設け、前記フレーム本体に昇降装置5
4等の昇降装置を、前記主筋保持手段を上下に移動駆動
位置決め自在に設けて構成されるので、主筋保持手段に
よって所定の配筋状態に保持された複数の主筋に、複数
の配力筋を接続していく作業により鉄筋組立を行い、ま
た、主筋保持手段を下方に移動させることによって該組
み立てられた鉄筋組立体の建て込み作業を行うことが出
来る。ところで、前記接続梁部材は、梁部材本体及び補
強部材からなっており、補強部材は梁部材本体に対して
着脱自在である。よって、本発明による鉄筋建て込み装
置は、現場への搬入などの運搬時には、補強部材を梁部
材本体から取外して別個に運搬することにより、梁部材
本体側の重量は極力小さくなる。従って、例えば施工現
場が山岳地などであったりする場合にも、該鉄筋建て込
み装置の現場への搬入作業が極力容易に行えるようにな
る。また、鉄筋建て込み装置の分解され得るパーツ数を
極力削減し、組立・分解時の手間をはぶき工事の能率を
高めることが望まれており、そのために設置手段とフレ
ーム本体とを梁部材本体を介して分解されない一体の部
材とすることが考えられる。本発明では、上述したよう
に梁部材本体側の重量が極力小さくなっているので、設
置手段とフレーム本体と梁部材本体による一体の部材の
大重量化が極力避けられている。つまり、本発明ではパ
ーツ数を極力削減することが容易に実現できる。
As described above, according to the first aspect of the present invention, a plurality of main reinforcements 37a and other main reinforcements and power distribution reinforcements 3 are provided in vertical holes such as vertical holes 3 dug down from the ground such as the ground 2a.
Reinforcing bar cage 37 for concrete reinforcement by force distribution bars such as 7b
In a reinforcing bar building apparatus used when building a reinforcing bar assembly such as a frame unit, a frame unit such as a frame unit 6a is provided, and a plurality of installation means such as installation legs 60 are provided around the frame unit, a beam unit 62, etc. Beam member main bodies such as a beam main body 62a for connecting between each of the installation means and the frame main body, and the beam member main body to the beam member main body. The frame body is provided with main reinforcing bar arrangement means such as main reinforcing bar arrangement means 70, and the main reinforcing bar arrangement means has a plurality of main reinforcement arrangements. Part 7
1, 71X or the like main bar guide portions are provided so as to be able to respectively guide the main bar in the vertical direction, and main bar holding means such as a lower frame frame 9 is provided below the main bar arranging means so as to be movable up and down. The main bar end holding portion 31 is provided in the main bar holding means.
Main bar end holding parts such as the above are provided in a form corresponding to the main bar guide part of the main bar arranging means, and the lifting device 5 is attached to the frame body.
Since an elevating device such as 4 is provided by vertically moving and positioning the main bar holding means, the main bar holding means is provided with a plurality of force distribution bars on a plurality of main bars held in a predetermined bar arrangement state. Reinforcing bars can be assembled by the connecting work, and the assembled reinforcing bar assembly can be built by moving the main reinforcing bar holding means downward. By the way, the connection beam member includes a beam member main body and a reinforcing member, and the reinforcing member is detachable from the beam member main body. Therefore, in the reinforcing bar building apparatus according to the present invention, when the reinforcing member is detached from the beam member main body and conveyed separately when it is transported to the site, the weight on the beam member main body side is reduced as much as possible. Therefore, for example, even when the construction site is in a mountainous area, the work of bringing the reinforcing bar building device into the site can be performed as easily as possible. In addition, it is desired to reduce the number of parts that can be disassembled in the reinforcing bar erection device as much as possible and to increase the efficiency of construction work by removing the labor at the time of assembling and disassembling. It is conceivable to make it an integral member that is not disassembled through. In the present invention, since the weight of the beam member main body side is as small as possible as described above, it is possible to avoid increasing the weight of the integrated member of the installation means, the frame main body and the beam member main body as much as possible. That is, according to the present invention, it is possible to easily reduce the number of parts as much as possible.

【0044】また本発明のうち第2の発明は、第1の発
明による鉄筋建て込み装置において、前記接続梁部材
は、断面の長手方向を上下方向に向けて配置した板状部
材からなる。即ち、接続梁部材は、構造上、その強度を
極力維持しつつ、その水平方向の厚さを極力小さくして
いる。従って、第1の発明による効果に加えて、設置手
段とフレーム本体との間に存在する複数の主筋と、接続
梁部材との干渉が極力防止され(即ち、隣接する主筋間
に接続梁部材が配置され)、主筋の設置の際など都合が
よい。
A second aspect of the present invention is the reinforcing bar building apparatus according to the first aspect, wherein the connecting beam member is a plate-shaped member having a longitudinal section in a vertical direction. That is, the connecting beam member is structurally designed to maintain its strength as much as possible, while its horizontal thickness is made as small as possible. Therefore, in addition to the effect of the first invention, interference between the plurality of main bars existing between the installation means and the frame body and the connection beam member is prevented as much as possible (that is, the connection beam member is provided between the adjacent main bars). It is convenient when installing the main bar.

【0045】また本発明のうち第3の発明は、地面2a
等の地面から掘り下げられた縦穴3等の縦穴に、複数の
主筋37a等の主筋と配力筋37b等の配力筋によるコ
ンクリート補強用の鉄筋籠37等の鉄筋組立体を建て込
む際に使用する鉄筋建て込み装置において、フレーム6
等のフレームを有し、前記フレームに主筋配筋手段70
等の主筋配筋手段を設け、前記主筋配筋手段に複数の主
筋配置部71、71X等の主筋ガイド部を、前記主筋を
上下方向にそれぞれガイドし得るように設け、前記フレ
ーム上に、ワイヤ11等のワイヤを繰り出し・巻取り自
在なウインチユニット53等のウインチユニット及び、
該ウインチユニットからのワイヤが接続されたワイヤ支
持手段44等のワイヤ支持手段を設け、前記フレームの
ワイヤ支持手段の下方に、収納空間65等の吊下用動滑
車収納空間を、上下方向に貫通した形で形成し、前記ワ
イヤに滑車10等の吊下用動滑車を、前記ウインチユニ
ットと前記ワイヤ支持手段とにより、前記吊下用動滑車
収納空間と前記フレームの下方との間を上下方向に昇降
駆動自在に吊下し、前記吊下用動滑車に下部フレーム枠
9等の主筋保持手段を吊下し、前記主筋保持手段に主筋
端部保持部31等の主筋端部保持部を、前記主筋配筋手
段の主筋ガイド部に対応した形で設けて構成されるの
で、主筋保持手段によって所定の配筋状態に保持された
複数の主筋に、複数の配力筋を接続していく作業により
鉄筋組立を行い、また、主筋保持手段を下方に移動させ
ることによって該組み立てられた鉄筋組立体の建て込み
作業を行うことが出来る。ところで、吊下用動滑車はフ
レームの吊下用動滑車収納空間に収納され得るようにな
っているので、鉄筋建て込み装置を運搬するような場合
には、吊下用動滑車を吊下用動滑車収納空間に収納した
状態で、従って極力コンパクトな状態で運搬できるの
で、鉄筋建て込み装置の現場への搬入作業が極力容易に
行える。例えば、組立・解体時に吊下用動滑車をフレー
ムの吊下用動滑車収納空間に収納するので、ウインチユ
ニット側が、吊下用動滑車やワイヤを敷き込むようなこ
とがなく容易に扱うことができる。
The third aspect of the present invention is the ground 2a.
Used when building a reinforcing bar assembly such as a reinforcing bar cage 37 for concrete reinforcement by a plurality of main reinforcing bars 37a and distribution reinforcing bars 37b in vertical holes such as vertical holes 3 dug from the ground. In the reinforcing bar building device, the frame 6
Etc., and the main muscle arrangement means 70 is provided in the frame.
Main bar arranging means such as a main bar arranging means, and a plurality of main bar arranging parts 71, 71X and other main bar guide portions are provided in the main bar arranging means so as to be able to respectively guide the main bar in the vertical direction. A winch unit, such as a winch unit 53, that can feed and wind a wire such as 11 and the like, and
A wire support means such as a wire support means 44 to which a wire from the winch unit is connected is provided, and a hanging movable pulley storage space such as a storage space 65 is vertically penetrated below the wire support means of the frame. The wire is provided with a hanging pulley, such as a pulley 10, and the winch unit and the wire support means vertically move between the hanging pulley housing space for hanging and the lower portion of the frame. The main bar holding means such as the lower frame frame 9 is hung on the hanging movable pulley, and the main bar end holding parts such as the main bar end holding parts 31 are attached to the main bar holding means. Since it is provided in a shape corresponding to the main bar guide portion of the main bar arranging means, a work of connecting a plurality of force arranging bars to a plurality of main bars held in a predetermined bar arrangement state by the main bar retaining means. Assemble the rebar by , It can be performed like an anchor working of the assembled reinforcement assembly by moving the main reinforcements holding means downward. By the way, the suspension pulley is designed so that it can be stored in the suspension suspension storage space of the frame. Since it can be carried in the movable pulley storage space in a compact state as much as possible, it is possible to carry in the reinforcing bar building device to the site as easily as possible. For example, since the hanging pulley is stored in the hanging pulley storage space of the frame during assembly and disassembly, the winch unit side can easily handle without hanging the hanging pulley or wire. it can.

【0046】また本発明のうち第4の発明は、第3の発
明による鉄筋建て込み装置において、前記ウインチユニ
ットはワイヤドラム56等のワイヤドラムを有してお
り、前記ワイヤドラムには、ワイヤ巻き部56b、56
b等の2つのワイヤ巻取り部が、該ワイヤドラムの回転
軸KJ等の回転軸方向に並列して形成されており、前記
各ワイヤ巻取り部には、ワイヤの始端側と終端側とがそ
れぞれ繰り出し・巻取り自在に設けられており、前記各
ワイヤ巻取り部の前記ワイヤは、前記吊下用動滑車の前
記吊下用動滑車収納空間内への収納時に、該ワイヤの巻
取り位置KD等の巻取り位置が前記ワイヤドラムの内方
に向かうように巻かれている。即ち、ワイヤの始端側と
終端側とがそれぞれ2つのワイヤ巻取り部に別個に巻か
れているので、これらワイヤ間の間隔等が不用意に狭ま
ることが極力防止されている。また、吊下用動滑車の収
納時、従って吊下用動滑車がワイヤドラムに接近する際
には、各ワイヤ巻取り部においてワイヤの巻取り位置が
ワイヤドラムの内方に向かうので、これらワイヤ間の間
隔等が不用意に広がることが極力防止されている。つま
り、第3の発明による効果に加えて、フリートアングル
が極力適切にとれるようになっているので、脱索や乱巻
が極力防止され都合がよい。
A fourth aspect of the present invention is the reinforcing bar building apparatus according to the third aspect, wherein the winch unit has a wire drum such as a wire drum 56, and the wire drum is wound around the wire drum. Parts 56b, 56
Two wire winding portions such as b are formed in parallel in the rotation axis direction of the rotation axis KJ of the wire drum, and each wire winding portion has a wire start end side and a wire end side. Each of the wires of the wire winding portion is provided so as to be able to be unwound and wound, and a winding position of the wire when the hanging pulley is stored in the hanging pulley storage space of the hanging pulley. The winding position of KD or the like is wound so as to face the inside of the wire drum. That is, since the starting end side and the terminating end side of the wire are separately wound around the two wire winding portions, it is possible to prevent the space between the wires from being unintentionally narrowed as much as possible. Further, when the suspension pulley is stored, that is, when the suspension pulley approaches the wire drum, the winding position of the wire in each wire winding portion is directed toward the inside of the wire drum. It is prevented as much as possible from unintentionally widening the space between them. That is, in addition to the effect of the third aspect of the invention, the fleet angle is designed to be as appropriate as possible, which is convenient because derailment and random winding are prevented as much as possible.

【0047】また本発明のうち第5の発明は、第4の発
明による鉄筋建て込み装置において、前記ワイヤドラム
には、前記2つのワイヤ巻取り部を仕切る形で仕切板5
6a等の仕切部が設けられているので、第4の発明によ
る効果に加えて、一方のワイヤ巻取り部のワイヤが他方
のワイヤ巻取り部に誤って巻かれるようなことが、仕切
部により防止されているので都合がよい。
A fifth aspect of the present invention is the reinforcing bar building apparatus according to the fourth aspect of the invention, wherein the wire drum has a partition plate 5 for partitioning the two wire winding portions.
Since the partition portion such as 6a is provided, in addition to the effect of the fourth invention, the partition portion prevents the wire of one wire winding portion from being mistakenly wound around the other wire winding portion. It is convenient because it is prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明による鉄筋建て込み装置の一実
施例を用いて鉄筋建て込み作業を行っている杭施工現場
の様子を示す一部破断斜視図である。
FIG. 1 is a partially cutaway perspective view showing a state of a pile construction site where a reinforcing bar erection work is being performed using an example of a reinforcing bar erection device according to the present invention.

【図2】図2は、図1に示す鉄筋建て込み装置の梁ユニ
ット付近を示す斜視図である。
FIG. 2 is a perspective view showing the vicinity of a beam unit of the reinforcing bar building device shown in FIG.

【図3】図3は、図1に示す鉄筋建て込み装置のフレー
ムを示す側面図である。
FIG. 3 is a side view showing a frame of the reinforcing bar building device shown in FIG. 1.

【図4】図4は、図3のI矢視図である。FIG. 4 is a view on arrow I of FIG.

【図5】図5は、図4に示す上部ゲージディスクのIV矢
視部分の拡大図である。
5 is an enlarged view of a portion of the upper gauge disc shown in FIG. 4, which is viewed in the direction of arrow IV.

【図6】図6は、図3のX1−Y1線断面図である。6 is a sectional view taken along line X1-Y1 of FIG.

【図7】図7は、図6に示す下部ゲージディスクの拡大
図である。
FIG. 7 is an enlarged view of the lower gauge disc shown in FIG.

【図8】図8は、ワイヤドラムと滑車との関係を示した
模式図である。
FIG. 8 is a schematic diagram showing a relationship between a wire drum and a pulley.

【図9】図9は、図3のX2−Y2線断面図である。9 is a sectional view taken along line X2-Y2 of FIG.

【図10】図10は、穴底に載置された状態の下部フレ
ーム枠を示した図である。
FIG. 10 is a diagram showing the lower frame frame mounted on the bottom of the hole.

【図11】図11は、穴底に載置された状態の下部フレ
ーム枠を示した断面拡大図である。
FIG. 11 is an enlarged cross-sectional view showing the lower frame frame mounted on the bottom of the hole.

【図12】図12は、主筋吊り具を示した斜視図であ
る。
FIG. 12 is a perspective view showing a main muscle suspender.

【図13】図13(a)乃至図13(c)は、配力筋の
設置作業の手順を示した図である。
13 (a) to 13 (c) are diagrams showing the procedure of the work of installing the force distribution muscles.

【図14】図14は、図3に示すフレームにおいて、滑
車を収納した状態を示した図である。
FIG. 14 is a diagram showing a state in which a pulley is housed in the frame shown in FIG.

【図15】図15は、別の形で構成された下部ゲージデ
ィスクを示した図である。
FIG. 15 is a view of a lower gauge disc configured in another form.

【図16】図16は、別の形で構成された下部ゲージデ
ィスクを示した図である。
FIG. 16 is a view of a lower gauge disc configured in another form.

【図17】図17は、別の形で構成された上部ゲージデ
ィスクを示した図である。
FIG. 17 is a diagram showing an alternative configuration of the upper gauge disc.

【図18】図18は、別の形で構成された上部ゲージデ
ィスクを示した図である。
FIG. 18 is a diagram showing an alternative top gauge disc.

【図19】図19は、別の形で構成されたフランジ部を
示した図である。
FIG. 19 is a view showing a flange portion configured in another shape.

【図20】図20は、別の形で構成されたフランジ部を
示した図である。
FIG. 20 is a view showing a flange portion configured in another shape.

【図21】図21は、図20に示すフランジ部を有した
下部フレーム枠が穴底に載置された状態を示した断面図
である。
21 is a cross-sectional view showing a state where the lower frame having the flange portion shown in FIG. 20 is placed on the hole bottom.

【符号の説明】[Explanation of symbols]

2a……地面 3……縦穴 5……鉄筋建て込み装置 6……フレーム 6a……フレーム本体 9……主筋保持手段(下部フレーム枠) 10……吊下用動滑車(滑車) 11……ワイヤ 31……主筋端部保持部 37……鉄筋組立体(鉄筋籠) 37a……主筋 37b……配力筋 44……ワイヤ支持手段 53……ウインチユニット 54……昇降装置 56……ワイヤドラム 56a……仕切部(仕切板) 56b……ワイヤ巻取り部(ワイヤ巻き部) 60……設置手段(設置脚) 62……接続梁部材(梁ユニット) 62a……梁部材本体(梁本体) 63……補強板部材(補強部材) 65……吊下用動滑車収納空間(収納空間) 70……主筋配筋手段 71……主筋ガイド部(主筋配置部) 71X……主筋ガイド部(主筋配置部) KJ……回転軸 KD……巻取り位置 2a ... Ground 3 ... Vertical hole 5 ... Reinforcing bar building device 6 ... Frame 6a ... Frame main body 9 ... Main bar holding means (lower frame frame) 10 ... Suspension movable pulley (pulley) 11 ... Wire 31 …… Main bar end holding section 37 …… Reinforcing bar assembly (rebar cage) 37 a …… Main bar 37 b …… Distribution bar 44 …… Wire support means 53 …… Winch unit 54 …… Elevating device 56 …… Wire drum 56 a ...... Partitioning part (partitioning plate) 56b …… Wire winding part (wire winding part) 60 …… Installation means (installation leg) 62 …… Connection beam member (beam unit) 62a …… Beam member body (beam body) 63 …… Reinforcement plate member (reinforcement member) 65 …… Suspended moving pulley storage space (storage space) 70 …… Main bar arrangement means 71 …… Main bar guide part (main bar arrangement part) 71X …… Main bar guide part (main bar arrangement) Part) KJ …… Rotating axis K ...... winding position

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小宮山 茂樹 東京都港区赤坂1丁目6番14号 東京電力 株式会社UHV送変電建設所内 (72)発明者 中井 栄 千葉県流山市駒木518番地1号 三井建設 株式会社技術研究所内 (72)発明者 魚住 雅孝 千葉県流山市駒木518番地1号 三井建設 株式会社技術研究所内 (72)発明者 長野 祐司 千葉県流山市駒木518番地1号 三井建設 株式会社技術研究所内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Shigeki Komiyama 1-6-14 Akasaka, Minato-ku, Tokyo Inside the UHV transmission and transformation substation, Tokyo Electric Power Co., Inc. (72) Sakae Nakai 518-1 Komagaki, Nagareyama-shi, Chiba Prefecture Mitsui Construction Co., Ltd. Technical Research Institute (72) Inventor Masataka Uozumi No. 518 Komagaki, Nagareyama City, Chiba Prefecture Mitsui Construction Co., Ltd. (72) Inventor Yuji Nagano No. 518 Komagaki, Nagareyama City, Chiba Mitsui Construction Co., Ltd. Inside the technical laboratory

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】地面から掘り下げられた縦穴に、複数の主
筋と配力筋によるコンクリート補強用の鉄筋組立体を建
て込む際に使用する鉄筋建て込み装置において、 フレーム本体を有し、 前記フレーム本体の周囲に複数の設置手段を、接続梁部
材を介してそれぞれ設け、 前記接続梁部材は、前記各設置手段と前記フレーム本体
との間を接続する梁部材本体及び、該梁部材本体に、該
梁部材本体を補強する形で着脱自在に設けられた補強部
材からなり、 前記フレーム本体に主筋配筋手段を設け、 前記主筋配筋手段に複数の主筋ガイド部を、前記主筋を
上下方向にそれぞれガイドし得るように設け、 前記主筋配筋手段の下方に主筋保持手段を、上下に移動
自在に設け、 前記主筋保持手段に主筋端部保持部を、前記主筋配筋手
段の主筋ガイド部に対応した形で設け、 前記フレーム本体に昇降装置を、前記主筋保持手段を上
下に移動駆動位置決め自在に設けて構成した鉄筋建て込
み装置。
Claim: What is claimed is: 1. A reinforcing bar building apparatus for use in building a reinforcing bar assembly for concrete reinforcement by a plurality of main bars and distribution bars in a vertical hole dug from the ground, comprising a frame main body, A plurality of installation means are provided around the periphery of each of the installation means via connection beam members, and the connection beam member includes a beam member main body connecting between each installation means and the frame body, and the beam member main body, The beam member main body comprises a reinforcing member that is detachably provided to reinforce the beam member main body, main frame reinforcing means is provided in the frame main body, a plurality of main reinforcing bar guides are provided in the main reinforcing bar arrangement means, and the main bars are vertically arranged. It is provided so that it can be guided, a main bar holding means is provided below the main bar arranging means so as to be movable up and down, and a main bar end holding part is provided in the main bar holding means and a main bar guide part of the main bar arranging means A reinforcing bar embedding device which is provided in a corresponding manner, and in which the elevating device is provided on the frame main body, and the main bar holding means is vertically movable and positionable.
【請求項2】前記接続梁部材は、断面の長手方向を上下
方向に向けて配置した板状部材からなることを特徴とす
る請求項1記載の鉄筋建て込み装置。
2. The reinforcing bar building apparatus according to claim 1, wherein the connecting beam member is a plate-shaped member having a longitudinal direction of a cross section arranged vertically.
【請求項3】地面から掘り下げられた縦穴に、複数の主
筋と配力筋によるコンクリート補強用の鉄筋組立体を建
て込む際に使用する鉄筋建て込み装置において、 フレームを有し、 前記フレームに主筋配筋手段を設け、 前記主筋配筋手段に複数の主筋ガイド部を、前記主筋を
上下方向にそれぞれガイドし得るように設け、 前記フレーム上に、ワイヤを繰り出し・巻取り自在なウ
インチユニット及び、該ウインチユニットからのワイヤ
が接続されたワイヤ支持手段を設け、 前記フレームのワイヤ支持手段の下方に、吊下用動滑車
収納空間を、上下方向に貫通した形で形成し、 前記ワイヤに吊下用動滑車を、前記ウインチユニットと
前記ワイヤ支持手段とにより、前記吊下用動滑車収納空
間と前記フレームの下方との間を上下方向に昇降駆動自
在に吊下し、 前記吊下用動滑車に主筋保持手段を吊下し、 前記主筋保持手段に主筋端部保持部を、前記主筋配筋手
段の主筋ガイド部に対応した形で設けて構成した鉄筋建
て込み装置。
3. A reinforcing bar building apparatus used for building a reinforcing bar assembly for concrete reinforcement by a plurality of main bars and distribution bars in a vertical hole dug from the ground, comprising a frame, and the main bar is provided in the frame. Providing bar arrangement means, a plurality of main bar guide portions in the main bar bar arrangement means, so as to be able to guide the main bar in the vertical direction, respectively, on the frame, a winch unit capable of paying out and winding the wire, and A wire supporting means to which a wire from the winch unit is connected is provided, and a hanging pulley storage space is formed below the wire supporting means of the frame in a vertically penetrating manner. The movable pulley for vertical movement is vertically driven by the winch unit and the wire support means between the suspension movable pulley storage space and the lower portion of the frame. The main reinforcement holding means is suspended on the suspension pulley, and the main reinforcement holding means is provided with a main reinforcement end holding portion in a form corresponding to the main reinforcement guide portion of the main reinforcement arrangement means. Reinforcement building device.
【請求項4】前記ウインチユニットはワイヤドラムを有
しており、 前記ワイヤドラムには、2つのワイヤ巻取り部が、該ワ
イヤドラムの回転軸方向に並列して形成されており、 前記各ワイヤ巻取り部には、ワイヤの始端側と終端側と
がそれぞれ繰り出し・巻取り自在に設けられており、 前記各ワイヤ巻取り部の前記ワイヤは、前記吊下用動滑
車の前記吊下用動滑車収納空間内への収納時に、該ワイ
ヤの巻取り位置が前記ワイヤドラムの内方に向かうよう
に巻かれていることを特徴とする請求項3記載の鉄筋建
て込み装置。
4. The winch unit has a wire drum, and two wire winding portions are formed on the wire drum in parallel with each other in a rotation axis direction of the wire drum. The winding end is provided with a starting end side and a terminating end side of the wire, which can be drawn out and wound up, respectively, and the wire of each of the wire winding parts is the hanging motion of the hanging pulley. The reinforcing bar building apparatus according to claim 3, wherein the wire is wound so that a winding position of the wire is directed toward an inner side of the wire drum when the wire is housed in the pulley housing space.
【請求項5】前記ワイヤドラムには、前記2つのワイヤ
巻取り部を仕切る形で仕切部が設けられていることを特
徴とする請求項4記載の鉄筋建て込み装置。
5. The reinforcing bar building device according to claim 4, wherein the wire drum is provided with a partitioning part for partitioning the two wire winding parts.
JP7306689A 1995-10-31 1995-10-31 Reinforcing steel installation device Pending JPH09125370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7306689A JPH09125370A (en) 1995-10-31 1995-10-31 Reinforcing steel installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7306689A JPH09125370A (en) 1995-10-31 1995-10-31 Reinforcing steel installation device

Publications (1)

Publication Number Publication Date
JPH09125370A true JPH09125370A (en) 1997-05-13

Family

ID=17960132

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7306689A Pending JPH09125370A (en) 1995-10-31 1995-10-31 Reinforcing steel installation device

Country Status (1)

Country Link
JP (1) JPH09125370A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015042833A (en) * 2013-01-23 2015-03-05 辻 八郎 Reinforcement assembly device utilizing shaft, reinforcement assembly method utilizing shaft, and shaft construction method using the method
KR20190007160A (en) * 2017-07-12 2019-01-22 현대건설주식회사 Jig For Pre-Assembling Iron Bar And Assembling Method Using Thereof
CN114482024A (en) * 2022-03-20 2022-05-13 陈政杰 Binding method for reinforcement cage in hollow hole in middle of defected cast-in-place pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015042833A (en) * 2013-01-23 2015-03-05 辻 八郎 Reinforcement assembly device utilizing shaft, reinforcement assembly method utilizing shaft, and shaft construction method using the method
KR20190007160A (en) * 2017-07-12 2019-01-22 현대건설주식회사 Jig For Pre-Assembling Iron Bar And Assembling Method Using Thereof
CN114482024A (en) * 2022-03-20 2022-05-13 陈政杰 Binding method for reinforcement cage in hollow hole in middle of defected cast-in-place pile

Similar Documents

Publication Publication Date Title
US20120291394A1 (en) Grout Template and Method of Use for Wind Turbine Foundations
JP3070657B2 (en) Reinforcing equipment
JPH09125370A (en) Reinforcing steel installation device
JP2858205B2 (en) Reinforcing bar mounting method and rebar mounting device used for the same
JP3068781B2 (en) Reinforcing equipment
JP5160121B2 (en) Pile holder to be attached to ready-made piles
JP3158383U (en) Body reinforcement assembly jig
US8146323B1 (en) Apparatus and method for installing anchor bolts in a cylindrical pier foundation
JP5075398B2 (en) Construction method of tower-like PC structure and tension system device
JP2017043952A (en) Reinforcing bar ground assembly device and reinforcing bar ground assembly method
JP2659170B2 (en) Pole column ground assembly equipment
JP2858206B2 (en) Rebar hanging jig
JP2004036235A (en) Construction method for heightening steel tower
JP3297212B2 (en) Construction method of tower-like structure and supporting structure used for it
JP2001055733A (en) Construction method for underground wall and underground wall structure thereof
JP4017143B2 (en) Shaft rebar assembly method and assembly apparatus
JP4274370B2 (en) Reinforcement apparatus and method for concrete structures
JPH08326014A (en) Structure and method of reinforcing stud made of steel
JP2004076256A6 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP3021199B2 (en) Construction method of chimney inner cylinder and pull jack up device for the construction
JPH1136292A (en) Spiral bar winding device and spiral bar winding method
JP5902513B2 (en) Construction device
JPH06257142A (en) Reinforcement cage installing device and reinforcement cage assembling and installing method using this device
JP6522217B1 (en) Rebar arrangement method for wall rebar, lifting aid device for reinforcing bar material and lifting device
WO2002031285A2 (en) System for lifting and assembling re-bar cages

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees