JPH0895776A - Software process management device - Google Patents

Software process management device

Info

Publication number
JPH0895776A
JPH0895776A JP6234638A JP23463894A JPH0895776A JP H0895776 A JPH0895776 A JP H0895776A JP 6234638 A JP6234638 A JP 6234638A JP 23463894 A JP23463894 A JP 23463894A JP H0895776 A JPH0895776 A JP H0895776A
Authority
JP
Japan
Prior art keywords
information
work
software
state
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6234638A
Other languages
Japanese (ja)
Inventor
Koji Fukushima
康治 福島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Solution Innovators Ltd
Original Assignee
NEC Solution Innovators Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Solution Innovators Ltd filed Critical NEC Solution Innovators Ltd
Priority to JP6234638A priority Critical patent/JPH0895776A/en
Publication of JPH0895776A publication Critical patent/JPH0895776A/en
Pending legal-status Critical Current

Links

Landscapes

  • Stored Programmes (AREA)

Abstract

PURPOSE: To provide the software process management device which can greatly decrease management man-hours and easily maintain the consistency of the operation states and product information of processes by setting the processes in software product generation support tool units and managing their operation states. CONSTITUTION: A process management part 1-1 edits respective pieces of information in a process management file 1-3, containing process names and project names set corresponding to respective use operations of a software product generation support tool group 2-1 and state information showing the operation states of the processes of the respective projects, according to the progress states of the projects, and an alteration management part 1-2 actuates corresponding software product generation support tools according to the state information of the processes to indicate the latest operation.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ソフトウエア工程管理
装置に関し、特に上流工程から下流工程まで一貫してソ
フトウエア開発を支援し、ある工程の作業で作成・更新
したソフトウエアの成果物情報を、後続する工程の作業
で作成・更新するソフトウエアの成果物情報に引用ある
いは参照する統合型ソフトウエア開発支援システムにお
いて、先行する工程の成果物情報と後続する工程の成果
物情報の変更同調を兼ね備えたソフトウエア工程管理装
置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a software process management device, and in particular, it consistently supports software development from upstream processes to downstream processes, and software product information created / updated in the work of a certain process. In the integrated software development support system that cites or refers to the product deliverable information of the software created / updated in the work of the subsequent process, the change synchronization of the product deliverable information of the preceding process and the deliverable product information of the subsequent process The present invention relates to a software process control device having both.

【0002】[0002]

【従来の技術】ある工程の作業で作成・更新したソフト
ウエアの成果物情報を、後続する工程の作業で作成する
ソフトウエアの成果物情報に引用、あるいは参照する統
合型ソフトウエア開発支援システムにおいては、先行す
る工程の作業が完了した後に、後続する工程の作業を開
始する。
2. Description of the Related Art In an integrated software development support system, software product information created / updated in a certain process work is quoted or referenced in software product information created in a subsequent process work. Starts the work of the succeeding process after the work of the preceding process is completed.

【0003】後続する工程の作業開始後に先行する工程
の成果物情報を修正すると、先行する工程の作業で作成
・更新したソフトウエアの成果物情報と後続する工程の
作業で作成・更新したソフトウエアの成果物情報とに矛
盾が生じる可能性がある。
When the product information of the preceding process is corrected after the work of the subsequent process is started, the product information of the software created / updated in the work of the preceding process and the software created / updated in the work of the subsequent process There may be inconsistency with the product information in.

【0004】この矛盾を発生させないための従来の技術
として、特開平4−326467号公報で示されるよう
に、ソフトウエアの成果物情報の論理的な単位である仕
様に状態情報を設け、仕様単位に工程を管理し、作業を
誘導する変更管理方式がある。
As a conventional technique for preventing this contradiction, as shown in Japanese Patent Laid-Open No. 4-326467, state information is provided in the specification which is a logical unit of software product information, and the specification unit is used. There is a change management system that manages the process and guides the work.

【0005】この方式では、仕様の状態情報として″作
業不可能″、″作業中″、″完了″といった区分を設定
する。ある工程の作業が完了した場合、その工程で作成
・更新した仕様の状態を″完了″にし、後続する工程の
仕様の状態を″作業中″に変更する。
In this method, as the status information of the specification, a classification such as "work not possible", "work in progress", and "completion" is set. When the work of a certain process is completed, the state of the specifications created / updated in the process is set to "complete", and the state of the specifications of the subsequent process is changed to "work in progress".

【0006】逆に、作業に着手したり、あるいは作業が
完了した工程の作業で作成・更新した仕様を修正するた
めに再度作業を開始する場合には、その工程で作成・更
新する仕様の状態を″作業中″に変更し、後続する工程
の仕様の状態を″作業不可能″に変更する。
On the contrary, when the work is started or the work is started again in order to correct the specifications created / updated in the work of the completed process, the state of the specifications created / updated in the process Is changed to "work in progress", and the specification state of the subsequent process is changed to "work not possible".

【0007】また、特開平4−364530号公報で示
されるように、先行する工程の仕様と後続する工程の仕
様の論理的な関係を関係表に予め定義し、先行する工程
の仕様が更新された場合は後続する工程の仕様を変更表
に登録することで、変更が必要な仕様を検出し、やはり
仕様単位に作業を誘導する変更管理方式もある。
As disclosed in Japanese Patent Laid-Open No. 4-364530, the logical relationship between the specifications of the preceding process and the specifications of the succeeding process is defined in advance in a relation table, and the specifications of the preceding process are updated. If there is a change, there is also a change management method in which the specification of the subsequent process is registered in the change table to detect the specification that needs to be changed and also guide the work to the specification unit.

【0008】さらに、IBM SYSTEM JOUR
NAL,vol29,no2,1990,pp189〜
208によれは、作業の関連を記憶し、該作業の関連を
表示し作業を誘導するという方法もある。
Furthermore, the IBM SYSTEM JOUR
NAL, vol29, no2, 1990, pp189-
According to 208, there is also a method of storing a work relationship, displaying the work relationship, and guiding the work.

【0009】[0009]

【発明が解決しようとする課題】大規模システムでは数
千〜数万単位におよぶ仕様が作成されるが、上述した特
開平4−326467および4−364530で示され
ている従来のソフトウエア工程管理方式は、仕様単位に
変更を管理しているため、その1つ1つの仕様に対して
状態情報を設定するのに膨大な時間がかかるという問題
点がある。
In a large-scale system, specifications of thousands to tens of thousands are created, but the conventional software process management shown in the above-mentioned JP-A-4-326467 and 4-364530. The method has a problem that it takes a huge amount of time to set the state information for each specification because the change is managed in specification units.

【0010】さらに、仕様の依存関係を予め定義しなけ
ればならないので、システムが大規模になるほどこの依
存関係の管理に多大な工数を要するという問題点があ
る。
Furthermore, since the dependency relation of the specification must be defined in advance, there is a problem that the larger the system, the more man-hours are required to manage this dependency relation.

【0011】また、前述のIBM SYSTEM JO
URNALに見られる従来の技術では、表示された工程
情報を元に作業者が該作業を指定するため、作業者の勘
違いや見落し、また、複数の作業者が同時に作業をする
ことで、先行する工程の作業で作成・更新したソフトウ
エアの成果物情報と後続する工程の作業で作成・更新し
たソフトウエアの成果物情報に矛盾が生じる可能性があ
るという問題点がある。
The above-mentioned IBM SYSTEM JO
In the conventional technology seen in URNAL, the operator designates the work based on the displayed process information, so that the operator misunderstands or overlooks it, and a plurality of workers work at the same time. There is a problem in that there may be a contradiction between the deliverable information of the software created / updated in the work of the process to be performed and the deliverable information of the software created / updated in the work of the subsequent process.

【0012】また、仕様の状態情報を変更管理のためだ
けに利用しているので、進行状態を管理する工程管理機
能用の情報を別に登録しなければならないという問題点
がある。
Further, since the status information of the specification is used only for change management, there is a problem that the information for the process management function for managing the progress status must be separately registered.

【0013】本発明の目的は、ソフトウエア成果物作成
支援ツール単位に工程を設定してこの作業状態を管理す
ることにより、管理工数を著しく減少させて、工程の作
業状態および工程間の成果物情報の整合性を容易に保つ
ことができる効率的なソフトウエア工程管理装置を提供
することにある。
An object of the present invention is to set a process for each software product creation support tool and manage this work state, thereby significantly reducing the management man-hours, the work state of the process, and the work product between processes. An object of the present invention is to provide an efficient software process control device capable of easily maintaining the consistency of information.

【0014】[0014]

【課題を解決するための手段】第1の発明のソフトウエ
ア工程管理装置は、ソフトウエア作成に使用する複数の
ソフトウエア成果物作成支援ツールと、前記各ソフトウ
エア成果物作成支援ツールの使用作業に対応してそれぞ
れ設定された工程の工程名称と管理対象のプロジェクト
のプロジェクト名称と前記各プロジェクトの前記各工程
の作業状態を示す状態情報とを格納する工程管理フアイ
ルと、プロジェクトの新設およびその作業進行状況に応
じて前記工程管理フアイルの各情報を編集する工程管理
手段と、前記工程管理フアイルを参照して前記工程の状
態情報に応じて該工程に対応する前記ソフトウエア成果
物作成支援ツールを起動し更新動作を指示する変更管理
手段とを含んで構成されている。
A software process control apparatus according to the first aspect of the present invention comprises a plurality of software product creation support tools used for software creation, and work for using the software product creation support tools. A process management file that stores the process name of the process, the project name of the project to be managed, and status information indicating the work status of each process of each project, and the new installation of the project and its work. A process management means for editing each information of the process management file according to the progress status, and a software product creation support tool corresponding to the process according to the status information of the process with reference to the process management file. It is configured to include a change management unit that starts up and instructs an update operation.

【0015】第2の発明のソフトウエア工程管理装置
は、第1の発明において、工程管理手段は工程の作業状
態を示す状態情報として、その工程の作業が全く行なわ
れていない未着手の状態を示す第1の情報と、その工程
の作業が開始されてまだ完了していない作業中であるこ
とを示す第2の情報と、その工程の作業が全て完了して
いることを示す第3の情報とを少なくとも有し、先行工
程の作業状態情報が第2の情報から第3の情報になった
後に作業状態情報が第1の情報を示す直後の後続工程の
作業状態情報を第2の情報に変えうるように状態情報を
編集し、状態情報がすでに第3の情報である先行工程を
再度実行するときはこの工程の状態情報を第3の情報か
ら第2の情報に変更し後続工程の第3または第2の情報
をすべて第1の情報に変更するように状態情報を編集す
ることを特徴としている。
In the software process management apparatus of the second invention, in the first invention, the process management means uses, as the status information indicating the work status of the process, the unstarted status in which the work of the process is not performed at all. First information indicating, second information indicating that the work of the process is started and not completed yet, and third information indicating that all the work of the process is completed And at least, and the work state information of the subsequent process immediately after the work state information of the preceding process changes from the second information to the third information and the work state information indicates the first information is changed to the second information. When the state information is edited so that it can be changed, and when the preceding step whose state information is already the third information is executed again, the state information of this step is changed from the third information to the second information and the subsequent step All 3 or 2nd information is 1st information It is characterized by editing the state information to change.

【0016】[0016]

【実施例】次に、本発明の実施例について図面を参照し
て説明する。
Embodiments of the present invention will now be described with reference to the drawings.

【0017】ソフトウエアの作成は、システム分析、シ
ステム概要設計、システム詳細設計などのフエーズをへ
て実施されるが、上流工程から下流工程まで一貫して開
発を支援する統合型ソフトウエア開発支援システムで
は、製造工程を除くすべてのフエーズの作業に対応する
必要なソフトウエア成果物作成支援ツールを用意してい
る。
The software is created through the phases of system analysis, system outline design, system detail design, etc., but an integrated software development support system that consistently supports development from upstream processes to downstream processes. Provides the necessary software deliverable creation support tools that support all phase operations except the manufacturing process.

【0018】図11には各ソフトウエア作成フエーズに
対応するソフトウエア成果物作成支援ツールの例が示し
てある。すなわち、システム分析フエーズにはシステム
構造分析ツールとデータ分析ツール、システム概要設計
フエーズにはフロー設計ツール、システム詳細設計フエ
ーズにはプログラム設計、画面設計、フアイル設計、レ
コード設計、帳票設計、表設計、パターン設計および部
品設計の各ツールが用意されている。
FIG. 11 shows an example of a software product creation support tool corresponding to each software creation phase. In other words, system structure analysis tools and data analysis tools for system analysis phases, flow design tools for system outline design phases, program design, screen design, file design, record design, form design, table design, system detailed design phase. Pattern design and component design tools are available.

【0019】そして、それぞれのフエーズの順序関係は
あらかじめ決まっているが、各フエーズ内の作業の順序
は特になく、開発プロジェクトの導入時にツール使用順
序を定義すればよい。
Although the order relation of each phase is predetermined, there is no particular order of the work in each phase, and the tool use order may be defined when the development project is introduced.

【0020】本発明はこの1つ1つのツールの使用作業
を単位工程としてソフトウエア工程を管理するソフトウ
エア工程管理装置である。
The present invention is a software process management device that manages software processes by using the operation of using each tool as a unit process.

【0021】図1は本発明のソフトウエア工程管理装置
の一実施例を示すブロック図である。
FIG. 1 is a block diagram showing an embodiment of the software process control apparatus of the present invention.

【0022】図1のソフトウエア工程管理装置は、ソフ
トウエア工程管理部1とソフトウエア成果物作成支援部
2とを含んで構成され、ソフトウエア工程管理部1は工
程管理部1−1と変更管理部1−2と工程管理フアイル
1−3とで構成され、ソフトウエア成果物作成支援部2
はリポジトリ2−0とソフトウエア成果物作成支援ツー
ル群2−1で構成され、リポジトリ2−0には複数の仕
様2−0−1が格納されている。
The software process management apparatus of FIG. 1 is configured to include a software process management unit 1 and a software deliverable creation support unit 2, and the software process management unit 1 is changed from the process management unit 1-1. The software product creation support unit 2 is composed of a management unit 1-2 and a process management file 1-3.
Is composed of a repository 2-0 and a software deliverable creation support tool group 2-1. The repository 2-0 stores a plurality of specifications 2-0-1.

【0023】工程管理フアイル1−3は管理対象のプロ
ジェクトの名称とそのプロジェクトの各工程の状態情報
とを格納している。ここでプロジェクトの各工程はソフ
トウエア成果物作成支援ツールの使用作業毎に設定され
ている。
The process management file 1-3 stores the name of the project to be managed and the status information of each process of the project. Here, each process of the project is set for each operation of using the software deliverable creation support tool.

【0024】図2には工程管理フアイル1−3の一例が
示してある。
FIG. 2 shows an example of the process control file 1-3.

【0025】図2において、工程管理フアイル1−3
は、プロジェクト名称1−3−1、工程名称1−3−2
およびそれぞれのプロジェクトにおける各工程の作業状
態1−3−3で構成する。
In FIG. 2, the process control file 1-3 is provided.
Is project name 1-3-1, process name 1-3-2
And the work status 1-3-3 of each process in each project.

【0026】実際の工程管理フアイル1−3には、これ
らの他に管理者情報、要員情報、日程管理情報、規模情
報および品質情報など一般的な工程管理情報が格納され
ている。
In addition to the above, the actual process management file 1-3 stores general process management information such as manager information, personnel information, schedule management information, scale information and quality information.

【0027】図2ではプロジェクト名称1−3−1とし
てプロジェクトA、プロジェクトBおよびプロジェクト
Zが、工程名称1−3−2として、プログラム概要設計
工程(図11のシステム概要設計フエーズのフロー設計
ツールの使用作業に対応)、画面設計工程(図11のシ
ステム詳細設計フエーズの画面設計ツールの使用作業に
対応)およびプログラム詳細設計工程(図11のシステ
ム詳細設計フエーズのプログラム設計ツールの使用作業
に対応)等が登録されている。
In FIG. 2, the project name 1-3-1 is project A, project B and project Z, and the process name 1-3-2 is program outline design process (of the system outline design phase flow design tool of FIG. 11). (Corresponding to use work), screen design process (corresponding to use work of screen design tool of system detail design phase of FIG. 11) and program detailed design process (corresponding to use work of program design tool of system detail design phase of FIG. 11) Etc. are registered.

【0028】各工程の作業内容は、該当するソフトウエ
ア成果物作成支援ツールによるソフトウエアの成果物情
報である仕様の作成・修正作業であり、ソフトウエア成
果物作成支援ツールと仕様との関係は1対n(n:0以
上)であり、多くの場合nは複数である。
The work content of each process is a creation / correction work of a specification which is software product information by a corresponding software product creation support tool, and the relationship between the software product creation support tool and the specification is 1 to n (n: 0 or more), and in many cases, n is plural.

【0029】作業状態1−3−3には″完了″、″作業
中″、″未着手″、″作業無″のいずれかが設定され
る。
In the work status 1-3-3, any one of "completed", "working", "not started", and "no work" is set.

【0030】作業状態1−3−3が″完了″のとき、該
当工程における仕様の作成・修正作業が全て完了してい
ることを示す。
When the work status 1-3-3 is "completed", it indicates that the specification creation / correction work in the relevant process is all completed.

【0031】作業状態1−3−3が″作業中″のとき、
該当工程における仕様の作成・修正作業が1つ以上作業
中であることを示す。
When the working state 1-3-3 is "working",
Indicates that one or more specifications are being created or modified in the relevant process.

【0032】作業状態1−3−3が″未着手″のとき、
該当工程における仕様の作成・修正作業が全く行なわれ
ていないことを示す。
When the work state 1-3-3 is "not yet started",
It indicates that the specification has not been created or modified in the relevant process.

【0033】作業状態1−3−3が″作業無″のとき、
該当工程に相当する仕様が存在しないことを示す。
When the work state 1-3-3 is "no work",
Indicates that there is no specification corresponding to the applicable process.

【0034】工程管理部1−1は工程管理フアイル1−
3の編集を行なう。すなわち、工程管理フアイル1−3
の編集には、プロジェクト情報・管理者情報・要員情報
・日程管理情報・規模情報・品質情報のそれぞれの追加
・修正・削除など一般的な工程管理情報の更新の他に、
変更管理に関係する作業状態1−3−3の修正機能があ
る。
The process control section 1-1 includes a process control file 1-
Edit 3. That is, the process control file 1-3
In addition to updating general process control information such as addition, correction and deletion of project information, manager information, personnel information, schedule management information, scale information, quality information,
There is a correction function for work status 1-3-3 related to change management.

【0035】変更管理部1−2は、プロジェクト名、工
程名等による作業要求を受けると工程管理フアイル1−
3に格納されている要求に対応する工程の作業状態を参
照してそれに応じてソフトウエア成果物作成支援ツール
を起動する。
When the change management unit 1-2 receives a work request based on the project name, process name, etc., the process management file 1-
The work state of the process corresponding to the request stored in No. 3 is referred to, and the software deliverable creation support tool is activated accordingly.

【0036】ソフトウエア成果物作成支援ツール群2−
1には、各工程対応のソフトウエア成果物作成支援ツー
ルが格納されていて、変更管理部1−2から要求のあっ
た工程名に対応するソフトウエア成果物作成支援ツール
が選択されてそれによりリポジトリ2−0にある対応す
る仕様の参照更新等の作業を行なう。
Software artifact creation support tool group 2-
The software product creation support tool corresponding to each process is stored in 1, and the software product creation support tool corresponding to the process name requested by the change management unit 1-2 is selected. Work such as reference update of the corresponding specifications in the repository 2-0.

【0037】次に本実施例の動作について説明する。Next, the operation of this embodiment will be described.

【0038】管理者は、作業者からの報告をもとに、工
程管理部1−1を利用して、工程管理フアイル1−3を
編集する。
The manager edits the process management file 1-3 using the process management section 1-1 based on the report from the worker.

【0039】作業者は、プロジェクト名称、工程名称お
よび仕様名称を指定して、ソフトウエア成果物作成支援
ツール群2−1のいずれかのツール起動を変更管理部1
−2に要求する。
The operator designates a project name, a process name, and a specification name, and activates any one of the software deliverable creation support tool group 2-1 by the change management unit 1.
-2 request.

【0040】作業者が仕様の更新要求をした場合、変更
管理部1−2は、工程管理フアイル1−3を検索し、該
当プロジェクトの該当工程の作業の状態を確認する。該
当プロジェクトの該当工程の作業の状態が″完了″、″
未着手″、″作業無″の場合は、作業者にその旨を通知
して、ソフトウエア成果物作成支援ツールの起動は行な
わない。該当プロジェクトの該当工程の作業の状態
が、″作業中″の場合は、作業着手が可能な状態なので
該当するソフトウエア成果物作成支援ツールを更新モー
ドで起動する。
When the worker makes a specification update request, the change management section 1-2 searches the process management file 1-3 and confirms the work status of the process of the project. The work status of the relevant process of the relevant project is "Complete", "
In case of "not started" and "no work", the worker is notified of that fact and the software product creation support tool is not started. The work status of the relevant process of the project is "work in progress". In the case of, since the work can be started, the corresponding software deliverable creation support tool is started in the update mode.

【0041】作業者が仕様の参照要求をした場合、変更
管理部1−2は、該当工程の作業の状態にかかわりな
く、ソフトウエア成果物作成支援ツールを参照モードで
起動する。
When the worker makes a reference request for specifications, the change management unit 1-2 activates the software deliverable creation support tool in the reference mode regardless of the work state of the process.

【0042】次に、作業状態1−3−3の修正の編集操
作を図3〜図10を用いて説明する。
Next, the editing operation for correcting the work status 1-3-3 will be described with reference to FIGS.

【0043】図3はプロジェクトを新規に登録したとき
の作業状態1−3−3を示した説明図である。プロジェ
クトを新規に登録したときには、工程の作業状態1−3
−3は″未着手″になっている。
FIG. 3 is an explanatory diagram showing work states 1-3-3 when a project is newly registered. When a new project is registered, the work status of the process 1-3
-3 is "not yet started".

【0044】図4はプロジェクトの形態にあわせて各工
程の作業状態1−3−3を変更するときの説明図であ
る。管理者は、プロジェクトを新規に登録したあと、作
業のない工程があれば、作業状態1−3−3を″作業
無″に変更する。プロジェクトを進めていくうちに作業
がないことが判明した場合も、同様に作業状態1−3−
3を″作業無″に変更する。
FIG. 4 is an explanatory diagram when changing the work state 1-3-3 of each process according to the form of the project. After newly registering the project, the manager changes the work status 1-3-3 to "no work" if there is a process with no work. Even if it is found that there is no work while the project is proceeding, the work status 1-3-
Change 3 to "no work".

【0045】図5、図6は各工程の作業を開始するとき
の作業状態1−3−3を示す説明図である。
FIGS. 5 and 6 are explanatory views showing work states 1-3-3 when the work of each process is started.

【0046】該当工程の作業を開始するとき、管理者は
該当工程の作業状態5−2を″作業中″に変更するよう
工程管理部1−1に要求する。工程管理部1−1は、該
当工程の作業状態5−2が″未着手″であることと、該
当工程の先行工程の作業状態5−1が″完了″であるこ
とを確認し、該当工程の作業状態5−2を″作業中″に
変更する。図6に示すように、先行工程の作業状態6−
2が″作業無″の場合、さらに先行する工程の作業状態
6−1が″完了″であることを確認する。
When starting the work of the process, the manager requests the process management section 1-1 to change the work state 5-2 of the process to "working". The process management section 1-1 confirms that the work state 5-2 of the relevant process is “not started” and that the work state 5-1 of the preceding process of the relevant process is “complete”, Change the working state 5-2 of "to""working". As shown in FIG. 6, the work state 6- of the preceding process
When 2 is "no work", it is confirmed that the work status 6-1 of the preceding process is "complete".

【0047】図7、図8および図9は作業が完了したと
きの作業状態1−3−3の変更を示す説明図である。
FIG. 7, FIG. 8 and FIG. 9 are explanatory views showing the change of the work state 1-3-3 when the work is completed.

【0048】該当工程の全ての仕様作成・修正作業が完
了したとき、管理者は図7に示すように、該当工程の作
業状態7−1を″完了″に変更するよう工程管理部1−
1に要求する。工程管理部1−1は、該当工程の作業状
態7−1が″作業中″であることを確認し、該当工程の
作業状態7−1を″完了″に変更する。続けて後続する
工程の作業を開始するときは、図8に示すように、該当
工程の作業状態8−1を″完了″にすると同時に、後続
工程の作業状態8−2を″作業中″に変更する。図9に
示すように、後続工程の作業状態9−2が″作業無″の
場合は、さらに後続工程の作業状態9−3を″作業中″
に変更する。
When all specification creation / correction work of the process is completed, the manager changes the work status 7-1 of the process to "complete" as shown in FIG.
Request to 1. The process management section 1-1 confirms that the work state 7-1 of the relevant process is "working", and changes the work state 7-1 of the relevant process to "completed". When the work of the subsequent process is continuously started, the work state 8-1 of the process is set to "complete" and the work state 8-2 of the subsequent process is set to "working" as shown in FIG. change. As shown in FIG. 9, when the work state 9-2 of the subsequent process is "no work", the work state 9-3 of the subsequent process is further "working".
Change to.

【0049】図10は誤りを検出したなどの理由で作業
が後戻りするときを作業状態1−3−3の変更を示す説
明図である。
FIG. 10 is an explanatory diagram showing a change of the work state 1-3-3 when the work is backtracked due to the detection of an error or the like.

【0050】後戻りするときは、後戻りする工程の作業
状態10−1を″作業中″に変更し、後戻りする工程の
すべての後続工程のうち、″作業無″以外の工程の状態
を″未着手″に変更する。
When returning, the working state 10-1 of the returning process is changed to "working", and the state of the processes other than "no work" among all the succeeding processes of the returning process is "not started". Change to ″.

【0051】以上説明したように、本実施例のソフトウ
エア工程管理装置は、ソフトウエア成果物作成支援ツー
ル単位に工程を設定してこの作業状態を管理することに
より、管理工数を著しく減少させて、工程の作業状態お
よび工程間の成果物情報の整合性を容易に保つことがで
きる。
As described above, the software process management apparatus of the present embodiment significantly reduces the management man-hour by setting the process for each software deliverable creation support tool and managing this work state. It is possible to easily maintain the consistency of the work state of the process and the product information between the processes.

【0052】[0052]

【発明の効果】以上説明したように、本発明のソフトウ
エア工程管理装置は、工程管理部で登録した工程の作業
の状態を変更管理部が参照することにより、従来、別々
に実現していた工程管理と変更管理を統合し、ソフトウ
エア工程管理が効率的になるという効果がある。
As described above, in the software process control apparatus of the present invention, conventionally, the change control unit refers to the work status of the process registered by the process control unit, so that it is realized separately. There is an effect that software process management becomes efficient by integrating process management and change management.

【0053】また、工程管理情報と変更管理情報とをソ
フトウエア工程管理部において集中管理するので、IB
M SYSTEM JOURNALで見られる、作業者
の勘違いや見落し、また、複数の作業者が同時に作業を
することで、先行する工程の作業で作成・更新したソフ
トウエアの成果物情報と後続する工程の作業で作成・更
新したソフトウエアの成果物情報に矛盾が生じる可能性
を排除し、いわゆる二重保守の危険性を回避するという
効果がある。
Further, since the process control information and the change control information are centrally controlled by the software process control section, the IB
Misunderstandings and oversights of workers seen in M SYSTEM JOURNAL, and multiple workers working at the same time, result information of software created and updated in the work of the preceding process and subsequent processes This has the effect of eliminating the risk of so-called double maintenance by eliminating the possibility of inconsistencies in the product information of software created and updated during work.

【0054】また、連続する工程の作業の状態の整合性
を保つことで、作業を要する工程を明示することが可能
となり、連続する工程間の成果物情報の整合性を保つこ
とが容易になるという効果がある。
Further, by maintaining the consistency of the work states of the continuous processes, it becomes possible to clearly indicate the process requiring the work, and it becomes easy to maintain the consistency of the product information between the continuous processes. There is an effect.

【0055】また、特開平4−326467、特開平4
−364530のように、仕様の依存関係による変更管
理ではなく、仕様と仕様の更新を支援するソフトウエア
成果物作成支援ツールの関係に着目し、仕様に対応する
ツール(=工程)の依存関係による変更管理により、数
十から数千単位の仕様の依存関係の管理を不要にし、シ
ステムが大規模化しても管理工数が著しく増加すること
がなくなるという効果がある。
Further, JP-A-4-326467 and JP-A-4-32667
As in -364530, instead of change management based on the dependency relationship of the specification, focusing on the relationship between the specification and the software deliverable creation support tool that supports the update of the specification, the dependency relationship of the tool (= process) corresponding to the specification The change management eliminates the need for managing dependency relationships of specifications of tens to thousands, and does not significantly increase management man-hours even when the system becomes large in scale.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のソフトウエア工程管理装置の一実施例
を示す構成図である。
FIG. 1 is a configuration diagram showing an embodiment of a software process control device of the present invention.

【図2】工程管理フアイルの内容を示すフアイル内容図
である。
FIG. 2 is a file content diagram showing the content of a process control file.

【図3】プロジェクトの新規登録時の作業状態設定図で
ある。
FIG. 3 is a work state setting diagram at the time of newly registering a project.

【図4】作業なしの工程存在時の作業状態設定図であ
る。
FIG. 4 is a work state setting diagram when there is a process without work.

【図5】工程の作業開始時の作業状態設定図である。FIG. 5 is a work state setting diagram at the start of work of a process.

【図6】工程の作業開始時の作業状態設定図である。FIG. 6 is a work state setting diagram at the start of work of a process.

【図7】工程の作業完了時の作業状態設定図である。FIG. 7 is a work state setting diagram upon completion of work of a process.

【図8】工程の作業完了時で後続工程を作業開始時の作
業状態設定図である。
FIG. 8 is a work state setting diagram at the time of starting work of a subsequent process when work of a process is completed.

【図9】工程の作業完了時で後続工程を作業開始時の作
業状態設定図である。
FIG. 9 is a work state setting diagram at the time of starting work of a subsequent process when work of a process is completed.

【図10】作業が後戻りするときの作業状態設定図であ
る。
FIG. 10 is a work state setting diagram when the work returns.

【図11】ソフトウエア開発フエーズに使用されるソフ
トウエア成果物作成支援ツールの例を示すフエーズ対応
使用ツール図である。
FIG. 11 is a use tool diagram corresponding to phases showing an example of a software deliverable creation support tool used for software development phases.

【符号の説明】[Explanation of symbols]

1 ソフトウエア工程管理部 1−1 工程管理部 1−2 変更管理部 1−3 工程管理フアイル 1−3−1 プロジェクト名称 1−3−2 工程名称 1−3−3、4−1、5−1、5−2、6−1、6−
2、6−3、7−1、8−1、8−2、9−1、9−
2、9−3、10−1、10−2 作業状態 2 ソフトウエア成果物作成支援部 2−0 リポジトリ 2−0−1 仕様 2−1 ソフトウエア成果物作成支援ツール群
1 Software Process Management Department 1-1 Process Management Department 1-2 Change Management Department 1-3 Process Management File 1-3-1 Project Name 1-3-2 Process Name 1-3-3, 4-1, 5- 1, 5-2, 6-1, 6-
2, 6-3, 7-1, 8-1, 8-2, 9-1, 9-
2, 9-3, 10-1, 10-2 Work status 2 Software artifact creation support unit 2-0 Repository 2-0-1 Specifications 2-1 Software artifact creation support tools

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ソフトウエア作成に使用する複数のソフ
トウエア成果物作成支援ツールと、前記各ソフトウエア
成果物作成支援ツールの使用作業に対応してそれぞれ設
定された工程の工程名称と管理対象のプロジェクトのプ
ロジェクト名称と前記各プロジェクトの前記各工程の作
業状態を示す状態情報とを格納する工程管理フアイル
と、プロジェクトの新設およびその作業進行状況に応じ
て前記工程管理フアイルの各情報を編集する工程管理手
段と、前記工程管理フアイルを参照して前記工程の状態
情報に応じて該工程に対応する前記ソフトウエア成果物
作成支援ツールを起動し更新動作を指示する変更管理手
段とを含むことを特徴とするソフトウエア工程管理装
置。
1. A plurality of software deliverable creation support tools used for software creation, a process name and a management target of a process set corresponding to the use work of each software deliverable creation support tool. A process management file storing a project name of a project and status information indicating a work status of each process of each project, and a process of editing each information of the process management file according to new establishment of the project and its work progress status Management means, and change management means for referring to the process management file and activating the software deliverable creation support tool corresponding to the process according to the state information of the process and instructing an update operation. And software process control equipment.
【請求項2】 工程管理手段は工程の作業状態を示す状
態情報として、その工程の作業が全く行なわれていない
未着手の状態を示す第1の情報と、その工程の作業が開
始されてまだ完了していない作業中であることを示す第
2の情報と、その工程の作業が全て完了していることを
示す第3の情報とを少なくとも有し、先行工程の作業状
態情報が第2の情報から第3の情報になった後に作業状
態情報が第1の情報を示す直後の後続工程の作業状態情
報を第2の情報に変えうるように状態情報を編集し、状
態情報がすでに第3の情報である先行工程を再度実行す
るときはこの工程の状態情報を第3の情報から第2の情
報に変更し後続工程の第3または第2の情報をすべて第
1の情報に変更するように状態情報を編集することを特
徴とする請求項1記載のソフトウエア工程管理装置。
2. The process management means has, as status information indicating a work state of a process, first information indicating a state in which no work has been performed yet for the process and work for the process has been started yet. It has at least second information indicating that the work that has not been completed is in progress and third information that indicates that all the work of the process has been completed, and the work state information of the preceding process is the second information. The state information is edited so that the work state information of the succeeding process immediately after the work state information indicates the first information after the information becomes the third information is changed to the second information, and the state information is already set to the third information. When the preceding process, which is the information of the above process, is executed again, the state information of this process is changed from the third information to the second information, and all the third or second information of the subsequent process is changed to the first information. 2. The status information is edited in the field. On-board software process control device.
JP6234638A 1994-09-29 1994-09-29 Software process management device Pending JPH0895776A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6234638A JPH0895776A (en) 1994-09-29 1994-09-29 Software process management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6234638A JPH0895776A (en) 1994-09-29 1994-09-29 Software process management device

Publications (1)

Publication Number Publication Date
JPH0895776A true JPH0895776A (en) 1996-04-12

Family

ID=16974172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6234638A Pending JPH0895776A (en) 1994-09-29 1994-09-29 Software process management device

Country Status (1)

Country Link
JP (1) JPH0895776A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000790A1 (en) * 1996-07-01 1998-01-08 Fujitsu Limited Device and method of controlling intergroup resource utilization
US6799183B2 (en) 2000-09-29 2004-09-28 Hitachi, Ltd. Operation assistance method and system and recording medium for storing operation assistance method
JP2009282584A (en) * 2008-05-19 2009-12-03 Nomura Research Institute Ltd Software development management device
WO2015136606A1 (en) * 2014-03-10 2015-09-17 株式会社アイ・エル・シー Software development assistance device, software development assistance method, and software development assistance program
JPWO2015136607A1 (en) * 2014-03-10 2017-04-06 株式会社アイ・エル・シー Software development support system, software development support method, and software development support program

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998000790A1 (en) * 1996-07-01 1998-01-08 Fujitsu Limited Device and method of controlling intergroup resource utilization
US6385639B1 (en) 1996-07-01 2002-05-07 Fujitsu Limited Device and method of controlling intergroup resource utilization
US6799183B2 (en) 2000-09-29 2004-09-28 Hitachi, Ltd. Operation assistance method and system and recording medium for storing operation assistance method
JP2009282584A (en) * 2008-05-19 2009-12-03 Nomura Research Institute Ltd Software development management device
WO2015136606A1 (en) * 2014-03-10 2015-09-17 株式会社アイ・エル・シー Software development assistance device, software development assistance method, and software development assistance program
JPWO2015136606A1 (en) * 2014-03-10 2017-04-06 株式会社アイ・エル・シー Software development support apparatus, software development support method, and software development support program
JPWO2015136607A1 (en) * 2014-03-10 2017-04-06 株式会社アイ・エル・シー Software development support system, software development support method, and software development support program

Similar Documents

Publication Publication Date Title
JP2993528B2 (en) Text management and restoration method
US5909689A (en) Automatic update of file versions for files shared by several computers which record in respective file directories temporal information for indicating when the files have been created
JPH04111399A (en) Mounting-program creation system
JPH0895776A (en) Software process management device
JP4102137B2 (en) Control program creation support system and support method thereof
JPH07319820A (en) Information processing system
Cisco Software Management
Cisco Software Management
Cisco Software Management
Cisco Software Management
Cisco Software Management
Cisco Software Management
Cisco Software Management
JPH07287688A (en) Method and device for changing dynamic access right
JP2000158504A (en) Molding condition control apparatus and method therefor
JP3789000B2 (en) Edit data management apparatus and management method thereof
JP2004062526A (en) Production management system
JPH06332909A (en) Plan managing system
JP3218571B2 (en) Lot splitting / merging device and lot splitting / merging method
JPH05100831A (en) Source program alteration history generation utility
JP3652481B2 (en) Process flow management method and apparatus
JPH06250836A (en) Device for supporting program development
JPH01140353A (en) System for maintaining data in data base
JPH05307500A (en) System for managing plate making picture data and device therefor
JPH0635753A (en) Program test method

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19980818