JPH0874276A - Construction method for surface of concrete building frame and concrete permanent form used in this method - Google Patents

Construction method for surface of concrete building frame and concrete permanent form used in this method

Info

Publication number
JPH0874276A
JPH0874276A JP21102094A JP21102094A JPH0874276A JP H0874276 A JPH0874276 A JP H0874276A JP 21102094 A JP21102094 A JP 21102094A JP 21102094 A JP21102094 A JP 21102094A JP H0874276 A JPH0874276 A JP H0874276A
Authority
JP
Japan
Prior art keywords
concrete
formwork
anchor
panel
back surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP21102094A
Other languages
Japanese (ja)
Other versions
JP3594658B2 (en
Inventor
Hirotoshi Masuda
広利 増田
Jiro Okamoto
治郎 岡本
Kazuo Kono
和生 河野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Landes Co Ltd
Original Assignee
Landes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Landes Co Ltd filed Critical Landes Co Ltd
Priority to JP21102094A priority Critical patent/JP3594658B2/en
Publication of JPH0874276A publication Critical patent/JPH0874276A/en
Application granted granted Critical
Publication of JP3594658B2 publication Critical patent/JP3594658B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: To obviate the special bar arrangement and shorten the construction term by facilitating the fine regulation of the slope of a permanent form and the adjustment of height in the case of the construction of a dam and a retaining wall. CONSTITUTION: The surface side of a permanent form 1 is formed in an irregular decorated face, and its back face is composed of an insert 4 for threadedly attaching the base of an anchor bolt 3 and a locking support 6 for locking an anchor reinforcement 5. The construction is carried out in such a way as, in the case of placing a base concrete, the base parts of a steel member 2 and of an assembling reinforcement 11a are simultaneously buriedly provided and solidified, and a permanent form 1a on the lowest stage is arranged on the solidified base part as it is adjusted in height by an adjusting bolt 9, and the anchor reinforcement 5 is locked on the locking support 6 in a state where the permanent form panel 1a is connected to the steel member 2 through the anchor bolt 3, and the base part of the anchor reinforcement 5 is weldedly fixed to the assembling reinforcement 11a. Next a permanent form panel 1b on the second stage is similarly fixed by the anchor bolt 3 and the anchor reinforcement 5, and the concrete is placed on the concrete placing side of the back of the sacrifice form and integrated. Next, the permanent form 1c on the third stage is fixed in a similar process.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、ダム、堰堤、コンクリ
ート擁壁等の施工に使用されるコンクリート製躯体表面
の施工方法とそれに用いるコンクリート製捨て型枠に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a surface of a concrete frame used for constructing a dam, a dam, a concrete retaining wall, etc., and a concrete discard formwork used for the method.

【0002】[0002]

【従来の技術】砂防ダムやコンクリート擁壁を構築する
場合、木製や鋼製型枠(仮枠)が使用される。その場合、
型枠の用意、組立、取外し、保管、保守等が必要であ
る。また型枠がコンクリート製で木製、鋼製型枠の不要
のものもあったが、その場合取付構造がセパレータによ
る固定式である。
2. Description of the Related Art Wooden and steel form frames (temporary frames) are used when constructing erosion control dams and concrete retaining walls. In that case,
Form preparation, assembly, removal, storage and maintenance are required. In addition, the formwork was made of concrete, and there were some that did not require steel or steel formwork, but in that case, the mounting structure was fixed with a separator.

【0003】上記のような木製や鋼製型枠を用いないで
型枠の役目を担うと共に、そのまま構造体へ組み込まれ
て表面を形成したり、強度メンバーとなることのできる
コンクリート製型枠については特願平4-211152号に提案
されている。これは、表面が構造物の仕上面、裏面がコ
ンクリート打設側となるコンクリート製パネルであっ
て、裏面側に型枠相互の連結金具を取付ける埋込みボル
ト穴を設けたのである。連結金具は埋設されたものや、
又は連結控壁を設けたものなどであって、従来のコンク
リート製型枠不要のものが有していた難点、すなわち、
大型に不向き、表面化粧をし直さなければならない、型
枠内での作業員の移動が困難等の難点を解決したもので
ある。
A concrete formwork which can serve as a formwork without using the wooden or steel formwork as described above, and can be directly incorporated into a structure to form a surface or serve as a strength member. Is proposed in Japanese Patent Application No. 4-212152. This is a concrete panel whose front surface is the finished surface of the structure and whose back surface is the concrete pouring side, and the back surface side is provided with embedded bolt holes for mounting the metal fittings for mutual connection of the formwork. The connecting fittings are buried,
Or, the difficulty that the conventional concrete formwork, such as the one provided with a connecting retaining wall, does not have,
This is a solution to problems such as being unsuitable for a large size, having to remake the surface, and making it difficult for workers to move within the mold.

【0004】[0004]

【発明が解決しようとする課題】この例のみならず、従
来のコンクリート捨て型枠には、施工期間の短縮化、勾
配調節、裏面に打設されるコンクリートとの一体化、下
部からの高さ調節等の要求に対して充分に応えることの
できるものではなかった。すなわち、従来のコンクリー
ト捨て型枠は、予め擁壁等の勾配に沿った勾配に形成さ
れた法面連結金具に固定したり、予め形成されているダ
ム等の形成躯体等へボルト等で固定するため、勾配の調
節が自由ではないし、個々の捨て型枠の上下調節機能も
なく、そして、施工に多くの手間と時間を必要としてい
た。本発明はこれらの点を解決しようとするものであ
る。
Not only in this example, but also in the conventional concrete discard formwork, shortening the construction period, adjusting the gradient, integrating with the concrete cast on the back side, height from the bottom It has not been able to fully meet the demand for adjustment and the like. That is, the conventional concrete discard formwork is fixed to a slope connecting metal fitting formed in advance along the slope of a retaining wall or the like, or is fixed to a preformed forming body such as a dam with a bolt or the like. Therefore, the slope cannot be adjusted freely, there is no function to adjust the individual discarding molds up and down, and a lot of labor and time are required for the construction. The present invention is intended to solve these problems.

【0005】[0005]

【課題を解決するための手段】本発明は、構造物の仕上
面とほぼ平行に鋼材を立設し、構造物の仕上面下方のベ
ースコンクリート上に最下段の捨て型枠を下縁部の調整
ボルトによって高さ調整して配置し、アンカーボルトで
パネルを鋼材に連結した状態で、背面の係止受にアンカ
ー筋の先端鉤部を係止すると共にアンカー筋の基部を躯
体側へ固定し、次いで第2段目以後の捨て型枠をアンカ
ーボルトとアンカー筋によって同様に固定し、捨て型枠
裏面のコンクリート打設側へコンクリートを打設して一
体化することを特徴とするコンクリート製躯体表面の施
工方法である。
SUMMARY OF THE INVENTION According to the present invention, a steel material is erected substantially parallel to the finished surface of a structure, and the lowermost waste formwork is provided on the base concrete below the finished surface of the structure. Adjust the height with the adjusting bolt and place it, and while the panel is connected to the steel material with the anchor bolt, lock the tip of the anchor bar to the back catch and fix the base of the anchor bar to the body side. Then, the discard formwork from the second stage onward is similarly fixed by anchor bolts and anchor bars, and concrete is cast into the concrete placing side of the rear face of the discard formwork to integrate the concrete frame. This is the surface construction method.

【0006】この施工方法に用いるコンクリート製捨て
型枠は、表面が構造物の仕上面、裏面がコンクリート打
設側となるコンクリート製型枠パネルの裏面へ該型枠パ
ネルを支持する鋼材との間を連結するアンカーボルトを
設けたり、コンクリート製型枠パネルの裏面へ構造物の
躯体側へ固定されたアンカー筋の先端鉤部が係止される
係止受を設ける。
[0006] The concrete discard formwork used in this construction method is a concrete formwork panel whose front surface is the finished surface of the structure and whose back surface is the concrete pouring side, and the steel material which supports the formwork panel. An anchor bolt for connecting the above is provided, or a lock receiving member is provided on the back surface of the concrete formwork panel for locking the tip hook portion of the anchor bar fixed to the body side of the structure.

【0007】また、このコンクリート製捨て型枠はパネ
ルの背部へ裏面に向かって小断面積となる勾配を設けて
いる。ここでいうコンクリート製型枠の材質は、一般の
ポルトランドセメントコンクリート、レジンコンクリー
ト、グラスファイバー補強コンクリート(FRC)など
や、これに類するものを含む。
Further, this concrete discarding formwork is provided with a gradient having a small cross-sectional area toward the back surface of the back of the panel. The material of the concrete formwork mentioned here includes general Portland cement concrete, resin concrete, glass fiber reinforced concrete (FRC), and the like.

【0008】更に、最下段の該型枠パネルの下部縁部へ
ベースコンクリートとの間で高さ調整可能に調整ボルト
を設けている。
Further, an adjusting bolt is provided at the lower edge of the lowermost formwork panel so that the height can be adjusted between it and the base concrete.

【0009】[0009]

【作用】本発明によると、アンカーボルトで型枠パネル
を鋼材に連結した状態で、背面の係止受に係止されたア
ンカー筋の基部を躯体側へ固定することによって、パネ
ル勾配の微調整が可能となり、また、型枠パネル裏面に
打設されたコンクリートと一体化して、型枠パネルが設
置勾配を変えたり、段積状態が崩れるのを防止する。
According to the present invention, while the form panel is connected to the steel material by the anchor bolt, by fixing the base of the anchor streak, which is locked to the lock receiving member on the back side, to the body side, the panel slope is finely adjusted. In addition, it is possible to prevent the formwork panel from changing the installation slope and collapsing the stacking state by integrating with the concrete cast on the backside of the formwork panel.

【0010】型枠パネルを支持する鋼材との間を連結す
るアンカーボルトを設けて、構造物の仕上面とほぼ平行
な鋼材に固定することにより、個々の型枠パネルの段積
固定ができるし、型枠パネルと鋼材との間にコンクリー
トの打設間隙が確保され、その間に打設されたコンクリ
ートによって表面近くにコンクリート層を形成し、かつ
型枠パネルが捨て型枠となって強固な表面状態を形成す
る。また、以前は所定の高さまでコンクリートを打設し
ないと作業が終わらなかったが、この施工方であると、
コンクリート打継目を気にせず、任意の部分で打ち込み
作業を止めることができる。
By providing anchor bolts that connect the steel material supporting the formwork panels to the steel material that is substantially parallel to the finished surface of the structure, the stacking of individual formwork panels can be fixed. A concrete pouring gap is secured between the formwork panel and the steel material, a concrete layer is formed near the surface by the concrete poured in between, and the formwork panel becomes a discarding formwork and has a strong surface. Form a state. Also, before, the work could not be completed without placing concrete to a predetermined height, but with this construction method,
You can stop the pouring work at any part without worrying about the concrete joint.

【0011】このコンクリート製捨て型枠は、型枠パネ
ルの背部へ裏面に向かって小断面積となる勾配を設けて
いるので、パネルとパネルとの間に楔(くさび)状にコン
クリートの充填間隙が形成され、型枠パネルの四面周囲
にコンクリートが入ってより一体化が促進される。
Since this concrete discard formwork has a slope on the back of the formwork panel that has a small cross-sectional area toward the back surface, a wedge-shaped concrete filling gap is provided between the panels. Is formed, concrete is entered around the four sides of the formwork panel, and integration is further promoted.

【0012】調整ボルトを設けたことにより、型枠パネ
ルの下部縁部とベースコンクリートとの間の高さを自由
に変えることができる。
By providing the adjusting bolt, the height between the lower edge of the formwork panel and the base concrete can be freely changed.

【0013】[0013]

【実施例】図1は本発明のコンクリート製捨て型枠によ
ってコンクリート擁壁表面を形成している様子を示す側
面図である。この例によって明らかなように、コンクリ
ート製捨て型枠1が下方から上方へ所定の傾斜(勾配)状
態で、構造物の仕上面とほぼ平行に設けられた鋼材2へ
アンカーボルト3によって鋼材2との間に所定の間隙を
おいて固定されている。鋼材としてはチャンネル鋼がこ
の例では用いられている。鋼材2にはアンカーボルト3
による締結位置を調節できるようにするために、図3に
示すようにグループ孔12を設けている。
EXAMPLE FIG. 1 is a side view showing a state in which the surface of a concrete retaining wall is formed by the concrete discard form of the present invention. As is clear from this example, the concrete discard form 1 is inclined from the lower side to the upper side in a predetermined inclination (gradient) state to the steel material 2 provided substantially parallel to the finished surface of the structure by the anchor bolt 3 and the steel material 2 Are fixed with a predetermined gap between them. Channel steel is used as the steel material in this example. Anchor bolt 3 for steel 2
Group holes 12 are provided as shown in FIG. 3 in order to be able to adjust the fastening position by.

【0014】コンクリート製捨て型枠1の個々の構造
は、図2に示すように、矩形(菱形や上下又は左右縁部
が波形でも構わない)の躯体の表面側が凹凸の装飾面(仕
上げ面)であり、裏面は鋼材2との間を連結するアンカ
ーボルト3の基部を螺着することのできるめねじ構造の
インサート4を埋設している。また、裏面には構造物の
躯体側へ固定されたアンカー筋5の先端鉤部を係止する
ことができるように、環状の係止受6を設けている。係
止受6はこのような環状に限らず、鉤状であってもよい
し、コンクリート製捨て型枠1の一部にアンカー筋5の
先端鉤部を係止可能な孔を設けてもよい。
As shown in FIG. 2, each concrete structure of the concrete discarding form 1 has a rectangular (rhombic shape or upper or lower or right and left edges may be corrugated) decorative surface (finishing surface) having an uneven surface on the surface side. In addition, the back surface is embedded with an insert 4 having a female screw structure capable of screwing a base portion of an anchor bolt 3 that connects the steel material 2 with the steel material 2. Further, on the back surface, an annular lock receiver 6 is provided so that the tip hook portion of the anchor muscle 5 fixed to the body side of the structure can be locked. The lock receiver 6 is not limited to such an annular shape, but may be a hook shape, or a hole capable of locking the tip hook portion of the anchor bar 5 may be provided in a part of the concrete discarding formwork 1. .

【0015】型枠パネルの背部は裏面に向かって小断面
積となる勾配部(テーパー部)7を設けている。この勾配
は裏面に向かう途中に多少の凹凸を有していても結果的
に裏面に向かって小断面積となっていればよい。
The back of the formwork panel is provided with a sloped portion (tapered portion) 7 having a small cross-sectional area toward the back surface. Even if this gradient has some unevenness on the way to the back surface, it is sufficient that it has a small cross-sectional area toward the back surface as a result.

【0016】最下段の型枠パネル1aは、図1の下方にみ
られるように、下縁部へベースコンクリート8との間で
高さ調整可能に調整ボルト9を設けるために、めねじ構
造のインサート10を埋設している。
The lowermost formwork panel 1a has a female screw structure as shown in the lower part of FIG. 1 in order to provide an adjusting bolt 9 for adjusting the height between the lower edge and the base concrete 8. The insert 10 is buried.

【0017】施工は概ね次のようになされる。ダムや擁
壁の構造物の仕上面下方のベースコンクリートを打設す
る際に同時に鋼材2と組立用鉄筋11aの基部を埋設し、
固化させた後、その上に最下段の捨て型枠パネル1aを下
縁部に設けられた調整ボルト9によって高さ調整して配
置し、アンカーボルト3で捨て型枠パネル1aを鋼材2に
連結した状態で、背面の係止受6にアンカー筋5の先端
鉤部を係止すると共にアンカー筋の基部を躯体側へ一部
埋設した組立用鉄筋11aへ溶接固定し、次いで第2段目
の捨て型枠パネル1bをアンカーボルト3とアンカー筋5
によって同様に固定し、捨て型枠裏面のコンクリート打
設側へコンクリートを打設して一体化する。このとき、
必要により延長用の鋼材2や組立用鉄筋11bを一緒に固
定する。続いて同様の工程で第3段目の捨て型枠パネル
1cをアンカーボルト3で鋼材2にセットし、アンカー筋
5によって組立用鉄筋11bへ固定する。この工程を設計
された上段に至るまで繰返して施工するのである。
Construction is generally performed as follows. When the base concrete below the finishing surface of the structure of the dam or retaining wall is placed, the steel material 2 and the base of the rebar 11a for assembly are buried at the same time,
After solidifying, the height of the lowermost discard form panel 1a is adjusted by the adjusting bolt 9 provided at the lower edge portion, and the anchor form 3 is used to connect the discard form panel 1a to the steel material 2. In this state, the front end hook of the anchor bar 5 is locked to the rear lock receiver 6 and the base of the anchor bar is welded and fixed to the rebar 11a for assembly partially buried in the body side, and then the second step Abandon the formwork panel 1b to the anchor bolts 3 and anchor bars 5.
Then, fix it in the same way, and cast concrete to the concrete casting side on the back of the discarding formwork to integrate it. At this time,
If necessary, the steel material 2 for extension and the reinforcing bar 11b for assembly are fixed together. Then, in the same process, the third-stage discarded formwork panel
1c is set on the steel material 2 with the anchor bolt 3, and is fixed to the rebar 11b for assembly by the anchor bar 5. This process is repeated until it reaches the designed upper stage.

【0018】本発明では、捨て型枠パネルの前面上方に
図1又は図2の2点鎖線で示すようにインサート金具13
を埋設しておくことにより、足場を準備しなくてもパネ
ルの吊金具を容易に外すことができる。また、前面2個
所にインサート金具13を埋設しておいて、それらにより
ボルト14を埋めれば、足場板15をかけることができ、容
易に足場を確保することができるのである。
In the present invention, the insert metal fitting 13 is provided above the front surface of the discard form panel as shown by the two-dot chain line in FIG. 1 or 2.
By embedding the panel, it is possible to easily remove the hanging member of the panel without preparing a scaffold. Further, if the insert fittings 13 are embedded in the front two places and the bolts 14 are embedded therein, the scaffolding plate 15 can be hung and the scaffolding can be easily secured.

【0019】[0019]

【発明の効果】本発明によって、ダムや堰堤、擁壁の施
工の際の捨て型枠の勾配の微調節及び高さ調節が可能と
なって施工が容易となった。個々の捨て型枠には周囲に
コンクリートが充填されて強固な一体化が可能となっ
た。型枠背面は、型枠支持のための鋼材や多数のアンカ
ー筋が補強用配筋としてそのまま残存されるので、特別
な配筋作業を要しない。施工期間の短縮も可能となっ
た。
Industrial Applicability According to the present invention, it is possible to finely adjust the slope and height of a waste formwork when constructing a dam, a dam, or a retaining wall, which facilitates construction. Concrete was filled around each of the discarding forms to enable solid integration. Since the steel material for supporting the formwork and a large number of anchor reinforcements remain as reinforcement reinforcements on the rear surface of the formwork, no special reinforcement work is required. It has also become possible to shorten the construction period.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のコンクリート製捨て型枠によってコン
クリート擁壁表面を形成している様子を示す側面図であ
る。
FIG. 1 is a side view showing a state in which a concrete retaining wall surface is formed by a concrete discarding formwork of the present invention.

【図2】同要部平面図である。FIG. 2 is a plan view of the same main part.

【図3】同背面図である。FIG. 3 is a rear view of the same.

【符号の説明】[Explanation of symbols]

1 コンクリート製捨て型枠 2 鋼材 3 アンカーボルト 4 インサート 5 アンカー筋 6 係止受 7 勾配部(テーパー部) 8 ベースコンクリート 9 調整ボルト 10 インサート 11 組立用鉄筋 12 グループ孔 1 Concrete discard form 2 Steel 3 Anchor bolt 4 Insert 5 Anchor bar 6 Locking bar 7 Gradient part (tapered part) 8 Base concrete 9 Adjustment bolt 10 Insert 11 Reinforcing bar for assembly 12 Group hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 河野 和生 岡山県真庭郡落合町大字開田630番地1 ランデス株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kazuo Kono 630 Kaida, Ochiai-cho, Maniwa-gun, Okayama 1 Landes Co., Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 構造物の仕上面とほぼ平行に鋼材を立設
し、構造物の仕上面下方のベースコンクリート上に最下
段の捨て型枠を下縁部の調整ボルトによって高さ調整し
て配置し、アンカーボルトで型枠パネルを鋼材に連結し
た状態で、背面の係止受にアンカー筋の先端鉤部を係止
すると共にアンカー筋の基部を躯体側へ固定し、次いで
第2段目以後の捨て型枠をアンカーボルトとアンカー筋
によって同様に固定し、捨て型枠裏面のコンクリート打
設側へコンクリートを打設して一体化することを特徴と
するコンクリート製躯体表面の施工方法。
1. A steel material is erected upright substantially parallel to the finished surface of the structure, and the height of the lowermost waste formwork is adjusted by adjusting bolts at the lower edge on the base concrete below the finished surface of the structure. Place it and connect the form panel to the steel material with the anchor bolts, lock the tip of the anchor bar to the back catch of the anchor bar and fix the base of the anchor bar to the side of the body, then the second step A method for constructing a surface of a concrete skeleton, characterized in that the subsequent discarding form is similarly fixed with anchor bolts and anchor bars, and concrete is placed on the concrete placing side of the backside of the discarding form to be integrated.
【請求項2】 表面が構造物の仕上面、裏面がコンクリ
ート打設側となるコンクリート製型枠パネルの裏面へ該
型枠パネルを支持する鋼材との間を連結するアンカーボ
ルトを設けてなるコンクリート製捨て型枠。
2. Concrete comprising a concrete form panel whose front surface is the finished surface of the structure and whose back surface is the concrete pouring side, and anchor bolts which connect the steel material supporting the form panel to the back surface. Abandoned formwork.
【請求項3】 表面が構造物の仕上面、裏面がコンクリ
ート打設側となるコンクリート製型枠パネルの裏面へ構
造物の躯体側へ固定されたアンカー筋の先端鉤部が係止
される係止受を設けてなるコンクリート製捨て型枠。
3. A hook for anchoring a tip end portion of an anchor bar fixed to the skeleton side of a structure to the back surface of a concrete formwork panel whose front surface is the finished surface of the structure and whose back surface is the concrete pouring side. A concrete discard formwork with a bar.
【請求項4】 表面が構造物の仕上面、裏面がコンクリ
ート打設側となるコンクリート製型枠パネルであって、
該型枠パネルの背部へ裏面に向かって小断面積となる勾
配を設けてなるコンクリート製捨て型枠。
4. A concrete formwork panel whose front surface is a finished surface of a structure and whose back surface is a concrete pouring side,
A concrete discard formwork provided with a gradient having a small cross-sectional area toward the back surface of the formwork panel.
【請求項5】 表面が構造物の仕上面、裏面がコンクリ
ート打設側となるコンクリート製型枠パネルであって、
最下段の該型枠パネルの下部縁部へベースコンクリート
との間で高さ調整可能に調整ボルトを設けてなるコンク
リート製捨て型枠。
5. A concrete formwork panel whose front surface is a finished surface of a structure and whose back surface is a concrete pouring side,
A concrete discard formwork in which an adjusting bolt is provided on the lower edge of the bottom formwork panel so that the height can be adjusted between it and the base concrete.
JP21102094A 1994-09-05 1994-09-05 Construction method of concrete body surface and concrete formwork used for it Expired - Lifetime JP3594658B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21102094A JP3594658B2 (en) 1994-09-05 1994-09-05 Construction method of concrete body surface and concrete formwork used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21102094A JP3594658B2 (en) 1994-09-05 1994-09-05 Construction method of concrete body surface and concrete formwork used for it

Publications (2)

Publication Number Publication Date
JPH0874276A true JPH0874276A (en) 1996-03-19
JP3594658B2 JP3594658B2 (en) 2004-12-02

Family

ID=16599027

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21102094A Expired - Lifetime JP3594658B2 (en) 1994-09-05 1994-09-05 Construction method of concrete body surface and concrete formwork used for it

Country Status (1)

Country Link
JP (1) JP3594658B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155310A (en) * 2003-10-28 2005-06-16 Joji Yamashita Retaining-wall building material
JP2007046295A (en) * 2005-08-09 2007-02-22 Takamura Sogyo Kk Surface decorative method in remaining form and decorative block used therefor
JP2010101036A (en) * 2008-10-22 2010-05-06 Hirotoshi Masuda Method for constructing concrete building frame by using permanent form, concrete building frame using the method, and foundation block for constructing concrete building frame using the permanent form
KR20130097416A (en) * 2012-02-24 2013-09-03 최종선 Reinforced block with installable flowerpot
JP2019019616A (en) * 2017-07-20 2019-02-07 フリー工業株式会社 Wall surface structure and method for constructing wall surface
JP2020002550A (en) * 2018-06-26 2020-01-09 戸田建設株式会社 Installation structure of concrete panel on bank slope
JP2020012310A (en) * 2018-07-19 2020-01-23 松六コンクリート工業株式会社 Retaining wall construction method and backing layer construction member
RU2745316C1 (en) * 2020-07-07 2021-03-23 ООО "Феррумленд" Method for manufacturing staircases of ways with the use of a fixed formwork with decorative functions
CN115853013A (en) * 2023-01-03 2023-03-28 中国电建集团成都勘测设计研究院有限公司 Assembled retaining wall structure

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155310A (en) * 2003-10-28 2005-06-16 Joji Yamashita Retaining-wall building material
JP2007046295A (en) * 2005-08-09 2007-02-22 Takamura Sogyo Kk Surface decorative method in remaining form and decorative block used therefor
JP2010101036A (en) * 2008-10-22 2010-05-06 Hirotoshi Masuda Method for constructing concrete building frame by using permanent form, concrete building frame using the method, and foundation block for constructing concrete building frame using the permanent form
KR20130097416A (en) * 2012-02-24 2013-09-03 최종선 Reinforced block with installable flowerpot
JP2019019616A (en) * 2017-07-20 2019-02-07 フリー工業株式会社 Wall surface structure and method for constructing wall surface
JP2020002550A (en) * 2018-06-26 2020-01-09 戸田建設株式会社 Installation structure of concrete panel on bank slope
JP2020012310A (en) * 2018-07-19 2020-01-23 松六コンクリート工業株式会社 Retaining wall construction method and backing layer construction member
RU2745316C1 (en) * 2020-07-07 2021-03-23 ООО "Феррумленд" Method for manufacturing staircases of ways with the use of a fixed formwork with decorative functions
CN115853013A (en) * 2023-01-03 2023-03-28 中国电建集团成都勘测设计研究院有限公司 Assembled retaining wall structure

Also Published As

Publication number Publication date
JP3594658B2 (en) 2004-12-02

Similar Documents

Publication Publication Date Title
US4564316A (en) Face panel system
JP3594658B2 (en) Construction method of concrete body surface and concrete formwork used for it
JPH08312090A (en) Construction method of concrete stair with stepped form left, and stepped form
JPH0734464A (en) Reinforced soil construction for cut slope face and concrete precast plate used therefor
GB1400277A (en) Process for the erection of concrete constructions
JP3064841B2 (en) Dam corridor construction method and corridor cell used for this
JP2003520311A (en) Method and apparatus for manufacturing unit wall material
KR19980021188U (en) Support device for ceiling concrete formwork
JPH1129910A (en) Method for constructing concrete pier
CN112663788A (en) Assembled rapid construction method
JPH11158813A (en) Concrete pier constructing method
JP3299596B2 (en) Construction method of reinforced concrete retaining wall using large precast plate.
JP2000034734A (en) Foundation method with lath formwork
JPS6195127A (en) Concrete formwork process
JPH0224438A (en) Concrete unit board
TWI851481B (en) Architecture unit
JP3242160B2 (en) Concrete formwork and its construction method
CN219471539U (en) Supporting tool for concrete template
JPH1162070A (en) Form panel for moulding concrete decoration wall surface, and construction of concrete decoration wall surface using same form panel
JPH07324376A (en) Method for constructing reinforced concrete structure
JP3356853B2 (en) Formwork equipment
JPH0419135Y2 (en)
JPH0978684A (en) Pc balcony member and construction method of balcony
JPH06336704A (en) Concrete precast floor slab and production thereof and construction by use thereof
JPH1121860A (en) Construction method for wall-form concrete structure

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040525

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040602

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040803

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040901

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080910

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090910

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100910

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110910

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110910

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120910

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130910

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term