JPH0849417A - Method for installing formwork during construction of arch concrete - Google Patents

Method for installing formwork during construction of arch concrete

Info

Publication number
JPH0849417A
JPH0849417A JP22730694A JP22730694A JPH0849417A JP H0849417 A JPH0849417 A JP H0849417A JP 22730694 A JP22730694 A JP 22730694A JP 22730694 A JP22730694 A JP 22730694A JP H0849417 A JPH0849417 A JP H0849417A
Authority
JP
Japan
Prior art keywords
formwork
support
arch
work
arch concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22730694A
Other languages
Japanese (ja)
Inventor
Nobuyuki Matsugashita
信之 松ケ下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OKABE TECHNO SYST KK
Okabe Co Ltd
Original Assignee
OKABE TECHNO SYST KK
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OKABE TECHNO SYST KK, Okabe Co Ltd filed Critical OKABE TECHNO SYST KK
Priority to JP22730694A priority Critical patent/JPH0849417A/en
Publication of JPH0849417A publication Critical patent/JPH0849417A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PURPOSE:To increase the efficiency of installing formwork during construction of arch concrete. CONSTITUTION:To install arched formwork B over timbering A installed between opposite leg structures 1, 1, form blocks b1 to b4 equal in size to a plurality of pieces into which the formwork B is divided are joined together. After being assembled on the ground, the form blocks b1 to b4 are sequentially hoisted onto the timbering A by a crane and secured in place so that the overall formwork B is constructed and installed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アーチ橋等のアーチコ
ンクリートの施工において行われる型枠体の設置を、能
率よく安全に行えるようにした設置方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a formwork body which is used in the construction of arch concrete such as an arch bridge, efficiently and safely.

【0002】[0002]

【従来の技術】アーチ橋等のアーチコンクリートの施工
では、例えば図1に示すように、橋台や橋脚等の脚部構
造物1,1にトラス構造によるアーチ状の支保工Aの両
下端を支持して架設し、支保工A上に型枠体Bを設置し
た後、型枠体B上にアーチコンクリートCの配筋組みを
してコンクリートを打設するようにしている。
2. Description of the Related Art In the construction of arch concrete such as an arch bridge, as shown in FIG. 1, for example, as shown in FIG. 1, both lower ends of an arch-shaped supporting work A of a truss structure are supported by leg structures 1, 1 such as abutments and piers. After installing the formwork B on the support A, the concrete of the arch concrete C is laid on the formwork B by placing the concrete.

【0003】上記の型枠体を設置するには、支保工Aの
上に、アーチ状に弯曲した縦バタ材7,7を、支保工A
の奥行き方向に間隔をおいて配列し、それぞれ多数の支
持具10,10を介して支保工Aに固定し、それら縦バタ材
7,7上に多数の横バタ材8,8を配設して、その上に
ベニヤ板等による型枠板9を取り付けるようにしてお
り、その作業は、各部材を支保工A上に運び上げて、人
手により組み立て、取り付けを行うようにしている。
In order to install the above-mentioned formwork, on the support A, the vertical flaps 7, 7 curved in an arch shape are placed on the support A.
Are arranged at intervals in the depth direction of, and are fixed to the supporting work A via a large number of support tools 10, 10, respectively, and a large number of horizontal flap materials 8, 8 are arranged on these vertical flap materials 7, 7. Then, the form frame plate 9 such as a veneer plate is mounted on it, and in this work, each member is carried up on the support work A, and manually assembled and mounted.

【0004】[0004]

【発明が解決しようとする課題】上記のように、従来の
型枠体の設置は、殆ど人手による作業で、多くの労力と
時間を要するばかりでなく、高所でしかもアーチ斜面上
での極めて足場の悪いところで行うものであるから、作
業性が悪く危険率も高い困難なものであった。
As described above, the installation of the conventional formwork body is almost manual work, requires a lot of labor and time, and is extremely high at a high place and on an arch slope. Since it is carried out on a poor footing, workability is poor and the risk rate is high.

【0005】本発明は、上記従来の型枠設置における難
点を解決するためになされたもので、地上で型枠体のブ
ロックを形成し、そのブロックを支保工上に運んで組み
付けるようにし、支保工上での人手による作業を大巾に
削減し、型枠設置の能率化と安全性の向上を図れるよう
にしようとするものである。
The present invention has been made in order to solve the above-mentioned problems in the conventional form installation, and forms a block of the form on the ground, and carries the block on a support work to assemble it. It is intended to greatly reduce the work done by humans on the work, and to improve the efficiency and safety of formwork installation.

【0006】[0006]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成について、実施例に対応する図面を参
照して説明すると、請求項1の設置方法は支保工A上
に、アーチコンクリートCの型枠体Bを設置するにあた
り、上記型枠体Bを複数個に分割した大きさの型枠ブロ
ックb1 〜b4 を連設して形成するものとし、上記各型
枠ブロックb1 〜b4 を地上など平らな場所において組
成した後、支保工A上に吊り上げて固定し、型枠体Bの
全体を形成することを特徴とするものである。
The structure of the present invention for achieving the above object will be described with reference to the drawings corresponding to the embodiments. In installing the formwork B of the concrete C, formwork blocks b 1 to b 4 each having a size obtained by dividing the formwork B into a plurality of pieces are continuously formed to form each formwork block b. It is characterized in that 1 to b 4 are formed on a flat place such as the ground, and then suspended and fixed on the support A to form the entire form B.

【0007】また、請求項2の設置方法は、支保工A上
に、アーチコンクリートCの型枠体Bを設置するにあた
り、上記型枠体Bの一部を、型枠ブロックb1 ,b4
して、地上など平らな場所において組成し、これを支保
工A1 上に吊り上げて固定した後、残余の部分の型枠b
0 を支保工A上において組成し、型枠体Bの全体を形成
することを特徴とするものである。
According to the installation method of claim 2, when installing the form B of arch concrete C on the support A, a part of the form B is replaced with the form blocks b 1 and b 4. As a result, the composition is made on a flat place such as on the ground, and after the composition is hung and fixed on the support A 1 , the remaining part of the form b
It is characterized in that 0 is formed on the supporting structure A to form the entire form B.

【0008】[0008]

【実施例】以下、本発明の実施例について、図面を参照
して説明する。図1〜図3はトラス構造によるアーチ状
支保工を使用してアーチコンクリートを施工する場合を
示したものであり、図4は図1の一部拡大図である。支
保工Aは、対向した橋台等の脚部構造物1,1に取付台
2,2を介して両下端をピン結合して架設される。そし
て、支保工Aの上面には型枠体Bを設置し、さらにその
上に配筋組みをして、コンクリートを打設し、アーチコ
ンクリートCが形成される。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 show a case where arch concrete is constructed using an arch-like support structure having a truss structure, and FIG. 4 is a partially enlarged view of FIG. The support work A is erected by pin-connecting both lower ends to the leg structure 1, 1 such as an opposing abutment via mounting bases 2, 2. Then, the form frame B is installed on the upper surface of the supporting work A, and the reinforcing frame is laid on the form frame B, and concrete is poured to form arch concrete C.

【0009】支保工Aは、アーチ状のトラス架構体aの
複数個を施工するアーチコンクリートCの巾方向(奥行
き方向)に間隔をおいて配置し、それぞれ脚部構造物
1,1にピン結合するとともに、相互に連結材及び斜材
(いずれも図示を略す)により結合して構成されてい
る。図示の支保工Aは、上弦材4と一対の側杆5,5に
より三角状に形成した支保要素3を、互に上弦材4,4
どうしで連結し、側杆5,5の結合端どうしを下弦材
6,6で結合した構造となっているが、この支保工Aは
従来公知の手段による一般的なトラス構造であってもよ
い。また、支保工Aは、上記のようなトラス構造物に限
らず、例えば、地上に多数の支柱を立設して上端をアー
チ状に形成したような構造物であってもよい。
The supporting works A are arranged at intervals in the width direction (depth direction) of the arch concrete C on which a plurality of arch-shaped truss frame structures a are to be constructed, and are connected to the leg structures 1 and 1 by pins. In addition, they are connected to each other by a connecting member and a diagonal member (both not shown). The supporting work A shown in the figure is that the supporting elements 3 formed in a triangular shape by the upper chord member 4 and the pair of side rods 5 and 5 are arranged on top of each other.
Although the structure is such that they are connected to each other and the connecting ends of the side rods 5 and 5 are connected to each other by the lower chord members 6 and 6, this support A may be a general truss structure by a conventionally known means. . Further, the support work A is not limited to the truss structure as described above, and may be a structure in which a large number of columns are erected on the ground and the upper end is formed in an arch shape.

【0010】上記のように架設された支保工Aの上面に
は、型枠体Bが設置される。この型枠体Bは一般に、支
保工Aを構成する各トラス架構体a,a上に、そのスパ
ン方向に沿って縦バタ材7,7を、多数の高さ調節自在
とした支持具10,10を介して載置して、取付ボルト11,
11により固定し、それら縦バタ材7,7上に多数の横バ
タ材8,8を、縦バタ材7,7と格子状をなすように配
列、固定し、横バタ材8,8上に型枠板9を取り付けて
設置される。
A mold frame B is installed on the upper surface of the supporting structure A constructed as described above. This form B is generally a support tool 10, in which a number of vertical flaps 7, 7 are adjustable along the span direction on each truss frame structure a, a constituting the support A, Placed via 10, mounting bolts 11,
11 by fixing, and a large number of horizontal flaps 8, 8 are arranged and fixed on the vertical flaps 7, 7 so as to form a grid pattern with the vertical flaps 7, 7, and are then fixed on the horizontal flaps 8, 8. The form board 9 is attached and installed.

【0011】本発明では、図1に示すように、上記の型
枠体Bを例えば支保工Aのスパン方向に複数に分割し、
各分割した大きさの型枠ブロックb1 〜b4 を形成し、
それを支保工A上に連設して構成する。
In the present invention, as shown in FIG. 1, the form B is divided into a plurality of pieces in the span direction of the support A, for example.
Forming form blocks b 1 to b 4 of each divided size,
It is constructed by arranging it continuously on support work A.

【0012】上記の各型枠ブロックb1 〜b4 は、地上
など平らな場所において組成する。図2はその一例を示
したもので、地上に、上面を型枠ブロックのアーチ形に
沿う弯曲面とした組付台12,12を用意し、その上におい
て、まず、支保工Aの両端部に配置する型枠ブロックd
1 ,d4 を組成する。この場合、縦バタ材7,7は、各
トラス架構体a,aに載る間隔で配列する。そして、従
来同様に、縦バタ材7,7上に横バタ材8,8を並べて
固定し、型枠体9を取り付ける。
The above mold blocks b 1 to b 4 are formed on a flat surface such as the ground. Fig. 2 shows an example of this. On the ground, there are prepared assembling bases 12, 12 whose upper surface is a curved surface that follows the arch shape of the form block. Form block to be placed in d
Composition 1 and d 4 . In this case, the vertical flap members 7, 7 are arranged at intervals so as to be placed on each truss frame structure a, a. Then, as in the conventional case, the horizontal flap members 8, 8 are arranged and fixed on the vertical flap members 7, 7 and the mold 9 is attached.

【0013】次に、図3に示すように、組成を終えた型
枠ブロックb1 ,b4 をそれぞれクレーン(図示を略
す)で吊り上げ、支保工A上に載置する。その際、縦バ
タ材7,7と支保工Aの上弦材4とを取付ボルト11,11
により結合し、型枠ブロックb1 ,b4 が固定される。
また、型枠ブロックb1 ,b4 の吊り上げ、設置を行う
間に、できれば地上において次の型枠ブロックb2 ,b
3 の組成を行う。
Next, as shown in FIG. 3, the mold blocks b 1 and b 4 whose composition has been finished are respectively lifted by a crane (not shown) and placed on the support A. At that time, attach the vertical flap material 7, 7 and the upper chord material 4 of the supporting work A to the mounting bolts 11, 11
And the mold block blocks b 1 and b 4 are fixed.
While hoisting and installing the form blocks b 1 and b 4 , if possible, the next form blocks b 2 and b on the ground.
Do the composition of 3 .

【0014】続いて、組成した型枠ブロックd2 ,d3
をクレーンで吊り上げ、支保工Aに支持具10,10を介し
て載置し、取付ボルト11,11により固定する。それによ
って、図1に示すように、型枠体B全体の載置が完了す
る。型枠体Bの載置後は、適宜配筋組み(図示を略す)
を行い、コンクリートを打設し、アーチコンクリートC
が構築される。
Subsequently, the formed mold blocks d 2 , d 3
Is lifted by a crane, placed on the support A via the support tools 10 and 10, and fixed by the mounting bolts 11 and 11. Thereby, as shown in FIG. 1, the placement of the entire mold frame B is completed. After placing the mold body B, an appropriate bar arrangement (not shown)
And place concrete, arch concrete C
Is built.

【0015】上記の実施例では、型枠体Bを支保工Aの
スパン方向に4分割して型枠ブロックb1 〜b4 を形成
するようにしているが、この分割数は、クレーンの大き
さや作業性を勘案して適宜増減できるものであり、型枠
ブロックBはさらに支保工Aの巾方向(奥行き方向)に
も分割して型枠ブロック化することもできる。また、型
枠ブロックb1 〜b4 の組成は、地上の条件が良好であ
れば、組付台12を使用しないでも行うことができる。
In the above-mentioned embodiment, the form B is divided into four in the span direction of the support A to form the form blocks b 1 to b 4 , but the number of divisions is the size of the crane. The mold block B can be appropriately increased or decreased in consideration of the workability, and the mold block B can be further divided into the width direction (depth direction) of the support work A to form a mold block. The composition of the mold blocks b 1 to b 4 can be performed without using the assembling table 12 as long as the conditions on the ground are good.

【0016】次に、本発明では、支保工A上に設置する
型枠体Bのすべてを、上記のように、地上で組成した型
枠ブロックb1 〜b4 の吊り上げ、連設により行うこと
なく、一部の範囲、例えば、アーチ斜面の急な支保工の
両端近くのような特に作業の困難な部分だけに型枠ブロ
ックを吊り上げて設置し、その他の部分を従来同様の、
支保工A上での手組み作業によって設置するようにする
ことができる。
Next, according to the present invention, all of the formwork bodies B to be installed on the support work A are carried out by hoisting and connecting the formwork blocks b 1 to b 4 formed on the ground as described above. Instead, part of the range, for example, the formwork block is hung up and installed only on the part where the work is particularly difficult, such as near the ends of the steep support on the arch slope, and the other parts are the same as before.
It can be installed by a manual work on the support work A.

【0017】この場合の実施例について説明すると、図
5に示すように、型枠体Bを、支保工A上のアーチ斜面
の急な両端近くの部分b1 ,b4 と残余の部分b0 とに
区分し、両端近くの部分では、上記したように、型枠ブ
ロックb1 ,b4 を地上で組成し、支保工A上に吊り上
げて設置する(図3、図4参照)。そして、その後は、
他の残余の部分、即ち両型枠ブロックb1 ,b4 間の部
分b0 を、従来同様に、型枠関係部材を支保工A上に運
び上げて、人手作業により型枠体を組成、設置し、型枠
体B全体の設置が完了するのである。
Explaining the embodiment in this case, as shown in FIG. 5, the form body B is provided with portions b 1 and b 4 near the steep ends of the arch slope on the support A and the remaining portion b 0. In the portions near both ends, the form blocks b 1 and b 4 are composed on the ground as described above, and are suspended and installed on the support work A (see FIGS. 3 and 4). And after that,
The remaining part, that is, the part b 0 between the two mold blocks b 1 and b 4 is moved up to the supporting member A by the same method as in the conventional case, and the mold body is manually composed. The installation is completed, and the installation of the entire form B is completed.

【0018】型枠体Bの設置後は、型枠体B上に適宜配
筋組み(図示を略す)を行い、コンクリートを打設して
アーチコンクリートCが構築されるが、この場合も、コ
ンクリートの打設は、型枠ブロックb1 ,b4 の設置
後、その部分の配筋組みとコンクリート打ちをしてか
ら、手組み部分b0 の型枠の設置を行うようにしてもよ
い。なお、この実施例では、型枠ブロックb1 ,b4
支保工Aの両端部に設置しているが、この型枠ブロック
は両端部だけに限らず、他の所要部分に、互いに隣接或
は間隔をおいて設置し、残余の部分を型枠の手組みによ
り行うこともできる。
After the formwork B is installed, an appropriate reinforcing bar arrangement (not shown) is performed on the formwork B, and concrete is cast to construct arch concrete C. In this case as well, the concrete is formed. For placing, the formwork blocks b 1 and b 4 may be installed, and then the reinforcing frame of that part may be placed into concrete and then the formwork of the hand-assembled part b 0 may be installed. In this embodiment, the form blocks b 1 and b 4 are installed at both ends of the support A. However, the form blocks are not limited to both ends, but may be adjacent to other required parts. Can be installed at intervals and the rest can be done by hand-assembling the formwork.

【0019】[0019]

【発明の効果】以上説明したように、請求項1の方法
は、アーチコンクリートの施工において設置する型枠体
を、型枠ブロックに分割して地上で組成し、これを支保
工上に吊り上げ、互いに結合して型枠体の全体を設置す
るようにしたので、アーチ斜面上の滑り易く足場の悪い
高所での作業は、型枠体の取り付けなどの極めて少ない
作業を行うだけでよく、作業が簡易化されて能率よくで
き、安全性も向上される。
As described above, according to the method of claim 1, the formwork body to be installed in the construction of arch concrete is divided into formwork blocks and is composed on the ground, and this is lifted on the support work, Since the whole formwork is installed by connecting to each other, work at a high place where the foot is slippery and the footing is poor on the arch slope requires only extremely few work such as mounting the formwork. Can be simplified and efficient, and safety can be improved.

【0020】また、各型枠ブロックは地上で組成するの
で、作業は容易で能率よく行えるとともに、型枠ブロッ
クの吊り上げや設置中にも、次の型枠ブロックの組成作
業を進めることができ、全体として型枠体の施工が短期
間に行えることになるばかりでなく、アーチ支保工の製
作や、架設する間でも型枠ブロックを組成して準備する
ことも可能であり、そうすれば、全体の工期も著しく短
縮できることになる。
Further, since each form block is composed on the ground, the work can be performed easily and efficiently, and the composition work of the next form block can be carried out even while the form block is being lifted or installed. Not only is it possible to construct the formwork in a short period of time as a whole, but it is also possible to construct the formwork block and prepare it during the construction of the arch support and installation. The construction period can be significantly shortened.

【0021】また、請求項2の方法では、アーチ形が比
較的扁平である場合のように、支保工の両端部を除き、
型枠の人手による設置作業が容易、かつ安全に行うこと
ができ、クレーンの吊り上げによるよりも作業が能率的
にできるような場合に適している。したがって、施工現
場の状況に応じて、請求項1の方法が請求項2の方法か
のいずれかが選択され、施工がより効果的に実施でき
る。
Further, in the method of claim 2, as in the case where the arch shape is relatively flat, both ends of the support work are removed,
It is suitable for cases where the work of manually setting the formwork can be done easily and safely, and the work can be done more efficiently than by lifting the crane. Therefore, either the method of claim 1 or the method of claim 2 is selected according to the situation of the construction site, and the construction can be carried out more effectively.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明により型枠体を設置した状態を示す正面
図である。
FIG. 1 is a front view showing a state in which a mold body is installed according to the present invention.

【図2】型枠ブロックの地上での組成状態を示した正面
図である。
FIG. 2 is a front view showing a composition state of the mold block on the ground.

【図3】型枠ブロックの吊り上げ、設置状態を示した正
面図である。
FIG. 3 is a front view showing a state in which the form block is lifted and installed.

【図4】図1の一部拡大正面図である。FIG. 4 is a partially enlarged front view of FIG.

【図5】本発明の他の実施例による型枠体の設置状態を
示す正面図である。
FIG. 5 is a front view showing an installed state of a mold body according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

A 支保工 B 型枠体 C アーチコンクリート a トラス架構体 b1 〜b4 型枠ブロック b0 手組み部分 1 脚部構造物 3 支保要素 4 上弦材 5 側杆 6 下弦材 7 縦バタ材 8 横バタ材 9 型枠板 10 支持具 11 取付ボルト 12 組付台A Supporting work B Formwork C Arch concrete a Truss frame structure b 1 to b 4 Formwork block b 0 Hand-assembled part 1 Leg structure 3 Supporting element 4 Upper chord member 5 Side rod 6 Lower chord member 7 Vertical butter material 8 Horizontal Flapping material 9 Form plate 10 Supporting tool 11 Mounting bolt 12 Assembly stand

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E04G 11/48 ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI technical display area E04G 11/48

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 支保工上に、アーチコンクリートの型枠
体を設置するにあたり、上記型枠体を複数個に分割した
大きさの型枠ブロックを連設して形成するものとし、上
記各型枠ブロックを地上など平らな場所において組成し
た後、支保工上に吊り上げて固定し、型枠体の全体を形
成することを特徴とする、アーチコンクリートの施工に
おける型枠体設置方法。
1. When installing an arch concrete formwork on a supporting structure, formwork blocks of a size obtained by dividing the formwork body into a plurality of pieces are continuously formed to form each of the formwork. A method for installing a form body in construction of arch concrete, characterized in that the frame block is formed on a flat place such as the ground and then lifted and fixed on a supporting structure to form the whole form body.
【請求項2】 支保工上に、アーチコンクリートの型枠
体を設置するにあたり、上記型枠体の一部を、型枠ブロ
ックとして、地上など平らな場所において組成し、これ
を支保工上に吊り上げて固定した後、残余の部分の型枠
を支保工上において組成し、型枠体の全体を形成するこ
とを特徴とする、アーチコンクリートの施工における型
枠体設置方法。
2. When installing the arch concrete formwork on the support work, a part of the formwork is formed as a form block on a flat surface such as the ground, and this is used for the support work. A method of installing a form body in construction of arch concrete, characterized in that after the structure is hung and fixed, the rest of the formwork is composed on the support work to form the entire formwork body.
JP22730694A 1994-05-30 1994-08-29 Method for installing formwork during construction of arch concrete Pending JPH0849417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22730694A JPH0849417A (en) 1994-05-30 1994-08-29 Method for installing formwork during construction of arch concrete

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP13934394 1994-05-30
JP6-139343 1994-05-30
JP22730694A JPH0849417A (en) 1994-05-30 1994-08-29 Method for installing formwork during construction of arch concrete

Publications (1)

Publication Number Publication Date
JPH0849417A true JPH0849417A (en) 1996-02-20

Family

ID=26472180

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22730694A Pending JPH0849417A (en) 1994-05-30 1994-08-29 Method for installing formwork during construction of arch concrete

Country Status (1)

Country Link
JP (1) JPH0849417A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424528A (en) * 2020-04-20 2020-07-17 东南大学 FRP (fiber reinforced plastic) pipe concrete arch structure with FRP longitudinal ribs and preparation method thereof
CN112681104A (en) * 2020-12-24 2021-04-20 中铁重工有限公司 Manufacturing method of steel arch steel frame landscape bridge
CN114075873A (en) * 2020-08-17 2022-02-22 北京城建轨道交通建设工程有限公司 Construction method of large-load column-free arc-shaped top plate structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424528A (en) * 2020-04-20 2020-07-17 东南大学 FRP (fiber reinforced plastic) pipe concrete arch structure with FRP longitudinal ribs and preparation method thereof
CN114075873A (en) * 2020-08-17 2022-02-22 北京城建轨道交通建设工程有限公司 Construction method of large-load column-free arc-shaped top plate structure
CN114075873B (en) * 2020-08-17 2023-10-27 北京城建轨道交通建设工程有限公司 Construction method of large-load column-free arc-shaped roof structure
CN112681104A (en) * 2020-12-24 2021-04-20 中铁重工有限公司 Manufacturing method of steel arch steel frame landscape bridge
CN112681104B (en) * 2020-12-24 2022-07-12 中铁重工有限公司 Manufacturing method of steel arch steel frame landscape bridge

Similar Documents

Publication Publication Date Title
JPH0849417A (en) Method for installing formwork during construction of arch concrete
JPH07233508A (en) Pier, and pier-constructing method by means of self-climbing form installation
JP2632922B2 (en) Bridge construction method
JPH0849214A (en) Construction method for installing arch concrete bar arrangement body
JPH0835328A (en) Construction of arch concrete
JPH07216822A (en) Bridge pier and construction method thereof by self-rising type form construction method
JPH0649982A (en) Formwork unit and its construction
JPH09250110A (en) Construction method of arch concrete
CN215714679U (en) Steel purlin arched bridge side span unstressed construction equipment
JP2812177B2 (en) Bridge pier construction method by slip form method
JP3690463B2 (en) Construction method of viaduct
CN105926857A (en) Prefabricated pier and application of prefabricated pier to high-rise reversed beam overhanging scaffold construction
JP3125205B2 (en) Construction method of temporary side wall
JPH05239810A (en) Constructing method for reinforced concrete arch bridge
JPH0415841B2 (en)
JP2649057B2 (en) How to build stairs in buildings
JPS58173238A (en) Construction of wall body in reinforced concrete building
JPH0345178B2 (en)
JPH0959924A (en) Slab form construction method
JPH0379489B2 (en)
JP3078389B2 (en) Temporary scaffolding method
JP2553349B2 (en) Form support for arch concrete construction
JPH11166323A (en) Construction method for rc molded frame installed in building
JPS63171939A (en) Execution of reinforced concrete building
JPS5898571A (en) Method and apparatus for constructing epanded part