JPH0842064A - Building method of reinforced cage for column and building jig - Google Patents

Building method of reinforced cage for column and building jig

Info

Publication number
JPH0842064A
JPH0842064A JP19467194A JP19467194A JPH0842064A JP H0842064 A JPH0842064 A JP H0842064A JP 19467194 A JP19467194 A JP 19467194A JP 19467194 A JP19467194 A JP 19467194A JP H0842064 A JPH0842064 A JP H0842064A
Authority
JP
Japan
Prior art keywords
rebar
screw
nut
cage
horizontal plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19467194A
Other languages
Japanese (ja)
Inventor
Hisao Tateno
久夫 舘野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Tekko Co Ltd
Original Assignee
Tokyo Tekko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Tekko Co Ltd filed Critical Tokyo Tekko Co Ltd
Priority to JP19467194A priority Critical patent/JPH0842064A/en
Publication of JPH0842064A publication Critical patent/JPH0842064A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PURPOSE:To shorten the suspension time of a crane when a reinforced cage for a column is built. CONSTITUTION:Building jigs 50 are set previously to the screw reinforcing bars 21 of a concrete structure. Slits 54, 55 are formed in the lower-side horizontal plate sections and upper-side horizontal plate sections of the building jigs 50 respectively. The horizontal plate sections are held and bone by coupler nuts 30 and first locknuts 31 screwed to the screw reinforcing bars 21 under the state that the screw reinforcing bars 21 are stored in the slits 54 of the lower-side horizontal plate sections. A reinforced cage 10 for a column is hung down by a crane 100, the screw reinforcing bars 11 of the reinforced cage 10 are passed through the slits 55 of the upper-side horizontal plate sections, previously screwed second locknuts 32 are placed on the upper-side horizontal plates, and the reinforced cage 10 for the column is self-supported. The suspended state by the crane is released, the screw reinforcing bars 11, 21 are connected by the coupler nuts 30, the building jigs 50 are extracted, and both locknuts 31, 32 are clamped to the coupler nuts 30.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、柱用鉄筋籠の建込方法
およびこの建込のために用いられる治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a rebar cage for a column and a jig used for this installation.

【0002】[0002]

【従来の技術】柱用鉄筋籠は、複数の主筋の回りに剪断
補強筋を配置させることにより構成されている。この柱
用鉄筋篭は、その主筋の下端部を下層階の柱用鉄筋籠の
主筋の上端部に連結することにより建込まれる。なお、
下層階の柱用鉄筋篭には、コンクリートが既に打設され
ていて、コンクリート構造物が構成されている。上記主
筋同士の連結の方法としてねじ結合を利用する方法があ
る。詳述すると、上下の柱用鉄筋篭の主筋はねじ鉄筋
(外周にねじフシを有する鉄筋)からなる。このねじ鉄
筋同士がカプラーナットで連結され、このカプラーナッ
トの両側が一対のロックナットにより締め付けられる。
2. Description of the Related Art Reinforcing bar cages for columns are constructed by arranging shear reinforcing bars around a plurality of main bars. This pillar rebar cage is constructed by connecting the lower end of the main bar to the upper end of the main bar of the pillar rebar basket on the lower floor. In addition,
Concrete has already been cast into the rebar cage for columns on the lower floors to form a concrete structure. As a method of connecting the main bars to each other, there is a method of using screw connection. More specifically, the main bars of the upper and lower pillar reinforcing bar cages are screw reinforcing bars (reinforcing bars having screw bushes on the outer circumference). The screw rebars are connected to each other by a coupler nut, and both sides of the coupler nut are tightened by a pair of lock nuts.

【0003】上記柱用鉄筋籠の建込方法では、まず、柱
用鉄筋篭とコンクリート構造物のねじ鉄筋にロックナッ
トをそれぞれ螺合させておき、いずれか一方のねじ鉄筋
にカプラーナットを螺合させておく。そして、柱用鉄筋
籠をクレーンで吊り下げて、コンクリート構造物の真上
まで運搬し、さらに、下降させて両ねじ鉄筋を接近させ
る。この吊り下げ状態で、上側のねじ鉄筋を下側のねじ
鉄筋と同一直線上に位置させながら、一方のねじ鉄筋に
螺合されていたカプラーナットの半分を他方のねじ鉄筋
に螺合させる。すべてのねじ鉄筋同士のカプラーナット
による連結が終了した時に、クレーンによる柱用鉄筋籠
の吊り下げ状態を解除する。その後で、それぞれのねじ
鉄筋に螺合されていたロックナットをカプラーナットに
向けて締付けることにより、柱用鉄筋籠の建込が完了す
る。
In the above-described method of constructing a column reinforcing rod basket, first, lock nuts are respectively screwed into the column reinforcing rod baskets and the screw reinforcing rods of the concrete structure, and the coupler nut is screwed into either one of the screw reinforcing rods. I will let you. Then, the rebar cage for columns is suspended by a crane, transported to just above the concrete structure, and further lowered to bring both screw rebars close to each other. In this suspended state, half of the coupler nut screwed to one screw rebar is screwed to the other screw rebar while the upper screw rebar is positioned on the same straight line as the lower screw rebar. When the connection of all the screw rebars with the coupler nuts is completed, the suspended state of the column rebar cage by the crane is released. After that, the lock nuts screwed to the respective screw reinforcing bars are tightened toward the coupler nuts, whereby the installation of the column reinforcing bar cage is completed.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記建
込方法では、カプラーナットによるねじ鉄筋の連結が終
了するまでは、クレーンによる柱用鉄筋篭の吊り下げ状
態を維持しておかなければならない。しかも、カプラー
ナットによる連結はねじ鉄筋同士のピッチ調整作業を伴
うので、上記吊り下げ時間は長くなってしまう。その結
果、各柱用鉄筋篭の建込みのためにクレーンを使用する
時間が長くなり、クレーンの使用効率が悪かった。
However, in the above-mentioned installation method, it is necessary to maintain the suspended state of the column reinforcing bar basket by the crane until the connection of the screw reinforcing bars by the coupler nut is completed. Moreover, since the connection by the coupler nut involves the work of adjusting the pitch between the screw rebars, the hanging time becomes long. As a result, it took a long time to use the crane for building the rebar cage for each column, and the efficiency of using the crane was poor.

【0005】[0005]

【課題を解決するための手段】前述の課題を解決するた
め、請求項1の柱用鉄筋籠の建込方法では、コンクリー
ト構造物のねじ鉄筋に予めカプラーナットを螺合させ、
柱用鉄筋籠のねじ鉄筋に予め補助ナットを螺合させ、柱
用鉄筋篭を吊り下げて、柱用鉄筋篭のねじ鉄筋をコンク
リート構造物のねじ鉄筋と同一直線上に位置させた状態
で、コンクリート構造物に設置した建込治具の水平載置
部に、柱用鉄筋篭のねじ鉄筋を貫通させるとともに補助
ナットを載せることにより、柱用鉄筋篭を自立させ、こ
の自立後に上記カプラーナットを上方へ移動させて、こ
のカプラーナットにより両者のねじ鉄筋を連結すること
を特徴とする。請求項2では、上記補助ナットを建込治
具上で回すことにより、柱用鉄筋篭のねじ鉄筋を昇降さ
せて、コンクリート構造物のねじ鉄筋に対する柱用鉄筋
篭のねじ鉄筋のピッチ調整を行うことを特徴とする。請
求項3では、上記コンクリート構造物のねじ鉄筋にはカ
プラーナットとともにその下方に配置された第1ロック
ナットが予め螺合されており、柱用鉄筋篭のねじ鉄筋に
予め螺合された補助ナットは、第2ロックナットとして
提供され、上記建込治具は、第1スリットを有する下側
水平板部と、上記第1スリットと平行をなす第2スリッ
トを有する上記水平載置部としての上側水平板部と、両
水平板部を連結する連結部とを備えており、上記建込治
具の下側水平板部の第1スリットにコンクリート構造物
のねじ鉄筋を嵌めた状態で、この下側水平板部をカプラ
ーナットと第1ロックナットで挟むことにより、建込治
具を予めセットしておき、このセット状態で、コンクリ
ート構造物のねじ鉄筋の上方に配置された上側水平板部
のスリットに柱用鉄筋篭のねじ鉄筋を通し、第2ロック
ナットを上側水平板部に載せることにより、柱用鉄筋篭
を自立させ、この後で、カプラーナットにより両者のね
じ鉄筋を連結し、さらに、建込治具を水平移動させて両
者のねじ鉄筋から抜き取り、最後に、第1,第2ロック
ナットをカプラーナットに向かって締め付けることを特
徴とする。さらに請求項4の建込治具では、(イ)上記
カプラーナットとその下方の第1ロックナットに挟まれ
て支持されるとともに、コンクリート構造物のねじ鉄筋
を抜き差し可能に収容する第1スリットを有する下側の
水平板部と、(ロ)上記第1スリットと平行をなし柱用
鉄筋篭のねじ鉄筋を抜き差し可能に収容する第2スリッ
トを有し、かつ上記第2ロックナットを載せて支持する
上側の水平板部と、(ハ)下側水平板部と上側水平板部
とを連結する連結部と、を備えたことを特徴とする。
In order to solve the above-mentioned problems, in the method for installing a pillar reinforcing bar basket according to claim 1, a coupler nut is screwed in advance to a screw reinforcing bar of a concrete structure,
In the state where the auxiliary nut is screwed into the screw reinforcing bar of the column reinforcing bar cage in advance, the column reinforcing bar basket is hung, and the screw reinforcing bar of the column reinforcing bar cage is positioned on the same straight line as the screw reinforcing bar of the concrete structure, In the horizontal placement part of the installation jig installed in the concrete structure, the screw reinforcement of the pillar rebar basket is penetrated and the auxiliary nut is placed, so that the pillar rebar cage is self-supporting, and after this self-supporting, the coupler nut is attached. It is characterized in that it is moved upward and the two screw rebars are connected by this coupler nut. In claim 2, by rotating the auxiliary nut on the installation jig, the screw reinforcing bar of the pillar reinforcing bar basket is moved up and down, and the pitch of the screw reinforcing bar of the column reinforcing bar cage is adjusted with respect to the screw reinforcing bar of the concrete structure. It is characterized by In Claim 3, the screw lock of the concrete structure is preliminarily screwed with the coupler nut and the first lock nut arranged below the coupler nut, and the auxiliary nut is screwed with the screw rebar of the pillar rebar basket in advance. Is provided as a second lock nut, and the erection jig is provided with a lower horizontal plate portion having a first slit, and an upper portion as the horizontal mounting portion having a second slit parallel to the first slit. A horizontal flat plate portion and a connecting portion for connecting both horizontal plate portions are provided, and in the state where the screw rebar of the concrete structure is fitted in the first slit of the lower horizontal plate portion of the above-mentioned installation jig, By sandwiching the side horizontal plate portion with the coupler nut and the first lock nut, the building jig is set in advance, and in this set state, the upper horizontal plate portion of the upper horizontal plate portion arranged above the screw rebar of the concrete structure is set. Pillar in slit Insert the second lock nut on the upper horizontal plate through the threaded rebar of the rebar cage to make the rebar cage for columns self-supporting. After that, connect the two threaded rebars with a coupler nut, and then repair the construction. The tool is characterized in that the tool is horizontally moved and pulled out from the screw rebars of both, and finally, the first and second lock nuts are tightened toward the coupler nut. Further, in the construction jig according to claim 4, (a) a first slit which is supported by being sandwiched between the coupler nut and a first lock nut below the coupler nut, and which accommodates a screw rebar of a concrete structure in a removable manner. A lower horizontal plate portion having, and (b) a second slit which is parallel to the first slit and accommodates a screw reinforcing bar of a column reinforcing bar basket so that the reinforcing bar can be inserted and removed, and the second lock nut is placed and supported. And (c) a connecting portion that connects the lower horizontal plate portion and the upper horizontal plate portion to each other.

【0006】[0006]

【作用】請求項1の建込方法では、柱用鉄筋籠のねじ鉄
筋に螺合された補助ナットを建込治具に載せて自立させ
た後は、コンクリート構造物のねじ鉄筋と柱用鉄筋篭の
ねじ鉄筋とをカプラーナットにより連結する作業におい
て、柱用鉄筋篭のクレーン等による吊り下げを必要とせ
ず、この吊り下げ状態を速やかに解除することができ
る。そのため、吊り下げのためのクレーン等の使用時間
を大幅に減らすことができる。請求項2の建込方法で
は、補助ナットを建込治具の上で回すことにより、ねじ
鉄筋を上下方向に微少量移動させることができ、コンク
リート構造物のねじ鉄筋と柱用鉄筋篭のねじ鉄筋のピッ
チ合わせを簡単に行うことができる。請求項3,4の建
込方法,建込治具によれば、建込治具をカプラーナット
と第1ロックナットによりセットすることができ、建込
治具の位置決めを簡単に行うことができる。また、建込
治具の上側水平板部の第2スリットに柱用鉄筋篭のねじ
鉄筋を挿入することにより、このねじ鉄筋の位置決めも
簡単に行うことができる。さらに、カプラーナットによ
りねじ鉄筋同士を連結した後は、建込治具を水平移動さ
せることにより、ねじ鉄筋から抜き取ることができ、そ
の後のロックナットによる締付作業を支障なく行うこと
ができる。
According to the erection method of claim 1, after the auxiliary nut screwed to the screw rebar of the column rebar cage is placed on the erection jig to be self-supporting, the rebar of the concrete structure and the column rebar are reinforced. In the work of connecting the screw rebar of the basket with the coupler nut, it is not necessary to hang the pillar rebar basket by a crane or the like, and the suspended state can be quickly released. Therefore, the usage time of the crane or the like for hanging can be significantly reduced. According to the erection method of claim 2, by rotating the auxiliary nut on the erection jig, the screw rebar can be moved in the vertical direction by a small amount, and the screw rebar of the concrete structure and the screw of the column rebar cage can be moved. You can easily adjust the pitch of the reinforcing bars. According to the installation method and the installation jig of claims 3 and 4, the installation jig can be set by the coupler nut and the first lock nut, and the positioning of the installation jig can be performed easily. . Further, by inserting the screw reinforcing bar of the column reinforcing bar cage into the second slit of the upper horizontal plate portion of the installation jig, the positioning of the screw reinforcing bar can be easily performed. Furthermore, after connecting the screw rebars with each other by the coupler nut, it can be pulled out from the screw rebars by horizontally moving the installation jig, and the subsequent tightening work with the lock nut can be performed without any trouble.

【0007】[0007]

【実施例】以下、本発明に係る柱用鉄筋籠の建込方法の
一実施例を図面に基いて説明する。図1に示すように建
込むべき柱用鉄筋篭10は、互いに平行をなす複数例え
ば4本のねじ鉄筋11(主筋)と、このねじ鉄筋11の
周囲に配置されねじ鉄筋11に沿って間隔をおいて配置
された多数の剪断補強筋12とを、番線により結ぶこと
により、構成されている。他方、下層の柱用鉄筋篭は上
記柱用鉄筋篭と同一構成をなし既にコンクリートに埋め
込まれており、このコンクリート構造物20からは、下
層の柱用鉄筋篭のねじ鉄筋21が上方に垂直に突出して
いる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a method for installing a column reinforcing rod cage according to the present invention will be described below with reference to the drawings. As shown in FIG. 1, the rebar cage for pillars 10 to be installed is composed of a plurality of, for example, four screw rebars 11 (main bars) that are parallel to each other, and a space along the screw rebars 11 arranged around the screw rebars 11. It is configured by connecting a number of shear reinforcement bars 12 arranged in advance with a numbered wire. On the other hand, the lower pillar rebar basket has the same structure as the above pillar rebar basket and is already embedded in the concrete, and from this concrete structure 20, the screw rebar 21 of the lower pillar rebar basket is vertically upward. It is protruding.

【0008】後述する建込作業に先立って、図1,図2
に示すように、ねじ鉄筋21には、予めカプラーナット
30が螺合されるとともに、これより下方に第1ロック
ナット31が螺合されている。また、柱用鉄筋籠10の
ねじ鉄筋11には第2ロックナット32が螺合されてい
る。
Prior to the installation work described later, FIGS.
As shown in (1), a coupler nut 30 is previously screwed into the threaded reinforcing bar 21, and a first lock nut 31 is screwed below the coupler nut 30. A second lock nut 32 is screwed onto the screw reinforcing bar 11 of the column reinforcing bar cage 10.

【0009】本発明の特徴は、建込作業において、建込
治具50を用いることである。この建込治具50は、図
6に最も良く示されているように、下側水平板部51と
上側水平板部52(水平載置部)と、両者を連結する垂
直板部53(連結部)とを有して、コ字形をなしてい
る。水平板部51,52には、互いに平行をなす同形状
の第1,第2のスリット54,55が形成されている。
これらスリット54,55は、上記ねじ鉄筋11,21
の外径とほぼ等しい幅を有しており、水平板部51,5
2の先端縁に開口し、その奥端部54a,55aは半円
筒面を有している。
A feature of the present invention is that the construction jig 50 is used in the construction work. As shown best in FIG. 6, the installation jig 50 includes a lower horizontal plate portion 51, an upper horizontal plate portion 52 (horizontal mounting portion), and a vertical plate portion 53 (connecting portion). Part) and has a U-shape. First and second slits 54 and 55 of the same shape which are parallel to each other are formed in the horizontal flat plate portions 51 and 52.
These slits 54, 55 are the above-mentioned screw rebars 11, 21.
Has a width substantially equal to the outer diameter of the horizontal plate portions 51, 5
2 has an opening at the front end edge thereof, and the rear end portions 54a and 55a thereof have a semi-cylindrical surface.

【0010】上記建込治具50は、建込作業に先立って
予めねじ鉄筋21にセットされている。詳述すると、図
6の想像線で示すように、下側の水平板部51のスリッ
ト54の奥端部54aにねじ鉄筋21を収容し、この水
平板部51をカプラーナット30と第1ロックナット3
1との間で締付けて挟持する。その結果、上側の水平板
部52はねじ鉄筋21の上方に水平に配置される。上記
建込治具50は図1,図2に示すように4本のねじ鉄筋
21のすべてにセットされる。なお、すべての建込治具
50の上側水平板部52のスリット55は、互いに平行
をなしているのが好ましい。
The installation jig 50 is set on the screw rebar 21 in advance before the installation work. More specifically, as shown by the imaginary line in FIG. 6, the screw rebar 21 is housed in the rear end portion 54a of the slit 54 of the lower horizontal plate portion 51, and the horizontal plate portion 51 is connected to the coupler nut 30 and the first lock. Nut 3
Tighten and pinch with 1. As a result, the upper horizontal plate portion 52 is horizontally arranged above the screw reinforcing bar 21. The installation jig 50 is set on all of the four screw rebars 21 as shown in FIGS. In addition, it is preferable that the slits 55 of the upper horizontal plate portions 52 of all the installation jigs 50 are parallel to each other.

【0011】上記のようにして建込治具50をセットし
た後で、図1,図2に示すように柱用鉄筋篭10をクレ
ーンのフック100で吊り下げ、ねじ鉄筋21の上方ま
で運搬する。そして、図2に想像線で示すように、柱用
鉄筋籠10を降下させて、柱用鉄筋篭10のねじ鉄筋1
1を建込治具50の上側水平板部52のスリット55に
収容させるとともに、ねじ鉄筋11に螺合させた第2ロ
ックナット32を上側水平板部52の上面に載せる。こ
の際、図7に最も良く示すように、ねじ鉄筋11をスリ
ット55の奥端部55aに合わせることにより、ねじ鉄
筋11はねじ鉄筋21と同一直線上に位置決めされるこ
とになる。
After the installation jig 50 is set as described above, the pillar rebar cage 10 is hung by the hook 100 of the crane as shown in FIGS. 1 and 2 and conveyed to above the screw rebar 21. . Then, as shown by an imaginary line in FIG. 2, the pillar rebar cage 10 is lowered to form the screw rebar 1 of the pillar rebar cage 10
1 is accommodated in the slit 55 of the upper horizontal plate portion 52 of the installation jig 50, and the second lock nut 32 screwed to the screw rebar 11 is placed on the upper surface of the upper horizontal plate portion 52. At this time, as best shown in FIG. 7, the screw reinforcing bar 11 is aligned with the screw reinforcing bar 21 by aligning the screw reinforcing bar 11 with the rear end portion 55 a of the slit 55.

【0012】上記のように、4本のねじ鉄筋11に螺合
された第2ロックナット32が、4本のねじ鉄筋21に
セットされた建込治具50の上側水平板部52に載るこ
とにより、柱用鉄筋籠10は自立する。なお、第2ロッ
クナット32のねじ鉄筋11に対する螺合位置はねじ鉄
筋11の下端から所定距離離れているので、柱用鉄筋篭
10は垂直に自立している。また、上記建込治具50の
ねじ鉄筋21に対する取り付け位置も決まっており、柱
用鉄筋籠10の主筋11の下端面とねじ鉄筋21の上端
面との間隔Sは、決められた微小量とすることができ
る。
As described above, the second lock nut 32 screwed onto the four screw rebars 11 is mounted on the upper horizontal plate portion 52 of the installation jig 50 set on the four screw rebars 21. Thereby, the rebar cage 10 for columns becomes independent. Since the screwing position of the second lock nut 32 with respect to the screw reinforcing bar 11 is away from the lower end of the screw reinforcing bar 11 by a predetermined distance, the column reinforcing bar cage 10 is vertically independent. Further, the mounting position of the installation jig 50 with respect to the screw reinforcing bar 21 is also determined, and the interval S between the lower end surface of the main bar 11 of the pillar reinforcing bar cage 10 and the upper end surface of the screw reinforcing bar 21 is a determined minute amount. can do.

【0013】上記柱用鉄筋篭10が自立した後は、柱用
鉄筋籠10はクレーンによる吊り下げ状態を解除され、
図3に示す状態になる。この状態で、第2ロックナット
32を回すことにより、ねじ鉄筋11を微少量上下移動
させ、ねじ鉄筋21とピッチを合わせる。次に、図4に
示すように、カプラーナット30を回動させて上方へ移
動し、その半分を柱用鉄筋籠10のねじ鉄筋11の下端
部に螺合させる。
After the pillar rebar cage 10 is self-supporting, the pillar rebar cage 10 is released from the suspended state by the crane,
The state shown in FIG. 3 is obtained. In this state, by rotating the second lock nut 32, the screw reinforcing bar 11 is moved up and down by a small amount to match the pitch with the screw reinforcing bar 21. Next, as shown in FIG. 4, the coupler nut 30 is rotated and moved upward, and half of the nut is screwed into the lower end portion of the screw reinforcing bar 11 of the column reinforcing bar basket 10.

【0014】続いて、図5に示すように、建込治具50
をスリット54,55の延び方向に水平移動させること
により、ねじ鉄筋11,21から抜き取る。この抜き取
りに先立って建込治具50の水平板部51の下面,水平
板部52の上面にそれぞれ当たっているロックナット1
1,21のいずれか一方を建込治具50から離す方向に
緩めておくのが好ましい。
Then, as shown in FIG.
Is horizontally moved in the extending direction of the slits 54 and 55, so that it is pulled out from the screw rebars 11 and 21. Prior to this withdrawal, the lock nut 1 is in contact with the lower surface of the horizontal plate portion 51 and the upper surface of the horizontal plate portion 52 of the installation jig 50, respectively.
It is preferable to loosen either one of 1 and 21 in the direction away from the installation jig 50.

【0015】次に、ロックナット31,32をカプラー
ナット30に向かって移動させ、その上下端面に締付け
る。これにより、ねじ鉄筋11,21の強固な連結が得
られると共に、柱用鉄筋篭10の建込が完了する。この
建込完了後にコンクリートを打設して、柱用鉄筋篭10
をコンクリートに埋め込む。
Next, the lock nuts 31 and 32 are moved toward the coupler nut 30 and fastened to the upper and lower end surfaces thereof. As a result, a strong connection between the screw rebars 11 and 21 is obtained, and the building of the column reinforcing bar cage 10 is completed. After this construction is completed, concrete is placed and the rebar cage for columns 10
Embedded in concrete.

【0016】本発明は上記実施例に制約されず、種々の
態様が可能である。例えば、建込治具は、ねじ鉄筋21
にセットせず、コンクリート構造物20の上面に載せて
もよい。また、建込治具の水平板部は、柱用鉄筋篭のね
じ鉄筋を通す穴を有し、ねじ鉄筋に対して抜き取り不能
であってもよい。この場合には、ねじ鉄筋と一緒にコン
クリートに埋め込まれる。カプラーナットの両端をロッ
クナットで締め付ける代わりに、カプラーナットにグラ
ウト材を充填して、連結強度を高めてもよい。
The present invention is not limited to the above embodiment, but various modes are possible. For example, the installation jig is screw rebar 21
It may be placed on the upper surface of the concrete structure 20 instead of being set on. Further, the horizontal plate portion of the installation jig may have a hole for passing the threaded reinforcing bar of the column reinforcing bar cage and may not be able to be pulled out from the threaded reinforcing bar. In this case, it is embedded in concrete together with screw reinforcement. Instead of tightening both ends of the coupler nut with lock nuts, the coupler nut may be filled with grout material to enhance the connection strength.

【0017】[0017]

【発明の効果】以上のように、請求項1の柱用鉄筋籠の
建込方法によれば、建込治具を用いて柱用鉄筋籠を自立
させるので、この自立後は、コンクリート構造物のねじ
鉄筋と柱用鉄筋篭のねじ鉄筋とをカプラーナットにより
連結する作業において、柱用鉄筋篭のクレーン等による
吊り下げを必要とせず、クレーン等の使用時間を大幅に
減らすことができる。請求項2の建込方法では、補助ナ
ットを回すことにより、コンクリート構造物のねじ鉄筋
と柱用鉄筋篭のねじ鉄筋のピッチ合わせを簡単に行うこ
とができる。請求項3,4の建込方法,建込治具によれ
ば、建込治具を簡単に位置決めできる。また、柱用鉄筋
篭のねじ鉄筋の位置決めも簡単に行うことができる。さ
らに、カプラーナットによりねじ鉄筋同士を連結した後
は、建込治具を水平移動させることにより、ねじ鉄筋か
ら抜き取ることができ、その後のロックナットによる締
付作業を支障なく行うことができる。
As described above, according to the method of erection of the column reinforcing bar basket of claim 1, the column reinforcing bar basket is made to stand by itself using the erection jig. In the work of connecting the screw rebar of No. 2 and the screw rebar of the pillar rebar cage by the coupler nut, it is not necessary to hang the pillar rebar cage by a crane or the like, and the usage time of the crane or the like can be greatly reduced. According to the erection method of claim 2, by turning the auxiliary nut, it is possible to easily perform pitch alignment between the screw reinforcing bars of the concrete structure and the screw reinforcing bars of the column reinforcing bar cage. According to the installation method and the installation jig of claims 3 and 4, the installation jig can be easily positioned. Further, the positioning of the screw reinforcing bars of the pillar reinforcing bar cage can be easily performed. Furthermore, after connecting the screw rebars with each other by the coupler nut, it can be pulled out from the screw rebars by horizontally moving the installation jig, and the subsequent tightening work with the lock nut can be performed without any trouble.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る柱用鉄筋籠の建込方法の一実施例
の第一工程を示す斜視図である。
FIG. 1 is a perspective view showing a first step of an embodiment of a method for installing a column reinforcing rod cage according to the present invention.

【図2】同実施例の第一工程の側面図である。FIG. 2 is a side view of a first step of the example.

【図3】同実施例の第二工程の側面図である。FIG. 3 is a side view of a second step of the same example.

【図4】同実施例の第三工程の側面図である。FIG. 4 is a side view of a third step of the same example.

【図5】同実施例の第四工程の側面図である。FIG. 5 is a side view of a fourth step of the same example.

【図6】同実施例に用いられる建込治具とコンクリート
構造物のねじ鉄筋に螺合されるカプラーナットおよび第
1ロックナットを示す要部拡大斜視図である。
FIG. 6 is an enlarged perspective view of a main part showing a construction jig and a coupler nut and a first lock nut which are screwed to a screw reinforcing bar of a concrete structure used in the embodiment.

【図7】柱用鉄筋篭の自立状態での要部拡大斜視図であ
る。
FIG. 7 is an enlarged perspective view of an essential part of a column reinforcing bar basket in an independent state.

【符号の説明】[Explanation of symbols]

10 … 柱用鉄筋籠 11 … ねじ鉄筋 20 … コンクリート構造物 21 … ねじ鉄筋 30 … カプラーナット 31 … 第1ロックナット 32 … 第2ロックナット 50 … 建込治具 51 … 下側水平板部 52 … 上側水平板部(水平載置部) 53 … 垂直板部(連結部) 54 … 第1スリット 55 … 第2スリット 10… Reinforcement basket for pillar 11… Screw rebar 20… Concrete structure 21… Screw rebar 30… Coupler nut 31… First lock nut 32… Second lock nut 50… Installation jig 51… Lower horizontal plate 52… Upper horizontal plate portion (horizontal placement portion) 53 ... Vertical plate portion (connection portion) 54 ... First slit 55 ... Second slit

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 複数のねじ鉄筋を主筋として含む柱用鉄
筋籠を、上方へ突出した複数のねじ鉄筋を含むコンクリ
ート構造物の上方に配置し、柱用鉄筋篭のねじ鉄筋とコ
ンクリート構造物のねじ鉄筋とを連結することにより、
柱用鉄筋籠を建込む方法において、 コンクリート構造物のねじ鉄筋に予めカプラーナットを
螺合させ、柱用鉄筋籠のねじ鉄筋に予め補助ナットを螺
合させ、 柱用鉄筋篭を吊り下げて、柱用鉄筋篭のねじ鉄筋をコン
クリート構造物のねじ鉄筋と同一直線上に位置させた状
態で、コンクリート構造物に設置した建込治具の水平載
置部に、柱用鉄筋篭のねじ鉄筋を貫通させるとともに補
助ナットを載せることにより、柱用鉄筋篭を自立させ、 この自立後に上記カプラーナットを上方へ移動させて、
このカプラーナットにより両者のねじ鉄筋を連結するこ
とを特徴とする柱用鉄筋籠の建込方法。
1. A rebar cage for a column including a plurality of screw rebars as main bars is disposed above a concrete structure including a plurality of screw rebars projecting upward, and a rebar cage for a column rebar and a concrete rebar By connecting with the screw rebar,
In the method of constructing a rebar cage for a column, a coupler nut is screwed in advance to a screw rebar of a concrete structure, an auxiliary nut is screwed in advance to a screw rebar of a column rebar basket, and a rebar cage for a column is suspended. With the screw rebar of the pillar rebar cage positioned on the same straight line as the screw rebar of the concrete structure, place the screw rebar of the pillar rebar cage on the horizontal placement part of the installation jig installed in the concrete structure. By penetrating and mounting an auxiliary nut, the pillar rebar cage can be made self-supporting, and after this self-supporting, the coupler nut can be moved upward,
A method for constructing a column reinforcing rod cage, characterized in that the screw nuts of the both are connected by this coupler nut.
【請求項2】 上記補助ナットを建込治具上で回すこと
により、柱用鉄筋篭のねじ鉄筋を昇降させて、コンクリ
ート構造物のねじ鉄筋に対する柱用鉄筋篭のねじ鉄筋の
ピッチ調整を行うことを特徴とする請求項1に記載の柱
用鉄筋籠の建込方法。
2. The pitch adjustment of the screw rebar of the pillar rebar basket with respect to the screw rebar of the concrete structure is performed by rotating the auxiliary nut on the installation jig to raise and lower the screw rebar of the pillar rebar basket. The method for constructing a rebar cage for a pillar according to claim 1, wherein.
【請求項3】 上記コンクリート構造物のねじ鉄筋には
カプラーナットとともにその下方に配置された第1ロッ
クナットが予め螺合されており、柱用鉄筋篭のねじ鉄筋
に予め螺合された補助ナットは、第2ロックナットとし
て提供され、上記建込治具は、第1スリットを有する下
側水平板部と、上記第1スリットと平行をなす第2スリ
ットを有する上記水平載置部としての上側水平板部と、
両水平板部を連結する連結部とを備えており、上記建込
治具の下側水平板部の第1スリットにコンクリート構造
物のねじ鉄筋を嵌めた状態で、この下側水平板部をカプ
ラーナットと第1ロックナットで挟むことにより、建込
治具を予めセットしておき、このセット状態で、コンク
リート構造物のねじ鉄筋の上方に配置された上側水平板
部のスリットに柱用鉄筋篭のねじ鉄筋を通し、第2ロッ
クナットを上側水平板部に載せることにより、柱用鉄筋
篭を自立させ、この後で、カプラーナットにより両者の
ねじ鉄筋を連結し、さらに、建込治具を水平移動させて
両者のねじ鉄筋から抜き取り、最後に、第1,第2ロッ
クナットをカプラーナットに向かって締め付けることを
特徴とする請求項1,2のいずれかに記載の柱用鉄筋篭
の建込方法。
3. A first lock nut, which is arranged below the coupler nut together with a coupler nut, is previously screwed to the screw rebar of the concrete structure, and the auxiliary nut is pre-threaded to the screw rebar of the pillar rebar basket. Is provided as a second lock nut, and the erection jig is provided with a lower horizontal plate portion having a first slit, and an upper portion as the horizontal mounting portion having a second slit parallel to the first slit. Horizontal plate part,
And a connecting portion that connects both horizontal plate portions, and in a state in which the screw rebar of the concrete structure is fitted in the first slit of the lower horizontal plate portion of the above-mentioned installation jig, this lower horizontal plate portion The building jig is set in advance by sandwiching it with the coupler nut and the first lock nut, and in this set state, the pillar rebar is inserted into the slit of the upper horizontal plate portion located above the screw rebar of the concrete structure. Insert the second lock nut on the upper horizontal plate through the screw rebar of the basket to make the rebar basket for columns self-supporting. After that, connect the two screw rebars with the coupler nut, and then install the jig. 3. The column reinforcing bar cage according to claim 1, wherein the first and second lock nuts are finally tightened toward the coupler nut by horizontally moving the screw and pulling out from the two screw reinforcing bars. Installation method.
【請求項4】 複数のねじ鉄筋を主筋として含む柱用鉄
筋籠を、上方へ突出した複数のねじ鉄筋を含むコンクリ
ート構造物の上方に配置し、柱用鉄筋篭のねじ鉄筋とコ
ンクリート構造物のねじ鉄筋とを、予めコンクリート構
造物のねじ鉄筋に螺合されたカプラーナットおよび第1
ロックナットと、柱用鉄筋篭のねじ鉄筋に螺合された第
2ロックナットとを用いて連結することにより、柱用鉄
筋籠を建込む際に用いられる建込治具であって、 (イ)上記カプラーナットとその下方の第1ロックナッ
トに挟まれて支持されるとともに、コンクリート構造物
のねじ鉄筋を抜き差し可能に収容する第1スリットを有
する下側の水平板部と、 (ロ)上記第1スリットと平行をなし柱用鉄筋篭のねじ
鉄筋を抜き差し可能に収容する第2スリットを有し、か
つ上記第2ロックナットを載せて支持する上側の水平板
部と、 (ハ)下側水平板部と上側水平板部とを連結する連結部
と、を備えたことを特徴とする連結治具。
4. A column reinforcing bar cage including a plurality of screw reinforcing bars as main bars is arranged above a concrete structure including a plurality of upwardly projecting screw reinforcing bars, and the column reinforcing bar cage screw reinforcing bars and the concrete structure are A screw nut and a coupler nut, which is screwed in advance to the screw rebar of the concrete structure, and the first
A building jig used when building a pillar reinforcing bar basket by connecting the lock nut and a second lock nut screwed to a screw reinforcing bar of the pillar reinforcing bar cage, which comprises: ) A lower horizontal plate portion which is supported by being sandwiched between the coupler nut and a first lock nut below the coupler nut, and which has a first slit for accommodating a screw rebar of a concrete structure in a removable manner; An upper horizontal plate portion that has a second slit that is parallel to the first slit and that accommodates a screw rebar of a rebar cage for a pillar so that the rebar can be inserted and removed, and (c) a lower side A connecting jig, comprising: a connecting portion that connects the horizontal plate portion and the upper horizontal plate portion.
JP19467194A 1994-07-27 1994-07-27 Building method of reinforced cage for column and building jig Pending JPH0842064A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19467194A JPH0842064A (en) 1994-07-27 1994-07-27 Building method of reinforced cage for column and building jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19467194A JPH0842064A (en) 1994-07-27 1994-07-27 Building method of reinforced cage for column and building jig

Publications (1)

Publication Number Publication Date
JPH0842064A true JPH0842064A (en) 1996-02-13

Family

ID=16328375

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19467194A Pending JPH0842064A (en) 1994-07-27 1994-07-27 Building method of reinforced cage for column and building jig

Country Status (1)

Country Link
JP (1) JPH0842064A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101375346B1 (en) * 2012-04-10 2014-03-19 서보산업 주식회사 Iron support jig
US10041252B1 (en) * 2016-07-28 2018-08-07 Steven James Bongiorno Bar sleeve
CN112609903A (en) * 2020-12-17 2021-04-06 上海宝冶集团有限公司 Steel bar connecting assembly and method for building by utilizing PC (polycarbonate) component

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101375346B1 (en) * 2012-04-10 2014-03-19 서보산업 주식회사 Iron support jig
US10041252B1 (en) * 2016-07-28 2018-08-07 Steven James Bongiorno Bar sleeve
CN112609903A (en) * 2020-12-17 2021-04-06 上海宝冶集团有限公司 Steel bar connecting assembly and method for building by utilizing PC (polycarbonate) component

Similar Documents

Publication Publication Date Title
JPH0842064A (en) Building method of reinforced cage for column and building jig
JP2536267Y2 (en) Driving formwork for floor slabs and connecting device for self-supporting truss-like reinforcing bars
JP4057204B2 (en) Formwork fixing structure
JPH09268708A (en) Separator with retaining metal tool for reinforcements
JP2000320142A (en) Device and method for reinforcement assembly in construction work
JPH0925636A (en) Reinforcement suspension frame
JP3453487B2 (en) Anchor bolt mounting device for steel reinforced concrete structures
CN211621992U (en) Steel construction pipe truss roof support built-in fitting
JP3081653U (en) Baseboard panel fixture
JP2601752B2 (en) Curved type frame
JP2002004581A (en) Jointing tool for pressure-tight board
JP2002038717A (en) Method of installing structural member
JP2575865Y2 (en) Lower reinforcement support for pillar for assembling foundation reinforcement
JPH0626197A (en) Bearingmetalfixture device for rising form support
JP3227551B2 (en) Method and support for supporting formwork around gantry pile
JPH06299699A (en) Support device of floor form
JPS638260B2 (en)
JPS6212028Y2 (en)
JPS624497B2 (en)
JP2904752B2 (en) Construction method of reinforced steel frame of reinforced concrete building
JPH0817517A (en) Embedded receptacle for concrete column
JP2003268988A (en) Supporter for concrete form
JPH0513789Y2 (en)
JPH08100532A (en) Joining method for beam support and beam member
JP2022066106A (en) Reinforced concrete embedded plate