JPH08333887A - Construction of scaffolding beam - Google Patents

Construction of scaffolding beam

Info

Publication number
JPH08333887A
JPH08333887A JP16811495A JP16811495A JPH08333887A JP H08333887 A JPH08333887 A JP H08333887A JP 16811495 A JP16811495 A JP 16811495A JP 16811495 A JP16811495 A JP 16811495A JP H08333887 A JPH08333887 A JP H08333887A
Authority
JP
Japan
Prior art keywords
scaffolding
main girder
scaffolding beam
bolt
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16811495A
Other languages
Japanese (ja)
Inventor
Tomohide Miyata
智秀 宮田
Shoji Miyamoto
鉦治 宮本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAKAKURA TEKKOSHO KK
Oriental Construction Co
Original Assignee
TAKAKURA TEKKOSHO KK
Oriental Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAKAKURA TEKKOSHO KK, Oriental Construction Co filed Critical TAKAKURA TEKKOSHO KK
Priority to JP16811495A priority Critical patent/JPH08333887A/en
Publication of JPH08333887A publication Critical patent/JPH08333887A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: To facilitate installation and removal by a single worker. CONSTITUTION: A support metal fixture 4 is fixed with a bolt screwed into an insert 2 buried in the exterior of a main girder 1, and a hang bolt 7 is screwed from the underside into the support metal fixture 4 and a support washer 10 is fixed to the hang bolt 7. A scaffolding beam 11 is slid over the support washer 10 and inserted for installation into the bottom side of the main girder 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、橋桁等の工事現場に
おいて足場となる足場梁を施工する方法に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a scaffolding beam which serves as a scaffolding at a construction site such as a bridge girder.

【0002】[0002]

【従来の技術及びその課題】従来、橋桁に足場梁を施工
する場合、図7に概略図で示すように、工場で製造され
たコンクート製の橋桁を構成する主桁1,1をクレーン
等により所定位置に複数列設した状態で、先ず作業者の
一人が主桁1,1間の隙間Sにロープ51を垂れ下げ、
このロープ51を別の作業者が外側よりL字状の鉄筋5
2等を使用して外側へロープ51を引き寄せ、この引き
寄せたロープ51を図8に示すように、足場梁53の吊
りボルト54に結び付け、足場梁53の他端側にもロー
プ55を結び付けて、二人の作業者により図9のよう
に、足場梁53を外側の主桁1の底面側に当接状に引き
上げ、図10のように、吊りボルト54の上端に支持板
56を取り付けて、支持板56と吊りボルト54を介し
足場梁53を主桁1に止め付けており、主桁1から外側
方に突出状に設置された足場梁53上に作業者が乗って
橋桁の欄干部分の施工工事等を行なっている。このよう
な従来の施工方法においては、複数の作業者がロープ等
を用いて足場梁を設置するものであり、作業工数が多
く、足場梁の設置作業が極めて困難で、足場梁の落下等
の危険性もあり、また、橋桁が道路上または鉄道の線路
上に構築される場合等においては、主桁の下方側に足場
梁の設置のための空間を十分に確保することができず、
従来のような施工方法では足場梁の設置が困難となる場
面が生ずるという問題点があった。
2. Description of the Related Art Conventionally, when scaffolding beams are constructed on a bridge girder, as shown in the schematic diagram of FIG. 7, main girders 1 and 1 constituting a bridge girder manufactured by a factory are constructed by a crane or the like. First, one of the workers hangs the rope 51 in the gap S between the main girders 1 in a state where a plurality of rows are provided at predetermined positions.
Another worker attaches the rope 51 to the L-shaped reinforcing bar 5 from the outside.
Using 2 etc., pull the rope 51 outward, tie the pulled rope 51 to the hanging bolt 54 of the scaffolding beam 53, and tie the rope 55 to the other end side of the scaffolding beam 53 as shown in FIG. As shown in FIG. 9, the two workers pull up the scaffolding beam 53 so as to abut on the bottom side of the outer main girder 1, and attach the support plate 56 to the upper end of the hanging bolt 54 as shown in FIG. The scaffolding beam 53 is fixed to the main girder 1 via the support plate 56 and the hanging bolts 54, and the worker rides on the scaffolding beam 53 projecting outward from the main girder 1 and the parapet part of the bridge girder. The construction work of In such a conventional construction method, a plurality of workers install the scaffolding beams by using ropes, etc., which requires a large number of man-hours, and the installation work of the scaffolding beams is extremely difficult. There is also a danger, and when the bridge girder is constructed on a road or railroad track, it is not possible to secure sufficient space for installing scaffolding beams below the main girder,
The conventional construction method has a problem in that it may be difficult to install the scaffold beams.

【0003】[0003]

【課題を解決するための手段】本発明は上記従来の問題
点に鑑み案出したものであって、一人の作業者により安
全に足場梁を設置することができる足場梁の施工方法を
提供せんことを目的とし、その要旨は、主桁の外周面に
予め埋設されたインサートに吊りボルトを垂設し、該吊
りボルトの下部部位に受け座金を取り付けるとともに、
該受け座金上に足場梁の内端側を載せ、該足場梁に長手
方向に沿って形成された中央溝内に前記吊りボルトを通
した状態で該足場梁を前記主桁の底面に沿って内側へ押
し込み主桁に足場梁を設置することである。
The present invention has been devised in view of the above problems of the prior art, and does not provide a scaffolding beam construction method by which one worker can safely install the scaffolding beam. For the purpose of that, the gist is to suspend the hanging bolt on the insert buried in advance on the outer peripheral surface of the main girder, and to attach the receiving washer to the lower part of the hanging bolt,
The inner end side of the scaffolding beam is placed on the receiving washer, and the scaffolding beam is passed along the bottom surface of the main girder in a state where the hanging bolt is passed through a central groove formed along the longitudinal direction of the scaffolding beam. It is to push inward and install scaffolding beams on the main girder.

【0004】[0004]

【作用】主桁に埋設されているインサートに対し支持金
具等を介し下方より吊りボルトを螺合させて、さらに吊
りボルトの下部部位に受け座金を取り付ければ、この受
け座金上に足場梁の内端側を載せて足場梁を主桁の底面
に沿って内側へ押し込むことにより、足場梁を主桁に容
易に設置することができ、一人の作業者により足場梁の
設置が可能となり、また、足場梁を取り外す場合にも、
足場梁を主桁の底面に沿って外側へ引き抜いて容易に取
り外すことが可能となる。
[Operation] If the hanging bolt is screwed into the insert embedded in the main girder from below through the support metal fittings and the receiving washer is attached to the lower part of the hanging bolt, the inside of the scaffolding beam will be placed on the receiving washer. By placing the end side and pushing the scaffolding beam inward along the bottom surface of the main girder, the scaffolding beam can be easily installed on the main girder, and one worker can install the scaffolding beam, and also Even when removing the scaffolding beams,
It is possible to easily remove the scaffolding beam by pulling it out along the bottom surface of the main girder.

【0005】[0005]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1は、橋桁の欄干の基礎部分をコンクリート打
設する工事における足場梁の取付状態を示すものであ
り、また図2は、図1における要部拡大図を示すもので
あり、また図3は、図1におけるA方向の矢視側面構成
図である。図において、工場で形成されたコンクリート
製の主桁1,1は現場に運ばれてクレーン等により複数
列設されて設置されるものであり、本例における主桁1
の底面側のコーナー部には傾斜状にコーナー切欠部1a
が形成されたものとなっており、この主桁1,1,1の
内、最も外側に設置される主桁1の外側面には予め長手
方向に沿って所定間隔でインサート2,2,2が埋設さ
れたものとなっており、この各インサート2に対しては
外側より固定ボルト3を螺合させて、固定ボルト3を主
桁1の外側面の外方へ突出させることができるものであ
り、図2に拡大して示すように、インサート2に対しボ
ルト3を螺合させてボルト3の外端部を外側へ突出さ
せ、ボルト3には外側よりナット5を締め付けて固定ボ
ルト3とナット5により主桁1の外側面に支持金具4を
固設することができるものであり、この支持金具4は図
5に斜視図で示すように、略L字状に形成されたもので
あり、主桁1の外側面に当接状となる垂直片部4aの下
端に水平状に外側に突出して水平片部4bが一体形成さ
れており、垂直片部4aから水平片部4bに亘りその両
側面側には突出して補強用のリブ片部4c,4cが一体
形成されており、また、垂直片部4aの上端にも突出し
て上リブ片4dが形成され、また、水平片部4bの先端
側にも上方へ突出して下リブ片4eが形成されたものと
なっており、また、下リブ片4eの内側の水平片部4b
の上面には予め溶接ナット6が固設されたものとなって
いる。なお、この支持金具4は、前記垂直片部4aと水
平片部4bをアングル材で形成し、アングル材にリブ片
部4c,4cを溶接して形成したものでも良い。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows the mounting state of the scaffolding beams in the construction of placing the foundation part of the balustrade of the bridge girder in concrete, and FIG. 2 shows an enlarged view of the main parts in FIG. 1, and FIG. FIG. 2 is a side view of the arrow A in FIG. 1. In the figure, the main girders 1 and 1 made of concrete formed in a factory are transported to the site and installed in multiple rows by a crane or the like.
The corner notch 1a is inclined in the corner on the bottom side of the
Of the main girders 1, 1, 1, the outer surface of the outermost main girder 1 is provided with inserts 2, 2, 2 at predetermined intervals along the longitudinal direction. The fixing bolts 3 are screwed into the respective inserts 2 from the outside so that the fixing bolts 3 can be projected to the outside of the outer side surface of the main girder 1. As shown in the enlarged view of FIG. 2, the bolt 3 is screwed into the insert 2 so that the outer end portion of the bolt 3 projects outward, and the nut 3 is tightened from the outer side of the bolt 3 to fix the fixing bolt 3. The support fitting 4 can be fixedly mounted on the outer surface of the main girder 1 by the nut 5, and the support fitting 4 is formed in a substantially L shape as shown in a perspective view in FIG. , At the lower end of the vertical piece 4a that comes into contact with the outer surface of the main girder 1 horizontally outwardly A horizontal piece 4b is integrally formed so as to extend, and rib pieces 4c, 4c for reinforcement are integrally formed so as to project from the vertical piece 4a to the horizontal piece 4b on both side surfaces thereof. An upper rib piece 4d is formed so as to project also on the upper end of the vertical piece 4a, and a lower rib piece 4e is formed so as to project upward also on the tip side of the horizontal piece 4b. Horizontal piece 4b inside rib piece 4e
The welding nut 6 is fixedly secured in advance on the upper surface of the. The support fitting 4 may be formed by forming the vertical piece 4a and the horizontal piece 4b with an angle member and welding the rib pieces 4c, 4c to the angle member.

【0006】このようにナット5を締め付けてそれぞれ
支持金具4を図3に示すように、所定間隔で主桁1の外
側面に長手方向に沿って固定しておき、この状態で各支
持金具4に対し、下方側より吊りボルト7を前記溶接ナ
ット6に螺合させて、吊りボルト7を支持金具4から垂
設させることができ、吊りボルト7には下方側より樹脂
コーン8またはゴム製のゴムコーンを差し込んで、樹脂
コーン8は支持金具4の水平片部4bの下面に当接させ
ておくことができ、さらに吊りボルト7にはブロック状
の弛み止めナット9を螺合させて中間位置に配置させて
おくことができ、さらに吊りボルト7の下部部位にはナ
ット12を介し受け座金10を取り付けることができ
る。
In this way, the nuts 5 are tightened and the support fittings 4 are fixed to the outer surface of the main girder 1 at predetermined intervals along the longitudinal direction as shown in FIG. On the other hand, the suspension bolt 7 can be vertically hung from the support fitting 4 by screwing the suspension bolt 7 into the welding nut 6 from the lower side. The suspension bolt 7 is made of the resin cone 8 or the rubber made from the lower side. By inserting a rubber cone, the resin cone 8 can be kept in contact with the lower surface of the horizontal piece 4b of the support fitting 4, and further, a block-shaped locking nut 9 can be screwed onto the hanging bolt 7 to bring it to an intermediate position. The receiving washer 10 can be attached to the lower portion of the hanging bolt 7 via a nut 12 in advance.

【0007】即ち、受け座金10は図5に示すように、
水平片10aと、その水平片10aの一端側から上方へ
直角に立ち上がる立上片10bで形成されたものであ
り、図3に示すように、それぞれの支持金具4に対し吊
りボルト7を垂設させて、各吊りボルト7に対し樹脂コ
ーン8及び弛み止めナット9及び受け座金10を取り付
けておく。この状態で図6に斜視図で示すような形状を
有する足場梁11を前記受け座金10上に載せる。即
ち、図6に示す足場梁11は、一対のチャンネル材11
a,11aを向かい合わせて並列状に配置し、連結片1
1b,11bでそれぞれ連結して一体化したものであ
り、各チャンネル材11a,11a間には長手方向に沿
って上下に貫通する中央溝Mが形成されたものとなって
いる。また、各チャンネル材11a,11aの内端側の
上面には、上方へ突出して先端係合突片11c,11c
がそれぞれ形成されたものとなっている。また、外端側
にはチャンネル材11a,11aの下面より外方へ延び
る突出板11dが形成されており、この突出板11d上
には立上パイプ11eが立設されたものとなっており、
立上パイプ11eの上端側には鉤状の鉤溝11fが形成
されている。また、一方側のチャンネル材11aの上面
側には上下に貫通してピン孔11gが形成されており、
その側方にはワイヤーを通すワイヤー孔11hが形成さ
れたものとなっている。なお、足場梁11は、前記のチ
ャンネル材11a,11aに限らず、軽量材で長手方向
に沿って上下に貫通する中央溝Mが良好に形成されたも
のであれば良い。
That is, the receiving washer 10 is, as shown in FIG.
The horizontal piece 10a is formed of a horizontal piece 10a and a rising piece 10b which rises at a right angle from one end side of the horizontal piece 10a. As shown in FIG. Then, the resin cone 8, the loosening prevention nut 9 and the receiving washer 10 are attached to the respective hanging bolts 7. In this state, a scaffolding beam 11 having a shape shown in a perspective view in FIG. 6 is placed on the receiving washer 10. That is, the scaffolding beam 11 shown in FIG.
a and 11a are arranged facing each other in parallel, and the connecting piece 1
1b and 11b are connected and integrated with each other, and a central groove M vertically penetrating along the longitudinal direction is formed between the channel members 11a and 11a. Further, on the upper surfaces of the respective channel members 11a, 11a on the inner end side, the tip engaging projections 11c, 11c are projected upward.
Are formed respectively. A protruding plate 11d extending outward from the lower surfaces of the channel members 11a, 11a is formed on the outer end side, and a rising pipe 11e is erected on the protruding plate 11d.
A hook-shaped hook groove 11f is formed on the upper end side of the rising pipe 11e. In addition, a pin hole 11g is formed vertically through the upper surface of the channel material 11a on one side.
A wire hole 11h for passing a wire is formed on its side. Note that the scaffolding beam 11 is not limited to the channel members 11a and 11a described above, and may be made of a light-weight material as long as the central groove M that vertically penetrates along the longitudinal direction is well formed.

【0008】このように形成された足場梁11の内端側
を前記受け座金10上に載せて、足場梁11を主桁1の
底面側へスライドさせて押し込むことができ、この時に
先端係合突片11cが引っ掛からないように僅かに先端
係合突片11c側を下側へ傾斜させて押し込むことによ
り、容易に受け座金10上をスライドさせて足場梁11
を主桁1の底面側に押し込むことができ、この際に前記
吊りボルト7は足場梁11の中央溝M内に嵌まり込んだ
状態となる。足場梁11の先端係合突片11cを主桁1
のコーナー切欠部1aに係合させることにより、足場梁
11は主桁1の底面側に当接した状態となって内端側と
前記吊りボルト7に支持された状態で良好に足場梁11
が主桁1に施工させることとなり、ナット12を適宜締
め付けることにより安定した状態で足場梁11を主桁1
の底面に固定させることができる。
The inner end side of the scaffolding beam 11 thus formed can be placed on the receiving washer 10 and the scaffolding beam 11 can be slid and pushed toward the bottom side of the main girder 1, and at this time, the tip engagement. By slightly inclining the tip engaging protrusion 11c side downward so that the protrusion 11c does not get caught, the protrusion beam 11c is easily slid on the receiving washer 10 to scaffold the beam 11.
Can be pushed into the bottom side of the main girder 1, and at this time, the suspension bolt 7 is fitted in the central groove M of the scaffolding beam 11. Attach the leading end engaging projection 11c of the scaffolding beam 11 to the main girder 1.
By engaging with the corner cutouts 1a of the scaffolding beam 11, the scaffolding beam 11 is brought into contact with the bottom side of the main girder 1 and is satisfactorily supported on the inner end side and the hanging bolt 7.
Will be applied to the main girder 1, and the scaffolding beam 11 can be stably attached to the main girder 1 by properly tightening the nut 12.
Can be fixed to the bottom of the.

【0009】このように予め主桁1の外側面に埋設され
たインサート2に対し固定ボルト3を螺合させて、かつ
ナット5を介し支持金具4を固設することができ、この
支持金具4に対し吊りボルト7を下方より螺合させて吊
りボルト7を垂設させ、この吊りボルト7に弛み止めナ
ット9及び受け座金10を取り付けて、受け座金10の
上面に足場梁11を載せて受け座金10上をスライドさ
せて足場梁11を主桁1の底面側へ押し込み、容易に足
場梁11を主桁1に設置することができ、足場梁11は
従来のものよりも構造上軽量に形成することができるた
め、一人の作業者が容易に現場で足場梁11をスライド
状に差し込んで設置することが可能となり、図3のよう
に主桁1の長手方向に沿って足場梁11をそれぞれ受け
座金10にスライドさせて設置し、設置された足場梁1
1上に足場板13を長手方向に沿って載せてゆけば、現
場において次々と長手方向に沿って足場梁11を一人の
作業者により設置してゆくことができるものとなり、設
置作業が容易で、また安全なものとなる。
In this way, the fixing bolt 3 can be screwed into the insert 2 previously embedded in the outer surface of the main girder 1, and the supporting metal fitting 4 can be fixedly mounted through the nut 5. The hanging bolt 7 is screwed from below to vertically hang the hanging bolt 7, and the locking nut 9 and the receiving washer 10 are attached to the hanging bolt 7, and the scaffolding beam 11 is placed on the upper surface of the receiving washer 10 to receive it. The scaffolding beam 11 can be easily installed on the main girder 1 by sliding on the washer 10 and pushing the scaffolding beam 11 to the bottom side of the main girder 1. The scaffolding beam 11 is structurally lighter in weight than conventional ones. Therefore, one worker can easily insert the scaffolding beam 11 in a sliding manner at the site and install the scaffolding beam 11 along the longitudinal direction of the main girder 1 as shown in FIG. Sly on the washer 10 Is not installed, the installed scaffold beam 1
If the scaffolding plate 13 is placed along the longitudinal direction on the scaffolding 1, the scaffolding beam 11 can be installed by one operator along the longitudinal direction one after another at the site, and the installation work is easy. , Will be safe again.

【0010】なお、このように設置された足場梁11
は、先端係合突片11cが主桁1のコーナー切欠部1a
に係合し、かつ外面側では吊りボルト7及び支持金具4
により支持されるものであり、荷重作用点が明確になる
と同時に主桁1の外面側で足場梁11が支持されるため
従来よりも外側へ突出する足場梁11の部分の下方側へ
のモーメントが少なくなり、従来よりも強度が増大した
ものとなり、その分、足場梁11は従来のものよりも小
型のものを使用して、より軽量化させることができる。
The scaffolding beam 11 installed in this way
Is the corner notch 1a of the main girder 1 at the tip engaging projection 11c.
And the hanging bolt 7 and the support fitting 4 on the outer surface side.
Since the scaffolding beam 11 is supported on the outer surface side of the main girder 1 at the same time that the load acting point becomes clear, the moment to the lower side of the part of the scaffolding beam 11 protruding outward than the conventional one is Since the number of the scaffolding beams 11 is smaller than that of the conventional scaffolding beam 11, the scaffolding beam 11 can be made smaller than that of the conventional scaffolding beam 11 and can be made lighter.

【0011】なお、最も外側の主桁1をクレーン等で所
定位置に設置する前に、予め前記支持金具4及び吊りボ
ルト7を介し足場梁11を取り付けておくこともでき、
主桁1の長手方向に沿って所定間隔で複数の足場梁11
を既に取り付けた状態で主桁1を所定位置に設置すれ
ば、高所での足場梁11の施工作業を省略することがで
き、より作業性が向上するものとなる。なお、前記弛み
止めナット9は施工状態では前記足場梁11を構成する
一対のチャンネル材11a,11a間の中央溝M内に嵌
まり込んで、吊りボルト7の弛み止め機能を達成するこ
とができるものである。また、弛み止めナット9は、主
桁1を所定位置に設置する前に予め支持金具4及び吊り
ボルト7を介し足場梁11を取り付けておく場合のブレ
止め機能を果たすことができ、先端係合突片11cはこ
の場合の足場梁11の脱落防止の役目をなす。
Before the outermost main girder 1 is installed at a predetermined position by a crane or the like, the scaffolding beam 11 can be attached in advance through the support fitting 4 and the suspension bolts 7,
A plurality of scaffolding beams 11 at predetermined intervals along the longitudinal direction of the main girder 1.
If the main girder 1 is installed at a predetermined position with the already installed, the construction work of the scaffolding beam 11 at a high place can be omitted, and the workability is further improved. It should be noted that the loosening prevention nut 9 can be fitted into the central groove M between the pair of channel members 11a, 11a forming the scaffolding beam 11 in the installed state to achieve the loosening prevention function of the suspension bolt 7. It is a thing. Also, the loosening prevention nut 9 can perform a shake preventing function when the scaffolding beam 11 is previously attached via the support fitting 4 and the suspension bolt 7 before the main girder 1 is installed at a predetermined position, and the tip engagement is performed. The protrusion 11c serves to prevent the scaffolding beam 11 from falling off in this case.

【0012】このようにして主桁1の長手方向に沿って
複数の足場梁11を設置した後には、複数の足場梁11
上に複数枚の足場板13を載せ、さらに足場梁11の立
上パイプ11eに対し上方より手摺りパイプ14を嵌め
込んで、鉤溝11fにより抜けを防止した状態で手摺り
パイプ14を立設させ、手摺りパイプ14には横方向に
横パイプ15,15を取り付けることができ、さらに手
摺りパイプ14の下部内側には落下防止板16を立設さ
せて、落下防止板16の内側には固定金具17を嵌め込
んで落下防止板16を固定することができ、この固定金
具17は前記足場梁11の立上パイプ11eとチャンネ
ル材11a,11aの外端間に嵌め込んで固定すること
ができるものである。
After installing the plurality of scaffolding beams 11 along the longitudinal direction of the main girder 1 in this manner, the plurality of scaffolding beams 11 are arranged.
A plurality of scaffolding plates 13 are placed on the scaffolding beam 11, and a handrail pipe 14 is fitted into the rising pipe 11e of the scaffolding beam 11 from above, and the handrail pipe 14 is erected in a state where the hook groove 11f prevents the handrail pipe 14 from coming off. Then, the horizontal pipes 15 and 15 can be attached to the handrail pipe 14 in the lateral direction. Further, the fall prevention plate 16 is erected on the inner side of the lower portion of the handrail pipe 14, and the inside of the fall prevention plate 16 is provided. The fall prevention plate 16 can be fixed by fitting the fixing metal fitting 17. The fixing metal fitting 17 can be fitted and fixed between the rising pipe 11e of the scaffolding beam 11 and the outer ends of the channel members 11a, 11a. It is possible.

【0013】このような状態で図1及び図2に示すよう
に、内側桟木19と外側桟木20を取り付けた底板18
を足場梁11上に設置し、ナット12を適宜締め付ける
ことにより、容易に一人で底板18を所定位置に固定す
ることができる。この際、内側桟木19は前記吊りボル
ト7,7間に嵌まり込むように現場で切断されて、図3
に示すように配置されるものであり、一方、外側桟木2
0は長手方向に連続したもので形成されており、内側桟
木19の配置状態は図2におけるB−B線断面図である
図4に示す。底板18を設置した後に前記外側桟木20
の外側に押し板21を配設し、押し板21の外側端部を
前記ピン孔11g内に差し込んだ差込ピン22に当接さ
せて、押し板21を介し底板18を主桁1の外側面側に
押し付けた状態で固定する。なお、ピン孔11g内に差
し込まれる差込ピン22の抜止のため、ワイヤー孔11
h内にワイヤーを通し、ワイヤーを差込ピン22に連結
させておくことができる。
In this state, as shown in FIGS. 1 and 2, the bottom plate 18 to which the inner stile 19 and the outer stile 20 are attached.
Is installed on the scaffolding beam 11 and the nut 12 is appropriately tightened, so that the bottom plate 18 can be easily fixed at a predetermined position by one person. At this time, the inner pier 19 is cut at the site so as to fit between the hanging bolts 7, 7,
The outer berth 2 is arranged as shown in FIG.
0 is formed continuously in the longitudinal direction, and the arrangement state of the inner crosspiece 19 is shown in FIG. 4 which is a sectional view taken along the line BB in FIG. After installing the bottom plate 18, the outer pier 20
A push plate 21 is disposed on the outside of the main plate 1, and the bottom end of the push plate 21 is brought out of the main girder 1 through the push plate 21 by bringing the outer end of the push plate 21 into contact with the insertion pin 22 inserted into the pin hole 11g. Fix it while pressing it to the side. In order to prevent the insertion pin 22 inserted in the pin hole 11g from coming off, the wire hole 11
The wire can be passed through the h and the wire can be connected to the insertion pin 22.

【0014】このように底板18を固定した後に、底板
18上に図1に示すように側型枠24を立設する。この
時に図2に示すように、前記外側へ突出している固定ボ
ルト3の先端に締付用ボルト23を溶接またはカップラ
ー等を介し固定状に連結する。この締付用ボルト23の
外側には締付金具25を締め付けて、締付金具25によ
り側型枠24を固定する。なお、主桁1の上面側にも内
側の側型枠26を立設させ、さらに側型枠26と側型枠
24間の上面には上型枠27を配設させて、締付金具2
5,25を外側より締め付けてこれらを固定する。この
状態で側型枠24,26間にコンクリートを打設し、打
設コンクリートCにより橋桁の欄干部分の基礎となる部
分を形成させる。
After fixing the bottom plate 18 in this way, a side form 24 is erected on the bottom plate 18 as shown in FIG. At this time, as shown in FIG. 2, a fastening bolt 23 is fixedly connected to the tip of the fixing bolt 3 projecting outward by welding or a coupler or the like. A fastening fitting 25 is fastened to the outside of the fastening bolt 23, and the side mold 24 is fixed by the fastening fitting 25. In addition, an inner side mold 26 is erected on the upper surface side of the main girder 1, and an upper mold frame 27 is disposed on the upper surface between the side mold 26 and the side mold 24, so that the tightening fitting 2
Tighten 5, 25 from the outside to fix them. In this state, concrete is cast between the side molds 24 and 26, and the cast concrete C is used to form the part that will be the basis of the balustrade of the bridge girder.

【0015】なお、工事が完了した後に現場において複
数の足場梁11を取り除く作業が必要となるが、この場
合には、ナット12を弛めて足場梁11の外端側を僅か
に上方へ持ち上げることにより、先端係合突片11cが
コーナー切欠部1aから外れるため、この状態で足場梁
11を外側へ引き抜いて取り除くことができ、一人の作
業者により次々と長手方向に沿って足場梁11を取り除
いてゆくことができる。なお、この場合、吊りボルト7
も溶接ナット6から取り外しておくが、後に橋桁の補修
作業等を行なう際には、支持金具4は打設コンクリート
C内に埋設された状態で残存しているため、この残存し
ている支持金具4の溶接ナット6に対し下方側より吊り
ボルト7を螺合させて、吊りボルト7に弛み止めナット
9及び受け座金10を取り付けて、受け座金10上に足
場梁11を載せて足場梁11を主桁1の底面へスライド
させて押し込み、容易に足場梁11を設置して補修作業
を行なうことができるものとなり、再利用も可能とな
る。なお、従来工法においては複数の主桁1上には舗装
面Wが形成されるため再利用は不可能であったのが、本
例の構造では修復工事等をも容易化させることができる
ものとなる。
After the construction is completed, it is necessary to remove the plurality of scaffolding beams 11 at the site. In this case, the nut 12 is loosened and the outer end side of the scaffolding beam 11 is lifted slightly upward. As a result, the tip engaging protrusion 11c is disengaged from the corner notch 1a, and thus the scaffolding beam 11 can be pulled out and removed in this state, and one worker can successively remove the scaffolding beam 11 along the longitudinal direction. It can be removed. In this case, the hanging bolt 7
The welding tool 6 is also removed from the welding nut 6, but when the bridge girder is repaired later, the supporting metal fitting 4 remains in the state of being embedded in the cast concrete C. The hanging bolt 7 is screwed onto the welding nut 6 of 4 from below, the locking nut 9 and the receiving washer 10 are attached to the hanging bolt 7, the scaffolding beam 11 is placed on the receiving washer 10, and the scaffolding beam 11 is attached. The scaffolding beam 11 can be easily installed by sliding it into the bottom surface of the main girder 1 and pushing it in for repair work, and it can be reused. In the conventional method, the pavement surface W is formed on the plurality of main girders 1 and cannot be reused. However, the structure of this example can facilitate repair work. Becomes

【0016】なお、本例では、足場梁11は主桁1に側
方より差し込む方法で取り付けられるため、主桁1の下
方に僅かな空間があれば施工することができ、下方側に
空間が確保しにくい道路上または鉄道線路上の橋桁工事
等に極めて有効に機能するものである。なお、このよう
な足場梁11の施工方法は橋桁に限らずビル等の工事現
場においても適応することができるものである。また、
本例では、主桁1の外側面に埋設されたインサート2に
対し固定ボルト3を螺合させて、ナット5を介し支持金
具4を固設し、この支持金具4に対し吊りボルト7を下
方より螺合させて吊りボルト7を垂設させ、この吊りボ
ルト7に弛み止めナット9及び受け座金10を取り付け
て、受け座金10の上面に足場梁11を載せて受け座金
10上をスライドさせて足場梁11を主桁1の底面側へ
押し込み、足場梁11を主桁1に設置する構成を述べた
が、インサート2を主桁1の底面に埋設しておき、この
インサート2に直接吊りボルト7を下方より螺合させ、
この吊りボルト7に弛み止めナット9及び受け座金10
を取り付ける構成とすることもでき、このような構成で
あっても、受け座金10の上面に足場梁11を載せて受
け座金10上をスライドさせて足場梁11を主桁1の底
面側へ押し込み、足場梁11を容易に主桁1に設置する
ことがてきる。
In this example, since the scaffolding beam 11 is attached to the main girder 1 by inserting it from the side, it can be constructed if there is a small space below the main girder 1, and there is a space below. It is extremely effective for bridge girder construction on roads or railroad tracks that are difficult to secure. In addition, such a construction method of the scaffolding beam 11 can be applied not only to a bridge girder but also to a construction site such as a building. Also,
In this example, the fixing bolt 3 is screwed into the insert 2 embedded in the outer side surface of the main girder 1, the support fitting 4 is fixedly mounted via the nut 5, and the hanging bolt 7 is moved downward from the support fitting 4. Tighten the suspension bolts 7 by screwing them together, attach the locking nuts 9 and the receiving washers 10 to the hanging bolts 7, mount the scaffolding beam 11 on the upper surface of the receiving washer 10 and slide it on the receiving washer 10. Although the scaffolding beam 11 is pushed into the bottom side of the main girder 1 and the scaffolding beam 11 is installed on the main girder 1, the insert 2 is embedded in the bottom surface of the main girder 1 and the hanging bolt is directly attached to the insert 2. Screw 7 from below,
The hanging bolt 7 is attached to the lock nut 9 and the receiving washer 10.
It is also possible to attach the scaffolding beam 11 on the upper surface of the receiving washer 10 and slide it on the receiving washer 10 to push the scaffolding beam 11 to the bottom side of the main girder 1 even with such a configuration. The scaffolding beam 11 can be easily installed on the main girder 1.

【0017】[0017]

【発明の効果】本発明の足場梁の施工方法は、主桁の外
周面に予め埋設されたインサートに吊りボルトを垂設
し、該吊りボルトの下部部位に受け座金を取り付けると
ともに、該受け座金上に足場梁の内端側を載せ、該足場
梁に長手方向に沿って形成された中央溝内に前記吊りボ
ルトを通した状態で該足場梁を前記主桁の底面に沿って
内側へ押し込み主桁に足場梁を設置することとしたた
め、主桁に吊りボルトを取り付ければ、受け座金上に足
場梁を載せて主桁の底面側へ側方より差込状にスライド
させて容易に施工することができ、一人の作業者が楽に
足場梁を次々と施工してゆくことができ、作業性が向上
し、かつ作業が安全なものとなる。また、主桁をクレー
ン等で所定位置に設置する前に、予め吊りボルトを介し
足場梁を取り付けておくこともでき、主桁の長手方向に
沿って所定間隔で複数の足場梁を既に取り付けた状態で
主桁を所定位置に設置すれば、高所での足場梁の施工作
業を省略することができ、より作業性が向上する。
According to the scaffolding beam construction method of the present invention, a hanging bolt is hung on an insert previously embedded in the outer peripheral surface of the main girder, and a receiving washer is attached to a lower portion of the hanging bolt, and the receiving washer is also attached. Place the inner end side of the scaffolding beam on top, and push the scaffolding beam inward along the bottom surface of the main girder with the hanging bolts inserted in the central groove formed along the longitudinal direction of the scaffolding beam. Since it was decided to install scaffolding beams on the main girders, if hanging bolts are attached to the main girders, the scaffolding beams will be placed on the receiving washers and slid sideways into the bottom side of the main girder for easy construction. Therefore, one worker can easily construct scaffolding beams one after another, workability is improved, and work is safe. In addition, before installing the main girder at a predetermined position with a crane, etc., scaffolding beams can be attached in advance via suspension bolts, and a plurality of scaffolding beams have already been attached at predetermined intervals along the longitudinal direction of the main girder. If the main girder is installed at a predetermined position in this state, the work of constructing the scaffolding beam at a high place can be omitted, and the workability is further improved.

【0018】また、側方より差し込む方法であるため、
主桁の下部の空間が極めて狭い場合にも容易に足場梁を
施工することができ、また、後に足場梁を取り外す際に
も、足場梁を外側へスライド移動させて容易に取り除く
ことができ、取り除き作業の作業性も極めて向上する。
Also, since the method of inserting from the side,
Scaffolding beams can be easily constructed even when the space under the main girder is extremely narrow, and when the scaffolding beams are later removed, the scaffolding beams can be slid outwardly and easily removed, The workability of removing work is also greatly improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】主桁に足場梁を施工した状態の構成図である。FIG. 1 is a configuration diagram of a state in which a scaffolding beam is installed on a main girder.

【図2】図1における要部拡大図である。FIG. 2 is an enlarged view of a main part in FIG.

【図3】図1のA方向矢視図である。FIG. 3 is a view on arrow A in FIG.

【図4】図2におけるB−B線断面構成図である。4 is a cross-sectional configuration diagram taken along the line BB in FIG.

【図5】支持金具に吊りボルト及び受け座金を取り付け
た状態の斜視構成図である。
FIG. 5 is a perspective configuration diagram showing a state in which a suspension bolt and a receiving washer are attached to a support fitting.

【図6】足場梁の斜視構成図である。FIG. 6 is a perspective configuration diagram of a scaffolding beam.

【図7】従来施工方法を示す概略構成図である。FIG. 7 is a schematic configuration diagram showing a conventional construction method.

【図8】従来施工方法を示す概略構成図である。FIG. 8 is a schematic configuration diagram showing a conventional construction method.

【図9】従来施工方法を示す概略構成図である。FIG. 9 is a schematic configuration diagram showing a conventional construction method.

【図10】従来施工方法を示す概略構成図である。FIG. 10 is a schematic configuration diagram showing a conventional construction method.

【符号の説明】[Explanation of symbols]

1 主桁 1a コーナー切欠部 2 インサート 3 固定ボルト 4 支持金具 5 ナット 6 溶接ナット 7 吊りボルト 8 樹脂コーン(ゴムコーン) 9 弛み止めナット 10 受け座金 11 足場梁 11a チャンネル材 11c 先端係合突片 11e 立上パイプ 12 ナット 13 足場板 14 手摺りパイプ 16 落下防止板 17 固定金具 18 底板 19 内側桟木 20 外側桟木 21 押し板 22 差込ピン 23 締付用ボルト 24,26 側型枠 25 締付金具 C 打設コンクリート 1 Main Girder 1a Corner Notch 2 Insert 3 Fixing Bolt 4 Supporting Metal 5 Nut 6 Welding Nut 7 Hanging Bolt 8 Resin Cone (Rubber Cone) 9 Locking Nut 10 Receiving Washer 11 Scaffolding Beam 11a Channel Material 11c Tip Engaging Projection Piece 11e Upper pipe 12 Nut 13 Scaffolding plate 14 Handrail pipe 16 Fall prevention plate 17 Fixing bracket 18 Bottom plate 19 Inner pier 20 Outer pier 21 Push plate 22 Insertion pin 23 Tightening bolt 24, 26 Side form 25 Clamping C Construction concrete

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 主桁の外周面に予め埋設されたインサー
トに吊りボルトを垂設し、該吊りボルトの下部部位に受
け座金を取り付けるとともに、該受け座金上に足場梁の
内端側を載せ、該足場梁に長手方向に沿って形成された
中央溝内に前記吊りボルトを通した状態で該足場梁を前
記主桁の底面に沿って内側へ押し込み主桁に足場梁を設
置することを特徴とする足場梁の施工方法。
1. A suspension bolt is vertically installed on an insert previously embedded in the outer peripheral surface of a main girder, a receiving washer is attached to a lower portion of the hanging bolt, and an inner end side of a scaffolding beam is placed on the receiving washer. Installing the scaffolding beam on the main girder by pushing the scaffolding beam inward along the bottom surface of the main girder in a state where the suspension bolt is passed through a central groove formed along the longitudinal direction of the scaffolding girder. The construction method of the characteristic scaffolding beam.
JP16811495A 1995-06-08 1995-06-08 Construction of scaffolding beam Pending JPH08333887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16811495A JPH08333887A (en) 1995-06-08 1995-06-08 Construction of scaffolding beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16811495A JPH08333887A (en) 1995-06-08 1995-06-08 Construction of scaffolding beam

Publications (1)

Publication Number Publication Date
JPH08333887A true JPH08333887A (en) 1996-12-17

Family

ID=15862120

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16811495A Pending JPH08333887A (en) 1995-06-08 1995-06-08 Construction of scaffolding beam

Country Status (1)

Country Link
JP (1) JPH08333887A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049029A (en) * 2020-09-17 2020-12-08 成都利方致远路桥工程有限公司 Deviation-rectifying and resetting device for pier stud of bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049029A (en) * 2020-09-17 2020-12-08 成都利方致远路桥工程有限公司 Deviation-rectifying and resetting device for pier stud of bridge

Similar Documents

Publication Publication Date Title
JP3181041U (en) Mounting member for scaffolding for bridge
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
JPH1113275A (en) Aerial expansion type suspended scaffold and its construction
JP6498075B2 (en) Overhang passage of steel structure
KR102464479B1 (en) Four-way binding bracket of single binding means for hanging bridge inspection facilities
KR100381724B1 (en) Inspection plate for a pier
JPH08333887A (en) Construction of scaffolding beam
JP2924659B2 (en) Construction method of assembling scaffold
JPH108710A (en) Scaffolding member
JP5812554B1 (en) Mounting bracket and mounting structure for strut mooring
JP2021075967A (en) Suspended scaffolding
KR100433700B1 (en) Mold system for slab concrete of bridge
KR102059081B1 (en) Temporary Bracket for Steel Bridge and Scaffold Installation Method using thereof
JP5409955B1 (en) Steel bridge structure
KR200347093Y1 (en) Mold system for slab concrete of bridge
CN217268832U (en) Early formwork dismantling device and early formwork dismantling system
KR200201606Y1 (en) The psc bridge beam which can institute slab mold and safety net
KR102482154B1 (en) Concrete reinforcement connection device
KR102335856B1 (en) Safety railing for steel beam installation
JP3359145B2 (en) How to install the water stop plate
KR20090007333U (en) handrail support device
JPS5934571Y2 (en) Hanging hardware for temporary protective floors in elevated road construction, etc.
KR20020082966A (en) The construction method and device for slab panel which can instal psc bridge beam
JPS6233383B2 (en)
JP2502031Y2 (en) Safety handrail frame for gate type building frame