JPH08333884A - Structure of connecting board for jumping scaffolding in building construction - Google Patents

Structure of connecting board for jumping scaffolding in building construction

Info

Publication number
JPH08333884A
JPH08333884A JP14225495A JP14225495A JPH08333884A JP H08333884 A JPH08333884 A JP H08333884A JP 14225495 A JP14225495 A JP 14225495A JP 14225495 A JP14225495 A JP 14225495A JP H08333884 A JPH08333884 A JP H08333884A
Authority
JP
Japan
Prior art keywords
scaffolding
building
scaffold
jumping
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14225495A
Other languages
Japanese (ja)
Other versions
JP3077560B2 (en
Inventor
Heizo Kawase
平蔵 川瀬
Masahiko Okita
雅彦 沖田
Motoki Kobayashi
幹樹 小林
Mitsusachi Yasuhara
光幸 安原
Yuji Yamashita
祐史 山下
Shigekazu Sakurai
繁和 桜井
Takeshi Watanabe
剛 渡辺
Kei Sakamoto
圭 坂本
Tetsuo Ito
徹郎 伊東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP07142254A priority Critical patent/JP3077560B2/en
Publication of JPH08333884A publication Critical patent/JPH08333884A/en
Application granted granted Critical
Publication of JP3077560B2 publication Critical patent/JP3077560B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PURPOSE: To execute works simply and efficiently for installing a connecting board that connects scaffold boards of adjacent scaffold frameworks and for removing the connecting board on occasion of Jumping. CONSTITUTION: In a jumping scaffolding that is used in building construction and formed of a scaffold framework built up by installing scaffold boards 2 horizontally in a plurality of tiers to a latticed frame body constructed of vertical and horizontal poles and installed in the form of suspended shelves to the external wall of a building under construction and furthermore moved upward entirely as the construction work progresses, a connecting board 15 is fixed with a hinge 16 either to the end of the scaffold board 2 on each of tiers or a breadthwise bar 1c supporting the end of the scaffold board. The connecting board 15 is so constructed that can be swung upward from a position approximately horizontal to a position approximately upright, or a position tilting at an acute angle. The connecting boards 15 installed in tiers are connected with a vertical wire rope 17 so that they can be moved in interlocking, being in parallel with one another.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、建物外壁に沿って上
下移動容易に足場枠組を吊り棚式に設置する建築物構築
作業用ジャンピング足場に関し、特に、隣り合って設置
された足場枠組の間に渡り板を掛け渡す機構に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jumping scaffold for building construction in which a scaffolding frame is installed in a hanging shelf type so that it can be easily moved up and down along the outer wall of a building, and more particularly, between scaffolding frames installed adjacent to each other. It relates to a mechanism that hangs a crossing board.

【0002】[0002]

【従来の技術】例えば特公平6−8572号公報に見ら
れるように、つぎのような建築物構築作業用ジャンピン
グ足場が知られている。この種のジャンピング足場は、
地面を支持基盤として設置するのではなく、建築中の建
物の外壁面に吊り棚式に設置して適時に上方へ移動させ
るものであり、その移動作業(ジャンピングまたは盛り
替えと呼ぶ)にタワークレーンなどの大型揚重機を使用
しないという特徴を有している。
2. Description of the Related Art As shown in, for example, Japanese Patent Publication No. 6-8572, the following jumping scaffold for building construction work is known. This kind of jumping scaffolding
Instead of installing the ground as a support base, it is installed on the outer wall of the building under construction in a hanging shelf type and moved upwards in a timely manner, and the tower crane is used for the moving work (called jumping or refilling). It has the feature that it does not use a large lifting machine such as.

【0003】つまり、鋼管や山型鋼や溝型鋼などの多数
の棒材を縦横に連結して格子状枠体を構成するととも
に、これに複数段の足場板を水平に取り付けて足場枠組
を構成している。この足場枠組の全体の高さは建物の数
階分であり、その中間部分と下端近くにそれぞれ係止金
具を取り付けている。一方、建築中の建物の外壁部分に
は適当な間隔でアンカーボルトを埋設していき、所定位
置のアンカーボルトに前記係止金具と結合するアンカー
金具を取り付ける。
That is, a large number of rods such as steel pipes, mountain steels, and grooved steels are vertically and horizontally connected to form a lattice-shaped frame body, and a plurality of stages of scaffolding plates are horizontally attached to this to form a scaffolding framework. ing. The overall height of this scaffolding frame is several floors of the building, and the metal fittings are attached to the middle part and near the lower end, respectively. On the other hand, anchor bolts are embedded in the outer wall portion of the building under construction at appropriate intervals, and anchor metal fittings to be coupled with the locking metal fittings are attached to the anchor bolts at predetermined positions.

【0004】そして、足場枠組の中間部分と下端近くの
係止金具を建物外壁のアンカー金具に引っ掛けること
で、足場枠組の全体の重量をアンカー金具で支持させ、
建物の側面に足場枠組を吊り棚式に設置する。建物外壁
の最上部のアンカー金具に足場枠組の中間部分の係止金
具を引っ掛けると、足場枠組の上部は建築中の建物の最
上部より上方に突出する。この足場枠組を利用して建物
のさらに上部の構築工事を進める(その工事で構築され
る部分の外壁にもアンカー金具を取り付ける)。
Then, by hooking the metal fittings near the middle portion and the lower end of the scaffolding framework to the anchor metal fittings on the outer wall of the building, the entire weight of the scaffolding framework is supported by the anchor metal fittings.
A scaffolding frame will be installed on the side of the building in a hanging shelf style. When the anchor metal fitting at the middle part of the scaffolding frame is hooked on the anchor metal fitting at the top of the outer wall of the building, the upper part of the scaffolding framework projects above the top of the building under construction. Using this scaffolding framework, proceed with construction work on the upper part of the building (attach anchor metal fittings to the outer wall of the part constructed by the construction work).

【0005】前記の工事で新たな建物上方部分が構築さ
れたなら、その新設部分の最上部からチェーンブロック
などを使って足場枠組全体を引き上げ、足場枠組の中間
部分の係止金具を建物新設部分に新たに設けたアンカー
金具に引っ掛ける。これで足場枠組の上部が建物新設部
分のさらに上方に突出する前記と同じ状態になり、この
足場を利用して建物のさらに上部の構築工事を進める。
このようにして工事の進捗に伴って足場枠組全体を上方
へ移動させる。
If a new upper part of the building is constructed by the above construction, the entire scaffolding frame is pulled up from the top of the new part using a chain block or the like, and the locking metal fittings in the middle part of the scaffolding frame are added to the new building part. Hook it on the newly installed anchor metal. With this, the upper part of the scaffolding frame is in the same state as above, in which the upper part of the scaffolding frame projects further above the new building portion, and the construction work of the upper part of the building is carried out using this scaffolding.
In this way, the entire scaffolding framework is moved upward as the construction progresses.

【0006】また従来の建築物構築作業用ジャンピング
足場は、足場枠組に設けた係止金具を建物外壁に突設し
たアンカー金具に引っ掛けることで全体を吊り棚式に支
持する。具体的な支持部の構成としては、縦横の棒材で
構成された格子状枠体における建物外壁に近い側の内側
縦棒材の所定位置に鉤型の係止金具を固設し、この係止
金具で足場枠組の重量を支える構造になっている。
Further, the conventional jumping scaffold for building construction supports the whole as a hanging shelf type by hooking the locking metal fittings provided on the scaffolding framework to the anchor metal fittings protruding from the outer wall of the building. As a concrete structure of the supporting portion, a hook-shaped locking metal fitting is fixed at a predetermined position of the inner vertical bar on the side closer to the outer wall of the building in the lattice-shaped frame body composed of vertical and horizontal bars. It has a structure that supports the weight of the scaffolding frame with fasteners.

【0007】この種の建築物構築作業用ジャンピング足
場では、建物の幅寸法いっぱいに大きな1つの足場枠組
を設置するのではなく、ある程度小規模で軽量な複数の
足場枠組を横方向に並べて設置するのが普通である。そ
のほうが足場枠組の移動作業が容易である。
In this type of jumping scaffolding for building construction work, instead of installing one large scaffolding framework over the full width of the building, a plurality of small and lightweight scaffolding frameworks are installed side by side. Is normal. It is easier to move the scaffolding framework.

【0008】複数の足場枠組を横方向に並べて設置する
場合、互いに干渉を避けるために、隣り合う足場枠組の
間には多少の隙間をあけて配設される。設置された足場
枠組に作業者がのりこみ、足場板の上を歩いて移動しな
がら各種の作業を行う。もちろん隣の足場枠組に移動す
ることも多い。そのため、隣り合う足場枠組の足場板間
の隙間部分に渡り板をほぼ水平に掛け渡し、複数の足場
板が長手方向に連続する作業通路を形成している。
When a plurality of scaffolding frameworks are installed side by side in the lateral direction, some gaps are provided between adjacent scaffolding frameworks in order to avoid interference with each other. Workers climb into the installed scaffolding framework and walk around on the scaffolding board to perform various tasks. Of course, they often move to the next scaffolding framework. For this reason, a crossover plate is spanned almost horizontally in the gap between the scaffolding plates of adjacent scaffolding frames, and a plurality of scaffolding plates form a working passage that is continuous in the longitudinal direction.

【0009】なお足場枠組の格子状枠体は、内側縦棒材
と外側縦棒材とが足場板の幅分だけ間隔をおいて平行に
配設され、この2本の縦棒材が水平な短い幅棒材で連結
されている。また、比較的大きな間隔があいている2本
の内側縦棒材が長い内側横棒材で連結され、同様に2本
の外側縦棒材が長い外側横棒材で連結されて、全体とし
て偏平で起立した直方体状をなしている。ここでは建物
外壁面に近い部材を内側棒材と呼び、外側に面した部材
を外側棒材と呼んでいる。
In the lattice-shaped frame body of the scaffolding frame, the inner vertical bar members and the outer vertical bar members are arranged in parallel with each other with an interval corresponding to the width of the scaffold plate, and the two vertical bar members are horizontal. It is connected with a short width bar. In addition, two inner vertical bar members with a relatively large gap are connected by a long inner horizontal bar member, and similarly two outer vertical bar members are connected by a long outer horizontal bar member, resulting in a flat shape as a whole. It has a rectangular parallelepiped shape. Here, a member close to the outer wall surface of the building is called an inner bar, and a member facing the outside is called an outer bar.

【0010】[0010]

【発明が解決しようとする課題】同一の足場枠組におい
て、各足場板は格子状枠体の前記幅棒材間に掛け渡して
取り付けられている。同様に、隣接して設置された足場
枠組の足場板の間隔部分をつなぐ前記の渡り板は、2つ
の足場枠組の格子状枠体の相対向している幅棒材間に掛
け渡して取り付けている。
In the same scaffolding framework, each scaffolding plate is mounted by being stretched between the width rod members of the lattice-shaped frame body. Similarly, the above-mentioned connecting plate that connects the space portions of the scaffolding plates of the scaffolding frames that are installed adjacent to each other is attached between the width bar members facing each other of the lattice-like frame bodies of the two scaffolding frames. .

【0011】この渡り板の設置方法は構造的に簡単であ
る。しかし工事の進捗に伴って各足場枠組を移動する際
に、まず掛け渡してある渡り板をすべて取り外し、その
上で各足場枠組を上方に移動して固定し、その後に渡り
板を再び掛け渡して取り付ける必要があり、作業的には
面倒であった。足場枠組には普通5〜10段の足場板が
あり、各段についての渡り板を撤去して再び敷設する作
業には多くの人手と時間を要し、そのためにジャンピン
グ作業性が悪かった。
The method of installing the transition plate is structurally simple. However, when moving each scaffolding framework as the construction progresses, first remove all the crossing boards that have been bridged, then move each scaffolding framework upward and fix it, and then re-stretch the crossing boards to attach them. It was necessary and laborious. The scaffolding framework usually has 5 to 10 steps of scaffolding boards, and it takes a lot of manpower and time to remove the crossing boards for each step and lay them again, which makes the jumping workability poor.

【0012】この発明は前述した従来の問題点に鑑みな
されたもので、その目的は、隣接する足場枠組の相場板
間をつなぐために渡り板を設置する作業と、ジャンピン
グ時に渡り板を撤収する作業とを簡単に能率よく行える
ようにした建築物構築作業用ジャンピング足場の渡り板
機構を提供することにある。
The present invention has been made in view of the above-mentioned problems of the prior art, and its purpose is to install a cross plate to connect between the market plates of adjacent scaffold frames and to remove the cross plate during jumping. It is to provide a jumper scaffolding mechanism for a jumping scaffold for building construction work that can be easily and efficiently performed.

【0013】[0013]

【課題を解決するための手段】そこでこの発明では、縦
横の棒材で構成された格子状枠体に複数段の足場板を水
平に取り付けてなる足場枠組を建築中の建物の外壁面に
吊り棚式に設置し、工事の進捗に伴って足場枠組全体を
上方へ移動させる方式の建築物構築作業用ジャンピング
足場において、各段の前記足場板の端部またはその端部
を支持する前記格子状枠体の幅棒材に渡り板をヒンジ構
造で取り付け、この渡り板をほぼ水平な姿勢から上方回
動させてほぼ垂直ないし鈍角な姿勢に変位自在な構成と
し、各段の前記渡り板を相互に平行な状態で上下につな
がるワイヤロープで連動連結した渡り板機構を設けた。
In view of the above, according to the present invention, a scaffolding frame, in which a plurality of steps of scaffolding plates are horizontally attached to a lattice-shaped frame body composed of vertical and horizontal bars, is hung on the outer wall surface of a building under construction. In the jumping scaffolding for building construction of a system that is installed in a shelf type and moves the entire scaffolding framework upwards as the construction progresses, in the building construction work jumping scaffolding, the end of the scaffolding plate at each stage or the lattice shape supporting the end A cross plate is attached to the width bar of the frame by a hinge structure, and this cross plate is rotated upward from a substantially horizontal posture so that the cross plate can be displaced to a substantially vertical or obtuse angle posture. In this state, a crossing plate mechanism is provided that is interlockingly connected by a wire rope that connects vertically.

【0014】前記の構成に加えて、好ましくは、前記足
場枠組の上部に設けた滑車に前記ワイヤロープの上方側
を掛け回して前記足場枠組の中間部に設けた巻き取り機
に結ぶ。
In addition to the above construction, preferably, the pulley provided at the upper portion of the scaffolding frame is hung around the upper side of the wire rope and tied to the winder provided at the intermediate portion of the scaffolding frame.

【0015】[0015]

【作用】前記ワイヤロープを上方にひっぱると、各段の
前記渡り板が連動し、それぞれの前記ヒンジを中心に上
方に回動してほぼ垂直ないし鈍角な姿勢になる。この状
態では各渡り板は足場枠組に寄り添っていて、出っ張り
はほとんどない。したがって、足場枠組を上方へジャン
ピング移動させるとき、隣の足場枠組と干渉しない。
When the wire rope is pulled upward, the transition plates of each step are interlocked and pivoted upward about the respective hinges to be in a substantially vertical or obtuse posture. In this state, the crossing boards are close to the scaffolding framework, and there is almost no protrusion. Therefore, when the scaffolding framework is jumped upward, it does not interfere with the adjacent scaffolding framework.

【0016】隣り合う2つの足場枠組を上方へジャンピ
ング移動させて固定した後に、前記ワイヤロープを下げ
ると、各段の渡り板が連動し、それぞれ前記ヒンジを中
心に下方に回動してほぼ水平な姿勢となり、その先端側
が隣の足場板の端部の上に重なる。これで隣接する足場
枠組の相場板間が前記渡り板でつながったことになる。
When two adjacent scaffolding frameworks are jumped upward and fixed, and then the wire rope is lowered, the crossing plates of each stage are interlocked, and each of the crossing plates is pivoted downward about the hinge to be substantially horizontal. The posture is such that its tip side overlaps the edge of the adjacent scaffold plate. This means that the market boards of adjacent scaffolding frames are connected by the crossing boards.

【0017】[0017]

【実施例】この発明を適用した建築物構築作業用ジャン
ピング足場の一実施例の全体的な構成を図1に示し、足
場枠組の支持機構の詳細を図2に示し、この発明の要部
をなす渡り板機構の詳細を図3と図4に示している。図
1において、Aは建築中の建物を示し、A(i)はi階
目の床版であり、A(i−1)はその下の階の床版を示
している。Bは足場枠組の全体を指す。足場枠組Bは縦
横の棒材で構成された格子状枠体1に複数段の足場板2
を水平に取り付けたもので、これを建物Aの外壁3に以
下の支持機構で吊り棚式に設置している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An overall construction of an embodiment of a jumping scaffold for building construction to which the present invention is applied is shown in FIG. 1, details of a supporting mechanism of a scaffolding frame are shown in FIG. Details of the transition plate mechanism are shown in FIGS. 3 and 4. In FIG. 1, A shows a building under construction, A (i) is the slab of the i-th floor, and A (i-1) is the slab of the floor below it. B refers to the entire scaffolding framework. The scaffolding framework B includes a grid-like frame body 1 composed of vertical and horizontal bars, and a scaffolding board 2 having a plurality of stages.
Is installed horizontally and is installed on the outer wall 3 of the building A in a hanging shelf type by the following support mechanism.

【0018】足場枠組Bの格子状枠体1は、内側縦棒材
1aと外側縦棒材1bとが足場板2の幅分だけ間隔をお
いて平行に配設され、この2本の縦棒材1aと1bが水
平な短い幅棒材1cで連結されている。また、比較的大
きな間隔があいている2本の内側縦棒材1aが長い内側
横棒材1dで連結され、同様に2本の外側縦棒材1bが
長い外側横棒材で連結されて、全体として偏平で起立し
た直方体状をなしている。ここでは建物外壁面3に近い
部材を内側棒材と呼び、外側に面した部材を外側棒材と
呼んでいる。
In the lattice-shaped frame body 1 of the scaffolding framework B, the inner vertical bar members 1a and the outer vertical bar members 1b are arranged in parallel with each other with an interval corresponding to the width of the scaffold plate 2, and these two vertical bars are arranged. The materials 1a and 1b are connected by a horizontal short width bar material 1c. Further, two inner vertical bar members 1a having a relatively large gap are connected by a long inner horizontal bar member 1d, and two outer vertical bar members 1b are similarly connected by a long outer horizontal bar member, As a whole, it is in the shape of a rectangular parallelepiped that is flat and upright. Here, a member close to the outer wall surface 3 of the building is called an inner bar, and a member facing the outside is called an outer bar.

【0019】足場枠組Bの実質高さを建物Aの約3階分
とし、その下から約3分の1の位置に中間水平補強板4
を配設しているとともに、最上部に同様な上部水平補強
板5を配設している。図2に詳しく示すように、格子状
枠体1を構成している縦棒材1aや1bが中間水平補強
板4を貫通しているとともに、その貫通部位でクランプ
6によりこれらが相互に締結・固着されている。同様な
構造で上部水平補強板5と格子状枠体1の棒材とが固着
されている。この2枚の水平補強板4と5も足場板を兼
ねている。足場板を兼ねた2枚の水平補強板4と5、そ
れに5段の足場板2とによって、足場枠組Bには合計7
段の足場ステージが構成されている。
The actual height of the scaffolding frame B is about three floors of the building A, and the intermediate horizontal reinforcing plate 4 is located at a position about one third from below.
And a similar upper horizontal reinforcing plate 5 is arranged at the uppermost part. As shown in detail in FIG. 2, the vertical bar members 1a and 1b forming the lattice-shaped frame body 1 penetrate through the intermediate horizontal reinforcing plate 4, and at the penetrating portion, these are fastened to each other. It is fixed. With the same structure, the upper horizontal reinforcing plate 5 and the bar material of the lattice-shaped frame body 1 are fixed. The two horizontal reinforcing plates 4 and 5 also serve as scaffolding plates. The two horizontal reinforcing plates 4 and 5 which also function as scaffolding plates, and the five scaffolding plates 2 make a total of 7 in the scaffolding frame B.
A stepped scaffolding stage is constructed.

【0020】足場枠組Bの全体は主としてブラケット7
により支持されて、建物外壁面3に吊り棚式に設置され
る。ブラケット7は、水平支持材7aの先端側下部に直
角三角形をなすように垂直支持材7bと斜め支持材7c
とを一体化した鋼材の組立部材である。
The entire scaffolding framework B is mainly a bracket 7.
And is installed on the outer wall surface 3 of the building in a hanging shelf type. The bracket 7 includes a vertical support member 7b and an oblique support member 7c so as to form a right-angled triangle at the lower end of the horizontal support member 7a.
It is an assembly member of a steel material that integrates and.

【0021】図2に詳しく示すように、建築中の建物A
の上部水平面、図1の例では床版A(i)に突設したア
ンカーボルト8によりブラケット7の水平支持材7aの
基部を固定して、水平支持材7aの先端側を建物外壁3
側へ突出させるとともに、前垂直支持材7bを建物外壁
面3に当接した状態とする。同様にして建物Aの床版A
(i)に複数のブラケット7を取り付けて、各ブラケッ
ト7の前記水平支持材7aを水平に並べて配置する。そ
して、格子状枠体1の中間水平補強板4を各ブラケット
7の水平支持材7aの上に載置することで、足場枠組B
を全体的に各ブラケット7で支持する。
As shown in detail in FIG. 2, building A under construction
Of the horizontal support member 7a of the bracket 7 is fixed by the anchor bolts 8 protruding from the upper horizontal surface of the building, that is, the floor slab A (i) in the example of FIG.
The front vertical support member 7b is brought into contact with the outer wall surface 3 of the building while projecting to the side. Similarly, floor slab A of building A
A plurality of brackets 7 are attached to (i), and the horizontal support members 7a of the brackets 7 are arranged horizontally. Then, by placing the intermediate horizontal reinforcing plate 4 of the lattice-shaped frame body 1 on the horizontal support member 7a of each bracket 7, the scaffolding frame B
Is supported by each bracket 7 as a whole.

【0022】また図1に示すように、建物外壁面3にア
ンカーボルト9を設けておき、このアンカーボルト9に
取り付けた連結具10によって、格子状枠体1の内側縦
棒材1aと建物外壁面3とを両者の間に所定の間隔をあ
けた状態で連結する。前述のように、足場枠組Bの重量
はもっぱら前記ブラケット7で支持されるが、前記のよ
うに要所要所の内側縦棒材1aと建物外壁面3とを連結
具10で結合することで、足場枠組Bの設置姿勢・強度
がさらに安定し、安全に作業を行える。
Further, as shown in FIG. 1, anchor bolts 9 are provided on the outer wall 3 of the building, and a connecting tool 10 attached to the anchor bolts 9 is used to connect the inner vertical bar 1a of the lattice-shaped frame 1 to the outside of the building. The wall surface 3 and the wall surface 3 are connected with a predetermined gap therebetween. As described above, the weight of the scaffolding framework B is exclusively supported by the brackets 7, but as described above, by connecting the inner vertical bar 1a and the building outer wall surface 3 with the connecting tool 10 at the required points, The installation posture and strength of the scaffolding frame B are more stable, and work can be performed safely.

【0023】また図1に概略を示すように、格子状枠体
1の内側縦棒材1aの要所要所にガイドアーム11を取
り付けて、各ガイドアーム11の先端側を建物外壁面3
に向けて所定長さ突出させ、各ガイドアーム11の先端
部に取り付けたガイドローラ11aを建物外壁面3に当
接させている。
Further, as schematically shown in FIG. 1, guide arms 11 are attached to essential points of the inner vertical bar 1a of the lattice-shaped frame body 1, and the tip end side of each guide arm 11 is attached to the outer wall surface 3 of the building.
A guide roller 11a attached to the tip of each guide arm 11 is brought into contact with the outer wall surface 3 of the building.

【0024】前述したように、足場枠組Bの高さの下か
ら約3分の1の位置に中間水平補強板4が配設されてお
り、図1のように建物のi階の床版A(i)の上に取り
付けたブラケット7の上に中間水平補強板4を載置する
ことで、足場枠組Bを吊り棚式に設置する。すると、中
間水平補強板4より上の足場枠組Bは床版A(i)より
上方に突出する。この足場枠組Bを利用して建物Aのさ
らに上部の構築工事を進める(その工事で構築される部
分A(i+1)やA(i+2)などの外壁面3や床面に
も必要なアンカーボルトなどを取り付ける)。
As described above, the intermediate horizontal reinforcing plate 4 is arranged at a position approximately one-third from the bottom of the scaffolding frame B, and the floor slab A on the i-th floor of the building is arranged as shown in FIG. By mounting the intermediate horizontal reinforcing plate 4 on the bracket 7 attached on (i), the scaffolding framework B is installed in a hanging shelf type. Then, the scaffolding framework B above the intermediate horizontal reinforcing plate 4 projects above the floor slab A (i). Using this scaffolding framework B, proceed with the construction work on the upper part of the building A (anchor bolts etc. necessary for the outer wall surface 3 and the floor surface of the parts A (i + 1) and A (i + 2) constructed by the work) Attach).

【0025】前記の工事で新たな建物上方部分A(i+
1)やA(i+2)などが構築されたなら、前記の連結
具10をいったん取り外し、建物新設部分の最上部から
チェーンブロックなどを使って足場枠組B全体を引き上
げ、足場枠組Bのの中間水平補強板4を建物新設部分に
新たに設けるブラケット7より少し上方に位置させる。
その状態で新たなブラケット7を取り付ける。その後、
足場枠組Bを少し下降させ、中間水平補強板4を新設ブ
ラケット7の上に載置する。さらに連結具10で足場枠
組Bの要所要所を建物外壁面3と結合する。これで足場
枠組Bの上部が建物新設部分のさらに上方に突出する前
記と同じ状態になり、この足場を利用して建物Aのさら
に上部の構築工事を進める。このようにして工事の進捗
に伴って足場枠組Bを上方へ移動させる。
By the above construction, the new building upper part A (i +
When 1) or A (i + 2) is constructed, the connecting tool 10 is once removed, and the entire scaffolding framework B is pulled up from the top of the new building part using a chain block, etc. The reinforcing plate 4 is located slightly above the bracket 7 which is newly provided in the new building portion.
In that state, a new bracket 7 is attached. afterwards,
The scaffolding framework B is lowered slightly, and the intermediate horizontal reinforcing plate 4 is placed on the new bracket 7. Further, the connecting parts 10 connect the essential points of the scaffolding framework B to the building outer wall surface 3. With this, the upper part of the scaffolding framework B is in the same state as above in which it projects further above the new building portion, and the construction work of the upper part of the building A is advanced using this scaffolding. In this way, the scaffolding framework B is moved upward as the construction progresses.

【0026】前記のようにチェーンブロックなどを使っ
て足場枠組Bを上方へ吊り上げたとき、足場枠組Bの内
面側の要所要所に取り付けた各ガイドアーム11の先端
のガイドローラ11aが外壁面3に当接しているので、
足場枠組Bと外壁面3との間にはつねに所定の間隔が保
たれ、前記ローラ11aが回転しながら外壁面3に沿っ
て足場枠組Bは安定に移動する。
When the scaffolding framework B is lifted up using the chain block or the like as described above, the guide rollers 11a at the tips of the respective guide arms 11 attached to the required points on the inner surface side of the scaffolding framework B are attached to the outer wall surface 3 Since it is in contact with
A predetermined space is always kept between the scaffolding framework B and the outer wall surface 3, and the scaffolding framework B moves stably along the outer wall surface 3 while the roller 11a rotates.

【0027】この発明の要部をなす渡り板機構の詳細を
図3と図4に示している。図3のように、各段の前足場
板2の端部またはその端部を支持する格子状枠体1の幅
棒材1cに渡り板15をヒンジ構造で取り付けている。
16はそのヒンジ軸を示している。この渡り板15はヒ
ンジ軸16を中心にして矢印のように回動し、ほぼ水平
な姿勢から上方回ほぼ垂直ないし鈍角な姿勢に変位自在
である。各段の渡り板15には所定位置に通り孔15a
が形成され、通り孔15aには格段の渡り板15を相互
に平行な状態で上下につなげるワイヤロープ17が挿通
されており、ワイヤロープ17に所要間隔でワイヤクリ
ップ17aが固定されている。さらに、足場枠組Bの上
部に設けた滑車18と19に前記のワイヤロープ17の
上方側を掛け回して下方に導き、足場枠組Bの中間水平
補強板4の上方部分に設けた巻き取り機20に結んでい
る。
The details of the crossover plate mechanism forming the essential part of the present invention are shown in FIGS. As shown in FIG. 3, the crossover plate 15 is attached to the end portion of the front scaffolding plate 2 at each step or the width bar 1c of the lattice-shaped frame body 1 supporting the end portion by a hinge structure.
Reference numeral 16 indicates the hinge axis. The connecting plate 15 rotates about a hinge shaft 16 as shown by an arrow, and is capable of being displaced from a substantially horizontal posture to a vertical upward or almost obtuse posture. Through holes 15a are provided at predetermined positions in the transition plate 15 of each step.
A wire rope 17 that vertically connects the remarkable crossover plates 15 in parallel with each other is inserted through the through hole 15a, and the wire clips 17a are fixed to the wire rope 17 at required intervals. Further, the pulleys 18 and 19 provided on the upper part of the scaffolding frame B are hooked around the upper side of the wire rope 17 and guided downward, and the winding machine 20 provided on the upper part of the intermediate horizontal reinforcing plate 4 of the scaffolding frame B is provided. Tied to.

【0028】図4に示すように、巻き取り機20でワイ
ヤロープ17を巻き取ると、ワイヤロープ17が上方に
引っ張られ、各ワイヤクリップ17aが渡り板15の通
り孔15aの周囲に引っかかる。すると各段の渡り板1
5が連動して、それぞれのヒンジ軸16を中心に上方に
回動し、その余力により足場枠組B内に倒れ込み、鈍角
姿勢となる。この状態では各渡り板15は足場枠組Bに
倒れ込んでいるので安定しており、出っ張りがほとんど
ない。したがって、足場枠組Bを上方へジャンピング移
動させるとき、隣の足場枠組Bと干渉しない。上記実施
例では、渡り板15を鈍角となる姿勢としたが、鈍角と
することなく、ほぼ垂直な姿勢とさせることもできる。
As shown in FIG. 4, when the wire rope 17 is wound by the winder 20, the wire rope 17 is pulled upward and each wire clip 17a is caught around the passage hole 15a of the connecting plate 15. Then, the crossing board 1 of each step
5 interlock with each other and rotate upward about their respective hinge shafts 16 and fall into the scaffolding framework B due to the remaining force thereof, resulting in an obtuse angle posture. In this state, since each crossing board 15 falls down on the scaffolding frame B, it is stable and there is almost no protrusion. Therefore, when jumping the scaffolding framework B upward, it does not interfere with the adjacent scaffolding framework B. In the above-mentioned embodiment, the crossover plate 15 has an obtuse angle, but it may have an obtuse angle instead of an obtuse angle.

【0029】隣り合う2つの足場枠組BとBを上方へジ
ャンピング移動させて固定した後に、前記ワイヤロープ
17を下げると、各段の渡り板15が連動し、それぞれ
ヒンジ軸16を中心に下方に回動してほぼ水平な姿勢と
なり、その先端側が隣の足場板2の端部の上に重なる。
これで隣接する足場枠組BとBの相場板2と2間が渡り
板15でつながったことになる。
When the wire ropes 17 are lowered after the two adjacent scaffolding frameworks B and B are jumped upwardly and fixed, and then the wire ropes 17 are lowered, the crossing plates 15 of the respective stages are interlocked to rotate downward around the hinge shafts 16, respectively. It moves to be in a substantially horizontal posture, and its tip end side overlaps the end portion of the adjacent scaffold plate 2.
This means that the adjacent scaffold frameworks B and the market plates 2 of B are connected by the crossover plate 15.

【0030】[0030]

【発明の効果】この発明の渡り板機構においては、前記
ワイヤロープを上方にひっぱると、各段の前記渡り板が
連動し、それぞれの前記ヒンジを中心に上方に回動して
ほぼ垂直ないし鈍角な姿勢になる。これは各渡り板の撤
収状態であり、このままで足場枠組をジャンピング移動
できる。また前記ワイヤロープを下げると、各段の渡り
板が連動し、それぞれ前記ヒンジを中心に下方に回動し
てほぼ水平な姿勢となり、その先端側が隣の足場板の端
部の上に重なる。これで隣接する足場枠組の相場板間が
前記渡り板でつながったことになる。このように隣接す
る足場枠組の相場板間をつなぐために渡り板を設置する
作業と、ジャンピング時に渡り板を撤収する作業とが従
来よりはるかに簡単に能率よく行える。
In the crossing plate mechanism of the present invention, when the wire rope is pulled upward, the crossing plates of each step are interlocked with each other, and the crossing plates are rotated upward about the respective hinges so as to have a substantially vertical or obtuse posture. become. This is the withdrawal state of each crossing board, and the scaffolding framework can be jumping moved as it is. Further, when the wire rope is lowered, the transition plates of the respective stages are interlocked with each other, and each of the transition plates pivots downward about the hinge to be in a substantially horizontal posture, and the tip end side thereof overlaps the end portion of the adjacent scaffold plate. This means that the market boards of adjacent scaffolding frames are connected by the crossing boards. In this way, the work of installing the cross plate to connect the market plates of the adjacent scaffold frames and the work of withdrawing the cross plate during jumping can be performed much more easily and efficiently than in the past.

【0031】また、足場枠組の上部に設けた滑車に前記
ワイヤロープの上方側を掛け回して前記足場枠組の中間
部に設けた巻き取り機に結ぶ構成を付加すれば、足場枠
組にのり込んでいる作業者が前記のワイヤロープの操作
を簡単に行うことができ、作業性がさらに向上する。
Further, by adding a configuration in which the upper side of the wire rope is hung around a pulley provided on the upper part of the scaffolding frame and connected to a winder provided in the middle part of the scaffolding frame, the pulley is mounted on the scaffolding frame. The operator can easily operate the wire rope, and the workability is further improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明を適用した建築物構築作業用ジャンピ
ング足場の一実施例の全体的な構成を示す概略図であ
る。
FIG. 1 is a schematic diagram showing an overall configuration of an embodiment of a jumping scaffolding for building construction to which the present invention is applied.

【図2】同上実施例における足場枠組の支持機構の要部
斜視図である。
FIG. 2 is a perspective view of a main part of a support mechanism for a scaffolding frame in the above embodiment.

【図3】同上実施例における本発明の要部をなす棧橋機
構の部分詳細図である。
FIG. 3 is a partial detailed view of a bridge mechanism which is a main part of the present invention in the above embodiment.

【図4】同上棧橋機構を備えた足場枠組を他の足場枠組
と隣り合わせて設置した状態の概略図である。
FIG. 4 is a schematic view of a state in which a scaffolding framework including the same bridge mechanism is installed next to another scaffolding framework.

【符号の説明】 A 建物 B 足場枠組 1 格子状枠体 1a 内側縦棒材 1b 外側縦棒材 1c 幅棒材 2 足場板 3 外壁ないし外壁面 4 中間水平補強板 5 上部水平補強板 6 クランプ 7 ブラケット 7a 水平支持材 7b 垂直支持材 7c 斜め支持材 8 アンカーボルト 9 アンカーボルト 10 連結具 11 ガイドアーム 11a ガイドローラ 15 渡り板 16 ヒンジ軸 17 ワイヤロープ 18、19 滑車 20 巻き取り機[Explanation of Codes] A Building B Scaffolding Frame 1 Lattice Frame 1a Inner Vertical Bar 1b Outer Vertical Bar 1c Width Bar 2 Scaffolding Board 3 Outer or Outer Wall 4 Intermediate Horizontal Reinforcing Plate 5 Upper Horizontal Reinforcing Plate 6 Clamp 7 Bracket 7a Horizontal support member 7b Vertical support member 7c Oblique support member 8 Anchor bolt 9 Anchor bolt 10 Connecting tool 11 Guide arm 11a Guide roller 15 Cross plate 16 Hinge shaft 17 Wire rope 18, 19 Pulley 20 Winder

───────────────────────────────────────────────────── フロントページの続き (72)発明者 安原 光幸 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 (72)発明者 山下 祐史 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 (72)発明者 桜井 繁和 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 (72)発明者 渡辺 剛 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 (72)発明者 坂本 圭 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 (72)発明者 伊東 徹郎 兵庫県神戸市中央区西町35 株式会社大林 組神戸支店内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Mitsuyuki Yasuhara 35, Nishimachi, Chuo-ku, Kobe, Hyogo Prefecture Obayashi Corporation Kobe Branch (72) Inventor, Yushi Yamashita 35, Nishimachi, Chuo-ku, Kobe City, Hyogo Prefecture Kobe Branch, Obayashi Corporation (72) Inventor Shigekazu Sakurai 35, Nishimachi, Chuo-ku, Kobe, Hyogo Prefecture Obayashi Corporation Kobe Branch (72) Inventor, Go Watanabe 35, Nishimachi, Chuo-ku, Kobe City, Hyogo Prefecture (72) Invention Author Kei Sakamoto 35 Nishimachi, Chuo-ku, Kobe, Hyogo Prefecture Obayashi Corporation Kobe Branch (72) Inventor Tetsuro Ito 35, Nishimachi, Chuo-ku, Kobe City Hyogo Prefecture Obayashi Corporation Kobe Branch

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 縦横の棒材で構成された格子状枠体に複
数段の足場板を水平に取り付けてなる足場枠組を建築中
の建物の外壁面に吊り棚式に設置し、工事の進捗に伴っ
て足場枠組全体を上方へ移動させる方式の建築物構築作
業用ジャンピング足場において、各段の前記足場板の端
部またはその端部を支持する前記格子状枠体の幅棒材に
渡り板をヒンジ構造で取り付け、この渡り板をほぼ水平
な姿勢から上方回動させてほぼ垂直ないし鈍角な姿勢に
変位自在な構成とし、各段の前記渡り板を相互に平行な
状態で上下につながるワイヤロープで連動連結したこと
を特徴とする建築物構築作業用ジャンピング足場の渡り
板機構。
1. A construction of a scaffolding frame in which a plurality of steps of scaffolding plates are horizontally attached to a lattice-shaped frame body composed of vertical and horizontal bars is installed on the outer wall surface of a building under construction in a hanging shelf type, and the progress of construction work. In the jumping scaffold for building construction work of the method of moving the entire scaffolding framework upwards, a crossing plate is attached to the width bar of the lattice-like frame body that supports the end of the scaffolding plate at each step or the end. Attached with a hinge structure, this crossover plate can be rotated upward from a substantially horizontal posture to be displaced in a substantially vertical or obtuse angle posture, and the crossover plates of each stage are linked in parallel with each other by a wire rope that connects vertically A jumper scaffold mechanism for building construction work characterized by being connected.
【請求項2】 請求項1において、前記足場枠組の上部
に設けた滑車に前記ワイヤロープの上方側を掛け回して
前記足場枠組の中間部に設けた巻き取り機に結んだこと
を特徴とする建築物構築作業用ジャンピング足場の渡り
板機構。
2. The pulley according to claim 1, wherein a pulley provided on an upper portion of the scaffolding frame is wound around an upper side of the wire rope and is connected to a winder provided at an intermediate portion of the scaffolding frame. Crossing mechanism for jumping scaffolds for building construction work.
JP07142254A 1995-06-08 1995-06-08 Crossing plate mechanism of jumping scaffold for building construction work Expired - Fee Related JP3077560B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07142254A JP3077560B2 (en) 1995-06-08 1995-06-08 Crossing plate mechanism of jumping scaffold for building construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP07142254A JP3077560B2 (en) 1995-06-08 1995-06-08 Crossing plate mechanism of jumping scaffold for building construction work

Publications (2)

Publication Number Publication Date
JPH08333884A true JPH08333884A (en) 1996-12-17
JP3077560B2 JP3077560B2 (en) 2000-08-14

Family

ID=15311048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07142254A Expired - Fee Related JP3077560B2 (en) 1995-06-08 1995-06-08 Crossing plate mechanism of jumping scaffold for building construction work

Country Status (1)

Country Link
JP (1) JP3077560B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963497A (en) * 2015-06-05 2015-10-07 刘飞 Scaffold connecting rod
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN112962941A (en) * 2021-02-07 2021-06-15 安徽同建建设集团有限公司 Temporary passing jump frame for house building construction
CN113027100A (en) * 2021-03-22 2021-06-25 广州中石科技有限公司 Scaffold with automatic upset apron structure
CN113235898A (en) * 2021-06-04 2021-08-10 中铁大桥局上海工程有限公司 Overhanging scaffold and construction process thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101597138B1 (en) * 2014-07-07 2016-02-25 (주)푸르고팜 Sterilization truck

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963497A (en) * 2015-06-05 2015-10-07 刘飞 Scaffold connecting rod
CN106088569A (en) * 2016-08-12 2016-11-09 天力博达科技有限公司 Collapsible material platform on construction scaffold
CN112962941A (en) * 2021-02-07 2021-06-15 安徽同建建设集团有限公司 Temporary passing jump frame for house building construction
CN112962941B (en) * 2021-02-07 2023-10-31 安徽同建建设集团有限公司 Temporary passing jump frame for house building construction
CN113027100A (en) * 2021-03-22 2021-06-25 广州中石科技有限公司 Scaffold with automatic upset apron structure
CN113235898A (en) * 2021-06-04 2021-08-10 中铁大桥局上海工程有限公司 Overhanging scaffold and construction process thereof

Also Published As

Publication number Publication date
JP3077560B2 (en) 2000-08-14

Similar Documents

Publication Publication Date Title
JP4163177B2 (en) Scaffolding system
JPH08333884A (en) Structure of connecting board for jumping scaffolding in building construction
CN211923466U (en) Elevator shaft regularization operation platform
JP7265967B2 (en) Cantilever device for bridge construction and bridge construction and demolition method
CN110805167A (en) Construction method for binding shear wall reinforcing steel bars by adopting outer hook support
JP4001332B2 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP2001115422A (en) Dismantling method of supporting for form fixed to concrete slab
JP3950800B2 (en) Suspension scaffold
KR102425363B1 (en) A structure of a flared shieldin integrated with climbing system and the mounting method thereof
JP3111854B2 (en) Elevating guide mechanism of jumping scaffold for building construction
JP4108076B2 (en) Construction method and dismantling method of scaffold for high-rise building
JPH08333886A (en) Structure of access board for jumping scaffolding in building construction
JPH10292619A (en) Self-climbing hanging scaffold unit for use in hanging scaffold constructing system corresponding to large space
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JP2004076256A6 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP3077559B2 (en) Supporting mechanism of jumping scaffold for building construction
CN214462700U (en) Horizontal steel bar binding platform
JPH0637159Y2 (en) Hanging scaffolding
JPH10152981A (en) Vertically moving scaffold
JP2532116B2 (en) Lifting scaffolding
CN110172965B (en) Sectional construction device and construction method for underground continuous wall reinforcing steel bars
JP2004270377A (en) Column-beam preassembled reinforcement body, and preassembled reinforcement method using the same
JPH10140839A (en) Device for vertically hoisting form material and pipe support
JPH09310484A (en) Large space applicable suspended scaffold constructing system
JP2004076525A (en) Temporary stage

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees