Shielding machine and method for reconstructing tunnel

Info

Publication number
JPH08291691A
JPH08291691A JP11929495A JP11929495A JPH08291691A JP H08291691 A JPH08291691 A JP H08291691A JP 11929495 A JP11929495 A JP 11929495A JP 11929495 A JP11929495 A JP 11929495A JP H08291691 A JPH08291691 A JP H08291691A
Authority
JP
Japan
Prior art keywords
tunnel
shield machine
shield
existing tunnel
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11929495A
Other languages
Japanese (ja)
Inventor
Kunito Sakai
邦登 酒井
Yuji Asagami
裕司 浅上
Nobuyuki Takamatsu
伸行 高松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP11929495A priority Critical patent/JPH08291691A/en
Publication of JPH08291691A publication Critical patent/JPH08291691A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To enable an economical construction work without any need for an excavation or earth removal facility, while a tunnel is in use. CONSTITUTION: A shielding machine 10 is advanced along an existing tunnel 20, while a natural ground around the tunnel 20 is being broken by ejecting high pressure water from a blade port 12 of the machine 10 fitted onto the tunnel 20. The existing tunnel 20 is demolished and removed in a front part of the machine 10, while a new tunnel is constructed in a tail part of the machine 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄道、道路、管渠等の既
設トンネルを使用に供しながら改築するシールド機及び
トンネルの改築工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a shield machine for rebuilding an existing tunnel such as a railroad, a road, a pipe or the like while using the tunnel and a method for rebuilding the tunnel.

【0002】[0002]

【従来の技術】掘削手段を具備するシールド機を使用し
て老朽化した既設トンネルを構築する方法が知られてい
る。この方法は既設トンネルより大径のシールド機で既
設トンネルとトンネル周囲の地山を同時に掘削しなが
ら、シールド機の後方に新たにトンネル躯体を構築する
方法である。
2. Description of the Related Art There is known a method of constructing an aged existing tunnel using a shield machine equipped with excavation means. This method is a method of constructing a new tunnel frame behind the shield machine while simultaneously excavating the existing tunnel and the ground around the tunnel with a shield machine having a diameter larger than that of the existing tunnel.

【0003】[0003]

【発明が解決しようとする問題点】前記した既設トンネ
ルの構築技術にあっては次のような問題点がある。 <イ> シールド機が少なくとも掘削手段と削土を回収
して搬送する排土設備を具備するためにシールド機が高
価となる。 <ロ> 既設トンネルの破砕片の混入した不良残土が大
量に発生する。特に良質残土でも処分コストが高い現
在、不良残土の処分が深刻な課題となっている。 <ハ> 施工中に既設トンネルの外方に切羽が露出す
る。この露出する切羽の崩落を防止するために予め地盤
改良工等の対策工を施す必要がある。 <ニ> シールド機内に多くの設備を配備するため、工
事期間中は長期間に亘ってトンネル使用の中断を強いら
れる。 <ホ> 既設トンネルが地下鉄トンネルである場合、作
業時間が電車が走行しない数時間に限られる。しかもト
ンネル内に資機材を残置できないため、工事を行う都
度、工事現場に資機材を搬出入する必要があり、施工効
率が悪い。
Problems to be Solved by the Invention The above-mentioned existing tunnel construction technique has the following problems. <a> The shield machine is expensive because it includes at least excavation means and earth removal equipment for collecting and transporting the cut soil. <B> A large amount of defective residual soil containing crushed fragments of the existing tunnel is generated. At present, the disposal cost of high quality residual soil is high, and the disposal of bad residual soil is a serious issue. <C> Faces are exposed outside the existing tunnel during construction. In order to prevent the exposed face from collapsing, it is necessary to take countermeasures such as ground improvement work in advance. <D> Since many facilities are installed in the shield machine, the use of the tunnel will be interrupted for a long time during the construction period. <E> When the existing tunnel is a subway tunnel, the working time is limited to a few hours when the train does not run. Moreover, since the materials and equipment cannot be left in the tunnel, it is necessary to carry the materials and equipment into and out of the construction site each time the construction is performed, which results in poor construction efficiency.

【0004】[0004]

【本発明の目的】本発明は以上の点に鑑みて成されたも
ので、その目的とするところは、つぎのようなシールド
機及びトンネルの改築工法を提供することにある。 設備の簡略化とマシンの低コスト化を図って施工でき
る、シールド機。 地盤改良工が一切不要で、しかも削土をほとんど発生
させずに施工できる、シールド機及びトンネルの改築工
法。 トンネルを使用に供しながら施工できる、シールド機
及びトンネルの改築工法。
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and an object thereof is to provide a shield machine and a tunnel reconstructing method as follows. A shield machine that can be installed by simplifying equipment and reducing machine cost. A method of reconstructing shield machines and tunnels that does not require any ground improvement work and can be constructed with almost no soil erosion. Shield machine and tunnel reconstruction method that can be used while using the tunnel.

【0005】[0005]

【問題点を解決するための手段】本発明は、トンネルに
外装可能なシールド本体と、複数のシールドジャッキと
を装備するシールド機において、シールド本体の刃口に
既設トンネルの周囲の地山を乱す乱し手段を配備したこ
とを特徴とする、シールド機である。さらに本発明はト
ンネルに外装可能なシールド本体と、複数のシールドジ
ャッキとを装備するシールド機において、シールド本体
の刃口に既設トンネルの周囲の地山を乱す乱し手段を配
備し、シールド本体の内側に既設トンネルの内方で既設
トンネルの上半を覆う防護板を設けたことを特徴とす
る、シールド機である。さらに本発明は前記のシールド
機において、シールド本体をフロント部とテール部に分
割し、両分割体の間を複数の連結ジャッキで連結して構
成することを特徴とする、シールド機である。さらに本
発明は前記したいずれかのシールド機において、乱し手
段が給水設備とシールド本体の刃口からシールド機の貫
入方向に沿って高圧水を噴射するノズルとにより構成す
ることを特徴とする、シールド機である。さらに本発明
は既設トンネルを解体撤去しながら、撤去跡に新設トン
ネルを構築するトンネルの改築工法において、前記した
いずれかのシールド機を使用し、既設トンネルに外装さ
せたシールド機の刃口で既設トンネルの周囲の地山を乱
しながらシールド機を既設トンネルに沿わせて前進させ
る工程と、シールド機のフロント部内で既設トンネルを
解体撤去する工程と、シールド機のテール部内で新設ト
ンネルを構築する工程とを繰り返すことを特徴とする、
トンネルの改築工法である。さらに本発明は既設トンネ
ルを解体撤去しながら、撤去跡に新設トンネルを構築す
るトンネルの改築工法において、前記したいずれかのシ
ールド機を使用し、既設トンネルに外装させたシールド
機の刃口で既設トンネルの周囲の地山を乱しながらシー
ルド機を既設トンネルに沿わせて前進させ、シールド機
のフロント部内で既設トンネルを解体撤去する工程と、
シールド機のテール部内で新設トンネルを構築する工程
とを並行して行うことを特徴とする、トンネルの改築工
法である。さらに本発明は前記したトンネルの改築工法
において、セグメントを組み立てて新設トンネルを構築
することを特徴とする、トンネルの改築工法である。
According to the present invention, in a shield machine equipped with a shield body that can be installed in a tunnel and a plurality of shield jacks, the blade of the shield body disturbs the ground around the existing tunnel. It is a shield machine characterized by having a disturbing means. Furthermore, the present invention is a shield machine equipped with a shield main body that can be installed in a tunnel and a plurality of shield jacks, in which the blade of the shield main body is provided with a disturbing means for disturbing the ground around the existing tunnel. It is a shield machine that is equipped with a protective plate that covers the upper half of the existing tunnel inside the existing tunnel. Further, the present invention is the above shield machine, wherein the shield body is divided into a front portion and a tail portion, and the two divided bodies are connected by a plurality of connecting jacks. Furthermore, the present invention is characterized in that, in any of the shield machines described above, the disturbing means is constituted by a water supply facility and a nozzle for injecting high-pressure water along the penetration direction of the shield machine from the blade opening of the shield body, It is a shield machine. Furthermore, the present invention uses a shield machine of any one of the above-mentioned shield machines in a tunnel reconstructing method for constructing a new tunnel at the site of removal while dismantling and removing the existing tunnel, and using the shield machine's blade that has been installed on the existing tunnel. A process of advancing the shield machine along the existing tunnel while disturbing the ground around the tunnel, a process of dismantling and removing the existing tunnel in the front part of the shield machine, and a new tunnel in the tail part of the shield machine Characterized by repeating steps and
This is a tunnel reconstruction method. Furthermore, the present invention uses a shield machine of any one of the above-mentioned shield machines in a tunnel reconstructing method for constructing a new tunnel at the site of removal while dismantling and removing the existing tunnel, and using the shield machine's blade that has been installed on the existing tunnel. A process of moving the shield machine forward along the existing tunnel while disturbing the ground around the tunnel, and dismantling and removing the existing tunnel in the front part of the shield machine,
This is a tunnel reconstructing method characterized by performing the process of constructing a new tunnel in the tail part of the shield machine in parallel. Further, the present invention is a tunnel reconstructing method, characterized in that, in the tunnel reconstructing method described above, segments are assembled to construct a new tunnel.

【0006】[0006]

【実施例1】以下図面を参照しながら本発明の一実施例
について説明する。
Embodiment 1 An embodiment of the present invention will be described below with reference to the drawings.

【0007】<イ>シールド機 図1に一部を破断したシールド機10の斜視図を示し、
図2にその縦断面図を示す。以下にシールド機10の各
部の構造について詳述する。
<A> Shield Machine FIG. 1 is a perspective view of a shield machine 10 with a part cut away.
FIG. 2 shows a vertical sectional view thereof. The structure of each part of the shield machine 10 will be described in detail below.

【0008】<ロ>シールド本体 シールド本体11は両端を開放した剛性の筒体で、その
フロント部の内径は既設トンネル20を外装可能な寸法
に設定し、シールド本体11のテール部の内径は構築予
定の新設トンネル30を外装可能な寸法に設定してあ
る。シールド本体11のフロント部の開口端は尖鋭な刃
口12を形成し、既設トンネル20の外周面と地山との
間に貫入し易くなっている。またシールド本体11内の
前後には既設トンネル20及び新設トンネル30の外周
面に当接可能な止水用のフロントシール11a及びテー
ルシール11bが夫々設けられている。尚、後述するよ
うにシールド機10を地山に貫入させるときには高圧水
を使用することから、フロントシール11aを複数設け
ておくことが望ましい。
<B> Shield main body The shield main body 11 is a rigid cylinder whose both ends are open, and the inside diameter of the front portion is set to a size that allows the existing tunnel 20 to be installed, and the inside diameter of the tail portion of the shield body 11 is constructed. The size of the planned new tunnel 30 is set so that it can be installed. The opening end of the front part of the shield body 11 forms a sharp blade 12 so that it can easily penetrate between the outer peripheral surface of the existing tunnel 20 and the ground. Further, front and rear inside the shield body 11 are provided with a front seal 11a and a tail seal 11b for stopping water, which can contact the outer peripheral surfaces of the existing tunnel 20 and the new tunnel 30, respectively. Since high pressure water is used when the shield machine 10 penetrates into the ground as described later, it is desirable to provide a plurality of front seals 11a.

【0009】<ハ>地山の乱し手段 本発明にかかるシールド機10は従来のような掘削手段
や排土設備を具備しない。代わりに既設トンネル20と
シールド本体11の外径間に位置する地山を強制的に乱
して外方へ押し退け易くするための乱し手段を装備して
いる。乱し手段は、例えば刃口12の前面に設けた複数
のノズル13と、シールド機本体11内に配備された給
水ユニット14とにより構成され、給水ユニット14か
ら送水される高圧水を各ノズル13から刃口12の貫入
方向へ向けて高圧水を噴射できるようになっている。
<C> Ground Disturbance Means The shield machine 10 according to the present invention does not have the conventional excavation means and earth removal equipment. Instead, it is equipped with a disturbing means for forcibly disturbing the natural ground located between the outer diameters of the existing tunnel 20 and the shield body 11 to easily push it outward. The disturbing means is composed of, for example, a plurality of nozzles 13 provided on the front surface of the blade 12 and a water supply unit 14 provided in the shield machine main body 11, and the high-pressure water sent from the water supply unit 14 is supplied to each nozzle 13. The high-pressure water can be jetted from the direction to the penetration direction of the blade opening 12.

【0010】<ニ>掘進手段 シールド本体11の内側中央でシールド本体11の内周
に沿って設けられたフレーム15には、複数のシールド
ジャッキ16が取り付けあり、図3に示す油圧ポンプユ
ニット17によって伸縮を操作できるようになってい
る。
<D> Excavating means A plurality of shield jacks 16 are attached to a frame 15 provided along the inner circumference of the shield body 11 at the center of the inside of the shield body 11, and a hydraulic pump unit 17 shown in FIG. You can operate the extension and contraction.

【0011】<ホ>防護板 またシールド本体11内のフレーム15にはシールド上
半と対向し、刃口12へ向けて延出する防護板18が取
り付けてある。防護板18は既設トンネル20の内方に
位置し、既設トンネル20の解体時にセグメント21の
誤落下を阻止するための板体である。防護板18の上部
を除いた両側(トンネル横断方向)にはスリット18a
が形成されている。このスリット18aは図示しない独
立した走行手段を有するエレクタ装置の把持部を各セグ
メント21の解体方向に誘導するための開口である。
<H> Protective Plate Further, a protective plate 18 facing the upper half of the shield and extending toward the blade 12 is attached to the frame 15 in the shield body 11. The protective plate 18 is located inside the existing tunnel 20 and is a plate body for preventing an erroneous drop of the segment 21 when the existing tunnel 20 is dismantled. Slits 18a are provided on both sides (in the tunnel crossing direction) except for the upper part of the protective plate 18.
Are formed. The slit 18a is an opening for guiding the grip portion of the elector device having an independent running means (not shown) in the disassembling direction of each segment 21.

【0012】[0012]

【作用】つぎに前記シールド機10を使用した既設トン
ネル20の改築方法について説明する。
Next, a method of reconstructing the existing tunnel 20 using the shield machine 10 will be described.

【0013】<イ>シールド機のセット 図5に示すように既設トンネル20が露出する深さの立
坑40を構築する。立坑40内に露出する既設トンネル
20を構成するセグメント21を解体し、シールド機1
0の組立空間を確保する。既設トンネル20の解体に当
たって立坑40内に既設トンネル20の解体端部を残し
ておく。これはシール時期10の発進初期に既設トンネ
ル20をガイド部材として活用するためである。立坑4
0内に露出する既設トンネル20の軌道や架線を桁材4
1等で仮受けする。つぎに立坑40内でシールド機10
の組み立てと発進架台42の構築を行う。 尚、図示し
ていないが立坑20内にはエントランス装置が配備され
ている。
<A> Set of shield machine As shown in FIG. 5, a vertical shaft 40 having a depth where the existing tunnel 20 is exposed is constructed. The segment 21 constituting the existing tunnel 20 exposed in the vertical shaft 40 is disassembled, and the shield machine 1
Secure 0 assembly space. Upon dismantling the existing tunnel 20, the dismantled end of the existing tunnel 20 is left in the vertical shaft 40. This is because the existing tunnel 20 is used as a guide member in the initial stage of the start of the sealing period 10. Vertical shaft 4
Tracks and overhead lines of the existing tunnel 20 exposed inside
Temporarily receive 1st grade. Next, in the vertical shaft 40, the shield machine 10
And assembling the starting frame 42. Although not shown, an entrance device is provided in the vertical shaft 20.

【0014】<ロ>シールド機の貫入 シールド機10のシールドジャッキ16を一斉に伸長
し、発進架台42から反力を得て、シールド機10を既
設トンネル20に沿わせて発進させる。同時に図2に示
す給水ユニット14を稼働させて刃口12のノズル13
から高圧水を吐出させる。ノズル13から噴射された高
圧水は既設トンネル20の周囲の地山を緩め、刃口12
の貫入抵抗を著しく低下させる。その結果、シールド機
10は既設トンネル20の外周の地山を押しのけながら
貫入する。
<B> Penetration of the shield machine The shield jacks 16 of the shield machine 10 are extended all at once, and a reaction force is obtained from the starting frame 42 to start the shield machine 10 along the existing tunnel 20. At the same time, the water supply unit 14 shown in FIG.
Discharge high-pressure water from. The high-pressure water sprayed from the nozzle 13 loosens the ground around the existing tunnel 20,
Significantly reduces the penetration resistance. As a result, the shield machine 10 penetrates while pushing away the natural ground around the existing tunnel 20.

【0015】<ハ>既設トンネルの解体撤去 図2に示すようにシールド機10のフロント部内に入り
込んだ既設トンネル20の各セグメント21をエレクタ
装置を使用し順次解体する。
<C> Dismantling and removing the existing tunnel As shown in FIG. 2, each segment 21 of the existing tunnel 20 that has entered the front portion of the shield machine 10 is sequentially dismantled using an erector device.

【0016】<ニ>新設トンネルの組み立て 既設トンネル20の解体作業と並行して、或いは前後し
てシールド機10のテール部内でセグメント31をリン
グ状に組み立て、裏込材を充填して新設トンネル30を
順次構築する。組み立てられた新設トンネル30はシー
ルド機10の反力部材となる。以下同様にシールド機1
0の貫入工程、既設トンネルの解体工程、新設トンネル
の組み立て工程を繰り返す。また以上の作業は終電が通
過して始発電車が通過するまでの時間帯に行うことが望
ましい。この際、軌道や架線はシールド機10内で仮受
けして電車の通過に供する。
<D> Assembly of new tunnel In parallel with or before or after the dismantling work of the existing tunnel 20, the segments 31 are assembled into a ring shape in the tail portion of the shield machine 10 and the back tunneling material is filled to construct the new tunnel 30. Sequentially build. The assembled new tunnel 30 serves as a reaction force member of the shield machine 10. Shield machine 1
0 penetration process, existing tunnel dismantling process, new tunnel assembling process are repeated. Further, it is desirable that the above work is performed during the time period from the passage of the last train to the passage of the first train. At this time, the tracks and overhead lines are temporarily received in the shield machine 10 and used for passing trains.

【0017】[0017]

【実施例2】図6はシールド本体11をフロント部11
aとテール部11bに二分して構成し、両者11a,1
1bの重合部間を複数の連結ジャッキ19で連結した他
のシールド機10aを示す。テール部11bは連結ジャ
ッキ19の伸縮操作によってフロント部11aに追随し
て移動することになる。本実施例の説明に当たり、前記
実施例1と同一の部位は同一の符号を付して構造や作動
についての説明を省略する。本実施例においては、フロ
ント部11a内における既設トンネルの解体撤去作業
と、テール部11b内における新設トンネルの構築作業
を独立して行うことができるので、急速施工が可能であ
る。また各連結ジャッキ19の伸縮を個別制御できるよ
うに構成すれば、シールド機10aに操舵機能を付与す
ることができ、曲りくねった既設トンネルを改築する場
合に有利である。
[Embodiment 2] FIG. 6 shows the shield body 11 with the front portion 11
a and the tail portion 11b are divided into two parts, 11a and 1
Another shield machine 10a in which the overlapping portions of 1b are connected by a plurality of connecting jacks 19 is shown. The tail portion 11b will move following the front portion 11a by the expansion / contraction operation of the connecting jack 19. In the description of this embodiment, the same parts as those in the first embodiment are designated by the same reference numerals, and the description of the structure and operation will be omitted. In the present embodiment, the dismantling and removing work of the existing tunnel in the front part 11a and the construction work of the new tunnel in the tail part 11b can be performed independently, so that rapid construction is possible. Further, if the expansion and contraction of each connecting jack 19 can be controlled individually, the steering function can be added to the shield machine 10a, which is advantageous when the winding existing tunnel is reconstructed.

【0018】[0018]

【実施例3】シールド機10,10aの防護板18を省
略する場合もある。
Third Embodiment The protective plate 18 of the shield machine 10, 10a may be omitted.

【0019】[0019]

【実施例4】シールド機10の乱し手段としては、既述
したウォータージェット方式以外につぎの方式を代用し
ても良い。
Fourth Embodiment As the disturbing means of the shield machine 10, the following method may be used instead of the water jet method described above.

【0020】円環カッタ方式 シールド機10の刃口12に円環状の回転カッタを装備
させ、回転カッタを回転させて既設トンネル20の周囲
の地山を乱す方式。
Ring cutter system A system in which the blade 12 of the shield machine 10 is equipped with a ring-shaped rotary cutter, and the rotary cutter is rotated to disturb the ground around the existing tunnel 20.

【0021】チェーンソー方式 多数のチップを取り付けた無端ベルト状物または無端チ
ェーン状物をシールド機10の刃口12に回転自在に装
備させ、無端ベルト状物または無端チェーン状物を回転
させて多数のチップ群により既設トンネル20の周囲の
地山を乱す方式。
Chainsaw method An endless belt or endless chain having a large number of chips attached thereto is rotatably mounted on the blade 12 of the shield machine 10, and the endless belt or endless chain is rotated to produce a large number of endless belts or endless chains. A method of disturbing the ground around the existing tunnel 20 by a chip group.

【0022】スイングカッタ方式 シールド機10の刃口12にシールド機10の軸心と直
交方向の支軸を中心に揺動する複数のカッタを装備さ
せ、複数のカッタを揺動させて既設トンネル20の周囲
の地山を乱す方式。
Swing Cutter Method The cutting edge 12 of the shield machine 10 is equipped with a plurality of cutters that swing around a support shaft in a direction orthogonal to the axis of the shield machine 10, and the plurality of cutters are swung to establish the existing tunnel 20. Method that disturbs the ground around.

【0023】[0023]

【実施例5】シールド機10の形状は単筒状に限定され
るものではなく、既設トンネル20の断面形状に対応す
る形状であれば良い。したがって、既設トンネル20の
断面が矩形を呈していたり、或いは複胴形状(略8字
形)の場合は、シールド機10はこれらの既設トンネル
20の断面形状に対応した形状を呈することになる。
Fifth Embodiment The shape of the shield machine 10 is not limited to the single cylinder shape, and may be any shape corresponding to the cross-sectional shape of the existing tunnel 20. Therefore, when the cross sections of the existing tunnels 20 are rectangular, or in the case of a double-hulled shape (substantially 8-shaped), the shield machine 10 has a shape corresponding to the cross-sectional shape of these existing tunnels 20.

【0024】[0024]

【実施例6】以上の実施例は新設トンネル40がセグメ
ント構造の場合について説明したが、新設トンネル40
は場所打ちコンクリート又は吹き付けコンクリートであ
ってもよい。
[Sixth Embodiment] In the above embodiment, the case where the new tunnel 40 has the segment structure has been described.
May be cast-in-place concrete or shotcrete.

【0025】[0025]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。 <イ> 削土手段や排土設備が不要となるので、シール
ド機の低コスト化と軽量化が図れる。さらにシールド機
の軽量化に伴いシールドジャッキの小型化も図れる。 <ロ> シールド機内に既設トンネル内の上半を覆う防
護板を設けることにより、既設トンネルの解体撤去工事
を安全に行える。 <ハ> シールド本体をフロント部とテール部に分け、
両者間をジャッキで伸縮自在に連結してシールド機を構
成する場合は、フロント部とテール部において夫々既設
トンネルの解体作業と新設トンネルの構築作業を夫々独
立して行えるので、工期を大幅に短縮できる。 <ニ> 既設トンネルの周囲の地山を強制的に乱した後
にシールド機を貫入させるので、シールド機の貫入抵抗
が小さくて済む。 <ホ> 切羽が露出しないので地盤改良が不要となるだ
けでなく、削土が一切発生しないので削土の処分問題が
発生しない。 <ヘ> シールド機を既設トンネルに外装させて施工す
るので、シールド機の方向制御が不要である。 <ト> 既設トンネルが地下鉄トンネルである場合は、
シールド機内で軌道や架線を仮受けすることで、電車の
走行に供しながら施工することができる。 <チ> 地下鉄トンネル、地下道トンネル、大径の上下
水管や各種ケーブル敷設用トンネル等の改築工事に適用
でき、汎用性が広い。 <リ> 新設トンネルの躯体厚を選定することで、既設
トンネルと外径を変えることなく、内空の拡径化が可能
である。 <ヌ> 設備を小型化できるので、トンネルが地下鉄ト
ンネルである場合は、建築限界内にシールド機やその他
の設備を電車の走行に支障なく配備することができる。
Since the present invention is as described above, the following effects can be obtained. <a> Since the earth cutting means and the earth discharging equipment are unnecessary, the cost and weight of the shield machine can be reduced. Further, as the weight of the shield machine is reduced, the shield jack can be downsized. <B> By disposing a protective plate inside the shield machine that covers the upper half of the existing tunnel, the dismantling and removal work of the existing tunnel can be performed safely. <C> The shield body is divided into a front part and a tail part,
When constructing a shield machine by connecting the two parts with a jack to expand and contract, the front part and the tail part can perform the dismantling work of the existing tunnel and the construction work of the new tunnel independently, so the construction period is greatly shortened. it can. <D> Since the shield machine is penetrated after forcibly disturbing the ground around the existing tunnel, the penetration resistance of the shield machine can be small. <E> Not only does the ground improvement not be necessary because the face is not exposed, and the problem of soil disposal does not occur because soil is not generated at all. <F> Since the shield machine is installed outside the existing tunnel, it is not necessary to control the direction of the shield machine. <G> If the existing tunnel is a subway tunnel,
By temporarily receiving the tracks and overhead lines inside the shield machine, it is possible to perform the construction while the train is running. <H> It can be applied to the renovation work of subway tunnels, underpass tunnels, large-diameter water and sewer pipes and various cable laying tunnels, etc. <R> By selecting the thickness of the new tunnel, it is possible to increase the inner diameter without changing the outer diameter of the existing tunnel. <Nu> Since the equipment can be miniaturized, if the tunnel is a subway tunnel, shield machines and other equipment can be installed within the building limits without hindering train operation.

【図面の簡単な説明】[Brief description of drawings]

【図1】 実施例1に係る説明図で、一部を破断したシ
ールド機の斜視図
FIG. 1 is an explanatory view according to a first embodiment and is a perspective view of a shield machine with a part cut away.

【図2】 シールド機の縦断面図[Fig. 2] Vertical cross-sectional view of the shield machine

【図3】 図2におけるIII −III の断面図FIG. 3 is a sectional view taken along line III-III in FIG.

【図4】 図2におけるIV−IVの断面図4 is a sectional view of IV-IV in FIG.

【図5】 シールド機の発進時の説明図FIG. 5 is an explanatory diagram when the shield machine is started.

【図6】 他の実施例に係るシールド機の縦断面図FIG. 6 is a vertical sectional view of a shield machine according to another embodiment.

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 トンネルに外装可能なシールド本体
と、複数のシールドジャッキとを装備するシールド機に
おいて、 シールド本体の刃口に既設トンネルの周囲の地山を乱す
乱し手段を配備したことを特徴とする、 シールド機。
1. A shield machine equipped with a shield main body that can be installed in a tunnel and a plurality of shield jacks, wherein a blade of the shield main body is provided with a disturbing means for disturbing the ground around the existing tunnel. And, the shield machine.
【請求項2】 トンネルに外装可能なシールド本体
と、複数のシールドジャッキとを装備するシールド機に
おいて、 シールド本体の刃口に既設トンネルの周囲の地山を乱す
乱し手段を配備し、 シールド本体の内側に既設トンネルの内方で既設トンネ
ルの上半を覆う防護板を設けたことを特徴とする、 シールド機。
2. A shield machine equipped with a shield main body that can be installed in a tunnel and a plurality of shield jacks, wherein the blade of the shield main body is provided with a disturbing means for disturbing the ground around the existing tunnel. A shield machine that is equipped with a protective plate inside the existing tunnel that covers the upper half of the existing tunnel.
【請求項3】 請求項1又は請求項2において、シー
ルド本体をフロント部とテール部に分割し、両分割体の
間を複数の連結ジャッキで連結して構成することを特徴
とする、シールド機。
3. The shield machine according to claim 1 or 2, wherein the shield body is divided into a front portion and a tail portion, and the two divided bodies are connected by a plurality of connecting jacks. .
【請求項4】 請求項1〜3のいずれかにおいて、乱
し手段が給水設備とシールド本体の刃口からシールド機
の貫入方向に沿って高圧水を噴射するノズルとにより構
成することを特徴とする、シールド機。
4. The disturbing means according to any one of claims 1 to 3, characterized in that the disturbing means comprises water supply equipment and a nozzle for injecting high-pressure water from a blade opening of the shield body along a penetration direction of the shield machine. Yes, a shield machine.
【請求項5】 既設トンネルを解体撤去しながら、撤
去跡に新設トンネルを構築するトンネルの改築工法にお
いて、 前記請求項1〜3のいずれかに記載のシールド機を使用
し、 既設トンネルに外装させたシールド機の刃口で既設トン
ネルの周囲の地山を乱しながらシールド機を既設トンネ
ルに沿わせて前進させる工程と、 シールド機のフロント部内で既設トンネルを解体撤去す
る工程と、 シールド機のテール部内で新設トンネルを構築する工程
とを繰り返すことを特徴とする、 トンネルの改築工法。
5. A tunnel reconstructing method for constructing a new tunnel on a site of removal while dismantling and removing an existing tunnel, using the shield machine according to any one of claims 1 to 3 to make the exterior of the existing tunnel exterior. The process of advancing the shield machine along the existing tunnel while disturbing the ground around the existing tunnel with the blade of the shield machine, the process of dismantling and removing the existing tunnel in the front part of the shield machine, A tunnel reconstruction method characterized by repeating the process of constructing a new tunnel in the tail section.
【請求項6】 既設トンネルを解体撤去しながら、撤
去跡に新設トンネルを構築するトンネルの改築工法にお
いて、 前記請求項1〜3のいずれかに記載のシールド機を使用
し、 既設トンネルに外装させたシールド機の刃口で既設トン
ネルの周囲の地山を乱しながらシールド機を既設トンネ
ルに沿わせて前進させ、 シールド機のフロント部内で既設トンネルを解体撤去す
る工程と、 シールド機のテール部内で新設トンネルを構築する工程
とを並行して行うことを特徴とする、 トンネルの改築工法。
6. A tunnel reconstructing method for constructing a new tunnel on a site of removal while dismantling and removing an existing tunnel, using the shield machine according to any one of claims 1 to 3 to make an exterior of the existing tunnel. The process of advancing the shield machine along the existing tunnel while disturbing the ground around the existing tunnel with the blade of the shield machine, dismantling and removing the existing tunnel in the front part of the shield machine, and in the tail part of the shield machine The tunnel reconstruction method is characterized by performing the process of constructing a new tunnel in parallel with.
【請求項7】 請求項5又は請求項6において、セグ
メントを組み立てて新設トンネルを構築することを特徴
とする、トンネルの改築工法。
7. The method for reconstructing a tunnel according to claim 5 or 6, wherein the segments are assembled to construct a new tunnel.
JP11929495A 1995-04-20 1995-04-20 Shielding machine and method for reconstructing tunnel Pending JPH08291691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11929495A JPH08291691A (en) 1995-04-20 1995-04-20 Shielding machine and method for reconstructing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11929495A JPH08291691A (en) 1995-04-20 1995-04-20 Shielding machine and method for reconstructing tunnel

Publications (1)

Publication Number Publication Date
JPH08291691A true JPH08291691A (en) 1996-11-05

Family

ID=14757857

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11929495A Pending JPH08291691A (en) 1995-04-20 1995-04-20 Shielding machine and method for reconstructing tunnel

Country Status (1)

Country Link
JP (1) JPH08291691A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387102A (en) * 2017-08-22 2017-11-24 华东交通大学 A kind of reconstruction shield machine of shield tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387102A (en) * 2017-08-22 2017-11-24 华东交通大学 A kind of reconstruction shield machine of shield tunnel
CN107387102B (en) * 2017-08-22 2023-11-14 华东交通大学 Reconstruction shield machine for shield tunnel

Similar Documents

Publication Publication Date Title
US5221160A (en) Subterranean connecting method for construction of shield tunnel and connecting apparatus therefor
JPS6346234B2 (en)
JP4471521B2 (en) Shield construction method, large section tunnel and its construction method, and shield machine
JPH08291691A (en) Shielding machine and method for reconstructing tunnel
JPH0489992A (en) Existing pipe duct enlarging method and shield excavation device used with the method
EP0781895B1 (en) Method of excavation for underground structures of variable cross sectional area
CN115012974A (en) Shield immersed tube combined construction method for butt joint of submarine tunnels
JP2008002070A (en) Tunnel excavator, reaming tunnel excavator and excavating method
JPH0244996B2 (en)
JPS6216309B2 (en)
JP2940402B2 (en) Rock tunnel excavation method using arch machine
EP0393187B1 (en) Method and apparatus for connecting halves of shield tunnel under ground
JP2000213278A (en) Method for connecting shield tunnel
JPS62258095A (en) Method of underground joining construction of shield-tunnel
JPH02210189A (en) Shield machine
Klados Experiences with hard rock shielded TBMs in special conditions
JPH02140396A (en) Annular excavating device
JPH1077782A (en) Tunnel excavator and excavation method
JPH0518184A (en) Underground connecting shield machine and tunnel connecting construction method therewith
JPH0288883A (en) Method of shielding construction and excavator thereof
JPH0490000A (en) Execution method for large section tunnel and foundation solidifying pillar constructing device
JP2516582B2 (en) Tunnel construction method
JPH05321573A (en) Tunnel excavator
JP4211362B2 (en) Connecting method of shield tunneling machine
JP2620133B2 (en) Shield machine

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20040709

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20040727

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040909

A131 Notification of reasons for refusal

Effective date: 20041012

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041129

A02 Decision of refusal

Effective date: 20050105

Free format text: JAPANESE INTERMEDIATE CODE: A02