JPH08286731A - Simultaneous preparing system for plural procedure tables - Google Patents

Simultaneous preparing system for plural procedure tables

Info

Publication number
JPH08286731A
JPH08286731A JP8782795A JP8782795A JPH08286731A JP H08286731 A JPH08286731 A JP H08286731A JP 8782795 A JP8782795 A JP 8782795A JP 8782795 A JP8782795 A JP 8782795A JP H08286731 A JPH08286731 A JP H08286731A
Authority
JP
Japan
Prior art keywords
procedure
state
simulated
management device
created
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8782795A
Other languages
Japanese (ja)
Inventor
Kenji Watanabe
渡辺健二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Original Assignee
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Meidensha Electric Manufacturing Co Ltd filed Critical Meidensha Corp
Priority to JP8782795A priority Critical patent/JPH08286731A/en
Publication of JPH08286731A publication Critical patent/JPH08286731A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To simutaneously prepare the correct procedures through plural terminals in a simultaneous preparing system of plural procedure tables which accumulates the simulated states of operation procedures to prepare a future pre-operation state and then prepares the operation procedure tables based on the pre-operation state for such jobs that maintain and check the facilities and equipments of a substation. CONSTITUTION: A CPU includes a simulated state management device in every process and an item name/simulated state management device at a common data part. The simulated state management device defines the initial state shown by the item name/simulated state management device as a temporary initial state and prepares a procedure and a post-operation state (S2 ). Then a first initial state is compared with the temporary initial state, so that it is decided whether the procedure is affected or not (S3 , S4 ). When the procedure is not affected, the procedure and the post-operation state are registered in a data base (S5 , S7 ). When the procedure is affected, a new procedure is prepared based on the latest state (S8 ).

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、操作手順の模擬状態を
積み重ねて将来の操作前状態を作成し、この状態をベー
スに変電所操作手順表を作成するシステムにおける複数
手順表の同時作成方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for simultaneously creating a plurality of procedure tables in a system for stacking simulation states of operation procedures to create a future pre-operation state and creating a substation operation procedure table based on this state. Regarding

【0002】[0002]

【従来の技術】変電所の操作手順表は、変電所の設備や
機器の保守や点検などの作業のために作成され、ある設
備等の停止操作や使用操作に関する一連の開閉器操作や
確認手順から成る。操作手順表は通常、操作時より1〜
2週間前に予め作成される。操作手順表の作成は、デシ
ジョンテーブル方式やエキスパートシステムによって手
順表を自動・半自動作成している。
2. Description of the Related Art A substation operation procedure table is created for maintenance and inspection of substation facilities and equipment, and a series of switch operation and confirmation procedures for stopping and using certain equipment. Consists of. The operating procedure table is usually 1 to
Created two weeks ago. The operation procedure table is created automatically or semi-automatically by the decision table method or the expert system.

【0003】この手順表は操作当日よりも前もって作成
されるため、手順作成のために操作直前の系統や変電所
の開閉器状態などを予測する必要がある。変電所操作手
順表自動生成エキスパートシステムでは、システムで作
成した手順表を内部で模擬実行することによって、操作
後の変電所模擬状態を作成し、これを積み重ねることに
よって将来の模擬状態を作成している。
Since this procedure table is prepared in advance of the day of operation, it is necessary to predict the state of the switch and the switchgear of the substation immediately before the operation in order to prepare the procedure. In the substation operation procedure table automatic generation expert system, the procedure table created by the system is simulated inside to create the substation simulated state after operation, and by stacking this, the future simulation state is created. There is.

【0004】ここで操作時の初期状態の作成方式の一例
を図4に示す。図4において、(1)は現在時=手順1
の操作前状態、(2)は手順1の操作後状態=手順2の
操作前状態、(3)は手順2の操作後状態=手順3の操
作前状態、(4)は手順3の操作後状態=操作時点の操
作前状態を各々表している。
Here, an example of a method of creating an initial state at the time of operation is shown in FIG. In FIG. 4, (1) is the present time = procedure 1
Before operation, (2) after operation of procedure 1 = before operation of procedure 2, (3) after operation of procedure 2 = before operation of procedure 3, (4) after operation of procedure 3 State = represents the state before the operation at the time of the operation.

【0005】操作手順は、停止件名と呼ばれる停止操作
と使用操作をセットで扱われるため、実際は停止操作の
操作後状態、使用操作の操作後状態をそれぞれ作成する
ことになる。
Since the operation procedure handles a stop operation called a stop subject and a use operation as a set, the post-operation state of the stop operation and the post-operation state of the use operation are actually created.

【0006】[0006]

【発明が解決しようとする課題】手順表は、多いときで
1日に20〜30件も作成する場合があり、作成する時
間も夜間などに限られるため、同時に作成することが望
まれている。現在の方式のように将来の模擬状態を生成
して手順作成の初期状態を作成するシステムにおいて、
複数の人が手順表を作成しようとするためには、図5の
ようなシステムを構成し、それぞれの端末で作成した手
順表とそれによって作成される変電所模擬状態を共通の
データベースにおく必要がある。
It is desirable to create the procedure table at the same time because there are many cases where 20 to 30 procedures tables are created per day, and the time for creating the procedure table is limited to night time. . In the system that creates the future simulated state and creates the initial state of procedure creation like the current method,
In order for more than one person to create a procedure table, it is necessary to configure the system as shown in Fig. 5 and put the procedure table created by each terminal and the substation simulation state created by it in a common database. There is.

【0007】図5(a)は1つのCPUにて複数のアプ
リケーションを起動し、それぞれを端末に表示する構成
であり、図5(b)は複数のCPUでそれぞれアプリケ
ーションを起動し、模擬状態などの共有データをサーバ
ーへアクセスする構成である。
FIG. 5 (a) shows a configuration in which a plurality of applications are activated by one CPU and each is displayed on a terminal, and FIG. 5 (b) is a configuration in which the applications are activated by a plurality of CPUs and a simulated state, etc. It is the configuration to access the shared data of the server.

【0008】しかし、この方式をとると、一方の端末に
おいて手順表を作成中の場合は、作成中の手順表の操作
日時よりも将来の手順を作成すると、初期状態が不確定
であるため、作成した手順表の正当性が失われる。例え
ば、図4において、手順3を作成中の時は状態(4)は
未確定のため、正確な手順は作成できない。
However, with this method, when a procedure table is being created at one terminal, the initial state is uncertain if a procedure that is later than the operation date and time of the procedure table being created is created. The validity of the created procedure table is lost. For example, in FIG. 4, when the procedure 3 is being created, the state (4) is undetermined, and therefore the accurate procedure cannot be created.

【0009】各端末で操作するための、模擬状態に一貫
性を持たせるために、手順作成中にデータベースのロッ
クをかけると、同時に複数の端末で手順表の作成を行う
ことができないため、結果的に1端末で操作するのと同
じになってしまう。
If the database is locked during the procedure creation in order to make the simulated state consistent for each terminal operation, the procedure table cannot be created on multiple terminals at the same time. It will be the same as operating with one terminal.

【0010】本発明は上記の点に鑑みてなされたもので
その目的は、複数の端末で同時に手順を作成しても正し
い手順を作成することができる複数手順表の同時作成方
式を提供することにある。
The present invention has been made in view of the above points, and an object thereof is to provide a simultaneous preparation method of a multi-procedure table capable of preparing a correct procedure even if a procedure is simultaneously prepared by a plurality of terminals. It is in.

【0011】[0011]

【課題を解決するための手段】本発明は、操作手順の模
擬状態を積み重ねて将来の操作前状態を作成し、この状
態をベースに変電所の設備や機器の保守や点検などの作
業のための操作手順表を作成する複数手順表の同時作成
方式において、CPUの各プロセス内部に模擬状態管理
装置を設けるとともに、共通データ部に件名・模擬状態
管理装置を設け、前記件名・模擬状態管理装置が示す初
期状態を仮の初期状態として前記模擬状態管理装置が手
順作成および操作後状態を作成し、該作成終了時に最新
の初期状態と前記仮の初期状態を比較して手順に影響が
有るか否かを判定し、影響が無いときは当該手順および
操作後状態をデータベースに登録し、影響が有るときは
最新の状態を基に再度手順作成を行うことを特徴として
いる。
SUMMARY OF THE INVENTION The present invention accumulates simulated states of operation procedures to create a future pre-operation state, and based on this state, for maintenance and inspection of substation facilities and equipment. In the method of simultaneously creating a multi-procedure table for creating the operation procedure table, a simulated state management device is provided inside each process of the CPU, and a subject / simulated state management device is provided in the common data section. The simulated state management device creates a procedure creation and post-operation status with the initial state shown by as a temporary initial state, and at the end of the creation, compares the latest initial state with the temporary initial state and affects the procedure. It is characterized by judging whether or not there is no influence, registering the procedure and the post-operation state in the database, and when there is an influence, re-creating the procedure based on the latest state.

【0012】[0012]

【作用】手順作成前と手順作成後において、それぞれ操
作前状態を比較し、手順作成に影響が無い範囲での状態
変更においては、手順の再作成を行わないようにするの
で、トータルでの手順作成時間が短縮され、また複数の
人による手順の作成が可能となる。
[Operation] Before the procedure is created and after the procedure is created, the pre-operation states are compared with each other, and the procedure is not recreated when the status is changed within the range that does not affect the procedure creation. Creation time is shortened and the procedure can be created by multiple people.

【0013】[0013]

【実施例】以下図面を参照しながら本発明の一実施例を
説明する。本発明では、複数端末より同時に手順表を作
成するために、図1のように各プロセスに模擬状態管理
装置11a〜11dを、また共通データ部に件名・模擬
状態管理装置12a、12bを各々設け、図2に示すフ
ローチャートに沿って手順作成を行う。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In the present invention, in order to simultaneously create a procedure table from a plurality of terminals, each process is provided with simulated state management devices 11a to 11d, and the common data section is provided with subject / simulated state management devices 12a and 12b, respectively. The procedure is created according to the flowchart shown in FIG.

【0014】まずステップS1において、手順作成時、
機器操作を行う時刻より手順を作成するための初期状態
を、件名・模擬状態管理装置12a、12bからデータ
を参照し、各プロセス内部の模擬状態管理装置11a〜
11dにコピーしておく。
First, in step S 1 , when creating a procedure,
The initial state for creating a procedure from the time when the device is operated is referred to by the subject / simulated state management devices 12a and 12b, and the simulated state management devices 11a to 11a in each process are referred to.
Copy it to 11d.

【0015】次にステップS2において、各プロセスは
コピーした状態(状態A)を仮の初期状態として手順を
作成していく。手順作成後、プロセス内部の模擬状態管
理装置11a〜11dにより手順を内部実行して新しい
操作後状態(状態B)を作成する。この時、作成した手
順によって操作された機器をマークし区別する。
Next, in step S 2 , each process creates a procedure with the copied state (state A) as a temporary initial state. After the procedure is created, the simulated state management devices 11a to 11d in the process internally execute the procedure to create a new post-operation state (state B). At this time, the devices operated by the created procedure are marked and distinguished.

【0016】手順作成と操作後状態の作成が終了した時
点で、再度件名・模擬状態管理装置12a、12bへ操
作時刻時点での模擬状態(状態A′)を問い合わせ(ス
テップS3,ステップS4)、手順作成前に参照した状態
(状態A)と違いがなければそのまま手順と操作後の状
態をデータベースへ登録する(ステップS5)。
[0016] at the time the procedure creation and the creation of post-operation state has been completed, query the simulated state (state A ') at the operating time time again subject, mock state management apparatus 12a, to 12b (step S 3, step S 4 ), If there is no difference from the state (state A) referred to before the procedure is created, the procedure and the state after the operation are registered in the database as they are (step S 5 ).

【0017】手順作成前と手順作成後で模擬状態が違う
場合(つまり、他の端末で同時に手順表が作成された場
合)、ステップS6において当該手順で操作された機器
(マークされた機器)の状態をチェックし、マークした
機器の状態に変更がなければ、当該手順には影響無いも
のとして手順はそのまま登録する(ステップS7)。た
だし、模擬状態に関しては、図3に示すように作成後の
操作後状態(状態B)のマークした機器のみの状態を操
作前状態(状態A′)とマージして正しい模擬状態(状
態C)を作成し、登録する。
[0017] If step simulated state after procedures created before creation is different (i.e., if the procedure table at the same time another terminal is created), engineered devices in the procedure in step S 6 (marked equipment) Check the state, if there is no change in the state of the marked equipment, the procedure to register it as no effect on the procedure (step S 7). However, as for the simulated state, as shown in FIG. 3, the state of only the marked device in the post-operation state (state B) after creation is merged with the pre-operation state (state A ′) to obtain the correct simulation state (state C). Create and register.

【0018】手順作成前の操作前状態(状態A)と手順
作成後の時点での操作前状態(状態A′)で操作する機
器の状態が違う場合は、状態不良として(ステップ
8)最新の状態を基に再度手順の再作成を行う。
[0018] If the state of the equipment to operate in the procedure created before the pre-operation state pre-operation state at the time of (state A) to the procedure after it is created (state A ') is different, as state failure (step S 8) latest Recreate the procedure again based on the state of.

【0019】停止操作・使用操作がセットになった件名
の場合は、それぞれの操作前、操作後に対して比較、反
映を行う。通常の停止件名では、使用操作手順は基本的
に停止操作前の状態に戻すため、停止操作前状態と使用
操作後状態を比較して、模擬状態が等しければ作成した
手順は、他の停止件名には影響はない。しかし停止のみ
あるいは使用のみの件名のように操作前と操作後の状態
が違う場合は、他の件名の操作前状態に変更を生じるた
め、件名・模擬状態管理装置12a、12bから当該件
名よりも未来に操作される件名を抽出して、手順の再作
成を行う。
In the case of a subject in which a stop operation / use operation is a set, comparison and reflection are performed before and after each operation. In a normal stop subject, the operation procedure used is basically returned to the state before the stop operation, so the pre-stop operation state and the post-use operation state are compared, and if the simulated state is the same, the created procedure is the other stop subject. Has no effect on. However, if the pre-operation state and post-operation state are different, such as the subject of stop only or use only, the subject / simulated state management device 12a, 12b is more likely than the subject to change because the state before the operation of another subject changes. Extract the subject to be operated in the future and recreate the procedure.

【0020】このように、手順作成前と手順作成後にお
いてそれぞれ操作前状態を比較し、手順作成に影響が無
い範囲での状態変更においては、手順の再作成を行わな
いようにするので、トータルでの手順作成時間が短縮さ
れ、また複数の人による手順の作成が可能となる。
In this way, the pre-operation states are compared before and after the procedure is created, and the procedure is not recreated when the status is changed within a range that does not affect the procedure creation. The procedure creation time in the field will be shortened and the procedure will be created by multiple people.

【0021】[0021]

【発明の効果】以上のように本発明によれば、CPUの
各プロセス内部に模擬状態管理装置を設けるとともに、
共通データ部に件名・模擬状態管理装置を設け、前記件
名・模擬状態管理装置が示す初期状態を仮の初期状態と
して前記模擬状態管理装置が手順作成および操作後状態
を作成し、該作成終了時に最新の初期状態と前記仮の初
期状態を比較して手順に影響が有るか否かを判定し、影
響が無いときは当該手順および操作後状態をデータベー
スに登録し、影響が有るときは最新の状態を基に再度手
順作成を行うようにしたので、次のような優れた効果が
得られる。
As described above, according to the present invention, the simulated state management device is provided inside each process of the CPU, and
A subject / simulated state management device is provided in the common data section, and the simulated state management device creates a procedure and a post-operation state with the initial state indicated by the subject / simulated state management device as a temporary initial state. The latest initial state and the temporary initial state are compared to determine whether or not the procedure is affected.If there is no impact, the procedure and the post-operation state are registered in the database. Since the procedure is made again based on the state, the following excellent effects can be obtained.

【0022】(1)複数の人が同時に手順を作成するこ
とが可能となり、また状態の変更により手順の再作成が
必要になっても、該当する件名の手順の作成によって済
む。
(1) It is possible for a plurality of people to create a procedure at the same time, and even if a procedure needs to be recreated due to a change in state, the procedure with the corresponding subject is created.

【0023】(2)模擬状態と操作手順との影響する範
囲を参照し、手順の再作成が必要かどうかを判断してい
るため、初期状態に変更があっても手順の再作成を行う
必要がない場合が多くなる。
(2) It is necessary to recreate the procedure even if there is a change in the initial state, because it is determined whether or not the procedure needs to be recreated by referring to the range in which the simulated state and the operating procedure affect. There are many cases where there is no.

【0024】(3)変電所の将来の状態をシステムが一
括して管理しているため、複数の端末で同時に手順を作
成しても正しい手順を作成することができる。
(3) Since the system collectively manages the future state of the substation, the correct procedure can be created even if the procedure is created simultaneously by a plurality of terminals.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の同時手順作成のための機構
を示し、(a)は1CPU方式に適用した場合のブロッ
ク図、(b)は複数CPU方式に適用した場合のブロッ
ク図。
1A and 1B show a mechanism for simultaneous procedure creation according to an embodiment of the present invention, FIG. 1A is a block diagram when applied to a 1 CPU system, and FIG. 1B is a block diagram when applied to a multiple CPU system.

【図2】本発明の一実施例の手順作成のフローチャー
ト。
FIG. 2 is a flowchart of procedure creation according to an embodiment of the present invention.

【図3】本発明の一実施例を示し、操作後状態の合成方
法を表す説明図。
FIG. 3 is an explanatory diagram showing a method of synthesizing a post-operation state according to an embodiment of the present invention.

【図4】従来の操作時の初期状態の作成方式を示す説明
図。
FIG. 4 is an explanatory diagram showing a conventional initial state creation method during operation.

【図5】従来の複数端末の構成を示し、(a)は1CP
U方式のブロック図、(b)は複数CPU方式のブロッ
ク図。
FIG. 5 shows a configuration of a plurality of conventional terminals, (a) shows 1CP.
The block diagram of a U system, (b) is a block diagram of a multiple CPU system.

【符号の説明】[Explanation of symbols]

11a〜11d…模擬状態管理装置 12a、12b…件名・模擬状態管理装置 11a to 11d ... Simulated state management device 12a, 12b ... Subject / simulated state management device

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 操作手順の模擬状態を積み重ねて将来の
操作前状態を作成し、この状態をベースに変電所の設備
や機器の保守や点検などの作業のための操作手順表を作
成する複数手順表の同時作成方式において、 CPUの各プロセス内部に模擬状態管理装置を設けると
ともに、共通データ部に件名・模擬状態管理装置を設
け、 前記件名・模擬状態管理装置が示す初期状態を仮の初期
状態として前記模擬状態管理装置が手順作成および操作
後状態を作成し、該作成終了時に最新の初期状態と前記
仮の初期状態を比較して手順に影響が有るか否かを判定
し、 影響が無いときは当該手順および操作後状態をデータベ
ースに登録し、影響が有るときは最新の状態を基に再度
手順作成を行うことを特徴とする複数手順表の同時作成
方式。
1. A plurality of operation procedure tables are created by stacking simulated states of operation procedures to create future pre-operation states, and based on these states, operation procedure tables for work such as maintenance and inspection of substation facilities and equipment. In the simultaneous procedure table creation method, a simulated state management device is provided inside each process of the CPU, and a subject / simulated state management device is provided in the common data section, and the initial state indicated by the subject / simulated state management device is provisionally initialized. As the state, the simulated state management device creates a procedure creation state and a post-operation state, and at the end of the creation, the latest initial state and the tentative initial state are compared to determine whether or not the procedure is affected. If there is no such procedure, the procedure and post-operation status are registered in the database, and if there is an effect, the procedure is created again based on the latest status.
JP8782795A 1995-04-13 1995-04-13 Simultaneous preparing system for plural procedure tables Pending JPH08286731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8782795A JPH08286731A (en) 1995-04-13 1995-04-13 Simultaneous preparing system for plural procedure tables

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8782795A JPH08286731A (en) 1995-04-13 1995-04-13 Simultaneous preparing system for plural procedure tables

Publications (1)

Publication Number Publication Date
JPH08286731A true JPH08286731A (en) 1996-11-01

Family

ID=13925792

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8782795A Pending JPH08286731A (en) 1995-04-13 1995-04-13 Simultaneous preparing system for plural procedure tables

Country Status (1)

Country Link
JP (1) JPH08286731A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004192120A (en) * 2002-12-09 2004-07-08 Misawa Homes Co Ltd Woody molded article manufacturing line checking management system, and checking management sheet used for the system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004192120A (en) * 2002-12-09 2004-07-08 Misawa Homes Co Ltd Woody molded article manufacturing line checking management system, and checking management sheet used for the system

Similar Documents

Publication Publication Date Title
Magee et al. Behaviour analysis of software architectures
US20030115177A1 (en) Process failure information management system
US7093216B2 (en) Apparatus connectable to a computer network for circuit design verification, computer implemented method for circuit design verification, and computer program product for controlling a computer system so as to verify circuit designs
CA2154585A1 (en) Event Correlation
CN110830608B (en) Global unique identifier generation method, device, equipment and storage medium
CN106096427A (en) The management-control method of transformer substation system configuration file and system
US20030005093A1 (en) Server configuration versioning tool
DE102020112530A1 (en) Technologies to ensure the functional safety of an electronic device
US20080161957A1 (en) Transaction Interface for Standardizing Transactions with a Measurement Instrument
CN105955838A (en) System halt reason check method and device
CN108074067A (en) Travel service information management platform
JPH08286731A (en) Simultaneous preparing system for plural procedure tables
US20150120252A1 (en) Cax model synchronization
CN112016256A (en) Integrated circuit development platform, method, storage medium and equipment
Tabery et al. Use of design pattern layout for automatic metrology recipe generation
DE102008046397A1 (en) System-level system-level transaction verification by translating transactions into machine code
JP2002203760A (en) Remote test method and system of semiconductor
US20060095400A1 (en) Macro delivery system and macro delivery program
CN111694851A (en) Transaction processing method of distributed transaction and related equipment
Koono et al. Structural way of thinking as applied to high quality design
Mak Automated Testing using XML and DEVS
Lisnianski et al. Time-redundant system reliability under randomly constrained time resources
US9053239B2 (en) Systems and methods for synchronizing software execution across data processing systems and platforms
US7139997B1 (en) Method and system for checking operation of a mask generation algorithm
Diaz Applying Petri net based models in the design of systems