JPH08254285A - Burring method for lengthy piping and pipe hanging device used therefor - Google Patents
Burring method for lengthy piping and pipe hanging device used thereforInfo
- Publication number
- JPH08254285A JPH08254285A JP7059288A JP5928895A JPH08254285A JP H08254285 A JPH08254285 A JP H08254285A JP 7059288 A JP7059288 A JP 7059288A JP 5928895 A JP5928895 A JP 5928895A JP H08254285 A JPH08254285 A JP H08254285A
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- support frame
- pipes
- groove
- chain block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
【0001】[0001]
【利用分野】本発明は、ガス配管や水道配管等の長尺配
管を地中に埋設する方法及びこれに使用する管吊装置に
関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for burying long pipes such as gas pipes and water pipes in the ground, and a pipe suspension device used for the method.
【0002】[0002]
【従来技術および課題】上記長尺配管は、掘削により形
成された配管埋設用の溝の底部に、複数の管を溶接によ
りつなぎ合わされた状態に配置した後、この配置部を埋
め戻すことによって、埋設される。ところが、溝の中で
前記溶接をするには、管の被溶接部に溶接機を取り付け
たり作業者が入る為の作業スペースを確保する必要か
ら、この溝において前記被溶接部が位置する部分を他の
部分より大きく余掘りしなければならない。又、前記余
掘りしても前記作業スペースが制約されるから、前記溶
接作業がしずらい。2. Description of the Related Art The above-mentioned long pipe is arranged by arranging a plurality of pipes by welding at the bottom of a groove for burying pipes formed by excavation, and then backfilling this arrangement portion. Buried. However, in order to perform the welding in the groove, it is necessary to attach a welding machine to the welded portion of the pipe or to secure a working space for an operator to enter. Therefore, in this groove, the portion where the welded portion is located is located. You have to dig larger than the other parts. In addition, since the working space is limited even if the overdrilling is performed, the welding work is difficult.
【0003】このため、従来は、溝上に複数の枕木を掛
け渡した状態で、これら枕木に複数の管を載置し、その
端部相互を対接させてその接合部を溶接し、この一体化
された埋設用配管をクレーン等により一旦吊り上げて前
記枕木を外した後に、前記管を溝の中に降ろし、その底
部に配置されている既設配管と溶接する方法が採用され
ていた。この方法によれば、溝の中での溶接作業や余掘
り作業の工数が大幅に減少し、全体としての作業性が向
上する。又、この方法では、溝上に管が載置されるか
ら、この溝の周辺に前記載置の為のスペースが不要とな
る。For this reason, conventionally, a plurality of sleepers are laid over the groove, a plurality of pipes are placed on these sleepers, their ends are brought into contact with each other, and their joints are welded together. A method has been adopted in which the embeded pipe for embedding is temporarily lifted by a crane or the like to remove the sleepers, and then the pipe is lowered into the groove and welded to the existing pipe arranged at the bottom thereof. According to this method, the number of man-hours for welding work and over-digging work in the groove is significantly reduced, and the workability as a whole is improved. Further, in this method, since the pipe is placed on the groove, a space for placing the pipe is not required around the groove.
【0004】そして、上記した溝上での管の溶接作業時
には、管の端面相互を全周にわたって対接させた状態に
維持して、その接合部を溶接する。ところが、管を枕木
上に載置してその端部相互を対接させただけでは、通
常、夫々の軸線が一直線上に位置せず、その端面相互が
全周にわたって対接した状態とならない。この為、管が
載置される枕木の高さや位置の変更により管相互の相対
位置及び姿勢を調整して、上記した全周対接状態とする
こととなるが、これら管が枕木により支持されているに
すぎないことから、さらには大型の管では、その重量が
極端に大きいことから、前記相対位置や姿勢を微調整し
にくく、この溶接作業の作業性が不十分であった。During the above welding work of the pipe on the groove, the end faces of the pipe are kept in contact with each other over the entire circumference, and the joint portion is welded. However, when the pipe is placed on the sleeper and the ends thereof are brought into contact with each other, the axes of the pipes are not normally aligned with each other, and the end faces thereof are not in contact with each other over the entire circumference. Therefore, by changing the height or position of the sleepers on which the pipes are placed, the relative positions and postures of the pipes are adjusted to bring them into the above-described all-circumferential contact state, but these pipes are supported by the sleepers. However, since the weight of a large-sized pipe is extremely large, it is difficult to finely adjust the relative position and posture, and the workability of this welding work is insufficient.
【0005】本発明は、このような点に鑑みてなされた
ものであり、『配管埋設用の溝(U)の外部で複数の管
(P1)(P1)を直列に溶接して埋設用配管(P) を形成した
後、この埋設用配管(P) を溝(U) の底部に吊り降ろして
既設配管(P0)と溶接し、これら配管の配置部を埋め戻す
形式の長尺配管の埋設方法』において、管(P1)(P1)の端
面相互を速やかに且つ正確に当接状態に支持できるよう
にして、溶接作業の作業性及び埋設作業全体の作業性を
向上させることをその課題とする。 [請求項1の発明]The present invention has been made in view of the above point, and "a plurality of pipes are provided outside the groove (U) for burying pipes".
(P 1 ) (P 1 ) are welded in series to form the burial pipe (P), and then this burial pipe (P) is hung on the bottom of the groove (U) to form the existing pipe (P 0 ). Welding, in the method of burying a long pipe of the type that backfills the arrangement portion of these pipes, '' so that the end faces of the pipes (P 1 ) (P 1 ) can be quickly and accurately supported in an abutting state, The task is to improve the workability of welding work and the workability of the entire burying work. [Invention of Claim 1]
【0006】[0006]
【技術的手段】上記課題を解決するために講じた本発明
の技術的手段は、『逆U字状の支持フレーム(1) を具備
する管吊装置(K) を使用するものとし、この管吊装置
(K) には、前記支持フレーム(1) に対して移動自在に支
持されたチェーンブロック(2) と、これの支持位置を水
平方向に調整する為の位置調整装置(3) とを具備させ、 .複数の管吊装置(K)(K)を溝(U) に跨らせてその長手
方向に並べ、各管吊装置(K) のチェーンブロック(2) に
より管(P1)を支持フレーム(1) 内に吊り下げることによ
り、管(P1)(P1)を直列させる工程と、 .チェーンブロック(2)(2)及び位置調整装置(3)(3)を
作動させて管(P1)(P1)の吊下げ位置及び姿勢を調整する
ことにより、管(P1)(P1)の端面相互が全周にわたって対
接された状態とする工程と、 .前記対接状態に維持された管(P1)(P1)の接合部を溶
接することにより、埋設用配管(P) を形成する工程と、 .チェーンブロック(2)(2)を作動させて前記埋設用配
管(P) を溝(U) の底部に吊り降ろす工程と、からなる』
ものとしたことである。[Technical Means] The technical means of the present invention taken to solve the above-mentioned problem is that "a pipe suspension device (K) having an inverted U-shaped support frame (1) is used. Hanging device
(K) is equipped with a chain block (2) movably supported with respect to the support frame (1) and a position adjusting device (3) for horizontally adjusting the supporting position of the chain block (2). ,. A plurality of pipe suspension devices (K) (K) are laid across the groove (U) and arranged in the longitudinal direction, and the pipe (P 1 ) is supported by the chain block (2) of each pipe suspension device (K). 1) A process in which the pipes (P 1 ) and (P 1 ) are connected in series by suspending the pipes inside. By adjusting the hanging position and orientation of the chain block (2) (2) and the position adjusting device (3) (3) to actuate the by the pipe (P 1) (P 1), the pipe (P 1) (P 1 ) The step of keeping the end faces in contact with each other over the entire circumference; A step of forming a burying pipe (P) by welding a joint portion of the pipes (P 1 ) and (P 1 ) maintained in the contact state; Activating the chain block (2) (2) to hang the buried pipe (P) on the bottom of the groove (U) ''
It was a matter of course.
【0007】[0007]
【作用】本発明の上記技術的手段は次のように作用す
る。このものでは、逆U字状の支持フレーム(1) を具備
する複数の管吊装置(K)(K)を、溝(U) に跨らせてその長
手方向に並べると共に、各管吊装置(K) のチェーンブロ
ック(2) により管(P1)を支持フレーム(1) 内に吊り下げ
ると、管(P1)(P1)が直列状態となる。The above technical means of the present invention operates as follows. In this device, a plurality of pipe suspension devices (K) (K) each having an inverted U-shaped support frame (1) are arranged in the longitudinal direction while straddling a groove (U), and each pipe suspension device is arranged. When the pipe (P 1 ) is suspended in the support frame (1) by the chain block (2) of (K), the pipes (P 1 ) (P 1 ) are put in series.
【0008】この後、各チェーンブロック(2) を操作す
ると、管(P1)の吊下げ位置が上下方向に調整され、又、
各位置調整装置(3) の作動により前記チェーンブロック
(2)の支持フレーム(1) に対する支持位置が水平方向に
調整されるから、前記吊下げ位置が水平方向に調整され
る。更に、管(P1)は、吊り下げ状態に支持されているか
ら、その姿勢が人手等により水平方向又は上下方向に微
調整できる。After that, when each chain block (2) is operated, the suspending position of the pipe (P 1 ) is adjusted in the vertical direction, and
By operating each position adjustment device (3), the chain block
Since the support position of (2) with respect to the support frame (1) is adjusted in the horizontal direction, the hanging position is adjusted in the horizontal direction. Further, since the pipe (P 1 ) is supported in a suspended state, its posture can be finely adjusted in the horizontal direction or the vertical direction by a human or the like.
【0009】これら調整により、管(P1)(P1)の端面相互
が全周にわたって対接された状態となる。そして、これ
ら管(P1)(P1)の対接状態を維持してその接合部を溶接す
ると、埋設用配管(P) が形成される。この後、チェーン
ブロック(2)(2)を操作して埋設用配管(P) を溝(U) の底
部に吊り降ろす。このものでは、各管(P1)の吊下げ位置
が上下方向及び水平方向にその方向別に調整され、しか
も、その調整量を任意に設定できることから、その吊下
げ位置の微調整が容易である。又、管(P1)の姿勢が容易
に微調整できる。尚、前記チェーンブロック(2) は、手
動操作するものであるから、前記吊下げ位置を上下方向
に微調整し易い。By these adjustments, the end faces of the tubes (P 1 ) (P 1 ) are in contact with each other over the entire circumference. Then, when the pipes (P 1 ) and (P 1 ) are maintained in contact with each other and their joints are welded, the buried pipe (P) is formed. Then, the chain block (2) (2) is operated to suspend the buried pipe (P) on the bottom of the groove (U). With this, the suspension position of each pipe (P 1 ) can be adjusted vertically and horizontally for each direction, and the amount of adjustment can be set arbitrarily, so fine adjustment of the suspension position is easy. . Also, the posture of the pipe (P 1 ) can be easily fine-adjusted. Since the chain block (2) is manually operated, it is easy to finely adjust the hanging position in the vertical direction.
【0010】[0010]
【効果】本発明は上記構成であるから次の特有の効果を
有する。このものでは、管(P1)(P1)の溶接作業に際し
て、その吊下げ位置及び姿勢の微調整が容易であるか
ら、前記管(P1)(P1)を速やかに且つ正確に上記全周対接
状態にできる。これにより、前記溶接作業の作業性が向
上し、さらには埋設作業全体の作業性が向上する。[Effects] The present invention having the above-described structure has the following unique effects. With this, it is easy to finely adjust the hanging position and posture of the pipe (P 1 ) (P 1 ) during welding work, so the pipe (P 1 ) (P 1 ) can be quickly and accurately It is possible to make contact all around. This improves the workability of the welding work, and further improves the workability of the entire burying work.
【0011】又、このものでは、管(P1)(P1)の溶接作業
に連続して、これにより形成された埋設用配管(P) の溝
(U) への吊り降ろしができるから、この点でも、埋設作
業全体の作業性が向上する。尚、管(P1)(P1)相互がまっ
すぐな姿勢に溶接される場合だけでなく、これら相互が
屈曲姿勢に溶接される場合でも、上記調整作業が容易で
あることには変わりがない。 [請求項2の発明]この請求項2の発明は、上記請求項
1の発明に於いて、『溝(U) の底部に埋設用配管(P) を
吊り降ろした時点で、これが一対のチェーンブロック
(2)(2)のみにより吊り下げられた状態とし、これらチェ
ーンブロック(2)(2)及びこれらの位置調整装置(3)(3)を
作動させて前記埋設用配管(P) の吊下げ位置及び姿勢を
調整することにより、この埋設用配管(P) と既設配管(P
0)の端面相互が全周にわたって対接された状態とし、こ
の対接状態に維持された配管接合部を溶接するようにし
た』ものである。Further, in this product, the groove of the buried pipe (P) formed by the welding work of the pipes (P 1 ) (P 1 ) is continued.
Since it can be hung on (U), the workability of the whole burial work is improved in this respect as well. It should be noted that the adjustment work remains the same not only when the pipes (P 1 ) and (P 1 ) are welded in a straight posture, but also when these pipes are welded in a bent posture. . [Invention of Claim 2] The invention of Claim 2 is the same as that of the invention of Claim 1 above, but when the embedding pipe (P) is hung at the bottom of the groove (U), it is a pair of chains. block
(2) Suspend only the (2), and operate the chain blocks (2) and (2) and their position adjusting devices (3) and (3) to suspend the buried pipe (P). By adjusting the position and orientation, the buried pipe (P) and the existing pipe (P)
The end surfaces of ( 0 ) are in contact with each other over the entire circumference, and the pipe joints maintained in this contact state are welded together. ”
【0012】この場合、埋設用配管(P) と既設配管(P0)
との溶接作業に際して、前記埋設用配管(P) を吊下げ状
態に支持する一対のチェーンブロック(2)(2)及びこれら
の位置調整装置(3)(3)を作動させると、前記埋設用配管
(P) は、2点支持状態で、既設配管(P0)に対する相対位
置及び姿勢が調整される。つまり、チェーンブロック
(2)(2)を同方向に同時操作すると、一定姿勢を維持した
ままで吊下げ位置が上下方向に調整され、又、操作方向
又は操作量を相違させると、吊下げ姿勢が上下方向に調
整される。又、位置調整装置(3)(3)によっても、同様に
して、吊下げ位置が水平方向に、吊下げ姿勢が水平方向
に調整される。これら調整により、埋設用配管(P) と既
設配管(P0)の端面相互が全周にわたって対接された状態
にできる。In this case, the buried pipe (P) and the existing pipe (P 0 )
During welding work with, when operating the pair of chain blocks (2) and (2) and their position adjusting devices (3) and (3) that support the buried pipe (P) in a suspended state, Piping
(P) is a two-point support state, and the relative position and orientation with respect to the existing pipe (P 0 ) are adjusted. That is, the chain block
(2) When (2) is operated simultaneously in the same direction, the hanging position is adjusted vertically while maintaining a constant posture, and when the operating direction or the operation amount is changed, the suspending posture is changed vertically. Adjusted. Similarly, the position adjusting devices (3) and (3) also adjust the hanging position in the horizontal direction and the hanging posture in the horizontal direction. By these adjustments, the end faces of the buried pipe (P) and the existing pipe (P 0 ) can be in contact with each other over the entire circumference.
【0013】このものでは、埋設用配管(P) と既設配管
(P0)の溶接作業に際して、これらを上記全周対接状態と
する為の微調整が速やかに且つ正確にできるから、前記
溶接作業の作業性が向上する。従って、埋設作業全体の
作業性が一層向上する。又、溝(U) に埋設用配管(P) を
吊り降ろす工程に連続して、この埋設用配管(P) と既設
配管(P0)との溶接作業ができるから、この点でも、埋設
作業全体の作業性が向上する。 [請求項3の発明]この請求項3の発明は、上記請求項
1の発明の実施に際して使用する管吊装置に関するもの
であり、その為の技術的手段は、『一対の逆U字状の主
フレーム(12)(12)が一定の間隔をあけて並設一体化され
た支持フレーム(1) と、この支持フレーム(1) の前記主
フレーム(12)(12)の上端水平部(12a)(12a)によりこれら
の長手方向の第1方向(C1)に移動自在に支持される第1
支持枠(31)と、この第1支持枠(31)の前記支持フレーム
(1) に対する支持位置を前記第1方向(C1)に調整する為
の第1調整装置(3a)と、前記第1支持枠(31)によりこれ
の移動方向に対して直角方向の第2方向(C2)に移動自在
に支持される第2支持枠(32)と、この第2支持枠(32)の
前記第1支持枠(31)に対する支持位置を前記第2方向(C
2)に調整する為の第2調整装置(3b)と、前記第2支持枠
(32)に支持される管吊下げ用のチェーンブロック(2) と
からなる』ものとしたことである。In this case, the buried pipe (P) and the existing pipe
During the welding work of (P 0 ), fine adjustment for bringing them into contact with each other around the entire circumference can be performed quickly and accurately, so that the workability of the welding work is improved. Therefore, the workability of the entire burying work is further improved. Also, since the welding work between the burying pipe (P) and the existing pipe (P 0 ) can be performed continuously with the process of suspending the burying pipe (P) in the groove (U), in this respect also Overall workability is improved. [Invention of Claim 3] The invention of Claim 3 relates to a pipe suspension device used for carrying out the invention of Claim 1 above, and the technical means therefor is "a pair of inverted U-shapes". A support frame (1) in which the main frames (12) (12) are integrated side by side with a certain interval, and an upper horizontal part (12a) of the main frame (12) (12) of the support frame (1). ) (12a) movably supported in the first longitudinal direction (C 1 )
Support frame (31) and the support frame of the first support frame (31)
A first adjusting device (3a) for adjusting the supporting position with respect to (1) in the first direction (C 1 ), and a second direction perpendicular to the moving direction of the first supporting frame (31). The second support frame (32) is movably supported in the direction (C 2 ), and the support position of the second support frame (32) with respect to the first support frame (31) is the second direction (C 2).
2 ) A second adjusting device (3b) for adjusting to the second support frame
It consists of a chain block (2) for suspending the pipe supported by (32) '.
【0014】このものでは、支持フレーム(1) は、全体
として逆U字状に形成されているから、この管吊装置
を、配管埋設用の溝に跨らせて載置できる。そして、こ
の支持フレーム(1) には、チェーンブロック(2) が第1
・第2支持枠(31)(32)を介して支持されているから、こ
れに吊り下げた管の吊下げ位置が上下方向に調整でき
る。更に、第1調整装置(3a)により、前記第1支持枠(3
1)の支持フレーム(1) に対する支持位置が、第1方向(C
1)に調整され、又、第2調整装置(3b)により、前記第2
支持枠(32)の第1支持枠(31)に対する支持位置が、第2
方向(C2)に調整される。このとき、前記第1・第2方向
(C1)(C2)が相互に直角であるから、前記チェーンブロッ
ク(2) の支持フレーム(1) に対する水平位置が調整され
る。In this structure, the support frame (1) is formed in an inverted U shape as a whole, so that the pipe suspension device can be placed by straddling the groove for embedding the pipe. The chain block (2) is firstly attached to the support frame (1).
-Since it is supported via the second support frames (31) and (32), the hanging position of the pipe suspended on this can be adjusted in the vertical direction. Further, by the first adjusting device (3a), the first support frame (3
The support position of (1) with respect to the support frame (1) is in the first direction (C
1 ) and the second adjusting device (3b)
The support position of the support frame (32) with respect to the first support frame (31) is the second
Adjusted in direction (C 2 ). At this time, the first and second directions
Since (C 1 ) and (C 2 ) are at right angles to each other, the horizontal position of the chain block (2) with respect to the support frame (1) is adjusted.
【0015】従って、このものでは、これに吊り下げら
れた管の吊下げ位置が上下方向及び水平方向に調整でき
るものとなり、これにより、この管吊装置を上記請求項
1の発明の実施に使用できる。Therefore, in this device, the hanging position of the pipe hanging on the pipe can be adjusted in the vertical direction and the horizontal direction, whereby the pipe hanging device is used for carrying out the invention of claim 1 above. it can.
【0016】[0016]
【実施例】以下本発明の実施例を図面に基づいて説明す
る。この実施例は、図1に示すように、既述請求項1及
び請求項2の発明を、一対の管吊装置(K)(K)を使用する
場合に実施したものであり、各管吊装置(K) は、図2及
び図3に示すように、既述の支持フレーム(1) を、棒状
部材を組み合わせて全体として逆U字状に形成し、これ
の上端部に、既述の位置調整装置(3) 及びこれに支持さ
れるチェーンブロック(2) を設けたものである。Embodiments of the present invention will be described below with reference to the drawings. In this embodiment, as shown in FIG. 1, the inventions of claim 1 and claim 2 are carried out when a pair of pipe suspension devices (K) and (K) are used. As shown in FIGS. 2 and 3, the device (K) has the above-mentioned support frame (1) formed by combining rod-shaped members into an inverted U-shape as a whole, and the above-mentioned support frame (1) is provided at the upper end thereof with A position adjusting device (3) and a chain block (2) supported by the position adjusting device (3) are provided.
【0017】[管吊装置(K) の構成について]上記支持
フレーム(1) は、同図に示すように、一対の逆U字状の
主フレーム(12)(12)相互がその直立部(12b)(12b)にて複
数の連結杆(11)(11)により一体化された構成であり、前
記連結杆(11)(11)は、水平姿勢に設けられると共に、前
記直立部(12b)(12b)との連結位置は、これらの上下端部
となっている。又、前記主フレーム(12)(12)の上端水平
部(12a)(12a)相互間にもその左右端部に位置させて支持
杆(13)(13)が連結されている。[Construction of Pipe Suspension Device (K)] As shown in the figure, the support frame (1) is constructed such that a pair of inverted U-shaped main frames (12) and (12) have their upright portions ( 12b) (12b) is a structure integrated by a plurality of connecting rods (11) (11), the connecting rod (11) (11) is provided in a horizontal posture, the upright portion (12b) The connection position with (12b) is the upper and lower ends of these. Support rods (13) and (13) are also connected between the upper horizontal portions (12a) and (12a) of the main frames (12) and (12) so as to be positioned at the left and right end portions thereof.
【0018】そして、前記上端水平部(12a)(12a)上に
は、図3及び図4に示すように、これに長手方向の両端
部が支持された矩形状の第1支持枠(31)が前記上端水平
部(12a)(12a)の長手方向に沿った第1方向(C1)に移動自
在に支持されている。又、上記支持杆(13)(13)間には、
一方の上端水平部(12a) 側に偏心した位置にて、前記第
1方向(C1)に平行な第1送りネジ(L1)が架設されてい
る。そして、これの一端は、前記支持杆(13)を貫通して
これの外側に連設された第1駆動モータ(M1)に連結され
ている。更に、この第1送りネジ(L1)は、前記第1支持
枠(31)における第1方向(C1)に対して直角となる側壁部
から垂下した一対の第1突片(33)(33)及びこれらの間に
介在された第1軸受(34)に貫通螺合している。これら第
1駆動モータ(M1)及び第1送りネジ(L1)が既述の第1調
整装置(3a)となる。As shown in FIGS. 3 and 4, on the upper end horizontal portions (12a) (12a), a rectangular first support frame (31) is supported by both longitudinal end portions thereof. Are movably supported in a first direction (C 1 ) along the longitudinal direction of the upper end horizontal portions (12a) (12a). Also, between the support rods (13) (13),
At one upper horizontal portion (12a) eccentric to the side position, the first feed screw parallel to the first direction (C 1) (L 1) it is bridged. One end of this is connected to a first drive motor (M 1 ) which penetrates the support rod (13) and is continuously provided outside the support rod (13). Further, the first feed screw (L 1 ) has a pair of first projecting pieces (33) (33) (hanging from a side wall portion of the first support frame (31) that is perpendicular to the first direction (C 1 ). 33) and the first bearing (34) interposed therebetween and are screwed therethrough. The first drive motor (M 1 ) and the first feed screw (L 1 ) serve as the above-mentioned first adjusting device (3a).
【0019】又、上記第1支持枠(31)上には、矩形状の
第2支持枠(32)が前記第1支持枠(31)の長手方向に沿っ
た第2方向(C2)に移動自在に支持されており、この第2
支持枠(32)は、第1方向(C1)の長さが前記第1支持枠(3
1)と同じで且つ第2方向(C2)の長さが第1支持枠(31)よ
り短く設定されている。又、第1支持枠(31)内には、第
2支持枠(32)と同じ長さの側壁部から所定距離内側の位
置に、前記側壁部と平行に且つ直立姿勢で一対の支持壁
(35)(35)が設けられ、これら支持壁(35)(35)間に、第2
方向(C2)と平行な第2送りネジ(L2)が架設されている。
そして、第1支持枠(31)の一端の外側面には、第2駆動
モータ(M2)が配置され、前記支持壁(35)と第1支持枠(3
1)の前記側壁部との間に内装された一対の傘歯車(61)(6
2)を介して、第2駆動モータ(M2)と第2送りネジ(L2)と
が連動する構成となっている。更に、第2送りネジ(L2)
は、第2支持枠(32)における中央部から第1支持枠(31)
内に垂下した一対の第2突片(36)(36)及びこれらの間に
介在された第2軸受(37)に、貫通螺合している。これら
第2送りネジ(L2)及び第2駆動モータ(M2)が既述の第2
調整装置(3b)となる。又、この第2調整装置(3b)及び上
記第1調整装置(3a)が、既述請求項1に記載の位置調整
装置(3) となる。A rectangular second support frame (32) is provided on the first support frame (31) in a second direction (C 2 ) along the longitudinal direction of the first support frame (31). It is movably supported and this second
The length of the support frame (32) in the first direction (C 1 ) is the same as that of the first support frame (3
It is the same as 1) and the length in the second direction (C 2 ) is set shorter than that of the first support frame (31). Further, in the first support frame (31), a pair of support walls are provided at a position inside a predetermined distance from the side wall part having the same length as the second support frame (32) in parallel with the side wall part and in an upright posture.
(35) (35) is provided, and the second wall is provided between the support walls (35) (35).
A second feed screw (L 2 ) is installed parallel to the direction (C 2 ).
A second drive motor (M 2 ) is disposed on the outer surface of one end of the first support frame (31), and the support wall (35) and the first support frame (3
A pair of bevel gears (61) (6) installed between the side wall of (1) and
The second drive motor (M 2 ) and the second feed screw (L 2 ) are interlocked via 2). In addition, the second feed screw (L 2 )
Is the first support frame (31) from the center of the second support frame (32).
A pair of second protrusions (36) (36) hanging inward and a second bearing (37) interposed therebetween are screwed through. These second feed screw (L 2 ) and second drive motor (M 2 ) are
It becomes the adjusting device (3b). Further, the second adjusting device (3b) and the first adjusting device (3a) are the position adjusting device (3) described in claim 1.
【0020】このものでは、第1駆動モータ(M1)を作動
させると、第1支持枠(31)が第1方向(C1)に移動し、
又、第2駆動モータ(M2)を作動させると、第2支持枠(3
2)が第2方向(C2)に移動するが、前記第2支持枠(32)に
後述のチェーンブロック(2) を吊り下げた状態における
このチェーンブロック(2) の支持位置の移動可能範囲
は、上記支持杆(13)(13)間で、且つ、第1送りネジ(L1)
の配置位置とこれの上記偏心方向とは反対側の水平部(1
2a) との間となる。In this structure, when the first drive motor (M 1 ) is operated, the first support frame (31) moves in the first direction (C 1 ),
When the second drive motor (M 2 ) is activated, the second support frame (3
2) moves in the second direction (C 2 ), but the movable range of the support position of this chain block (2) when the below-mentioned chain block (2) is suspended on the second support frame (32) Between the supporting rods (13) and (13) and the first feed screw (L 1 )
Position and the horizontal part (1
2a).
【0021】更に、上記チェーンブロック(2) は、図4
及び図5に示すように、第2軸受(37)に吊り下げられて
いる。このチェーンブロック(2) は、公知の機構のもの
が採用され、これの操作チェーン(22)を操作することに
より、下端にフック(21)が具備されたロードチェーン(2
3)が巻上げ又は巻下げられる構成である。尚、上記主フ
レーム(12)(12)の下端には、車輪(4)(4)が各別に連設さ
れ、その走行方向は、上記第2方向(C2)に設定されてい
る。又、前記主フレーム(12)(12)の下端の内側には、ジ
ャッキ(5)(5)が各別に連設され、各ジャッキ(5) の出力
部(51)が下方に進出駆動可能となっていると共に、この
出力部(51)の下端には、これの断面積よりも大きい受圧
板(52)が連設されている。Further, the chain block (2) is shown in FIG.
And, as shown in FIG. 5, it is suspended on the second bearing (37). This chain block (2) has a well-known mechanism, and by operating the operation chain (22) of this, the load chain (2) having the hook (21) at its lower end is installed.
3) is a structure that can be rolled up or down. Wheels (4) and (4) are separately provided at the lower ends of the main frames (12) and (12), and the traveling direction thereof is set to the second direction (C 2 ). Further, inside the lower ends of the main frames (12) and (12), jacks (5) and (5) are separately provided in series, and the output part (51) of each jack (5) can be driven downward. At the same time, the pressure receiving plate (52) having a larger cross section is connected to the lower end of the output part (51).
【0022】[施工の実際について]次に、一対の上記
管吊装置(K)(K)を使用して、長尺配管を埋設施工する実
際について以下に詳述する。先ず、従来と同様に掘削に
より配管埋設用の溝(U) を形成し、前記管吊装置(K)(K)
を、上記第2方向(C2)が溝(U) の長手方向に平行となる
姿勢で前記溝(U) に跨らせて載置する。尚、図2に示す
ように、前記溝(U) の幅(B) よりも、この幅方向におけ
る上記受圧板(52)(52)の内側端縁相互の間隔(A) が大き
く設定されていることはいうまでもない。[Actual Construction] Next, the actual construction of burying a long pipe by using the pair of pipe suspension devices (K) and (K) will be described in detail below. First, the groove (U) for burying the pipe is formed by excavation as in the conventional method, and the pipe suspension device (K) (K) is formed.
Is placed over the groove (U) in a posture in which the second direction (C 2 ) is parallel to the longitudinal direction of the groove (U). As shown in FIG. 2, the gap (A) between the inner edges of the pressure receiving plates (52) and (52) in this width direction is set to be larger than the width (B) of the groove (U). Needless to say
【0023】又、これら管吊装置(K)(K)相互が溝(U) の
長手方向に離して並べられた状態とし、支持フレーム
(1)(1)の中心間隔が、一本の管(P1)の長さに略一致する
ように設定する。このとき、上記第2支持枠(32)は、上
端水平部(12a)(12a)間の中央に位置させておく。又、上
記第1支持枠(31)は、支持杆(13)(13)間の中央に位置さ
せておく。そして、上記ジャッキ(5)(5)を作動させてこ
れらの出力部(51)(51)を下方に進出させると、これらが
接地されると共に、車輪(4)(4)が非接地状態となる。こ
れにより、支持フレーム(1) の載置状態が安定して、後
述の各作業が確実に実施されるものとなる。Further, the pipe suspension devices (K) (K) are placed in a state in which they are spaced apart from each other in the longitudinal direction of the groove (U), and the support frame
(1) Set the center interval of (1) so as to approximately match the length of one pipe (P 1 ). At this time, the second support frame (32) is positioned at the center between the upper horizontal portions (12a) (12a). The first support frame (31) is placed in the center between the support rods (13) and (13). Then, when the jacks (5) (5) are actuated to move these output parts (51) (51) downward, they are grounded and the wheels (4) (4) are in a non-grounded state. Become. As a result, the mounting state of the support frame (1) is stabilized, and each work described later is surely performed.
【0024】そして、各管吊装置(K) のチェーンブロッ
ク(2) に管(P1)を吊り下げる。この管(P1)は、チェーン
ブロック(2) の吊下げフック(21)に、管(P1)の中央部に
巻つけたワイヤ等を介して吊り下げられ、支持フレーム
(1) 内に水平姿勢で挿通される(図1の実線の状態)。
尚、この吊下げ作業は、予め溝(U) の上に枕木を掛け渡
して管(P1)を載置した後に、管吊装置(K) を上記載置状
態としてから、前記チェーンブロック(2) に吊り下げる
ようにしてもよく、他の手順で行うようにしてもよい。Then, the pipe (P 1 ) is suspended from the chain block (2) of each pipe suspension device (K). This pipe (P 1 ) is suspended from the suspension hook (21) of the chain block (2) via the wire wound around the center of the pipe (P 1 ) and the supporting frame.
(1) It is inserted in the horizontal position (state shown by the solid line in Fig. 1).
In addition, in this suspending work, after the sleeper is hung over the groove (U) and the pipe (P 1 ) is placed in advance, the pipe suspending device (K) is placed in the above-described installed state, and then the chain block ( It may be hung on 2) or by another procedure.
【0025】このとき、支持フレーム(1)(1)相互の間隔
と管(P) の長さとの関係、及び、第1・第2支持体(31)
(32)の初期位置が上記のように設定されているから、前
記管(P1)(P1)の端部相互が近接した状態となる。尚、こ
の実施例では、前記管(P1)として、鋼製管が使用され
る。この後、各管吊装置(K) のチェーンブロック(2) を
操作すると共に、第1・第2調整装置(3a)(3b)を作動さ
せると、前記チェーンブロック(2) により、管(P1)の吊
下げ位置が上下方向に調整される。又、第1調整装置(3
a)により、第2調整装置(3b)及びチェーンブロック(2)
が溝(U) の長手方向の直角方向に移動し、又、第2調整
装置(3b)により、チェーンブロック(2) が溝(U) の長手
方向に移動することから、前記管(P1)の吊下げ位置が水
平方向に調整される。更に、管(P1)は、その中央部で水
平姿勢に吊り下げられているから、その姿勢を人手によ
り簡単に調整できる。これら調整により、管(P1)(P1)の
端面相互が全周にわたって対接された状態にできる。
尚、上記調整作業に際して、チェーンブロック(2)(2)、
第1調整装置(3a)(3a)及び第2調整装置(3b)(3b)の全部
を使用してもよく、又、その一部を使用してもよい。
又、前記第1・第2調整装置(3a)(3b)を操作する為のリ
モコン操作部を、支持フレーム(1) において操作し易い
位置に設け、これにより第1・第2駆動モータ(M1)(M2)
のON・OFF等する構成としてもよい。At this time, the relationship between the distance between the support frames (1) and (1) and the length of the pipe (P), and the first and second supports (31)
Since the initial position of (32) is set as described above, the ends of the pipes (P 1 ) and (P 1 ) are close to each other. In this embodiment, a steel pipe is used as the pipe (P 1 ). Thereafter, when the chain block (2) of each pipe suspension device (K) is operated and the first and second adjusting devices (3a) and (3b) are operated, the chain block (2) causes the pipe (P) to move. The hanging position of 1 ) is adjusted vertically. In addition, the first adjusting device (3
According to a), the second adjusting device (3b) and the chain block (2)
There was moved in the longitudinal direction of the perpendicular direction of the groove (U), also by the second adjusting device (3b), since the chain hoist (2) moves in the longitudinal direction of the groove (U), said pipe (P 1 The hanging position of) is adjusted horizontally. Furthermore, since the pipe (P 1 ) is suspended in a horizontal posture at its central portion, the posture can be easily adjusted manually. By these adjustments, the end faces of the pipe (P 1 ) (P 1 ) can be in contact with each other over the entire circumference.
During the adjustment work, the chain block (2) (2),
All of the first adjusting devices (3a) (3a) and the second adjusting devices (3b) (3b) may be used, or a part thereof may be used.
Further, a remote control operating portion for operating the first and second adjusting devices (3a) and (3b) is provided at a position on the support frame (1) where it is easy to operate, whereby the first and second drive motors (M 1 ) (M 2 )
It may be configured to turn on / off the.
【0026】このものでは、管(P1)の吊下げ位置が上下
方向及び水平方向にその方向別に調整され、しかも、そ
の調整量を任意に設定できることから、又、管(P1)の姿
勢が人手により容易に微調整できることから、管(P1)(P
1)の端面相互を、速やかに且つ正確に、上記全周対接状
態とできる。尚、チェーンブロック(2) は、手動操作す
るものであるから、その吊下げ位置の上下方向の微調整
が容易且つ正確である。The attitude of the In this construction, since the hanging position of the pipe (P 1) is adjusted in that direction by the vertical and horizontal directions, moreover, can be arbitrarily set the adjustment amount, also the pipe (P 1) The tube (P 1 ) (P
The end faces of 1 ) can be quickly and accurately brought into contact with each other around the entire circumference. Since the chain block (2) is manually operated, fine adjustment of the hanging position in the vertical direction is easy and accurate.
【0027】この後、管(P1)(P1)を前記対接状態に維持
してその接合部を溶接すると、これら管(P1)(P1)が一体
化されて埋設用配管(P) に形成される。尚、この溶接に
際しては、前記対接状態で前記接合部を点付溶接等によ
り仮止めした上で、溶接機を取り付け、この後前記接合
部を全周溶接するようにしてもよい。又、他の手法によ
ってもよい。After that, when the pipes (P 1 ) and (P 1 ) are maintained in the above-mentioned contact state and their joints are welded, these pipes (P 1 ) and (P 1 ) are integrated and embedded pipe ( P). At the time of this welding, the joint may be temporarily fixed by spot welding or the like in the facing state, a welding machine may be attached, and then the joint may be welded all around. Alternatively, another method may be used.
【0028】更に、この後、チェーンブロック(2)(2)の
両方を同方向に操作することにより、前記埋設用配管
(P) を溝(U) の底部に吊り降ろす(図1の二点鎖線の状
態)。そして、各管吊装置(K) のチェーンブロック(2)
及び第1・第2調整装置(3a)(3b)を作動させると、埋設
用配管(P) の吊下げ位置及び姿勢が調整される。つま
り、チェーンブロック(2)(2)を同方向に同時操作する
と、一定姿勢を維持したままで上下方向の吊下げ位置が
調整され、又、操作方向又は操作量を相違させると、姿
勢が上下方向に調整される。又、第1・第2調整装置(3
a)(3b)によっても、同様にして、水平方向の吊下げ位置
及び水平姿勢が調整される。これら調整により、埋設用
配管(P) と既設配管(P0)の端面相互が全周にわたって対
接された状態にできる。この対接状態に維持された配管
接合部を溶接することにより、埋設用配管(P) と既設配
管(P0)とが一体化される。尚、溝(U) における前記溶接
部に位置する部分は、図1に示すように、その他の部分
よりも溝幅が大きく且つ深く掘削されて、溶接機を設置
したり作業者が入ったりできるようにしていることは言
うまでもない。Further, thereafter, by operating both of the chain blocks (2) and (2) in the same direction, the buried pipe
(P) is hung on the bottom of the groove (U) (indicated by the chain double-dashed line in Fig. 1). And the chain block (2) of each pipe suspension device (K)
When the first and second adjusting devices (3a) and (3b) are operated, the suspended position and posture of the buried pipe (P) are adjusted. In other words, when the chain blocks (2) and (2) are operated simultaneously in the same direction, the suspension position in the vertical direction is adjusted while maintaining a constant posture, and when the operation direction or the operation amount is changed, the posture is changed to the vertical direction. Adjusted in direction. Also, the first and second adjusting devices (3
The suspension position and the horizontal posture in the horizontal direction are adjusted in the same manner by a) and (3b). By these adjustments, the end faces of the buried pipe (P) and the existing pipe (P 0 ) can be in contact with each other over the entire circumference. The buried pipe (P) and the existing pipe (P 0 ) are integrated by welding the pipe joint portion maintained in the facing state. In addition, as shown in FIG. 1, the portion of the groove (U) located at the welded portion has a larger groove width and is deeper than other portions, so that a welding machine can be installed or an operator can enter. It goes without saying that we are doing so.
【0029】このものでは、埋設用配管(P) と既設配管
(P0)の溶接作業に際して、これらを上記全周対接状態と
する為の微調整が速やかに且つ正確にできる。又、溝
(U) に埋設用配管(P) を吊り降ろす工程に連続して、こ
の埋設用配管(P) と既設配管(P 0)との溶接作業ができ
る。さらにこの後、上記ジャッキ(5)(5)の出力部(51)(5
1)を上方に後退させて車輪(4)(4)により支持フレーム
(1) が支持された状態とし、各管吊装置(K) を、溝(U)
における未配管側に、埋設用配管(P) の長さ分の距離を
移動させた後に、前記出力部(51)(51)を進出させてこれ
らにより支持フレーム(1) が支持された状態として、上
記と同様の配管配置工程を実施する。そして、前記配管
配置工程を連続して繰り返すことにより、溝(U) 内に長
尺配管が形成される。この後、配管配置部を埋め戻す
と、この埋設工程が完了する。尚、前記埋め戻しは、一
つの埋設用配管(P) を上記配置する毎に実施してもよい
ことは言うまでもない。In this case, the buried pipe (P) and the existing pipe
(P0) During the welding work,
Fine adjustment can be performed quickly and accurately. Also, the groove
Continue the process of hanging the burying pipe (P) to (U),
Buried pipe (P) and existing pipe (P 0) Welding work with
It Further after this, the output parts (51) (5) of the jacks (5) (5)
Retract 1) upwards and support frame with wheels (4) (4)
(1) is supported, and each pipe suspension device (K) is connected to the groove (U).
On the unpiped side of, the distance for the length of the buried pipe (P)
After moving it, advance the output part (51) (51) and
The support frame (1) is supported by the
The pipe arrangement process similar to that described above is performed. And the piping
By repeating the placement process continuously, the length in the groove (U) is increased.
A length pipe is formed. After this, refill the piping arrangement part
Then, this burying process is completed. The backfill is
May be carried out each time one buried pipe (P) is placed
Needless to say.
【0030】[変形例について] .上記実施例では、一対の管吊装置(K)(K)を使用した
が、これを、3つ以上の管吊装置(K)(K)を同時に使用す
るようにしてもよい。この場合、隣接する一対の管(P1)
(P1)相互の溶接作業は、上記と同様に実施され、これを
全ての管(P1)(P 1)に実施すると、これらが一体化されて
埋設用配管(P) が形成される。そして、この埋設用配管
(P) の溝(U) への吊り降ろしに際しては、全てのチェー
ンブロック(2)(2)を同方向に同時操作して、溝(U) の底
部に配置し、この後、前記埋設用配管(P) を一対のチェ
ーンブロック(2)(2)のみにより、吊下げられた状態とす
る(これらチェーンブロック(2)(2)より他のチェーンブ
ロック(2)(2)のワイヤーを外す)。この状態で、上記実
施例と同様に、埋設用配管(P) と既設配管(P0)との上記
溶接作業を実施する。尚、埋設用配管(P) の溝(U) への
吊り降ろし直前に、埋設用配管(P) を一対のチェーンブ
ロック(2)(2)のみにより吊下げた状態にしてもよい。[Modification] In the above example, a pair of pipe suspension devices (K) (K) was used.
However, it is possible to use three or more pipe suspension devices (K) (K) at the same time.
You may make it. In this case, a pair of adjacent pipes (P1)
(P1) Mutual welding work is performed in the same manner as above, and
All tubes (P1) (P 1), These are integrated
A buried pipe (P) is formed. And this buried pipe
When lifting (P) into the groove (U), check all chains.
Block (2) (2) simultaneously in the same direction to
Section, and then connect the buried pipe (P) to a pair of chains.
Suspended only with the rock block (2) (2).
(A chain chain other than these chain blocks (2) (2)
Remove the wires from the locks (2) (2)). In this state,
As in the example, the buried pipe (P) and the existing pipe (P)0) And above
Carry out welding work. In addition, connect the buried pipe (P) to the groove (U).
Immediately before unloading, connect the buried pipe (P) to the chain
It may be suspended only by the locks (2) (2).
【0031】.上記実施例では、管吊装置(K) に管(P
1)を吊下げた状態で、人手により管(P1)の姿勢を微調整
するものとしたが、これを、図6に示すように、姿勢調
整手段(7)(7)を具備させた構成としてもよい。同図のも
のでは、主フレーム(12)(12)の上端水平部(12a)(12a)か
ら上記第2方向の外側に突出させた支持片(16)(16)の夫
々に支持される既述の駆動装置(70)としての油圧シリン
ダー(71)と、これから下方に垂下する出力軸(72)の下端
に連設した管保持部(73)とから前記姿勢調整手段(7) が
構成される。このものでは、チェーンブロック(2) に管
(P1)を吊り下げた状態でこの管(P1)を一方の姿勢調整手
段(7) により押し下げると、この管(P1)の姿勢が上下方
向に調整されるから、上記実施例と同様に、管(P1)(P1)
の端部相互を上記した全周対接状態とする調整作業が容
易となる。又、この対接状態を維持することが容易とな
ることから、溶接作業の作業性が向上する。更に、前記
姿勢調整手段(7) の支持位置を上記第1方向(C1)に調整
可能な構成とすれば、管(P 1)の姿勢が水平方向にも調整
されるものとなるから、前記調整作業及び溶接作業の作
業性がより一層向上する。尚、前記姿勢調整手段(7)
は、管(P1)を引き上げることにより前記姿勢調整する構
成としてもよい。又、姿勢調整手段(7) を一つだけ設け
た構成としてもよい。.. In the above embodiment, the pipe suspension device (K) is connected to the pipe (P
1) Is suspended and the pipe (P1) Fine adjustment of the posture
However, as shown in FIG.
It may be configured to have the adjusting means (7) (7). Also in the figure
In the main frame (12) (12), the upper horizontal part (12a) (12a)
Of the support pieces (16), (16) protruding outward from the above in the second direction
Hydraulic cylinder as the above-mentioned driving device (70) supported individually
(71) and the lower end of the output shaft (72) that hangs downwards
The posture adjusting means (7) is connected to the pipe holding part (73)
Be composed. In this one, the pipe is attached to the chain block (2).
(P1) With this tube (P1) With one hand
When pushed down by the step (7), this tube (P1) Is up and down
Direction, the pipe (P1) (P1)
It is easy to adjust the ends of the
It will be easy. In addition, it is easy to maintain this contact state.
Therefore, the workability of welding work is improved. Furthermore, the above
Set the support position of the posture adjusting means (7) in the first direction (C1)
If possible, the pipe (P 1) Attitude is also adjusted horizontally
Therefore, the adjustment work and welding work described above will be performed.
The workability is further improved. Incidentally, the posture adjusting means (7)
Is the pipe (P1) Is used to adjust the posture.
It may be done. Also, only one attitude adjustment means (7) is provided.
The configuration may be different.
【0032】.上記実施例では、管吊装置(K) の支持
フレーム(1) を、棒状部材が組み合わされた構成として
いるが、これに限定されるものではない。 .上記実施例では、位置調整装置(3) を、上記第1・
第2調整装置(3a)(3b)からなる構成としたが、チェーン
ブロック(2) の支持フレーム(1) に対する支持位置を水
平方向に調整できるかぎり、上記以外の構成を採用でき
る。[0032] In the above embodiment, the support frame (1) of the pipe suspension device (K) has a structure in which rod-shaped members are combined, but the present invention is not limited to this. . In the above embodiment, the position adjusting device (3) is provided with
Although the second adjusting devices (3a) and (3b) are used, other structures can be adopted as long as the supporting position of the chain block (2) with respect to the supporting frame (1) can be adjusted in the horizontal direction.
【0033】.管(P1)としては、溶接できるかぎり上
記鋼製管以外のものが使用できる。 .上記実施例では、管吊装置(K) を手動により移動さ
せるものとしたが、車輪(4)(4)に駆動モータを連動させ
て、これの作動により管吊装置(K) が移動される構成と
してもよい。.. As the pipe (P 1 ), other than the above steel pipes can be used as long as they can be welded. . In the above embodiment, the pipe suspension device (K) was manually moved, but the drive motor is interlocked with the wheels (4) and (4), and the pipe suspension device (K) is moved by the operation of the drive motor. It may be configured.
【図1】本発明実施例における埋設工程の説明図FIG. 1 is an explanatory view of a burying process in an embodiment of the present invention.
【図2】管吊装置(K) に管(P1)を吊り下げた状態の正面
図[Fig. 2] Front view of the pipe (P 1 ) suspended from the pipe suspension device (K).
【図3】これの上面図FIG. 3 Top view of this
【図4】XーX断面図FIG. 4 is a sectional view taken along line XX.
【図5】YーY断面図FIG. 5 is a sectional view taken along line YY
【図6】姿勢調整手段(7) を具備させた管吊装置(K) の
側面図FIG. 6 is a side view of a pipe suspension device (K) equipped with a posture adjusting means (7).
(U) ・・・溝 (P1)・・・管 (P) ・・・埋設用配管 (K) ・・・管吊装置 (1) ・・・支持フレーム (2) ・・・チェーンブロック (3) ・・・位置調整装置 (P0)・・・既設配管 (12)・・・主フレーム (12a) ・・・上端水平部 (31)・・・第1支持枠 (32)・・・第2支持枠 (3a)・・・第1調整装置 (3b)・・・第2調整装置 (7) ・・・姿勢調整手段(U) ・ ・ ・ Groove (P 1 ) ・ ・ ・ Pipe (P) ・ ・ ・ Buried pipe (K) ・ ・ ・ Pipe suspension device (1) ・ ・ ・ Support frame (2) ・ ・ ・ Chain block ( 3) ・ ・ ・ Position adjusting device (P 0 ) ・ ・ ・ Existing pipe (12) ・ ・ ・ Main frame (12a) ・ ・ ・ Top horizontal part (31) ・ ・ ・ First support frame (32) ・ ・ ・Second support frame (3a) ... First adjusting device (3b) ... Second adjusting device (7) ... Attitude adjusting means
フロントページの続き (72)発明者 新野 良司 大阪府堺市出島西町2番地 住友金属プラ ンテック株式会社内 (72)発明者 河上 孝 東京都港区高輪3丁目25番29号 中道機械 産業株式会社内Front page continued (72) Inventor Ryoji Shinno 2 Deshima Nishimachi, Sakai City, Osaka Prefecture Sumitomo Metals Plantech Co., Ltd. (72) Inventor Takashi Kawakami 3-25-29 Takanawa, Minato-ku, Tokyo Nakamichi Machine Industry Co., Ltd. Within
Claims (4)
1)(P1)を直列に溶接して埋設用配管(P) を形成した後、
この埋設用配管(P) を溝(U) の底部に吊り降ろして既設
配管(P0)と溶接し、これら配管の配置部を埋め戻す形式
の長尺配管の埋設方法において、 逆U字状の支持フレーム(1) を具備する管吊装置(K) を
使用するものとし、この管吊装置(K) には、前記支持フ
レーム(1) に対して移動自在に支持されたチェーンブロ
ック(2) と、これの支持位置を水平方向に調整する為の
位置調整装置(3) とを具備させ、 .複数の管吊装置(K)(K)を溝(U) に跨らせてその長手
方向に並べ、各管吊装置(K) のチェーンブロック(2) に
より管(P1)を支持フレーム(1) 内に吊り下げることによ
り、管(P1)(P1)を直列させる工程と、 .チェーンブロック(2)(2)及び位置調整装置(3)(3)を
作動させて管(P1)(P1)の吊下げ位置及び姿勢を調整する
ことにより、管(P1)(P1)の端面相互が全周にわたって対
接された状態とする工程と、 .前記対接状態に維持された管(P1)(P1)の接合部を溶
接することにより、埋設用配管(P) を形成する工程と、 .チェーンブロック(2)(2)を作動させて前記埋設用配
管(P) を溝(U) の底部に吊り降ろす工程と、 からなる長尺配管の埋設方法。1. A plurality of pipes (P) are provided outside a groove (U) for burying pipes.
1 ) (P 1 ) are welded in series to form the buried pipe (P),
This buried pipe (P) is hung on the bottom of the groove (U), welded to the existing pipe (P 0 ), and the arrangement of these pipes is backfilled. It is assumed that a pipe suspension device (K) equipped with the support frame (1) of (1) is used, and this pipe suspension device (K) has a chain block (2) movably supported with respect to the support frame (1). ) And a position adjusting device (3) for adjusting the supporting position of the same in the horizontal direction, A plurality of pipe suspension devices (K) (K) are laid across the groove (U) and arranged in the longitudinal direction, and the pipe (P 1 ) is supported by the chain block (2) of each pipe suspension device (K). 1) A process in which the pipes (P 1 ) and (P 1 ) are connected in series by suspending the pipes inside. By adjusting the hanging position and orientation of the chain block (2) (2) and the position adjusting device (3) (3) to actuate the by the pipe (P 1) (P 1), the pipe (P 1) (P 1 ) The step of keeping the end faces in contact with each other over the entire circumference; A step of forming a burying pipe (P) by welding a joint portion of the pipes (P 1 ) and (P 1 ) maintained in the contact state; A method for burying a long pipe, comprising a step of activating the chain block (2) (2) to suspend the burying pipe (P) on the bottom of the groove (U).
ろした時点で、これが一対のチェーンブロック(2)(2)の
みにより吊り下げられた状態とし、これらチェーンブロ
ック(2)(2)及びこれらの位置調整装置(3)(3)を作動させ
て前記埋設用配管(P) の吊下げ位置及び姿勢を調整する
ことにより、この埋設用配管(P) と既設配管(P0)の端面
相互が全周にわたって対接された状態とし、この対接状
態に維持された配管接合部を溶接するようにした請求項
1に記載の長尺配管の埋設方法。2. When the buried pipe (P) is hung at the bottom of the groove (U), it is suspended only by a pair of chain blocks (2) and (2), and these chain blocks (2 ) (2) and these position adjusting devices (3) and (3) are operated to adjust the hanging position and posture of the burial pipe (P), and the burial pipe (P) and the existing pipe (P). The method for burying a long pipe according to claim 1, wherein the end faces of (P 0 )) are in contact with each other over the entire circumference, and the pipe joint portion maintained in this contact state is welded.
一定の間隔をあけて並設一体化された支持フレーム(1)
と、この支持フレーム(1) の前記主フレーム(12)(12)の
上端水平部(12a)(12a)によりこれらの長手方向の第1方
向(C1)に移動自在に支持される第1支持枠(31)と、この
第1支持枠(31)の前記支持フレーム(1)に対する支持位
置を前記第1方向(C1)に調整する為の第1調整装置(3a)
と、前記第1支持枠(31)によりこれの移動方向に対して
直角方向の第2方向(C2)に移動自在に支持される第2支
持枠(32)と、この第2支持枠(32)の前記第1支持枠(31)
に対する支持位置を前記第2方向(C2)に調整する為の第
2調整装置(3b)と、前記第2支持枠(32)に支持される管
吊下げ用のチェーンブロック(2) とからなる管吊装置。3. A support frame (1) in which a pair of inverted U-shaped main frames (12) (12) are integrally arranged side by side at regular intervals.
And a first frame movably supported in the first longitudinal direction (C 1 ) by upper end horizontal portions (12a) (12a) of the main frames (12) (12) of the support frame (1). A support frame (31) and a first adjusting device (3a) for adjusting the support position of the first support frame (31) with respect to the support frame (1) in the first direction (C 1 ).
A second support frame (32) movably supported by the first support frame (31) in a second direction (C 2 ) perpendicular to the direction of movement of the first support frame (31); 32) The first support frame (31)
From a second adjusting device (3b) for adjusting the support position for the second direction (C 2 ) and a chain block (2) for pipe suspension supported by the second support frame (32) Tube suspension equipment.
よる吊下げ位置から離れた部位に当接又は装着される管
保持部(73)と、この管保持部(73)を上下方向に駆動する
駆動装置(70)とからなる姿勢調整手段(7) を設けた請求
項3に記載の管吊装置。4. A pipe holding portion (73) which is brought into contact with or attached to a portion of the pipe (P 1 ) separated from the suspension position by the chain block (2), and the pipe holding portion (73) is arranged in the vertical direction. The pipe suspension device according to claim 3, further comprising a posture adjusting means (7) including a driving device (70) for driving.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7059288A JPH08254285A (en) | 1995-03-17 | 1995-03-17 | Burring method for lengthy piping and pipe hanging device used therefor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7059288A JPH08254285A (en) | 1995-03-17 | 1995-03-17 | Burring method for lengthy piping and pipe hanging device used therefor |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH08254285A true JPH08254285A (en) | 1996-10-01 |
Family
ID=13109058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7059288A Withdrawn JPH08254285A (en) | 1995-03-17 | 1995-03-17 | Burring method for lengthy piping and pipe hanging device used therefor |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH08254285A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101691489B1 (en) * | 2015-06-23 | 2016-12-30 | 삼성물산 주식회사 | Pipe module and construction method thereof |
-
1995
- 1995-03-17 JP JP7059288A patent/JPH08254285A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101691489B1 (en) * | 2015-06-23 | 2016-12-30 | 삼성물산 주식회사 | Pipe module and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2684155B2 (en) | Excavation method used for construction of underground structures | |
JP2894226B2 (en) | Bridge construction method | |
JPH08254285A (en) | Burring method for lengthy piping and pipe hanging device used therefor | |
JP4509844B2 (en) | Vertical wall assembly apparatus and vertical wall construction method | |
CN115613548A (en) | Prefabricated diaphragm wall construction device and construction method thereof | |
CN114016546A (en) | Hole-pile method station steel pipe column hoisting and fixing device and construction method | |
JPH0989159A (en) | Pipe line laying method, timbering method, and timbering assembling body | |
CN111472783A (en) | Shield tunneling machine split initial lengthened pipeline extending device and application method | |
JPH08310783A (en) | Concrete caisson hoisting tool | |
JP2000017643A (en) | Working method for pile head portion of diagonally assembled pile body | |
JP3281974B2 (en) | Method and apparatus for assembling wall rebar unit | |
JPH08259177A (en) | Handling device of pipe | |
JPH0531631B2 (en) | ||
JP3325156B2 (en) | Soil support method and structure in excavation trench | |
JPH0725595A (en) | Tubing handling device | |
JP2512649Y2 (en) | U-shaped groove suspender | |
JPS59150803A (en) | Construction in track | |
JPH1037672A (en) | Lift frame | |
JPH08338567A (en) | Burying process for gas pipe line | |
JPH07189254A (en) | Sheathing device | |
JP2000017642A (en) | Working method for pile head portion of diagonally assembled pile | |
JP2848555B2 (en) | Core stock truck in core embedding equipment for underground continuous wall | |
JP5681539B2 (en) | Heavy material transport device and pile removal method | |
JPH09132078A (en) | Cargo receiving device for carrying and hanging down pipes and the like | |
JPH06136958A (en) | Tank constructing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20020604 |