JPH08246782A - Removal method of start pit wall with shield starting - Google Patents
Removal method of start pit wall with shield startingInfo
- Publication number
- JPH08246782A JPH08246782A JP5400295A JP5400295A JPH08246782A JP H08246782 A JPH08246782 A JP H08246782A JP 5400295 A JP5400295 A JP 5400295A JP 5400295 A JP5400295 A JP 5400295A JP H08246782 A JPH08246782 A JP H08246782A
- Authority
- JP
- Japan
- Prior art keywords
- shield
- starting
- wall
- shield starting
- continuous wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、トンネル施工でのシー
ルド工法におけるシールド発進に伴う発進坑壁の撤去工
法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for removing a starting pit wall accompanying the start of a shield in a shield construction method for tunnel construction.
【0002】[0002]
【従来の技術】シールド工法におけるシールド発進立坑
は、H型鋼やシートパイル等の鋼矢板による鋼材で構築
する場合の他に、連壁(地中連続壁)で構築する場合が
ある。2. Description of the Related Art A shield starting shaft in a shield construction method may be constructed not only by a steel material such as H-section steel or sheet pile with a steel sheet pile but also by a continuous wall (underground continuous wall).
【0003】このような連壁(地中連続壁)は周知のご
とく、削孔した横長孔に鉄筋かごを吊り降ろし、鉄筋か
ごの継手を残してコンクリートを打設して鉄筋コンクリ
ート製の先行エレメントを構築し、次いで削孔、鉄筋か
ごの配置、コンクリート打設で、前記継手を介して先行
エレメントに接続する後行エレメントを構築し、このよ
うな先行エレメントと後行エレメントとの接続で連続す
る鉄筋コンクリート壁体を地中に構築していくものであ
る。As is well known, such a continuous wall (underground continuous wall) is constructed by suspending a rebar cage in a drilled laterally long hole and placing concrete by leaving the joint of the rebar cage to form a reinforced concrete preceding element. Constructed, then drilled, reinforced cage placement, concrete pouring, constructing a trailing element that connects to the leading element through the joint, and a continuous reinforced concrete with such a leading and trailing element connection. The wall is built underground.
【0004】かかる連壁を周囲壁とするような発進坑
は、大深度に対応するものが施工可能となる。A start pit having such a connecting wall as a surrounding wall can be constructed for a large depth.
【0005】そして、発進坑内にシールド機を設置しこ
れを発進させるには、その部分の発進坑壁の撤去を行わ
なければならないが、従来は、ほとんどシールド発進範
囲の外周部をコアボーリングによりスリット切断した
後、ブレーカ等の打撃機械により少量ずつ破壊してい
た。In order to install a shield machine in the start pit and start it, it is necessary to remove the start pit wall in that part, but conventionally, almost all of the outer periphery of the shield start range is slit by core boring. After cutting, it was broken little by little by a hitting machine such as a breaker.
【0006】[0006]
【発明が解決しようとする課題】このようにブレーカ等
の打撃機械による従来の撤去工法では、時間と労力がか
かり、工程が長くおよび工費が高いものとなる。特に、
大深度連壁では連壁コンクリート強度が高くなり、800
〜1,000 kgf /cm2 となると破壊が困難となる。As described above, the conventional removal method using a hitting machine such as a breaker requires time and labor, requires a long process, and is expensive. In particular,
The deep concrete wall has a high concrete strength of 800
~1,000 kgf / cm 2 and the destruction is difficult.
【0007】本発明の目的は前記従来例の不都合を解消
し、簡単かつ確実に、しかも短時間で行うことができ、
工費も低廉なシールド発進に伴う発進坑壁の撤去工法を
提供することにある。The object of the present invention is to eliminate the inconveniences of the above-mentioned conventional examples, and to carry out the method easily, reliably and in a short time.
It is to provide a method for removing the starting pit wall that accompanies the start of the shield, which is inexpensive.
【0008】[0008]
【課題を解決するための手段】本発明は前記目的を達成
するため、シールド発進坑が連壁(地中連続壁)で構築
される場合において、連壁のシールド発進範囲外周部に
あたる部分をコアボーリングし、このコアの連続により
スリット切断し、さらに、シールド発進範囲下部を横方
向に同様にスリット切断して開放部を設け、残りのシー
ルド発進範囲内に発破用装薬孔を所要ピッチに穿孔し、
この穿孔した装薬孔のうち下部の開放部に近い位置より
装薬、発破を行うことを要旨とするものである。In order to achieve the above-mentioned object, the present invention, when the shield starting shaft is constructed by a connecting wall (underground continuous wall), uses a portion corresponding to the outer peripheral part of the shield starting range of the connecting wall as a core. Boring, slitting by the continuation of this core, further slitting the lower part of the shield starting range in the same way in the lateral direction to provide an open part, and blasting charging holes at the required pitch within the remaining shield starting range Then
The gist of the present invention is to carry out the charging and blasting from a position near the lower open portion of the punched charging holes.
【0009】[0009]
【作用】本発明によれば、シールド発進範囲の連壁を発
破により破砕して短時間で撤去するものであり、スリッ
トによりシールド発進範囲の下部に設けた開放部はこの
発破による破砕を容易にすることができる。According to the present invention, the connecting wall in the shield starting range is crushed by blasting and removed in a short time, and the opening provided at the bottom of the shield starting range by the slit facilitates crushing by this blasting. can do.
【0010】[0010]
【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1〜図10は本発明のシールド発進に伴う発
進坑壁の撤去工法の1実施例を示す各工程の正面図と縦
断側面図である。Embodiments of the present invention will now be described in detail with reference to the drawings. 1 to 10 are a front view and a longitudinal side view of each step showing one embodiment of a method of removing a starting pit wall according to the starting of a shield according to the present invention.
【0011】図中1はシールド発進坑、2はこのシール
ド発進坑1を構築する連壁(地中連続壁)、3はシール
ド発進坑1内に設置されるシールド機である。また、シ
ールド機1の発進に備えて連壁2の外側には凍結工法や
薬液注入工法での地盤改良4が施される。さらに、連壁
2の斜線部分はシールド発進範囲5を示す。In the figure, 1 is a shield starting pit, 2 is a connecting wall (underground wall) which constructs the shield starting pit 1, and 3 is a shield machine installed in the shield starting pit 1. Further, in preparation for the start of the shield machine 1, a ground improvement 4 is applied to the outside of the connecting wall 2 by a freezing method or a chemical injection method. Further, the hatched portion of the connecting wall 2 indicates the shield starting range 5.
【0012】図2、図3に示すように、前記シールド発
進範囲5の外周部にあたる部分をコアボーリングし、こ
のコア6の連続によりスリット7をなして切断する。そ
の際、このコア6は図4に示すように外壁部に約10cm程
度の残壁部を残すものとする。As shown in FIGS. 2 and 3, a portion corresponding to the outer peripheral portion of the shield starting range 5 is core-bored, and a slit 7 is formed by the continuation of the core 6 to cut. At this time, the core 6 has a remaining wall portion of about 10 cm left on the outer wall portion as shown in FIG.
【0013】さらに、図5、図6に示すように、シール
ド発進範囲5に下部をコアボーリングし、このコア6の
連続により横方向にスリット8をなして切断して開放部
9を設ける。この場合もコア6は外壁部に約10cm程度の
残壁部を残すものとするので、図6に示すように開放部
9も外壁部に約10cm程度の残壁部を残すものとなる。Further, as shown in FIGS. 5 and 6, a lower portion is core-bored in the shield starting range 5, and a slit 8 is cut in the lateral direction by the continuation of the core 6 to provide an open portion 9. In this case as well, the core 6 leaves a residual wall portion of about 10 cm on the outer wall portion, so that the open portion 9 also leaves a residual wall portion of about 10 cm on the outer wall portion as shown in FIG.
【0014】図7、図8に示すように、残りのシールド
発進範囲5内に発破用装薬孔10を30〜50cmピッチに穿孔
する。As shown in FIGS. 7 and 8, blasting charge holes 10 are punched at a pitch of 30 to 50 cm in the remaining shield starting range 5.
【0015】このように穿孔した装薬孔10のうち下部の
開放部に近い位置より装薬、発破を行う。そして、装薬
は図11に示すように少量(100g〜200g)を 10g程度の小
さい爆薬11に分散して行う。図中12は発破器である。The charging and blasting are carried out from a position near the lower opening of the charging hole 10 thus drilled. Then, as shown in Fig. 11, a small amount (100g to 200g) of the explosive is dispersed in a small explosive 11 of about 10g. In the figure, 12 is a blasting machine.
【0016】[0016]
【発明の効果】以上述べたように本発明のシールド発進
に伴う発進坑壁の撤去工法は、発破を用いて破砕するこ
とにより、簡単かつ確実に、しかも短時間で行うことが
でき、工費も低廉なものである。As described above, the method of removing the starting pit wall associated with the starting of the shield according to the present invention can be performed easily and reliably in a short time by crushing using blasting, and the construction cost is also low. It is inexpensive.
【図1】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す前段階の状態の正面図である。FIG. 1 is a front view of a front stage state showing one embodiment of a method of removing a starting pit wall according to the starting of a shield according to the present invention.
【図2】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す前段階の状態の縦断側面図である。FIG. 2 is a vertical cross-sectional side view showing a front stage state of an embodiment of a method of removing a starting pit wall according to the present invention when a shield is started.
【図3】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第1工程の正面図である。FIG. 3 is a front view of a first step showing an embodiment of a method of removing a starting pit wall associated with starting of a shield according to the present invention.
【図4】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第2工程の縦断側面図である。FIG. 4 is a vertical cross-sectional side view of a second step showing one embodiment of the method of removing the starting pit wall associated with the starting of the shield according to the present invention.
【図5】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第3工程の正面図である。FIG. 5 is a front view of a third step showing one embodiment of the method of removing the starting pit wall associated with the starting of the shield according to the present invention.
【図6】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第3工程の縦断側面図である。FIG. 6 is a vertical cross-sectional side view of a third step showing an embodiment of the method for removing the starting shaft wall associated with the starting of the shield according to the present invention.
【図7】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第4工程の正面図である。FIG. 7 is a front view of a fourth step showing an embodiment of the method of removing the starting pit wall associated with the starting of the shield according to the present invention.
【図8】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第4工程の縦断側面図である。FIG. 8 is a vertical cross-sectional side view of a fourth step showing an embodiment of the method for removing the starting shaft wall associated with the starting of the shield according to the present invention.
【図9】本発明のシールド発進に伴う発進坑壁の撤去工
法の1実施例を示す第5工程の正面図である。FIG. 9 is a front view of a fifth step showing one embodiment of the method of removing the starting pit wall associated with the starting of the shield according to the present invention.
【図10】本発明のシールド発進に伴う発進坑壁の撤去
工法の1実施例を示す第5工程の部分拡大縦断側面図で
ある。FIG. 10 is a partially enlarged vertical cross-sectional side view of a fifth step showing an embodiment of a method of removing a starting pit wall associated with starting of a shield according to the present invention.
【図11】本発明のシールド発進に伴う発進坑壁の撤去
工法の1実施例を示す装薬孔部分の拡大縦断側面図であ
る。FIG. 11 is an enlarged vertical cross-sectional side view of a charging hole portion showing an embodiment of a method of removing a starting pit wall associated with starting of a shield according to the present invention.
1…シールド発進坑 2…連壁 3…シールド機 4…地盤改良 5…シールド発進範囲 6…コア 7,8…スリット 9…開放部 10…装薬孔 11…爆薬 12…発破器 1 ... Shield launch pit 2 ... Wall 3 ... Shield machine 4 ... Ground improvement 5 ... Shield launch range 6 ... Core 7, 8 ... Slit 9 ... Open part 10 ... Charge hole 11 ... Explosive 12 ... Blaster
フロントページの続き (72)発明者 高野 孝 東京都港区元赤坂一丁目3番8号 鹿島建 設株式会社東京支店内 (72)発明者 松本 龍二 東京都港区元赤坂一丁目3番8号 鹿島建 設株式会社東京支店内 (72)発明者 碓氷 和夫 東京都港区元赤坂一丁目3番8号 鹿島建 設株式会社東京支店内 (72)発明者 石田 雅利 東京都港区元赤坂一丁目2番7号 鹿島建 設株式会社内Front page continuation (72) Inventor Takashi Takano 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Inside Kashima Construction Co., Ltd. Tokyo Branch (72) Inventor Ryuji Matsumoto 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. in Tokyo Branch (72) Inventor Kazuo Usui 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. in Tokyo Branch (72) Inventor Masatoshi Ishida 1-chome, Moto Akasaka, Minato-ku, Tokyo No. 2-7 Kashima Construction Co., Ltd.
Claims (1)
構築される場合において、連壁のシールド発進範囲外周
部にあたる部分をコアボーリングし、このコアの連続に
よりスリット切断し、さらに、シールド発進範囲下部を
横方向に同様にスリット切断して開放部を設け、残りの
シールド発進範囲内に発破用装薬孔を所要ピッチに穿孔
し、この穿孔した装薬孔のうち下部の開放部に近い位置
より装薬、発破を行うことを特徴としたシールド発進に
伴う発進坑壁の撤去工法。1. When the shield starting shaft is constructed by a continuous wall (underground continuous wall), core boring is performed on a portion corresponding to the outer peripheral portion of the shield starting range of the continuous wall and slit cutting is performed by the continuation of the core. The lower part of the shield starting area is slit similarly in the lateral direction to provide an opening, and the blasting charging holes are punched to the required pitch in the remaining shield starting range. A method for removing the starting pit wall that accompanies the start of the shield, which is characterized by charging and blasting from a position close to.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5400295A JP2867322B2 (en) | 1995-03-14 | 1995-03-14 | Removal method of starting pit wall accompanying shield starting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5400295A JP2867322B2 (en) | 1995-03-14 | 1995-03-14 | Removal method of starting pit wall accompanying shield starting |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08246782A true JPH08246782A (en) | 1996-09-24 |
JP2867322B2 JP2867322B2 (en) | 1999-03-08 |
Family
ID=12958396
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5400295A Expired - Fee Related JP2867322B2 (en) | 1995-03-14 | 1995-03-14 | Removal method of starting pit wall accompanying shield starting |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2867322B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008163569A (en) * | 2006-12-27 | 2008-07-17 | Kumagai Gumi Co Ltd | Well head forming method and earth retaining wall |
JP2008231677A (en) * | 2007-03-16 | 2008-10-02 | Kumagai Gumi Co Ltd | Pit mouth forming method |
-
1995
- 1995-03-14 JP JP5400295A patent/JP2867322B2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008163569A (en) * | 2006-12-27 | 2008-07-17 | Kumagai Gumi Co Ltd | Well head forming method and earth retaining wall |
JP2008231677A (en) * | 2007-03-16 | 2008-10-02 | Kumagai Gumi Co Ltd | Pit mouth forming method |
Also Published As
Publication number | Publication date |
---|---|
JP2867322B2 (en) | 1999-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106592591A (en) | Drilling pile head overall removal construction method | |
JPH08246782A (en) | Removal method of start pit wall with shield starting | |
JP4698398B2 (en) | Ground reinforcement pipe and tunnel excavation method using the same | |
JPH05247939A (en) | Demolition method of obstruction in deep ground | |
JP2006097272A (en) | Method of removing redundant portion of pipe bodies in natural ground reinforcing works | |
US6481502B1 (en) | Borehole closure plug | |
JP2868663B2 (en) | Docking dock | |
JP3486103B2 (en) | How to blast rock | |
JP2001323463A (en) | Inner excavation, low-displacement, low-noise, low- vibration pile driver for friction pile and method of driving pile | |
JP3241872B2 (en) | Freezing method | |
JPH05113095A (en) | Structure of starting-arrival shaft in shield method | |
JPS5681719A (en) | Driving method of precast pile | |
JPH0437916B2 (en) | ||
JP2775609B2 (en) | Water collection method and water collection structure | |
JPH0536597B2 (en) | ||
JP2000226982A (en) | Grouting reinforcing method in tunnel excavation | |
JP2849331B2 (en) | Shaft casing in propulsion method | |
JP2751044B2 (en) | Shield starting method and device | |
JP2000145363A (en) | Pit mouth cutoff device for non-cut-cover pipe jacking and pit mouth cutoff construction method using the same | |
JP2000265780A (en) | Shaft for shield machine | |
JP2673187B2 (en) | Shield tunnel joining method | |
JP2001003680A (en) | Method for constructing tunnel | |
JPH08121077A (en) | Construction method of start and arrival shaft | |
JPS6353382A (en) | Laying changer for existing pipe | |
JPH08218795A (en) | Method of constructing underground space |