JPH08246556A - Elliptic large-sized dome and its construction method - Google Patents
Elliptic large-sized dome and its construction methodInfo
- Publication number
- JPH08246556A JPH08246556A JP8778395A JP8778395A JPH08246556A JP H08246556 A JPH08246556 A JP H08246556A JP 8778395 A JP8778395 A JP 8778395A JP 8778395 A JP8778395 A JP 8778395A JP H08246556 A JPH08246556 A JP H08246556A
- Authority
- JP
- Japan
- Prior art keywords
- roof
- keel
- arch member
- keel arch
- sub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Rod-Shaped Construction Members (AREA)
- Tents Or Canopies (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、内部を多目的に利用で
きる長円形大型ドームとその構築方法に関するものであ
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an oval large dome which can be used for various purposes and a method for constructing the same.
【0002】[0002]
【従来技術】従来、大型ドームについては各種提案があ
り、開閉屋根を備えた大型の屋根構造物として、1対の
平行アーチ梁間に開閉屋根を架設したものも知られてい
るが(例えば、特公平1−223237号公報、特公平
2−58647号公報参照)、この1対の平行アーチ間
に開閉屋根を架設した従来例は、大スパンの場合に別
途、安定性確保のために大規模な手段が必要である。2. Description of the Related Art Heretofore, various proposals have been made for a large dome, and as a large roof structure having an opening / closing roof, one having an opening / closing roof installed between a pair of parallel arch beams is known (for example, Japanese Patent Publication No. 1-2223237 and Japanese Patent Publication No. 2-58647), the conventional example in which an opening / closing roof is installed between a pair of parallel arches is a large scale for securing stability separately in the case of a large span. Means are needed.
【0003】[0003]
【発明の目的】本発明の目的は、荷重の処理が明快かつ
合理的であり、剛性が大で、大スパンでも安定性に富
み、容易かつ安全に開閉屋根付きとすることができる長
円形大型ドームとその有利な構築方法を提供することに
ある。It is an object of the present invention that the load handling is clear and rational, the rigidity is large, the stability is large even in a large span, and the open / close roof can be easily and safely installed. It is to provide a dome and an advantageous construction method thereof.
【0004】[0004]
【発明の構成】本発明の長円形大型ドームの構成上の基
本的特徴は、長辺方向の1対のメインキールアーチ部材
と短辺方向の1対のサブキールアーチ部材とを井桁状に
組み、前記メインキールアーチ部材とサブキールアーチ
部材の各両端部間にケーブルを張設するとともに、該ケ
ーブルでメインキールアーチ部材とサブキールアーチ部
材の各交点位置に下向きに突設した束材を上方に押し上
げるように支持して、井桁状のキールトラスを形成し、
該キールトラスに屋根を架設して屋根部を構成した点に
ある。The basic feature of the ellipse large dome of the present invention is that a pair of main keel arch members in the long side direction and a pair of sub keel arch members in the short side direction are assembled in a cross beam shape. , A cable is stretched between both ends of the main keel arch member and the sub-keel arch member, and a bundle material projecting downward is provided at each intersection of the main keel arch member and the sub-keel arch member with the cable. Support to push it up to form a cross-shaped keel truss,
The point is that the roof is constructed by constructing a roof on the keel truss.
【0005】そして、本発明の長円形大型ドームでは、
キールトラスの頂部に開閉屋根を、裾部に固定屋根を、
それぞれ設けること、メインキールアーチ部材に開閉屋
根走行・案内用のレールを設けること、屋根部の全周に
沿って屋根支持部を設けること、屋根部と屋根支持部を
内部施設と構造的に分離すること、屋根支持部に耐震壁
を設けることが、それぞれできる。And, in the oval large dome of the present invention,
An openable roof on the top of the keel truss and a fixed roof on the hem.
Providing each of them, providing rails for running and guiding the roof on the main keel arch member, providing a roof support along the entire circumference of the roof, and separating the roof and the roof support from the internal facilities structurally It is possible to install a seismic wall on the roof support part.
【0006】次に、本発明の長円形大型ドームの構築方
法の構成上の特徴は、前記基本的構成を備えた長円形大
型ドームを構築する際に、地表面からメインキールアー
チ部材とサブキールアーチ部材の各交点位置まで延びる
仮設ベント支柱を立設し、この仮設ベント支柱を利用し
て、メインキールアーチ部材とサブキールアーチ部材の
井桁状組立体を形成するとともに、該井桁状組立体をケ
ーブルの張設作業が終わるまで安定状態に保持する点に
ある。Next, the constructional feature of the method for constructing an oval large dome of the present invention is that when constructing an oval large dome having the above-mentioned basic construction, a main keel arch member and a sub keel are formed from the ground surface. A temporary vent strut extending up to each intersection of the arch members is erected, and using this temporary vent strut, a cross girder-shaped assembly of the main keel arch member and the sub-keel arch member is formed, and the girder-like assembly is formed. The point is to maintain a stable state until the cable tension work is completed.
【0007】そして、本発明の長円形大型ドームの構築
方法では、先に、ドームの長辺方向の両端部において、
メーンキールアーチ部材の端部とサブキールアーチ部材
の組立体を形成し、それから、メインキールアーチ部材
の中央部を架設して、メインキールアーチ部材とサブキ
ールアーチ部材の井桁状組立体を形成するのがよい。In the method for constructing an oval large dome of the present invention, first, at both ends of the dome in the long side direction,
Forming an assembly of main keel arch members and sub-keel arch members, and then erection of a central portion of the main keel arch members to form a cross girder assembly of main keel arch members and sub-keel arch members. Is good.
【0008】[0008]
【実施例の説明】本発明の長円形大型ドームの一実施例
の概要を示す図面において、1は平面形状が長円形の大
型ドームの長辺方向に延びるメインキールアーチ部材、
2は同じく短辺方向に延びるサブキールアーチ部材であ
る。DESCRIPTION OF THE PREFERRED EMBODIMENTS In the drawings showing the outline of one embodiment of an oval large dome of the present invention, 1 is a main keel arch member extending in the long side direction of a large dome having an oval planar shape,
Reference numeral 2 is a sub-keel arch member that also extends in the short side direction.
【0009】メインキールアーチ部材1とサブキールア
ーチ部材2の各1対を井桁状に組み、メインキールアー
チ部材1とサブキールアーチ部材2の各両端部間にそれ
ぞれケーブル3,4を張設するとともに、これらケーブ
ル3,4で、メインキールアーチ部材1とサブキールア
ーチ部材2の各交点位置に下向きに突設した束材5を上
方に押し上げるように支持して、井桁状のキールトラス
6を形成し、このキールトラス6に屋根を架設してドー
ムの屋根部を構成する。Each pair of the main keel arch member 1 and the sub-keel arch member 2 is assembled in a cross beam shape, and the cables 3 and 4 are stretched between both ends of the main keel arch member 1 and the sub-keel arch member 2, respectively. Along with these cables 3 and 4, the bundle material 5 projecting downward at each intersection of the main keel arch member 1 and the sub-keel arch member 2 is supported so as to be pushed upward, and the keel truss 6 in the form of a double girder is formed. Then, a roof is erected on the keel truss 6 to form a roof portion of the dome.
【0010】図示の実施例では、キールトラス6の頂部
に開閉屋根7を、裾部に固定屋根8を、それぞれ設け
て、屋根部9を構成しているが、開閉屋根付きとした場
合にその設置箇所は頂部のみに限定されず、また、開閉
屋根付きとしないで全部の屋根を固定屋根にしてもよ
い。In the illustrated embodiment, the opening / closing roof 7 is provided at the top of the keel truss 6 and the fixed roof 8 is provided at the hem to form the roof 9. However, when the opening / closing roof is provided, the roof 9 is installed. The location is not limited to the top, and the entire roof may be a fixed roof without being provided with an opening / closing roof.
【0011】図示の実施例の場合、メインキールアーチ
部材1は、断面が菱形状の立体トラス梁で、その勾配は
比較的緩く、その上半部はドームの内外境界部を超えて
外方に延び、その上弦材の全長に亙って開閉屋根走行・
案内用のレールが設けられている。In the illustrated embodiment, the main keel arch member 1 is a space truss beam having a diamond-shaped cross section, the slope of which is relatively gentle, and the upper half of the main keel arch member 1 extends outward beyond the inner and outer boundaries of the dome. It extends and runs on an openable roof over the entire length of the chord.
Guide rails are provided.
【0012】サブキールアーチ部材2は、断面がW形の
立体トラス梁で、その勾配はメインキールアーチ部材1
の勾配よりもきつく、また、その梁成はメインキールア
ーチ部材1の梁成の約1/2であって、メインキールア
ーチ部材2の下半部と同じレベルで交叉している。The sub-keel arch member 2 is a space truss beam having a W-shaped cross section, and the slope thereof is the main keel arch member 1.
Of the main keel arch member 1 is about 1/2 of that of the main keel arch member 1 and intersects with the lower half of the main keel arch member 2 at the same level.
【0013】両側のメインキールアーチ部材2の上半部
間に挟まれた状態でメインキールアーチ部材2に沿って
移動する開閉屋根7の両側には、マルチローラ型式の走
行装置と水平案内用のローラと駆動用のピンギヤが設け
られ、また、メインキールアーチ部材2の上弦材には前
記レールの外に前記ピンギヤが係合するピンラックガ設
けられている。On both sides of the opening / closing roof 7 that moves along the main keel arch member 2 while being sandwiched between the upper half portions of the main keel arch members 2 on both sides, a multi-roller type traveling device and a horizontal guide are provided on both sides. A roller and a driving pin gear are provided, and a pin rack gear for engaging the pin gear is provided on the upper chord member of the main keel arch member 2 outside the rail.
【0014】なお、開閉屋根7の開閉範囲は、ドーム内
で行われる競技の種類等によって異なるが、図示の場合
は、サブキールアーチ部材2,2の横架位置を超えた側
方まで開くようになっている。The opening / closing range of the openable / closable roof 7 varies depending on the type of competition held in the dome, but in the case shown in the figure, it is opened to the side beyond the horizontal position of the sub-keel arch members 2, 2. It has become.
【0015】以上のように構成された屋根部9を支持す
る屋根支持部10は、屋根部9の全周に沿って設けられ
ているが、屋根部9から屋根支持部10への力の流れを
明快にするために、屋根部9から屋根支持部10はスタ
ンド等の内部施設11と構造的に分離するのがよい。The roof support portion 10 for supporting the roof portion 9 constructed as described above is provided along the entire circumference of the roof portion 9, but the force flow from the roof portion 9 to the roof support portion 10 is large. For clarity, the roof 9 and roof support 10 may be structurally separated from an internal facility 11 such as a stand.
【0016】屋根支持部10は、ドームの内外境界部に
プレキャストコンクリート製の境界柱と境界梁で形成し
た鉛直力支持部と、その外側にブレース材を介して設け
た水平力支持部とで構成することができ、この場合、水
平力支持部に耐震壁を設けるのがよい。The roof support portion 10 is composed of a vertical force support portion formed of a precast concrete boundary column and a boundary beam at the inner and outer boundary portions of the dome, and a horizontal force support portion provided on the outer side thereof through a brace material. In this case, it is advisable to provide a horizontal wall for the horizontal force support.
【0017】次に、本発明の長円形大型ドームの構築方
法では、前述の長円形大型ドームの屋根部9を構築する
際に、地表面からメインキールアーチ部材1とサブキー
ルアーチ部材2の各交点位置まで延びる4本の仮設ベン
ト支柱を立設し、この仮設ベント支柱を利用して、メイ
ンキールアーチ部材1,1とサブキールアーチ部材2,
2の井桁状組立体を形成するとともに、この井桁状組立
体をケーブル3,4の張設作業が終わるまで安定状態に
保持する。Next, in the method for constructing an oval large dome of the present invention, when constructing the roof portion 9 of the aforementioned oval large dome, each of the main keel arch member 1 and the sub keel arch member 2 is formed from the ground surface. Four temporary vent columns extending up to the intersection position are erected, and the main keel arch members 1 and 1 and the sub-keel arch members 2 are utilized by using these temporary vent columns.
The double girder assembly is formed, and the double girder assembly is held in a stable state until the work of stretching the cables 3 and 4 is completed.
【0018】前述の井桁状組立体の形成は、ドームの長
辺方向の両端部において、メインキールアーチ部材1,
1の端部とサブキールアーチ部材2の組立体(端部組立
体)を先に形成し、それからメインキールアーチ部材
1,1の中央部をサブキールアーチ部材2,2間に架設
する、という順序で行うのがよい。The formation of the above-mentioned cross girder-like assembly is performed by forming the main keel arch members 1, at both ends in the long side direction of the dome.
An assembly of the end portion 1 and the sub-keel arch member 2 (end portion assembly) is formed first, and then the central portion of the main keel arch member 1, 1 is installed between the sub-keel arch members 2, 2. Good practice in order.
【0019】前述の端部組立体は、適宜大きさのブロッ
クに分割し、各ブロックを地表面近くの低位置で組み立
て、これを架設ベント支柱の上に引き上げて接続すると
いう、いわゆるブロック工法で形成するのが好ましく、
この場合、前述の4本の仮設ベント支柱の外に、更に適
宜数の仮設ベント支柱を設ける必要であるが、この仮設
ベント支柱は端部組立体の形成後、徹去される。The above-mentioned end assembly is divided into blocks of an appropriate size, each block is assembled at a low position near the ground surface, and this is pulled up onto the erection vent stanchions and connected by a so-called block construction method. Preferably formed,
In this case, it is necessary to provide an appropriate number of temporary vent struts outside the above-mentioned four temporary vent struts, but these temporary vent struts are removed after the formation of the end assembly.
【0020】前述の4本の仮設ベント支柱は、ケーブル
3,4の張設作業が終わるまで前述の井桁状組立体を安
定状態に保持するので、束材5の設置やケーブル3,4
の張設の作業の妨げにならないよう設置する必要がある
ことはいうまでもない。The above-mentioned four temporary vent struts hold the above-mentioned cross girder-like assembly in a stable state until the work of stretching the cables 3, 4 is completed, so that the installation of the bundle 5 and the cables 3, 4 are prevented.
Needless to say, it is necessary to install it so as not to interfere with the work of tensioning.
【0021】なお、メインキールアーチ部材1,1の端
部とサブキールアーチ部材2の組立体を形成するとき
に、メインキールアーチ部材1,1の端部をその間の固
定屋根で繋いだ状態で組み立てるようにしてもよい。When forming the assembly of the main keel arch members 1 and 1 and the sub-keel arch member 2, the end portions of the main keel arch members 1 and 1 are connected with a fixed roof therebetween. It may be assembled.
【0022】[0022]
【発明の効果】本発明の長円形大型ドームは、以上のよ
うなものであって、張弦梁を井桁状に組んだキールトラ
スで屋根荷重の大部分を負担する構造になっているの
で、屋根荷重を自己保持的に処理することができ、荷重
の処理が明快かつ合理的であるのみならず、剛性が大
で、大スパンでも安定性に富み、容易かつ安全に開閉屋
根付きとすることができる。The large oval dome of the present invention is as described above, and since the keel truss in which the string beams are assembled in the shape of a cross beam bears most of the roof load, it is possible to reduce the roof load. Not only can it be treated in a self-supporting manner, the treatment of load is clear and rational, but it is also highly rigid and highly stable even in large spans, and it can be easily and safely equipped with a roof.
【0023】また、本発明の長円形大型ドームの構築方
法は、以上のようなものであって、屋根部の構造の特徴
を生かし、キールトラスを形成するキールアーチ部材の
各交点位置に樹立した仮設ベント支柱をキールトラスの
組立てとその安定保持に利用して屋根部を構築するの
で、作業の安全性と効率性が十分に確保できる。Further, the method for constructing an oval large dome of the present invention is as described above, and by taking advantage of the structure of the roof portion, the temporary construction is established at each intersection of the keel arch members forming the keel truss. Since the roof part is constructed by using the vent columns to assemble the keel truss and hold it stably, it is possible to secure sufficient work safety and efficiency.
【図1】本発明の長円形大型ドームの一例の平面図であ
る。FIG. 1 is a plan view of an example of an oval large dome of the present invention.
【図2】同じく長辺方向の断面図である。FIG. 2 is likewise a cross-sectional view in the long side direction.
【図3】同じく短辺方向の断面図である。FIG. 3 is likewise a sectional view in the direction of the short side.
1:メインキールアーチ部材、2:サブキールアーチ部
材、3:ケーブル、4:ケーブル、5:束材、6:キー
ルトラス、7:開閉屋根、8:固定屋根、9:屋根部、
10:屋根支持部、11:内部施設。1: main keel arch member, 2: sub keel arch member, 3: cable, 4: cable, 5: bundle material, 6: keel truss, 7: open / close roof, 8: fixed roof, 9: roof part,
10: roof support, 11: internal facility.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 コーネリス アルバートス マリア ボス オランダ国 ワッセナール市 2243 A C,バッケシハーゲンラーン 16 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Cornelis Alberts Maria Boss 2243 AC, Wackeshagenran 16 Wasenar, The Netherlands 16
Claims (8)
材と短辺方向の1対のサブキールアーチ部材とを井桁状
に組み、前記メインキールアーチ部材とサブキールアー
チ部材の各両端部間にケーブルを張設するとともに、該
ケーブルでメインキールアーチ部材とサブキールアーチ
部材の各交点位置に下向きに突設した束材を上方に押し
上げるように支持して、井桁状のキールトラスを形成
し、該キールトラスに屋根を架設して屋根部を構成した
ことを特徴とする長円形大型ドーム。1. A pair of main keel arch members in the long-side direction and a pair of sub-keel arch members in the short-side direction are assembled in a cross beam shape, and the main keel arch member and the sub-keel arch members are provided between both ends thereof. A cable is stretched, and the cable is supported so as to push upward a bundle material projecting downward at each intersection position of the main keel arch member and the sub-keel arch member, thereby forming a cross-shaped keel truss, A large oval dome characterized in that a roof is constructed by constructing a roof on the keel truss.
に固定屋根を、それぞれ設けた請求項1記載の長円形大
型ドーム。2. The large oval dome according to claim 1, wherein an opening and closing roof is provided on the top of the keel truss and a fixed roof is provided on the hem.
・案内用のレールを設けた請求項2記載の長円形大型ド
ーム。3. The large oval dome according to claim 2, wherein the main keel arch member is provided with a rail for running and guiding an openable roof.
た請求項1記載の長円形大型ドーム。4. The oval large dome according to claim 1, wherein a roof support portion is provided along the entire circumference of the roof portion.
に分離した請求項4記載の長円形大型ドーム。5. The oval large dome according to claim 4, wherein the roof part and the roof support part are structurally separated from the internal facility.
載の長円形大型ドーム。6. The oval large dome according to claim 4, wherein an earthquake-resistant wall is provided on the roof support portion.
する際に、地表面からメインキールアーチ部材とサブキ
ールアーチ部材の各交点位置まで延びる仮設ベント支柱
を立設し、この仮設ベント支柱を利用して、メインキー
ルアーチ部材とサブキールアーチ部材の井桁状組立体を
形成するとともに、該井桁状組立体をケーブルの張設作
業が終わるまで安定状態に保持することを特徴とする長
円形大型ドームの構築方法。7. When constructing the oval large dome according to claim 1, a temporary vent strut extending from the ground surface to each intersection of the main keel arch member and the sub-keel arch member is erected, and the temporary vent strut is provided. Is used to form a cross girder-like assembly of a main keel arch member and a sub-keel arch member, and the cross girder-like assembly is held in a stable state until the cable tensioning work is completed. How to build a large dome.
て、メーンキールアーチ部材の端部とサブキールアーチ
部材の組立体を形成し、それから、メインキールアーチ
部材の中央部を架設して、メインキールアーチ部材とサ
ブキールアーチ部材の井桁状組立体を形成する請求項7
記載の長円形大型ドームの構築方法。8. First, an assembly of a main keel arch member and a sub-keel arch member is formed at both ends of the dome in the long side direction, and then a central portion of the main keel arch member is erected. 8. Forming a cross girder assembly of a main keel arch member and a sub keel arch member.
How to build the large oval dome described.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8778395A JP2775672B2 (en) | 1995-03-09 | 1995-03-09 | Oval large dome and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8778395A JP2775672B2 (en) | 1995-03-09 | 1995-03-09 | Oval large dome and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08246556A true JPH08246556A (en) | 1996-09-24 |
JP2775672B2 JP2775672B2 (en) | 1998-07-16 |
Family
ID=13924582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8778395A Expired - Lifetime JP2775672B2 (en) | 1995-03-09 | 1995-03-09 | Oval large dome and its construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2775672B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560799A (en) * | 2016-03-26 | 2018-09-21 | 叶香雄 | The Business Building top level structure of arched girder is set |
JP2021031919A (en) * | 2019-08-22 | 2021-03-01 | 清水建設株式会社 | Roof structure and method for constructing roof structure |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6706070B2 (en) * | 2016-01-06 | 2020-06-03 | 株式会社竹中工務店 | Roof structure |
-
1995
- 1995-03-09 JP JP8778395A patent/JP2775672B2/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560799A (en) * | 2016-03-26 | 2018-09-21 | 叶香雄 | The Business Building top level structure of arched girder is set |
JP2021031919A (en) * | 2019-08-22 | 2021-03-01 | 清水建設株式会社 | Roof structure and method for constructing roof structure |
Also Published As
Publication number | Publication date |
---|---|
JP2775672B2 (en) | 1998-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4581860A (en) | Saddle-shaped cable dome system for large span lightweight roof structures | |
JP4691431B2 (en) | Roof structure and construction method thereof | |
KR920002118B1 (en) | Roof structure | |
JPH08246556A (en) | Elliptic large-sized dome and its construction method | |
JP3409265B2 (en) | Large dome with membrane structure and its construction method | |
JP2004156388A (en) | Construction method of arch structure, dome structure and its construction method | |
JP2005009231A (en) | Method of constructing steel structure | |
JPH1054136A (en) | Frame system in slip form construction method | |
JPH09177377A (en) | Tent warehouse and constructing method therefor | |
JP2946074B2 (en) | Large roof erection method | |
CN116657964B (en) | Stand comprehensive steel structure containing large-span arch truss and construction method thereof | |
JPH04277205A (en) | Bride and contruction method thereof | |
JP2787266B2 (en) | Roof structure and its construction method | |
JP3318717B2 (en) | Construction method of PC cable stayed bridge | |
JPS6022183Y2 (en) | Steel frame equipment for tennis court shed | |
JPH0363306A (en) | Suspension bridge-type pipeline bridge | |
JP2994216B2 (en) | How to build a roof frame | |
JPH0493466A (en) | Dismounting method of mould timbering for arch concrete construction | |
JPH0460038A (en) | Constructing method of large span dome roof | |
JP2663102B2 (en) | Long span canopy equipment and its construction method | |
JPH01169071A (en) | Tension-introducing device construction for opening and closing type film structure | |
RU1788184C (en) | Method for reinforcing single-storey industrial buildings | |
JPH0437904B2 (en) | ||
JPH0485465A (en) | Suspension film structure and its construction | |
JPH01295945A (en) | Roofing work of large-sized construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090501 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100501 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110501 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120501 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120501 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130501 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140501 Year of fee payment: 16 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |