JPH08134811A - Rail renewal machine for railway and rail renewal method using rail renewal machine - Google Patents

Rail renewal machine for railway and rail renewal method using rail renewal machine

Info

Publication number
JPH08134811A
JPH08134811A JP27149794A JP27149794A JPH08134811A JP H08134811 A JPH08134811 A JP H08134811A JP 27149794 A JP27149794 A JP 27149794A JP 27149794 A JP27149794 A JP 27149794A JP H08134811 A JPH08134811 A JP H08134811A
Authority
JP
Japan
Prior art keywords
rail
new
guide
rails
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP27149794A
Other languages
Japanese (ja)
Other versions
JP2648105B2 (en
Inventor
Ryuichi Nonaka
隆一 野中
Naoki Sasaki
直樹 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUTABA TETSUDO KOGYO KK
TETSUYUU KOGYO KK
Original Assignee
FUTABA TETSUDO KOGYO KK
TETSUYUU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUTABA TETSUDO KOGYO KK, TETSUYUU KOGYO KK filed Critical FUTABA TETSUDO KOGYO KK
Priority to JP27149794A priority Critical patent/JP2648105B2/en
Publication of JPH08134811A publication Critical patent/JPH08134811A/en
Application granted granted Critical
Publication of JP2648105B2 publication Critical patent/JP2648105B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

PURPOSE: To abolish a mountain crossing equipment wholly, and to simplify even the usage and control of a renewal machine when old and new rails are introduced to a truck-shaped renewal machine traveling along rails respectively and the old and new rails are renewed while backwards forwarding the old and new rails. CONSTITUTION: Two renewal machines 1 having the same constitution are used as a pre-stage machine 1A and a post-stage machine 1B, the pre-stage machine 1A is set onto old rails R1, and new rails R2 temporarily placed on both sides of the old rails R1 are set onto guide rollers 31 by suspension arms 35 configuring the new-rail introducing mechanisms 32 of guide sections 4. The pre-stage machine 1A is moved forward while the new rails R2 are crossed and introduced onto the old rails R1 to backward rail-laying places, the post- stage machine 1B is set onto the new rails R2, and the old rails R1 are induced onto the guide rollers 31 of the guide sections 4 of the post-stage machine 1B. Both machines 1A, 1B are advanced from the states of setting, thus collectively renewing the old and new rails.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄道用レールにおい
て、老朽化、破損等に起因して既設のレールを新レール
に交換する際に用いて好適な鉄道用レール交換装置およ
び交換方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a railway rail exchanging device and an exchanging method suitable for exchanging an existing rail with a new rail due to aging or damage.

【0002】[0002]

【従来の技術】道床の上にレールが敷設された鉄道にお
いて、既設のレールを新レールに交換するにあたって
は、従来より、既設レールの外側方の道床に、既設レー
ルと略平行に新レールを仮置きし、門型フレーム構造の
クレーンである山越器を既設レールにまたがせた状態に
セットし、この山越器で、既設レールを除去した後に、
新レールを既設レールが敷設されていた位置に移動させ
る方法が採られていた。ところが、このような方法で
は、レール長が500メートル以上にわたるロングレー
ルを交換する場合、多数の山越器を必要とすることによ
り多大なコストと労力を要し、かつこれら多数の山越器
の作動を一致させてレール交換を行う作業が困難であっ
た。また、高架上に敷設されているレールを交換する場
合には、地上から高架上に多数の山越器を持ち上げて搬
入する作業を要し、これに手間と労力がかかってしまう
欠点があった。
2. Description of the Related Art In a railway in which rails are laid on a roadbed, when replacing existing rails with new rails, conventionally, a new rail is provided on a roadbed outside the existing rails in a direction substantially parallel to the existing rails. Temporarily put, set the state that the gantry frame type crane Yamagoshiki straddled the existing rail, and after removing the existing rail with this yamagoshi,
The method of moving the new rail to the position where the existing rail was laid was adopted. However, with such a method, when replacing a long rail having a rail length of 500 meters or more, a large number of Yamakoshi are required, which requires a great deal of cost and labor, and the operation of these many Yamakoshi is required. It was difficult to replace the rails by matching them. Further, when replacing the rails laid on the elevated structure, it is necessary to lift up a large number of the Yamakoshi devices from the ground and carry them in, which is disadvantageous in that it takes time and labor.

【0003】そこで、特開平1ー299901号公報に
示されるレール交換方法および交換装置が提案されてい
る。これは、既設レール上で前段ガイド装置を走行させ
ながら既設レールの外側に仮置きしてある新レールを内
側のレール敷設位置に導きながら、この新レール上で後
段のガイド装置を走行させるとともにこの後段ガイド装
置により既設レールを外側に排除していくといったもの
である。
Therefore, a rail replacement method and a rail replacement device disclosed in Japanese Patent Application Laid-Open No. 1-299901 have been proposed. This is to run the front guide device on the existing rail, guide the new rail temporarily placed outside the existing rail to the inner rail laying position, and run the subsequent guide device on this new rail. An existing rail is removed to the outside by a rear guide device.

【0004】[0004]

【発明が解決しようとする課題】上記交換装置を用いた
交換方法によれば、多数の山越器を必要とせずに、前段
および後段のガイド装置を走行させることにより一連の
動作で円滑に新レールの敷設と既設レールの排除を同時
に行うことができるといった効果がある。ところが、こ
の交換装置を用いる場合においても、最初に前段のガイ
ド装置へ新レールを供給する場合および後段のガイド装
置へ既設レールを供給する場合には、やはり山越器を必
要とする。したがって、山越器の搬入およびその作動に
手間を要するといった問題は残るものであった。また、
前段と後段のガイド装置は互いに構成の異なるものなの
で、これらの構成を見定めて前後の順を間違えないよう
にレール上へそれぞれセッティングしなければならず、
作業上の煩雑さと的確な管理を必要とする。さらに、前
段および後段の各ガイド装置の全体重量がかさみ、現場
への運搬に困難を来たす不具合な面もあった。
According to the replacement method using the above-described replacement device, the new rail can be smoothly moved in a series of operations by running the front and rear guide devices without the need for a large number of Yamagoshi devices. There is an effect that the laying of the existing rail and the removal of the existing rail can be performed at the same time. However, even in the case of using this exchange device, the Yamakoshi device is still required when supplying a new rail to the preceding guide device and supplying an existing rail to the subsequent guide device. Therefore, there still remains a problem that it takes time to carry in and operate the Yamakoshi device. Also,
Since the guide devices at the front and rear stages have different configurations from each other, it is necessary to determine these configurations and set them on the rail so that the order before and after is not mistaken.
Requires complicated work and precise management. Further, there is also a problem in that the overall weight of each of the front and rear guide devices is increased, which makes it difficult to transport them to the site.

【0005】本発明は上記事情に鑑みてなされたもので
あって、山越器を必要としないことによりそのための労
力の軽減が図られ、交換装置の使用方法および管理も簡
単となり、さらに運搬しやすくして現場への搬入を容易
とする鉄道用レール交換装置およびこれを用いたレール
交換方法を提供することを目的としている。
The present invention has been made in view of the above circumstances, and by not requiring a Yamakoshi device, the labor therefor can be reduced, the usage and management of the exchange device can be simplified, and the transport device can be more easily transported. It is an object of the present invention to provide a rail rail replacement device and a rail replacement method using the same, which facilitates delivery to the site.

【0006】[0006]

【課題を解決するための手段】本発明は上記目的を達成
するためになされたもので、請求項1記載の鉄道用レー
ルの交換装置は、鉄道の道床に敷設されている左右の既
設レールを除去し、既設レール側方の道床上に略平行に
仮置きした新たに敷設する左右の新レールを、前記既設
レールが除去された後のレール敷設位置に敷設する鉄道
用レールの交換装置であって、レールを走行する駆動輪
およびレールを両側から挟む一対のクランプローラを備
えた車輪機構によって既設レールあるいは新たに敷設す
る新レール上を走行するよう構成された台車部と、この
台車部に設けられ、レールの敷設方向に直交して延び、
かつ両端部が新レールの仮置き位置まで延びるフレーム
部と、このフレーム部の両端部にフレーム部に沿ってス
ライド可能に装着され、その上側に、レールの側面に当
接して転動するガイドローラおよび仮置きした新レール
を把持して持ち上げ前記ガイドローラに導く新レール導
入機構を備えるガイド部と、前記台車部もしくは前記フ
レーム部に搭載され、台車部の駆動輪を回転駆動させて
装置全体を走行させる走行駆動部とを備えてなることを
特徴としている。
SUMMARY OF THE INVENTION The present invention has been made to achieve the above-mentioned object, and a rail rail exchanging device according to the first aspect of the present invention is a system for replacing a left and right existing rail laid on a railroad bed. A rail rail replacement device that removes and temporarily lays new left and right new rails tentatively placed substantially parallel on the roadbed beside the existing rails at the rail laying position after the existing rails are removed. A bogie unit configured to run on an existing rail or a new rail to be newly laid by a wheel mechanism having a pair of clamp rollers sandwiching the rail from a driving wheel running on the rail and a rail provided on the bogie unit; And extend perpendicular to the rail laying direction,
And a frame part whose both ends extend to the temporary placement position of the new rail, and a guide roller which is slidably mounted on both ends of the frame part along the frame part and rolls on the upper side in contact with the side surface of the rail. And a guide unit having a new rail introducing mechanism for grasping and temporarily lifting the newly placed new rail and guiding it to the guide roller, mounted on the bogie unit or the frame unit, and driving the drive wheels of the bogie unit to rotate and drive the entire apparatus. And a traveling drive unit for traveling.

【0007】請求項2記載の鉄道用レールの交換装置
は、請求項1記載の鉄道用レールの交換装置において、
前記台車部、前記フレーム部、前記ガイド部、前記走行
駆動部に分割可能で、これらが組み合わせられて構成さ
れることを特徴としている。
According to a second aspect of the present invention, there is provided a railroad rail exchanging apparatus according to the first aspect.
The truck unit, the frame unit, the guide unit, and the traveling drive unit can be divided, and are configured by combining them.

【0008】また、請求項3記載の鉄道用レールの交換
方法は、請求項1または請求項2記載の鉄道用レール交
換装置を2台用意し、一方の交換装置を前段側、他方を
後段側と設定し、前段側の交換装置を、前記台車部の前
記一対の走行ローラで既設レールを挟むことにより既設
レールにセットし、この前段側の交換装置の前記ガイド
部を、外側にスライドさせて前記新レールの仮置き位置
上に配し、前段側の交換装置を前進させ、ガイド部に備
えられた前記新レール導入機構により、仮置きした新レ
ールの端部を把持して持ち上げた後、前記ガイドローラ
に導入し、この状態で前段の交換装置を前進させること
により、新レールを、ガイド部のガイドローラを経て後
方に導き、この導かれた新レールを道床のレール敷設位
置に配するとともに、この新レール上に、後段側の交換
装置を、前段側の交換装置と同様にしてセットするとと
もに、前段側の交換装置が走行した後の既設レールを、
後段側の交換装置のガイド部に導き、このガイド部をレ
ール敷設位置よりも外側にスライドさせ、この状態で、
前段側および後段側の各交換装置を、各走行駆動部によ
り略同速度で前進させることを特徴としている。
According to a third aspect of the present invention, there is provided a rail rail exchanging device according to claim 1 or 2, wherein one of the exchanging devices is provided on the front side and the other is on the rear side. And set the pre-stage exchange device on the existing rail by sandwiching the existing rail with the pair of traveling rollers of the carriage unit, and sliding the guide part of the pre-stage exchange device to the outside. After arranging on the temporary placement position of the new rail, advancing the exchange device on the preceding stage side, by the new rail introducing mechanism provided in the guide part, after grasping and lifting the end of the temporarily placed new rail, By introducing into the guide roller and advancing the exchange device at the previous stage in this state, the new rail is guided rearward through the guide roller of the guide portion, and the guided new rail is arranged at the rail laying position of the roadbed. Tomo , On the new rail, the switching device in the subsequent stage side, as well as set in the same manner as the preceding stage of the switching device, the existing rail after the first-stage switching apparatus has traveled,
Guide it to the guide part of the rear side exchange device, slide this guide part outside the rail installation position, and in this state,
It is characterized in that the front-stage side and rear-stage side exchange devices are moved forward at substantially the same speed by the respective traveling drive units.

【0009】[0009]

【作用】本発明の鉄道用レール交換装置およびこれを用
いたレール交換方法によれば、2台のレール交換装置を
用い、前段のレール交換装置が旧レール上を、後段のレ
ール交換装置が前段のレール交換装置に導かれた新レー
ル上を順次走行することにより、新レールが新たに敷設
されるとともに、この新レールの両側に旧レールが排除
され、新旧レールの交換作業が一連の動作で円滑に行わ
れる。前段のレール交換装置に新レールをセットするに
は、前段のレール交換装置のガイド部の新レール導入機
構を作動させることにより行えるので、従来のように山
越器を必要としない。
According to the rail exchanging device for railroad and the rail exchanging method using the same according to the present invention, two rail exchanging devices are used, the former one is on the old rail, and the latter one is the former. New rails are newly laid by running sequentially on the new rails led by the rail changer of the old, the old rails are removed on both sides of the new rails, the replacement work of the new and old rails in a series of operations It is performed smoothly. Since a new rail can be set in the preceding rail exchanging device by operating the new rail introducing mechanism of the guide portion of the preceding rail exchanging device, the Yamagoshi device is not required unlike the conventional case.

【0010】また、同一構成の2台のレール交換装置を
用い、いずれか一方を前段に、他方を後段にセットすれ
ばよく、作業する上で混乱を招かないとともに管理が簡
単になる。
In addition, it is only necessary to use two rail exchange devices having the same configuration and set one of them at the front stage and the other at the rear stage, so that work is not confused and management is simplified.

【0011】レール交換装置を、台車部、フレーム部、
ガイド部および走行駆動部に分割可能で、これらの組み
合わせで構成することにより、これら構成部材を分割し
て個々の構成部材を1つずつ運搬するようにすれば、軽
くなって現場への搬入が容易になる。
[0011] The rail replacement device, a carriage unit, a frame unit,
It can be divided into a guide section and a traveling drive section, and by configuring them in combination, if these components are divided and each individual component is transported one by one, it becomes lighter and can be carried into the site. It will be easier.

【0012】[0012]

【実施例】以下、図面を参照して本発明の一実施例を説
明する。図1において符号R1は鉄道の道床D上に枕木
Mを介して敷設されていて、老朽化等の理由により交換
を要する既設の旧レール、R2は旧レールR1に換えて
新たに敷設する新レールであり、1が本発明に係るレー
ル交換装置である。新レールR2は旧レールR1の側方
の道床D上に仮置きされる。まず、レール交換装置1に
ついて説明していくが、説明中、前後、左右といった方
向の記載は、当該交換装置1の前進方向を基準にした方
向とここで定義する。また、新旧のレールを特に分けな
くてもよい説明の場合には、単にレールRとする。
An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, reference numeral R1 denotes an existing old rail which is laid on a railroad bed D via a sleeper M and needs to be replaced due to aging or the like, and R2 denotes a new rail which is newly laid instead of the old rail R1. And 1 is a rail exchange device according to the present invention. The new rail R2 is temporarily placed on the track D on the side of the old rail R1. First, the rail exchanging device 1 will be described. In the description, directions such as front and rear, left and right are defined here as directions based on the forward direction of the exchanging device 1. In the case where the old and new rails do not need to be particularly divided, the rail is simply referred to as the rail R.

【0013】レール交換装置1は、図2ないし図4に示
す如く、台車部2、フレーム部3、ガイド部4および走
行駆動部5から構成されている。これらはそれぞれ独立
した構成部材であり、これらが組み合わせられてレール
交換装置1として構成されるようになっている。
As shown in FIGS. 2 to 4, the rail exchanging device 1 is composed of a carriage portion 2, a frame portion 3, a guide portion 4 and a traveling drive portion 5. These are independent constituent members, and these are combined to constitute the rail exchanging device 1.

【0014】台車部2は、左右一対の車輪機構10が、
前後に配された左右に延びるバー11で連結されて構成
されている。車輪機構10は、図5に示すように、車輪
ホルダ12と、この車輪ホルダ12に装着された前後一
対の車輪13a・13bと、車輪ホルダ12の後側に装
着された左右一対のクランプローラ14とを備えてい
る。前側の車輪13aは図示せぬ油圧モータが組み込ま
れた駆動輪であり、前側車輪13aと後側車輪13bに
はチェーン15が巻回され、両輪13a・13bが同期
して回転するようになっている。
The cart unit 2 includes a pair of left and right wheel mechanisms 10,
It is configured by being connected by bars 11 extending in the left-right direction and arranged in the front-rear direction. As shown in FIG. 5, the wheel mechanism 10 includes a wheel holder 12, a pair of front and rear wheels 13 a and 13 b mounted on the wheel holder 12, and a pair of left and right clamp rollers 14 mounted on the rear side of the wheel holder 12. It has and. The front wheel 13a is a drive wheel in which a hydraulic motor (not shown) is incorporated, and a chain 15 is wound around the front wheel 13a and the rear wheel 13b, so that both wheels 13a and 13b rotate synchronously. I have.

【0015】クランプローラ14は、図6に示すよう
に、スイングアーム16に回転自在に支持されており、
スイングアーム16は車輪ホルダ12に固定されたブラ
ケット17に対し左右に揺動可能に支持されている。ス
イングアーム16はピン18でブラケット17に固定さ
れ、その状態で左右のクランプローラ14はレールRの
ヘッド6aを挟むように構成されている。クランプロー
ラ14をスイングアーム16とともに揺動させるには、
ピン18を外してスイングアーム16に取り付けられた
レバー19をつかんで行う。ちなみにレールRは、上か
らヘッド6a、ウェブ6b、ベース6cと呼ばれる部分
で構成されている。
The clamp roller 14 is rotatably supported by a swing arm 16, as shown in FIG.
The swing arm 16 is supported to be able to swing right and left with respect to a bracket 17 fixed to the wheel holder 12. The swing arm 16 is fixed to the bracket 17 by a pin 18, and the left and right clamp rollers 14 sandwich the head 6a of the rail R in this state. To swing the clamp roller 14 together with the swing arm 16,
The operation is performed by removing the pin 18 and grasping the lever 19 attached to the swing arm 16. Incidentally, the rail R is composed of portions called a head 6a, a web 6b, and a base 6c from above.

【0016】各車輪ホルダ12の中央上側には凹所12
aが形成されており、左右の車輪ホルダ12の凹所12
aにわたってフレーム部3が架けられている。フレーム
部3は、図2、図7および図8に示すように、溝型鋼か
らなり溝が対向して配された前後一対のビーム20が、
複数の連結材21で連結され、連結材21には油圧等に
よるシリンダ22が左右一対で固定されており、これら
シリンダ22のピストン22aは、ビーム20と平行に
外側に伸びるようになっている。
A recess 12 is formed in the upper center of each wheel holder 12.
a is formed, and the recesses 12 of the left and right wheel holders 12 are formed.
The frame part 3 is hung over "a". As shown in FIGS. 2, 7 and 8, the frame portion 3 is formed by a pair of front and rear beams 20 made of channel steel and arranged with the grooves facing each other.
A plurality of connecting members 21 are connected, and a pair of left and right cylinders 22 are fixed to the connecting member 21 by hydraulic pressure or the like, and pistons 22a of the cylinders 22 extend outward in parallel with the beam 20.

【0017】ガイド部4は、図7ないし図10に示すよ
うに、断面長方形の角筒状部材であるスライダ30と、
このスライダ30に設けられたガイドローラ31および
新レール導入機構32とから構成されている。スライダ
30は、フレーム部3の両端がその内部に通されフレー
ム部3に沿って摺動してスライド自在なるよう取り付け
られている。スライダ30の内側には、シリンダ22の
ピストン22aの先端が連結されており、ピストン22
aの伸縮動作によりスライダ30はスライドさせられ
る。
As shown in FIGS. 7 to 10, the guide portion 4 includes a slider 30 which is a rectangular tubular member having a rectangular cross section,
The slider 30 includes a guide roller 31 and a new rail introducing mechanism 32. The slider 30 is mounted so that both ends of the frame portion 3 pass through the inside thereof and slide along the frame portion 3 so as to be slidable. The tip of a piston 22 a of the cylinder 22 is connected to the inside of the slider 30.
The slider 30 is slid by the expansion / contraction operation of a.

【0018】スライダ30の上部には、旧レールR1が
載せられる走行ローラ31aが設けられ、この走行ロー
ラ31aの内側および外側に、水平ローラ31bおよび
補助ローラ31cがそれぞれ設けられている。走行ロー
ラ31aはスライダ30に回転軸33aを介して回転自
在に装着され、水平ローラ31b、補助ローラ31c
は、それぞれポスト33b、33cの先端に回転自在に
装着されている。これら3つのローラ31a、31b、
31cでガイドローラ31が構成されている。旧レール
R1は、ベース6cの底面が走行ローラ31aに載り、
ヘッド6aの外側面が水平ローラ31bに、ベース6c
の内側面が補助ローラ31cに接触し、この状態でガイ
ドローラ31にセットされたことになり、レール交換装
置1の前進にともなって旧レールR1がガイドローラ3
1を通過するようになっている。
A traveling roller 31a on which the old rail R1 is placed is provided above the slider 30, and a horizontal roller 31b and an auxiliary roller 31c are provided inside and outside the traveling roller 31a, respectively. The running roller 31a is rotatably mounted on the slider 30 via a rotating shaft 33a, and includes a horizontal roller 31b, an auxiliary roller 31c.
Are rotatably mounted on the tips of the posts 33b and 33c, respectively. These three rollers 31a, 31b,
The guide roller 31 is constituted by 31c. In the old rail R1, the bottom surface of the base 6c rests on the traveling roller 31a,
The outer surface of the head 6a is connected to the horizontal roller 31b and the base 6c.
Is in contact with the auxiliary roller 31c, and is set on the guide roller 31 in this state. As the rail exchanging device 1 advances, the old rail R1
It is designed to pass 1.

【0019】新レール導入機構32は、図7ないし図1
0に示すように、スライダ30の外端の支持プレート3
4に揺動自在に連結された吊上げアーム35と、この吊
上げアーム35の先端にピン結合されたレールクランプ
36と、吊上げアーム35を作動させるシリンダ37と
から構成されている。
The new rail introducing mechanism 32 is shown in FIGS.
0, the support plate 3 at the outer end of the slider 30
The lifting arm 35 is swingably connected to the lifting arm 35, a rail clamp 36 pin-connected to the tip of the lifting arm 35, and a cylinder 37 for operating the lifting arm 35.

【0020】吊上げアーム35は、基端部35aの上部
が支持プレート34にピン38を介して軸支されて前方
に延び、ピン38を軸に上下に揺動する。その揺動は、
スライダ30の上に設置されたシリンダ37によって行
われる。シリンダ37のピストン37aは前方に延びる
ようになっており、その先端が吊上げアーム35の基端
部35aの、前記ピン38よりも下方にピン39を介し
て連結されている。吊上げアーム35は、ピストン37
aを伸ばすと上がり、縮めると下がる。
The lifting arm 35 extends forward with the upper end of the base end portion 35a supported by the support plate 34 via a pin 38, and swings up and down about the pin 38. The swing is
It is performed by a cylinder 37 installed on the slider 30. The piston 37a of the cylinder 37 extends forward, and the distal end thereof is connected to the base end 35a of the lifting arm 35 below the pin 38 via a pin 39. The lifting arm 35 has a piston 37.
When a is extended, it goes up, and when it contracts, it goes down.

【0021】レールクランプ36は、左右のクランプ片
40・41および各クランプ片40・41の先端に装着
されたローラ42とから構成されている。吊上げアーム
35の先端には左右に延びる回転軸43が設けられ、こ
の回転軸43にリング44が回転自在に装着され、この
リング44に、ピン45を介して一方のクランプ片40
の上端が左右に揺動自在に取り付けられている。このク
ランプ片40に他方のクランプ片41が左右に揺動自在
に取り付けられている。その揺動は、両者を貫通して装
着された一対のピン46・47のうちの一方のピン46
を軸としてなされ、他方のピン47を両者に貫通させる
ことで固定される。この固定状態で、左右のローラ42
が、旧レールR1のヘッド6aの下部を挟むように設定
されている。吊上げアーム35の揺動とともに上下動す
るレールクランプ36は、常に下向きになるようになっ
ており、正面から見た際の上下動の軌跡は、ガイドロー
ラ31の走行ローラ31aの中央を通るように設定され
ている。
The rail clamp 36 is composed of left and right clamp pieces 40, 41 and a roller 42 attached to the tip of each clamp piece 40, 41. A rotary shaft 43 extending in the left-right direction is provided at the tip of the lifting arm 35, and a ring 44 is rotatably attached to the rotary shaft 43, and one clamp piece 40 is attached to the ring 44 via a pin 45.
The upper end of is swingably attached to the left and right. The other clamp piece 41 is attached to the clamp piece 40 so as to be swingable right and left. The swing is caused by one pin 46 of a pair of pins 46
And the other pin 47 is fixed by penetrating both pins. In this fixed state, the left and right rollers 42
However, it is set so as to sandwich the lower part of the head 6a of the old rail R1. The rail clamp 36, which moves up and down with the swing of the lifting arm 35, is always downward, so that the trajectory of the up and down movement when viewed from the front passes through the center of the traveling roller 31a of the guide roller 31. Is set.

【0022】スライダ30におけるガイドローラ31の
前方には、旧レールR1の底面に付着してくるパットを
除去するスクレバ50が設けられている。パットは、枕
木MとレールRの間に挟まれる緩衝材である。スクレバ
50は、スライダ30の前面に固定されたステー51に
回動軸52を介して装着され、上下に回動するようにな
っている。そして、弾発部材によって付勢されることに
よりその先端が上げられ、この状態でガイドローラ31
を通過する旧レールR1の底面にその先端がこすりつけ
られてパットが剥がされるようになっている。このスク
レバ50は、旧レールR1をガイドローラ31に導くと
きにのみ作動させるものであり、通常は弾発部材に抗し
てその先端を下げておく。
In front of the guide roller 31 of the slider 30, a scrubber 50 for removing the pad attached to the bottom surface of the old rail R1 is provided. The pad is a cushioning material sandwiched between the sleeper M and the rail R. The scrubber 50 is mounted on a stay 51 fixed to the front surface of the slider 30 via a turning shaft 52, and is turned up and down. Then, the tip end is raised by being urged by the elastic member, and in this state, the guide roller 31
The tip is rubbed against the bottom surface of the old rail R1 passing through and the pad is peeled off. The scrubber 50 is operated only when the old rail R1 is guided to the guide roller 31, and its tip is normally lowered against the resilient member.

【0023】走行駆動部5は、エンジンおよび油圧ポン
プ(いずれも図示略)とが組み合わされ、これらがボッ
クス60内に収納されて構成されており、ボックス60
がフレーム部3に取り付けられる。走行駆動部5の動力
は、台車部2の駆動側の前側車輪13aの油圧モータを
作動させるようになっている。
The traveling drive unit 5 is configured by combining an engine and a hydraulic pump (both not shown), and these are housed in a box 60.
Is attached to the frame unit 3. The power of the traveling drive unit 5 operates the hydraulic motor of the front wheel 13a on the drive side of the bogie unit 2.

【0024】以上がレール交換装置1の構成であり、次
いで、このレール交換装置1を用いたレール交換方法お
よびそれにともなう作用を説明する。
The configuration of the rail exchanging device 1 has been described above. Next, a rail exchanging method using the rail exchanging device 1 and an operation associated therewith will be described.

【0025】[1] まず、新レールR2を、作業区間
である交換すべき旧レールR1の、外側の道床D上に旧
レールR1と略平行に配置する。新レールR2は、その
端部を交換すべき旧レールR1と、この旧レールR1と
連結されている図示せぬ本線レールとの継目にほぼ一致
させて、かつ通常の姿勢すなわちベース6cを下に、ヘ
ッド6aを上にして配置する。
[1] First, the new rail R2 is arranged substantially parallel to the old rail R1 on the track D outside the old rail R1 to be replaced, which is the working section. The new rail R2 substantially coincides with the seam between the old rail R1 whose end is to be replaced and a main rail (not shown) connected to the old rail R1, and the normal posture, that is, the base 6c is lowered. , With the head 6a facing up.

【0026】[2] 台車部2、フレーム部3、ガイド
部4および走行駆動部5を、2台分すなわち2つずつ現
場に搬入し、本線レール上に、前進方向を作業区間の方
向に向けて、つまり新レール導入機構32の吊上げアー
ム35が旧レールR1側に、車輪機構10のクランプロ
ーラ14が旧レールR1とは反対側に向く状態で、交換
装置1を組み立て2台を前後に並べる。組み立ては、ま
ず台車部2を、車輪機構10のクランプローラ14のス
イングアーム16を左右に広げてから、各車輪13a・
13bを本線レール上に載せ、次いでスイングアーム1
6を元に戻してクランプローラ14で本線レールを挟む
ことにより本線レール上に設置し、この後、台車部2に
フレーム部3を載せ、フレーム部3の両端にガイド部4
を取り付け、フレーム部3の上に走行駆動部5を取り付
けて、レール交換装置1を組み立てる。ここで、作業区
間に向かって前側の交換装置1を前段装置1A、後側を
後段装置1Bとして以下説明していく。
[2] The carriage unit 2, the frame unit 3, the guide unit 4, and the traveling drive unit 5 are carried into the site by two vehicles, that is, two at a time, and the forward direction is directed to the work section on the main rail. In other words, with the lifting arm 35 of the new rail introducing mechanism 32 facing the old rail R1 and the clamp roller 14 of the wheel mechanism 10 facing the opposite side to the old rail R1, the replacement device 1 is assembled and two units are arranged in front and rear. . Assembling is performed by first unfolding the bogie portion 2 to the left and right of the swing arm 16 of the clamp roller 14 of the wheel mechanism 10,
13b on the main rail, and then swing arm 1
6 is returned to its original position, and the main line rail is sandwiched between the clamp rollers 14 so as to be installed on the main line rail. Thereafter, the frame portion 3 is placed on the bogie portion 2, and the guide portions 4 are provided at both ends of the frame portion 3.
And the traveling drive unit 5 is mounted on the frame unit 3 to assemble the rail exchanging device 1. Here, the exchange device 1 on the front side toward the work section will be described as a front device 1A and the rear side as a rear device 1B.

【0027】[3] 以上で交換作業の準備が完了し、
次に、前段装置1Aの両側のガイド部4を、吊上げアー
ム35が新レールR2の仮置き位置上に配されるまで外
側にスライドさせた状態にして、前段装置1Aを、本線
レールと旧レールR1の継目の手前まで自走により前進
させる。後段装置1Bは本線レール上に待機させてお
く。ガイド部4が仮置きしてある新レールR2の端部の
上にきたら、新レール導入機構32の吊上げアーム35
をシリンダ37で下げ、かつ、レールクランプ36のク
ランプ片41を開いた後に閉じることにより、レールク
ランプ36で新レールR2の端部を把持する(図11参
照)。新レールR2に対するレールクランプ36の位置
調整は、レールクランプ36を揺動させたり、スライダ
30を若干スライドさせることにより行えばよい。吊上
げアーム35を上げて新レールR2の端部をガイドロー
ラ31よりも上に持ち上げた後さらに前段装置1Aを前
進させ、新レールR2の端部がガイドローラ31の上方
にきたら、新レールR2の端部がガイドローラ31の走
行ローラ31a上に載るまで吊上げアームを下げる。次
いでレールクランプ36による新レールR2の把持を解
除し、吊上げアーム35を上方に上げて新レール導入機
構32によるガイド部4への新レールR2の導入を完了
する(図12参照)。
[3] Preparation for the replacement work is now complete.
Next, the guide unit 4 on both sides of the former apparatus 1A is slid outward until the lifting arm 35 is disposed on the temporary placement position of the new rail R2, and the former apparatus 1A is moved to the main line rail and the old rail. Move forward by yourself up to the seam of R1. The latter device 1B is kept on standby on the main line rail. When the guide unit 4 comes over the end of the temporarily placed new rail R2, the lifting arm 35 of the new rail introducing mechanism 32
Is lowered by the cylinder 37 and the clamp piece 41 of the rail clamp 36 is opened and then closed, whereby the end of the new rail R2 is gripped by the rail clamp 36 (see FIG. 11). The position of the rail clamp 36 with respect to the new rail R2 may be adjusted by swinging the rail clamp 36 or slightly sliding the slider 30. After raising the lifting arm 35 to raise the end of the new rail R2 above the guide roller 31, the preceding apparatus 1A is further advanced, and when the end of the new rail R2 comes above the guide roller 31, the new rail R2 The lifting arm is lowered until the end rests on the running roller 31a of the guide roller 31. Next, the gripping of the new rail R2 by the rail clamp 36 is released, and the lifting arm 35 is lifted upward to complete the introduction of the new rail R2 into the guide portion 4 by the new rail introduction mechanism 32 (see FIG. 12).

【0028】[4] 前段装置1Aを旧レールR1上に
前進させるとともに、新レールR2の端部を、ガイド部
4のガイドローラ31を経て旧レールR1の内側に落と
し込む。続いて、旧レールR1の枕木Mへの締結を解除
するとともに、連結されている本線レールとの接続を解
除する。通常レールどうしは継目板と呼ばれる連結材が
双方に添接されてボルト止めされることにより連結され
ており、したがって、この継目板を外して交換すべき旧
レールR1と本線レールとの連結を解除する。本線レー
ルとの連結を外した旧レールR1の前段装置1Aより後
側部分を、バール等の工具で外側に排除し、先ほど旧レ
ールR1の内側に落とし込んだ新レールR2を、本線レ
ールに前記継目板により連結する。
[4] The front-end device 1A is advanced on the old rail R1, and the end of the new rail R2 is dropped inside the old rail R1 via the guide roller 31 of the guide unit 4. Subsequently, the fastening of the old rail R1 to the sleeper M is released, and the connection with the connected main rail is released. Normally, rails are connected by connecting members called joint plates attached to both sides and bolted. Therefore, the connection between the old rail R1 and the main line rail to be replaced by removing the joint plate is released. To do. The rear side of the former rail R1 from the former device 1A, which has been disconnected from the main rail, is removed to the outside with a tool such as a crowbar, and the new rail R2, which has been dropped inside the old rail R1, is connected to the main rail. Connected by a plate.

【0029】[5] 引き続き前段装置1Aを前進さ
せ、本線レールとの継目部分からある程度の距離(たと
えば20メートル程度)に至ったら、本線レール上で待
機させていた後段装置1Bを継目付近まで前進させ、か
つ両側のガイド部4を本線レールよりも外側の排除位置
にスライドさせ、この後、上記のように前段装置1Aの
新レール導入機構32が新レールR2を把持してガイド
ローラ31に導いたと同様に、後段装置1Bの新レール
導入機構32で旧レールR1を後段装置1Bのガイドロ
ーラ31に導く。その際、前段装置1Aのスクレバ50
を作動させて旧レールR1の底面に付着しているパット
を剥がし、旧レールR1のガイドローラ31への導入を
スムーズにする。
[5] Next, the front device 1A is moved forward, and when a certain distance (for example, about 20 meters) is reached from the joint with the main line rail, the rear device 1B, which has been waiting on the main line rail, is advanced to near the joint. Then, the guide portions 4 on both sides are slid to the removal position outside the main line rail, and thereafter, the new rail introduction mechanism 32 of the preceding apparatus 1A grasps the new rail R2 and guides it to the guide roller 31 as described above. Similarly, the new rail introducing mechanism 32 of the subsequent device 1B guides the old rail R1 to the guide roller 31 of the subsequent device 1B. At this time, the scrubber 50 of the pre-stage device 1A
Is operated to peel off the pat adhering to the bottom surface of the old rail R1, and to smoothly introduce the old rail R1 into the guide roller 31.

【0030】[6] この状態から、前段装置1A、後
段装置1B双方を、適度な一定速度で自走により前進さ
せていく。すると、新レールR2は、前段装置1Aのガ
イド部4を経て後段装置1Bの各車輪13a・13bお
よびクランプローラ14を通過することにより道床D上
に敷設され、この新レールR2の敷設と同時に、旧レー
ルR1は、前段装置1Aの各車輪13a・13bおよび
クランプローラ14を経て後段装置1Bのガイド部4を
通過することにより、新たに敷設された新レールR2の
外側の道床D上に排除されていく。図1はその状態を示
しており、旧レールR1と新レールR2とは前段装置1
Aと後段装置1Bとの間で、旧レールR1の上に新レー
ルR2が交差する。なお、新たに敷設した新レールR2
を、枕木Mに順次締結していく。
[6] From this state, both the upstream device 1A and the downstream device 1B are advanced by self-propelled at an appropriate constant speed. Then, the new rail R2 is laid on the roadbed D by passing through the wheels 13a and 13b and the clamp roller 14 of the subsequent device 1B via the guide portion 4 of the preceding device 1A, and at the same time as the laying of the new rail R2, The old rail R1 passes through the wheels 13a and 13b of the preceding device 1A and the guide portion 4 of the subsequent device 1B via the clamp roller 14, thereby being removed on the roadbed D outside the newly laid new rail R2. To go. FIG. 1 shows such a state, in which the old rail R1 and the new rail R2 are connected to the front stage device 1.
A new rail R2 intersects the old rail R1 between A and the downstream device 1B. The newly laid new rail R2
To the sleepers M sequentially.

【0031】上記[1]〜[6]のようにして、2台の
レール交換装置1により新旧レールの交換を行う方法に
よれば、前段装置1Aが旧レールR1上を、後段装置1
Bが前段装置1Aに導かれた新レールR2上を順次走行
することにより、新レールR2が新たに敷設されるとと
もに、この新レールR2の両側に旧レールR1が排除さ
れ、新旧レールの交換作業が一連の動作で円滑に行われ
る。そして、前段装置1Aに新レールR2をセットする
には、前段装置1Aのガイド部4の新レール導入機構3
2を作動させることにより行えるので、従来のように山
越器を必要としない。すなわち従来ではどうしても必要
であった山越器を全く用いないでレール交換が可能とな
り、したがって、現場への山越器の搬入およびその作動
に手間を要するといった問題が解消される。
According to the method of exchanging the old and new rails by the two rail exchanging devices 1 as described in the above [1] to [6], the former device 1A moves on the old rail R1 and the latter device 1
The new rail R2 is newly laid by sequentially traveling on the new rail R2 led by the front device 1A, and the old rail R1 is removed on both sides of this new rail R2, and the old and new rails are replaced. Is smoothly performed by a series of operations. Then, in order to set the new rail R2 in the preceding apparatus 1A, the new rail introducing mechanism 3 of the guide portion 4 of the preceding apparatus 1A is used.
2 does not require a Yamagoshi device as in the prior art. In other words, the rail can be replaced without using any Yamagoshi equipment, which is always necessary in the related art. Therefore, it is possible to solve the problem that it takes time to carry the Yamagoshi equipment to the site and to operate it.

【0032】また、同一構成の2台のレール交換装置1
を用い、いずれか一方を前段装置1A、他方を後段装置
1Bとしてセットすればよく、異なる構成のものを見定
めて前後の順を間違えないようにレール上へセットする
といった手間が省ける。すなわち、レール交換装置1を
セットする際における煩雑さが解消されるとともに、レ
ール交換装置1の管理が簡単になる。
Further, two rail exchanging devices 1 having the same structure are used.
It suffices to set one of them as the front-stage device 1A and the other as the rear-stage device 1B by using, and it is possible to save the trouble of deciding different configurations and setting them on the rail so as not to make a mistake in the front-back order. That is, the complexity of setting the rail exchanging device 1 is eliminated and the management of the rail exchanging device 1 is simplified.

【0033】さらに、レール交換装置1は、台車部2
と、この台車部2の上に取り付けられるフレーム部3
と、フレーム部3の両端に取り付けられるガイド部4
と、走行駆動部5とを組み合わせることにより構成さ
れ、つまりこれらを分割して個々に運搬することができ
る。このように分割して個々の構成部材を1つずつ運搬
すれば軽くなって運搬しやすく、大掛かりな運搬装置を
用いることなく現場への搬入が容易となる。
Further, the rail exchanging device 1 includes a bogie unit 2
And a frame 3 mounted on the cart 2
And guide portions 4 attached to both ends of the frame portion 3
And the traveling drive unit 5, that is, they can be divided and transported individually. If the individual components are divided and transported one by one as described above, the components are reduced in weight and easily transported, and can be easily transported to the site without using a large-scale transport device.

【0034】[0034]

【発明の効果】以上説明したように、本発明の鉄道用レ
ール交換装置およびこれを用いたレール交換方法によれ
ば、2台のレール交換装置を用い、前段のレール交換装
置が旧レール上を、後段のレール交換装置が前段のレー
ル交換装置に導かれた新レール上を順次走行することに
より、新レールが新たに敷設されるとともに、この新レ
ールの両側に旧レールが排除され、新旧レールの交換作
業が一連の動作で円滑に行われるものであり、前段のレ
ール交換装置に新レールをセットするには、前段のレー
ル交換装置のガイド部の新レール導入機構を作動させる
ことにより行えるので、従来のように山越器を必要とし
ない。すなわち従来ではどうしても必要であった山越器
を全く用いないでレール交換が可能となり、したがっ
て、現場への山越器の搬入およびその作動に手間を要す
るといった問題が解消され、労力の低減が図られる。ま
た、同一構成の2台のレール交換装置を用い、いずれか
一方を前段に、他方を後段にセットすればよく、このた
め、異なる構成のものを見定めて前後の順を間違えない
ようにレール上へセットするといった手間が省け、当該
レール交換装置をセットする際における煩雑さが解消さ
れるとともに、レール交換装置の管理が簡単になる。さ
らに、レール交換装置を、台車部、フレーム部、ガイド
部、走行駆動部に分割可能で、これらの組み合わせで構
成することによってこれら構成部材を分割して個々に運
搬することができるようになり、大掛かりな運搬装置を
用いることなく現場への搬入が容易となる。
As described above, according to the rail exchanging apparatus for railroad and the rail exchanging method using the same according to the present invention, two rail exchanging apparatuses are used, and the former rail exchanging apparatus is mounted on the old rail. A new rail is newly laid by successively running on the new rail led by the preceding rail exchange device, and the old rail is eliminated on both sides of the new rail, and the new rail is replaced by the new rail. The replacement work is performed smoothly by a series of operations, and the new rail can be set to the preceding rail replacement device by operating the new rail introduction mechanism of the guide section of the preceding rail replacement device. It does not require Yamagoshi as in the conventional case. That is, the rails can be replaced without using any Yamagoshi equipment, which was always necessary in the related art. Therefore, it is possible to solve the problem that it takes time to carry in the Yamagoshi equipment to the site and to operate the same, thereby reducing labor. In addition, two rail exchange devices having the same configuration may be used, one of which may be set in the front stage and the other in the rear stage. The trouble of setting the rail exchanging device is eliminated, the complexity of setting the rail exchanging device is eliminated, and the management of the rail exchanging device is simplified. Furthermore, the rail exchanging device can be divided into a trolley part, a frame part, a guide part, and a traveling drive part, and by constructing a combination thereof, these constituent members can be divided and individually transported, It can be easily carried into the field without using a large-scale transportation device.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の一実施例の交換装置および方法でレ
ール交換している状態の平面図である。
FIG. 1 is a plan view showing a state where rails are exchanged by an exchange device and method according to an embodiment of the present invention.

【図2】一実施例の交換装置の平面図である。FIG. 2 is a plan view of the exchange device according to one embodiment.

【図3】 同正面図である。FIG. 3 is a front view of the same.

【図4】 同側面図である。FIG. 4 is a side view of the same.

【図5】 車輪機構の側面図である。FIG. 5 is a side view of the wheel mechanism.

【図6】 クランプローラの正面図である。FIG. 6 is a front view of a clamp roller.

【図7】 ガイド部を説明するための平面図である。FIG. 7 is a plan view for explaining a guide portion.

【図8】 同正面図である。FIG. 8 is a front view of the same.

【図9】 同一部断面正面図である。FIG. 9 is a partially sectional front view of the same.

【図10】 新レール導入機構の側面図である。FIG. 10 is a side view of the new rail introduction mechanism.

【図11】 新レール導入機構で新レールを把持した状
態の側面図である。
FIG. 11 is a side view of a state where a new rail is held by a new rail introduction mechanism.

【図12】 新レール導入機構で新レールをガイド部の
ガイドローラに導入した状態の側面図である。
FIG. 12 is a side view showing a state in which the new rail is introduced into the guide roller of the guide portion by the new rail introduction mechanism.

【符号の説明】[Explanation of symbols]

1…レール交換装置、1A…前段装置、1B…後段装
置、2…台車部、3…フレーム部、4…ガイド部、5…
走行駆動部、10…車輪機構、13a…前側車輪(駆動
輪)、32…新レール導入機構、D…道床、R…レー
ル、R1…旧レール、R2…新レール。
DESCRIPTION OF SYMBOLS 1 ... Rail exchange apparatus, 1A ... Front-stage apparatus, 1B ... Rear-stage apparatus, 2 ... Truck part, 3 ... Frame part, 4 ... Guide part, 5 ...
Running drive unit, 10: wheel mechanism, 13a: front wheel (drive wheel), 32: new rail introduction mechanism, D: roadbed, R: rail, R1: old rail, R2: new rail.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 鉄道の道床に敷設されている左右の既設
レールを除去し、既設レール側方の道床上に略平行に仮
置きした新たに敷設する左右の新レールを、前記既設レ
ールが除去された後のレール敷設位置に敷設する鉄道用
レールの交換装置であって、 レールを走行する駆動輪およびレールを両側から挟む一
対のクランプローラを備えた車輪機構によって、既設レ
ールあるいは新たに敷設する新レール上を走行するよう
構成された台車部と、 この台車部に設けられ、レールの敷設方向に直交して延
び、かつ両端部が新レールの仮置き位置まで延びるフレ
ーム部と、 このフレーム部の両端部にフレーム部に沿ってスライド
可能に装着され、その上側に、レールの側面に当接して
転動するガイドローラおよび仮置きした新レールを把持
して持ち上げ前記ガイドローラに導く新レール導入機構
を備えるガイド部と、 前記台車部もしくは前記フレーム部に搭載され、台車部
の駆動輪を回転駆動させて装置全体を走行させる走行駆
動部とを備えてなることを特徴とする鉄道用レール交換
装置。
1. The left and right existing rails laid on the railway roadbed are removed, and the newly installed left and right new rails temporarily placed on the roadbed on the side of the existing rail are removed by the existing rails. A rail rail replacement device to be laid at a rail laying position after being installed, which is to be installed on an existing rail or newly by a wheel mechanism equipped with a pair of clamp rollers sandwiching the drive wheel and the rail from both sides. A trolley portion configured to travel on the new rail, a frame portion provided on the trolley portion, extending at right angles to the laying direction of the rail, and having both ends extending to the temporary placement position of the new rail. It is slidably attached to both ends of the frame along the frame part, and on top of that, hold the guide roller that rolls by contacting the side surface of the rail and the new rail that is temporarily placed. A guide unit having a new rail introduction mechanism for guiding the guide roller, and a traveling drive unit mounted on the bogie unit or the frame unit, the driving unit rotating the drive wheels of the bogie unit to travel the entire apparatus. A rail exchanging device for railroads.
【請求項2】 前記台車部、前記フレーム部、前記ガイ
ド部、前記走行駆動部に分割可能で、これらが組み合わ
せられて構成されることを特徴とする請求項1記載の鉄
道用レール交換装置。
2. The railway rail changing device according to claim 1, wherein the rail unit can be divided into the bogie unit, the frame unit, the guide unit, and the traveling drive unit, and these are combined.
【請求項3】 請求項1または請求項2記載の鉄道用レ
ール交換装置を2台用意し、一方の交換装置を前段側、
他方を後段側と設定し、 前段側の交換装置を、前記台車部の前記一対のクランプ
ローラで既設レールを挟むことにより既設レールにセッ
トし、 この前段側の交換装置の前記ガイド部を、外側にスライ
ドさせて前記新レールの仮置き位置上に配し、 前段側の交換装置を前進させ、ガイド部に備えられた前
記新レール導入機構により、仮置きした新レールの端部
を把持して持ち上げた後、前記ガイドローラに導入し、 この状態で前段の交換装置を前進させることにより、新
レールを、ガイド部のガイドローラを経て後方に導き、 この導かれた新レールを道床のレール敷設位置に配する
とともに、この新レール上に、後段側の交換装置を、前
段側の交換装置と同様にしてセットするとともに、前段
側の交換装置が走行した後の既設レールを、後段側の交
換装置のガイド部に導き、このガイド部をレール敷設位
置よりも外側にスライドさせ、 この状態で、前段側および後段側の各交換装置を、各走
行駆動部により略同速度で前進させることを特徴とする
鉄道用レール交換方法。
3. Two rail rail exchanging devices according to claim 1 or 2 are prepared, and one exchanging device is provided on the front stage side,
The other side is set as the rear stage side, and the exchange device on the front stage side is set on the existing rail by sandwiching the existing rail with the pair of clamp rollers of the carriage unit. Slide it to place it on the temporary placement position of the new rail, move the front side exchange device forward, and grasp the end of the temporarily placed new rail by the new rail introduction mechanism provided in the guide part. After lifting, the guide rail is introduced into the guide roller, and in this state, the front stage exchange device is moved forward to guide the new rail rearward through the guide roller of the guide section, and the guided new rail is laid on the track bed. In addition to arranging it in the position, set the rear side exchange device on this new rail in the same way as the front stage side exchange device, and set the existing rail after the front stage side exchange device Side guide device, slide this guide part to the outside of the rail laying position, and in this state, move the front-stage and rear-stage exchange devices forward at approximately the same speed by the travel drive units. A method for replacing a rail for a railway characterized by the following.
JP27149794A 1994-11-04 1994-11-04 Rail exchange device for railway and rail exchange method using the same Expired - Lifetime JP2648105B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27149794A JP2648105B2 (en) 1994-11-04 1994-11-04 Rail exchange device for railway and rail exchange method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27149794A JP2648105B2 (en) 1994-11-04 1994-11-04 Rail exchange device for railway and rail exchange method using the same

Publications (2)

Publication Number Publication Date
JPH08134811A true JPH08134811A (en) 1996-05-28
JP2648105B2 JP2648105B2 (en) 1997-08-27

Family

ID=17500885

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27149794A Expired - Lifetime JP2648105B2 (en) 1994-11-04 1994-11-04 Rail exchange device for railway and rail exchange method using the same

Country Status (1)

Country Link
JP (1) JP2648105B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007255131A (en) * 2006-03-24 2007-10-04 Futaba Tetsudo Kogyo Kk Rail replacing device
CN104309524A (en) * 2014-10-22 2015-01-28 中国北车集团沈阳机车车辆有限责任公司 Approach rail clamp, rail withdrawal guiding and levering bogie and long-rail transport bogie unit
CN104444164A (en) * 2014-10-22 2015-03-25 中国北车集团沈阳机车车辆有限责任公司 Rail stirring clamp and rail collecting guiding and rail stirring trolley of long steel rail transportation vehicle set
JP2016070034A (en) * 2014-10-02 2016-05-09 山九株式会社 Rail spacing adjustment device
JP2016183540A (en) * 2015-03-27 2016-10-20 東日本旅客鉄道株式会社 Rail replacement device
CN112813745A (en) * 2021-01-04 2021-05-18 中铁四局集团有限公司 Intelligent track laying method and intelligent track laying equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007255131A (en) * 2006-03-24 2007-10-04 Futaba Tetsudo Kogyo Kk Rail replacing device
JP2016070034A (en) * 2014-10-02 2016-05-09 山九株式会社 Rail spacing adjustment device
CN104309524A (en) * 2014-10-22 2015-01-28 中国北车集团沈阳机车车辆有限责任公司 Approach rail clamp, rail withdrawal guiding and levering bogie and long-rail transport bogie unit
CN104444164A (en) * 2014-10-22 2015-03-25 中国北车集团沈阳机车车辆有限责任公司 Rail stirring clamp and rail collecting guiding and rail stirring trolley of long steel rail transportation vehicle set
JP2016183540A (en) * 2015-03-27 2016-10-20 東日本旅客鉄道株式会社 Rail replacement device
CN112813745A (en) * 2021-01-04 2021-05-18 中铁四局集团有限公司 Intelligent track laying method and intelligent track laying equipment

Also Published As

Publication number Publication date
JP2648105B2 (en) 1997-08-27

Similar Documents

Publication Publication Date Title
CA1133758A (en) Mobile apparatus for receiving and laying an assembled track switch or crossing section
CA1130653A (en) Mobile apparatus for continuously renewing track
CA1074620A (en) Mobile apparatus for continuous track renewal
AU706712B2 (en) A machine and an installation for implementing track maintenance operations
US5357867A (en) Machine for renewing or laying a railway track
JP4713016B2 (en) Machine and method for removing old track and laying new track
AU636791B2 (en) A machine for replacing the sleepers of a railway track
DK0835712T3 (en) Method for welding at least one rail string and machine for carrying out the method
JP4713017B2 (en) Orbit changer
HU209000B (en) Method and machine arrangement for renewing track
CN102080349B (en) Sleeper laying method and device of railway line main tracklayer
US4270456A (en) Mobile apparatus for receiving and laying an assembled track section
HU177489B (en) Moving apparatus for continuous changing respectively improving track consists of rails and sleepers
JP2648105B2 (en) Rail exchange device for railway and rail exchange method using the same
DE3851622D1 (en) Movable machine arrangement for pulling in or pulling out the cross sleepers.
AU709022B2 (en) A machine for laying a track
GB2157347A (en) A travelling machine and a process for taking up and/or laying track panels
US5046270A (en) Mobile ballast clearing and planing machine
CA2114398C (en) Machine arrangement for tamping a track
RU2257439C1 (en) Track repair machine
EA000120B1 (en) Tamping device for railway track
CA1255540A (en) Track-bound carriage for an assembled track section
JP3854368B2 (en) Railway rail exchanging apparatus and rail exchanging method using the same
JPH089202Y2 (en) Railway group train for railway track update
JPH0941306A (en) Track rail replacer

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970401