Railway rail exchanging apparatus and rail exchanging method using the same Download PDFInfo
- Publication number
- JP3854368B2 JP3854368B2 JP14830697A JP14830697A JP3854368B2 JP 3854368 B2 JP3854368 B2 JP 3854368B2 JP 14830697 A JP14830697 A JP 14830697A JP 14830697 A JP14830697 A JP 14830697A JP 3854368 B2 JP3854368 B2 JP 3854368B2
- Authority
- JP
- Japan
- Prior art keywords
- rail
- new
- existing
- rails
- exchanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鉄道用レールにおいて、老朽化、破損等の理由により既設のレールを新レールに交換する際に用いて好適なレール交換装置及びこのレール交換装置を用いたレール交換方法に関する。
【0002】
【従来の技術】
道床の上にレールが敷設された鉄道において、既設レールを新レールに交換するにあたっては、従来より、既設レールの外側方の道床に、既設レールと略平行に新レールを仮置きし、門型フレーム構造のクレーンである山越器を既設レールに跨った状態にセットし、この山越器を用いて既設レールを除去した後、新レールを既設レールの敷設位置に移動させる方法が採用されていた。しかしながら、この方法では、レール長が500メートル以上にわたるロングレールを交換する場合、多数の山越器が必要となって多大なコストと労力を要し、かつこれら多数の山越器の作動を一致させてレール交換を行う作業は困難であった。また、高架上に敷設されているレールを交換する場合には、地上から高架上に多数の山越器を持ち上げて搬入する作業を要し、これに手間と労力がかかるという欠点があった。
【0003】
そこで、特開平1ー299901号公報に開示のレール交換方法および交換装置が提案されている。これは、既設レール上で前段ガイド装置を走行させながら既設レールの外側に仮置きしてある新レールを内側のレール敷設位置に導き、この新レール上にて後段ガイド装置を走行させつつ、後段ガイド装置により既設レールを外側に排除するものである。上記交換装置を用いた交換方法によれば、多数の山越器が不要で、かつ前段および後段のガイド装置を同時に走行させることにより、一連の動作で円滑に新レールの敷設と既設レールの排除とを同時に実施できるという効果がある。
【0004】
【発明が解決しようとする課題】
ところが、この交換装置を用いる場合においても、最初に前段のガイド装置に新レールを供給する場合および後段のガイド装置に既設レールを供給する場合には、やはり山越器が必要となる。従って、山越器の搬入およびその作動に手間を要するといった問題は依然として残っていた。また、前段および後段の各ガイド装置の全体重量がかさむため、運搬に困難を来たす場合があった。
【0005】
本発明は上記事情に鑑みてなされたものであって、山越器を不要とすることによりそのための労力が軽減され、かつ装置の使用及び管理が簡略化され、更に運搬しやすく現場への搬入が容易な鉄道用レール交換装置及びこれを用いたレール交換方法を提供することを目的としている。
【0006】
【課題を解決するための手段】
本発明は上記目的を達成するためになされたもので、その請求項1記載の装置は、鉄道の道床に敷設された左右一対の既設レールを除去し、これら既設レールの外側方の道床上にそれぞれ略平行に仮置きされた新レールを、前記既設レール除去後のレール敷設位置に敷設する際に使用される鉄道用レール交換装置であって、敷設された前記既設レール上を走行する駆動輪を備える台車と、この台車上にレールの敷設方向と直交して延設され且つ先端が前記新レールの仮置き位置上に位置するアームと、このアーム上に、その延設方向に沿って移動可能に支持され且つ前記新レールを上方から上下動自在に把持するクランパを備えた移動手段と、前記新レールの仮置き位置より内側にて前記アームの下方に設けられ、前記移動手段により移動された前記新レールを、前記レール敷設位置より上方にて支持する支持手段と、前記駆動輪を回転駆動させて装置全体を走行させる駆動源と、前記新レールを移動手段で把持して移動させて前記支持手段に載置した状態で、前記装置全体の走行に応じて新レールを内側に絞り込む外ローラとを有することを特徴としている。
【0007】
また、請求項2記載の装置は、請求項1記載の鉄道用レールの交換装置において、前記アームが、その基端部に設けられ、垂直な軸回りに回転するヒンジにより折り畳み可能とされていることを特徴としている。
【0008】
また、請求項3記載のレールの交換方法は、請求項1または2に記載されたレール交換装置の前記駆動輪を前記既設レール上にセットし、前記移動手段を前記新レールの仮置き位置上に配し、前記新レールの端部をクランパによって上方から把持し、把持した前記新レールの端部を持ち上げ、前記移動手段を内側に移動させて前記支持手段に載置した後、前記移動手段による前記新レールの把持を解除し、更に前記レール交換装置を前進させることにより、前記新レールを前記支持手段を経て後方に導くとともに外ローラによって前記既設レールの内側に落とし込み、前記レール交換装置が走行した後の前記既設レールを、前記レール敷設位置の外側に排除した後、後方に導かれた前記新レールを前記レール敷設位置に敷設することを特徴としている。
【0009】
【発明の実施の形態】
以下、図面に基づき、本発明の実施形態について説明する。
図1中符号R1は鉄道の道床D上に枕木Mを介して敷設され、老朽化等の理由により交換を要する既設の旧レール、R2は旧レールR1に換えて新たに敷設される新レール(新旧のレールを特に分ける必要がない場合には、単にレールRと呼称する。)で、新レールR2は旧レールR1の側方の道床D上に仮置きされている。また、符号1は本発明に係るレール交換装置である。以下、まずレール交換装置1について説明するが、説明中、前後、左右といった方向の記載は、該交換装置1の前進方向を基準にした方向とここで定義する。
【0010】
レール交換装置1は、図1ないし図3に示すように、台車2、フレーム3、アーム4、移動手段5、支持手段6、及び駆動源7から概略構成されている。台車2は、前後一対の車輪21a,21bが装着された車輪ホルダ22を、左右に延びるバー23にて連結したもので、前方の車輪21aは油圧モータが組み込まれた駆動輪となっている。また、前方の車輪21aと後方の車輪21bとは、チェーン(図示せず。)等を介して同期して回転可能とされている。
【0011】
フレーム3は、車輪ホルダ22上に立設された左右一対の支柱31の上端を、左右に延びるバー32にて連結したもので、支柱31の左右上端部には、垂直な軸回りに回転するヒンジ33がそれぞれ設置されている。また、ヒンジ33からは、一対の前記アーム4が、レールRの敷設方向に直交する位置、すなわち、左右に向け水平に延設されている。ここで、アーム4の全長は、アーム4の先端が新レールR2の仮置き位置上に位置するよう設定されている。更に、アーム4は、ヒンジ33に設けられたピン34の操作により、図2,3に二点鎖線で示すように、ヒンジ33を支点として、レールRの敷設方向に平行な向きに折り畳み可能とされている。
【0012】
移動手段5は、アーム4上に、その延設方向に沿って移動可能に支持された手動ウインチ51と、この手動ウインチ51からチェン52を介して上下動自在に垂下され、レールRのヘッドを左右から挟んでレールRを把持するクランパ53とから構成されている。また、支持手段6は、車輪21a,21b間にて車輪ホルダ22から左右に向け水平に延設された一対の部材で、その先端は、移動手段5による新レールR2の上下動の妨げとならないよう、新レールR2の仮置き位置より内側に位置している。更に、個々の支持手段6の上面には、垂直な軸回りに回転する外ローラ61と内ローラ62により左右から挟まれた水平ローラ63が、レールRの敷設方向に直交する軸回りに回転可能に設けられている。
【0013】
駆動源7は、エンジン71と油圧ポンプ(図示せず。)とを組み合わせて枠体72内に収容したもので、枠体72を介してバー23に取り付けられている。そして、駆動源7の動力により、台車2の駆動側の車輪21aの油圧モータを作動させるようになっている。
【0014】
次いで、上記構成を有するレール交換装置1を用いたレール交換方法について以下に説明する。
まず、新レールR2を、作業区間である交換すべき旧レールR1の、外側の道床D上に旧レールR1と略平行に配置する。新レールR2は、その端部を、交換すべき旧レールR1と、この旧レールR1と連結されている本線レール(図示せず。)との継目にほぼ一致させて、かつ通常の姿勢すなわちベースを下、ヘッドを上にして配置する。また、本線レール上に、レール交換装置1を、アーム4が左右に延設された状態で、前進方向が作業区間の方向(図4〜6中矢印Fで示す方向)となるよう設置する。以上で交換作業の準備が完了する。
【0015】
準備が完了したら、手動ウインチ51を、新レールR2の仮置き位置上に位置するまで外側に移動させるとともに、レール交換装置1を、本線レールと旧レールR1の継目の手前まで自走により前進させる。この状態を図4に示す。そして、手動ウインチ51を操作し、クランパ53による新レールR2の把持が可能となるまでチェン52を繰り出し、更に、クランパ53を開いて新レールR2のヘッドを左右から挟んで閉じることにより、図1中矢印Pで示すように、新レールR2の端部を把持する。新レールR2に対するクランパ53の位置調整は、クランパ53を揺動させたり、手動ウインチ51を若干移動させることにより行えばよい。
【0016】
クランパ53により新レールR2を把持したら、手動ウインチ51を操作してチェン52を巻き上げ、図1中矢印Qで示すように、新レールR2の端部を外ローラ61よりも上方に持ち上げる。次いで、図1中矢印Rで示すように、手動ウインチ51を、支持手段6の水平ローラ63上に位置するまで内側に移動させる。新レールR2の端部が水平ローラ63上に到達したら、手動ウインチ51を操作してチェン52を繰り出し、新レールR2が水平ローラ63上に載置されるまでクランパ53を下げる。更に、クランパ53による新レールR2の把持を解除し、クランパ53を上方に戻すことにより、図1中矢印Sで示すように、支持手段6上への新レールR2の設置が完了する。
【0017】
支持手段6上に新レールR2を設置したら、旧レールR1上のレール交換装置1を矢印Fで示す方向に前進させる。すると、新レールR2が、水平ローラ63上を後方に相対移動しつつ、外ローラ61の存在により内側に絞り込まれ、その結果、図5に示すように、新レールR2が、その端部から順次旧レールR1の内側に落とし込まれる。
【0018】
続いて、旧レールR1の枕木Mへの締結を解除するとともに、連結されている本線レールとの接続を解除する。この場合、通常レール同士は継目板と呼ばれる連結材を双方のレールに添接してボルト止めすることにより連結されているため、具体的には、この継目板を外して、交換すべき旧レールR1と本線レールとの連結を解除する。更に、本線レールとの連結を外した旧レールR1のうち、レール交換装置1より後側部分を、バール等の工具で外側に排除するとともに、旧レールR1の内側に落とし込まれた新レールR2を、前記継目板を介して本線レールに連結する。
【0019】
そして、レール交換装置1を、適度な速度で自走により前進させ、かつ旧レールR1を順次外側に排除しつつ新レールR2を枕木Mに順次締結することにより、図6に示すように、新レールR2が支持手段6を経て順次道床D上に敷設され、旧レールR1から新レールR2への交換が行われる。また、この際、レール交換装置1の後方にて、旧レールR1の上に新レールR2が交差する。
【0020】
一方、レール交換装置1の搬送時等には、ピン34を操作して、図2,3に二点鎖線で示すように、アーム4を、ヒンジ33を支点としてレールRの敷設方向に平行な向きに折り畳んでおく。こうすることにより、レール交換装置1の幅が車両限界内に収まる程度にまで縮小され、その結果、レールRを利用したレール交換装置1の搬送が容易となる。
【0021】
このように、本発明のレール交換装置1によれば、装置への新レールR2の設置を自らのアーム4と移動手段5により行うため、従来必要不可欠であった山越器が不要となる。従って、現場への山越器の搬入およびその作動に要する手間等の問題が解消される。
【0022】
また、レール交換装置1が、図1〜3で示すような簡単な構造とされているため、装置の使用及び管理が簡略化され、かつ装置が小型軽量となって、装置の運搬や現場への搬入も容易となる。特に、アーム4が折畳み可能であるため、レール交換装置1を車両限界内に収まる程度にまで小型化できる。更に、移動手段5に軽量で構造が簡単な手動ウインチ51を用いたため、レール交換装置1の軽量化が推進されるばかりではなく、故障発生率が低下し、更には故障時の修理が容易であるという点でも有利となる。また、手動ウインチ51が安価なため、装置の製造コストが低減されるという効果もある。
【0023】
【発明の効果】
以上説明した通り、本発明のレール交換装置によれば、装置への新レールの設置を自身のアームと移動手段により行うため、従来必要不可欠であった山越器が不要となり、その結果、現場への山越器の搬入およびその作動に要する手間等の問題が解消される。
【0024】
また、レール交換装置の構造が簡単であるため、装置の使用及び管理が簡略化され、かつ装置が小型軽量となって、装置の運搬や現場への搬入も容易となる。特に、アームが折畳み可能であるため、レール交換装置を車両限界内に収まる程度にまで小型化することができる。
【図面の簡単な説明】
【図1】 本発明のレール交換装置の構造の例を示す図2の矢印Iに沿った正面図である。
【図2】 本発明のレール交換装置の構造の例を示す図1の矢印IIに沿った上面図である。
【図3】 本発明のレール交換装置の構造の例を示す図2の矢印IIIに沿った側面図である。
【図4】 本発明のレール交換装置によるレール交換の手順を示す上面図である。
【図5】 本発明のレール交換装置によるレール交換の手順を示す上面図である。
【図6】 本発明のレール交換装置によるレール交換の手順を示す上面図である。
【符号の説明】
1 レール交換装置
2 台車
4 アーム
5 移動手段
6 支持手段
7 駆動源
21a 車輪(駆動輪)
D 道床
R1 旧レール(既設レール)
R2 新レール[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a rail exchanging device suitable for use in exchanging an existing rail with a new rail for reasons such as aging and damage in a rail for railroad, and a rail exchanging method using the rail exchanging device.
[0002]
[Prior art]
In railways where rails are laid on the roadbed, when replacing existing rails with new rails, a new rail is temporarily placed on the roadbed outside the existing rails, approximately parallel to the existing rails. A method of moving a new rail to the laying position of an existing rail after the existing rail was removed using this Yamagoe device was set in a state where a Yamakoshi device, which is a crane with a frame structure, was straddled over the existing rail. However, in this method, when exchanging a long rail having a rail length of 500 meters or more, a large number of Yamakoshi are required, which requires a great deal of cost and labor, and the operations of these many Yamakoshi are matched. The work of exchanging rails was difficult. Moreover, when exchanging the rails laid on the overhead, it takes a work to lift and carry in a large number of Yamakoshi from the ground to the elevated, and this has the disadvantage that it takes time and labor.
[0003]
Therefore, a rail exchanging method and exchanging device disclosed in JP-A-1-299901 has been proposed. This is because the new rail that is temporarily placed on the outside of the existing rail is guided to the inner rail laying position while running the front guide device on the existing rail, and the rear guide device is driven on the new rail while The existing rail is removed to the outside by the guide device. According to the exchanging method using the exchanging device described above, a large number of Yamakoshi units are unnecessary, and by running the front and rear guide devices at the same time, it is possible to smoothly install new rails and eliminate existing rails in a series of operations. Can be implemented simultaneously.
[0004]
[Problems to be solved by the invention]
However, even when this exchange device is used, when a new rail is first supplied to the front guide device and when an existing rail is supplied to the rear guide device, a Yamakoshi device is still required. Therefore, there still remains a problem that it takes time to carry in and operate the Yamakoshi device. In addition, the overall weight of each of the front and rear guide devices is increased, which may make transportation difficult.
[0005]
The present invention has been made in view of the above circumstances, and by eliminating the need for a Yamakoshi device, the labor for that is reduced, the use and management of the device is simplified, and it is easier to carry and can be carried to the site. It is an object of the present invention to provide an easy railway rail exchanging apparatus and a rail exchanging method using the rail exchanging apparatus.
[0006]
[Means for Solving the Problems]
The present invention has been made to achieve the above object, and the apparatus according to claim 1 removes a pair of left and right existing rails laid on the road bed of a railway, and on the road bed outside these existing rails. A rail-rail exchanging device for use in laying a new rail temporarily placed substantially parallel to the rail laying position after removal of the existing rail, which is a drive wheel that travels on the existing rail. a carriage provided with an arm which is located on this in the carriage perpendicularly to the laying direction of the rail is extended and the tip on the temporary placement position of the new rails, on the arm, moves along the extending direction capable the supported and a moving means for the new rail with a clamper to grip vertically movable from above, provided under the arm at the inside than the temporary placement position of the new rail, movement of the said moving means And the new rails, and support means for supporting at above said rail laying location, a drive source for running the whole apparatus is driven to rotate the driving wheel, it is moved by gripping the new rail moving means An outer roller that narrows the new rail inward in accordance with the travel of the entire apparatus in a state of being placed on the support means .
[0007]
According to a second aspect of the present invention, in the railway rail exchanging apparatus according to the first aspect, the arm is provided at a base end portion thereof and can be folded by a hinge that rotates about a vertical axis. It is characterized by that.
[0008]
According to a third aspect of the present invention, there is provided a rail exchanging method in which the driving wheel of the rail exchanging device according to the first or second aspect is set on the existing rail, and the moving means is placed on the temporary placement position of the new rail. The end of the new rail is gripped from above by a clamper, the end of the gripped new rail is lifted, the moving means is moved inward and placed on the support means, and then the moving means By releasing the grip of the new rail and further moving the rail exchanging device forward, the new rail is guided to the rear through the support means and is dropped into the existing rail by an outer roller. The existing rail after traveling is excluded outside the rail laying position, and then the new rail guided rearward is laid at the rail laying position. To have.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
In FIG. 1, symbol R1 is laid on a railroad bed D through a sleeper M, and an existing old rail that needs to be replaced for reasons such as aging, R2 is a new rail that is newly laid in place of the old rail R1 ( When there is no need to separate the old and new rails, the new rail R2 is temporarily placed on the road bed D on the side of the old rail R1. Reference numeral 1 denotes a rail exchanging device according to the present invention. Hereinafter, the rail exchanging device 1 will be described first, but in the description, descriptions of directions such as front and rear and left and right are defined here as directions based on the forward direction of the exchanging device 1.
[0010]
As shown in FIGS. 1 to 3, the rail exchanging device 1 is schematically composed of a
[0011]
The
[0012]
The moving
[0013]
The
[0014]
Next, a rail exchanging method using the rail exchanging apparatus 1 having the above configuration will be described below.
First, the new rail R2 is disposed substantially parallel to the old rail R1 on the outer roadbed D of the old rail R1 to be replaced, which is a work section. The end of the new rail R2 substantially coincides with the joint between the old rail R1 to be replaced and the main rail (not shown) connected to the old rail R1, and has a normal posture or base. With the head facing down. Further, the rail exchange device 1 is installed on the main rail so that the forward direction is the direction of the work section (the direction indicated by the arrow F in FIGS. 4 to 6) with the
[0015]
When the preparation is completed, the
[0016]
When the new rail R2 is gripped by the
[0017]
When the new rail R2 is installed on the support means 6, the rail exchange device 1 on the old rail R1 is advanced in the direction indicated by the arrow F. Then, the new rail R2 is squeezed inward due to the presence of the
[0018]
Subsequently, the fastening of the old rail R1 to the sleepers M is released, and the connection with the connected main rail is released. In this case, since the rails are usually connected by connecting a connecting material called a seam plate to both rails and bolted, specifically, the old rail R1 to be replaced by removing the seam plate. And the main rail are disconnected. Further, among the old rail R1 that has been disconnected from the main rail, the rear portion of the rail exchange device 1 is removed to the outside with a tool such as a bar, and the new rail R2 that is dropped inside the old rail R1. Are connected to the main rail via the joint plate.
[0019]
Then, as shown in FIG. 6, the rail exchange device 1 is advanced by self-propelled at an appropriate speed, and the new rail R2 is sequentially fastened to the sleepers M while sequentially removing the old rail R1 to the outside. The rail R2 is laid on the road bed D sequentially through the support means 6, and the old rail R1 is replaced with the new rail R2. At this time, the new rail R2 intersects the old rail R1 behind the rail exchanging device 1.
[0020]
On the other hand, when the rail exchanging device 1 is transported, etc., the
[0021]
Thus, according to the rail exchanging device 1 of the present invention, since the new rail R2 is installed in the device by the
[0022]
Since the rail exchange device 1 has a simple structure as shown in FIGS. 1 to 3, the use and management of the device are simplified, and the device is reduced in size and weight, so that the device can be transported and used on site. It becomes easy to carry in. In particular, since the
[0023]
【The invention's effect】
As described above, according to the rail exchanging device of the present invention, the new rail is installed on the device by its own arm and moving means, so that the Yamakoshi device, which has been indispensable in the past, is no longer necessary, and as a result, to the site. This eliminates problems such as the time and effort required to carry in and operate the Yamakoshi device.
[0024]
Further, since the structure of the rail exchanging device is simple, the use and management of the device are simplified, the device is small and light, and the device can be easily transported and carried into the site. In particular, since the arm can be folded, the rail exchanging device can be downsized to the extent that it is within the vehicle limit.
[Brief description of the drawings]
FIG. 1 is a front view taken along an arrow I in FIG. 2 showing an example of the structure of a rail exchanging device according to the present invention.
FIG. 2 is a top view taken along the arrow II in FIG. 1 showing an example of the structure of the rail exchange device of the present invention.
FIG. 3 is a side view taken along the arrow III in FIG. 2 showing an example of the structure of the rail exchanging device of the present invention.
FIG. 4 is a top view showing a procedure of rail replacement by the rail replacement device of the present invention.
FIG. 5 is a top view showing a procedure of rail exchange by the rail exchange device of the present invention.
FIG. 6 is a top view showing a procedure of rail replacement by the rail replacement device of the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1
D Roadbed R1 Old rail (existing rail)
R2 new rail
Claims (3)
敷設された前記既設レール上を走行する駆動輪を備える台車と、
この台車上にレールの敷設方向と直交して延設され且つ先端が前記新レールの仮置き位置上に位置するアームと、
このアーム上に、その延設方向に沿って移動可能に支持され且つ前記新レールを上方から上下動自在に把持するクランパを備えた移動手段と、
前記新レールの仮置き位置より内側にて前記アームの下方に設けられ、前記移動手段により移動された前記新レールを、前記レール敷設位置より上方にて支持する支持手段と、
前記駆動輪を回転駆動させて装置全体を走行させる駆動源と、
前記新レールを移動手段で把持して移動させて前記支持手段に載置した状態で、前記装置全体の走行に応じて新レールを内側に絞り込む外ローラとを有することを特徴とする鉄道用レール交換装置。The pair of left and right existing rails laid on the road bed of the railway is removed, and new rails temporarily placed in parallel on the road bed outside the existing rails are laid at the rail laying position after the existing rails are removed. Railway rail exchanging device used when
A carriage provided with driving wheels that run on the installed rails;
An arm extending perpendicularly to the rail laying direction on the carriage and having a tip positioned on the temporary placement position of the new rail;
On the arm, and moving means comprising a clamper for gripping vertically movably its extended along the direction being movably supported and the new rail from above,
Support means provided below the arm on the inner side of the temporary placement position of the new rail and supporting the new rail moved by the moving means above the rail laying position;
A drive source for rotating the drive wheel to travel the entire apparatus ;
A rail for rails having an outer roller for narrowing the new rail inward according to the travel of the entire apparatus in a state where the new rail is gripped and moved by the moving means and placed on the support means Exchange equipment.
前記移動手段を前記新レールの仮置き位置上に配し、前記新レールの端部をクランパによって上方から把持し、
把持した前記新レールの端部を持ち上げ、前記移動手段を内側に移動させて前記支持手段に載置した後、前記移動手段による前記新レールの把持を解除し、
更に前記レール交換装置を前進させることにより、前記新レールを前記支持手段を経て後方に導くとともに外ローラによって前記既設レールの内側に落とし込み、
前記レール交換装置が走行した後の前記既設レールを、前記レール敷設位置の外側に排除した後、後方に導かれた前記新レールを前記レール敷設位置に敷設することを特徴とするレールの交換方法。The drive wheel of the rail exchanging device according to claim 1 or 2 is set on the existing rail,
The moving means is arranged on the temporary placement position of the new rail, the end of the new rail is gripped from above by a clamper ,
After lifting the end of the gripped new rail, moving the moving means inward and placing it on the support means, release the grip of the new rail by the moving means,
Furthermore, by advancing the rail exchanging device, the new rail is guided rearward through the support means and dropped into the existing rail by an outer roller ,
After exchanging the existing rail after the rail exchanging device travels outside the rail laying position, the new rail guided rearward is laid at the rail laying position. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14830697A JP3854368B2 (en) | 1997-06-05 | 1997-06-05 | Railway rail exchanging apparatus and rail exchanging method using the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14830697A JP3854368B2 (en) | 1997-06-05 | 1997-06-05 | Railway rail exchanging apparatus and rail exchanging method using the same |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10338902A JPH10338902A (en) | 1998-12-22 |
JP3854368B2 true JP3854368B2 (en) | 2006-12-06 |
Family
ID=15449846
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14830697A Expired - Lifetime JP3854368B2 (en) | 1997-06-05 | 1997-06-05 | Railway rail exchanging apparatus and rail exchanging method using the same |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3854368B2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6000804A (en) * | 1997-09-30 | 1999-12-14 | Shiseido Co., Ltd. | Colored light retroreflective material and retroreflective hologram reconstructor using the same |
CN103496565B (en) * | 2013-10-14 | 2016-07-06 | 中国水利水电第十四工程局有限公司 | Underground workshop concrete ledge track installation fortune rail device and fortune rail method |
JP6268411B2 (en) * | 2015-03-09 | 2018-01-31 | 大鉄工業株式会社 | Rail switch |
JP7083108B2 (en) * | 2018-06-08 | 2022-06-10 | 東日本旅客鉄道株式会社 | Railroad rail loading and unloading equipment |
CN109629354B (en) * | 2018-12-11 | 2023-10-20 | 株洲旭阳机电科技开发有限公司 | Roller retraction device for rail laying, tractor and rail laying operation method |
GB2608636A (en) * | 2021-07-08 | 2023-01-11 | Txm Plant Ltd | Railway-works support apparatus |
-
1997
- 1997-06-05 JP JP14830697A patent/JP3854368B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH10338902A (en) | 1998-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA1133758A (en) | Mobile apparatus for receiving and laying an assembled track switch or crossing section | |
CA1290618C (en) | Mobile installation for loading, transporting and unloading as well as exchanging railroad ties | |
US5357867A (en) | Machine for renewing or laying a railway track | |
EP2094912B1 (en) | Self-propelled rail unloading machine | |
SU1101176A3 (en) | Moable machine for butt resistance welding by rail flashing | |
JP4713016B2 (en) | Machine and method for removing old track and laying new track | |
US5619928A (en) | Apparatus for transporting an assembled track section | |
RU1830098C (en) | Device for longitudinal movement of pails of rail-road track | |
CA2166438C (en) | Machine and an installation for implementing track maintenance operations | |
GB2024288A (en) | Machine for replacing the rails and sleepers of a railway track | |
CA1312784C (en) | Tie exchange machine | |
JP4713017B2 (en) | Orbit changer | |
CA2556312A1 (en) | Machine for the transport of track switches, and method | |
JP3854368B2 (en) | Railway rail exchanging apparatus and rail exchanging method using the same | |
US5778794A (en) | Machine for laying a railroad track having multiple-part carrier frame connected by a disengageable joint | |
CN1100922C (en) | Machine for dismantling old track and laying new track | |
GB2157347A (en) | A travelling machine and a process for taking up and/or laying track panels | |
RU2082847C1 (en) | Sleeper padding machine and method of rail track padding | |
CA1295187C (en) | Mobile tie gang apparatus and tie exchange method | |
JP3856564B2 (en) | Steel pipe pile driving device and steel pipe pile driving method | |
JP2648105B2 (en) | Rail exchange device for railway and rail exchange method using the same | |
CA3034174A1 (en) | Method for unloading, transporting and installing a railway track | |
JP2555508B2 (en) | Rail seam spacing correction device | |
CN118008397A (en) | Waterproof laying structure based on tunnel inverted arch trestle is integrative | |
RU2144125C1 (en) | Machine for repair of contact system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040601 |
|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20040617 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20040617 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050928 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051206 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060203 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060815 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060908 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100915 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100915 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110915 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110915 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |