JPH08128568A - Holding tool for boring sleeve pipe in reinforced concrete structure and boring method using this holding tool for reinforced concrete structure - Google Patents

Holding tool for boring sleeve pipe in reinforced concrete structure and boring method using this holding tool for reinforced concrete structure

Info

Publication number
JPH08128568A
JPH08128568A JP26963494A JP26963494A JPH08128568A JP H08128568 A JPH08128568 A JP H08128568A JP 26963494 A JP26963494 A JP 26963494A JP 26963494 A JP26963494 A JP 26963494A JP H08128568 A JPH08128568 A JP H08128568A
Authority
JP
Japan
Prior art keywords
ring member
sleeve pipe
holding
reinforced concrete
holding ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26963494A
Other languages
Japanese (ja)
Other versions
JP2673106B2 (en
Inventor
Hideaki Sakata
秀昭 坂田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP6269634A priority Critical patent/JP2673106B2/en
Publication of JPH08128568A publication Critical patent/JPH08128568A/en
Application granted granted Critical
Publication of JP2673106B2 publication Critical patent/JP2673106B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

PURPOSE: To provide a holding tool for a sleeve pipe for a boring method using this holding tool for a reinforced concrete structure by which the sleeve pipe can be held without any shift or deflection of an axis and boring can be carried out in the predetermined position. CONSTITUTION: A holding tool 1 consists of a holding ring member 2 and flexible mounting wire members 3 which extend outward in at least three directions at approximately equal angles from the holding ring member 2. The holding ring member 2 in the holding tool 1 is arranged in a sleeve pipe 5 arrangement position of a reinforcement 9 by fixing each of the radial mounting wire members 3 in the nearest reinforcement, and the sleeve pipe 5 is passed through the holding ring member 2, while a concrete placing area is formed with formwork, and after hardening of the placed concrete, the formwork and the sleeve pipe 5 are removed, and consequently, a hole 10 is formed in a remaining hole from which the sleeve pipe 5 is pulled out, while the holding tool 1 is buried.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄筋コンクリート建造物
の壁、床、梁等における孔施工用スリーブ管の保持具お
よびこの保持具を用いた鉄筋コンクリート建造物の孔施
工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a holder for a sleeve tube for constructing holes in walls, floors, beams and the like of reinforced concrete structures and a method for constructing holes in reinforced concrete structures using the retainers.

【0002】[0002]

【従来の技術】従来、鉄筋コンクリート建造物における
孔を施工する場合、図9および図10に示す通り、鉄筋50
の表側と裏側に支持棒材51をそれぞれ架設して、この支
持棒材51上に保持具52を乗せて鉄線53で緩く仮止めした
後、両保持具52に渡りスリーブ管54を貫挿して、型枠55
によりコンクリート打設空間56を形成し、打設して、コ
ンクリートが硬化した後に型枠55を外して、スリーブ管
54の抜き跡に孔を形成している。ところが、仮止め状態
にあるスリーブ管は、打設時におけるコンクリートの圧
力を受けて、保持環部材ともども支持棒材上を左右方向
に動いてしまうことが有り、この場合、スリーブ管の軸
線が平行移動してズレたり、振れてブレたまま施工され
ることになるので、結果として孔を所定の位置に形成で
きないという問題がある。
2. Description of the Related Art Conventionally, when constructing a hole in a reinforced concrete building, as shown in FIG. 9 and FIG.
Support rods 51 are erected on the front side and the back side, respectively, and a holder 52 is placed on the support rods 51 and loosely temporarily fixed with an iron wire 53, and then a sleeve tube 54 is inserted through both holders 52. , Formwork 55
Form a concrete pouring space 56 by pouring, after the concrete hardens, remove the form 55,
A hole is formed in the trace of 54. However, the temporarily fixed sleeve tube may move left and right on the support rod together with the retaining ring member due to the pressure of concrete during casting, in which case the axis of the sleeve tube is parallel. There is a problem that the hole cannot be formed at a predetermined position as a result because the work is moved and displaced, or shaken and the work is performed while being shaken.

【0003】この軸線ズレの問題は、支持棒材にスリー
ブ管を動かないように固定できれば解決するのである
が、仮に固定した場合には、スリーブ管は軸線方向への
動きもできなくなるので、型枠によりコンクリート打設
空間を形成する際に、鉄筋と打設空間の位置関係に調整
が必要である時に求められるスリーブ管の出入り(軸線
方向の動き:約5〜7mm程度)が不可能になって、施工
条件が制限されることになる。
The problem of the axial displacement can be solved if the sleeve pipe can be fixed to the support rod so as not to move. However, if the sleeve pipe is fixed, the sleeve pipe cannot move in the axial direction. When forming the concrete pouring space by the frame, it becomes impossible to move the sleeve tube in and out (axial movement: about 5 to 7 mm), which is required when the positional relationship between the reinforcing bars and the pouring space needs to be adjusted. Therefore, construction conditions will be limited.

【0004】[0004]

【発明が解決しようとする課題】解決しようとする課題
は、スリーブ管が出入り可能に保持環部材を緩く仮止め
していることによって、スリーブ管に軸線のズレおよび
ブレが発生するのを阻止できないことであり、孔を所定
の位置に施工できないことである。
The problem to be solved by the invention is that the sleeve tube temporarily loosens the retaining ring member so that the sleeve tube can move in and out, so that the sleeve tube cannot be prevented from being displaced or shaken. That is, it is impossible to construct a hole at a predetermined position.

【0005】[0005]

【課題を解決するための手段】前記の課題を解決するた
め、鉄筋コンクリート建造物における孔施工用スリーブ
管の保持具では、スリーブ管を略同心状に保持可能な径
の保持環部材と、この保持環部材から外向きに少なくと
も三方へほぼ等角度状に伸びて、鉄筋に止着可能な可撓
性取付線部材よりなることを特徴とする。
In order to solve the above-mentioned problems, in a holder for a sleeve pipe for hole construction in a reinforced concrete structure, a holding ring member having a diameter capable of holding the sleeve pipe substantially concentrically, and this holding member. It is characterized in that it comprises a flexible attachment wire member that extends outwardly from the ring member in at least three directions in a substantially equiangular manner and can be fixed to the reinforcing bar.

【0006】また本発明の保持具では、保持環部材が、
同保持環部材の少なくとも三方に軸線方向に沿うガイド
部材を略等間隔状に備えていることを特徴とする。
In the holder of the present invention, the holding ring member is
It is characterized in that guide members along the axial direction are provided on at least three sides of the holding ring member at substantially equal intervals.

【0007】本発明における保持環部材はプレス成型品
または棒材を環状に巻回して形成した金属製のものであ
り、取付線部材は鉄筋に溶接または絡ませて止着可能な
可撓性の金属製のものである。また、ガイド部材は帯状
または棒状のもので、保持環部材の内面または側面に形
成し、金属製である。
The holding ring member in the present invention is a press-formed product or a metal member formed by winding a rod in an annular shape, and the attachment wire member is a flexible metal which can be welded or entwined with a reinforcing bar to be fixed. It is made. Further, the guide member is a belt-shaped or rod-shaped member, is formed on the inner surface or the side surface of the holding ring member, and is made of metal.

【0008】そして、鉄筋コンクリート建造物の孔施工
方法では、保持環部材と、この保持環部材から外向きに
少なくとも三方へほぼ等角度状に伸びている可撓性取付
線部材よりなる保持具を用いて施工する鉄筋コンクリー
ト建造物の施工方法であって、組まれた鉄筋におけるス
リーブ管配設位置に保持環部材を、放射状の各取付線部
材を最寄りの鉄筋にそれぞれ止着することにより架設
し、然る後に、保持環部材にスリーブ管を貫挿して、型
枠によりコンクリート打設空間を形成し、打設後のコン
クリート硬化後に型枠およびスリーブ管を外して、スリ
ーブ管の抜き跡に孔を形成すると共に、保持具を埋設施
工するようにしたことを特徴とする。
In the method of constructing a hole in a reinforced concrete structure, a holding tool including a holding ring member and a flexible mounting wire member extending outwardly from the holding ring member in at least three directions at substantially equal angles is used. A method of constructing a reinforced concrete structure to be constructed by constructing a retaining ring member at the sleeve pipe arrangement position in the assembled reinforcing bar, erection by fixing each radial mounting wire member to the nearest reinforcing bar, After that, the sleeve pipe is inserted through the retaining ring member to form the concrete pouring space by the formwork, and after the concrete is hardened after setting, the formwork and the sleeve pipe are removed, and holes are formed in the sleeve pipe extraction marks. In addition, it is characterized in that the holder is embedded.

【0009】[0009]

【作用】保持具が、スリーブ管を略同心状に保持可能な
径の保持環部材と、この保持環部材から外向きに少なく
とも三方へほぼ等角度状に伸びて、鉄筋に止着可能な可
撓性取付線部材よりなるため、鉄筋におけるスリーブ管
配設位置に保持環部材を、放射状の各取付線部材を最寄
りの鉄筋部分にそれぞれ止着して架設することができる
と共に、この保持環部材は架設された状態で、軸線方向
と交差する径方向への動きがなくなるので、打設時のコ
ンクリート圧力によってスリーブ管の軸線がズレたりブ
レ動かないように保持することができる。そして保持環
部材は架設された状態で、鉄筋に対して可撓性の取付線
部材を経て、軸線上を軸線方向に動き可能であるから、
スリーブ管を固定した状態で同管の出入りに応動するこ
とができる。
The holder has a holding ring member having a diameter capable of holding the sleeve tube substantially concentrically, and extends outward from the holding ring member in at least three directions at substantially equal angles so that the holding member can be fixed to the reinforcing bar. Since it is made of a flexible mounting wire member, a retaining ring member can be installed at the sleeve pipe disposition position in the reinforcing bar, and each radial mounting wire member can be fixedly attached to the nearest reinforcing bar portion. Since it does not move in the radial direction intersecting the axial direction in the installed state, it can be held so that the axial line of the sleeve pipe does not shift or shake due to the concrete pressure at the time of placing. Since the retaining ring member is erected, it can move in the axial direction on the axis through the flexible attaching wire member with respect to the reinforcing bar.
It is possible to respond to the entrance and exit of the sleeve tube with the tube fixed.

【0010】また保持環部材が、同保持環部材の少なく
とも三方に軸線方向に沿うガイド部材を略等間隔状に備
えているため、保持環部材にスリーブ管を保持する際
に、ガイド部材がスリーブ管を軸線方向に誘導して支持
することができる。
Further, since the holding ring member is provided with guide members extending along the axial direction in at least three directions of the holding ring member at substantially equal intervals, when the holding ring member holds the sleeve tube, the guide member has a sleeve. The tube can be axially guided and supported.

【0011】そして、孔施工方法では、保持環部材と、
この保持環部材から外向きに少なくとも三方へほぼ等角
度状に伸びている可撓性取付線部材よりなる保持具を用
いて施工する鉄筋コンクリート建造物の施工方法であっ
て、組まれた鉄筋におけるスリーブ管配設位置に保持環
部材を、放射状の各取付線部材を最寄りの鉄筋にそれぞ
れ止着することにより架設し、然る後に、保持環部材に
スリーブ管を貫挿して、型枠によりコンクリート打設空
間を形成し、打設後のコンクリート硬化後に型枠および
スリーブ管を外して、スリーブ管の抜き跡に孔を形成す
ると共に、保持具を埋設施工するようにしてあるため、
コンクリート打設空間を形成する際にスリーブ管が軸線
方向に出入りして所定の打設空間を確立できると共に、
打設時にスリーブ管がズレたりブレたりしないので、ス
リーブ管の抜き跡には所定の位置関係の孔を施工するこ
とができる。
Then, in the hole construction method, the holding ring member,
A method for constructing a reinforced concrete structure, which is constructed by using a retainer made of a flexible attachment wire member extending outwardly from the retaining ring member in at least three directions at substantially equal angles, wherein a sleeve in a rebar is assembled. A retaining ring member is installed at the pipe installation position by fixing each radial mounting wire member to the nearest reinforcing bar, and after that, a sleeve pipe is inserted into the retaining ring member and concrete-cast by a formwork. Forming the installation space, removing the formwork and sleeve tube after the concrete has hardened after casting, forming a hole in the extraction mark of the sleeve tube, and embedding the holding tool,
When forming a concrete pouring space, the sleeve pipe can move in and out in the axial direction to establish a predetermined pouring space,
Since the sleeve tube is not displaced or shaken at the time of driving, a hole having a predetermined positional relationship can be formed in the extraction mark of the sleeve tube.

【0012】[0012]

【実施例】図1には本発明の第1実施例の保持具(図2
参照)を用いて施工した鉄筋コンクリート建造物におけ
る孔周りを例示しており、この保持具1は、スリーブ管
5を略同心状に保持可能な径の保持環部材2と、この保
持環部材2から外向きに四方へ等角度状に伸びて、鉄筋
9に絡めて止着可能な適宜長さの可撓性取付線部材3と
で構成してある。保持環部材2は金属丸棒を丸めて、両
端を溶接して接合してあり、この保持環部材2から伸び
る取付線部材3は同線部材の一部を環部材に沿わせて溶
接固定して接合強度を高めてある。
FIG. 1 shows a holder according to a first embodiment of the present invention (see FIG. 2).
The holding tool 1 has a holding ring member 2 having a diameter capable of holding the sleeve pipe 5 in a substantially concentric manner, and the holding ring member 2 from the holding ring member 2. The flexible mounting wire member 3 extends outward in all directions at equal angles and is entangled with the reinforcing bar 9 so as to be fastened. The holding ring member 2 is formed by rolling a metal round bar and joining both ends by welding, and the attaching wire member 3 extending from the holding ring member 2 is fixed by welding along a part of the wire member. The joint strength is increased.

【0013】そして、保持具1は、厚いコンクリート躯
体8における鉄筋9のスリーブ管5配設位置の両側に、
それぞれに放射状の各取付線部材3を鉄筋9の最寄りの
上下左右部分にそれぞれ絡めて止着した状態に埋設され
ており、両保持環部材2に亘って貫挿状のスリーブ管5
の抜き跡には孔10が成形されている。
The holder 1 is provided on both sides of the sleeve pipe 5 of the reinforcing bar 9 in the thick concrete frame 8,
The radial mounting wire members 3 are embedded in a state in which they are entwined and fastened to the nearest upper, lower, left, and right portions of the reinforcing bar 9, respectively.
A hole 10 is formed in the extraction trace of.

【0014】これにより、孔10が所定の位置関係にある
厚いコンクリート躯体8を得ることができる。
As a result, it is possible to obtain a thick concrete skeleton 8 having the holes 10 in a predetermined positional relationship.

【0015】図3には本発明の保持具の第2実施例を例
示しており、構成は前記した第1実施例のものと基本的
に同一であるため、共通している構成の説明を省略し、
相違する構成について説明する。
FIG. 3 illustrates a second embodiment of the holder of the present invention, and since the structure is basically the same as that of the above-described first embodiment, a description of the common structure will be given. Omitted,
The different configuration will be described.

【0016】保持具1における取付線部材3は保持環部
材2からを三方へ等角度状に伸びて、いる。
The attachment wire member 3 of the holder 1 extends from the holding ring member 2 in three directions at equal angles.

【0017】図4には本発明の保持具の第3実施例を例
示しており、構成は前記した第1実施例のものと基本的
に同一であるため、共通している構成の説明を省略し、
相違する構成について説明する。
FIG. 4 illustrates a third embodiment of the holder of the present invention. Since the structure is basically the same as that of the first embodiment described above, the description of the common structure will be given. Omitted,
The different configuration will be described.

【0018】保持具1における取付線部材3は端部を保
持環部材2に溶接して点接合してある。
The attachment wire member 3 of the holder 1 is welded at its end to the holding ring member 2 to be point-joined.

【0019】図5には本発明の第4実施例の保持具(図
6のA参照)を用いて施工した鉄筋コンクリート建造物
における孔周りを例示している。この保持具1は、構成
が前記した第1実施例のものと基本的に同一であるた
め、共通している構成の説明を省略して、相違する構成
について説明すると、保持具1における保持環部材2は
片面側の四方に軸線と平行状のガイド部材4を等間隔状
に配設してある。このガイド部材4は金属丸棒端を保持
環部材2に溶接して接合固定している。
FIG. 5 illustrates the periphery of a hole in a reinforced concrete building constructed using the holder of the fourth embodiment of the present invention (see A in FIG. 6). Since the structure of this holder 1 is basically the same as that of the first embodiment described above, a description of the common structure will be omitted and a different structure will be described. The member 2 is provided with guide members 4 parallel to the axis line at equal intervals on four sides on one side. The guide member 4 is welded and fixed to the holding ring member 2 by welding the end of the metal round bar.

【0020】そして、保持具1は、薄いコンクリート躯
体8における鉄筋9のスリーブ管5配設位置に、放射状
の各取付線部材3を鉄筋9の最寄りの上下左右部分にそ
れぞれ絡めて止着した状態に埋設されており、この保持
環部材2にガイド部材4で軸線方向を誘導規制されて貫
挿状のスリーブ管5の抜き跡には孔10が成形されてい
る。
The holder 1 is in a state in which the radial mounting wire members 3 are entwined and fastened to the positions where the sleeve pipes 5 of the reinforcing bars 9 are arranged in the thin concrete skeleton 8 while being entwined with the nearest upper, lower, left and right portions of the reinforcing bars 9. A hole 10 is formed in the retaining ring member 2 at a cutout of a sleeve tube 5 which is axially guided and regulated by a guide member 4 in the holding ring member 2.

【0021】これにより、一つの孔10に一つの保持具1
で、孔10が所定の位置関係にある薄いコンクリート躯体
8を得ることができる。
As a result, one holder 1 is provided for each hole 10.
Thus, it is possible to obtain a thin concrete skeleton body 8 in which the holes 10 have a predetermined positional relationship.

【0022】図6のBには本発明の保持具の第5実施例
を例示しており、構成は前記した第4実施例のものと基
本的に同一であるため、共通している構成の説明を省略
し、相違する構成について説明する。
FIG. 6B shows a fifth embodiment of the holder of the present invention, and since the constitution is basically the same as that of the above-mentioned fourth embodiment, it has a common constitution. Description will be omitted, and different configurations will be described.

【0023】ガイド部材4は両面側に交互に配設してあ
る。
The guide members 4 are alternately arranged on both sides.

【0024】図6のCには本発明の保持具の第6実施例
を例示しており、構成は前記した第4実施例のものと基
本的に同一であるため、共通している構成の説明を省略
し、相違する構成について説明する。
FIG. 6C shows a sixth embodiment of the holder of the present invention, and since the structure is basically the same as that of the above-mentioned fourth embodiment, it has a common structure. Description will be omitted, and different configurations will be described.

【0025】ガイド部材4は両面側にそれぞれ配設して
ある。
The guide members 4 are arranged on both sides, respectively.

【0026】図7には本発明の保持具1の鉄筋9に対す
るその他の架設例を例示しており、鉄筋9の左右部分に
各取付線部材3をそれぞれ絡めて止着している。
FIG. 7 illustrates another example of the installation of the holder 1 of the present invention to the reinforcing bar 9, in which the attachment wire members 3 are entwined and fastened to the left and right parts of the reinforcing bar 9.

【0027】図8には前記第1実施例の保持具1を用い
て施工した本発明の鉄筋コンクリート建造物の孔施工方
法を工程順に例示している。 第1工程(図8のA) 組まれた鉄筋9におけるスリーブ管5配設位置の両側に
それぞれ保持具1を、保持環部材2が軸線と一致するよ
うに、放射状の各取付線部材3を鉄筋9の最寄りの上下
左右部分にそれぞれ止着することにより架設する。 第2工程(図8のB) 両保持環部材2に亘りスリーブ管5を貫挿して、型枠6
によりコンクリート打設空間7を形成する。 第3工程(図8のC) コンクリート打設空間7にコンクリートを流し込み打設
する。 第4工程(図8のD) コンクリート硬化後に型枠6を外す。 第5工程(図8のE) スリーブ管5を抜き取り、その抜き取り跡に孔10が所定
の位置関係に形成されたコンクリート躯体8を打設成形
する。
FIG. 8 illustrates, in the order of steps, a method of constructing a hole in a reinforced concrete building of the present invention constructed using the holder 1 of the first embodiment. First step (A in FIG. 8) The holders 1 are respectively provided on both sides of the sleeve pipe 5 provided in the assembled rebar 9, and the radial mounting wire members 3 are provided so that the holding ring members 2 are aligned with the axis. It is erected by being fastened to the upper, lower, left and right parts of the reinforcing bar 9 respectively. Second step (B in FIG. 8) The sleeve tube 5 is inserted through both the retaining ring members 2 to form the mold 6
The concrete placing space 7 is formed by. Third step (C in FIG. 8) Concrete is poured into the concrete placing space 7 and placed. Fourth step (D in FIG. 8) The mold 6 is removed after the concrete is hardened. Fifth Step (E in FIG. 8) The sleeve pipe 5 is extracted, and a concrete skeleton 8 in which holes 10 are formed in a predetermined positional relationship in the extraction trace is cast and formed.

【0028】これにより、コンクリート打設空間7を形
成する際に、スリーブ管5がその両端をそれぞれ保持具
1に保持・案内されて軸線方向に出入りするので、所定
の打設空間7を確立できると共に、打設時にスリーブ管
5がズレやブレたりしないから、スリーブ管5の抜き跡
に所定の位置関係の孔10を施工することができる。
As a result, when the concrete placing space 7 is formed, the sleeve pipe 5 is held and guided by the holders 1 at both ends thereof and moves in and out in the axial direction, so that the predetermined placing space 7 can be established. At the same time, since the sleeve pipe 5 does not shift or shake during the driving, the hole 10 having a predetermined positional relationship can be formed in the trace of the sleeve pipe 5.

【0029】[0029]

【発明の効果】【The invention's effect】

A.請求項1により、スリーブ管を略同心状に保持可能
な径の保持環部材と、この保持環部材から外向きに少な
くとも三方へほぼ等角度状に伸びて、鉄筋に止着可能な
可撓性取付線部材よりなるため、鉄筋におけるスリーブ
管配設位置に保持環部材を、放射状の各取付線部材を最
寄りの鉄筋部分にそれぞれ止着して架設することができ
ると共に、この保持環部材は架設された状態で、軸線方
向と交差する径方向への動きがなくなるので、打設時の
コンクリート圧力によってスリーブ管の軸線がズレ動か
ないように保持することができる。そして、保持環部材
は架設された状態で、鉄筋に対して取付線部材を経て、
軸線上を軸線方向に動き可能であるから、スリーブ管を
固定した状態で同管の出入りに応動することができる。
A. According to claim 1, a holding ring member having a diameter capable of holding the sleeve tube substantially concentrically, and a flexibility that extends outward from the holding ring member in at least three directions at substantially equal angles and can be fixed to the reinforcing bar. Since it is composed of the attachment wire member, the retaining ring member can be installed at the position where the sleeve pipe is arranged on the reinforcing bar, and each radial mounting wire member can be fixedly attached to the nearest reinforcing bar portion. In this state, since there is no radial movement that intersects the axial direction, it is possible to keep the axial line of the sleeve pipe from shifting due to the concrete pressure at the time of placing. Then, the retaining ring member is in the erected state, through the attachment wire member to the reinforcing bar,
Since it is movable on the axis in the axial direction, it is possible to respond to the entrance and exit of the tube with the sleeve tube fixed.

【0030】B.請求項2により、保持環部材が、同保
持環部材の少なくとも三方に軸線方向に沿うガイド部材
を略等間隔状に備えているため、保持環部材にスリーブ
管を保持する際に、ガイド部材がスリーブ管を軸線方向
に誘導して支持することができる。また、ガイド部材で
スリーブ管を軸線方向に誘導して支持できるので、コン
クリート打設空間が薄い場合等では、打設空間の中央に
保持具を配設することによって、一つの保持具でスリー
ブ管を軸線のズレおよびブレが発生しないように保持す
ることができる。
B. According to claim 2, since the holding ring member is provided with guide members extending along the axial direction in at least three directions of the holding ring member at substantially equal intervals, when the holding ring member holds the sleeve tube, The sleeve tube can be guided and supported in the axial direction. In addition, since the guide member can guide and support the sleeve pipe in the axial direction, when the concrete pouring space is thin, by disposing the holder in the center of the pouring space, the sleeve pipe can be held by one holder. Can be held so that the axis is not displaced or shaken.

【0031】C.請求項3により、組まれた鉄筋におけ
るスリーブ管配設位置に保持環部材を、放射状の各取付
線部材を最寄りの鉄筋にそれぞれ止着することにより架
設し、然る後に、保持環部材にスリーブ管を貫挿して、
型枠によりコンクリート打設空間を形成し、打設後のコ
ンクリート硬化後に型枠およびスリーブ管を外して、保
持具を埋設施工するようにしてあるため、コンクリート
打設空間を形成する際にスリーブ管が軸線方向に出入り
して所定の打設空間を確立できると共に、打設時にスリ
ーブ管がズレたりブレたりしないので、スリーブ管の抜
き跡には所定の位置関係の孔を施工することができる。
C. According to claim 3, a retaining ring member is installed at a sleeve pipe arrangement position in the assembled reinforcing bar by fixing each radial mounting wire member to the nearest reinforcing bar, and thereafter, the retaining ring member is sleeved. Insert the tube,
Since the concrete pouring space is formed by the formwork, and after the concrete is hardened after the pouring, the formwork and the sleeve pipe are removed, and the retainer is embedded, so that the sleeve pipe is formed when the concrete pouring space is formed. Can move in and out in the axial direction to establish a predetermined casting space, and since the sleeve pipe does not shift or shake during the driving, holes having a predetermined positional relationship can be formed in the sleeve pipe withdrawal mark.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の第1実施例の保持具を用いて施工し
た厚い鉄筋コンクリート建造物における孔周りを例示し
ている斜視図で一部切欠している。
FIG. 1 is a partial cutaway view showing a periphery of a hole in a thick reinforced concrete building constructed by using the holder according to the first embodiment of the present invention.

【図2】 本発明の保持具の第1実施例を例示している
拡大正面図。
FIG. 2 is an enlarged front view illustrating the first embodiment of the holder of the present invention.

【図3】 本発明の保持具の第2実施例を例示している
拡大正面図。
FIG. 3 is an enlarged front view illustrating the second embodiment of the holder of the present invention.

【図4】 本発明の保持具の第3実施例を例示している
部分拡大正面図。
FIG. 4 is a partially enlarged front view illustrating a third embodiment of the holder of the present invention.

【図5】 本発明の第1実施例の保持具を用いて施工し
た薄い鉄筋コンクリート建造物における孔周りを例示し
ている斜視図で一部切欠している。
FIG. 5 is a partially cutaway perspective view illustrating the periphery of a hole in a thin reinforced concrete building constructed using the holder according to the first embodiment of the present invention.

【図6】 (A)は本発明の保持具の第4実施例を、
(B)は本発明の保持具の第5実施例を、(C)は本発
明の保持具の第6実施例を、それぞれ例示している各縦
断面図。
FIG. 6A is a fourth embodiment of the holder of the present invention,
(B) is each longitudinal cross-sectional view which respectively illustrates the fifth embodiment of the holder of the present invention and (C) the sixth embodiment of the holder of the present invention.

【図7】 本発明の保持具の鉄筋に対するその他の架設
例を例示している正面図。
FIG. 7 is a front view illustrating another example of the installation of the holder of the present invention with respect to the reinforcing bar.

【図8】 本発明の鉄筋コンクリート建造物の孔施工方
法を工程順に例示しており、(A)は第1工程を、
(B)は第2工程を、(C)は第3工程を、(D)は第
4工程を、(E)は第5工程を、それぞれ示している各
縦断面図。
FIG. 8 illustrates a method for constructing a hole in a reinforced concrete building according to the present invention in the order of steps, in which (A) shows the first step,
(B) The 2nd process, (C) The 3rd process, (D) The 4th process, (E) The 5th process of each longitudinal section.

【図9】 従来の施工例を示す正面図。FIG. 9 is a front view showing a conventional construction example.

【図10】 同縦断面図。FIG. 10 is a vertical sectional view of the same.

【符号の説明】[Explanation of symbols]

1,52 保持具 2 保持具の
保持環部材 3 保持具の取付線部材 4 保持具の
ガイド部材 5,54 スリーブ管 6,55 型枠 7,56 コンクリート打設空間 8 コンクリ
ート躯体 9,50 鉄筋 10 孔 51 支持棒材 53 鉄線
1,52 Retainer 2 Retainer retaining ring member 3 Retainer mounting wire member 4 Retainer guide member 5,54 Sleeve tube 6,55 Formwork 7,56 Concrete placing space 8 Concrete skeleton 9,50 Reinforcing bar 10 Hole 51 Support rod 53 Iron wire

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 スリーブ管を略同心状に保持可能な径の
保持環部材と、この保持環部材から外向きに少なくとも
三方へほぼ等角度状に伸びて、鉄筋に止着可能な可撓性
取付線部材よりなることを特徴とする鉄筋コンクリート
建造物における孔施工用スリーブ管の保持具。
1. A holding ring member having a diameter capable of holding a sleeve tube in a substantially concentric manner, and a flexibility which extends outward from the holding ring member in at least three directions at substantially equal angles and can be fixed to a reinforcing bar. A holder for a sleeve pipe for constructing a hole in a reinforced concrete structure, comprising a mounting wire member.
【請求項2】 前記保持環部材が、同保持環部材の少な
くとも三方に軸線方向に沿うガイド部材を略等間隔状に
備えていることを特徴とする請求項1記載の鉄筋コンク
リート建造物における孔施工用スリーブ管の保持具。
2. The hole construction in a reinforced concrete building according to claim 1, wherein the retaining ring member is provided with guide members along the axial direction on at least three sides of the retaining ring member at substantially equal intervals. Sleeve tube holder.
【請求項3】 保持環部材と、この保持環部材から外向
きに少なくとも三方へほぼ等角度状に伸びている可撓性
取付線部材よりなる保持具を用いて施工する鉄筋コンク
リート建造物の施工方法であって、組まれた鉄筋におけ
るスリーブ管配設位置に保持環部材を、放射状の各取付
線部材を最寄りの鉄筋部分にそれぞれ止着することによ
り架設し、然る後に、保持環部材にスリーブ管を貫挿し
て、型枠によりコンクリート打設空間を形成し、打設後
のコンクリート硬化後に型枠およびスリーブ管を外し
て、スリーブ管の抜き跡に孔を形成すると共に、保持具
を埋設施工するようにしたことを特徴とする鉄筋コンク
リート建造物の孔施工方法。
3. A method for constructing a reinforced concrete structure, which is constructed by using a holding ring member and a holding tool made of a flexible mounting wire member extending outward from the holding ring member in at least three directions at substantially equal angles. A retaining ring member is installed at the sleeve pipe disposition position in the assembled reinforcing bar by fixing each radial mounting wire member to the nearest reinforcing bar portion, and after that, the sleeve is attached to the retaining ring member. Insert the pipe, form a concrete pouring space with the formwork, remove the formwork and the sleeve pipe after setting the concrete after placing, form a hole in the extraction mark of the sleeve pipe, and embed the retainer A method for constructing a hole in a reinforced concrete building, characterized in that
JP6269634A 1994-11-02 1994-11-02 Holder for sleeve pipe for hole construction in reinforced concrete structure and method for making hole in reinforced concrete structure using this holder Expired - Lifetime JP2673106B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6269634A JP2673106B2 (en) 1994-11-02 1994-11-02 Holder for sleeve pipe for hole construction in reinforced concrete structure and method for making hole in reinforced concrete structure using this holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6269634A JP2673106B2 (en) 1994-11-02 1994-11-02 Holder for sleeve pipe for hole construction in reinforced concrete structure and method for making hole in reinforced concrete structure using this holder

Publications (2)

Publication Number Publication Date
JPH08128568A true JPH08128568A (en) 1996-05-21
JP2673106B2 JP2673106B2 (en) 1997-11-05

Family

ID=17475089

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6269634A Expired - Lifetime JP2673106B2 (en) 1994-11-02 1994-11-02 Holder for sleeve pipe for hole construction in reinforced concrete structure and method for making hole in reinforced concrete structure using this holder

Country Status (1)

Country Link
JP (1) JP2673106B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091869A (en) * 2007-10-12 2009-04-30 Sekisui House Ltd Sleeve holder
JP2010001703A (en) * 2008-06-23 2010-01-07 Nsp Corp Sleeve holder
JP2010174460A (en) * 2009-01-28 2010-08-12 Takiron Co Ltd Sheath pipe holder
CN103557372A (en) * 2013-11-14 2014-02-05 中国海洋石油总公司 Support structure of pipeline of underwater infrastructure
CN108532947A (en) * 2018-06-05 2018-09-14 中国五冶集团有限公司 For the service sleeve structure and its construction method in shear wall, floor
CN114837410A (en) * 2022-05-31 2022-08-02 中天建设集团有限公司 Beam-penetrating casing pipe positioning construction method for fabricated building
CN115573511A (en) * 2022-11-10 2023-01-06 广东达万建设有限公司 Modular building unit and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6021594U (en) * 1983-07-22 1985-02-14 シャープ株式会社 wall fan

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6021594U (en) * 1983-07-22 1985-02-14 シャープ株式会社 wall fan

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091869A (en) * 2007-10-12 2009-04-30 Sekisui House Ltd Sleeve holder
JP2010001703A (en) * 2008-06-23 2010-01-07 Nsp Corp Sleeve holder
JP2010174460A (en) * 2009-01-28 2010-08-12 Takiron Co Ltd Sheath pipe holder
CN103557372A (en) * 2013-11-14 2014-02-05 中国海洋石油总公司 Support structure of pipeline of underwater infrastructure
CN108532947A (en) * 2018-06-05 2018-09-14 中国五冶集团有限公司 For the service sleeve structure and its construction method in shear wall, floor
CN114837410A (en) * 2022-05-31 2022-08-02 中天建设集团有限公司 Beam-penetrating casing pipe positioning construction method for fabricated building
CN114837410B (en) * 2022-05-31 2024-03-12 中天建设集团有限公司 Beam penetrating sleeve positioning construction method for assembled building
CN115573511A (en) * 2022-11-10 2023-01-06 广东达万建设有限公司 Modular building unit and construction method thereof

Also Published As

Publication number Publication date
JP2673106B2 (en) 1997-11-05

Similar Documents

Publication Publication Date Title
JP2673106B2 (en) Holder for sleeve pipe for hole construction in reinforced concrete structure and method for making hole in reinforced concrete structure using this holder
KR102178763B1 (en) Connecting joint structure and connecting method of reinforced concrete column and installaion system of reinforced concrete column
JP4191583B2 (en) Construction method of cast-in-place concrete column and position fixing jig for column main reinforcement used for it
JP2822692B2 (en) Construction method of building using beam rebar
KR101621338B1 (en) Precast concrete segments applied to the framing unit set
JPH062331A (en) Construction method of cast-in-place reinforced concrete under-reamed pile and reinforced cage used therefor
JP2020097844A (en) Column-beam joint structure
JP4505249B2 (en) Reinforced concrete member joining structure and method for joining reinforced concrete members
JPH0744652Y2 (en) Mechanical joint hardware support structure
JPH0351849B2 (en)
JP7158997B2 (en) Joining structure and joining method of precast concrete members
JP2984626B2 (en) PC pillar construction method and its PC pillar
JP3981496B2 (en) Precast pillar unit
JP2001311152A (en) Holding device for earth retaining wall support
JP2023142326A (en) Precast concrete foundation beam structure
JPH0613793B2 (en) Concrete placing method for reinforced concrete structures
JP4537748B2 (en) Joining structure of cylindrical member and reinforced concrete member, and joining method of cylindrical member and reinforced concrete member
JP2022102970A (en) Opening formation method and opening reinforcement structure
JPH11131692A (en) Unit joint bar
JPH01178646A (en) Reinforcement of through-hole of beam and column
JP2006169917A (en) Method of forming foundation
JPH01207551A (en) Reinforcing metal piece for porous beam in ferroconcrete
JPH04130657U (en) Guide member for beam assembly reinforcement
JP2007063927A (en) Column unit
JP2836409B2 (en) Construction method of reinforced concrete wall using PC version

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080711

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090711

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20100711