JPH062331A - Construction method of cast-in-place reinforced concrete under-reamed pile and reinforced cage used therefor - Google Patents

Construction method of cast-in-place reinforced concrete under-reamed pile and reinforced cage used therefor

Info

Publication number
JPH062331A
JPH062331A JP18190692A JP18190692A JPH062331A JP H062331 A JPH062331 A JP H062331A JP 18190692 A JP18190692 A JP 18190692A JP 18190692 A JP18190692 A JP 18190692A JP H062331 A JPH062331 A JP H062331A
Authority
JP
Japan
Prior art keywords
pile
widening
reinforcing bar
cast
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18190692A
Other languages
Japanese (ja)
Other versions
JPH0715167B2 (en
Inventor
Masayasu Ishijima
正康 石島
Yoshimi Shimatani
欣巳 嶋谷
Masao Miyake
政夫 三宅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUGO KISO KOGYO KK
Original Assignee
MARUGO KISO KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUGO KISO KOGYO KK filed Critical MARUGO KISO KOGYO KK
Priority to JP18190692A priority Critical patent/JPH0715167B2/en
Publication of JPH062331A publication Critical patent/JPH062331A/en
Publication of JPH0715167B2 publication Critical patent/JPH0715167B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To construct a cast-in-place reinforced concrete under-reamed having simple construction with high work efficiency at a low cost. CONSTITUTION:For constructing a cast-in-place reinforced concrete under-reamed pile, hollow lead pipes 3 are fixed to a cylindrical reinforced cage B positioned in a pile widening section in parallel crosses, and under-reamed pile reinforced widening cages freely inserting slide reinforcing bars 5 fixed to widening section reinforcing bars 4 in a slidable manner are used for the lead pipes 3. The under- reamed pile reinforced widening cages are suspended and lowered in pile holes A, and the widening section reinforcing bars 4 are widened at pile hole widening section Al by means of widening devices C in the pile holes. After that, the widening devices C are withdrawn, and concrete is placed into the pile holes A.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アースドリル工法、リ
バース工法、ベノト工法等による場所打鉄筋コンクリー
ト拡底杭を構築する方法及びこれに使用する鉄筋篭に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing cast-in-place concrete reinforced concrete bottom piles by an earth drill method, a reverse method, a benot method, etc., and a reinforced cage used for the method.

【0002】[0002]

【従来の技術】従来、場所打鉄筋コンクリート拡底杭
は、図8及び図9に示すように、杭拡幅部には鉄筋が設
けられていなかったため、杭拡幅部にかかる地盤反力に
よって生じるせん断力は杭拡幅部のコンクリートによっ
て支持されることとなり、このため杭拡底部の傾斜角θ
は12度以下に設計しなければならず、杭の地耐力を大
きく、すなわち杭拡幅部の底面積を大きくしようとする
と杭拡幅部の高さhを大きくしなければならず、コンク
リートの使用量の増大等によりコストの上昇につながっ
た。なお、場所打鉄筋コンクリート拡底杭は、所用本数
の主筋1をフープ筋2によって連結してなる鉄筋篭Bを
杭孔A内に吊り降ろした後、コンクリートを打設して構
築されるが、この場合、杭拡幅部の傾斜角θは上述のと
おり12度以下、立ち上がり部h1は30cm以上、杭
底部鉄筋量は杭断面積の0.4%以上、かつ鉄筋の使用
本数は6本以上と定められている。また、杭拡幅部の高
さhは杭拡幅部の必要底面積によって定まる。
2. Description of the Related Art Conventionally, cast-in-place concrete reinforced concrete bottom piles, as shown in FIGS. 8 and 9, do not have reinforcing bars in the widened portion of the pile, so that the shearing force generated by the ground reaction force applied to the widened portion of the pile is Since it will be supported by the concrete of the pile widening part, the inclination angle θ of the pile bottom part
Must be designed to be 12 degrees or less, and if the soil bearing capacity of the pile is to be increased, that is, if the bottom area of the pile widened portion is to be increased, the height h of the pile widened portion must be increased. The cost has risen due to the increase in In addition, the cast-in-place concrete reinforced concrete bottom pile is constructed by suspending the rebar cage B formed by connecting the required number of main reinforcements 1 by the hoop reinforcements 2 in the pile hole A, and then placing concrete. The inclination angle θ of the pile widened portion is 12 degrees or less as described above, the rising portion h1 is 30 cm or more, the pile bottom rebar amount is 0.4% or more of the pile cross-sectional area, and the number of rebars used is 6 or more. ing. Further, the height h of the pile widened portion is determined by the required bottom area of the pile widened portion.

【0003】[0003]

【発明が解決しようとする課題】これに対処するため、
杭拡幅部に鉄筋を設けることも試みられている(特公昭
49ー41848号公報、特開昭58ー29917号公
報)が、いずれも拡幅部鉄筋の拡幅機構としてヒンジを
用いる等構造が複雑で作業性に問題があり、また、コス
トもかかった。本発明は従来技術の前記問題点を解消し
た場所打鉄筋コンクリート拡底杭を構築する方法及びこ
れに使用する鉄筋篭を提供することを目的とする。
In order to deal with this,
Attempts have also been made to provide reinforcing bars to the widened portions of the piles (Japanese Patent Publication No. 49-41848 and Japanese Patent Laid-Open No. 58-29917), but all of them have complicated structures such as the use of hinges as the widening mechanism of the widened portion reinforcing bars. There was a problem in workability, and it was costly. It is an object of the present invention to provide a method for constructing cast-in-place reinforced concrete bottom piles, which solves the above-mentioned problems of the prior art, and a rebar cage used for the method.

【0004】[0004]

【課題を解決するための手段】本発明は上記目的を達成
するためになしたもので、 (1)場所打鉄筋コンクリート拡底杭を構築する方法に
おいて、杭拡幅部に位置する円筒状鉄筋篭に中空のリー
ド管を井桁状に固設し、前記リード管に拡幅部鉄筋に固
設したスライド鉄筋を摺動可能に遊挿してなる拡底杭用
鉄筋篭を杭孔内に吊り降ろし、杭孔内で前記拡幅部鉄筋
を拡開装置を用いて杭孔拡幅部に拡開した後、杭孔内に
コンクリートを打設すること(第1発明) (2)前記第1発明において、杭孔内で拡幅部鉄筋を杭
拡幅部に拡開した後、前記拡開装置を回収すること(第
2発明) (3)場所打鉄筋コンクリート拡底杭用鉄筋篭におい
て、杭拡幅部に位置する円筒状鉄筋篭に中空のリード管
を井桁状に固設し、前記リード管に拡幅部鉄筋に固設し
たスライド鉄筋を摺動可能に遊挿して、杭孔内で前記拡
幅部鉄筋を杭孔拡幅部に拡開するようにしたこと(第3
発明) (4)前記第3発明において、前記スライド鉄筋の摺動
長さを規制するストパーを設けたこと(第4発明) を要旨とする。
The present invention has been made to achieve the above object. (1) In a method of constructing cast-in-place reinforced concrete bottom piles, a hollow cylindrical reinforcing bar cage located in the pile widening portion is used. The lead pipe is fixed in the shape of a cross girder, and the rebar cage for expanded piles, which is slidably inserted into the lead pipe, is slidably inserted into the widening bar reinforcement, and is suspended in the pile hole. After expanding the widening part reinforcing bar to the pile hole widening part using a widening device, placing concrete in the pile hole (first invention) (2) In the first invention, widening in the pile hole After expanding the partial rebar to the pile widening part, recover the expanding device (2nd invention) (3) Place cast-in-place reinforced concrete bottom pile reinforcing bar cage is hollow in the cylindrical rebar basket located in the pile widening part The lead tube of the The slides reinforcing bar loosely inserted slidably, it has to be expanded to the wider section rebar Kuiana widened portion in the pile hole (3
(Invention) (4) The gist of the third invention is that a stopper for regulating the sliding length of the slide rebar is provided (fourth invention).

【0005】[0005]

【実施例】以下本発明を図1〜図7に示す実施例に基づ
いて説明する。図3及び図4は、本発明の拡底杭用鉄筋
篭に用いる円筒状鉄筋篭Bの縦断面図と杭拡幅部の横断
面図を示したもので、適宜径の小鋼管パイプ2本を並列
に溶接して一体とした2組のリード管3,3を主筋1と
フープ筋2とを連結して形成した円筒状鉄筋篭Bの底部
のフープ筋2上に間隔をおいて各々配置して固設せし
め、該2組のリード管3,3の両端直角方向にも2組の
同様のリード管3,3を固設することにより、フープ筋
2上にリード管3,3を井桁状に固定する。なお、本実
施例では、リード管3は2本の鋼管パイプを並列に溶接
したものを用いているが杭拡幅部の底面積がさほど大き
くない場合には、1本の鋼管パイプでリード管を構成す
ることも可能である。また、拡底杭用鉄筋篭の強度を増
すため、井桁状のフープ筋2を2段設けているが、フー
プ筋2の段数は、1段としても、あるいは、3段以上と
してもよい。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the embodiments shown in FIGS. 3 and 4 show a vertical cross-sectional view of a cylindrical rebar cage B and a transverse cross-section of the pile widening part used in the rebar cage for expanded bottom piles of the present invention, in which two small steel pipes having an appropriate diameter are arranged in parallel. Two sets of lead tubes 3, 3 which are welded to and integrated with each other are arranged at intervals on the hoop muscle 2 at the bottom of the cylindrical rebar cage B formed by connecting the main bar 1 and the hoop bar 2. The lead pipes 3, 3 are fixed on the hoop muscle 2 by fixing the two sets of similar lead pipes 3, 3 in the directions perpendicular to both ends of the two sets of lead pipes 3, 3 in a cross pattern. Fix it. In the present embodiment, the lead pipe 3 is formed by welding two steel pipes in parallel. However, if the bottom area of the pile widened portion is not so large, one steel pipe is used as the lead pipe. It is also possible to configure. Further, in order to increase the strength of the reinforcing bar cage for the expanded pile, two cross-shaped hoop reinforcements 2 are provided, but the number of the hoop reinforcements 2 may be one, or three or more.

【0006】図5及び図6は、拡幅部鉄筋4の斜視図と
該拡幅部鉄筋4と円筒状鉄筋篭Bからなる拡底杭用鉄筋
篭の杭拡幅部の横断面図を示したもので、拡幅用鉄筋
4,4は、円筒状鉄筋篭Bへの挿入部4a、傾斜部4b
及び立ち上がり部4cからなり、この拡幅用鉄筋4,4
は所定の間隔を保つように間隔保持部材7により固定さ
れる。また、拡幅用鉄筋4,4には、リード管3,3内
に摺動可能に遊挿されるスライド鉄筋5,5を固設す
る。このスライド鉄筋5,5の長さは、本実施例のよう
にリード管3に2本の鋼管パイプを並列に溶接したもの
を用いている場合には、リード管3,3とほぼ同じ長さ
とし、1本の鋼管パイプを用いた場合には、リード管3
の半分の長さとする。さらに、拡幅用鉄筋4,4には、
リード管3,3上を摺動し、拡幅用鉄筋4,4が拡開さ
れたとき円筒状鉄筋篭Bの軸心から放射する如くなした
放射線筋6を固設するとともに、間隔保持部材7を介し
て後述の拡開装置Cのフレーム14の先端16が繋合す
る摺動鉄筋17を固設する。
FIGS. 5 and 6 are perspective views of the widened portion reinforcing bar 4 and a cross-sectional view of the pile widened portion of the widened portion reinforcing bar 4 and the cylindrical reinforcing bar cage B for the bottom expanded pile reinforcing bar cage. The widening rebars 4 and 4 are the insertion part 4a into the cylindrical rebar cage B and the inclined part 4b.
And the rising portion 4c, and the reinforcing bars 4, 4 for widening
Are fixed by the spacing member 7 so as to maintain a predetermined spacing. Further, slide reinforcing bars 5 and 5 which are slidably inserted into the lead tubes 3 and 3 are fixedly installed on the widening reinforcing bars 4 and 4. The lengths of the slide rebars 5 and 5 are almost the same as those of the lead pipes 3 and 3 when the lead pipe 3 in which two steel pipes are welded in parallel is used as in this embodiment. If one steel pipe is used, the lead pipe 3
Half of the length. Furthermore, the widening rebars 4 and 4 are
A radiation streak 6 which is slid on the lead tubes 3 and 3 so as to radiate from the axial center of the cylindrical rebar cage B when the widening rebars 4 and 4 are expanded is fixed, and the spacing member 7 is provided. A sliding reinforcing bar 17 to which a tip 16 of a frame 14 of the expansion device C described later is connected is fixedly provided via the.

【0007】そして、場所打鉄筋コンクリート拡底杭を
構築するに際しては、円筒状鉄筋篭Bに固設したリード
管3,3内に拡幅部鉄筋4,4に固設したスライド鉄筋
5,5を遊挿した拡底杭用鉄筋篭を、円筒状鉄筋篭Bの
外周に拡幅用鉄筋4,4の立ち上がり部4cを密着させ
た状態、すなわち拡底杭用鉄筋篭の外形を最も小さくし
た状態で杭孔A内に吊り降ろし、杭孔A内で拡幅部鉄筋
4を拡開装置Cを用いて杭孔拡幅部A1に拡開した後、
杭孔A内にコンクリートを打設する。
When constructing a cast-in-place concrete reinforced concrete bottom pile, slide rebars 5 and 5 fixed to the widened part rebars 4 and 4 are loosely inserted into the lead pipes 3 and 3 fixed to the cylindrical rebar cage B. Inside the pile hole A with the expanded bottom pile reinforcing bar cage in a state where the rising portions 4c of the expanding bars 4 are closely attached to the outer periphery of the cylindrical reinforcing bar cage B, that is, with the outer diameter of the expanded bottom reinforcing bar cage minimized. After hanging down to the pile hole A and expanding the widening part reinforcing bar 4 in the pile hole A to the pile hole widening part A1 using the expanding device C,
Concrete is placed in the pile hole A.

【0008】拡幅部鉄筋4の拡開に用いる拡開装置C
は、図1及び図2に示すように、軸管8の上端に上部固
定環9、下部に下部固定環10を設け、上部固定環9と
下部固定環10間の軸管8上を摺動する摺動環11を油
圧シリンダー12により摺動させることにより上部固定
環9に連結したフレーム14の先端16を摺動環11に
連結したリンク15のリンクモーションにより軸管8の
軸径方向に拡縮せしめるように構成されている。そし
て、地上においてこの拡開装置Cの下部固定環10に連
結した固定脚13をリード管3に定着し、フレーム14
の先端16を拡幅部鉄筋4に間隔保持部材7を介して固
設した摺動鉄筋17に摺動自在に繋合させてから、拡底
杭用鉄筋篭を上述のとおり杭孔A内に吊り降ろし、拡開
装置Cの油圧シリンダー12を作動させて、フレーム1
4の先端16、摺動鉄筋17及び間隔保持部材7を介し
て、拡幅部鉄筋4を杭孔拡幅部A1に拡開した後、杭孔
A内にコンクリートを打設する。この場合、拡幅部鉄筋
4を杭孔拡幅部A1に拡開してから杭孔A内にコンクリ
ートを打設する前に、油圧シリンダー12を作動させる
ことによって、フレーム14の先端16と摺動鉄筋17
の繋合及び固定脚13とリード管3の定着を解いて、ワ
イヤー18を地上より操作して拡開装置Cを回収するよ
うにすることが望ましい。
Expanding device C used for expanding the widening bar 4
As shown in FIGS. 1 and 2, the upper fixed ring 9 and the lower fixed ring 10 are provided at the upper end of the shaft tube 8 and the lower fixed ring 10 slides on the shaft tube 8 between the upper fixed ring 9 and the lower fixed ring 10. By sliding the sliding ring 11 that is moved by the hydraulic cylinder 12, the distal end 16 of the frame 14 that is connected to the upper fixed ring 9 is expanded and contracted in the axial direction of the shaft tube 8 by the link motion of the link 15 that is connected to the sliding ring 11. It is constructed to be vulnerable. Then, on the ground, the fixed leg 13 connected to the lower fixed ring 10 of the expansion device C is fixed to the lead tube 3, and the frame 14 is fixed.
16 is slidably connected to the sliding reinforcing bar 17 fixed to the widening part reinforcing bar 4 via the spacing member 7 and then the expanded bottom reinforcing bar cage is hung in the pile hole A as described above. , The hydraulic cylinder 12 of the expansion device C is operated, and the frame 1
After expanding the widening part reinforcing bar 4 to the pile hole widening part A1 through the tip 16 of 4, the sliding reinforcing bar 17 and the spacing member 7, concrete is placed in the pile hole A. In this case, before the concrete is placed in the pile hole A after expanding the widening part reinforcing bar 4 to the pile hole widening part A1, the hydraulic cylinder 12 is operated to move the tip 16 of the frame 14 and the sliding reinforcing bar. 17
It is desirable that the connection of the above and the fixing of the fixed leg 13 and the lead tube 3 be released, and the wire 18 be operated from the ground so that the expansion device C is recovered.

【0009】拡幅部鉄筋4が杭孔拡幅部A1に確実に拡
開するように、また拡開状態を保持するように、リード
管3内でのスライド鉄筋5の摺動長さを規制するストッ
パーDを設けることができる。図7はストッパーDの一
例を示したもので、リード管3に透孔19を、スライド
鉄筋に突状部20を設けて、リード管3内でスライド鉄
筋5が所定長さ摺動したときリード管3内でスライド鉄
筋5が摺動しないようにすることにより、拡幅部鉄筋4
が円筒状鉄筋篭Bの軸心を対称として杭孔拡幅部A1に
確実に拡開し、また拡開状態を保持できるようにしたも
のである。
A stopper for restricting the sliding length of the slide reinforcing bar 5 in the lead tube 3 so that the widening part reinforcing bar 4 surely expands to the pile hole widening part A1 and maintains the expanded state. D can be provided. FIG. 7 shows an example of the stopper D, which is provided with a through hole 19 in the lead tube 3 and a projecting portion 20 in the slide rebar so that when the slide rebar 5 slides in the lead tube 3 for a predetermined length, the lead By preventing the slide rebar 5 from sliding in the pipe 3, the widened part rebar 4
In this configuration, the axis of the cylindrical rebar cage B is made symmetrical so that the cylindrical rebar cage B can be reliably expanded in the pile hole widened portion A1 and the expanded state can be maintained.

【0010】また、拡幅部鉄筋4が杭孔拡幅部A1に拡
開した状態は、水中カメラや種々のセンサーを設置する
ことにより確認することができる。また、これらの水中
カメラや種々のセンサーは、拡開装置Cと同様、拡幅部
鉄筋4の拡開確認後回収できるように設置することが望
ましい。
The state in which the widened portion reinforcing bar 4 is widened to the pile hole widened portion A1 can be confirmed by installing an underwater camera or various sensors. Further, like the expansion device C, it is desirable that these underwater cameras and various sensors be installed so that they can be collected after confirmation of the expansion of the widened part reinforcing bar 4.

【0011】なお、本発明は場所打鉄筋コンクリート拡
底杭に係るものであるが、本発明のリード管3とスライ
ド鉄筋5からなる拡幅機構を矩形状鉄筋篭の長手方向に
多数設置することにより、場所打鉄筋コンクリート拡底
地中壁を構築することも可能である。
Although the present invention relates to a cast-in-place concrete reinforced concrete bottom pile, by installing a large number of widening mechanisms consisting of the lead tube 3 and the slide reinforcing bars 5 of the present invention in the longitudinal direction of the rectangular reinforced cage, It is also possible to construct a reinforced concrete bottomed underground wall.

【0012】[0012]

【発明の効果】本発明によれば、場所打鉄筋コンクリー
ト拡底杭を構築するにあたり、杭拡幅部にも鉄筋を設け
たので、杭拡幅部にかかる地盤反力によって生じるせん
断力は杭拡幅部のコンクリート及び鉄筋により支持され
ることとなり、このため杭拡底部の傾斜角θを大きく設
計できるため杭拡幅部の高さhを鉄筋を設けない場合と
比較して小さくでき、コンクリートの使用量を少なくで
きること等によりコストを低減できる。さらに、拡底杭
用鉄筋篭の拡幅部鉄筋を拡幅するのに、リード管とスラ
イド鉄筋からなる簡単な構造の拡幅機構を用いたので、
従来ヒンジを用いていた複雑な構造の拡幅機構と比較し
て作業性がよく、また、コストも低減できる等の利点が
ある。さらに、本第2発明によれば、杭孔内で拡幅部鉄
筋を杭拡幅部に拡開した後、拡開装置を回収し再使用す
るので、よりコストを低減できる利点がある。また、本
第4発明によれば、スライド鉄筋の摺動長さを規制する
ストパーを設けたので、拡幅部鉄筋を杭孔拡幅部に確実
に拡開し、また拡開状態を保持できる利点がある。
According to the present invention, in constructing cast-in-place concrete reinforced concrete bottom piles, since reinforcing bars are also provided in the pile widening portions, the shearing force generated by the ground reaction force applied to the pile widening portions causes the concrete in the pile widening portions to be concrete. Also, since it is supported by reinforcing bars, the inclination angle θ of the pile bottom part can be designed to be large, so the height h of the pile widening part can be made smaller than that without reinforcing bars, and the amount of concrete used can be reduced. Therefore, the cost can be reduced. Furthermore, to widen the widening part rebar of the rebar cage for the bottom pile, a widening mechanism with a simple structure consisting of a lead tube and slide rebar was used.
Compared with a widening mechanism having a complicated structure that conventionally uses a hinge, it has advantages such as better workability and lower cost. Furthermore, according to the second aspect of the present invention, after expanding the widening part reinforcing bar to the widening part of the pile in the pile hole, the expanding device is collected and reused, so that there is an advantage that the cost can be further reduced. Further, according to the fourth aspect of the present invention, since the stopper for restricting the sliding length of the slide reinforcing bar is provided, there is an advantage that the widening part reinforcing bar can be reliably expanded to the pile hole widening part and the expanded state can be maintained. is there.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の拡幅部鉄筋の拡開方法を示す縦断面図FIG. 1 is a vertical cross-sectional view showing a method for expanding a reinforcing bar of a widened portion according to the present invention.

【図2】本発明の拡幅部鉄筋の拡開方法を示す横断面図FIG. 2 is a cross-sectional view showing a method for expanding the reinforcing bar of the widened portion of the present invention.

【図3】本発明の拡底杭用鉄筋篭に用いる円筒状鉄筋篭
の縦断面図
FIG. 3 is a vertical cross-sectional view of a cylindrical rebar cage used in a rebar cage for a bottom pile according to the present invention.

【図4】本発明の拡底杭用鉄筋篭に用いる円筒状鉄筋篭
の杭拡幅部の横断面図
FIG. 4 is a cross-sectional view of a pile widening portion of a cylindrical reinforcing bar cage used in the reinforcing bar cage for the bottom expanding pile of the present invention.

【図5】本発明の拡幅部鉄筋を示す斜視図FIG. 5 is a perspective view showing a reinforcing bar of the widened portion of the present invention.

【図6】本発明の拡幅部鉄筋を取り付けた拡底杭用鉄筋
篭の杭拡幅部の横断面図
FIG. 6 is a transverse cross-sectional view of the pile widening portion of the reinforcing bar cage for the bottom expanding pile to which the widening portion reinforcing bar of the present invention is attached.

【図7】本発明のストッパーの断面図FIG. 7 is a sectional view of the stopper of the present invention.

【図8】従来の拡底杭の縦断面図FIG. 8 is a vertical cross-sectional view of a conventional bottomed pile

【図9】従来の拡底杭の杭拡幅部の横断面図FIG. 9 is a transverse cross-sectional view of a pile widening portion of a conventional bottom spreading pile.

【符号の説明】[Explanation of symbols]

A 杭孔 A1 杭孔拡幅部 B 円筒状鉄筋篭 C 拡開装置 D ストッパー 3 リード管 4 拡幅部鉄筋 5 スライド鉄筋 A Pile hole A1 Pile hole widening part B Cylindrical rebar cage C Expanding device D Stopper 3 Reed tube 4 Widening part rebar 5 Slide rebar

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 場所打鉄筋コンクリート拡底杭を構築す
る方法において、杭拡幅部に位置する円筒状鉄筋篭
(B)に中空のリード管(3)を井桁状に固設し、前記
リード管(3)に拡幅部鉄筋(4)に固設したスライド
鉄筋(5)を摺動可能に遊挿してなる拡底杭用鉄筋篭を
杭孔(A)内に吊り降ろし、杭孔内で前記拡幅部鉄筋
(4)を拡開装置(C)を用いて杭孔拡幅部(A1)に
拡開した後、杭孔(A)内にコンクリートを打設するこ
とを特徴とする場所打鉄筋コンクリート拡底杭を構築す
る方法。
1. A method for constructing cast-in-place reinforced concrete bottom piles, wherein hollow lead pipes (3) are fixed to the cylindrical reinforcing cage (B) located in the pile widening part in a cross beam shape, and the lead pipes (3) ), The slide bar (5) fixedly mounted on the widened part reinforcing bar (4) is slidably inserted, and the rebar cage for expanded bottom piles is hung in the pile hole (A), and the widened part reinforcing bar is inside the pile hole. (4) is expanded to the pile hole widening part (A1) using the expansion device (C), and then concrete is placed in the pile hole (A) to construct a cast-in-place concrete reinforced concrete bottom pile how to.
【請求項2】 杭孔内で拡幅部鉄筋(4)を杭拡幅部に
拡開した後、前記拡開装置(C)を回収することを特徴
とする請求項1記載の場所打鉄筋コンクリート拡底杭を
構築する方法。
2. The cast-in-place concrete reinforced concrete bottom pile according to claim 1, characterized in that the expansion device (C) is recovered after expanding the widening part reinforcing bar (4) into the pile widening part in the pile hole. How to build.
【請求項3】 場所打鉄筋コンクリート拡底杭用鉄筋篭
において、杭拡幅部に位置する円筒状鉄筋篭(B)に中
空のリード管(3)を井桁状に固設し、前記リード管
(3)に拡幅部鉄筋(4)に固設したスライド鉄筋
(5)を摺動可能に遊挿して、杭孔(A)内で前記拡幅
部鉄筋(4)を杭孔拡幅部(A1)に拡開するようにし
たことを特徴とする場所打鉄筋コンクリート拡底杭用鉄
筋篭。
3. A rebar basket for cast-in-place reinforced concrete bottom piles, wherein hollow lead pipes (3) are fixed to the cylindrical rebar basket (B) located in the pile widening portion in a cross beam shape, and the lead pipe (3) is provided. The slide reinforcing bar (5) fixed to the widened part reinforcing bar (4) is slidably inserted into the pile hole (A) and the widened part reinforcing bar (4) is expanded to the pile hole widening part (A1). Reinforcing bar cage for cast-in-place reinforced concrete bottom piles.
【請求項4】 前記スライド鉄筋(5)の摺動長さを規
制するストッパー(D)を設けたことを特徴とする請求
項3記載の場所打鉄筋コンクリート拡底杭用鉄筋篭。
4. The rebar cage for cast-in-place concrete reinforced concrete bottom piles according to claim 3, further comprising a stopper (D) for restricting a sliding length of the slide rebar (5).
JP18190692A 1992-06-16 1992-06-16 Method for constructing cast-in-place concrete reinforced concrete pile and reinforced basket used for this method Expired - Fee Related JPH0715167B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18190692A JPH0715167B2 (en) 1992-06-16 1992-06-16 Method for constructing cast-in-place concrete reinforced concrete pile and reinforced basket used for this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18190692A JPH0715167B2 (en) 1992-06-16 1992-06-16 Method for constructing cast-in-place concrete reinforced concrete pile and reinforced basket used for this method

Publications (2)

Publication Number Publication Date
JPH062331A true JPH062331A (en) 1994-01-11
JPH0715167B2 JPH0715167B2 (en) 1995-02-22

Family

ID=16108962

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18190692A Expired - Fee Related JPH0715167B2 (en) 1992-06-16 1992-06-16 Method for constructing cast-in-place concrete reinforced concrete pile and reinforced basket used for this method

Country Status (1)

Country Link
JP (1) JPH0715167B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100430342B1 (en) * 2001-07-25 2004-05-04 원 회 양 A formative installation and construction method of concrete file that projection is protruded into a radial shape
CN104727309A (en) * 2015-02-02 2015-06-24 中国电力工程顾问集团中南电力设计院有限公司 Construction technology of squeeze-in expanded-base pipe pile

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019431B (en) * 2015-05-28 2016-11-09 杭州江润科技有限公司 Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
CN105821834B (en) * 2016-03-16 2018-03-30 杨涅 A kind of construction method of concrete-pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100430342B1 (en) * 2001-07-25 2004-05-04 원 회 양 A formative installation and construction method of concrete file that projection is protruded into a radial shape
CN104727309A (en) * 2015-02-02 2015-06-24 中国电力工程顾问集团中南电力设计院有限公司 Construction technology of squeeze-in expanded-base pipe pile

Also Published As

Publication number Publication date
JPH0715167B2 (en) 1995-02-22

Similar Documents

Publication Publication Date Title
US6216403B1 (en) Method, member, and tendon for constructing an anchoring device
US6327825B1 (en) Method and apparatus for use in positioning high-strength cables within a precast moment resisting frame
KR101648704B1 (en) Underground wall structure
JP2018172868A (en) Pile head fixing and holding structure of reinforcing bar cage
JP2009007745A (en) Axial-force transmission structure for permanent sub-substructural column and foundation pile, and construction method for permanent sub-substructural column
JPH062331A (en) Construction method of cast-in-place reinforced concrete under-reamed pile and reinforced cage used therefor
JP2009013611A (en) Reinforcement structure and method for earth retaining wall
JP3603130B2 (en) Root-wound reinforcement structure for column bases such as steel columns
JP3818072B2 (en) Multi-column composite pier structure and its construction method
JP5008683B2 (en) Pile head reinforcement member and pile head reinforcement structure using it
JPH10152840A (en) Constructing method for earth retaining timbering
JP2007032124A (en) Block fence reinforcement structure
JPH08128568A (en) Holding tool for boring sleeve pipe in reinforced concrete structure and boring method using this holding tool for reinforced concrete structure
JPH06101226A (en) Constructing method for cast-in-place reinforced concrete bottom widening pile and reinforced cage used therefor
JP4060137B2 (en) Civil engineering structures and construction methods
JPS61122399A (en) Reinforced timbering and construction of earth wall surface by using the same
KR100387751B1 (en) Reinforcement structure for a foundation pile
JPH0820945A (en) Foot protection at front end of foundation pile and device therefor
JP2004162414A (en) Cast-in-place concrete filling steel pipe pile and construction method thereof
JP2002138470A (en) Developing tool of cage, under-reamed pile method and structure of under-reamed pile
JPH08246445A (en) Underground bottom widening pile using existing pile
JPH073783A (en) Expansion reinforcement for bottom-enlarged foundation
JP7406476B2 (en) Existing building reinforcement structure and existing building reinforcement method
JP3074282B2 (en) Rebar assembly
JP2001081865A (en) Roof structure and construction method therefor

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees