JPH08116619A - Device and method for automatically laying cable trough cover - Google Patents

Device and method for automatically laying cable trough cover

Info

Publication number
JPH08116619A
JPH08116619A JP6274473A JP27447394A JPH08116619A JP H08116619 A JPH08116619 A JP H08116619A JP 6274473 A JP6274473 A JP 6274473A JP 27447394 A JP27447394 A JP 27447394A JP H08116619 A JPH08116619 A JP H08116619A
Authority
JP
Japan
Prior art keywords
lid
trough
laying
boom
loaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6274473A
Other languages
Japanese (ja)
Other versions
JP3214595B2 (en
Inventor
Shigeo Yomokari
成夫 四百苅
Kazuhiko Torii
和彦 鳥井
Minoru Suzuki
実 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON TETSUDO KENSETSU KODAN
Fujikura Ltd
Railway Technical Research Institute
Central Japan Railway Co
Original Assignee
NIPPON TETSUDO KENSETSU KODAN
Fujikura Ltd
Railway Technical Research Institute
Central Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON TETSUDO KENSETSU KODAN, Fujikura Ltd, Railway Technical Research Institute, Central Japan Railway Co filed Critical NIPPON TETSUDO KENSETSU KODAN
Priority to JP27447394A priority Critical patent/JP3214595B2/en
Publication of JPH08116619A publication Critical patent/JPH08116619A/en
Application granted granted Critical
Publication of JP3214595B2 publication Critical patent/JP3214595B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

PURPOSE: To reduce the labor required for laying cable trough covers on cable troughs by loading the covers on the bed of a vehicle and unloading the covers from the vehicle to fixed positions on the cable troughs by extending/contracting, lifting/ lowering, and turning a handling device. CONSTITUTION: A handling device(HD) 21 which puts a cover 15 loaded on the bed 7 of a vehicle on a cable trough 2 is provided on the main body 5 of the vehicle. The HD 21 is constituted of a crane device 23 having a boom 22 the base end section of which is installed to the rear section of the main body 5 and which can be extended/ contracted, lifted/lowered, and turned, hook 24 which is fitted to the front end of the boom 22 and can be lifted and lowered, and attracting device 25 suspended from the hook 24. The device 23 is constituted in such a way that its base end section 22a is erected on the rear end section of the main body 5 so that the section 22a can be turned around a vertical axis and its boom main body (BM) 22b can be expanded and contracted in the length direction. The BM 22b is connected to the base end section 22a so that the BM 22b can be lifted/lowered in the vertical direction and can be extended/contracted in the length direction. The hook 24 is suspended from the front end of the BM 226 with a cable 26 which is wound around a cable reel 27.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は,磁気浮上式鉄道や通
常の軌条鉄道等に沿って設けたトラフ上に蓋を自動的に
敷設するトラフ蓋自動敷設装置,およびこのトラフ蓋自
動敷設装置を用いてトラフ上に蓋を敷設するトラフ蓋敷
設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a trough lid automatic laying device for automatically laying a lid on a trough provided along a magnetic levitation railway or a normal railroad railway, and this trough lid automatic laying device. TECHNICAL FIELD The present invention relates to a trough lid laying method for laying a lid on a trough using the method.

【0002】[0002]

【従来の技術】磁気浮上鉄道や通常の軌条鉄道等の両側
または片側に電力ケーブル等を敷設するトラフを設けた
場合,このトラフに蓋をする必要がある。従来,この蓋
をトラフ上に敷設するトラフ蓋敷設作業は,台車に複数
の蓋を積んで移動しながら,単に蓋を吊るクレーンを用
いて人が人力で行っていた。
2. Description of the Related Art When a trough for laying a power cable or the like is provided on both sides or one side of a magnetic levitation railway or an ordinary railroad railway, it is necessary to cover the trough. Conventionally, the work of laying the trough lid on the trough has been performed manually by a person using a crane that simply hangs the lid while moving the trolley with a plurality of lids.

【0003】[0003]

【発明が解決しようとする課題】上記従来の単なるクレ
ーンを利用する方法では,必ずしも軽度でない労力を要
する上,極めて非能率的で,蓋敷設工事を短期間に行う
ことが困難であった。
The above-mentioned conventional method using a simple crane requires labor which is not necessarily light, is extremely inefficient, and it is difficult to perform lid laying work in a short period of time.

【0004】本発明は上記事情に鑑みてなされたもの
で,車両走行路に沿って側方に設けたトラフに蓋をする
作業を能率的に,かつ短期間で施工できるトラフ蓋自動
敷設装置,およびトラフ蓋敷設方法を提供することを目
的とする。
The present invention has been made in view of the above circumstances, and an automatic trough lid laying device for efficiently and quickly constructing a lid for a trough provided laterally along a vehicle running path, And to provide a trough lid laying method.

【0005】[0005]

【課題を解決するための手段】上記課題を解決する本発
明は,車両走行路に沿って側方に設けたトラフ上に蓋を
自動的に敷設するトラフ蓋自動敷設装置であって,車両
走行路に沿って走行可能な車両本体と,この車両本体上
に設けられて複数の蓋を積み重ねた状態でかつ走行路長
手方向に並べて積載可能な荷役台と,前記車両本体に伸
縮,起伏,旋回可能に設けられ,かつ前記荷役台上の蓋
を荷積みして側方のトラフ上に敷設可能なハンドリング
装置とを備えたことを特徴としている。
SUMMARY OF THE INVENTION The present invention for solving the above-mentioned problems is an automatic trough lid laying device for automatically laying a lid on a trough provided laterally along a vehicle traveling path. A vehicle main body that can run along a road, a cargo handling platform that is provided on the vehicle main body and that can be stacked in the longitudinal direction of the road with a plurality of lids stacked, and the vehicle main body can be expanded, contracted, undulated, and turned. And a handling device which can be installed and which can be laid on a side trough by loading a lid on the cargo handling table.

【0006】請求項2記載の発明は,前記ハンドリング
装置は,基端部が前記車両本体の後部に設置された伸
縮,起伏,旋回可能なブーム,及びこのブームの先端に
設けられて昇降自在なフックを有するクレーン装置と,
このクレーン装置のフックに吊持されて前記蓋を吸着し
または放すことができる吸着装置とを備えたことを特徴
としている。
According to a second aspect of the present invention, in the handling device, a boom having a base end portion installed at a rear portion of the vehicle body, which can be extended, retracted, swiveled, and a tip end of the boom is movable up and down. A crane device having a hook,
It is characterized in that it is provided with an adsorption device which is hung on a hook of the crane device and which can adsorb or release the lid.

【0007】請求項3記載の発明は,前記吸着装置に,
吸着させた前記蓋を両側から把持し叉は放すことができ
る蓋クランプ装置を設けたことを特徴としている。
According to a third aspect of the invention, in the adsorption device,
It is characterized in that a lid clamp device is provided which is capable of grasping or adsorbing the sucked lid from both sides.

【0008】請求項4記載の発明は,前記クレーン装置
のブームの先端には,このブームの先端が障害物に接近
した場合に,このブームを停止させて前記障害物との衝
突を防止するためのスイッチが設けられていると共に,
前記クレーン装置の基端部には前記ブームの伸縮量,起
伏角,旋回角を制限するリミットスイッチがそれぞれ設
けられていることを特徴としている。
According to a fourth aspect of the present invention, in order to prevent the boom of the crane device from colliding with the obstacle by stopping the boom when the tip of the boom approaches an obstacle. With the switch of
Limit switches for limiting the amount of expansion and contraction, the hoisting angle, and the turning angle of the boom are respectively provided at the base end of the crane device.

【0009】請求項5記載の発明は,前記ハンドリング
装置に,前記ブームを自動的に伸縮,起伏,旋回させる
ことにより,前記荷役台に積載された蓋を所定の順序に
従って荷積みしてトラフ上の荷卸し位置に敷設する制御
手段を設けてなり,この制御手段には現場において前記
蓋の荷積み位置,荷卸し方向,荷卸し位置等が設定可能
であると共に,荷積み作業開始前に前記ハンドリング装
置の原点位置が設定可能であることを特徴としている。
According to a fifth aspect of the present invention, by automatically extending, retracting, and swinging the boom in the handling device, the lids loaded on the cargo handling platform are loaded in a predetermined order to be mounted on the trough. Control means for laying at the unloading position is provided, and the loading position, the unloading direction, the unloading position, etc. of the lid can be set on the site, and the control means is set before starting the unloading work. The feature is that the origin position of the handling device can be set.

【0010】請求項6記載の発明は,請求項1叉は2記
載のトラフ蓋自動敷設装置を用いてトラフに蓋を敷設す
るトラフ蓋敷設方法であって,前記荷役台に前記蓋を走
行路長手方向に沿って2列に並べて積載し,この2列に
積載された蓋を走行路の最前列或いは途中の列から後列
側に横順に荷積みして,前記車両本体の左右に位置する
トラフのいずれか一方に敷設していくことを特徴として
いる。
The invention according to claim 6 is a trough lid laying method for laying a lid on a trough using the automatic trough lid laying device according to claim 1 or 2, wherein the lid is provided on the cargo handling platform. The columns are stacked in two rows along the longitudinal direction, and the lids loaded in these two rows are loaded laterally in order from the front row or the middle row of the traveling path to the rear row side, and the troughs located on the left and right sides of the vehicle main body. The feature is that it is laid on either side.

【0011】請求項7記載の発明は,請求項1叉は2記
載のトラフ蓋自動敷設装置を用いてトラフに蓋を敷設す
るトラフ蓋敷設方法であって,前記荷役台に積載された
蓋を荷積みして車両本体の左右に位置するトラフのいず
れか一方に走行路の前方側から長手方向に沿って複数枚
敷設する工程と,この複数枚敷設した時点で前記車両本
体を前記走行路の後方側へ移動させる工程と,この工程
の後に前記荷役台に積載された蓋を前記トラフの後方側
から前方側へ連続して複数枚敷設して,前記前方側に敷
設された蓋と連設させる工程とを備えたことを特徴とし
ている。
The invention according to claim 7 is a trough lid laying method for laying a lid on a trough using the automatic trough lid laying device according to claim 1 or 2, wherein the lid loaded on the cargo handling platform is A step of loading and laying a plurality of sheets on one of the troughs located on the left and right sides of the vehicle main body along the longitudinal direction from the front side of the traveling path; A step of moving to the rear side, and after this step, a plurality of lids loaded on the cargo handling platform are continuously laid from the rear side to the front side of the trough, and the lid is laid continuously with the lid laid on the front side. It is characterized by having a step of

【0012】[0012]

【作用】請求項1のトラフ蓋自動敷設装置を用いてトラ
フ上に蓋を敷設する場合,荷役台上の蓋をハンドリング
装置を伸縮,起伏,旋回させて荷積みすると共に,荷積
みした状態でハンドリング装置を伸縮,起伏,旋回させ
てトラフの上の定位置に荷卸して蓋をトラフ上に敷設す
る。
When a lid is laid on the trough using the automatic trough lid laying device according to claim 1, the lid on the cargo handling platform is loaded and unloaded while the handling device is expanded, contracted, swung, and swung. The handling device is expanded, retracted, swung, and unloaded at a fixed position on the trough, and the lid is laid on the trough.

【0013】請求項2のトラフ蓋自動敷設装置では,車
両本体の後部に設けられたクレーン装置の基端部を基軸
としてブームを伸縮,起伏,旋回させることにより,こ
のブームの先端を荷役台上の荷積み位置に移動させ,荷
積み位置においてブームの先端からフックに吊持された
吸着装置を荷積み位置の蓋の上に降ろし,この吸着装置
で蓋を吸着して荷積みし,この荷積みした蓋をブーム先
端付近まで巻き上げた状態で,ブームを伸縮,起伏,旋
回させて先端に吊持された蓋をトラフ上の所定の荷卸し
位置に移動させ,この荷卸し点でフックを降ろして前記
トラフ上に蓋を敷設する。
In the automatic trough lid laying device according to a second aspect of the present invention, the tip end of the boom is expanded, retracted and swung around the base end portion of the crane device provided at the rear portion of the vehicle main body as a base shaft. To the loading position of the boom, and at the loading position, the adsorption device suspended from the tip of the boom on the hook is lowered onto the lid at the loading position, and the adsorption device adsorbs the lid to load it. With the stacked lid rolled up near the tip of the boom, the boom is extended, retracted, swung, and swung to move the lid suspended at the tip to the specified unloading position on the trough, and the hook is unloaded at this unloading point. And lay a lid on the trough.

【0014】請求項3において,吸着装置に吸着荷積み
された蓋の両側部が蓋クランプ装置で把持されているた
め,吸着装置に万一故障が発生して蓋が吸着装置から離
脱した場合にも蓋が落下することがない。
In the third aspect, since both sides of the lid loaded by suction on the suction device are held by the lid clamp device, if the suction device should break down and the lid is detached from the suction device. Even the lid does not fall.

【0015】請求項4記載において,ブームの先端が障
害物に接近した場合に,ブームの先端に設けられたスイ
ッチが作動して,ブームの動きを停止させ,ブームが障
害物と衝突して破損するのが防止される。またクレーン
装置の基端部には予めブームの伸縮量,起伏角,旋回角
を制限するリミットスイッチが設けられているため,予
め予想される危険な範囲にブームが移動しようとした場
合にも自動的に停止し,危険な動き,無駄な動きが抑制
される。さらに,リミットスイッチにクレーン装置の原
点位置を設定しておけば,クレーン装置が原点位置に達
したことを表示手段等によって確認することができる。
When the tip of the boom approaches an obstacle, the switch provided at the tip of the boom is actuated to stop the movement of the boom, and the boom collides with the obstacle and is damaged. Is prevented. In addition, a limit switch that limits the amount of boom expansion / contraction, hoisting angle, and turning angle is installed in advance at the base of the crane device. Stop and prevent dangerous and useless movements. Further, if the origin position of the crane device is set on the limit switch, it is possible to confirm that the crane device has reached the origin position by the display means or the like.

【0016】請求項5において,制御手段により予めブ
ームの伸縮,起伏,旋回等の動きの方向や手順をプログ
ラミングしておくことにより,荷役台に積載された蓋を
設定された手順に従って荷積みすると共に,荷積みした
蓋をトラフ上の荷卸し位置に手順に従って敷設する。ま
た,制御手段には現場の状況に応じて適宜荷積み位置,
荷卸し方向,荷卸し位置等が適宜設定される。さらに,
荷積み作業開始前にハンドリング装置の原点位置を設定
すれば,その後ブームは原点位置から自動的に上記設定
された手順に従って荷積み位置と荷卸し位置との間を移
動して,敷設作業を行う。
According to the fifth aspect of the present invention, the control means preliminarily programs the direction and procedure of movement of the boom such as expansion and contraction, ups and downs, and turning, so that the lid loaded on the loading platform is loaded in accordance with the set procedure. At the same time, lay the loaded lid on the trough at the unloading position according to the procedure. In addition, the control means can be loaded at a suitable loading position depending on the situation at the site.
The unloading direction, unloading position, etc. are set appropriately. further,
If the origin position of the handling device is set before starting the loading work, then the boom automatically moves from the origin position between the loading position and the unloading position according to the procedure set above to perform the laying work. .

【0017】請求項6のトラフ蓋敷設方法では,荷役台
の長手方向に沿って蓋が2列に並べて積載された蓋が,
任意の位置から走行路長手方向に沿って横順に荷積みさ
れ,この荷積みされた蓋が車両本体の左右に位置するト
ラフのいづれか一方に敷設されていく。
In the trough lid laying method according to the sixth aspect, the lids stacked in two rows along the longitudinal direction of the cargo handling platform,
The cargo is loaded laterally from an arbitrary position along the longitudinal direction of the road, and the loaded lids are laid on either one of the troughs located on the left and right of the vehicle body.

【0018】請求項7のトラフ蓋敷設方法では,荷役台
に積載された蓋を荷積みして車両本体の左右に位置する
トラフのいづれか一方に敷設する。敷設する際には走行
路の前方側から後方側へ長手方向に沿って複数枚連続し
て敷設する。蓋を複数枚連続して敷設した時点で,車両
本体を走行路の後方側へ移動させて所定の位置で停車さ
せる。次いで荷役台に積載された蓋をトラフの後方側か
ら前方側へ向かって複数枚連続して敷設する。最後に敷
設する蓋が,既に前方側に敷設された最後の蓋と連設さ
れる。
In the trough lid laying method according to the seventh aspect, the lid loaded on the cargo handling platform is loaded and laid on either one of the troughs located on the left and right of the vehicle body. When laying, a plurality of sheets are continuously laid along the longitudinal direction from the front side to the rear side of the traveling path. When a plurality of lids are continuously laid, the vehicle body is moved to the rear side of the traveling path and stopped at a predetermined position. Next, a plurality of lids loaded on the cargo platform are continuously laid from the rear side of the trough toward the front side. The last lid to be laid is connected to the last lid already laid on the front side.

【0019】[0019]

【実施例】以下,本発明の一実施例を図1ないし図14
を参照して説明する。図1は本発明の一実施例のトラフ
蓋自動敷設装置の正面図,図2は同平面図,図3は図1
における右側面図である。この実施例は磁気浮上式鉄道
の走行路1に沿ってその両側に設けたトラフ2上にコン
クリートの蓋を自動的に敷設するトラフ蓋自動敷設装置
である。トラフ2には電力ケーブル等が収容される。実
施例のトラフ2の幅は900mm〜1200mm程度の
範囲で複数種ある。実施例の蓋15はトラフ2の幅に合
わせた幅と500mmの長さ(配列ピッチ方向(トラフ
長手方向)の寸法)を持つ。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT An embodiment of the present invention will be described below with reference to FIGS.
Will be described with reference to. 1 is a front view of an automatic trough lid laying apparatus according to an embodiment of the present invention, FIG. 2 is a plan view of the same, and FIG. 3 is FIG.
FIG. This embodiment is an automatic trough lid laying device for automatically laying concrete lids on troughs 2 provided on both sides of a running path 1 of a magnetic levitation railway. The trough 2 accommodates power cables and the like. The trough 2 of the embodiment has a plurality of widths in the range of about 900 mm to 1200 mm. The lid 15 of the embodiment has a width matching the width of the trough 2 and a length of 500 mm (dimension in the arrangement pitch direction (trough longitudinal direction)).

【0020】このトラフ蓋自動敷設装置3は,走行路1
を走行する車両本体5と,この車両本体5のフレーム6
上に固定されて蓋15を積載する荷役台7を備えてい
る。車両本体5の各車輪8はいずれもタイヤ式であり,
車両本体5の左右側面に走行路1の側壁面に接触するガ
イドタイヤ9および安全確保のための鋼製のストッパ車
輪10が取り付けられている。また,フレーム6の後部
にはタイヤ11aを走行路面上で転がしてその回転数を
エンコーダで検出して車両本体5の移動距離を検出する
距離検出装置11が設けられている。さらに車両本体5
の前部には運転室12が,車両本体5の後部にはヂーゼ
ル発電機13,車両本体5吊り上げ金具14等が設置さ
れている。なおフレーム6の後方部には,蓋敷設作業時
に下降して走行路1に突き当ててフレーム6を走行路1
に固定するアウトリガーを設けるようにしても良い。
The automatic trough lid laying device 3 is provided on the running path 1.
Vehicle body 5 traveling on the road and a frame 6 of the vehicle body 5
It is provided with a cargo handling platform 7 which is fixed on the top and carries the lid 15. Each wheel 8 of the vehicle body 5 is a tire type,
Guide tires 9 that come into contact with the side wall surfaces of the road 1 and steel stopper wheels 10 for ensuring safety are attached to the left and right side surfaces of the vehicle body 5. Further, at the rear portion of the frame 6, there is provided a distance detecting device 11 that rolls the tire 11a on the traveling road surface and detects the rotational speed of the tire 11a by an encoder to detect the moving distance of the vehicle body 5. Furthermore, the vehicle body 5
A driver's cab 12 is installed in the front part of the vehicle, and a diesel generator 13, a vehicle body 5 lifting metal fitting 14, etc. are installed in the rear part of the vehicle body 5. At the rear portion of the frame 6, when the lid is laid, the frame 6 is lowered and abutted against the running path 1 so that the frame 6 runs on the running path 1.
You may make it provide the outrigger fixed to this.

【0021】前記荷役台7には,蓋15を複数枚積み重
ねた状態(以下,この複数枚積み重ねた蓋群を積層蓋群
と呼ぶ)でかつ走行路長手方向(図1等で左右方向)に
並べて積載される。この実施例では荷役台7上に10枚
積み重ねた積層蓋群を8×2列積載するようにしてい
る。荷役台7は蓋15を積載可能かつ現場の特性を考慮
して鋼板製の構造とされ,荷役台7の両側部には走行路
長手方向に沿って落下防止用の手摺16が設けられてい
る。
A plurality of lids 15 are stacked on the cargo handling table 7 (hereinafter, the lid group formed by stacking the plurality of lids is referred to as a laminated lid group) and in the longitudinal direction of the traveling path (left-right direction in FIG. 1 etc.). They are loaded side by side. In this embodiment, a stack of 10 stacked lids is stacked on the cargo handling table 7 in 8 × 2 rows. The cargo handling platform 7 has a structure that can be loaded with a lid 15 and is made of steel sheet in consideration of site characteristics, and handrails 16 are provided on both sides of the cargo handling platform 7 to prevent falling along the longitudinal direction of the traveling path. .

【0022】前記車両本体5には,荷役台7に積載され
た蓋15をトラフ2に敷設するためのハンドリング装置
21が設けられている。このハンドリング装置21は,
基端部が前記車両本体の後部に設置されて伸縮,起伏,
旋回可能なブーム22を有するクレーン装置23と,前
記ブーム22の先端に昇降可能に設けられたフック24
と,このフック24に吊持された吸着装置25とから構
成されている。
The vehicle body 5 is provided with a handling device 21 for laying the lid 15 loaded on the cargo handling platform 7 on the trough 2. This handling device 21
The base end is installed in the rear part of the vehicle body to expand, contract, undulate,
A crane device 23 having a swingable boom 22, and a hook 24 provided at the tip of the boom 22 so as to be able to move up and down.
And a suction device 25 suspended from the hook 24.

【0023】この実施例のクレーン装置23は,ブーム
22の基端部22aが車両本体5の後端部に垂直軸回り
に旋回可能に立設されると共にブーム本体22bが長手
方向に3段に伸縮可能とされている。そして,ブーム本
体22bは基端部22aに鉛直方向に起伏自在に接続さ
れており,油圧駆動で長手方向に伸縮しかつ鉛直方向に
起伏する。ブーム本体22bの先端にはケーブル26に
よってフック24が吊持され,ケーブル26はブーム本
体22bに沿って配設され,かつブーム本体22bの基
端部に取り付けられたケーブルリール27に巻回されて
いる。そして,前記ケーブルリール27を駆動してケー
ブル26を巻き上げたり或いは送り出したりすることに
よりフック24を昇降させるようにしている。
In the crane device 23 of this embodiment, the base end portion 22a of the boom 22 is erected at the rear end portion of the vehicle body 5 so as to be pivotable around a vertical axis, and the boom body 22b has three stages in the longitudinal direction. It is expandable. The boom body 22b is connected to the base end portion 22a so as to be vertically movable, and is hydraulically driven to expand and contract in the longitudinal direction and vertically movable. A hook 24 is suspended by a cable 26 from the tip of the boom body 22b, and the cable 26 is arranged along the boom body 22b and wound around a cable reel 27 attached to the base end of the boom body 22b. There is. Then, the hook 24 is moved up and down by driving the cable reel 27 to wind up or feed out the cable 26.

【0024】ブーム本体22bの先端部には,このブー
ム本体22bの先端が障害物(例えば,図3に示すよう
にトンネル内で施工を行う際のトンネルの壁面)に接近
した場合に,この障害物との衝突を防止するためのマイ
クロスイッチ30が3方向に設けられている。またブー
ム本体22bの基端部にはブーム本体22bの伸縮量と
起伏角とをそれぞれ制限する第1のリミットスイッチ3
1,および第2のリミットスイッチ32が設けられ,基
端部22aには旋回角度を制限する第3のリミットスイ
ッチ33が設けてある。
When the tip of the boom body 22b approaches an obstacle (for example, the wall surface of the tunnel when construction is performed in the tunnel as shown in FIG. 3), the obstacle is attached to the tip of the boom body 22b. Microswitches 30 are provided in three directions to prevent collision with an object. The base end of the boom body 22b has a first limit switch 3 for restricting the expansion and contraction amount and the undulation angle of the boom body 22b.
The first and second limit switches 32 are provided, and the base end 22a is provided with the third limit switch 33 for limiting the turning angle.

【0025】さらにクレーン装置23は,手動,リーモ
ートコントロール,ラジオコントロールの3つのモード
によって操作可能であると共に,荷役台7の後部に設置
された制御盤34内に組み込まれた制御手段によって,
ブーム22を自動的に伸縮,起伏,旋回させ,荷役台に
積載された蓋15を所定の順序に従ってトラフ2上に敷
設することができる。この制御手段は,現場において蓋
15の荷積み開始位置,荷卸方向,荷卸し位置等の設定
が可能である。なお,クレーン装置23は,通常状態
(敷設作業以外の状態)では最短の長さに縮めた状態に
収納されている(図1中破線部)。
Further, the crane device 23 can be operated in three modes of manual, remote control, and radio control, and by means of control means incorporated in a control panel 34 installed at the rear of the cargo handling platform 7,
The boom 22 can be automatically expanded / contracted, raised / lowered, and swung, and the lid 15 loaded on the cargo handling platform can be laid on the trough 2 in a predetermined order. This control means can set the loading start position, the unloading direction, the unloading position, etc. of the lid 15 at the site. It should be noted that the crane device 23 is stored in a state in which it is contracted to the shortest length in a normal state (a state other than the laying work) (broken line portion in FIG. 1).

【0026】吸着装置25は,通常状態では荷役台7の
最前部中央に配設されており,敷設作業時にはブーム2
2のフック24に吊持されて用いられている。吸着装置
25は,図4ないし図7に示すように,箱状の装置本体
25aの上部にフック24に係止される吊下金具25b
が設けられ,装置本体25aの下側には蓋15を吸着す
る吸引パッド25cが設けられている。そして吸着装置
25は吸着ボタン25dを押すと真空ポンプが起動して
吸引パッド25cに蓋15が吸着し,離脱ボタン25e
を押すと真空ポンプが停止して吸引パッド25cから蓋
15が離脱するようになっている。この吸着装置25の
下部には,機械式の蓋クランプ装置35が設けられ,こ
の蓋クランプ装置35によって蓋15を吸引して移動す
る際に,万一故障が発生しても蓋15が落下するのを防
止する。
The suction device 25 is arranged in the center of the forefront of the cargo handling platform 7 in a normal state, and is used for the boom 2 during laying work.
It is used by being suspended from the second hook 24. As shown in FIGS. 4 to 7, the suction device 25 includes a hanging metal fitting 25b that is hooked to a hook 24 on an upper portion of a box-shaped device body 25a.
Is provided, and a suction pad 25c for adsorbing the lid 15 is provided below the device body 25a. Then, when the suction button 25d of the suction device 25 is pressed, the vacuum pump is activated and the lid 15 is sucked onto the suction pad 25c, and the release button 25e.
When is pressed, the vacuum pump is stopped and the lid 15 is detached from the suction pad 25c. A mechanical lid clamp device 35 is provided below the suction device 25. When the lid clamp device 35 sucks and moves the lid 15, the lid 15 drops even if a failure occurs. Prevent.

【0027】蓋クランプ装置35は,図6に示すように
2本の平行に配置されたフレーム35aと,このフレー
ム35a間を連結する2本の連結部材35bと,さらに
連結部材35bの間の中央部付近を連結するチャンネル
材35cとで枠体が形成され,この枠体の2本のフレー
ム35a間の両端部付近に回転ロッド35eが取り付け
られ,この回転ロッド35eがフレーム35の外側に突
出した両端付近には,この回転ロッド35eと共に回転
して蓋15を両側から把持する4個のクランプ35fが
取り付けられ,さらに回転ロッド35eの一方の端部に
はクランプ35fを回転させるためのハンドル35gが
固定されている。そして,前記チャンネル材35cの中
央部には,図7に示すように内側に向かって取付板35
hが固定されており,この取付板35hを上記吸引パッ
ド25cの上面側に固定することにより,蓋クランプ装
置35を吸着装置25に取り付けるようにしたものであ
る(図4,5参照)。なおクランプ35fを,把持する
蓋15の長さ方向に伸縮可能かつ固定可能とし,蓋15
の一方の位置決め手段としてもよい。
As shown in FIG. 6, the lid clamp device 35 includes two frames 35a arranged in parallel, two connecting members 35b for connecting the frames 35a, and a center between the connecting members 35b. A frame is formed by the channel material 35c that connects the portions near each other, and a rotary rod 35e is attached near both ends between the two frames 35a of the frame, and the rotary rod 35e protrudes to the outside of the frame 35. Four clamps 35f that rotate together with the rotating rod 35e and grip the lid 15 from both sides are attached near both ends, and a handle 35g for rotating the clamp 35f is further provided at one end of the rotating rod 35e. It is fixed. At the central portion of the channel member 35c, the mounting plate 35 faces inward as shown in FIG.
h is fixed, and the lid clamp device 35 is attached to the suction device 25 by fixing the attachment plate 35h to the upper surface side of the suction pad 25c (see FIGS. 4 and 5). The clamp 35f can be expanded and contracted and fixed in the length direction of the lid 15 to be gripped.
One of the positioning means may be used.

【0028】図8,9は車両本体5の後部に設けられた
距離検出装置11の説明図であり,距離検出装置11
は,走行路面上を転がるタイヤ11aと,このタイヤ1
1aをフレーム6の後部側面に取り付けるアーム部11
bと,前記タイヤ11aの回転数をエンコーダで検出し
て車両本体5の移動距離を検出する検出手段11cとを
備えてる。前記アーム部11bはフレーム6側に固定さ
れる固定アームと,この固定アームに対して上下方向に
回動自在とされて前記タイヤ11aを支持する回転アー
ムとからなり,これによってタイヤ11aが走行路面に
追従して上下動可能とされている。また回転アームの所
定の位置に係止部11dが設けられる一方,固定アーム
には前記係止部11dに着脱自在なピンによって係合す
る係合部11eが取り付けられ,通常(距離検出が不
要)時には,回転アームを上側に折曲げて,前記係止部
11dを係合部11eにピン接合することによりタイヤ
11aをフレーム6側に支持するようになっている(図
8中の2点鎖線参照)。なお図1ないし3図中,符号4
0はブーム本体22bの先端付近に設けられた作業灯,
41は運転室屋根部に設けられた回転灯,42は車両本
体5の後端部に設けられて他車を牽引するためのピン式
連結器である。
8 and 9 are explanatory views of the distance detecting device 11 provided at the rear portion of the vehicle body 5, and the distance detecting device 11 is shown.
Is a tire 11a rolling on the road surface and this tire 1
Arm part 11 for attaching 1a to the rear side surface of the frame 6
b, and a detection means 11c for detecting the moving distance of the vehicle body 5 by detecting the number of rotations of the tire 11a with an encoder. The arm portion 11b is composed of a fixed arm fixed to the frame 6 side and a rotary arm which is rotatable in the vertical direction with respect to the fixed arm and supports the tire 11a. It is possible to move up and down following. Further, the locking portion 11d is provided at a predetermined position of the rotating arm, while the fixed arm is provided with an engaging portion 11e that engages with the locking portion 11d by a detachable pin, which is usually (distance detection is not required). At times, the rotating arm is bent upward, and the locking portion 11d is pin-joined to the engaging portion 11e to support the tire 11a on the frame 6 side (see a chain double-dashed line in FIG. 8). ). It should be noted that reference numeral 4 in FIGS.
0 is a work light provided near the tip of the boom body 22b,
Reference numeral 41 is a revolving light provided on the roof portion of the driver's cab, and 42 is a pin type connector provided at the rear end portion of the vehicle body 5 for pulling another vehicle.

【0029】次にこの実施例のトラフ蓋自動敷設装置を
用いてトラフ2上に蓋15を敷設する作業方法について
説明する。予め,荷役台7上に必要数の蓋15を積載す
る。この場合,図1,図2等に示すように,例えば10
枚程度を積み重ねた蓋群(積層蓋群)が走行路長手方向
にほぼ接触して並ぶように積載する。図示例では走行路
幅方向の右側と左側との2列に積載している。この蓋1
5の積み込み方法は,例えば図示略のパレット上に2つ
の積層蓋群を乗せ,このパレット毎に2つの積層蓋群を
フォークリフトあるいはクレーン等で荷役台7上に積み
込む。必要数の蓋15の積み込みが済むと,車両本体5
を運転して蓋施工場所まで走行した後,所定の位置に停
車する。
Next, a method of laying the lid 15 on the trough 2 using the automatic trough lid laying apparatus of this embodiment will be described. The required number of lids 15 are loaded on the cargo handling table 7 in advance. In this case, as shown in FIGS.
The lid group formed by stacking about one sheet (the laminated lid group) is stacked so that the lid groups are almost in contact with each other in the longitudinal direction of the traveling path. In the illustrated example, they are loaded in two rows, the right side and the left side in the traveling road width direction. This lid 1
In the loading method of 5, for example, two laminated lid groups are placed on a pallet (not shown), and the two laminated lid groups are loaded on the cargo handling platform 7 for each pallet by a forklift or a crane. When the required number of lids 15 have been loaded, the vehicle body 5
After driving to the lid construction site, stop at the specified position.

【0030】図10は蓋15をハンドリング装置21を
用いて左右のトラフ2上に敷設する際の施工順序を蓋1
5に符番した状態を示すものである。まず,2列に積載
された蓋15を走行路の右側のトラフ2に敷設する作業
方法について説明する。右側のトラフ2に敷設する場合
には,まず,荷役台7のNO.1の蓋15荷積み位置(車両
本体5の既設マーキング位置)に合わせてトラフ2上の
荷下ろし(敷設)開始位置をマーキングAした後,蓋1
5の前列側から横順に取り出して行く。即ち,蓋15に
符番された順序に従って,まず最上段,最前列のNO.1の
蓋15を荷積みして右側のトラフ2のNO.1の蓋15の位
置に敷設する。次に,NO.1の左横に位置する最前列のN
O.2の蓋15を荷積みして,右側のトラフ2のNO.2の蓋
15の位置に敷設する。次に,NO.1の後列に位置するN
O.3の蓋15を荷積みして右側のトラフ2のNO.3の蓋1
5の位置に敷設する,以下同様にしてNO.4,NO.5・・・NO.8
までの8枚の蓋15を右側のトラフ2に敷設する。そし
て,トラフ2上に8枚敷設する工程が完了した後には,
蓋15のN0.8の後端位置にマーキングBを行った後,車
両本体5を走行路1に沿って後方へ移動させ,車両本体
5のマーキング位置を前記マーキングBの位置に合わせ
て停車させる。この状態において,前記工程に続いて荷
役台7のN0.9の蓋15を荷積みして右側のトラフ2のN
O.8の蓋15から蓋8枚分の間隔を隔てた後方の後方のN
O.1の蓋15の位置に敷設する。次に,荷役台7のNO.10
の蓋15を荷積みして,トラフ2のNO.2の蓋15の位置
に敷設する。以下同様にして荷役台7のNO.11,NO.12・・・
NO.16の蓋15をトラフ2のNO.3,NO.4・・・NO.8の位置に
走行路の前面側に向かって敷設していく。最後に荷役台
7のNO.16の蓋15がトラフ2のNO.8の位置に敷設さ
れ,これによってトラフ2の前方側の最後に敷設された
NO.8の蓋15に連設され,荷役台7上の積層蓋群の最上
段の蓋15の敷設が完了する。そして,トラフ2の後方
のNO.1の蓋15の後端部にマーキングCを行った後,前
記車両本体5を後方に移動させてマーキングCに荷積み
位置を合わせ,この状態においてクレーン装置23を積
層蓋群の2段目のNO.1の蓋15の位置に復帰させ,この
2段目のNO.1の蓋から前記工程を繰り返して順次トラフ
2に敷設していく。これによって,クレーン装置23の
動きが無駄なく制御され,効率よく敷設作業を行わせる
ことができる。
FIG. 10 shows the order in which the lid 15 is laid on the left and right troughs 2 using the handling device 21.
It shows the state numbered 5. First, a method of laying the lids 15 stacked in two rows on the trough 2 on the right side of the traveling path will be described. When laying on the trough 2 on the right side, first, the loading / unloading (laying) start position on the trough 2 is set in accordance with the loading position of the No. 1 lid 15 of the loading platform 7 (the existing marking position of the vehicle body 5). After marking A, lid 1
Take out from the front row side of 5 in horizontal order. That is, the topmost and frontmost NO.1 lids 15 are first loaded and laid at the position of the NO.1 lid 15 of the trough 2 on the right side in the order in which the lids 15 are numbered. Next, N in the front row located on the left side of NO.1
Load the O.2 lid 15 and lay it on the right trough 2 at the NO.2 lid 15 position. Next, N located in the back row of NO.1
O.3 lid 15 is loaded and right trough 2 NO.3 lid 1 is loaded.
No.4, NO.5 ... NO.8 are laid at the position of No.5 and so on.
The eight lids 15 up to are laid on the right trough 2. And after the process of laying 8 sheets on the trough 2 is completed,
After marking B is made at the rear end position of N0.8 of the lid 15, the vehicle body 5 is moved rearward along the traveling path 1, and the vehicle body 5 is stopped in accordance with the marking position of the marking B. . In this state, following the above process, the N0.9 lid 15 of the loading platform 7 is loaded and the N of the trough 2 on the right side is loaded.
The rear N behind the lid 15 of O.8 with a distance of 8 lids.
Install at the position of the lid 15 of O.1. Next, No. 10 of the loading platform 7
Load the lid 15 of No. 2 and lay it at the position of the No. 2 lid 15 of the trough 2. In the same way, NO.11, NO.12 of loading platform 7 ...
The NO.16 lid 15 is laid at the NO.3, NO.4 ... NO.8 positions of the trough 2 toward the front side of the road. Finally, the NO.16 lid 15 of the cargo handling platform 7 was laid at the NO.8 position of the trough 2, and thus was laid at the last of the front side of the trough 2.
It is connected to the lid 15 of NO.8, and the laying of the uppermost lid 15 of the stacked lid group on the cargo handling platform 7 is completed. Then, after marking C on the rear end of the NO.1 lid 15 behind the trough 2, the vehicle body 5 is moved backward to align the loading position with the marking C. In this state, the crane device 23 Is returned to the position of the second-stage NO.1 lid 15 of the laminated lid group, and the above steps are repeated from the second-stage NO.1 lid 15 to sequentially lay them on the trough 2. As a result, the movement of the crane device 23 is controlled without waste, and the laying work can be performed efficiently.

【0031】また,2列に積載された蓋15を走行路の
左側のトラフ2(図10中破線部側)に敷設する場合に
は,まず車両本体5の荷積み位置のマーキングに合わせ
てトラフ2の荷卸し位置の開始点にマーキングaをした
後,上記右側のトラフ2に敷設した荷積み順序に従って
荷役台7の積層蓋群のNO.1の蓋15から横順にハンドリ
ング装置21によって荷積みして,順次トラフ2上の荷
下ろし位置にNO.1,NO.2・・・NO.8まで敷設する。走行路の
前方の敷設が終わると,NO.8の蓋15の後端にマーキン
グbをした後,車両本体5を後方に移動させて,マーキ
ングbに荷積み位置のマーキングを合わせ,以下上記工
程と同様の取り出し順序に従ってトラフ2の後方側から
NO.1,NO.2・・・NO.8と前方側へ敷設する。
When the lids 15 stacked in two rows are laid on the left trough 2 (on the side of the broken line in FIG. 10) of the traveling road, first, the troughs are aligned with the marking of the loading position of the vehicle body 5. After marking a at the starting point of the unloading position of No. 2, according to the loading order laid on the above-mentioned trough 2 on the right side, the loading device 21 loads the stacking lid group No. 1 of the stacking lid group from the No. 1 lid 15 laterally in order. Then, lay NO.1, NO.2 ... NO.8 at the unloading position on the trough 2 in order. When the laying on the front side of the traveling path is completed, after marking b on the rear end of the lid 15 of NO.8, the vehicle body 5 is moved backward, and the marking of the loading position is aligned with the marking b. From the rear side of the trough 2 according to the same removal order as
NO.1, NO.2 ... NO.8 and lay on the front side.

【0032】上記の敷設作業では,トラフ2に8枚の蓋
15を敷設した後,車両本体5を移動させる際には,ト
ラフ2側にマーキングA,B,C・・・した位置に,車両
本体5の荷卸し位置を一致させるように移動させるが,
車両本体5の正確な移動距離は距離検出装置11で検出
されて運転室37内にデジタル表示される。なお,蓋1
5の長さを500mmとした場合の8枚分の移動距離は
500mm×8枚=4,000mmとなる。
In the above laying work, after laying the eight lids 15 on the trough 2 and then moving the vehicle main body 5, the vehicle is moved to the positions marked A, B, C ... Move the main body 5 to match the unloading position,
The accurate movement distance of the vehicle body 5 is detected by the distance detection device 11 and is digitally displayed in the cab 37. The lid 1
When the length of 5 is 500 mm, the moving distance for 8 sheets is 500 mm × 8 sheets = 4,000 mm.

【0033】この実施例の装置には,上述した荷役台7
からの蓋15の荷積み位置,荷積み順序,トラフ2への
荷卸し方向,叉は荷卸し位置等に合わせてクレーン装置
23の動きを制御する制御手段が備えられ,これによっ
て蓋15の敷設作業が自動的に行われるようになってい
る。これによって,荷役台7の積層蓋群の蓋15の荷積
み順序は,必ずしもNO.1の蓋15から取り出す必要はな
く,例えばNO.6或いはNO.11等に配置された途中の蓋1
5から取り出すようにプログラムを設定することもで
き,敷設作業に中断が生じた場合にも,前の作業に継続
して蓋の敷設作業を行う事ができる。
The apparatus of this embodiment includes the above-described cargo handling platform 7
Control means for controlling the movement of the crane device 23 in accordance with the loading position of the lid 15 from the above, loading order, unloading direction to the trough 2, or unloading position, and the like. The work is done automatically. As a result, the stacking order of the lids 15 of the stacking lid group of the cargo handling table 7 does not necessarily have to be taken out from the NO.1 lid 15, and for example, the lid 1 in the middle placed on NO.6 or NO.11.
The program can be set so that the lid can be taken out from No. 5, and even if the laying work is interrupted, the lid laying work can be continued from the previous work.

【0034】次に図11ないし図14に示すフローチャ
ートを用いて,この実施例のハンドリング装置21の操
作方法について説明する。まず,車両本体5を蓋15を
敷設するトラフ2の所定の位置に移動させた後,現場に
おいて制御盤34のブレーカをオンすることによりハン
ドリング装置21を起動させると共に,制御盤34に設
けられた次の各種スイッチの設定,選択を手動にて行う
(ステップ1)。このステップ1では,手動運転,ステ
ップ運転,自動運転等のモード切換スイッチの選択,左
右どちらのトラフ2に蓋15を敷設するかを選択する荷
卸し方向スイッチの選択,蓋15をトラフ2のどの位置
に敷設するかを選択する荷卸し位置スイッチの選択,蓋
15の大きさ等を選択する蓋種類スイッチの選択,どの
位置に荷積みされた蓋15から取り出すかを決める荷積
み位置ステップNOの設定,トラフ2のどの位置に蓋15
を敷設するのかを決める荷卸し位置ステップNOの設定等
を行う。(なお,ここで自動運転とはブーム22が三軸
方向に同時に移動する運転方法であり,またステップ運
転とはブーム22が一軸づつ移動する運転方法であ
る。)
Next, the operation method of the handling device 21 of this embodiment will be described with reference to the flow charts shown in FIGS. First, after moving the vehicle body 5 to a predetermined position of the trough 2 on which the lid 15 is laid, the handling device 21 is activated by turning on the breaker of the control panel 34 at the site, and is provided on the control panel 34. The following switches are set and selected manually (step 1). In this step 1, selection of a mode changeover switch for manual operation, step operation, automatic operation, etc., selection of an unloading direction switch for selecting which of the left and right troughs 2 the lid 15 is to be installed, and which of the troughs 2 is used for the lid 15 Select the unloading position switch that selects whether to lay it in the position, select the lid type switch that selects the size of the lid 15 and the like, and select the loading position step NO that determines the position from which the lid 15 is loaded. Setting, where on the trough 2 the lid 15
Set the unloading position step NO, etc. that decides whether or not to install. (Here, the automatic operation is an operation method in which the boom 22 moves simultaneously in the three axis directions, and the step operation is an operation method in which the boom 22 moves one axis at a time.)

【0035】つぎに上記の各種選択,設定を行った後
に,原点復帰スイッチをオンすることにより(ステップ
2),クレーン装置23の動きに異常が無いかどうかが
判断される(ステップ3)。ここで原点出しを行う場合
は,ブーム本体22bが必ず格納状態にあることを確認
すると共に,ブーム本体22bが旋回原点にあることを
知らせる旋回原点青ランプが点灯していることを確認す
る。クレーン装置23の動きに異常が無い場合には,ブ
ーム本体22bの起伏を下げる動作と,ブーム本体22
bの長さを縮める動作と,ブーム本体22bを手動にて
旋回させる動作とを行い(ステップ4),ブーム22が
原点リミット(クレーン装置23に設けられた第1のリ
ミットスイッチ31,第2のリミットスイッチ32,第
3のリミットスイッチ33の各原点位置)に達したかど
うかが判断される(ステップ5)。なお,クレーン装置
23の動きに異常がある場合には,異常処理ループ(ス
テップ6)へ進み,異常ランプ(赤)が点灯し,シグナ
ルホーンが5秒間鳴る。この場合には,異常の原因を調
べて修理すると共に手動モードでブーム本体22bを移
動させた後,自動のステップモードを選択する。つい
で,リセットスイッチをオンとし異常ランプが消えてス
テップ3に戻る。
After making the above-mentioned various selections and settings, the origin return switch is turned on (step 2) to determine whether or not there is any abnormality in the movement of the crane device 23 (step 3). In this case, when the origin is set, it is necessary to confirm that the boom body 22b is in the retracted state and that the turning origin blue lamp that lights that the boom body 22b is at the origin of turning is turned on. When there is no abnormality in the movement of the crane device 23, the operation of lowering the ups and downs of the boom main body 22b and the boom main body 22b are performed.
The operation of shortening the length of b and the operation of manually rotating the boom main body 22b are performed (step 4), and the boom 22 is set at the origin limit (the first limit switch 31 provided on the crane device 23, the second limit switch 31). It is judged whether or not the respective origin positions of the limit switch 32 and the third limit switch 33) have been reached (step 5). If the movement of the crane device 23 is abnormal, the process goes to the abnormality processing loop (step 6), the abnormality lamp (red) is turned on, and the signal horn sounds for 5 seconds. In this case, the cause of the abnormality is investigated and repaired, the boom body 22b is moved in the manual mode, and then the automatic step mode is selected. Then, the reset switch is turned on, the abnormal lamp goes out, and the process returns to step 3.

【0036】ステップ5において,ブーム22が原点リ
ミットに達した場合には,ブーム本体22bの起伏が停
止して起伏原点青ランプが点灯し,またブーム本体22
bの伸縮が停止して伸縮原点青ランプが点灯する。そし
てこれら青ランプの点灯を確認した後,ブーム本体22
bの先端のフック24に吸着装置25を取り付ける。こ
の場合のブーム本体22bは,図1,2に示すように,
車両本体5の幅方向の中心線上に位置すると共に,ブー
ム本体22bの先端は荷役台7の最前部に置かれた吸着
装置25の中央部に位置した状態となる(ステップ
7)。この状態において,制御盤34の荷積み作業(※
1)のスタートスイッチをオンとすることにより,スタ
ート押ボタンランプが赤色に点灯して遠隔操作箱の使用
が可能となり(ステップ8),ハンドリング装置21が
荷積み点に移動し(ステップ9),クレーン装置23の
動きに異常がないかどうかが判断され(ステップ1
0),異常がない場合には,設定されたステップ,即ち
取り出すべき蓋15の位置へ吸着装置25が移動したど
うかが判断され(ステップ11),吸着装置25が設定
されたステップ(蓋15の位置)に達した場合には,荷
積ステップNO表示がステップアップして,ブーム本体2
2bの伸縮,起伏,旋回が停止する(ステップ12)。
なお,初回のみはスタートNO.設定と同じとなる。ステ
ップ10において異常がある場合には,異常処理ループ
(ステップ6)へ戻る。
In step 5, when the boom 22 reaches the origin limit, the boom main body 22b stops undulating, the undulation origin blue lamp lights up, and the boom main body 22b
The expansion / contraction of b stops and the expansion / contraction origin blue lamp lights up. After confirming the lighting of these blue lamps, the boom body 22
The suction device 25 is attached to the hook 24 at the tip of b. The boom main body 22b in this case is, as shown in FIGS.
The boom body 22b is positioned on the center line of the vehicle body 5 in the width direction, and the tip of the boom body 22b is positioned at the center of the suction device 25 placed at the forefront of the cargo handling platform 7 (step 7). In this state, loading work on the control panel 34 (*
By turning on the start switch of 1), the start push button lamp lights up in red and the remote control box can be used (step 8), the handling device 21 moves to the loading point (step 9), It is determined whether or not the movement of the crane device 23 is abnormal (step 1
0) If there is no abnormality, it is judged whether or not the suction device 25 has moved to the set step, that is, the position of the lid 15 to be taken out (step 11), and the suction device 25 is set to the set step (of the lid 15). Position) is reached, the loading step NO display will step up and the boom body 2
Expansion / contraction, undulation and turning of 2b are stopped (step 12).
In addition, only the first time is the same as the start NO. Setting. If there is an abnormality in step 10, the process returns to the abnormality processing loop (step 6).

【0037】ステップ12でブーム22の動きが停止す
ると,荷積みした蓋15が8枚になったかどうかが判断
され(ステップ13),8枚になっていない場合には,
巻き下げスイッチをオンとしてケーブルリール27から
ケーブル26を送り出して吸着装置25を荷積みし蓋1
5の表面に接触させた後,巻き下げスイッチをオフとす
る(ステップ14)。このとき遠隔操作箱の使用が可能
となる。なお,ステップ13において,取り出した蓋1
5が8枚に達した場合には,シグナルホーンが1秒間鳴
り,これを確認した後,距離検出装置11で検出される
車両本体5の移動距離を見ながら車両本体5を走行路の
後方側へ4m移動させて定位置に停車させ(ステップ1
5),ステップ14へ進む。吸着装置25を蓋15の表
面に接触させた状態で,荷役台7上の作業員が吸着装置
25の吸着ボタン25dをオンとして,蓋15を吸引パ
ッド25cに吸着させ(ステップ16),ついでフック
24の巻き上げスイッチをオンして蓋15を所定の高さ
まで巻き上げる(ステップ17)。ここで,蓋15をわ
ずかに巻き上げて積層蓋群との間に所定の隙間が形成さ
れた時点で,一旦巻き上げを停止させ,作業員が吸着装
置25の下部に設けられた蓋クランプ装置35を手動で
操作し,クランプ35fを回転させて蓋15の両側を把
持し,吸着装置25が故障した場合にもにクランプ35
fで蓋15が落下するのを防止する。
When the movement of the boom 22 is stopped in step 12, it is judged whether the number of the loaded lids 15 is 8 (step 13).
With the lowering switch turned on, the cable 26 is sent out from the cable reel 27, the adsorption device 25 is loaded, and the lid 1 is loaded.
After contacting the surface of No. 5, the lowering switch is turned off (step 14). At this time, the remote control box can be used. In addition, in step 13, the lid 1 taken out
When the number of 5 reaches 8, the signal horn sounds for 1 second, and after confirming this, while checking the moving distance of the vehicle body 5 detected by the distance detection device 11, the vehicle body 5 is moved to the rear side of the traveling path. 4m to stop at a fixed position (Step 1
5) Go to step 14. With the suction device 25 in contact with the surface of the lid 15, the worker on the cargo handling table 7 turns on the suction button 25d of the suction device 25 to suck the lid 15 onto the suction pad 25c (step 16), and then hooks it. The winding switch 24 is turned on to wind the lid 15 to a predetermined height (step 17). Here, when the lid 15 is slightly rolled up and a predetermined gap is formed between the lid 15 and the stacked lid group, the winding is temporarily stopped, and an operator operates the lid clamp device 35 provided below the suction device 25. The clamp 35f is manually operated to rotate the clamp 35f to grip both sides of the lid 15, and even when the suction device 25 fails, the clamp 35
The lid 15 is prevented from falling by f.

【0038】この状態において,スタートスイッチをオ
ンとし(ステップ18),ブーム本体22bの先端をト
ラフ2の荷卸し位置に移動させ(ステップ19),クレ
ーン装置23の動きに異常が無いかどうかが判断される
(ステップ20)。異常が無い場合には,蓋15がトラ
フ2上の設定された位置に達した否かの判断が行われる
(ステップ21)。ステップ20において,異常がある
場合,例えばトンネル内で蓋敷設作業を行う際に(図3
参照),トンネル側壁面50にブーム本体22bの先端
のマイクロスイッチが当たってクレーン装置23が停止
するような場合には,ステップ6の異常処理ループへ戻
る。ステップ21において蓋15が設定されたトラフ2
上の設定された位置に達した場合には,ブーム本体22
bの伸縮,起伏,旋回が停止されて荷卸しステップNO.
表示がステップアップする(ステップ22)。またステ
ップ21において異常があるある場合には,ステップ1
9へ戻る。
In this state, the start switch is turned on (step 18), the tip of the boom body 22b is moved to the unloading position of the trough 2 (step 19), and it is determined whether or not the crane device 23 is operating normally. (Step 20). If there is no abnormality, it is determined whether the lid 15 has reached the set position on the trough 2 (step 21). If there is an abnormality in step 20, for example, when performing lid laying work in a tunnel (see FIG.
If the micro switch at the tip of the boom body 22b hits the tunnel side wall surface 50 to stop the crane device 23, the process returns to the abnormal processing loop of step 6. Trough 2 with lid 15 set in step 21
When the upper set position is reached, the boom body 22
Unloading step NO.
The display is stepped up (step 22). If there is an abnormality in step 21, step 1
Return to 9.

【0039】ステップ22において,ブーム本体22b
の動きが停止すると,巻き下げスイッチをオンとし,フ
ック24をトラフ2上の所定の位置まで降下させた後,
定位置においてスイッチをオフとし巻き下げを停止する
(ステップ23)。蓋15がトラフ2上の所定の位置に
停止すると,トラフ2付近の作業員が吸着装置25の離
脱ボタン25eを押して吸引パッド25cから蓋15を
離脱させ(ステップ24),ついでフック24の巻き上
げスイッチをオンして巻き上げた後,定位置において巻
き上げスイッチをオフにして巻き上げを停止させ(ステ
ップ25),次の荷積み作業(※1)のステップ8へ戻
る。図14は,作業途中で荷積み点や荷卸し点を変更す
る際のモードを示すフローチャートであり,荷積み点,
荷卸し点のリセットスイッチをオンとし(ステップ2
6),ついでスタートスイッチを押すことにより(ステ
ップ27),つぎの荷積み作業(※1)のステップ8へ
進む。このフローはクレーン装置23の停止中であれ
ば,いつでも作動させることが可能であり,ステップ2
6では荷積み及び荷卸し点共ステップNO.表示がデジス
イッチの設定NO.になり,またステップ27では表示NO.
からスタートとする。
In step 22, the boom body 22b
When the movement of the hook stops, the lowering switch is turned on, the hook 24 is lowered to a predetermined position on the trough 2,
At the fixed position, the switch is turned off to stop the lowering (step 23). When the lid 15 stops at a predetermined position on the trough 2, a worker near the trough 2 pushes the release button 25e of the suction device 25 to remove the lid 15 from the suction pad 25c (step 24), and then the hoist switch of the hook 24. After turning on and winding up, the winding switch is turned off at a fixed position to stop the winding (step 25), and the process returns to step 8 of the next loading work (* 1). FIG. 14 is a flowchart showing a mode in which the loading point and the unloading point are changed during the work.
Turn on the unloading point reset switch (Step 2
6) Then, by pressing the start switch (step 27), the process proceeds to step 8 of the next loading work (* 1). This flow can be operated at any time while the crane device 23 is stopped.
In step 6, the step No. display for both loading and unloading points becomes the setting No. of the digital switch, and in step 27 the display NO.
Start from

【0040】[0040]

【発明の効果】本発明のトラフ蓋自動敷設装置によれ
ば,蓋の敷設作業が車両本体の一定距離の走行とハンド
リング装置の伸縮,起伏,旋回との組み合わせによる無
駄な動きのない効率的な動作で行われるので,多数の蓋
をトラフ上に連続的にかつ能率的に敷設することがで
き,蓋敷設作業の省力化が図られるとともに,工事期間
を短縮することができる。また,車両走行路の左右いず
れのトラフに対しても蓋を能率的に敷設できる。
According to the automatic trough lid laying device of the present invention, the laying work of the lid is efficient without wasteful movement due to the combination of the traveling of the vehicle main body for a certain distance and the extension, undulation and turning of the handling device. Since the operation is performed by operation, a large number of lids can be continuously and efficiently laid on the trough, the labor for laying the lids can be saved, and the construction period can be shortened. In addition, the lid can be efficiently laid on either the left or right trough of the vehicle running path.

【0041】請求項2のトラフ蓋自動敷設装置によれ
ば,ハンドリング装置がクレーン装置と,ブーム先端の
フックに吊持される吸着装置とで構成されているため,
ハンドリング装置を簡単な構造とすることができ,操作
の容易性,コストの低減を図ることができる。
According to the automatic trough lid laying device of the second aspect, since the handling device is composed of the crane device and the suction device suspended by the hook at the tip of the boom,
The handling device can have a simple structure, which can facilitate the operation and reduce the cost.

【0042】請求項3のトラフ蓋自動敷設装置によれ
ば,吸着装置に蓋クランプ装置を設けたので,吸着装置
が万一故障した場合にも,蓋が落下して破損したり,事
故の発生が防止される。
According to the automatic trough lid laying device of the third aspect, since the suction device is provided with the lid clamping device, even if the suction device should fail, the lid may drop and be damaged, or an accident may occur. Is prevented.

【0043】請求項4のトラフ蓋自動敷設装置によれ
ば,ブームの先端にスイッチを設けたので,ブームの先
端部が障害物に衝突する前にクレーン装置の動きを停止
させて,装置の破損や事故の発生を防止することができ
る。またクレーン装置の動きを制限するリミットスイッ
チを設けたので,クレーン装置の危険な動きや無駄な動
きを防止することができ,かつクレーン装置の原点位置
を設定することができる。
According to the automatic trough lid laying device of the fourth aspect, since the switch is provided at the tip of the boom, the movement of the crane device is stopped before the tip part of the boom collides with an obstacle to damage the device. It is possible to prevent the occurrence of accidents. Further, since the limit switch for limiting the movement of the crane device is provided, it is possible to prevent the dangerous movement and the unnecessary movement of the crane device and to set the origin position of the crane device.

【0044】請求項5のトラフ蓋自動敷設装置によれ
ば,予め設定された位置,方向,手順に従ってブームを
自動的に移動させることができるため,マニュアルで作
業を行う場合に較べて格段の効率化を図ることができる
と共に,作業を安全に行うことができる。
According to the automatic trough lid laying device of the fifth aspect, the boom can be automatically moved in accordance with the preset position, direction, and procedure, so that the efficiency is remarkably higher than that in the case where manual work is performed. The work can be performed safely while being realized.

【0045】請求項6のトラフ蓋敷設方法によれば,蓋
を任意の荷積み位置からトラフ上に敷設することができ
るため,敷設作業を様々な状況に対応させて行うことが
できる。
According to the trough lid laying method of the sixth aspect, since the lid can be laid on the trough from an arbitrary loading position, the laying work can be performed in various situations.

【0046】請求項7のトラフ蓋敷設方法によれば,ト
ラフの前方側に敷設した蓋に対してトラフの後方側から
前方側へ向かって敷設していくようにしたので,クレー
ン装置の動きの無駄をなくすことができる。
According to the trough lid laying method of the seventh aspect, since the lid laid on the front side of the trough is laid from the rear side of the trough toward the front side, the movement of the crane device is prevented. Waste can be eliminated.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示すトラフ蓋自動敷設装置
の正面図である。
FIG. 1 is a front view of an automatic trough lid laying device according to an embodiment of the present invention.

【図2】同平面図である。FIG. 2 is a plan view of the same.

【図3】図1における右側面図である。FIG. 3 is a right side view in FIG.

【図4】図1における吸着装置の正面図である。FIG. 4 is a front view of the adsorption device in FIG.

【図5】同側面図である。FIG. 5 is a side view of the same.

【図6】図1における蓋クランプ装置の平面図である。6 is a plan view of the lid clamp device in FIG. 1. FIG.

【図7】図6における蓋クランプ装置の吸着装置への取
り付け部分の拡大断面図である。
FIG. 7 is an enlarged cross-sectional view of a portion where the lid clamp device in FIG. 6 is attached to the suction device.

【図8】図1における距離検出装置を説明するための車
両本体の後部を一部拡大した正面図である。
8 is a partially enlarged front view of the vehicle main body for explaining the distance detection device in FIG. 1. FIG.

【図9】同右側面図である。FIG. 9 is a right side view of the same.

【図10】図1における荷役台上の蓋の敷設順序を説明
するための説明図である。
FIG. 10 is an explanatory diagram for explaining a laying order of lids on the cargo handling table in FIG. 1.

【図11】図1における実施例のハンドリング装置の操
作方法のフローチャートである。
11 is a flowchart of a method of operating the handling device of the embodiment in FIG.

【図12】図1における実施例のハンドリング装置の操
作方法のフローチャートである。
12 is a flowchart of a method of operating the handling device of the embodiment in FIG.

【図13】図1における実施例のハンドリング装置の操
作方法のフローチャートである。
13 is a flow chart of a method of operating the handling device of the embodiment in FIG.

【図14】図1における実施例のハンドリング装置の荷
積み点,荷卸し点を変更する場合の操作方法のフローチ
ャートである。
FIG. 14 is a flowchart of an operating method for changing a loading point and an unloading point of the handling device of the embodiment in FIG.

【符号の説明】[Explanation of symbols]

1 走行路 2 トラフ 3 トラフ蓋自動敷設装置 5 車両本体 7 荷役台 15 蓋 21 ハンドリング装置 22 ブーム 22a 基端部 22b ブーム本体 24 フック 25 吸着装置 30 スイッチ(マイクロスイッチ) 31,32,33 リミットスイッチ 35 蓋クランプ装置 1 Traveling path 2 Trough 3 Trough lid automatic laying device 5 Vehicle body 7 Cargo stand 15 Lid 21 Handling device 22 Boom 22a Base end 22b Boom body 24 Hook 25 Adsorption device 30 Switch (micro switch) 31, 32, 33 Limit switch 35 Lid clamp device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 四百苅 成夫 東京都江東区木場1丁目5番1号 株式会 社フジクラ内 (72)発明者 鳥井 和彦 東京都江東区木場1丁目5番1号 株式会 社フジクラ内 (72)発明者 鈴木 実 東京都台東区北上野1丁目10番14号 日本 鉄道建設公団関東支社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shigeo Shikari, 1-5-1, Kiba, Koto-ku, Tokyo Fujikura Stock Company (72) Inventor Kazuhiko Torii 1-1-5, Kiba, Koto-ku, Tokyo Stock company Fujikura (72) Inventor Minoru Suzuki 1-10-14 Kitaueno, Taito-ku, Tokyo Japan Railway Construction Corporation Kanto branch office

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 車両走行路に沿って側方に設けたトラフ
上に蓋を自動的に敷設するトラフ蓋自動敷設装置であっ
て,車両走行路に沿って走行可能な車両本体と,この車
両本体上に設けられて複数の蓋を積み重ねた状態でかつ
走行路長手方向に並べて積載可能な荷役台と,前記車両
本体に伸縮,起伏,旋回可能に設けられ,かつ前記荷役
台上の蓋を荷積みして側方のトラフ上に敷設可能なハン
ドリング装置とを備えたことを特徴とするトラフ蓋自動
敷設装置。
1. A trough lid automatic laying device for automatically laying a lid on a trough provided laterally along a vehicle running path, the vehicle body being able to run along the vehicle running path, and this vehicle. A cargo handling platform provided on the main body and capable of stacking and stacking a plurality of lids side by side in the longitudinal direction of the traveling path; and a lid provided on the vehicle main body so as to be extendable, retractable, and turnable, and having a lid on the cargo handling platform. An automatic trough lid laying device comprising: a handling device that can be loaded and laid on a lateral trough.
【請求項2】 前記ハンドリング装置は,基端部が前記
車両本体の後部に設置された伸縮,起伏,旋回可能なブ
ーム,及びこのブームの先端に設けられて昇降自在なフ
ックを有するクレーン装置と,このクレーン装置のフッ
クに吊持されて前記蓋を吸着しまたは放すことができる
吸着装置とを備えたことを特徴とする請求項1記載のト
ラフ蓋自動敷設装置。
2. The handling device comprises a crane device having a boom having a base end portion installed at a rear portion of the vehicle body, which can be extended, retracted, swiveled, and a hook provided at a tip end of the boom and capable of moving up and down. The trough lid automatic laying device according to claim 1, further comprising: a suction device that is hung on a hook of the crane device and that is capable of adsorbing or releasing the lid.
【請求項3】 前記吸着装置に,吸着させた前記蓋を両
側から把持し叉は放すことができる蓋クランプ装置を設
けたことを特徴とする請求項2記載のトラフ蓋自動敷設
装置。
3. The automatic trough lid laying device according to claim 2, wherein the suction device is provided with a lid clamp device capable of grasping or releasing the sucked lid from both sides.
【請求項4】 前記クレーン装置のブームの先端には,
このブームの先端が障害物に接近した場合に,このブー
ムを停止させて前記障害物との衝突を防止するためのス
イッチが設けられていると共に,前記クレーン装置の基
端部には前記ブームの伸縮量,起伏角,旋回角を制限す
るリミットスイッチがそれぞれ設けられていることを特
徴とする請求項2叉は3記載のトラフ蓋自動敷設装置。
4. The boom end of the crane device comprises:
When the tip of the boom approaches an obstacle, a switch is provided for stopping the boom to prevent the collision with the obstacle, and the crane device has a base end portion for the boom. 4. The automatic trough lid laying device according to claim 2 or 3, wherein limit switches for limiting the amount of expansion and contraction, the undulation angle, and the turning angle are respectively provided.
【請求項5】 前記ハンドリンク装置に,前記ブームを
自動的に伸縮,起伏,旋回させることにより,前記荷役
台に積載された蓋を所定の順序に従って荷積みしてトラ
フ上の荷卸し位置に敷設する制御手段を設けてなり,こ
の制御手段には現場において前記蓋の荷積み位置,荷卸
し方向,荷卸し位置等が設定可能であると共に,荷積み
作業開始前に前記ハンドリング装置の原点位置が設定可
能であることを特徴とする請求項2,3叉は4記載のト
ラフ蓋自動敷設装置。
5. The hand link device automatically expands, retracts, and swivels the boom to load the lids loaded on the cargo handling platform in a predetermined order to the unloading position on the trough. A control means for laying is provided, and the loading position, the unloading direction, the unloading position, etc. of the lid can be set on the site, and the origin position of the handling device is set before starting the loading operation. 5. The automatic trough lid laying device according to claim 2, 3 or 4, wherein:
【請求項6】 請求項1叉は2記載のトラフ蓋自動敷設
装置を用いてトラフに蓋を敷設するトラフ蓋敷設方法で
あって,前記荷役台に前記蓋を走行路長手方向に沿って
2列に並べて積載し,この2列に積載された蓋を走行路
の最前列或いは途中の列から後列側に横順に荷積みし
て,前記車両本体の左右に位置するトラフのいずれか一
方に敷設していくことを特徴とするトラフ蓋敷設方法。
6. A trough lid laying method for laying a lid on a trough using the automatic trough lid laying apparatus according to claim 1 or 2, wherein the lid is provided on the cargo handling platform along the longitudinal direction of the traveling path. They are loaded side by side in rows and the lids loaded in these two rows are loaded laterally in order from the front row or the middle row of the traveling path to the rear row side, and laid on either one of the troughs located on the left and right sides of the vehicle body. A method of laying a trough lid characterized by carrying out.
【請求項7】 請求項1叉は2記載のトラフ蓋自動敷設
装置を用いてトラフに蓋を敷設するトラフ蓋敷設方法で
あって,前記荷役台に積載された蓋を荷積みして車両本
体の左右に位置するトラフのいずれか一方に走行路の前
方側から長手方向に沿って複数枚敷設する工程と,この
複数枚敷設した時点で前記車両本体を前記走行路の後方
側へ移動させる工程と,この工程の後に前記荷役台に積
載された蓋を前記トラフの後方側から前方側へ連続して
複数枚敷設して,前記前方側に敷設された蓋と連設させ
る工程とを備えたことを特徴とするトラフ蓋敷設方法。
7. A trough lid laying method for laying a lid on a trough using the trough lid automatic laying device according to claim 1 or 2, wherein the lid loaded on the cargo handling platform is loaded. Laying a plurality of sheets along the longitudinal direction from the front side of the runway on one of the troughs located on the left and right of the trough, and moving the vehicle body to the rear side of the runway at the time of laying the plurality of sheets And, after this step, a plurality of lids loaded on the cargo handling platform are continuously laid from the rear side to the front side of the trough, and the lid is laid continuously with the lid laid on the front side. A method of laying a trough lid, which is characterized in that
JP27447394A 1994-10-13 1994-10-13 Automatic trough lid laying apparatus and trough lid laying method Expired - Fee Related JP3214595B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27447394A JP3214595B2 (en) 1994-10-13 1994-10-13 Automatic trough lid laying apparatus and trough lid laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27447394A JP3214595B2 (en) 1994-10-13 1994-10-13 Automatic trough lid laying apparatus and trough lid laying method

Publications (2)

Publication Number Publication Date
JPH08116619A true JPH08116619A (en) 1996-05-07
JP3214595B2 JP3214595B2 (en) 2001-10-02

Family

ID=17542186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27447394A Expired - Fee Related JP3214595B2 (en) 1994-10-13 1994-10-13 Automatic trough lid laying apparatus and trough lid laying method

Country Status (1)

Country Link
JP (1) JP3214595B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009541123A (en) * 2006-06-28 2009-11-26 ローベル バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツング Track building train to repair track
JP2013035352A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035355A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035354A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035353A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
US8612049B2 (en) 2011-08-04 2013-12-17 Central Japan Railway Company Vehicle

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009541123A (en) * 2006-06-28 2009-11-26 ローベル バーンバウマシーネン ゲゼルシャフト ミット ベシュレンクテル ハフツング Track building train to repair track
JP2013035352A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035355A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035354A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
JP2013035353A (en) * 2011-08-04 2013-02-21 Central Japan Railway Co Vehicle
US8612049B2 (en) 2011-08-04 2013-12-17 Central Japan Railway Company Vehicle
US9085259B2 (en) 2011-08-04 2015-07-21 Central Japan Railway Company Nippon Sharyo, Ltd. Vehicle
US9126523B2 (en) 2011-08-04 2015-09-08 Central Japan Railway Company Vehicle elevating a working beam with respect to booms

Also Published As

Publication number Publication date
JP3214595B2 (en) 2001-10-02

Similar Documents

Publication Publication Date Title
US4491449A (en) Load raising vehicle and method
US4068446A (en) Moving work station for use in constructing a building roof
EP0141518B1 (en) Tube handling device
JP6189512B1 (en) Work vehicle with gondola device
JP2011020778A (en) Article storage facility
US4614251A (en) Load raising vehicle and method
JP2008156087A (en) Method and device for handling traveling carriage
JPH08116619A (en) Device and method for automatically laying cable trough cover
US4723886A (en) Method and apparatus for loading and unloading railroad gondola cars
JPH08209629A (en) Overhanging type construction device for bridge
EP1801318A1 (en) Vehicle for transporting materials along exteriors of buildings
JPS62293084A (en) Automatic device for lining inner wall of vessel by brick
JP2004115174A (en) Movable carriage for member erection, and bridging member erection method using it
JP2008019062A (en) Automatic folding control device of crane
JP2551161Y2 (en) Overhead traveling crane equipment
JP3312077B2 (en) Lifting equipment for curved roofs
JPH10115192A (en) Device for mounting floor panel for tunnel
JP2985020B2 (en) Method and apparatus for positioning bottom plate for outrigger of crane truck
JP2002349034A (en) Electric carriage for roofing works
JPS62251253A (en) Carrying vehicle for automobile
JPH1025896A (en) Frame for load handling
JP7120432B1 (en) Seat hanging assistance system and seat hanger moving device
JP3317845B2 (en) Transport vehicle
JP2857731B2 (en) Sheet hanging and removing device
JP3681257B2 (en) Safety equipment for track work vehicles

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070727

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080727

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090727

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees