JPH0776472A - Method for installing elevator - Google Patents

Method for installing elevator

Info

Publication number
JPH0776472A
JPH0776472A JP22340193A JP22340193A JPH0776472A JP H0776472 A JPH0776472 A JP H0776472A JP 22340193 A JP22340193 A JP 22340193A JP 22340193 A JP22340193 A JP 22340193A JP H0776472 A JPH0776472 A JP H0776472A
Authority
JP
Japan
Prior art keywords
hoistway
opening
hall
carried
landing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22340193A
Other languages
Japanese (ja)
Inventor
Toshiyuki Tadokoro
俊之 田所
Takashi Morinaga
貴志 森永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Original Assignee
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Engineering and Service Co Ltd, Hitachi Building Systems Engineering Co Ltd filed Critical Hitachi Building Systems Engineering and Service Co Ltd
Priority to JP22340193A priority Critical patent/JPH0776472A/en
Publication of JPH0776472A publication Critical patent/JPH0776472A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To provide a method for installing safely efficiently an elevator without providing a device for taking care of landing in an opening between a lift well and landing. CONSTITUTION:After a car device 8 or the like is carried into a lift well 1 by a crane 4, a landing doorway device 7 is carried into the lift well 1 by the crane 4 to attach the landing doorway device 7 to an opening 3. Thus, when the car device 8 is lowered in the lift well 1, the car device 8 does not make contact with the landing doorway device 7 while the car device 8 is easily carried in. Also, when the car device 8 is carried in, the opening 3 is not taken care of while an operation in the landing 2 is obliterated and an operation time in the lift well 1 is fairly short, so that a possibility of an object dropping from the opening 3 and hitting an operator in the lift well 1 is small. Thereafter, the opening 3 is covered by attaching a landing doorway device 7.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はエレベータの据付方法に
係わり、特に昇降路の上方に設置した揚重装置により上
方から昇降路内にエレベータ部品を順次搬入するエレベ
ータの据付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator installation method, and more particularly to an elevator installation method in which elevator components are sequentially loaded into a hoistway from above by a lifting device installed above the hoistway.

【0002】[0002]

【従来の技術】従来、例えば特開昭59−12064号
公報に記載されているように、あらかじめかご装置と、
三方枠やドアを含む乗場出入口装置などとを昇降路の外
部でそれぞれ組み立てた後、クレーン等の揚重装置によ
り、昇降路の上部および機械室の天井に設けられる搬入
口から前記のかご装置、乗場出入口装置などを昇降路内
へ搬入して所定の位置に配置するエレベータの据付方法
が提案されている。
2. Description of the Related Art Conventionally, as described in, for example, Japanese Patent Application Laid-Open No. 59-12064, a car device is provided in advance,
After assembling a landing entrance / exit device including a three-way frame and a door outside the hoistway, using a lifting device such as a crane, from the carry-in port provided at the top of the hoistway and the ceiling of the machine room to the car device, There has been proposed an elevator installation method in which a hall entrance / exit device and the like are carried into a hoistway and arranged at a predetermined position.

【0003】しかしながら、前記の昇降路と各階の乗場
との間に形成される開口部から作業中に作業者が転落し
たり物体が落下する危険があることから、昇降路内での
作業の開始に先立って各階の開口部を養生することによ
って、乗場の作業者および昇降路内の作業者の安全を確
保することが関連法規により定められている。
However, since there is a risk that a worker may fall down or an object may fall during the work from the opening formed between the hoistway and the landing on each floor, the work in the hoistway is started. Related laws and regulations stipulate that the safety of workers in landing halls and workers in hoistways will be ensured by curing the openings on each floor prior to.

【0004】そこで従来、例えば特開平2−14439
3号公報に記載されるように、養生シートの上部、下部
に補強パイプを取り付け、この補強パイプを挟圧子で挟
圧保持して取付けを容易にするとともに、養生シートの
破損を防止するようにしたエレベータの乗場養生装置が
提案されていた。この養生装置では、養生シートで前記
の開口部を覆うことにより昇降路内への作業者の転落や
物体の落下を防止し、これによって、乗場の作業者や昇
降路内の作業者の安全を確保するようになっていた。
Therefore, in the prior art, for example, Japanese Patent Laid-Open No. 14439/1990.
As described in Japanese Patent Publication No. 3, a reinforcing pipe is attached to the upper and lower portions of the curing sheet, and the reinforcing pipe is clamped and held by a clamp to facilitate the mounting and prevent the curing sheet from being damaged. An elevator elevator curing device was proposed. In this curing device, by covering the opening with a curing sheet, it is possible to prevent the worker from falling into the hoistway and the falling of objects, thereby ensuring the safety of the worker at the landing and the worker in the hoistway. It was supposed to be secured.

【0005】[0005]

【発明が解決しようとする課題】ところで、上述した従
来のエレベータの乗場養生装置では、養生シートや補強
パイプなどの仮設材を据付現場へ運搬したり、乗場出入
口装置を取付けた後に前記の仮設材を回収する必要があ
ることから、多くの作業時間や手間を要するという問題
があった。
By the way, in the above-mentioned conventional elevator hall curing device, after the temporary materials such as curing sheets and reinforcing pipes are transported to the installation site, or after the hall entrance / exit device is attached, the above-mentioned temporary materials are installed. However, there is a problem that it requires a lot of work time and labor because it is necessary to collect.

【0006】なお、このような乗場養生装置を設ける代
わりに、まず乗場出入口装置を設けることにより昇降路
および乗場間の開口部を覆った後、かご装置を昇降路内
に搬入する方法もあったが、かご装置を昇降路内で下降
させる際に前記の乗場出入口装置と接触するという懸念
があった。そのため、かご装置の搬入がかなり困難であ
るとともに、かご装置が接触した場合、意匠品である乗
場出入口装置が損傷するという問題があった。
Instead of providing such a hall curing device, there is also a method of first providing a hall entrance / exit device to cover the hoistway and the opening between the halls and then carrying the car device into the hoistway. However, there is a concern that the car device may come into contact with the hall entrance / exit device when the car device is lowered in the hoistway. Therefore, there is a problem that it is considerably difficult to carry in the car device, and when the car device comes into contact, the hall entrance / exit device, which is a design product, is damaged.

【0007】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、昇降路と乗場と
の間に形成される開口部に乗場養生装置を設けることを
要せずに、安全かつ効率的にエレベータの据付を行なう
ことのできるエレベータの据付方法を提供することにあ
る。
The present invention has been made in view of the circumstances in the prior art as described above, and an object of the present invention is to provide a hall curing device at an opening formed between a hoistway and a hall. An object of the present invention is to provide an elevator installation method capable of safely and efficiently installing an elevator.

【0008】[0008]

【課題を解決するための手段】この目的を達成するため
に本発明は、昇降路の上方に揚重装置を設置して、この
揚重装置により上方から前記昇降路内にエレベータ部品
を順次搬入するようにしたエレベータの据付方法におい
て、工場出荷時にあらかじめ組み立てたかご装置を含む
昇降路内機器を前記揚重装置により前記昇降路内に搬入
する工程と、次いであらかじめ組み立てた乗場出入口装
置を前記揚重装置により前記昇降路内に搬入して、前記
昇降路と乗場との間に形成される開口部に前記乗場出入
口装置を装着する工程とを有し、この乗場出入口装置に
より前記開口部を養生する構成にしてある。
In order to achieve this object, the present invention has a hoisting device installed above a hoistway and sequentially carries elevator parts into the hoistway from above by means of the hoisting device. In the installation method of the elevator, the step of loading the equipment in the hoistway including the pre-assembled car device into the hoistway by the lifting device at the time of factory shipment, and then the hoistway entrance / exit device that has been preassembled is lifted. Loading into the hoistway with a heavy device, and mounting the hall entrance / exit device to an opening formed between the hoistway and the hall, and curing the opening with the hall entrance / exit device. It is configured to

【0009】[0009]

【作用】本発明は上記のように、乗場出入口装置の搬入
に先立ってかご装置を含む昇降路内機器を搬入すること
から、前記のかご装置を昇降路内で下降させる際に、前
記の乗場出入口装置と接触することがなくて済むととも
に、かご装置の搬入が容易であり、効率的にエレベータ
の据付を行なうことができる。
As described above, according to the present invention, since the equipment in the hoistway including the car device is carried in prior to the carry-in of the hall entrance / exit device, when the car device is lowered in the hoistway, the hall It is not necessary to make contact with the entrance / exit device, the car device can be easily carried in, and the elevator can be efficiently installed.

【0010】また、前記の昇降路内機器を搬入する際に
は昇降路と乗場間の開口部の養生が行なわれていない
が、このときに乗場での作業はなく、しかも昇降路内で
の作業時間がかなり短いため、前記の開口部から物体が
落下して昇降路内の作業者に当たる確率がかなり小さ
い。その後、乗場出入口装置を装着することにより前記
の開口部を覆うようになっている。したがって、乗場養
生装置を特別に要せずに昇降路内の作業者の安全を確保
することができる。
Although the opening between the hoistway and the hall is not cured when the above equipment in the hoistway is carried in, there is no work at the hall at this time, and moreover, in the hoistway. Since the working time is quite short, the probability that an object will fall from the opening and hit the worker in the hoistway is quite small. After that, the hall entrance / exit device is attached to cover the opening. Therefore, it is possible to ensure the safety of the worker in the hoistway without specially requiring the hall curing device.

【0011】[0011]

【実施例】以下、本発明のエレベータの据付方法の実施
例を図に基づいて説明する。図1は本発明のエレベータ
の据付方法の一実施例を説明する縦断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of an elevator installation method according to the present invention will be described below with reference to the drawings. FIG. 1 is a vertical sectional view for explaining an embodiment of an elevator installation method according to the present invention.

【0012】図1に示すエレベータは据付途中のもので
あり、昇降路1と、工場出荷時にあらかじめ組み立てた
かご装置8と、このかご装置8を案内するガイドレール
9と、昇降路1上部に設置される機械室11とを有して
いる。これらの機械室11の天井と床にはそれぞれ搬入
口12、13が設けられ、これらの搬入口12、13に
は据付作業を開始する前、作業者の転落防止や雨水の侵
入防止を図るために図示しない養生体が設けられてい
る。また、昇降路1と乗場2との間には開口部3が形成
されている。
The elevator shown in FIG. 1 is in the middle of installation, and is installed on the hoistway 1, a car device 8 preassembled at the time of factory shipment, a guide rail 9 for guiding the car device 8, and an upper part of the hoistway 1. And a machine room 11 which is operated. The ceiling and floor of these machine rooms 11 are provided with carry-in entrances 12 and 13, respectively, in order to prevent workers from falling and preventing rainwater from entering before carrying out installation work. An unillustrated nourishing body is provided. An opening 3 is formed between the hoistway 1 and the hall 2.

【0013】前記の昇降路1の上方に設置される揚重装
置4は、吊りロープ5と、この吊りロープ5が巻掛けら
れる吊りフック6とを備え、この吊りフック6でエレベ
ータ部品、例えば乗場出入口装置7を吊上げて上方から
昇降路1内に搬入するようになっている。
The lifting device 4 installed above the hoistway 1 comprises a suspension rope 5 and a suspension hook 6 around which the suspension rope 5 is wound. The entrance / exit unit 7 is lifted and carried into the hoistway 1 from above.

【0014】この実施例にあっては、まず搬入口12、
13の養生体(図示せず)を撤去した後、揚重装置4に
よりかご装置8を吊上げて搬入口12、13を介して昇
降路1内に上方より搬入して、前記のかご装置8を昇降
路1下部のピット10に仮置きし、同様に、ガイドレー
ル9も揚重装置4により昇降路1内に搬入してピット1
0に仮置きする。この時点では、開口部3に乗場出入口
装置7が装着されておらず、すなわち開口部3の養生が
行なわれていないが、前記のかご装置8やガイドレール
9などの搬入物を昇降路1のピット10に搬入した後に
搬入物から吊りフック6を外すのみであることから、昇
降路1内での作業時間が短く、開口部3から物体が落下
して作業者に当たる確率がかなり小さくて済む。また、
このときは昇降路1内での作業であることから、乗場2
から作業者が昇降路1内へ転落することもない。
In this embodiment, first, the carry-in port 12,
After removing the nourishing body 13 (not shown), the car device 8 is lifted by the lifting device 4 and carried into the hoistway 1 from above via the carry-in ports 12 and 13, and the car device 8 is removed. The guide rail 9 is temporarily placed in the pit 10 below the hoistway 1, and similarly, the guide rail 9 is loaded into the hoistway 1 by the lifting device 4 and the pit 1 is moved.
Temporarily set to 0. At this point, the hall entrance / exit device 7 is not attached to the opening 3, that is, the opening 3 is not cured, but the carried items such as the car device 8 and the guide rails 9 are transferred to the hoistway 1. Since the hanging hooks 6 are only removed from the carried-in object after being carried into the pit 10, the work time in the hoistway 1 is short, and the probability that an object falls from the opening 3 and hits the worker is considerably small. Also,
At this time, since it is work in the hoistway 1, the landing 2
Therefore, the worker does not fall into the hoistway 1.

【0015】次いで、図示を省略したが三方枠および乗
場ドアを含む乗場出入口装置7を揚重装置4により昇降
路1内に搬入し、各階床の開口部2に乗場出入口装置7
をそれぞれ装着する。これよって乗場出入口装置7によ
り開口部3が覆われ、すなわち開口部3の養生が行なわ
れる。
Next, although not shown, a hall entrance / exit device 7 including a three-way frame and a hall door is carried into the hoistway 1 by the lifting device 4, and the hall entrance / exit device 7 is placed in the opening 2 of each floor.
Put on each. As a result, the opening 3 is covered by the hall entrance / exit device 7, that is, the opening 3 is cured.

【0016】このように構成した実施例では、乗場出入
口装置7の搬入に先立ってかご装置8を搬入することか
ら、このかご装置8を昇降路1内で下降させる際に、前
記の乗場出入口装置7と接触することがなくて済むとと
もに、かご装置8の搬入が容易であり、効率的にエレベ
ータの据付を行なうことができる。
In the embodiment thus constructed, the car device 8 is carried in prior to the carrying in of the hall entrance / exit device 7. Therefore, when the car device 8 is lowered in the hoistway 1, the above-mentioned hall entrance / exit device. It is not necessary to contact with the car 7, the car device 8 can be easily carried in, and the elevator can be efficiently installed.

【0017】また、かご装置8やガイドレール9などを
搬入する際には開口部3の養生が行なわれていないが、
このときの昇降路1内での作業時間が短く、開口部3か
ら物体が落下して昇降路1内の作業者に当たる確率がか
なり小さいとともに、その後、乗場出入口装置7を装着
することにより開口部3を覆うようになっているので、
乗場養生装置を特別に要せずに昇降路1内の作業者の安
全を確保することができる。
Although the opening 3 is not cured when the car device 8 and the guide rail 9 are carried in,
At this time, the work time in the hoistway 1 is short, the probability that an object falls from the opening 3 and hits the worker in the hoistway 1 is considerably small, and thereafter, by installing the hall entrance / exit device 7, the opening Since it is designed to cover 3,
The safety of the worker in the hoistway 1 can be ensured without specially requiring the landing curing device.

【0018】なお、本実施例ではまずかご装置8を昇降
路1内に搬入し、次いで、ガイドレール9を昇降路1内
に搬入するようにしたが、搬入順序を変えてガイドレー
ル9を搬入した後、かご装置8を搬入するようにしても
同様の効果を得ることができる。
In this embodiment, the car device 8 is first carried into the hoistway 1 and then the guide rails 9 are carried into the hoistway 1. However, the guide rails 9 are carried in in a different order. After that, the same effect can be obtained even if the car device 8 is carried in.

【0019】[0019]

【発明の効果】本発明は以上のように構成したので、昇
降路と乗場との間に形成される開口部に乗場養生装置を
設けることを要せずに、安全かつ効率的にエレベータの
据付を行なうことができる。
EFFECTS OF THE INVENTION Since the present invention is configured as described above, it is possible to safely and efficiently install an elevator without providing a hall curing device in the opening formed between the hoistway and the hall. Can be done.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のエレベータの据付方法の一実施例を説
明する縦断面図である。
FIG. 1 is a vertical cross-sectional view illustrating an embodiment of an elevator installation method according to the present invention.

【符号の説明】[Explanation of symbols]

1 昇降路 2 乗場 3 開口部 4 揚重装置 7 乗場出入口装置 8 かご装置 9 ガイドレール 1 hoistway 2 hall 3 opening 4 hoisting device 7 hall entrance / exit device 8 car device 9 guide rail

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 昇降路の上方に揚重装置を設置して、こ
の揚重装置により上方から前記昇降路内にエレベータ部
品を順次搬入するようにしたエレベータの据付方法にお
いて、工場出荷時にあらかじめ組み立てたかご装置を含
む昇降路内機器を前記揚重装置により前記昇降路内に搬
入する工程と、次いであらかじめ組み立てた乗場出入口
装置を前記揚重装置により前記昇降路内に搬入して、前
記昇降路と乗場との間に形成される開口部に前記乗場出
入口装置を装着する工程とを有し、この乗場出入口装置
により前記開口部を養生するようにしたことを特徴とす
るエレベータの据付方法。
1. An elevator installation method in which a lifting device is installed above a hoistway, and elevator parts are sequentially carried into the hoistway from above by the hoisting device. A step of loading the equipment in the hoistway including a car device into the hoistway by the hoisting device, and then carrying in a previously assembled hall entrance / exit device into the hoistway by the hoisting device, And a step of attaching the hall entrance / exit device to an opening formed between the hall and the hall, and the opening is cured by the hall entrance / exit device.
JP22340193A 1993-09-08 1993-09-08 Method for installing elevator Pending JPH0776472A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22340193A JPH0776472A (en) 1993-09-08 1993-09-08 Method for installing elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22340193A JPH0776472A (en) 1993-09-08 1993-09-08 Method for installing elevator

Publications (1)

Publication Number Publication Date
JPH0776472A true JPH0776472A (en) 1995-03-20

Family

ID=16797573

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22340193A Pending JPH0776472A (en) 1993-09-08 1993-09-08 Method for installing elevator

Country Status (1)

Country Link
JP (1) JPH0776472A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001287881A (en) * 2000-04-04 2001-10-16 Hitachi Building Systems Co Ltd Elevator for construction and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001287881A (en) * 2000-04-04 2001-10-16 Hitachi Building Systems Co Ltd Elevator for construction and its installation method

Similar Documents

Publication Publication Date Title
JPH07100582B2 (en) Elevator work platform and elevator installation method
JPH061568A (en) Erection method for elevator counter weight and counter weight
JPH0776472A (en) Method for installing elevator
JP3170559B2 (en) Elevator car fixing device
JP2000177949A (en) Elevator
JPH0737308B2 (en) Elevator control panel
JP3209931B2 (en) Elevator car fixing device
JP2878936B2 (en) Elevator installation method
JP2612258B2 (en) Elevator installation construction method
JPH0840666A (en) Method for installing elevator
JPH0336184A (en) Home elevator
JP2930911B2 (en) Elevator installation method
JP3253441B2 (en) Elevator installation method
JPH04266381A (en) Method of installing elevator
US20210198084A1 (en) Method and arrangement
JP2859811B2 (en) Equipment transportation method and elevator with transportation basket
JP2939064B2 (en) Elevator installation template
JP3378806B2 (en) Elevator installation method
JPS5912064A (en) Method of construction of installation of elevator
JPH03267283A (en) Installing method for elevator
JPH04116079A (en) Installation method for elevator
JPH06171858A (en) Temporary fixing device for balance weight of elevator
JPH0747453B2 (en) Elevator installation method
JPH07232874A (en) Elevator doorway integrally assembled article installing method and device
JPH07101655A (en) Installation work of elevator