JPH06171858A - Temporary fixing device for balance weight of elevator - Google Patents

Temporary fixing device for balance weight of elevator

Info

Publication number
JPH06171858A
JPH06171858A JP33174192A JP33174192A JPH06171858A JP H06171858 A JPH06171858 A JP H06171858A JP 33174192 A JP33174192 A JP 33174192A JP 33174192 A JP33174192 A JP 33174192A JP H06171858 A JPH06171858 A JP H06171858A
Authority
JP
Japan
Prior art keywords
hoistway
counterweight
elevator
main rope
machine room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP33174192A
Other languages
Japanese (ja)
Inventor
Toshiyuki Tadokoro
俊之 田所
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Original Assignee
Hitachi Building Systems Engineering and Service Co Ltd
Hitachi Building Systems Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Engineering and Service Co Ltd, Hitachi Building Systems Engineering Co Ltd filed Critical Hitachi Building Systems Engineering and Service Co Ltd
Priority to JP33174192A priority Critical patent/JPH06171858A/en
Publication of JPH06171858A publication Critical patent/JPH06171858A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

PURPOSE:To eliminate necessities of assembling a foothold for work in an ascent and descent passage and installing a winch in a machine room when a main rope is applied and connect a car and a balance weight by the main rope easily in a short period of time by devising so that the balance weight which is carried into the ascent and descent passage from above is held at the predetermined position. CONSTITUTION:A temporary fixing device of balance weight of elevator is provided with a holding tool (for example, a hoisting wire) 8 which can be mounted on a balance weight 5 and hangs the balance weight 5 in the upper section of an ascent and descent passage 1 and an engaging means (for example, a hoisting hook) 9 which engages the holding tool 8 in a machine room.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、エレベータの据付過程
に用いられ、昇降路内へ上方から搬入した乗りかごと釣
合おもりを主ロープにて連結する主ロープ掛け作業に好
適なエレベータの釣合おもり仮固定装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator fishing, which is used in an elevator installation process and is suitable for a main rope hanging work for connecting a car and a counterweight, which are carried into the hoistway from above, with a main rope. Related to temporary weight temporary fixing device.

【0002】[0002]

【従来の技術】エレベータの施工に際し作業性の改善と
工期の短縮を図るため、特開昭62−56280号公報
に記載されているように、乗りかごや釣合おもり、機械
室機器などの各機器を建物の昇降路内へクレーン等で吊
り降ろして搬入し、据え付けるという方法が知られてい
る。このようなエレベータの据付過程において、昇降路
内へ搬入した乗りかごと釣合おもりとを主ロープにて連
結する主ロープ掛け作業は、昇降路内の下方から上方へ
作業用足場を組み立てて行うか、あるいは、昇降路底部
に仮置きした釣合おもりをウインチで上方へ吊り上げて
行っていた。
2. Description of the Related Art In order to improve workability and shorten the construction period when constructing an elevator, as described in JP-A-62-56280, various equipment such as a car, a counterweight, a machine room equipment, etc. A method is known in which a building is hoisted into a hoistway of a building by a crane or the like, carried in, and installed. In such an elevator installation process, the main rope hooking work for connecting the carriage and the counterweight carried into the hoistway with the main rope is performed by assembling the work scaffold from the lower part to the upper part of the hoistway. Or, a counterweight temporarily placed on the bottom of the hoistway was lifted up by a winch.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、主ロー
プ掛け作業に際して作業用足場を組み立てるという従来
技術は、具体的には、作業床を支持する足場材としての
単管を昇降路内の下方位置から組み上げていき、昇降路
内の上部で該単管に作業床を固定するという煩雑な足場
組立作業を行わなければならないので、作業時間が長く
なってしまい、しかも単管を相当量用意しなければなら
ないという不具合があった。
However, in the prior art of assembling the work scaffold during the main rope hanging work, specifically, a single pipe as a scaffolding material for supporting the work floor is provided from a lower position in the hoistway. Since the complicated scaffold assembly work of assembling and fixing the work floor to the single pipe in the upper part of the hoistway must be performed, the working time becomes long and moreover, a considerable amount of single pipe must be prepared. There was a problem that it did not happen.

【0004】また、主ロープ掛け作業に際してウインチ
を用いるという従来技術は、機械室から降ろした主ロー
プの一端を昇降路底部に仮置きした釣合おもりに接続
し、該釣合おもりをウインチで吊り上げながら、その動
きに合わせて主ロープの他端を機械室から昇降路底部に
仮置きした乗りかごへ降ろしていって接続するというも
のであるが、これら一連の作業に先立って機械室にウイ
ンチを設置しなければならないという煩雑さがあった。
In the prior art of using a winch for hanging the main rope, one end of the main rope lowered from the machine room is connected to a counterweight temporarily placed on the bottom of the hoistway, and the counterweight is hoisted by a winch. However, in accordance with the movement, the other end of the main rope is lowered from the machine room to the car temporarily placed on the bottom of the hoistway and connected, but prior to these series of work, the winch is installed in the machine room. It was complicated to install.

【0005】したがって本発明の目的は、上述した従来
技術の課題を解消し、主ロープ掛け作業に際して昇降路
内に作業用足場を組み立てたり機械室にウインチを設置
する必要がなく、短時間で容易に乗りかごと釣合おもり
を主ロープにて連結することができるエレベータの釣合
おもり仮固定装置を提供することにある。
Therefore, an object of the present invention is to solve the above-mentioned problems of the prior art, and it is not necessary to assemble a work scaffold in a hoistway or install a winch in a machine room at the time of main rope hanging work, and it is easy in a short time. It is an object of the present invention to provide an elevator counterbalance weight temporary fixing device capable of connecting a car and a counterweight with a main rope.

【0006】[0006]

【課題を解決するための手段】上述した本発明の目的
は、エレベータの各機器を上方から昇降路内へ搬入して
主ロープ掛け作業を行うエレベータの据付過程におい
て、釣合おもりに装着可能で該釣合おもりを昇降路内の
上部に懸吊するための保持具と、該保持具を機械室に係
止させるための係止手段とを備えることによって達成さ
れる。
DISCLOSURE OF THE INVENTION The above-mentioned object of the present invention can be mounted on a counterweight during the installation process of an elevator in which each equipment of the elevator is carried into the hoistway from above and the main rope hanging work is performed. This is achieved by providing a holder for suspending the counterweight above the hoistway and a locking means for locking the holder in the machine chamber.

【0007】[0007]

【作用】上述した構成要素を備えた釣合おもり仮固定装
置を用いると、昇降路の上方からクレーン等により搬入
した釣合おもりを、保持具および係止手段によって昇降
路内の上部の所定位置に保持することができるので、該
釣合おもりに一端を接続した主ロープの他端を、機械室
内の巻上機を介して昇降路内の下方へ降ろしてやれば、
昇降路底部に仮置きした乗りかごと該釣合おもりとを容
易に連結することができる。
When the balance weight temporary fixing device having the above-mentioned components is used, the balance weight carried in by a crane or the like from above the hoistway is held at a predetermined position in the hoistway by the holder and the locking means. Therefore, if the other end of the main rope, one end of which is connected to the counterweight, is lowered below the hoistway via the hoist in the machine room,
It is possible to easily connect the riding basket temporarily placed on the bottom of the hoistway and the counterweight.

【0008】[0008]

【実施例】以下、本発明の一実施例を図1ないし図3に
基づいて説明する。ここで、図1は実施例たる釣合おも
り仮固定装置の使用時の斜視図、図2はエレベータの各
機器を上方から昇降路内へ搬入している様子を示す概略
断面図、図3は機械室床を示す平面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. Here, FIG. 1 is a perspective view of the counterweight temporary fixing device as an embodiment when it is used, FIG. 2 is a schematic cross-sectional view showing a state in which each device of the elevator is carried into the hoistway from above, and FIG. It is a top view showing a machine room floor.

【0009】これらの図において、符号1はエレベータ
の昇降路、2は機械室床を支持する梁、3は機械室床の
開口を蓋閉するための塞ぎ板、4は機械室床の梁2上に
固定されるマシンビーム用受け台、5は釣合おもり、6
は昇降路1内に立設される釣合おもり用ガイドレール、
7は釣合おもり5と乗りかご12を連結するための主ロ
ープである。また、符号8は釣合おもり5を昇降路1内
の上部に懸吊する保持具として用いた吊りワイヤ、9は
マシンビーム用受け台4に固定されて吊りワイヤ8およ
び主ロープ7を係止する吊りフックであり、これら吊り
ワイヤ8および吊りフック9によって釣合おもり仮固定
装置が構成されている。また、符号10は機械室天井に
開設した搬入口、11は昇降路1内へ各機器を吊り降ろ
すためのクレーンである。
In these figures, reference numeral 1 is an elevator hoistway, 2 is a beam for supporting the machine room floor, 3 is a closing plate for closing the opening of the machine room floor, and 4 is a beam 2 for the machine room floor. Machine beam pedestal fixed on top, 5 is a counterweight, 6
Is a guide rail for a counterweight that is erected in the hoistway 1,
7 is a main rope for connecting the counterweight 5 and the car 12. Reference numeral 8 is a suspension wire used as a holder for suspending the counterweight 5 above the hoistway 1, and 9 is fixed to the machine beam pedestal 4 to lock the suspension wire 8 and the main rope 7. The hanging wire 8 and the hanging hook 9 form a counterweight temporary fixing device. Further, reference numeral 10 is a carry-in port opened on the ceiling of the machine room, and 11 is a crane for hanging each device into the hoistway 1.

【0010】次に、エレベータの据付手順について説明
する。
Next, an elevator installation procedure will be described.

【0011】まず、図2に示すように、クレーン11を
用いて、機械室天井の搬入口10から昇降路1内へエレ
ベータの各機器を搬入していく。このとき、釣合おもり
5は吊りワイヤ8および吊りフック9によって昇降路1
内の上部に懸吊状態で保持され、乗りかご12は昇降路
1の底部に仮置きされ、他の機器もそれぞれ所定位置に
仮固定もしくは仮置きされる。すなわち、釣合おもり5
を昇降路1内へ搬入する際には、予め吊りワイヤ8を取
外し可能に巻きつけて装着しておき、かつ主ロープ7の
一端も接続しておき、この釣合おもり5をクレーン11
で吊り上げて昇降路1内の上部の所定位置に移動させた
なら、吊りワイヤ8を吊りフック9に取外し可能に係止
させるとともに、主ロープ7もワイヤ等を用いて吊りフ
ック9に取外し可能に係止させる。
First, as shown in FIG. 2, each equipment of the elevator is carried into the hoistway 1 from the carry-in entrance 10 on the ceiling of the machine room by using the crane 11. At this time, the counterweight 5 is attached to the hoistway 1 by the suspension wire 8 and the suspension hook 9.
The car 12 is held in a suspended state at the upper part of the inside thereof, the car 12 is temporarily placed at the bottom of the hoistway 1, and other devices are also temporarily fixed or temporarily placed at predetermined positions. That is, counterweight 5
When loading the hoistway 1 into the hoistway 1, the suspension wire 8 is detachably wound and attached beforehand, and one end of the main rope 7 is also connected.
If it is lifted up and moved to a predetermined position in the upper part of the hoistway 1, the hanging wire 8 is detachably locked to the hanging hook 9, and the main rope 7 can also be detached to the hanging hook 9 using a wire or the like. Lock it.

【0012】そして、昇降路1内に配置される各機器の
搬入が終了したなら、機械室床の塞ぎ板3をクレーン1
1で吊り上げて梁2上に配置し、固定する。しかる後、
本実施例においては、予め据付現場とは別の工場で一体
に組み立てておいた機械室機器(図示せず)、すなわち
マシンビーム上に巻上機および制御盤を設置するといっ
た組立を済ませた機械室機器一体品を、クレーン11で
吊り上げてマシンビーム用受け台4上に配置し、固定す
る。ただし、マシンビームや巻上機、制御盤等の機械室
機器を個別に搬入して据え付けてもよい。
When the loading of each device arranged in the hoistway 1 is completed, the closing plate 3 of the machine room floor is placed on the crane 1
It is lifted by 1, placed on the beam 2, and fixed. After that,
In this embodiment, a machine room device (not shown) that has been integrally assembled in advance in a factory different from the installation site, that is, a machine that has been assembled by installing a hoisting machine and a control panel on the machine beam. The room equipment integrated product is lifted by the crane 11 and placed on the machine beam pedestal 4 and fixed. However, machine room equipment, hoisting machines, machine room equipment such as a control panel may be individually carried in and installed.

【0013】こうしてエレベータの各機器の搬入と部分
的据付が完了したなら、釣合おもり5に接続してある主
ロープ7の他端を、巻上機のシーブ(図示せず)に巻き
掛けて乗りかご12側のロープ落とし穴13から昇降路
1内の下方へ降ろしていき、これを昇降路1の底部に仮
置きした乗りかご12に接続することにより、釣合おも
り5と乗りかご12とが巻上機を介して主ロープ7にて
連結できる。これにより、エレベータを稼働させること
ができるので、その後の据付については、作業者が乗り
かご12上に乗って昇降路1内の各機器の芯出し調整を
行う。
When the loading and partial installation of the elevator equipment are completed in this way, the other end of the main rope 7 connected to the counterweight 5 is wound around the sheave (not shown) of the hoist. By lowering the rope from the rope drop hole 13 on the side of the car 12 into the hoistway 1 and connecting it to the car 12 temporarily placed on the bottom of the hoistway 1, the counterweight 5 and the car 12 are connected. It can be connected by the main rope 7 via a hoist. As a result, the elevator can be operated, and for subsequent installation, the operator rides on the car 12 to perform centering adjustment of each device in the hoistway 1.

【0014】なお、クレーン11による各機器の搬入作
業が完了した時点で、機械室天井の搬入口10は、例え
ばプレキャストコンクリート板等からなる塞ぎ部材を該
クレーン11で吊り上げて嵌め込み、固定することによ
り、蓋閉される。
At the time when the work of loading each device by the crane 11 is completed, the loading port 10 on the ceiling of the machine room is lifted by the crane 11 and fitted and fixed by a closing member made of, for example, a precast concrete plate. , The lid is closed.

【0015】このように本実施例は、昇降路1の上方か
ら搬入した釣合おもり5を、吊りワイヤ8および吊りフ
ック9によって昇降路1内の上部の所定位置に懸吊状態
で仮固定することができるので、この釣合おもり5に一
端を接続した主ロープ7の他端を、機械室内の巻上機を
介して昇降路1内の下方へ降ろしてやれば、乗りかご1
2と釣合おもり5とを容易に連結することできる。つま
り、従来のように昇降路1内に作業用足場を組み立てた
り機械室にウインチを設置する必要がなくなって、ロー
プ掛け作業が短時間で行え、据付時の作業性が大幅に向
上する。
As described above, in this embodiment, the counterweight 5 carried in from above the hoistway 1 is temporarily fixed in a suspended state at a predetermined position in the upper part of the hoistway 1 by the hanging wire 8 and the hanging hook 9. Therefore, if the other end of the main rope 7 having one end connected to the counterweight 5 is lowered below the hoistway 1 via the hoist in the machine room, the car 1
The 2 and the counterweight 5 can be easily connected. In other words, it is not necessary to assemble a work scaffold in the hoistway 1 or install a winch in the machine room as in the conventional case, the rope hanging work can be performed in a short time, and the workability at the time of installation is significantly improved.

【0016】なお、上述した実施例では吊りワイヤ8や
主ロープ7を係止するための吊りフック9が機械室のマ
シンビーム用受け台4に固定してあるが、吊りワイヤ8
や主ロープ7が取外し可能に係止できさえすれば、機械
室の他の個所に吊りフック9等の係止手段を設けてもよ
く、また、吊りワイヤ8と主ロープ7を別々の係止手段
にて係止してもよい。
In the above-described embodiment, the suspension wire 8 and the suspension hook 9 for locking the main rope 7 are fixed to the machine beam pedestal 4 in the machine room.
As long as the main rope 7 and the main rope 7 can be detachably locked, a locking means such as a hanging hook 9 may be provided at another place in the machine room, and the hanging wire 8 and the main rope 7 can be locked separately. It may be locked by means.

【0017】[0017]

【発明の効果】以上説明したように、釣合おもりに装着
した吊りワイヤ等の保持具を機械室に係止させることに
より、上方から搬入した該釣合おもりを昇降路内の上部
に仮固定できるようにした本発明によれば、該釣合おも
りに一端を接続した主ロープの他端を、機械室内の巻上
機に巻き掛けて昇降路底部の乗りかごに接続することが
できるので、主ロープ掛け作業に際して昇降路内に作業
用足場を組み立てたり機械室にウインチを設置する必要
がなくなり、短時間で容易に乗りかごと釣合おもりを主
ロープにて連結することができるという優れた効果を奏
し、その結果、エレベータの据付時の作業性を大幅に向
上させることができる。
As described above, by suspending a holding tool such as a hanging wire attached to the counterweight in the machine room, the counterweight carried in from above is temporarily fixed to the upper part of the hoistway. According to the present invention made possible, since the other end of the main rope, one end of which is connected to the counterweight, can be wound around the hoist in the machine room and connected to the car at the bottom of the hoistway. It is not necessary to assemble a work scaffold in the hoistway or to install a winch in the machine room when hanging the main rope, and it is easy to connect the car and the counterweight with the main rope in a short time. As a result, the workability at the time of installing the elevator can be significantly improved as a result.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例たる釣合おもり仮固定装置の使用時の斜
視図である。
FIG. 1 is a perspective view of a counterweight temporary fixing device as an example when the device is used.

【図2】エレベータの各機器を上方から昇降路内へ搬入
している様子を示す概略断面図である。
FIG. 2 is a schematic cross-sectional view showing a state in which each device of the elevator is carried into the hoistway from above.

【図3】機械室床を示す平面図である。FIG. 3 is a plan view showing a machine room floor.

【符号の説明】[Explanation of symbols]

1 昇降路 2 梁 4 マシンビーム用受け台 5 釣合おもり 7 主ロープ 8 吊りワイヤ(保持具) 9 吊りフック(係止手段) 11 クレーン 12 乗りかご 1 hoistway 2 beam 4 machine beam cradle 5 counterweight 7 main rope 8 suspension wire (holding tool) 9 suspension hook (locking means) 11 crane 12 car

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 エレベータの各機器を上方から昇降路内
へ搬入した後、乗りかごと釣合おもりとを主ロープにて
連結するエレベータの据付過程において、前記釣合おも
りに装着可能で該釣合おもりを昇降路内の上部に懸吊す
るための保持具と、該保持具を機械室に係止させるため
の係止手段とを備えたことを特徴とするエレベータの釣
合おもり仮固定装置。
1. In the process of installing an elevator in which each equipment of the elevator is carried into the hoistway from above, and the car and the counterweight are connected by a main rope, the elevator can be mounted on the counterweight and can be mounted on the counterweight. Elevator counterbalance weight temporary fixing device comprising: a holder for suspending the combined weight above the hoistway; and a locking means for locking the holder in the machine room. .
JP33174192A 1992-12-11 1992-12-11 Temporary fixing device for balance weight of elevator Pending JPH06171858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33174192A JPH06171858A (en) 1992-12-11 1992-12-11 Temporary fixing device for balance weight of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33174192A JPH06171858A (en) 1992-12-11 1992-12-11 Temporary fixing device for balance weight of elevator

Publications (1)

Publication Number Publication Date
JPH06171858A true JPH06171858A (en) 1994-06-21

Family

ID=18247094

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33174192A Pending JPH06171858A (en) 1992-12-11 1992-12-11 Temporary fixing device for balance weight of elevator

Country Status (1)

Country Link
JP (1) JPH06171858A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112249839A (en) * 2020-10-16 2021-01-22 江苏阿尔法电梯制造有限公司 Formula hauler spandrel girder structure can climb

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112249839A (en) * 2020-10-16 2021-01-22 江苏阿尔法电梯制造有限公司 Formula hauler spandrel girder structure can climb

Similar Documents

Publication Publication Date Title
EP0904247B1 (en) Procedure and apparatus for the installation of an elevator
JPH07100582B2 (en) Elevator work platform and elevator installation method
JPH061568A (en) Erection method for elevator counter weight and counter weight
CA2253269C (en) Procedure and apparatus for installing the overspeed governor of an elevator
JPH09151053A (en) Fixing device for car of elevator
JPH06171858A (en) Temporary fixing device for balance weight of elevator
JP3844944B2 (en) Demolition method of construction elevator
JP2878936B2 (en) Elevator installation method
JP3253441B2 (en) Elevator installation method
JP2001072354A5 (en)
JPH05262475A (en) Installation method of elevator
JPH0336184A (en) Home elevator
JP2612258B2 (en) Elevator installation construction method
JP2006001739A (en) Installation method of rise-up elevator
JPH05139656A (en) Method of installing elevator
JPH04266381A (en) Method of installing elevator
JP2939064B2 (en) Elevator installation template
JPH0840666A (en) Method for installing elevator
JPH0776473A (en) Apparatus and method for installing elevator
JP2002332175A (en) Elevator device
JP2001097650A (en) Construction method for installing elevator without machine room
JPH02300081A (en) Installation work method for elevator
JPH0747453B2 (en) Elevator installation method
JPH04121384A (en) Method for setting up elevator
JP2003292268A (en) Load receiving bracket