JPH0753176A - Load suspending device for crane - Google Patents

Load suspending device for crane

Info

Publication number
JPH0753176A
JPH0753176A JP5198597A JP19859793A JPH0753176A JP H0753176 A JPH0753176 A JP H0753176A JP 5198597 A JP5198597 A JP 5198597A JP 19859793 A JP19859793 A JP 19859793A JP H0753176 A JPH0753176 A JP H0753176A
Authority
JP
Japan
Prior art keywords
suspending
rope
suspension
suspended
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5198597A
Other languages
Japanese (ja)
Inventor
Shoji Tamaki
章次 玉記
Minoru Kato
実 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP5198597A priority Critical patent/JPH0753176A/en
Publication of JPH0753176A publication Critical patent/JPH0753176A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To simplify the shift control for a suspended load and increase the longitudinal shift quantity of the suspended load for the tilt quantity of a suspending beam, by shifting the suspended load in the longitudinal, direction by positively tilting the suspending beam through the shift of a balance weight. CONSTITUTION:A suspended load raising and lowering device 14 is installed at the front end part of a suspending beam 12, and a balance weight 16 is installed so as to be shiftable on the suspending beam 12. The front end part, center end part, and the rear end part of the suspending beam 12 are installed on a hooking tool 24 through a front suspending rope 18, center suspending rope 20, and a rear suspending rope 22, and the hooking tool 24 is hooked with the hook block 26 of a crane. The rope 30 of the motor-driven cylinder 28 of the suspended load raising and lowering device 14 is wound on a fixed sheave 32 installed at the front end of the suspending beam 12 and suspended, and a curtain wall 36 is installed on an equalizer 34 at the lower end part of the rope 30. The rear suspending rope 22 is made sufficiently longer than the front suspending rope 18, and the equalizer 34 is approached to the vertical lower part of the hook block 26.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、障害物の下側に荷物を
吊込む場合に用いるクレーン用吊荷装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane loader used when a load is hung under an obstacle.

【0002】[0002]

【従来の技術】従来から重量物を揚重するにあたってク
レーンが多く用いられるが、このクレーンを用いて建物
の室内等に荷物を吊込む場合は、室の上方に天井等の障
害物が存在するため、従来では例えば特開平4−365
791号公報に開示されるように、水平方向に延設した
吊ビームの先端部に荷物の吊下げ部分を伸縮可能に設
け、この吊下げ部分を伸長させることにより荷物を室内
に取り込むことができるようになっている。
2. Description of the Related Art Conventionally, a crane is often used to lift a heavy object, but when a load is hung in a room or the like of a building using the crane, an obstacle such as a ceiling exists above the room. Therefore, in the past, for example, Japanese Patent Laid-Open No. 4-365
As disclosed in Japanese Laid-Open Patent Publication No. 791, a hanging portion for luggage is provided at the tip of a horizontally extending hanging beam so as to be extendable and contractible, and the luggage can be taken into the room by extending the hanging portion. It is like this.

【0003】この場合、前記吊下げ部分の伸縮により吊
荷の荷重が移動するため、前記吊ビームに移動可能にバ
ランスウエイトを設け、このバランスウエイトを吊下げ
部分の移動に伴って移動制御することにより、吊荷によ
るモーメントとバランスウエイトによるモーメントとを
釣り合わせるようになっている。
In this case, since the load of the suspended load moves due to the expansion and contraction of the suspended portion, a balance weight is movably provided on the suspended beam, and the balance weight is controlled to move as the suspended portion moves. Thus, the moment due to the suspended load and the moment due to the balance weight are balanced.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、かかる
従来のクレーン用吊荷装置にあっては、上述したように
水平方向の吊ビームに荷物の吊下げ部分を伸縮可能に設
け、この吊下げ部分の伸縮に伴ってバランスウエイトを
移動させるようになっているので、このバランスウエイ
トの移動量は吊下げ部分の伸縮量に応じて制御する必要
がある。このため、吊下げ部分の移動に追従させてバラ
ンスウエイトを移動させるための制御が複雑になり、そ
の制御装置が大掛かりになってコストアップが余儀無く
されるという課題があった。
However, in such a conventional crane hoisting device, as described above, the hanging part of the load is provided on the horizontal hanging beam so that the hanging part can be extended and contracted. Since the balance weight is moved along with the expansion and contraction, it is necessary to control the movement amount of the balance weight according to the expansion and contraction amount of the hanging portion. Therefore, the control for moving the balance weight in accordance with the movement of the suspended portion becomes complicated, and the control device becomes large-scaled, which causes an increase in cost.

【0005】そこで、本発明はかかる従来の課題に鑑み
て、バランスウエイトの移動によって吊ビームを積極的
に傾斜させて吊荷を前後移動させることにより、吊荷の
移動制御を簡単化し、かつ、吊ビームの傾斜量に対する
吊荷の前後移動量をより大きくすることができるクレー
ン用吊荷装置を提供することを目的とする。
In view of the conventional problems, the present invention simplifies the movement control of the suspended load by positively inclining the suspended beam by moving the balance weight to move the suspended load back and forth. An object of the present invention is to provide a hoisting device for a crane, which can further increase the amount of forward and backward movement of a hoisted load with respect to the amount of inclination of the hoisting beam.

【0006】[0006]

【課題を解決するための手段】かかる目的を達成するた
めに本発明は、少なくとも前後両端部が前方吊ロープお
よび後方吊ロープを介してクレーンに略水平方向に吊下
げられる吊ビームと、この吊ビームの前方端部に設けら
れる吊荷揚降装置と、前記吊ビームに移動可能に取付け
られるバランスウエイトとを備え、後方吊ロープを前方
吊ロープより十分長くして吊ビームを全体的に後方に移
動し、前記吊荷揚降装置の荷吊部分を前記フックブロッ
クの鉛直下方に近付けることにより構成する。
In order to achieve the above object, the present invention provides a suspension beam, at least both front and rear ends of which are suspended substantially horizontally by a crane through a front suspension rope and a rear suspension rope, and a suspension beam. Equipped with a hoisting / unloading device provided at the front end of the beam and a balance weight movably attached to the hoisting beam, and moving the hoisting beam as a whole backward by making the rear hoisting rope sufficiently longer than the front hoisting rope. Then, the load hoisting unit of the hoisting and hoisting device is configured to approach the hook block vertically below the hook block.

【0007】[0007]

【作用】以上の構成により本発明のクレーン用吊荷装置
にあっては、少なくとも前方吊ロープおよび後方吊ロー
プを介してクレーンに略水平方向に吊下げた吊ビームに
沿ってバランスウエイトを移動することにより、この吊
ビームの重心位置変化により吊ビームの傾斜角を変化さ
せることができる。このように、前記吊ビームの傾斜角
が変化される際、この吊ビームは前記前,後方吊ロープ
がクレーンに掛止される部分を中心として全体的に前後
移動し、この吊ビームの前端部に設けた吊荷揚降装置の
吊荷部分を前後移動させることができる。従って、吊荷
部分に吊下げられた荷物を前後移動させるためには前記
バランスウエイトの移動制御を行うのみでよく、吊荷の
移動制御を著しく簡単化することができる。
In the crane hoisting device of the present invention having the above-described structure, the balance weight is moved along the suspension beam suspended substantially horizontally in the crane via at least the front suspension rope and the rear suspension rope. As a result, the inclination angle of the suspension beam can be changed by changing the position of the center of gravity of the suspension beam. In this way, when the tilt angle of the suspension beam is changed, the suspension beam moves back and forth entirely around the portion where the front and rear suspension ropes are hooked by the crane, and the front end portion of the suspension beam is moved. It is possible to move the suspended load portion of the suspended load lifting device provided in the front and rear. Therefore, in order to move the load suspended on the suspended load portion back and forth, it is only necessary to perform the movement control of the balance weight, and the movement control of the suspended load can be significantly simplified.

【0008】このとき、前記吊ビームは後方吊ロープを
前方吊ロープより十分長くして吊ビームを全体的に後方
に移動し、前記吊荷揚降装置の荷吊部分を前記フックブ
ロックの鉛直下方に近付けてあるので、吊ビームの傾斜
角度が変化するときの荷吊部分の水平移動量を垂直移動
量より大幅に大きくすることができるため、この荷吊部
分の前後移動量を十分に確保することができる。
At this time, the suspension beam is configured such that the rear suspension rope is made sufficiently longer than the front suspension rope and the suspension beam is moved rearward as a whole, so that the load suspension portion of the suspension load lifting device is placed vertically below the hook block. Since they are close to each other, the horizontal movement amount of the load hanging portion when the tilt angle of the hanging beam changes can be made significantly larger than the vertical movement amount.Therefore, secure sufficient forward and backward movement amount of this load hanging portion. You can

【0009】[0009]

【実施例】以下、本発明の実施例を添付図面を参照して
詳細に説明する。図1は本発明のクレーン用吊荷装置1
0の一実施例を示す側面図である。
Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. FIG. 1 is a crane lifting device 1 of the present invention.
It is a side view which shows one Example of No. 0.

【0010】即ち、本実施例のクレーン用吊荷装置10
は、前後方向(後述の吊荷36を移動する図中左方を前
方とする)を指向して略水平方向に配置される吊ビーム
12を備え、この吊ビーム12の前方端部に吊荷揚降装
置14が設けられると共に、この吊ビーム12の下辺に
移動可能にバランスウエイト16が設けられることによ
り概略構成される。前記吊ビーム12の前方端部,中央
部および後方端部にそれぞれ前方吊ロープ18,中央吊
ロープ20および後方吊ロープ22の一端が取付けら
れ、これら各吊ロープ18,20,22の他端は掛止具
24に取付けられる。そして、前記掛止具24が図外の
クレーンのフックブロック26に掛止されることによ
り、前記クレーン用吊荷装置10がこのフックブロック
26に吊下げられるようになっている。
That is, the crane lifting device 10 according to the present embodiment.
Is provided with a hanging beam 12 that is arranged in a substantially horizontal direction in the front-back direction (the left side in the figure in which the hanging load 36, which will be described later, moves is the front), and the hanging load is lifted at the front end of the hanging beam 12. The lowering device 14 is provided, and a balance weight 16 is movably provided on the lower side of the suspension beam 12, which is a general configuration. One ends of the front suspension rope 18, the center suspension rope 20 and the rear suspension rope 22 are attached to the front end portion, the center portion and the rear end portion of the suspension beam 12, respectively, and the other ends of these suspension ropes 18, 20, 22 are It is attached to the hook 24. When the hook 24 is hooked on a hook block 26 of a crane (not shown), the crane load device 10 is hung on the hook block 26.

【0011】前記吊荷揚降装置14は電動シリンダ28
を備え、この電動シリンダ28から繰り出されるロープ
30は吊ビーム12の前端に取付けられた固定シーブ3
2に周回されて垂下され、その下端部に荷吊部分として
のエコライザ34が設けられる。そして、このエコライ
ザ34に吊荷としてのカーテンウォール36が吊下げら
れる。
The lifting / unloading device 14 is an electric cylinder 28.
The rope 30 that is provided from the electric cylinder 28 is a fixed sheave 3 attached to the front end of the suspension beam 12.
It circulates in 2 and hangs down, and the equalizer 34 as a load hanging part is provided in the lower end part. Then, a curtain wall 36 as a suspended load is hung on the equalizer 34.

【0012】前記バランスウエイト16は、電動モータ
等を用いた駆動機構38を介して吊ビーム12に沿って
移動するようになっており、また、この吊ビーム12に
は傾斜センサー40が取付けられ、この傾斜センサー4
0の計測値をフィードバックしつつ前記バランスウエイ
ト16が移動制御される。つまり、吊ビーム12に所定
の傾斜角変化を与える場合に、前記バランスウエイト1
6の移動量を前記傾斜センサー40の計測値に基づいて
制御し、この吊ビーム12が急激に傾いてしまうのを防
止できるようになっている。
The balance weight 16 is configured to move along the suspension beam 12 via a drive mechanism 38 using an electric motor or the like, and an inclination sensor 40 is attached to the suspension beam 12. This tilt sensor 4
The balance weight 16 is controlled to move while feeding back a measured value of 0. That is, when the suspension beam 12 is given a predetermined inclination angle change, the balance weight 1
The moving amount of 6 is controlled on the basis of the measured value of the tilt sensor 40, so that the suspension beam 12 can be prevented from being rapidly tilted.

【0013】ここで本実施例にあっては、後方吊ロープ
22を前方吊ロープ18より十分長くして吊ビーム12
を全体的に後方に移動し、前記吊荷揚降装置14のエコ
ライザ34を前記フックブロック26の鉛直下方により
近付けてある。尚、中央吊ロープ20の長さは、前記前
方吊ロープ18および後方吊ロープ22の長さによって
決定され、この中央吊ロープは緊張状態で配索される。
In this embodiment, the rear suspension rope 22 is made sufficiently longer than the front suspension rope 18 and the suspension beam 12 is provided.
Is moved to the rear as a whole so that the equalizer 34 of the hoisting and unloading device 14 is brought closer to the vertical lower side of the hook block 26. The length of the central suspension rope 20 is determined by the lengths of the front suspension rope 18 and the rear suspension rope 22, and the center suspension rope is installed in a tensioned state.

【0014】以上の構成により本実施例のクレーン用吊
荷装置10にあっては、吊荷としてのカーテンウォール
36を吊込む初期状態では、バランスウエイト16を図
中実線に示すように吊ビーム12の中央部分に位置させ
て、この吊ビーム12を略水平状態に設定しておくか、
若しくは、バランスウエイト16を更に前方側に位置さ
せて、吊ビーム12の前方を下方に傾斜させた状態に設
定しておく。
In the crane hoisting device 10 of the present embodiment having the above construction, in the initial state of hanging the curtain wall 36 as a hoisting load, the balance weight 16 is lifted as shown by the solid line in the figure. Or position the suspension beam 12 in a substantially horizontal position, or
Alternatively, the balance weight 16 is positioned further forward and the front of the suspension beam 12 is set to be inclined downward.

【0015】次に、前記カーテンウォール36を吊込ん
だ後、クレーンを作動してこのカーテンウォール36
を、取付けようとする所定位置近傍まで揚重する。そし
て、カーテンウォール36が所定高さまで揚重される
と、バランスウエイト16を後方に移動制御する。する
と、吊ビーム12は前記掛止具24がフックブロック2
6に掛止される部分を中心として、図中実線状態から一
点鎖線状態となるように全体的に後方が下方に傾斜され
て行き、エコライザ34が設けられる吊ビーム12の前
端部、つまりカーテンウォール36を若干の上方移動を
伴いつつ前方に移動させることができる。従って、前記
カーテンウォール36の取付部分の上方に庇等の障害物
が存在する場合にも、この障害物に干渉すること無くカ
ーテンウォール36を取付けることができる。尚、カー
テンウォール36の最終的な取付け時には、電動シリン
ダ28を作動してカーテンウォール36の高さ位置を微
調整し、目的の取付け位置に正確に合わせることができ
る。
Next, after suspending the curtain wall 36, the crane is operated to operate the curtain wall 36.
Is lifted up to near the predetermined position where it is to be attached. Then, when the curtain wall 36 is lifted to a predetermined height, the balance weight 16 is controlled to move rearward. Then, in the hanging beam 12, the hook 24 has the hook block 2.
Around the portion hooked on 6, the rear is inclined downward as a whole from the solid line state in the figure to the one-dot chain line state, and the front end portion of the suspension beam 12 where the equalizer 34 is provided, that is, the curtain wall 36 can be moved forward with some upward movement. Therefore, even if an obstacle such as an eave is present above the attachment portion of the curtain wall 36, the curtain wall 36 can be attached without interfering with the obstacle. When the curtain wall 36 is finally attached, the electric cylinder 28 can be operated to finely adjust the height position of the curtain wall 36 so that the curtain wall 36 can be accurately adjusted to the intended attachment position.

【0016】このように本実施例のクレーン用吊荷装置
10にあっては、バランスウエイト16を移動すること
により吊ビーム12自体を傾斜させて、この吊ビーム1
2の前方端部に吊り下げたカーテンウォール36を前方
に移動するようにしたので、このカーテンウォール36
の吊下げ位置を吊ビーム12の前後方向に変化させる必
要がなくなる。従って、前記荷物吊下げ部分つまりエコ
ライザ34の前後移動を制御する必要が無くなり、カー
テンウォール36を前方移動させるためには前記バラン
スウエイト16の移動制御を専ら行うのみでよい。この
ため、カーテンウォール36の前後移動制御を著しく簡
単化することができると共に、制御装置自体の構造を簡
単にすることができる。
As described above, in the crane hoisting device 10 of the present embodiment, the balance beam 16 is moved to incline the suspension beam 12 itself so that the suspension beam 1
Since the curtain wall 36 hung at the front end of 2 is moved forward, the curtain wall 36
It is no longer necessary to change the hanging position in the front-back direction of the hanging beam 12. Therefore, it is not necessary to control the front-back movement of the luggage suspending portion, that is, the equalizer 34, and the movement control of the balance weight 16 only needs to be performed in order to move the curtain wall 36 forward. Therefore, the control of the front and rear movement of the curtain wall 36 can be significantly simplified, and the structure of the control device itself can be simplified.

【0017】ところで、本実施例では前記カーテンウォ
ール36を移動制御するにあたって、吊ビーム12をフ
ックブロック26に吊下げた各吊ロープ18,20,2
2のうち、後方吊ロープ22を前方吊ロープ18より十
分長くして吊ビーム12を全体的に後方に移動し、吊荷
揚降装置14の荷吊部分を前記フックブロックの鉛直下
方に近付けたので、吊ビーム12の傾斜角度が変化する
ときの荷吊部分の水平移動量Lを垂直移動量Hより大き
くすることができる。このため、前記荷吊部分つまりカ
ーテンウォール36の前後移動量を十分に確保すること
ができる。
By the way, in the present embodiment, when controlling the movement of the curtain wall 36, the suspension ropes 18, 20, 2 in which the suspension beam 12 is suspended on the hook block 26 are used.
Of the two, the rear suspension rope 22 is made sufficiently longer than the front suspension rope 18 and the suspension beam 12 is moved rearward as a whole, so that the load suspending portion of the suspending / unloading device 14 is brought closer to vertically below the hook block. The horizontal movement amount L of the load suspending portion when the inclination angle of the suspension beam 12 changes can be made larger than the vertical movement amount H. Therefore, it is possible to secure a sufficient amount of forward and backward movement of the load suspending portion, that is, the curtain wall 36.

【0018】[0018]

【発明の効果】以上説明したように本発明のクレーン用
吊荷装置にあっては、吊ビームを少なくとも前後両端部
で前方吊ロープおよび後方吊ロープを介してクレーンに
略水平方向に吊下げると共に、後方吊ロープを前方吊ロ
ープより十分長くして吊ビームを全体的に後方に移動さ
せて、前記吊荷揚降装置の荷吊部分を前記フックブロッ
クの鉛直下方に近付けたので、バランスウエイトの移動
による吊ビームの傾斜で吊荷を前後移動させることがで
きるため、この吊荷の移動制御を著しく簡単化すること
ができると共に、吊ビームの傾斜角度が変化するときの
荷吊部分の水平移動量を垂直移動量より大幅に大きくす
ることができるため、この荷吊部分の前後移動量を十分
に確保することができるという優れた効果を奏する。
As described above, in the crane hoisting device of the present invention, at least the front and rear end portions of the hanging beam are hung from the crane through the front suspension rope and the rear suspension rope in a substantially horizontal direction. , The rear suspension rope is made sufficiently longer than the front suspension rope, the suspension beam is moved rearward as a whole, and the load suspending portion of the suspending / unloading device is brought closer to vertically below the hook block. Since the suspended load can be moved forward and backward by the inclination of the suspended beam, the movement control of this suspended load can be significantly simplified, and the horizontal movement amount of the suspended portion when the inclination angle of the suspended beam changes. Can be made significantly larger than the vertical movement amount, so that there is an excellent effect that the front-back movement amount of the load hanging portion can be sufficiently secured.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明にかかるクレーン用吊荷装置の一実施例
を示す側面図である。
FIG. 1 is a side view showing an embodiment of a crane lifting device according to the present invention.

【符号の説明】[Explanation of symbols]

10 クレーン用吊荷装置 12 吊ビーム 14 吊荷揚降装置 16 バランス
ウエイト 18 前方吊ロープ 22 後方吊ロ
ープ 24 掛止具 26 フックブ
ロック 28 電動シリンダ 34 エコライ
ザ(荷吊部分) 36 カーテンウォール(吊荷)
10 Crane Suspension Device 12 Suspended Beam 14 Suspended Lifting Device 16 Balance Weight 18 Front Suspension Rope 22 Rear Suspension Rope 24 Hooking Device 26 Hook Block 28 Electric Cylinder 34 Equalizer (Load Suspended Part) 36 Curtain Wall (Suspended)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも前後両端部が前方吊ロープお
よび後方吊ロープを介してクレーンに略水平方向に吊下
げられる吊ビームと、この吊ビームの前方端部に設けら
れる吊荷揚降装置と、前記吊ビームに移動可能に取付け
られるバランスウエイトとを備え、後方吊ロープを前方
吊ロープより十分長くして吊ビームを全体的に後方に移
動し、前記吊荷揚降装置の荷吊部分を前記フックブロッ
クの鉛直下方に近付けたことを特徴とするクレーン用吊
荷装置。
1. A suspension beam, at least both front and rear ends of which are suspended in a substantially horizontal direction by a crane via a front suspension rope and a rear suspension rope, and a suspended load lifting device provided at the front end of the suspension beam, A balance weight movably attached to the suspension beam, the rear suspension rope being sufficiently longer than the front suspension rope to move the suspension beam rearward as a whole, and the load suspending portion of the suspending / unloading device to the hook block. A crane lifting device characterized in that it is located vertically below.
JP5198597A 1993-08-10 1993-08-10 Load suspending device for crane Pending JPH0753176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5198597A JPH0753176A (en) 1993-08-10 1993-08-10 Load suspending device for crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5198597A JPH0753176A (en) 1993-08-10 1993-08-10 Load suspending device for crane

Publications (1)

Publication Number Publication Date
JPH0753176A true JPH0753176A (en) 1995-02-28

Family

ID=16393845

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5198597A Pending JPH0753176A (en) 1993-08-10 1993-08-10 Load suspending device for crane

Country Status (1)

Country Link
JP (1) JPH0753176A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011178345A (en) * 2010-03-03 2011-09-15 Ishikame Kogyo:Kk Inclined carriage
CN112408195A (en) * 2019-08-20 2021-02-26 沈阳新松机器人自动化股份有限公司 Power hanging beam capable of adjusting heavy object posture

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011178345A (en) * 2010-03-03 2011-09-15 Ishikame Kogyo:Kk Inclined carriage
CN112408195A (en) * 2019-08-20 2021-02-26 沈阳新松机器人自动化股份有限公司 Power hanging beam capable of adjusting heavy object posture

Similar Documents

Publication Publication Date Title
US8528755B2 (en) Mobile crane having counterweight
US20210114848A1 (en) Cantilevered lifting beam system
JPH0753176A (en) Load suspending device for crane
JPH10218549A (en) Lifting device
JP2019123570A (en) Height adjustment auxiliary apparatus, crane therewith and height adjustment method
JPH07117976A (en) Suspension cargo rotation preventing device for cargo suspending device for crane
JPH10167682A (en) Platform lift and tilt device
JPH0710461A (en) Cargo hoisting device for crane
JP3691355B2 (en) Loading device
JP2001054687A (en) Sound reflecting board drive mechanism
KR200262607Y1 (en) cargo lift
JP4708067B2 (en) Crane equipment
JP2021020771A (en) Derricking/winding control system of jib crane
JP2000086165A (en) Method and device for slowly stopping crane
JPH0680385A (en) Hoisting accessory having inclining device
JPH08108991A (en) Crane device
JPH09235091A (en) Crane device
JP2002080187A (en) Level luffing jib crane
JPH0741283A (en) Overhead crane with turning jib
JP3811419B2 (en) Building material lifting device and building material lifting method
JPH0769579A (en) Cargo lifting device for crane
JPS61206792A (en) Horizontal and derricking combination type crane with telescopic boom
JPH0728179Y2 (en) Lifting device for tower erection crane
JPH07144876A (en) Load hoisting device for crane
JPH0780673B2 (en) Retractable crane

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Effective date: 20051122

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051205

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20091222

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20091222

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101222

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20101222

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20111222

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121222

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20131222