JPH0748754Y2 - Independent foundation structure - Google Patents

Independent foundation structure

Info

Publication number
JPH0748754Y2
JPH0748754Y2 JP8000091U JP8000091U JPH0748754Y2 JP H0748754 Y2 JPH0748754 Y2 JP H0748754Y2 JP 8000091 U JP8000091 U JP 8000091U JP 8000091 U JP8000091 U JP 8000091U JP H0748754 Y2 JPH0748754 Y2 JP H0748754Y2
Authority
JP
Japan
Prior art keywords
foundation
independent
concrete
spacer block
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8000091U
Other languages
Japanese (ja)
Other versions
JPH0527145U (en
Inventor
彰一 上野
英樹 辻山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP8000091U priority Critical patent/JPH0748754Y2/en
Publication of JPH0527145U publication Critical patent/JPH0527145U/en
Application granted granted Critical
Publication of JPH0748754Y2 publication Critical patent/JPH0748754Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、独立基礎の形式の基礎
構築において基礎梁を掛渡し設置するための支持部であ
る独立基礎の構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of an independent foundation which is a support portion for suspending and installing foundation beams in foundation construction in the form of an independent foundation.

【0002】[0002]

【従来の技術】建築物を安定した状態で構築するために
は、まず地盤に基礎を安定かつ的確に構築する必要があ
るがこの基礎の構築においては、いわゆる独立基礎形式
や布基礎形式などが知られている。布基礎の形式は、建
築物の設置地盤に連続する所定深さの溝を形成し、この
溝内に連続する基礎を構築するようにしている。一方独
立基礎の形式では、建築物の構築領域の所定ポイント、
例えば建築物の角部及び壁部の交差部などの位置に所定
深さの掘削穴を形成し、その掘削穴毎に独立基礎を構築
してその独立基礎上に基礎梁を掛けわたして基礎全体を
構成するようにしている。
2. Description of the Related Art In order to construct a building in a stable state, it is necessary to first construct a foundation on the ground in a stable and appropriate manner. In the construction of this foundation, there are so-called independent foundation type and cloth foundation type. Are known. The type of cloth foundation is such that a groove having a predetermined depth is formed continuously in the ground where the building is installed, and a continuous foundation is constructed in this groove. On the other hand, in the form of independent foundation, predetermined points in the building construction area,
For example, an excavation hole with a predetermined depth is formed at a position such as a corner of a building and an intersection of walls, an independent foundation is constructed for each excavation hole, and a foundation beam is hung on the independent foundation to construct the entire foundation. Is configured.

【0003】上記のような独立基礎の形式は、地盤を連
続して掘削する必要がないことから、寒冷地などにおけ
る地盤の掘削の困難な地域において広く採用されてい
る。
The independent foundation type as described above is widely adopted in regions where it is difficult to excavate the ground, such as in cold regions because it is not necessary to continuously excavate the ground.

【0004】上記独立基礎の形式における独立基礎の施
工については、特開昭63−251527号公報に「独
立基礎の施工方法とそれに使用する基礎ブロック」など
が開示されている。
Regarding construction of an independent foundation in the form of the above-mentioned independent foundation, JP-A-63-251527 discloses "construction method of independent foundation and basic block used therefor" and the like.

【0005】[0005]

【考案が解決しようとする課題】本願出願人は、独立基
礎の形式による基礎の構築を、独立基礎間に底部中央部
を切り欠いてブリッジ状に構成したコンクリート製の基
礎梁を掛け渡すことによって構築する方式を提案してい
る。
The applicant of the present invention constructs a foundation in the form of an independent foundation by straddling a concrete foundation beam, which is formed in a bridge shape by cutting out the central portion of the bottom between the independent foundations. We are proposing a method to build.

【0006】そして、このような基礎梁の独立基礎への
設置は、その独立基礎の設置面を常に正確な位置に設定
し、かつ安定した状態を確保しておく必要がある。すな
わち、独立基礎の部分は、建築物全体を支持するポイン
トであり、各基礎梁が設置された後は、その部分をコン
クリートを打設することによって完全に固定する必要が
ある。
To install such a foundation beam on an independent foundation, it is necessary to always set the installation surface of the independent foundation at an accurate position and to secure a stable state. That is, the part of the independent foundation is a point that supports the entire building, and after each foundation beam is installed, it is necessary to fix the part completely by pouring concrete.

【0007】従って、独立基礎の部分は、正確な位置決
めと有効なコンクリートの打設を行い得るための構造が
要求される。しかしながら、現状においては、上記のよ
うな基礎梁を正確かつ安定して設置することのできる独
立基礎に関する構成は開示されておらず、さらにコンク
リートの打設を有効に行うための構成も同様に開示され
ていない。
Therefore, the part of the independent foundation is required to have a structure capable of performing accurate positioning and effective placement of concrete. However, under the present circumstances, a configuration related to an independent foundation capable of accurately and stably installing the foundation beam as described above is not disclosed, and a configuration for effectively placing concrete is also disclosed. It has not been.

【0008】上記従来の技術である特開昭63−251
527号公報に開示された独立基礎についても、鉄筋を
下方へ突設した基礎ブロックを掘削穴内に設置するよう
にしているが、このようなコンクリートブロックでは、
本願人が実施するブリッジ状の基礎梁をその上面側に安
定して設置することは困難である。
The above-mentioned conventional technique, Japanese Patent Laid-Open No. 63-251
Also for the independent foundation disclosed in Japanese Patent No. 527, a foundation block having a reinforcing bar projecting downward is installed in an excavation hole. However, in such a concrete block,
It is difficult for the applicant to stably install the bridge-shaped foundation beam on the upper surface side thereof.

【0009】従って、独立基礎間に掛け渡される基礎梁
を安定してかつ正確な位置で支持することができ、かつ
コンクリートの打設を有効に行うことのできる独立基礎
部分を構築することが課題となっていた。
Therefore, it is a problem to construct an independent foundation part which can stably and accurately support the foundation beams bridged between the independent foundations and can effectively perform concrete pouring. It was.

【0010】考案の目的 本考案は、上記課題を解決するためになされたものであ
り、基礎梁を的確に支持する独立基礎を安定かつ正確に
構築することのできる独立基礎構造を提供することにあ
る。
[0010]Purpose of devising  The present invention has been made to solve the above problems.
Stable and accurate independent foundations that accurately support foundation beams
To provide an independent foundation that can be built
It

【0011】[0011]

【課題を解決するための手段】上記目的を達成するた
め、本考案の請求項1の独立基礎構造は、建築物設置領
域の所定箇所に形成された掘削穴内に構築され、基礎の
構成部材である基礎梁を掛け渡し設置するための支持部
を構成する独立基礎構造において、前記掘削穴の底部の
所定箇所に少なくとも3個以上設置され、各々の上面か
らの突出高さを調整可能な高さ調整具を備えたスペーサ
ブロックと、内部に鉄筋が配筋された所定厚さのプレキ
ャストコンクリート製プレートであって、前記スペーサ
ブロックの前記高さ調整具上に載置された基礎底盤と、
を含むことを特徴とする。
In order to achieve the above object, an independent foundation structure according to claim 1 of the present invention is constructed in an excavation hole formed at a predetermined location of a building installation area, and is composed of foundation constituent members. In an independent foundation structure that constitutes a support portion for installing and installing a certain foundation beam, at least three or more are installed at predetermined locations on the bottom of the excavation hole, and the height at which the protruding height from each upper surface can be adjusted is adjustable. A spacer block provided with an adjusting tool, a precast concrete plate having a predetermined thickness in which reinforcing bars are arranged inside, and a base bottom plate placed on the height adjusting tool of the spacer block,
It is characterized by including.

【0012】請求項2の構造は、請求項1において、前
記基礎定盤には1又は複数の打設用穴が上下面に貫通し
て形成され、かつ、前記スペーサブロックには、前記基
礎底盤の中心側に位置する側面より上面に亘って面取り
部が形成されていることを特徴とする。
According to a second aspect of the present invention, in the first aspect, the foundation surface plate is formed with one or a plurality of holes for driving, and the spacer block is provided with the foundation bottom plate. The chamfered portion is formed from the side surface located on the center side to the upper surface.

【0013】[0013]

【作用】上記構成の独立基礎構造によれば、まず独立基
礎の設置箇所に形成された掘削穴の底部にスペーサブロ
ックが少なくとも3個以上設置される。これは、この上
部に載置される基礎底盤を安定して設置するために3個
以上必要となるものである。これら各スペーサブロック
にはその上面からの突出高さを可変する高さ調整具が具
備されている。そして、基礎底盤はこの高さ調整具上に
設置され、その突出高さを調整することにより、基礎底
盤の設置高さの微調整を行うことができる。
According to the independent foundation structure having the above construction, at least three spacer blocks are installed at the bottom of the excavation hole formed at the installation location of the independent foundation. This requires three or more in order to stably install the foundation bottom plate placed on this upper part. Each of these spacer blocks is provided with a height adjuster for varying the height of protrusion from the upper surface thereof. Then, the base bottom plate is installed on this height adjusting tool, and by adjusting the protruding height thereof, the installation height of the base bottom plate can be finely adjusted.

【0014】従って、掘削穴の底部が完全に水平に保た
れていない場合であってもスペーサブロックの高さ調整
により基礎底盤の設置面(ボルトの頭部)を水平面とす
ることが可能となる。
Therefore, even when the bottom of the excavation hole is not kept perfectly horizontal, it is possible to make the installation surface (head of the bolt) of the foundation bottom plate horizontal by adjusting the height of the spacer block. .

【0015】従って、基礎底盤をほぼ水平に設置するこ
とができる。そして、基礎底盤は鉄筋の組み込まれたプ
レキャストコンクリート製プレートであることから、そ
の上面に基礎梁を安定的に載置することが可能である。
Therefore, the base bottom plate can be installed substantially horizontally. Since the foundation bottom plate is a precast concrete plate in which reinforcing bars are incorporated, it is possible to stably mount the foundation beam on the upper surface thereof.

【0016】さらに、基礎底盤にはその厚さ方向に貫通
する1または複数の打設用穴が形成されており、上方か
らコンクリートの打設を行った場合、その打設用穴から
コンクリートが流入し、基礎底盤の下部のスペーサブロ
ックの部分までコンクリートを流し込むことができる。
このとき、スペーサブロックに面取り部を設けておく
と、このブロック上面と底盤下面との間の数cmのすき
間にも円滑にコンクリートが流入する。これによって、
基礎底盤の下側の掘削穴の底部側から十分にコンクリー
トの打設を行うことができ独立基礎部の安定した構築を
行うことができる。
Further, one or a plurality of pouring holes penetrating in the thickness direction are formed in the foundation bottom plate, and when pouring concrete from above, concrete flows in through the pouring holes. However, concrete can be poured into the spacer block at the bottom of the foundation floor.
At this time, if the spacer block is provided with a chamfer, concrete can smoothly flow into a gap of several cm between the upper surface of the block and the lower surface of the bottom plate. by this,
Concrete can be poured sufficiently from the bottom side of the excavation hole on the lower side of the foundation floor, and stable construction of the independent foundation can be performed.

【0017】[0017]

【実施例】以下図面に基づいて、本考案に係る独立基礎
構造の実施例について詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of an independent foundation structure according to the present invention will be described in detail below with reference to the drawings.

【0018】図1は、実施例に係る独立基礎構造の全体
構成を示す説明図であり、建築物の設置領域の所定箇
所、例えば建築物の角部や壁部の交叉位置などに掘削さ
れた穴10の根切り底12上にスペーサブロック14が
設置されている。根切り底12は、ほぼ水平に形成され
るが、砕石や砂利などを敷いて転圧することによって構
成している。そして、スペーサブロック14は、少なく
とも3箇所以上設置する必要があり、本実施例では、4
個のスペーサブロック14が設置されている。
FIG. 1 is an explanatory view showing the overall structure of an independent foundation structure according to an embodiment, which is excavated at a predetermined location in a building installation area, such as a corner of a building or a crossing position of a wall. A spacer block 14 is installed on the root 12 of the hole 10. The root cutting bottom 12 is formed substantially horizontally, but is constructed by laying crushed stone or gravel and rolling it. The spacer block 14 needs to be installed at least at three or more places.
Individual spacer blocks 14 are installed.

【0019】そして、このスペーサブロック14上に基
礎底盤16が設置される。これらのスペーサブロック1
4及び基礎底盤16が独立基礎の主要構成部材であり、
この基礎底盤16上に2以上の基礎梁18の端部が設置
され、基礎梁ジョイント部の周囲に型枠を形成した後に
コンクリートを打設することによって、独立基礎が固定
されるものである。すなわち、このような構成の独立基
礎間に基礎梁18が掛け渡された形で基礎全体が構成さ
れていくものである。
Then, the base 16 is installed on the spacer block 14. These spacer blocks 1
4 and the base 16 are the main components of the independent foundation,
The end portions of two or more foundation beams 18 are installed on the foundation bottom plate 16, a concrete frame is formed around the foundation beam joint portion, and then concrete is poured, whereby the independent foundation is fixed. That is, the entire foundation is constructed in such a manner that the foundation beam 18 is bridged between the independent foundations having such a configuration.

【0020】図2(A)及び(B)は、スペーサブロッ
ク14の構成例をそれぞれ示しており、図(A)に示し
たスペーサブロック14は、直方体形状のブロックの上
面にボルト20を螺入させることによって構成されてい
る。ボルト20は、ブロック本体の上面14aから内方
へ向けて形成された雌ねじ部22に螺入されている。本
実施例では、この雌ねじ部22は、ナットをブロック本
体にその上面14a側から埋め込むことによって形成し
ている。そして、ボルト20はこれを回転させることに
よりその螺入量を調整することができ、その螺入量調整
によりボルト頭部の高さ位置の微調整を行うことが可能
である。さらに、ブロック本体の上面14aにはけがき
線24a及び24bが付されており、このけがき線24
によってこのスペーサブロック14自体の位置設定並び
にこのスペーサブロック14上に設置する基礎底盤16
の位置調整を容易に行うことができるようにしている
(例えば、そのけがき線24上に基礎底盤16の端部を
合せる)。
FIGS. 2A and 2B show examples of the structure of the spacer block 14, and the spacer block 14 shown in FIG. 2A is such that the bolt 20 is screwed into the upper surface of the rectangular block. It is configured by The bolt 20 is screwed into an internal thread portion 22 formed inward from the upper surface 14a of the block body. In this embodiment, the female screw portion 22 is formed by embedding a nut in the block body from the upper surface 14a side. By rotating the bolt 20, the screwing amount can be adjusted, and by adjusting the screwing amount, the height position of the bolt head can be finely adjusted. In addition, marking lines 24a and 24b are provided on the upper surface 14a of the block body.
By setting the position of the spacer block 14 itself and the base plate 16 installed on the spacer block 14,
Is easily adjusted (for example, the end of the base floor 16 is aligned with the marking line 24).

【0021】次に、同図(b)のスペーサブロック14
の構成は、ほぼ正方形の水平断面形状を有する四角柱ブ
ロックとして行われている。そして、その上面側の1つ
の角部を切り落し、面取り部14bが形成されている。
なお、ボルト20並びに雌ねじ部22の構成は同図
(A)の構成と同様である。また、ブロック体の上面1
4aには同図(A)の構成と同様に位置決めのためのけ
がき線24が付されている。
Next, the spacer block 14 shown in FIG.
The configuration is performed as a square pole block having a substantially square horizontal sectional shape. Then, one chamfer on the upper surface side is cut off to form a chamfered portion 14b.
The configurations of the bolt 20 and the female screw portion 22 are the same as the configuration of FIG. Also, the upper surface 1 of the block body
A marking line 24 for positioning is attached to 4a similarly to the configuration of FIG.

【0022】次に、図3(A)及び(B)は上記図1の
実施例に用いられた基礎底盤16の構成を示すための平
面図及び側面図である。図示のように、基礎底盤16は
所定の厚さhを有するプレキャストコンクリート製のプ
レートして構成されており、その内部には鉄筋26が配
設されている。そして、そのほぼ中央部には厚さ方向に
貫通されたコンクリート打設用穴28が形成されてい
る。このコンクリート打設用穴28は、スペーサブロッ
ク14上での設置状態において下面側に向って徐々に開
口幅を広げてテーパをつけた構成とされている。なお、
基礎定盤16の上面にもけがき線27が付されており、
その位置決め作業の容易化が図られている。
Next, FIGS. 3 (A) and 3 (B) are a plan view and a side view showing the structure of the base bottom plate 16 used in the embodiment of FIG. As shown in the figure, the base 16 is made of a precast concrete plate having a predetermined thickness h, and a reinforcing bar 26 is arranged inside the plate. A hole 28 for concrete pouring is formed at a substantially central portion thereof so as to penetrate therethrough in the thickness direction. The concrete pouring hole 28 has a configuration in which the opening width is gradually widened toward the lower surface side in a state of being installed on the spacer block 14 and is tapered. In addition,
A scribing line 27 is also attached to the upper surface of the foundation surface plate 16,
The positioning work is facilitated.

【0023】なお、図4(A)及び(B)は、基礎底盤
16の他の構成例をそれぞれ示しており、同図(A)の
基礎底盤16は、コンクリート打設用穴28を4個構成
した例を示している。同図(B)は、基礎底盤16を円
形に形成し、同じくコンクリート打設用穴28も円形の
穴として構成したものである。
4 (A) and 4 (B) show other examples of the construction of the foundation bottom board 16, and the foundation bottom board 16 in FIG. 4 (A) has four concrete pouring holes 28. An example of the configuration is shown. In the same figure (B), the foundation bottom plate 16 is formed in a circular shape, and the concrete pouring hole 28 is also formed as a circular hole.

【0024】また、それぞれの基礎底盤16には図3に
示した基礎底盤と同様に内部に鉄筋が配されており(図
示せず)、コンクリート打設用穴28についても図3の
構成と同様に下面側へ向け開口幅を広げたテーパ状の構
成とされている。
Reinforcing bars are arranged inside each of the base floors 16 (not shown) similarly to the base floors shown in FIG. 3, and the concrete pouring holes 28 have the same configuration as shown in FIG. In addition, it has a tapered configuration in which the opening width is widened toward the lower surface side.

【0025】次に、上記各構成部からなる独立基礎構造
の機能について説明する。
Next, the function of the independent basic structure composed of the above-mentioned components will be described.

【0026】まず、スペーサブロック14は、ボルト2
0の螺入量を調整することによってそれぞれ基礎底盤1
6の設置高を微調整することができるので、基礎底盤1
6は根切り底12が水平性を保っていない場合であって
も常に水平に設置することが可能である。
First, the spacer block 14 includes the bolt 2
By adjusting the screwing amount of 0
Since the installation height of 6 can be finely adjusted, the foundation base 1
6 can always be installed horizontally even if the root cutting bottom 12 does not maintain horizontality.

【0027】そして、接続された基礎底盤16の上面は
水平な平面となっているので、その上面に例えば2つの
基礎梁18の設置脚部を安定して載置することができ
る。この基礎梁18の設置が終了した後独立基礎の部分
はこれをコンクリートによって固めるため、基礎梁ジョ
イント部の周囲に型枠を形成した後にコンクリートが打
設される。このコンクリートの打設において、基礎底盤
16のコンクリート打設用穴28には上方からコンクリ
ートが流入し、基礎底盤16の下方へコンクリートが流
れ込む。この時、スペーサブロック14の上面14aと
基礎底盤16の底面との間にはボルト20の突出分だけ
数cm程度の隙間が形成されている。従って、コンクリ
ートはその隙間にも流れ込むため、基礎底盤16の下方
側はコンクリートによって十分に固められる。
Since the upper surface of the connected base bottom plate 16 is a horizontal plane, the installation legs of the two base beams 18, for example, can be stably placed on the upper surface. After the installation of the foundation beam 18 is completed, the portion of the independent foundation is solidified with concrete, so that concrete is poured after forming a form around the foundation beam joint portion. In this concrete pouring, concrete flows into the concrete pouring hole 28 of the foundation bottom plate 16 from above and concrete flows into the bottom of the foundation bottom plate 16. At this time, a gap of about several cm is formed between the upper surface 14a of the spacer block 14 and the bottom surface of the base bottom board 16 by the amount of the protrusion of the bolt 20. Therefore, the concrete also flows into the gap, so that the lower side of the foundation bottom plate 16 is sufficiently hardened by the concrete.

【0028】また、図2(B)に示したスペーサブロッ
ク14によれば、面取り部14b側を中心に向けて配置
することによって、基礎底盤16のコンクリート打設用
穴28から流入してきたコンクリートはその面取り部1
4bの部分からよりスムーズに流れ込み、基礎底盤16
とスペーサブロック14との間隙へのコンクリートの流
入がより良好に行われる。
Further, according to the spacer block 14 shown in FIG. 2 (B), by arranging the chamfered portion 14b side toward the center, the concrete flowing in from the concrete pouring hole 28 of the foundation floor 16 is prevented. Chamfer 1
It flows in more smoothly from the part 4b, and the base 16
The concrete can flow into the gap between the spacer block 14 and the spacer block 14 better.

【0029】このように、スペーサブロック14及び基
礎底盤16を主たる構成部として形成された独立基礎構
造によれば、簡単な構造の少ない構成部材によって安定
して基礎梁18を設置することができ、かつコンクリー
トの打設もスムーズかつ良好に行われ、その固定状態の
安定性も確保される。
As described above, according to the independent foundation structure formed with the spacer block 14 and the foundation bottom plate 16 as main constituent portions, the foundation beam 18 can be stably installed by the constituent members having few simple structures. In addition, concrete can be poured smoothly and satisfactorily, and the stability of its fixed state is secured.

【0030】なお、本考案は、上記実施例に示した構成
に限定されるものではなく、考案の要旨の範囲内で種々
の変形が可能である。例えば、スペーサブロックの構成
は、流入するコンクリートの流入をより良好なものとす
るため種々の変形を行うことが可能である。
The present invention is not limited to the configuration shown in the above embodiment, but various modifications can be made within the scope of the invention. For example, the configuration of the spacer block can be modified in various ways to improve the inflow of inflowing concrete.

【0031】[0031]

【考案の効果】以上説明したように、本考案に係る独立
基礎構造によれば、独立基礎の部分を簡単な構成によっ
て的確に構築することができ、基礎梁の安定設置が可能
となり、かつ基礎梁設置後のコンクリートによる固定も
良好に行うことができる。これにより、独立基礎及びそ
の間に掛け渡される基礎梁によって構成される建築物の
基礎の構築の迅速化並びに安定化を達成することができ
る。
As described above, according to the independent foundation structure of the present invention, the independent foundation portion can be accurately constructed with a simple structure, and the stable foundation beam can be installed, and the foundation beam can be installed. It can also be satisfactorily fixed with concrete after installing beams. As a result, it is possible to speed up and stabilize the construction of the foundation of the building that is composed of the independent foundation and the foundation beam bridged between the independent foundation.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例に係る独立基礎構造の全体構成を示す説
明図である。
FIG. 1 is an explanatory diagram showing an overall configuration of an independent basic structure according to an embodiment.

【図2】(A)および(B)は本考案の独立基礎構造の
一構成部であるスペーサブロックの構成例をそれぞれ示
している。
2 (A) and 2 (B) respectively show an example of the structure of a spacer block which is a part of the independent basic structure of the present invention.

【図3】(A)および(B)は図1の実施例に用いた基
礎底盤の平面図及び側面図である。
3 (A) and 3 (B) are a plan view and a side view of a base bottom plate used in the embodiment of FIG.

【図4】(A)および(B)は基礎底盤の他の構成例を
それぞれ示している。
4 (A) and 4 (B) show other structural examples of the base plate.

【符号の説明】[Explanation of symbols]

10 掘削穴 12 根切り底 14 スペーサブロック 16 基礎底盤 20 ボルト 22 雌ねじ部 24 けがき線 26 鉄筋 28 コンクリート打設用穴
MH018402
10 Drilling Hole 12 Root Cutting Bottom 14 Spacer Block 16 Foundation Bottom 20 Bolt 22 Female Threaded Section 24 Marking Line 26 Reinforcing Bar 28 Concrete Placing Hole
MH018402

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 建築物設置領域の所定箇所に形成された
掘削穴内に構築され、基礎の構成部材である基礎梁を掛
け渡し設置するための支持部を構成する独立基礎構造に
おいて、 前記掘削穴の底部の所定箇所に少なくとも3個以上設置
され、各々の上面からの突出高さを調整可能な高さ調整
具を備えたスペーサブロックと、 内部に鉄筋が配筋された所定厚さのプレキャストコンク
リート製プレートであって、前記スペーサブロックの前
記高さ調整具上に載置された基礎底盤と、 を含むことを特徴とする独立基礎構造。
1. An independent foundation structure, which is constructed in a drilling hole formed at a predetermined location in a building installation area, and which constitutes a support portion for mounting and installing a foundation beam, which is a component of the foundation, in the drilling hole. Pre-cast concrete with a predetermined thickness in which at least three or more are installed at predetermined locations on the bottom of the base and each of which has a height adjuster capable of adjusting the protruding height from the upper surface of the base, and reinforcing bars are arranged inside. An independent foundation structure comprising: a base plate placed on the height adjusting tool of the spacer block.
【請求項2】 請求項1において、前記基礎定盤には1
又は複数の打設用穴が上下面に貫通して形成され、か
つ、前記スペーサブロックには、前記基礎底盤の中心側
に位置する側面より上面に亘って面取り部が形成されて
いることを特徴とする独立基礎構造。
2. The base plate according to claim 1, wherein
Alternatively, a plurality of driving holes are formed so as to penetrate through the upper and lower surfaces, and the spacer block is formed with a chamfered portion extending from the side surface located on the center side of the foundation bottom plate to the upper surface. Independent foundation structure.
JP8000091U 1991-09-05 1991-09-05 Independent foundation structure Expired - Lifetime JPH0748754Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8000091U JPH0748754Y2 (en) 1991-09-05 1991-09-05 Independent foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8000091U JPH0748754Y2 (en) 1991-09-05 1991-09-05 Independent foundation structure

Publications (2)

Publication Number Publication Date
JPH0527145U JPH0527145U (en) 1993-04-09
JPH0748754Y2 true JPH0748754Y2 (en) 1995-11-08

Family

ID=13706040

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8000091U Expired - Lifetime JPH0748754Y2 (en) 1991-09-05 1991-09-05 Independent foundation structure

Country Status (1)

Country Link
JP (1) JPH0748754Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5284533B1 (en) * 2012-12-27 2013-09-11 株式会社堀内土木 Solar panel foundation and its formwork

Also Published As

Publication number Publication date
JPH0527145U (en) 1993-04-09

Similar Documents

Publication Publication Date Title
JPH05214731A (en) Column base fixing device
JPH0748754Y2 (en) Independent foundation structure
JPH0674591B2 (en) Anchor support beam construction method
JPH0626650Y2 (en) Precast outer wall version with adjusting bracket
JP2501020Y2 (en) Independent foundation structure and foundation floor
JPH0748755Y2 (en) Spacer block positioning jig
JPH0371537B2 (en)
JP3662207B2 (en) Construction block for concrete foundation for construction and construction method for concrete foundation for construction
JPS6268928A (en) Construction for foundation for setting machine
JPH10317391A (en) Foundation structure for steel tower and method for constructing the same
JP2002097818A (en) Method of installing base isolating foundation frame for building
JP2507676Y2 (en) Concrete cloth foundation assembly member positioning jig
JPH0476117A (en) Supporting device for anchor bolt
JP2532797B2 (en) Support beam for foundation beams
JP2780861B2 (en) Block structure for foundation construction
JPH0336573Y2 (en)
JPH01163320A (en) Method and apparatus for fixing anchor bolt
JP2585064Y2 (en) Anchor bolt and sheath tube positioning jig for foundation
JP3716366B2 (en) Foundation structure and construction method of the foundation structure
JP3017999B2 (en) Construction method of L-shaped shade concrete block
JPH0762668A (en) Device for setting anchor bolt to be embedded in concrete foundation
JPH04306319A (en) Foundation construction
JP2596589Y2 (en) Foundation structure
JP3583080B2 (en) Fixing structure of panel in building structure with concrete wall panel and fixing method
JPH0240823B2 (en) KATAMOCHISURABUNIOKERUTESURITORITSUKEBUZAINOSETSUCHIHOHO

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960430