JPH0734936B2 - Square pipe manufacturing method - Google Patents

Square pipe manufacturing method

Info

Publication number
JPH0734936B2
JPH0734936B2 JP3252185A JP25218591A JPH0734936B2 JP H0734936 B2 JPH0734936 B2 JP H0734936B2 JP 3252185 A JP3252185 A JP 3252185A JP 25218591 A JP25218591 A JP 25218591A JP H0734936 B2 JPH0734936 B2 JP H0734936B2
Authority
JP
Japan
Prior art keywords
metal plate
roll
plate body
square pipe
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3252185A
Other languages
Japanese (ja)
Other versions
JPH0592212A (en
Inventor
秀次郎 丸山
Original Assignee
双福鋼器株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 双福鋼器株式会社 filed Critical 双福鋼器株式会社
Priority to JP3252185A priority Critical patent/JPH0734936B2/en
Publication of JPH0592212A publication Critical patent/JPH0592212A/en
Publication of JPH0734936B2 publication Critical patent/JPH0734936B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、角パイプの製造方法に
関するものである。
The present invention relates to a method of manufacturing a corner pipes.

【0002】[0002]

【従来の技術】例えば、上下複数段の棚板を有するラッ
クの支柱や建設資材等においては、鋼製の角パイプが広
く利用されている。この角パイプは、通常、帯状の金属
板体を複数のロールをタンデムに配置したロール成形機
にかけてロール成形することにより製造されるが、特に
ラックの支柱として用いる角パイプの場合には、棚板を
掛止させるための切欠孔を角パイプの側面に設けておく
のが一般的である(図1参照)。
2. Description of the Related Art For example, steel square pipes are widely used in rack columns having a plurality of upper and lower shelves, construction materials and the like. This square pipe is usually manufactured by roll-forming a strip-shaped metal plate by using a roll forming machine in which a plurality of rolls are arranged in tandem. Especially, in the case of a square pipe used as a support for a rack, a shelf board is used. It is common to provide a cutout hole on the side surface of the square pipe for hooking (see FIG. 1).

【0003】図13は、かかる切欠孔を設けた角パイプ
の従来の製造方法を示している。即ち、従来では、先ず
帯状の金属板体20を断面丸形にロール成形してその板端
を電縫溶接した後、できた丸形管21を四方からロール22
で徐々に押圧して角形管23とし、その後、角形管23の側
面にパンチング24によって切欠孔25を設けるようにして
いた。
FIG. 13 shows a conventional method of manufacturing a square pipe provided with such a cutout hole. That is, in the prior art, first, a band-shaped metal plate body 20 is roll-formed into a round cross-section and the plate ends thereof are electric resistance welded, and then a round tube 21 formed from four sides is rolled.
Then, the rectangular tube 23 was gradually pressed to form the rectangular tube 23, and then the notch hole 25 was provided by punching 24 on the side surface of the rectangular tube 23.

【0004】[0004]

【発明が解決しようとする課題】しかし、上記従来の技
術では、金属板体20を一旦丸形管21に成形してから角形
管23に成形し直すことにしているため、以下に示すよう
な欠点がある。 ロール成形機が丸形用と角形用の二種類のものが必
要となり、設備コストが高くつきしかも作業場占有面積
が大きくなる。 溶接線26における亀裂の発生を防止するため、従来
では、溶接線26を角パイプの側面中央を通るようにしな
ければならならず、従って、特に内厚が薄い角パイプで
はその溶接線26部分が強度上のネックとなって断面剛性
をあまり大きくできない。
However, in the above-mentioned conventional technique, the metal plate body 20 is once formed into the round tube 21 and then formed into the square tube 23 again. There are drawbacks. Two types of roll forming machines, one for round type and one for square type, are required, resulting in high equipment cost and large occupation area. In order to prevent the occurrence of cracks in the weld line 26, conventionally, the weld line 26 must be made to pass through the center of the side surface of the square pipe. It becomes a neck for strength, and the cross-sectional rigidity cannot be increased so much.

【0005】また、従来の製造方法では、角形管23の成
形後に孔明け作業を行っているため、以下に示すような
欠点がある。 角形管23の変形防止の観点から、パンチング24の雌
型27を角形管23の断面内にスライド自在に挿入しなけれ
ば切欠孔25を設けることができない。従って、従来では
孔明け装置の構造が専ら複数で高価なものとなってお
り、この点からも設備コストが高くつく。 角パイプの断面剛性を増すために、例えば図4に示
すように、切起し片14を断面内部に残すようにして切欠
孔25を形成したい場合があるが、従来の孔明け方法で
は、雌型27を角形管23断面内でスライドさせる必要があ
るので、かかる切起し片14を形成するのは非常に困難で
ある。
Further, in the conventional manufacturing method, since the punching operation is performed after the rectangular tube 23 is formed, it has the following drawbacks. From the viewpoint of preventing deformation of the rectangular tube 23, the notch hole 25 cannot be provided unless the female die 27 of the punching 24 is slidably inserted into the cross section of the rectangular tube 23. Therefore, conventionally, the structure of the punching device is plural and the structure is expensive, and the facility cost is high in this respect as well. In order to increase the cross-sectional rigidity of the square pipe, there is a case where it is desired to form the cut-out hole 25 so that the cut-and-raised piece 14 is left inside the cross-section as shown in FIG. Forming such a cut-and-raised piece 14 is very difficult because the mold 27 has to be slid in the cross section of the rectangular tube 23.

【0006】一方、例えば図14に示す如く、金属板体
20に予め切欠孔25を設けておき、その後その金属板体20
を前記従来の技術と同様に丸形管21から角形管23にロー
ル成形することにより、孔明け作業における従来の欠点
を回避することが考えられる。しかし、この製造方法で
は、特に丸形管21から角形管23に成形し直す際に、切欠
孔25の位置ずれや切欠孔25周辺の材料が応力集中によっ
て座屈する場合があり、製品部止りが低下するという欠
点がある。
On the other hand, for example, as shown in FIG.
A cutout hole 25 is provided in advance in 20 and then the metal plate body 20
It is conceivable to roll-form the round tube 21 into the rectangular tube 23 in the same manner as the above-mentioned conventional technique, thereby avoiding the conventional drawbacks in the punching operation. However, in this manufacturing method, when the round tube 21 is reshaped into the rectangular tube 23 in particular, the position shift of the notch hole 25 and the material around the notch hole 25 may buckle due to stress concentration, and the product part stops. It has the drawback of decreasing.

【0007】本発明は、このような実情に鑑み、強度面
及び製品精度面でより優れた角パイプを極めて簡便かつ
安価に製造し得るようにすることを目的とする。
[0007] The present invention has been made in view of such circumstances, and an object thereof is to be capable of easily and inexpensively manufacturing Te because very superior square pipe in terms of strength and product precision surface.

【0008】[0008]

【課題を解決するための手段】上記目的を達成すべく、
本発明は次の技術的手段を講じた。即ち、請求項1記載
の発明は、側面に切欠孔13を有する角パイプ12を、金属
板体17をロール成形することにより製造する角パイプの
製造方法において、前記金属板体17に予め前記切欠孔13
を設けておき、その金属板体17の幅方向両端の接合部に
おいて前記角パイプ12の断面コーナ部16が構成されるよ
う、ロール成形の初期において当該金属板体17の幅方向
両端をロールによりアール加工しておくとともに、この
アール加工された金属板体17を後続のロールによって
定のロールフラワに従って平板状態から直接角形断面形
状にロール成形した後、前記金属板体17の幅方向両端
を突合せ溶接して角形断面を閉塞することを特徴とす
る。
[Means for Solving the Problems] In order to achieve the above object,
The present invention has taken the following technical means. That is, the invention according to claim 1 is a method of manufacturing a square pipe 12 in which a metal plate body 17 is roll-molded to form a square pipe 12 having a notch hole 13 in a side surface thereof. Hole 13
Is provided, and at the joints at both ends in the width direction of the metal plate body 17.
The cross-section corner portion 16 of the square pipe 12 is constructed.
In the width direction of the metal plate 17 at the beginning of roll forming
Both ends are rounded with rolls and
After roll forming directly rectangular cross-sectional shape of a flat plate state in accordance with Earle processed roll flower of <br/> constant at the subsequent roll the metal plate body 17, butt welding between the widthwise ends of the metal plate body 17 It is characterized by closing the rectangular cross section.

【0009】また、請求項2記載の発明は、断面内方に
膨出する切起し片14が残るように形 成された切欠孔13を
側面に有する角パイプ12を、金属板体17をロール成形す
ることにより製造する角パイプの製造方法であって、
記金属板体17に予め前記切起し片14が残るように形成さ
れた切欠孔13を設けておき、その金属板体17の幅方向両
端の接合部において前記角パイプ12の断面コーナ部16が
構成されるよう、ロール成形の初期において当該金属板
体17の幅方向両端を前記切起し片14の逃げ用の周溝18を
有するロールによりアール加工しておくとともに、この
アール加工された金属板体17を後続のロールによって所
定のロールフラワに従って平板状態から直接角形断面形
状にロール成形した後、当該金属板体17の幅方向両端間
を突合せ溶接して角形断面を閉塞することを特徴とす
る。
The invention according to claim 2 is characterized in that
The cutout holes 13 made forms as cut-and-raised pieces 14 that bulges remains
The square plate 12 on the side surface is roll-formed with the metal plate body 17.
A method of manufacturing a square pipe to be manufactured by Rukoto, before
The metal plate body 17 is formed in advance so that the cut and raised pieces 14 remain.
The cutout hole 13 is provided in the width direction of the metal plate body 17.
The cross-sectional corner portion 16 of the square pipe 12 at the end joint is
As configured, the metal plate at the beginning of roll forming
The both ends in the width direction of the body 17 are cut and raised, and the circumferential groove 18 for escape of the piece 14 is formed.
In addition to being rounded with the rolls it has,
Place the rounded metal plate 17 with the subsequent roll.
Direct rectangular cross section from flat plate according to constant roll flower
Between the two ends in the width direction of the metal plate 17 after roll-forming
Is butt-welded to close the rectangular cross section .

【0010】[0010]

【作用】本発明方法によれば、金属板体17を平板状態か
ら直接角形断面形状にロール成形するので、ロール成形
機5 が一台で済み、切欠孔13の位置ずれ等を生じさせる
ことなく所定の断面形状に成形できる。このさい、金属
板体17の幅方向両端の接合部において角パイプ12の断面
コーナ部16が構成されるよう、金属板体17の幅方向両端
間を突合せ溶接するようにしているので、角パイプ12の
すべての側面において切欠孔13を適切な位置に設けるこ
とができ、溶接後の当該角パイプ12の断面強度も向上で
きる。
According to the method of the present invention, since the metal plate body 17 is directly roll-formed from the flat plate state into a rectangular cross-sectional shape, only one roll-forming machine 5 is required, and the positional deviation of the notch hole 13 or the like does not occur. It can be molded into a predetermined cross-sectional shape. At this time, metal
The cross section of the square pipe 12 at the joints at both ends in the width direction of the plate body 17
Both ends of the metal plate body 17 in the width direction so that the corner portions 16 are configured.
Since the butt welding is performed between the
Make sure that the cutout holes 13 are properly placed on all sides.
It is possible to improve the cross-sectional strength of the square pipe 12 after welding.
Wear.

【0011】また、金属板体17のロール成形の際にその
幅方向両端をロール9,10によりアール加工するため、ロ
ール成形後に行う突合せ溶接がなされやすくなり、しか
も、かかるアール加工をロール成形の初期の段階で行う
ので、ロール成形の中期や後期に金属板体17の幅方向両
端をアール加工する場合に比べて極めて簡単な構造のロ
ールで当該アール加工を行える。
Further , during roll forming of the metal plate body 17,
Since both ends in the width direction are rounded by rolls 9 and 10,
Butt welding performed after molding
Also, such rounding is performed at the initial stage of roll forming.
Therefore, both the width direction of the metal plate body 17 can be
It has a very simple structure compared to the case where the end is rounded.
You can do the rounding process with a tool.

【0012】請求項2記載の発明では、ロール成形の初
期において上記アール加工を行うロール9 が金属板体17
に予め設けてある切起し片14の逃げ用の周溝18を有する
ので、当該アール加工に際してその切起し片14が潰され
ることがない。
According to the second aspect of the invention, the first roll forming is performed.
The roll 9 that performs the above-mentioned rounding in the
Has a peripheral groove 18 for escaping the cut-and-raised piece 14 provided in advance
Therefore, the cut-and-raised piece 14 is crushed during the rounding process.
Never.

【0013】[0013]

【実施例】以下、図面に基づいて本発明の実施例につい
て詳述する。図2は、本発明方法が採用される角パイプ
の製造設備の概要を示している。この製造設備は、同図
左側から順に、アンコイラ1 、レベラ2 、NCフィーダ
3 、切欠プレス4 、ロール成形機5 、高周波溶接機6 、
走行切断器7 、ラインアウトテーブル8 をタンデムに配
置して構成されている。
Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 2 shows an outline of a square pipe manufacturing facility in which the method of the present invention is adopted. The manufacturing equipment consists of an uncoiler 1, a leveler 2 and an NC feeder in order from the left side of the figure.
3, notch press 4, roll forming machine 5, high frequency welding machine 6,
It consists of a traveling cutting device 7 and a line-out table 8 arranged in tandem.

【0014】前記ロール成形機5 は、上下一対のローラ
9,10を多数直列に備えていて、本実施例では、全部で20
段のローラ9,10を有している。また、高周波溶接器6
は、スライダ11を介してロール成形機5 の上部でパスラ
イン方向に移動自在に取付けられている。図3及び図4
において、12は本実施例で製造対象とした角パイプで、
断面方形の鋼製のものが採用され、図外のラックの棚板
を支持する支柱となるものである。この角パイプ12は、
棚板を種々の高さで支持すべく、その側面の上下方向所
定間隔おきに多数の切欠孔13を備え、本実施例では、こ
の切欠孔13の一側に、角パイプ12の断面内方に膨出する
切起し片14を残すことにしている。
The roll forming machine 5 comprises a pair of upper and lower rollers.
A large number of 9, 10 are provided in series, and in this embodiment, a total of 20
It has stepped rollers 9, 10. Also, high-frequency welder 6
Is mounted on the roll forming machine 5 via a slider 11 so as to be movable in the pass line direction. 3 and 4
In the above, 12 is a square pipe to be manufactured in this embodiment,
It is made of steel with a rectangular cross section and serves as a support pillar for supporting the shelf boards of the rack (not shown). This square pipe 12
In order to support the shelf board at various heights, a large number of notch holes 13 are provided at predetermined intervals on the side surface in the vertical direction.In the present embodiment, one side of the notch hole 13 has a cross section inward of the square pipe 12. The cut-and-raised piece 14 that bulges out is left.

【0015】また、15は角パイプ12の溶接線を示し、本
実施例では、この溶接線15が当該角パイプ12の断面コー
ナ部16に位置するように突合せ溶接されている。次に、
上記角パイプ12の製造方法を順を追って説明する。図1
に示す如く、先ず角パイプ12の素材となる帯状の金属板
体17は、前記アンコイラ1 及びレベラ2 によって平坦化
され、この平坦状態において切欠プレス4によって所定
位置に切欠孔13が設けられる。尚、このとき切欠孔13の
一側には、前記切起し片14が上方突出状に残されるよう
になっている。
Reference numeral 15 denotes a welding line of the square pipe 12, and in this embodiment, the welding line 15 is butt-welded so that the welding line 15 is located at the cross section corner portion 16 of the square pipe 12. next,
A method of manufacturing the square pipe 12 will be described step by step. Figure 1
As shown in FIG. 1, first, the strip-shaped metal plate body 17, which is the material of the square pipe 12, is flattened by the uncoiler 1 and the leveler 2. In this flat state, the notch hole 13 is provided at a predetermined position by the notch press 4. At this time, the cut-and-raised piece 14 is left on one side of the cutout hole 13 so as to project upward.

【0016】その後、この切欠孔13を有する金属板体17
は、従来のように一旦丸形に成形するのではなく、前記
20段ロール成形機5 によって平板状態から直接方形断面
形状にロール成形される。図5は、かかるロール成形を
行う場合のロールフラワを示しており、同図におけるN
O.1,NO.2 …は、ロール番号を示す。
Thereafter, the metal plate body 17 having the cutout holes 13 is formed.
Is not a round shape as in the past, but the above
A 20-stage roll forming machine 5 roll-forms a flat plate directly into a rectangular cross-section. FIG. 5 shows a roll flower when such roll forming is performed.
O.1, NO.2 ... Indicates roll numbers.

【0017】図5からも明らかなように、本実施例で
は、先ず第2ロールによって金属板体17の板端(幅方向
両端)をアール加工することにしている。これは、本実
施例でこの板端部分で成形後の角パイプ12の断面コーナ
部16を構成することにより、後の突合せ溶接がなされや
すいようにするとともに、ロール成形の最初に金属板体
17の板端をアール加工しておく方がロール9,10の構造が
単純なもので済むためである。
As is apparent from FIG. 5, in the present embodiment, first, the plate end (width direction) of the metal plate member 17 is first moved by the second roll.
Both ends are rounded. This is because in the present embodiment, by forming the cross-section corner portion 16 of the square pipe 12 after forming at the plate end portion, it becomes easier to perform butt welding later, and at the beginning of roll forming, the metal plate body is formed.
The structure of rolls 9 and 10 is better if the 17 plate edges are rounded
This is because it can be simple.

【0018】すなわち、ロール成形の中期(例えば、図
8のNO.8の後)や後期(例えば、図10のNO.13 の後)
では、金属板体17が既に屈曲されて平板状ではなくなっ
ているため、かかる屈曲後の金属板体17の板端をアール
加工しようとすると、上下ロール9,10ともに特別な形状
に設計し直す必要がある。 この点、本実施例では、ロー
ル成形の初期、すなわち本格的なロール成形を始める前
(図6のNO.2)に金属板体17の幅方向両端をロール9,10
によりアール加工するようにしているので、図6に示す
ように上ロール9 の段部両側と下ロール10の溝部両側に
所定形状のアール部9A,10Aを形成しておけばよく、かか
るアール部9A,10Aを有する上下ロール9,10間に金属板体
17を通すだけでその幅方向両端にアール加工を行うこと
ができる。
That is, the middle stage of roll forming (see, for example, FIG.
8 NO.8) or late (for example, after NO.13 in FIG. 10)
Now, the metal plate body 17 has already been bent and is no longer flat.
Therefore, the plate edge of the metal plate body 17 after the bending is rounded.
The upper and lower rolls 9 and 10 have special shapes when they are processed.
Need to be redesigned. In this regard, in this embodiment, the low
The beginning of roll forming, that is, before starting full-scale roll forming
Roll both ends of the metal plate body 17 in the width direction (No. 2 in Fig. 6)
As shown in FIG.
The upper roll 9 on both sides of the step and the lower roll 10 on both sides of the groove.
It suffices if the rounded portions 9A and 10A having a predetermined shape are formed.
A metal plate body between upper and lower rolls 9 and 10 having rounded portions 9A and 10A
Rounding the widthwise ends by simply passing 17
You can

【0019】更に、上記のように板端の溶接部(接合
部)を角パイプ12の断面コーナ部16をに配した場合、角
パイプ12のすべての側面において切欠孔13を適切な位置
に設けることができ、また、例えば側面中途部において
溶接する場合に比べて、溶接後の当該角パイプ12の断面
強度も向上される。次に、第2から第8ロールによって
金属板体17の両端をある程度起こした後、第9から第12
ロールによって金属板体17の中央部を下側が稜線となる
ように曲げ、その後は、第13から第16ロールによって断
面を徐々に閉じて行くようにしてロール成形される。
Furthermore, as described above, the welded portion (joint
Section) is arranged at the corner section 16 of the square pipe 12,
Proper location of cutouts 13 on all sides of pipe 12
Can be provided on the side surface, and, for example, in the middle of the side surface.
Cross-section of the square pipe 12 after welding compared to the case of welding
Strength is also improved. Next, after raising both ends of the metal plate body 17 to some extent by the second to eighth rolls, the ninth to twelfth rolls
Rolling is performed by bending the central portion of the metal plate body 17 so that the lower side becomes a ridge line, and thereafter, by rolling the thirteenth to sixteenth rolls so as to gradually close the cross section.

【0020】そして、第17ロールにおいて、板端間が略
接触すると、第17ロールと第18ロール間に配置しておい
た前記高周波溶接機6 によって板端間が突合せ溶接され
る。尚、第19及び第20ロールは、断面閉塞後の角パイプ
の断面寸法を微調整するためのロールである。尚、図6
乃至図12は、上記ロールフラワーのうち、それぞれ第
2、第6、第8、第11、第13、第16、第18ロールの縦断
面図を示す。このうち、図6において、上側のロール9
切起し片14の逃げ用の周溝18が設けられているのは、
金属板体17に形成した切起し片14をつぶさないようにす
るためである。
When the plate ends of the seventeenth roll are substantially in contact with each other, the plate ends are butt-welded by the high-frequency welding machine 6 arranged between the seventeenth roll and the eighteenth roll. The nineteenth and twentieth rolls are rolls for finely adjusting the cross-sectional dimension of the square pipe after the cross-section is closed. Incidentally, FIG.
12 to 12 are vertical cross-sectional views of the second, sixth, eighth, eleventh, thirteenth, sixteenth, and eighteenth rolls of the above roll flour, respectively. Of these, in FIG. 6, the upper roll 9
The peripheral groove 18 for escape of the cut- and- raised piece 14 is provided in
This is to prevent the cut-and-raised pieces 14 formed on the metal plate body 17 from being crushed.

【0021】その後、上記のようにしてロール成形され
た角パイプ12は、前記走行切断機7によって所定長さに
切断され、ラインアウトテーブ8 上に搬出される。この
ように、本実施例によれば、予め切欠孔13を有する金属
板体17を直接角形断面形状にロール成形することにした
ので、ロール成形機5 が一台で済み設備コストを低減化
できると共に、切欠孔13の位置ずれやその周辺材料の座
屈を生じることなくロール成形できるので、精度の高い
切欠孔13付き角パイプ12を非常に簡便に製造することが
できる。
Thereafter, the square pipe 12 roll-formed as described above is cut into a predetermined length by the traveling cutting machine 7 and is carried out onto the line out table 8. As described above, according to this embodiment, since the metal plate body 17 having the cutout holes 13 is directly roll-formed into the rectangular cross-sectional shape, only one roll forming machine 5 is required and the equipment cost can be reduced. At the same time, the roll forming can be performed without the positional deviation of the cutout hole 13 and the buckling of the peripheral material thereof, so that the square pipe 12 with the cutout hole 13 with high accuracy can be manufactured very easily.

【0022】また、本実施例に係る製造方法によれば、
ロールフラワの最終段階で突合せ溶接を行うので、上述
のように角パイプ12の溶接線15を断面コーナ部16に配置
することができ、成形後の角パイプ12の断面剛性を可及
的に増大することができる。また、切欠孔13の一側に切
起し片14が残った金属板体17をロール成形することもで
き、切欠孔13による断面欠損を有効に防止できる利点が
ある。
According to the manufacturing method of this embodiment,
Since the butt welding is performed at the final stage of the roll flower, the welding line 15 of the square pipe 12 can be arranged in the cross-section corner portion 16 as described above, and the cross-sectional rigidity of the square pipe 12 after forming can be increased as much as possible. can do. Further, it is possible to roll-form the metal plate body 17 which is cut and raised on one side of the cutout hole 13 and has the piece 14 left, and there is an advantage that the cross-section loss due to the cutout hole 13 can be effectively prevented.

【0023】更に、本実施例によれば、平板状態の金属
板体17に孔明け作業を行うので、切欠プレス4 も簡単な
構造のもので足り、この点からも設備コストの低減を図
ることができる。尚、本発明は上記実施例に限定される
ものではなく、角パイプ12の断面剛性を特に高める必要
のない場合には、敢えて切起し片14を残しておく必要
ない。
Furthermore, according to this embodiment, since the metal plate body 17 in the flat plate state is punched, the notch press 4 need only have a simple structure, and the facility cost can be reduced also from this point. You can The present invention is not limited to the above embodiment, when there is no need to particularly increase section stiffness of square pipes 12, the need to leave the raised pieces 14 daringly Ete switching without <br/> .

【0024】また、本発明方法によれば、前記ラックの
支柱のみならず、その他、各種建設資材等に用いる角パ
イプも製造可能であり、ロールフラワを設計しなおすこ
とにより異形断面の角パイプも成形しうることは勿論で
ある。
According to the method of the present invention, it is possible to manufacture not only the support pillars of the rack but also other square pipes used for various construction materials. By redesigning the roll flower, square pipes of irregular cross section can be produced. Of course, it can be molded.

【0025】[0025]

【発明の効果】請求項1記載の発明によれば、ロール成
形機5 が一台で済むので設備コストを低減化できると共
に、切欠孔13の位置ずれ等を生ずることなくロール成形
できるので、製品精度の高い角パイプ12を極めて簡便に
製造することができる。また、金属板体17の幅方向両端
の接合部において角パイプ12の断面コーナ部16が構成さ
れるよう、金属板体17の幅方向両端間を突合せ溶接して
いるので、角パイプ12のすべての側面において切欠孔13
を適切な位置に設けることができ、しかも、側面中途部
において溶接する場合に比べて溶接後の角パイプ12の断
面強度を向上することができる。
According to the first aspect of the present invention, since only one roll forming machine 5 is required, the equipment cost can be reduced, and the roll forming can be performed without causing the positional deviation of the notch holes 13 and the like. The highly accurate square pipe 12 can be manufactured very easily. In addition, both ends in the width direction of the metal plate body 17
The cross-section corner 16 of the square pipe 12 is
Butt welding between the widthwise ends of the metal plate 17
The cutout holes 13 on all sides of the square pipe 12.
Can be installed at an appropriate position,
Of square pipe 12 after welding compared to welding at
The surface strength can be improved.

【0026】更に、金属板体17の幅方向両端をロール9,
10によりアール加工するため、ロール成形後に行う突合
せ溶接がなされやすくなるとともに、かかるアール加工
をロール成形の初期において行うので、ロール成形の中
期や後期に金属板体17の幅方向両端をアール加工する場
合に比べて簡単なロールで当該アール加工を行え、ロー
ル成形機5 の設備コストを可及的に低く抑えられる。
Further, both ends in the width direction of the metal plate member 17 are rolled 9,
Butt that is performed after roll forming because R is processed by 10
This makes it easier to perform welding, and at the same time rounds
Is performed at the beginning of roll forming,
When rounding both ends in the width direction of the metal plate 17 at the end or later
Compared with the case of rolling
The equipment cost of the molding machine 5 can be kept as low as possible.

【0027】請求項2記載の発明によれば、ロール成形
の初期において上記アール加工を行うに際し、切起し片
14がロール9 に設けた逃げ用の周溝18に収納されるの
で、そのアール加工の際に当該切起し片14が潰されるこ
とがなく、このため、断面内方に膨出した切起し片14を
有する角パイプ12であっても同切起し片14を有しない角
パイプ12と同じ製造ラインで製造することができる。
According to the invention described in claim 2, roll forming
When performing the above-mentioned R processing in the initial stage of
14 is stored in the escape groove 18 provided on the roll 9.
The cut-and-raised pieces 14 are crushed during the rounding process.
For this reason, the cut-and-raised piece 14 that bulges inward in the cross section
Even if it has the square pipe 12, it does not have the same raised piece 14
It can be manufactured on the same manufacturing line as the pipe 12.

【図面の簡単な説明】[Brief description of drawings]

【図1】角パイプの製造方法の概略説明図である。FIG. 1 is a schematic explanatory view of a method for manufacturing a square pipe.

【図2】角パイプの製造設備の側面図である。FIG. 2 is a side view of a square pipe manufacturing facility.

【図3】角パイプの斜視図である。FIG. 3 is a perspective view of a square pipe.

【図4】図3のA−A線断面図である。4 is a cross-sectional view taken along the line AA of FIG.

【図5】ロールフラワの説明図である。FIG. 5 is an explanatory diagram of a roll flower.

【図6】第2ロールの縦断面図である。FIG. 6 is a vertical sectional view of a second roll.

【図7】第6ロールの縦断面図である。FIG. 7 is a vertical cross-sectional view of a sixth roll.

【図8】第8ロールの縦断面図である。FIG. 8 is a vertical cross-sectional view of an eighth roll.

【図9】第11ロールの縦断面図である。FIG. 9 is a vertical sectional view of an eleventh roll.

【図10】第13ロールの縦断面図である。FIG. 10 is a vertical sectional view of a thirteenth roll.

【図11】第16ロールの縦断面図である。FIG. 11 is a vertical sectional view of a 16th roll.

【図12】第18ロールの縦断面図である。FIG. 12 is a vertical sectional view of an eighteenth roll.

【図13】従来の角パイプの製造方法を示す概略説明図
である。
FIG. 13 is a schematic explanatory view showing a conventional method for manufacturing a square pipe.

【図14】比較例を示す概略説明図である。FIG. 14 is a schematic explanatory view showing a comparative example.

【符号の説明】9 ロール 10 ロール 12 スライダ 13 切欠孔 14 切起し片 16 断面コーナ部 17 金属板体[Explanation of Codes] 9 Roll 10 Roll 12 Slider 13 Notch Hole 14 Cut and Raised Piece 16 Cross Section Corner 17 Metal Plate

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 側面に切欠孔(13)を有する角パイプ(12)
を、金属板体(17)をロール成形することにより製造する
角パイプの製造方法において、前記金属板体(17)に予め
前記切欠孔(13)を設けておき、その金属板体(17)の幅方
向両端の接合部において前記角パイプ(12)の断面コーナ
部(16)が構成されるよう、ロール成形の初期において当
該金属板体(17)の幅方向両端をロール(9)(10)によりア
ール加工しておくとともに、このアール加工された金属
板体(17)を後続のロール(9)(10) によって所定のロール
フラワに従って平板状態から直接角形断面形状にロール
成形した後、前記金属板体(17)の幅方向両端間を突合せ
溶接して角形断面を閉塞することを特徴とする角パイプ
の製造方法。
1. A square pipe (12) having a notch hole (13) on its side surface.
In the method for manufacturing a square pipe produced by roll-forming a metal plate body (17), the metal plate body (17) is provided with the notch hole (13) in advance, and the metal plate body (17) is provided. Width of
Cross-section corners of the square pipe (12) at joints on both ends in the opposite direction
So that part (16) is configured at the beginning of roll forming.
Both ends in the width direction of the metal plate body (17) are moved by rolls (9) and (10).
This is a processed metal
After roll forming directly rectangular cross-sectional shape of a flat plate state in accordance with a predetermined roll flower plate body (17) by a subsequent roll (9) (10), butt welding between the widthwise ends of the metal plate body (17) A method for manufacturing a square pipe, characterized in that a rectangular cross section is closed.
【請求項2】 断面内方に膨出する切起し片(14)が残る
ように形成された切欠孔(13)を側面に有する角パイプ(1
2)を、金属板体(17)をロール成形することにより製造す
る角パイプの製造方法であって、 前記金属板体(17)に予
め前記切起し片(14)が残るように形成された切欠孔(13)
を設けておき、その金属板体(17)の幅方向両端の接合部
において前記角パイプ(12)の断面コーナ部(16)が構成さ
れるよう、ロール成形の初期において当該金属板体(17)
の幅方向両端を前記切起し片(14)の逃げ用の周溝(18)を
有するロール(9)(10) によりアール加工しておくととも
に、このアール加工された金属板体(17)を後続のロール
(9)(10) によって所定のロールフラワに従って平板状態
から直接角形断面形状にロール成形した後、当該金属板
体(17)の幅方向両端間を突合せ溶接して角形断面を閉塞
することを特徴とする角パイプの製造方法。
2. A cut and raised piece (14) which bulges inward of the cross section remains.
Square pipe (1) having a notch hole (13)
2) is manufactured by roll forming the metal plate body (17).
A method for manufacturing a rectangular pipe according to claim 1, wherein the metal plate body (17) is preliminarily prepared.
Notch hole (13) formed so that the cut and raised piece (14) remains
Is provided, and the joints at both ends in the width direction of the metal plate body (17)
At the corner section (16) of the square pipe (12)
The metal plate body (17) at the beginning of roll forming
The both ends in the width direction of the above are cut and raised, and the peripheral groove (18) for escape of the piece (14)
It can be rounded with the rolls (9) (10)
Then, this rounded metal plate body (17) is rolled into a subsequent roll.
(9) By means of (10), flat plate condition according to the specified roll flower
From the metal plate directly after roll forming into a rectangular cross-sectional shape
Closing the rectangular cross section by butt welding the widthwise ends of the body (17)
A method for manufacturing a square pipe, comprising:
JP3252185A 1991-09-30 1991-09-30 Square pipe manufacturing method Expired - Lifetime JPH0734936B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3252185A JPH0734936B2 (en) 1991-09-30 1991-09-30 Square pipe manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3252185A JPH0734936B2 (en) 1991-09-30 1991-09-30 Square pipe manufacturing method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP8088320A Division JP2719129B2 (en) 1996-04-10 1996-04-10 Method for manufacturing long steel members

Publications (2)

Publication Number Publication Date
JPH0592212A JPH0592212A (en) 1993-04-16
JPH0734936B2 true JPH0734936B2 (en) 1995-04-19

Family

ID=17233680

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3252185A Expired - Lifetime JPH0734936B2 (en) 1991-09-30 1991-09-30 Square pipe manufacturing method

Country Status (1)

Country Link
JP (1) JPH0734936B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3476093B2 (en) * 1994-06-15 2003-12-10 カルソニックカンセイ株式会社 Stubbing method and apparatus
JPH08120828A (en) * 1994-10-25 1996-05-14 Asahi Chem Ind Co Ltd Manufacture of long-sized building material
JP5725778B2 (en) * 2010-09-21 2015-05-27 日新製鋼株式会社 Stainless steel square tube for nuclear fuel storage rack, its manufacturing method and rack
KR102290783B1 (en) * 2019-11-14 2021-08-18 주식회사 포스코 Forming method and apparatus for metallic materials

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6462216A (en) * 1987-08-31 1989-03-08 Eiwa Denki Kk Production of cross arm for electric pole
JP2823260B2 (en) * 1989-09-09 1998-11-11 ナカジマ鋼管株式会社 Roll forming method for large diameter square steel pipe

Also Published As

Publication number Publication date
JPH0592212A (en) 1993-04-16

Similar Documents

Publication Publication Date Title
US5188418A (en) Truck bed and method of manufacture
US5247825A (en) Method of forming part in progressive die system
US6128815A (en) Process of forming a vehicle bed
KR100720931B1 (en) Manufacturing method of the housing for lcd module and housing made by the same
US5938272A (en) Vehicle bed
CN88100264A (en) Method for manufacturing light metal profiles
JPH0734936B2 (en) Square pipe manufacturing method
JP2719129B2 (en) Method for manufacturing long steel members
US20040064929A1 (en) Shelf formation system and method
US5123271A (en) Method for removing workpart blanks from sheet-metal strip
JP4250508B2 (en) Metal plate processing apparatus and metal plate processing method
JPH05293571A (en) Press manufacturing device
JPS61135428A (en) Forming device of electric welded steel pipe
JP3088946B2 (en) ERW pipe cutting method and manufacturing method
KR100217084B1 (en) Bumper beam manufacture method of motorcar
JPH05104147A (en) Manufacture of shape
JP2006315075A (en) Component of grid body and method for manufacturing the same
JPS6255461B2 (en)
JP4016818B2 (en) Manufacturing method of H-shaped steel with flange tip R and its hot rolling device row
JPH0547295B2 (en)
JP2508873B2 (en) Method for hot rolling profile with flange
EP0450865A2 (en) Structural support
JPH11151538A (en) Manufacturing device for deck plate
CN116213551A (en) Alloy stamping and rolling method
GB2102707A (en) Manufacture of anti-slip decking

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090419

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090419

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100419

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110419

Year of fee payment: 16

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120419

Year of fee payment: 17

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120419

Year of fee payment: 17