JPH0734668A - Lifter for structure - Google Patents

Lifter for structure

Info

Publication number
JPH0734668A
JPH0734668A JP17829393A JP17829393A JPH0734668A JP H0734668 A JPH0734668 A JP H0734668A JP 17829393 A JP17829393 A JP 17829393A JP 17829393 A JP17829393 A JP 17829393A JP H0734668 A JPH0734668 A JP H0734668A
Authority
JP
Japan
Prior art keywords
mast
building
jack receiver
main mast
receiver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17829393A
Other languages
Japanese (ja)
Other versions
JP2872886B2 (en
Inventor
Masatake Tokioka
誠剛 時岡
Hidehiko Watanabe
英彦 渡辺
Hideyuki Takada
秀行 高田
Sunao Nagao
直 長尾
Hirokazu Tanaka
浩和 田中
Mitsuhiro Naito
充洋 内藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP17829393A priority Critical patent/JP2872886B2/en
Publication of JPH0734668A publication Critical patent/JPH0734668A/en
Application granted granted Critical
Publication of JP2872886B2 publication Critical patent/JP2872886B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To simplify a lifter for a construction device for a building and stably raise the construction device. CONSTITUTION:A slide mast 23 is suspended at the inside of the external side 12 of a construction device 10 of a building. Brackets 25, 25 having hanging devices 29 are fitted loose at the upper and lower positions of the slide mast 23. A main mast 26 is fixed between the upper and lower brackets 25, 25. And a number of pin holes 28, 28... are opened in the main mast 26. And an upper jack receiver 34 and a lower jack receiver 35 which are locked at pin holes 28a to coincide with pin holes 28 by means of lock pins 27 are fitted loose on the main mast 26 so as to freely slide. Moreover, lifting cylinders 36, 36 are interposed between the upper jack receiver 34 and the lower jack receiver 35.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は構築物の上昇装置に関
するものであり、特に、全天候形ビル自動構築に際し、
新たに上階層を構築するのに伴って構築装置を上昇させ
るための上昇装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lifting device for a building, and more particularly, in the automatic building of an all-weather building
The present invention relates to an elevating device for elevating a construction device as a new upper layer is constructed.

【0002】[0002]

【従来の技術】従来の全天候形ビル自動構築装置は、構
築されるビルの天井部及び外側部を被蔽し、且つ、クレ
ーン等の揚重装置や鉄骨組立、溶接等の自動ロボットを
内装した自動構築装置を設け、該自動構築装置を構築し
た既設のフロアの鉄骨部分に支持させて成るものであ
る。そして、該既設の鉄骨部分に油圧ジャッキで上下動
する支持柱を複数個設け、この支持柱をガイドとして自
動構築装置を上昇させ乍ら、順次上階層を新たに構築し
ていくのである。
2. Description of the Related Art A conventional all-weather building automatic construction apparatus covers the ceiling and outside of a building to be constructed, and is equipped with a lifting device such as a crane and an automatic robot for assembling and welding steel frames. An automatic construction device is provided and supported on a steel frame portion of an existing floor on which the automatic construction device is constructed. Then, a plurality of support pillars that move up and down by a hydraulic jack are provided on the existing steel frame portion, and the support pillars are used as guides to raise the automatic construction apparatus to successively construct new upper layers.

【0003】[0003]

【発明が解決しようとする課題】前記従来の全天候形ビ
ル自動構築装置は、既設のフロアの鉄骨部分に自動構築
装置を支持させており、且つ、建築物のフロア内に自動
構築装置の支持柱が存在するため、天井走行クレーン等
の構築装置のレイアウトが自由に設定することが困難と
なる。更に、既設の鉄骨部分毎に支持柱が必要となり、
コストアップの要因となっている。又、前記支持柱は既
存の鉄骨部分に建入れる状態で接合されるので、地震時
等の水平方向の振れに対する安定性が悪い。
SUMMARY OF THE INVENTION The conventional all-weather building automatic construction apparatus has an automatic construction apparatus supported on a steel frame portion of an existing floor, and a support pillar for the automatic construction apparatus on a floor of a building. Therefore, it is difficult to freely set the layout of a construction device such as an overhead traveling crane. Furthermore, a supporting column is required for each existing steel frame part,
It is a factor of cost increase. Further, since the support columns are joined in a state of being built in the existing steel frame portion, the stability against horizontal shake of the earthquake is poor.

【0004】そこで、構築装置の上昇を簡素化すると共
に、安定して該構築装置の上昇操作を為さしめるために
解決せらるべき技術的課題が生じてくるのであり、本発
明は該課題を解決することを目的とする。
Therefore, there arises a technical problem to be solved in order to simplify the raising of the construction apparatus and to stably perform the raising operation of the construction apparatus, and the present invention solves the problems. The purpose is to resolve.

【0005】[0005]

【課題を解決するための手段】本発明は上記目的を達成
するために提案せられたものであり、構築されるビルの
天井部及び外側部を被蔽し、ビルの構築に伴って上昇し
ていくビル自動構築装置に於て、構築装置の外側部の内
側にスライドマストを上下方向に固設し、該スライドマ
ストに沿って上下にスライド自在に遊嵌した上下のブラ
ケットに既設の本設躯体を把持するハンガー装置を設
け、更に、該上下のブラケット間にメインマストを固設
すると共に、該メインマストにはロックピンのピン穴を
上下に多数開穿し、更に、前記各ピン穴に一致するピン
穴を有し、ロックピンを差し込むことによってロックで
きるようにした上部ジャッキ受体及び下部ジャッキ受体
を該メインマストに遊嵌し、且つ、該上下のジャッキ受
体間に昇降シリンダをを介装し、前記上部ジャッキ受体
を前記スライドマストに固設した構築物の上昇装置を提
供するものである。
The present invention has been proposed in order to achieve the above-mentioned object, and covers the ceiling portion and the outside portion of a building to be constructed, and rises as the building is constructed. In the automatic building construction equipment of Teku, a slide mast is vertically fixed inside the outer side of the construction equipment, and the existing main installation is installed on the upper and lower brackets that are freely slidably fitted vertically along the slide mast. A hanger device for gripping the body is provided, and further a main mast is fixed between the upper and lower brackets, and a large number of lock pin pin holes are vertically opened in the main mast. An upper cylinder receiving member and a lower jack receiving member, which have matching pin holes and can be locked by inserting a lock pin, are loosely fitted to the main mast, and a lifting cylinder is provided between the upper and lower jack receiving members. Interposed, and is intended to provide a rising device of the constructs the upper jack receptacle and fixed to the slide mast.

【0006】[0006]

【作用】先ず、上下のブラケットを既設の本設躯体にハ
ンガー装置によって把持する。そして、該ブラケット間
に固設されているメインマストに遊嵌されている上部ジ
ャッキ受体及び下部ジャッキ受体を下部のブラケットの
直上に移動させておく。そして、ロックピンによって上
下のジャッキ受体をメインマストに固定する。このと
き、上部のジャッキ受体と構築装置とは一体的に連結さ
れているので、該構築装置は所定の位置に支持される。
First, the upper and lower brackets are gripped on the existing main body structure by the hanger device. Then, the upper jack receiver and the lower jack receiver, which are loosely fitted to the main mast fixed between the brackets, are moved directly above the lower bracket. Then, the upper and lower jack receivers are fixed to the main mast by the lock pin. At this time, since the upper jack receiver and the construction device are integrally connected, the construction device is supported at a predetermined position.

【0007】そこで、下部ジャッキ受体のロックピンを
抜き、昇降シリンダにて下部ジャッキ受体のみをメイン
マストに沿って該メインマストに設けたピン穴の1ピッ
チ分だけ引き上げ、そして、下部ジャッキ受体に再びロ
ックピンを差し込む。次に、上部ジャッキ受体のロック
ピンを抜き、昇降シリンダで該上部ジャッキ受体をメイ
ンマストのピン穴の1ピッチ分だけ押し上げる。このと
き、該上部ジャッキ受体と一体的に連結されているスラ
イドマスト及び構築装置も同時に該メインマストの1ピ
ッチ分だけ押し上げられる。そこで、該上部ジャッキ受
体のロックピンを再び差し込む。以上の動作を繰り返し
て、1階層相当分の高さに構築装置を上昇させる。
Therefore, the lock pin of the lower jack receiver is pulled out, and only the lower jack receiver is pulled up by the lift cylinder along the main mast by one pitch of the pin hole provided in the main mast, and then the lower jack receiver is lifted. Insert the lock pin into the body again. Next, the lock pin of the upper jack receiver is pulled out, and the upper jack receiver is pushed up by one pitch of the pin hole of the main mast with the lifting cylinder. At this time, the slide mast and the building device, which are integrally connected to the upper jack receiver, are simultaneously pushed up by one pitch of the main mast. Then, the lock pin of the upper jack receiver is reinserted. The above operation is repeated to raise the building apparatus to a height corresponding to one layer.

【0008】斯くして、上下ジャッキ受体はメインマス
トに沿って上部のブラケット近傍まで移動しているの
で、之を元の位置に後退させる必要がある。この後退操
作は前述の上昇操作と逆操作によって行うのであるが、
先ず本発明の上昇装置は、複数セットが建物に設置され
ているので、このうちの1乃至2セットのハンガー装置
を既設の本設躯体より外す。然るときは、構築装置の荷
重はハンガー装置にて本設躯体を把持している上昇装置
にて支持している。
Thus, since the upper and lower jack receivers have moved to the vicinity of the upper bracket along the main mast, it is necessary to retract them to their original positions. This reverse operation is performed by the reverse operation of the above-mentioned ascending operation,
First, since a plurality of sets are installed in the building in the lifting device of the present invention, one or two sets of the hanger devices are removed from the existing main body structure. In that case, the load of the building device is supported by the lifting device holding the main body by the hanger device.

【0009】そこで、上部ジャッキ受体のロックピンを
抜き、昇降シリンダにて下部ジャッキ受体及びメインマ
ストを該メインマストのピン穴1ピッチ分だけ引き上げ
る。この後、上部ジャッキ受体のロックピンを差し込
む。次に、下部ジャッキ受体のロックピンを抜き、昇降
シリンダにて下部ジャッキ受体をメインマストのピン穴
の1ピッチ分だけ押し下げる。その後、下部ジャッキ受
体にロックピンを差し込む。次に、上部ジャッキ受体の
ロックピンを抜き、昇降シリンダにて再び下部ジャッキ
受体及びメインマストを該メインマストのピン穴の1ピ
ッチ分だけ引き上げる。このような動作を繰り返して1
階層相当分のメインマストの上昇を終了させ、そして、
上下のハンガー装置で本設躯体を把持する。更に、未だ
該ハンガー装置を取外していない上昇装置についても前
記動作を繰り返して全てのメインマストの上昇が完了す
る。
Then, the lock pin of the upper jack receiver is pulled out, and the lower jack receiver and the main mast are pulled up by one pitch of the pin hole of the main mast by the elevating cylinder. Then, insert the lock pin of the upper jack receiver. Next, the lock pin of the lower jack receiver is pulled out, and the lower jack receiver is pushed down by one pitch of the pin hole of the main mast with the lifting cylinder. Then insert the lock pin into the lower jack receiver. Next, the lock pin of the upper jack receiver is pulled out, and the lower jack receiver and the main mast are again pulled up by one pitch of the pin hole of the main mast by the elevating cylinder. Repeat this operation to 1
End the rise of the main mast for the hierarchy, and
Hold the main body structure with the upper and lower hanger devices. Further, the above operation is repeated for the lifting device for which the hanger device has not been removed yet, and the lifting of all the main masts is completed.

【0010】斯くの如き工程を繰り返して構築装置全体
を上昇させ乍ら、順次上層階を新たに構築する。
By repeating the steps as described above to raise the entire construction apparatus, new upper floors are sequentially constructed.

【0011】[0011]

【実施例】以下、本発明の一実施例を図1乃至図13に
従って詳述する。図1は全天候形ビル自動構築装置10
を示したものである。先ず、該全天候形ビル自動構築装
置10の概略を説明する。該自動構築装置10は天井部
11と外側部12,12,12,12とから成り、構築
されるビルを被蔽する。又、自動構築装置10の天井部
11の内側近傍位置に、前後方向へガータ走行ガイド1
3,13,13を固設してクレーンガータ14,14を
前後動自在に架設し、夫々のクレーンガータ14にはウ
インチ15を走行自在に載置して、地上から構築資材を
揚重するように形成する。又、自動構築装置10の外側
部12,12,12,12の内側に複数の上昇装置1
6,16…を設け、夫々の上昇装置16に設けた後述の
油圧式ハンガー装置が既設の鉄骨部分17を把持して自
動構築装置10の全体を支持するとともに、新たに上階
層を構築していくのに伴って該自動構築装置10が上昇
するように形成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail below with reference to FIGS. Figure 1 is an all-weather building automatic construction system 10
Is shown. First, the outline of the all-weather building automatic construction device 10 will be described. The automatic construction apparatus 10 comprises a ceiling portion 11 and outer portions 12, 12, 12, 12 and covers the building to be constructed. In addition, at a position near the inside of the ceiling portion 11 of the automatic construction device 10, the garter running guide 1 in the front-back direction is provided.
Crane garters 14 and 14 are erected so that they can be moved back and forth, and winch 15 is movably mounted on each crane garter 14 so that construction materials can be lifted from the ground. To form. Further, a plurality of lifting devices 1 are provided inside the outer parts 12, 12, 12, 12 of the automatic construction device 10.
6 and 16 are provided, and a hydraulic hanger device, which will be described later, provided in each of the lifting devices 16 grips the existing steel frame portion 17 to support the entire automatic construction device 10, and a new upper layer is constructed. The automatic construction device 10 is formed so as to rise as it goes.

【0012】前記ウインチ15のワイヤーロープ18に
把持装置19を懸吊するとともに、該把持装置19に位
置決め装置20を設ける。該把持装置19は、後述する
ように油圧式ハンガー装置に構築資材を把持し、前記ウ
インチ15の作動により地上から上階層の構築部分へ運
搬する。そして、構築場所での細かい位置決めは前記位
置決め装置20で微動調整し、既設の鉄骨部分17に新
たな構築資材を建入れる。
A holding device 19 is suspended from the wire rope 18 of the winch 15, and a positioning device 20 is provided on the holding device 19. The gripping device 19 grips a construction material on a hydraulic hanger device, as will be described later, and conveys the construction material from the ground to the construction part of the upper floor by the operation of the winch 15. Then, fine positioning at the building location is finely adjusted by the positioning device 20, and new building material is built in the existing steel frame portion 17.

【0013】尚、ウインチ15と位置決め装置20との
間にサポート油圧シリンダ21を介装し、構築資材を揚
重する際に把持装置19の捩れを防止する。そこで、本
発明の上昇装置16について説明する。先ず、図1に示
す如く、構築されるビルの本設躯体を構成する鉄骨部分
17の外側面と、自動構築装置10の外側部12との間
には一定のスペース22が設けられている。そこで、こ
のスペース22内であって、前記自動構築装置10の外
側部12の内側面の上下に2本のスライドマスト23,
23を支持アーム24,24…を介して垂設する。
A support hydraulic cylinder 21 is interposed between the winch 15 and the positioning device 20 to prevent the gripping device 19 from twisting when the construction material is lifted. Therefore, the lifting device 16 of the present invention will be described. First, as shown in FIG. 1, a constant space 22 is provided between the outer side surface of the steel frame portion 17 constituting the main body of the building to be constructed and the outer side portion 12 of the automatic construction apparatus 10. Therefore, in this space 22, two slide masts 23 are provided above and below the inner surface of the outer portion 12 of the automatic construction device 10.
23 is hung vertically via support arms 24, 24 ...

【0014】該スライドマスト23,23には上下に一
定の距離Lを有してブラケット25,25が遊嵌せられ
ており、更に、該上下のブラケット25,25間にメイ
ンマスト26を垂設して該端部を夫々上下のブラケット
25,25に固設する。又、該メインマスト26にはロ
ックピン27のピン穴28,28…が上下に多数開穿さ
れている。
Brackets 25, 25 are loosely fitted to the slide masts 23, 23 with a certain distance L in the vertical direction, and a main mast 26 is vertically provided between the upper and lower brackets 25, 25. Then, the ends are fixed to the upper and lower brackets 25, 25, respectively. Further, a large number of pin holes 28, 28 ... Of the lock pin 27 are vertically opened in the main mast 26.

【0015】一方、前記上下のブラケット25,25の
他側部にはハンガー装置29,29が夫々設けられてい
る。図2及び図3の図示例に於ては、該ハンガー装置2
9,29の本体部は前記上下のブラケット25,25に
て構成し、該ブラケット25,25の夫々の他側部に一
対の把持アーム30,30を突設すると共に、該ハンガ
ー装置29,29の内部に夫々並設した油圧シリンダ3
1,31にて前記各把持アーム30,30を既設の鉄骨
部分17に向って伸縮自在に構成され、更に、夫々の把
持アーム30,30の先端部に爪部32,32を対設
し、各爪部32,32を油圧シリンダ31a,31aの
伸縮により該把持アーム30,30の内側面から出没自
在に形成されている。尚、図中符合31bは前記ハンガ
ー装置29のガイドローラ、33は本設躯体を構成する
梁、38は高低調整シリンダを示す。
On the other hand, hanger devices 29, 29 are provided on the other sides of the upper and lower brackets 25, 25, respectively. In the illustrated example of FIGS. 2 and 3, the hanger device 2 is used.
The main body of 9, 29 is composed of the upper and lower brackets 25, 25. A pair of gripping arms 30, 30 are provided on the other side of the brackets 25, 25, respectively, and the hanger devices 29, 29 are provided. Hydraulic cylinders 3 arranged side by side inside each
1, 31 each of the gripping arms 30, 30 is configured to be extendable / contractible toward the existing steel frame portion 17, and further the claw portions 32, 32 are provided opposite to the tip end portions of the gripping arms 30, 30, respectively. The claw portions 32, 32 are formed so as to be retractable from the inner side surfaces of the gripping arms 30, 30 by expanding and contracting the hydraulic cylinders 31a, 31a. In the figure, reference numeral 31b indicates a guide roller of the hanger device 29, reference numeral 33 indicates a beam constituting the main body, and reference numeral 38 indicates a height adjusting cylinder.

【0016】斯くして、前記ハンガー装置29は各油圧
シリンダの伸縮動作にて既設鉄骨部分17を確実に把持
し、又は離脱することができる。又、該メインマスト2
6には上下摺動自在に遊嵌された上部ジャッキ受体34
と下部ジャッキ受体35が配設され、更に、該上部ジャ
ッキ受体34と下部ジャッキ受体35間には昇降シリン
ダ36,36が対峙して配設されており、而も、上部ジ
ャッキ受体34は前記スライドマスト23,23にアー
ム37,37を介して一体的に固設されており、且つ、
該上部ジャッキ受体34と下部ジャッキ受体35には夫
々前記ロックピン27のピン穴28aが夫々開穿され、
該ロックピン27を挿入することにより、該ピン穴28
aに一致している前記メインマスト26に開穿された任
意のピン穴28に該ロックピン27が挿入されて、上部
ジャッキ受体34及び下部ジャッキ受体35を各別に該
メインマスト26に固定することができるように構成さ
れている。
In this way, the hanger device 29 can securely grip or remove the existing steel frame portion 17 by the expansion and contraction operation of each hydraulic cylinder. Also, the main mast 2
6 is an upper jack receiver 34 that is loosely fitted in the upper and lower parts.
And a lower jack receiver 35 are arranged. Further, lifting cylinders 36, 36 are arranged between the upper jack receiver 34 and the lower jack receiver 35 so as to face each other. 34 is integrally fixed to the slide masts 23, 23 via arms 37, 37, and
The upper jack receiver 34 and the lower jack receiver 35 are respectively formed with pin holes 28a of the lock pin 27,
By inserting the lock pin 27, the pin hole 28
The lock pin 27 is inserted into an arbitrary pin hole 28 formed in the main mast 26 corresponding to a, and the upper jack receiver 34 and the lower jack receiver 35 are separately fixed to the main mast 26. Is configured to be able to.

【0017】本発明の一実施例は上述せる如き装置に係
るから、先ず、上下のブラケット25,25を既設の鉄
骨部分17の所定位置にハンガー装置29,29を用い
て把持する。このとき、該ハンガー装置29,29に設
けられている把持アーム30,30が油圧シリンダ3
1,31にて該鉄骨部分17の両側面に突出して該鉄骨
部分17を挟持する。而して、該挟持部は梁33の直上
である。而して、上昇装置16は複数セットが建物にセ
ットされる関係上、ハンガー装置29,29による前記
挟持位置は、その上昇装置16との位置関係で前記高低
調整シリンダ38,38にて自在に調整され、そして、
構築装置10の荷重を平均化して該ハンガー装置29,
29…に負荷させるものとする。
Since one embodiment of the present invention relates to the device as described above, first, the upper and lower brackets 25, 25 are gripped at predetermined positions of the existing steel frame part 17 by using the hanger devices 29, 29. At this time, the grip arms 30, 30 provided on the hanger devices 29, 29 are not connected to the hydraulic cylinder 3.
1, 31 project the both sides of the steel frame portion 17 to sandwich the steel frame portion 17 therebetween. Thus, the holding portion is directly above the beam 33. Thus, since a plurality of sets of the lifting device 16 are set in the building, the nipping position by the hanger devices 29, 29 can be freely adjusted by the height adjusting cylinders 38, 38 due to the positional relationship with the lifting device 16. Tuned and
The load of the building device 10 is averaged so that the hanger device 29,
29 ... is to be loaded.

【0018】そこで、メインマスト26に遊嵌されてい
るジャッキ受体34,35を該メインマスト26の下部
支持部材であるブラケット25の直上に移動させてお
く。そして、ロックピン27,27を上部ジャッキ受体
34及び下部ジャッキ受体35のピン穴28a,28a
から前記メインマスト26に設けられているピン穴2
8,28に夫々挿入して上部ジャッキ受体34及び下部
ジャッキ受体35をメインマスト26の下部にロックし
ておく。
Therefore, the jack receivers 34 and 35 loosely fitted to the main mast 26 are moved directly above the bracket 25 which is a lower support member of the main mast 26. Then, the lock pins 27, 27 are attached to the pin holes 28a, 28a of the upper jack receiver 34 and the lower jack receiver 35.
From the pin hole 2 provided in the main mast 26
The upper jack receiver 34 and the lower jack receiver 35 are locked in the lower part of the main mast 26 by inserting them into the Nos. 8 and 28, respectively.

【0019】そこで、上昇装置16,16…によって構
築装置10を上昇させようとするときは、先ず、下部ジ
ャッキ受体35のロックピン27を抜き、そして、昇降
シリンダ36,36にて下部ジャッキ受体35のみをメ
インマスト26に設けたピン穴28,28…の1ピッチ
分だけ引上げ、そして、該下部ジャッキ受体35に再び
ロックピン27を差し込んでロックする。
Therefore, when the construction device 10 is to be raised by the raising devices 16, 16, ..., First, the lock pin 27 of the lower jack receiver 35 is pulled out, and then the lower cylinder receiving members 36, 36 are used. Only the body 35 is pulled up by one pitch of the pin holes 28, 28 ... Provided in the main mast 26, and the lock pin 27 is again inserted into the lower jack receiving body 35 and locked.

【0020】次に、上部ジャッキ受体34のロックピン
27を抜き、昇降シリンダ36,36で該上部ジャッキ
受体34を前記ピン穴28,28…の1ピッチ分だけ押
し上げる。このとき、該上部ジャッキ受体34と一体的
に連結されているスライドマスト23及び構築装置10
も同時に前記1ピッチ分だけ押し上げられる。そこで、
該上部ジャッキ受体34にロックピン27を再び差し込
んでロックする。以上の動作を繰り返すことによって1
階層相当分の高さに構築装置10を上昇させるのであ
る。
Next, the lock pin 27 of the upper jack receiver 34 is pulled out, and the lifting jacks 36, 36 push the upper jack receiver 34 up by one pitch of the pin holes 28, 28 ... At this time, the slide mast 23 and the building device 10 that are integrally connected to the upper jack receiver 34.
At the same time, it is pushed up by one pitch. Therefore,
The lock pin 27 is reinserted into the upper jack receiver 34 and locked. 1 by repeating the above operation
The construction apparatus 10 is elevated to the height corresponding to the hierarchy.

【0021】このとき、上部ジャッキ受体34及び下部
ジャッキ受体35はメインマスト26に沿って上部のブ
ラケット25近傍まで移動しているので、次の上昇操作
を為すために之を下部のブラケット25近傍まで後退さ
せておく必要がある。この後退操作は前述の上昇操作と
逆操作によって行うのであるが、先ず、上昇装置16は
複数セットが構築装置10の外側部12の内側に設置さ
れているので、このうちの1乃至2セットのハンガー装
置29,29…を本設躯体を構成する鉄骨部分17より
外す。そこで、上部ジャッキ受体34のロックピン27
を抜き、そして、昇降シリンダ36,36にて下部ジャ
ッキ受体35及びメインマスト26を前記1ピッチ分だ
け引き上げる。この後、上部ジャッキ受体34のロック
ピン27を差し込んで該上部ジャッキ受体34をロック
する。
At this time, since the upper jack receiver 34 and the lower jack receiver 35 have moved to the vicinity of the upper bracket 25 along the main mast 26, the lower bracket 25 must be moved to perform the next raising operation. It is necessary to retreat to the vicinity. This backward movement operation is performed by the reverse operation to the above-mentioned upward movement operation. First, since a plurality of sets of the raising device 16 are installed inside the outer portion 12 of the construction device 10, one or two sets of them are set. The hanger devices 29, 29 ... Are removed from the steel frame portion 17 that constitutes the main body. Therefore, the lock pin 27 of the upper jack receiver 34
And the lower jack receiver 35 and the main mast 26 are pulled up by the lifting cylinders 36, 36 by one pitch. Then, the lock pin 27 of the upper jack receiver 34 is inserted to lock the upper jack receiver 34.

【0022】次に、下部ジャッキ受体35のロックピン
27を抜き、昇降シリンダ36,36にて該下部ジャッ
キ受体35を前記1ピッチ分だけ押し下げ、そして、該
下部ジャッキ受体35にロックピン27を差し込んでロ
ックする。次に、上部ジャッキ受体34のロックピン2
7を抜き、昇降シリンダ36,36にて再び下部ジャッ
キ受体35及びメインマスト26を前記1ピッチ分だけ
引き上げる。このような動作を繰り返して1階層相当分
のメインマスト26の上昇を終了させ、そして、上下の
ハンガー装置29,29で前記鉄骨部分17を把持して
固定する。更に、未だ該ハンガー装置29,29を取外
していない上昇装置16についても前記動作を繰り返し
て全てのメインマスト26,26…の上昇を完了させ
る。このとき、上下のジャッキ受体34,35は該メイ
ンマスト26の下部に後退して前記構築装置10の上昇
操作ができるように待機している。
Next, the lock pin 27 of the lower jack receiver 35 is pulled out, the lower jack receiver 35 is pushed down by the lifting cylinders 36, 36 by the one pitch, and the lock pin 27 is locked to the lower jack receiver 35. Insert 27 and lock. Next, the lock pin 2 of the upper jack receiver 34
7 is pulled out, and the lower jack receiver 35 and the main mast 26 are again pulled up by the one pitch by the elevating cylinders 36, 36. By repeating such an operation, the ascent of the main mast 26 corresponding to one layer is completed, and then the steel frame portion 17 is gripped and fixed by the upper and lower hanger devices 29, 29. Further, the above operation is repeated for the lifting device 16 to which the hanger devices 29, 29 have not been removed yet, and the lifting of all the main masts 26, 26 ... Is completed. At this time, the upper and lower jack receivers 34 and 35 are retracted to the lower part of the main mast 26 and are on standby so that the building device 10 can be lifted.

【0023】又、前記メインマスト26の上昇に際し
て、上部ジャッキ受体34のロックピン27を抜き、昇
降シリンダ36,36にて再び下部ジャッキ受体35及
びメインマスト26を引き上げる動作の代わりに、上部
ジャッキ受体34及び下部ジャッキ受体35の夫々のロ
ックピン27,27を抜いて、構築装置10側に設置し
たホイスト(図示せず)等を用いて一気に上昇させるこ
ともできる。之は工程時間を短縮するのであるが、前記
メインマスト26の引き上げ動作は、構築装置10を上
昇させる動作に比して荷重負担が著しく少ないので該ホ
イストによる引き上げ動作も可能となるのである。
Further, when the main mast 26 is raised, the lock pin 27 of the upper jack receiver 34 is pulled out, and the lower jack receiver 35 and the main mast 26 are pulled up again by the elevating cylinders 36, 36, instead of the upper operation. It is also possible to pull out the lock pins 27, 27 of the jack receiver 34 and the lower jack receiver 35, respectively, and raise them all at once by using a hoist (not shown) installed on the construction device 10 side. Although the process time is shortened, the hoisting operation of the main mast 26 has a significantly smaller load burden than the hoisting operation of the building apparatus 10, and thus the hoisting operation can be performed.

【0024】尚、本発明は、本発明の精神を逸脱しない
限り種々の改変を為すことができ、そして、本発明が該
改変されたものに及ぶことは当然である。
The present invention can be modified in various ways without departing from the spirit of the present invention, and it goes without saying that the present invention covers the modifications.

【0025】[0025]

【発明の効果】本発明は上記一実施例に詳述したよう
に、構築装置全体を支持し、且つ、上昇させるための上
昇装置を構築する鉄骨部分の外側に設けてあるため、構
築装置内の各種構築作業に干渉することがない。従っ
て、構築装置を上昇する際に、他の構築作業を中断する
ことなく作業工程が著しく短縮できる。
As described in detail in the above one embodiment, the present invention is provided on the outside of the steel frame portion for constructing the lifting device for supporting and lifting the entire building device. It does not interfere with various construction work of. Therefore, when the building apparatus is moved up, the working process can be remarkably shortened without interrupting other building work.

【0026】又、上部及び下部双方のハンガー装置によ
って鉄骨部分を把持するため、地震等の水平方向の振れ
に対する安定性が高く、且つ、外周柱の形状に左右され
ず簡素化された構成であることから安価にビルの構築装
置の昇降が可能となり、更に全自動で動作することがで
きるため、構築装置の上昇に際しては作業員が不要とな
り、且つ、昇降シリンダのストロークが短く使えるた
め、緊急時に於ても安全性が極めて高い等、正に諸種の
効果を奏する発明である。
Further, since the steel frame portions are gripped by both the upper and lower hanger devices, the stability is high against horizontal shake such as an earthquake and the structure is simplified regardless of the shape of the outer peripheral column. Therefore, it is possible to raise and lower the building construction equipment at low cost, and since it can operate fully automatically, no workers are required to raise the construction equipment, and the stroke of the lifting cylinder can be used in a short time, so in an emergency. Even in this case, the invention has various kinds of effects such as extremely high safety.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例を示し、全天候ビル自動構築
の内部を示した一部切欠正面図。
FIG. 1 is a partially cutaway front view showing the inside of an all-weather building automatic construction according to an embodiment of the present invention.

【図2】本発明の要旨を示す一部切欠正面図。FIG. 2 is a partially cutaway front view showing the gist of the present invention.

【図3】図2のA−A線断面図。3 is a sectional view taken along the line AA of FIG.

【図4】上昇装置の初期状態を示す一部切欠正面図。FIG. 4 is a partially cutaway front view showing an initial state of a lifting device.

【図5】上昇装置にて構築装置を上昇させる状態を示す
一部切欠正面図。
FIG. 5 is a partially cutaway front view showing a state where the building device is raised by the raising device.

【図6】図5の次の工程を示す一部切欠正面図。6 is a partially cutaway front view showing the next step of FIG.

【図7】図6の次の工程を示す一部切欠正面図。7 is a partially cutaway front view showing the next step of FIG.

【図8】構築装置を1階層相当分だけ上昇させた状態を
示す一部切欠正面図。
FIG. 8 is a partially cutaway front view showing a state in which the building apparatus is raised by one layer.

【図9】ハンガー装置を取外した状態を示す一部切欠正
面図。
FIG. 9 is a partially cutaway front view showing a state in which a hanger device is removed.

【図10】下部ジャッキ受体及びメインマストを引き上
げる状態を示す一部切欠正面図。
FIG. 10 is a partially cutaway front view showing a state where the lower jack receiver and the main mast are pulled up.

【図11】図10の次の工程を示す一部切欠正面図。11 is a partially cutaway front view showing the next step of FIG.

【図12】図11の次の工程を示す一部切欠正面図。FIG. 12 is a partially cutaway front view showing the next step of FIG. 11.

【図13】メインマストを1階層相当分だけ上昇させた
状態を示す一部切欠正面図。
FIG. 13 is a partially cutaway front view showing a state in which the main mast is raised by one layer.

【符号の説明】[Explanation of symbols]

10 自動構築装置 12 外側部 16 上昇装置 17 既設の鉄骨部分 23 スライドマスト 25 ブラケット 26 メインマスト 27 ロックピン 28,28a ピン穴 29 ハンガー装置 34 上部ジャッキ受体 35 下部ジャッキ受体 36 昇降シリンダ 10 Automatic Construction Device 12 Outside Part 16 Lifting Device 17 Existing Steel Frame 23 Slide Mast 25 Bracket 26 Main Mast 27 Lock Pin 28, 28a Pin Hole 29 Hanger Device 34 Upper Jack Receiver 35 Lower Jack Receiver 36 Lifting Cylinder

───────────────────────────────────────────────────── フロントページの続き (72)発明者 長尾 直 愛知県豊川市穂ノ原2丁目1番 株式会社 熊谷組豊川工場内 (72)発明者 田中 浩和 愛知県豊川市穂ノ原2丁目1番 株式会社 熊谷組豊川工場内 (72)発明者 内藤 充洋 愛知県豊川市穂ノ原2丁目1番 株式会社 熊谷組豊川工場内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Nao Nagao 2-1-1 Honohara, Toyokawa City, Aichi Prefecture, Kumagaya Gumi Toyokawa Factory (72) Inventor Hirokazu Tanaka 2-1-1 Honohara, Aichi Prefecture Kumagaya Gumi Co., Ltd. Inside the Toyokawa Plant (72) Inventor Mitsuhiro Naito 2-1-1 Honohara, Toyokawa City, Aichi Prefecture Kumagaya Gumi Toyokawa Plant

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 構築されるビルの天井部及び外側部を被
蔽し、ビルの構築に伴って上昇していくビル自動構築装
置に於て、構築装置の外側部の内側にスライドマストを
上下方向に固設し、該スライドマストに沿って上下にス
ライド自在に遊嵌した上下のブラケットに既設の本設躯
体を把持するハンガー装置を設け、更に、該上下のブラ
ケット間にメインマストを固設すると共に、該メインマ
ストにはロックピンのピン穴を上下に多数開穿し、更
に、前記各ピン穴に一致するピン穴を有し、ロックピン
を差し込むことによってロックできるようにした上部ジ
ャッキ受体及び下部ジャッキ受体を該メインマストに遊
嵌し、且つ、該上下のジャッキ受体間に昇降シリンダを
介装し、前記上部ジャッキ受体を前記スライドマストに
固設したことを特徴とする構築物の上昇装置。
1. In a building automatic construction device that covers a ceiling portion and an outer portion of a building to be constructed and rises as the building is constructed, a slide mast is vertically moved inside the outer portion of the construction device. Direction, and the upper and lower brackets that are freely slidable vertically along the slide mast are provided with hanger devices that hold the existing main frame, and the main mast is fixed between the upper and lower brackets. In addition, the main mast is provided with a large number of pin holes for the lock pin in the upper and lower direction, and further has a pin hole corresponding to each of the pin holes, and the upper jack receiving member which can be locked by inserting the lock pin. A body and a lower jack receiver are loosely fitted to the main mast, an elevating cylinder is interposed between the upper and lower jack receivers, and the upper jack receiver is fixed to the slide mast. Lifting device for structures.
JP17829393A 1993-07-19 1993-07-19 Construction lift equipment Expired - Fee Related JP2872886B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17829393A JP2872886B2 (en) 1993-07-19 1993-07-19 Construction lift equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17829393A JP2872886B2 (en) 1993-07-19 1993-07-19 Construction lift equipment

Publications (2)

Publication Number Publication Date
JPH0734668A true JPH0734668A (en) 1995-02-03
JP2872886B2 JP2872886B2 (en) 1999-03-24

Family

ID=16045942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17829393A Expired - Fee Related JP2872886B2 (en) 1993-07-19 1993-07-19 Construction lift equipment

Country Status (1)

Country Link
JP (1) JP2872886B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003120037A (en) * 2001-10-05 2003-04-23 Kajima Corp Construction lifting system for multistoried building
JP2014185435A (en) * 2013-03-22 2014-10-02 Jfe Civil Engineering & Construction Corp Lift frame unit and operation method of lift frame unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003120037A (en) * 2001-10-05 2003-04-23 Kajima Corp Construction lifting system for multistoried building
JP2014185435A (en) * 2013-03-22 2014-10-02 Jfe Civil Engineering & Construction Corp Lift frame unit and operation method of lift frame unit

Also Published As

Publication number Publication date
JP2872886B2 (en) 1999-03-24

Similar Documents

Publication Publication Date Title
CN104379488B (en) Method and installation system for assembling elevator parts
JP2009073599A (en) Supporting structure of tower crane and climbing method
GB1589693A (en) Climbing device for a climbing crane
JPH0734668A (en) Lifter for structure
CN207960496U (en) Be easily installed drilling tool from hoisting type horizontal boring machine
JP2000203788A (en) Climbing crane
JPH0812262A (en) Installing method for overhead traveller and its device
JP3029501B2 (en) All-weather building automatic construction method
JP2002129747A (en) Lift-up method and lift-up system
JP3841242B2 (en) Elevator parking elevating work table and construction method using it
JP6165504B2 (en) Jacking device
JP2019157532A (en) Building construction method
JPH062434A (en) Method of building steel structure roof
JP3070438B2 (en) Temporary frame equipment for construction
JP2890341B2 (en) Method and apparatus for lifting up top-level frame for structure construction
JPH0240076Y2 (en)
JP3179814B2 (en) Column and beam construction method and apparatus
JP3027925B2 (en) Temporary frame equipment for construction
CN211283529U (en) Automatic elevator for mounting multi-section combined gantry crane supporting legs
JP3263504B2 (en) Construction method of tower structure
JP3027924B2 (en) Temporary frame equipment for construction
JP2022035256A (en) Mobile scaffold
JPH0594459U (en) Middle part support device in all-weather building automatic construction system
JP3675286B2 (en) Heavy goods transport mechanism
CN117266526A (en) Supporting device for walking building equipment and jacking method thereof

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19981222

LAPS Cancellation because of no payment of annual fees