JPH07331872A - Slide form moving device - Google Patents

Slide form moving device

Info

Publication number
JPH07331872A
JPH07331872A JP15278094A JP15278094A JPH07331872A JP H07331872 A JPH07331872 A JP H07331872A JP 15278094 A JP15278094 A JP 15278094A JP 15278094 A JP15278094 A JP 15278094A JP H07331872 A JPH07331872 A JP H07331872A
Authority
JP
Japan
Prior art keywords
slide form
slide
bank
moving device
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15278094A
Other languages
Japanese (ja)
Inventor
Toshio Mori
利夫 森
Takeshi Kanda
神田  剛
Kazutoshi Nakabachi
和敏 中鉢
Shigeo Kita
重夫 北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Okabe Co Ltd
Original Assignee
Fujita Corp
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp, Okabe Co Ltd filed Critical Fujita Corp
Priority to JP15278094A priority Critical patent/JPH07331872A/en
Publication of JPH07331872A publication Critical patent/JPH07331872A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To perform a moving operation of a slide form efficiently and safely in a short period of time. CONSTITUTION:A truck is fixed on a bank by means of an outrigger 24 and a tilting frame 25 is inclined by a drive means for tilting so that the frame 25 lies on the extension of the side wall of the bank 1. Under such conditions, a lifting rod 2901 and a slide form 3 are connected to each other by a suspending hook 30 to separate a metal form from the side wall by means of a jack 31 for separating the slide form. And the rod 2901 is lifted by a worm gear jack 2903 to pull up the slide form 3, thereby moving the slide form 3.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、コンクリートダムの堤
体をスライディングフォーム工法により構築する際に用
いるスライドフォームの移動装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slide form moving device used when constructing a dam body of a concrete dam by a sliding form method.

【0002】[0002]

【従来の技術】図8は、従来のスライディングフォーム
工法によるダム堤体の構築作業の説明図を示す。図にお
いて1は堤体で、該堤体1は、複数の堤体部分が上方に
順次継ぎ足して構成されている。3は型枠に相当するス
ライドフォームで、該スライドフォーム3は、略々上下
方向に延在し水平方向に間隔を置いて配置された複数の
縦端太5と、略々水平方向に延在し上下方向に間隔を置
いて配置され前記各縦端太5の略々上半部に架設された
複数の横端太7と、それら横端太7で支持されたメタル
フォーム9を備える。
2. Description of the Related Art FIG. 8 is an explanatory view of a dam embankment construction work by a conventional sliding foam method. In the figure, reference numeral 1 denotes a dam body, and the dam body 1 is constructed by sequentially adding a plurality of dam body portions upward. Reference numeral 3 denotes a slide form corresponding to a mold frame. The slide form 3 extends in a substantially vertical direction and has a plurality of vertical end thicknesses 5 arranged at intervals in the horizontal direction, and extends in a substantially horizontal direction. A plurality of horizontal end thicknesses 7 are provided at intervals in the up-down direction and erected in the substantially upper half of each vertical end thickness 5, and a metal foam 9 supported by these horizontal end thicknesses 7.

【0003】前記各縦端太5の略々下半部は堤体1の上
端箇所に取着され、メタルフォーム9は堤体1の上方で
該堤体1の側壁101の延長上に位置し、この状態で、
メタルフォーム9の内側にコンクリートを打設し養生す
ることで、既に構築した堤体1上に新たな堤体1部分が
継ぎ足して構築される。堤体1上に新たな堤体1部分を
継ぎ足したならば、各縦端太5を堤体1から取外し、ス
ライドフォーム3を上方に移動し、継ぎ足した堤体1部
分の上方で側壁101の延長上にメタルフォーム9を位
置させ、その状態で、各縦端太5を継ぎ足した堤体1部
分に取付ける。以後は、メタルフォーム9内側へのコン
クリート打設、養生、各縦端太5の堤体1からの取外
し、スライドフォーム3の移動、並びに各縦端太5の堤
体1への取付けを繰り返し行って、所望の高さの堤体1
を構築して行く。
The lower half of each of the vertical ends 5 is attached to the upper end of the bank 1, and the metal foam 9 is located above the bank 1 and on the extension of the side wall 101 of the bank 1. , In this state,
By pouring concrete on the inside of the metal foam 9 and curing it, a new bank 1 part is added to the bank 1 already built to build it. When a new bank 1 portion is added on the bank 1, each vertical end thick 5 is removed from the bank 1, the slide form 3 is moved upward, and the side wall 101 of the side wall 101 is moved above the bank 1 part. The metal foam 9 is positioned on the extension, and in that state, it is attached to the portion of the dam body 1 to which the vertical ends 5 are added. After that, the concrete pouring on the inside of the metal foam 9, curing, removal from the bank 1 of each vertical end thick 5, movement of the slide form 3, and attachment to each bank 5 of each vertical end thick 5 are repeated. And the bank 1 of the desired height
Build and go.

【0004】そして、スライドフォーム3を上方に移動
する際、従来は、図8に示すように、堤体1上にクレー
ン11を設置し、スライドフォーム3の上部に設けられ
た2つの吊りフック301にクレーン11のワイヤ13
のフック(図示せず)を引っ掛けて、ワイヤ13でスラ
イドフォーム3を吊り、クレーン11のオペレータが、
堤体1上の作業員15の身振りや声による合図を確認し
ながら、クレーン11のブーム17やワイヤ巻上装置
(図示せず)等を操作して、吊上げによりスライドフォ
ーム3を移動させていた。
When the slide form 3 is moved upward, conventionally, as shown in FIG. 8, a crane 11 is installed on the bank 1, and two suspension hooks 301 provided on the slide form 3 are provided. Wire 13 of crane 11
Hook the slide form 3 with the wire 13 and the operator of the crane 11
While confirming the gestures and voices of the worker 15 on the bank 1, the boom 17 of the crane 11 and the wire hoisting device (not shown) are operated to move the slide form 3 by lifting. .

【0005】[0005]

【発明が解決しようとする課題】しかしながら、クレー
ン11によるスライドフォーム3の吊上げは、作業員1
5の身振りや声による合図を確認しながら行う分、多大
な時間と手間がかかる上、スライドフォーム3を側壁1
01に沿って移動させるには、熟練したオペレータが必
要となる不具合があった。また、作業員15は、堤体1
の上縁から側壁101を見下ろして吊上げ中のスライド
フォーム3を視認しなければならず、特にダム工事は高
所での作業となるため、転落等の危険性が大きいという
不具合があった。本発明は前記事情に鑑みてなされたも
ので、本発明の目的は、スライディングフォーム工法に
よりコンクリートダムの堤体を構築するに当たり、スラ
イドフォームの移動作業を効率よく短時間で安全に行う
ことができるスライドフォームの移動装置を提供するこ
とにある。
However, when the slide form 3 is lifted by the crane 11, the worker 1
It takes a lot of time and effort to confirm the gestures and voice cues of Step 5, and the slide form 3 is attached to the side wall 1.
There was a problem that a trained operator was needed to move along 01. In addition, the worker 15 is the bank 1
It is necessary to look down on the side wall 101 from the upper edge of the side wall 101 to see the slide form 3 being lifted. Especially, since dam construction requires work at a high place, there is a problem that there is a large risk of falling or the like. The present invention has been made in view of the above circumstances, and an object of the present invention is to construct a dam body of a concrete dam by a sliding foam method, and to perform a sliding foam moving operation efficiently and safely in a short time. The object is to provide a slide form moving device.

【0006】[0006]

【課題を解決するための手段】前記目的を達成するため
に本発明は、堤体の側壁に配設される堤体構築用のスラ
イドフォームを前記側壁に沿って上方に移動させるスラ
イドフォーム移動装置であって、走行可能な台車と、前
記台車に設けられた台車固定用のアウトリガーと、前記
台車の側部に傾動可能に支持された揺動フレームと、前
記揺動フレームと前記台車の間に介設され該揺動フレー
ムを傾動させる揺動用駆動手段と、前記揺動フレームに
設けられた移動手段と、前記スライドフォームに係脱可
能で前記移動手段により前記揺動フレームに沿って移動
される係合部材と、前記揺動フレームの下部に配設さ
れ、該揺動フレームにおける前記台車とは反対側の面に
出没する剥離用ジャッキとを備えることを特徴とする。
To achieve the above object, the present invention provides a slide form moving device for moving a slide form for constructing a dam body arranged on a sidewall of the dam body upward along the sidewall. A traveling bogie, a bogie fixing outrigger provided on the bogie, a rocking frame tiltably supported on a side portion of the bogie, and between the rocking frame and the bogie. A swinging driving means which is interposed and tilts the swinging frame, a moving means provided on the swinging frame, and a slide form that can be engaged with and disengaged from the slide form, and is moved along the swinging frame by the moving means. It is characterized by comprising an engaging member and a peeling jack arranged below the swing frame and protruding and retracting on a surface of the swing frame opposite to the carriage.

【0007】また、本発明は、前記係合部材は前記揺動
フレームの水平方向に間隔を置いて2つ設けられ、前記
移動手段は、前記揺動フレームの上部で水平方向に間隔
を置いて配設された2つの駆動機構を含んで構成され、
前記各係合部材は前記各駆動機構に連結されているもの
とした。また、本発明は、前記剥離用ジャッキの先端に
は車輪が設けられているものとした。
Further, in the present invention, the two engaging members are provided at intervals in the horizontal direction of the swing frame, and the moving means are provided at intervals in the horizontal direction above the swing frame. It is configured to include two drive mechanisms arranged,
The engagement members are connected to the drive mechanisms. Further, in the present invention, a wheel is provided at the tip of the peeling jack.

【0008】[0008]

【作用】スライドフォームの上方への移動は、揺動フレ
ームが堤体の上方で該堤体の側壁の延長上に延在するよ
うに揺動用駆動手段で揺動フレームを傾動させ、その状
態で、係合部材をスライドフォームに連結し、剥離用ジ
ャッキによりスライドフォームを堤体の側壁から剥離
し、移動手段により前記係合部材を揺動フレームに沿っ
て上方に移動させることで行う。
In the upward movement of the slide form, the rocking frame is tilted by the rocking drive means so that the rocking frame extends above the bank and extends on the extension of the side wall of the bank. The engaging member is connected to the slide form, the slide form is separated from the side wall of the bank by the peeling jack, and the engaging member is moved upward along the swing frame by the moving means.

【0009】[0009]

【実施例】以下、本発明の実施例について図面に基づい
て説明する。図1は本発明の一実施例に係るスライドフ
ォーム移動装置の側面図、図2は同正面図を示し、図中
図7と同一のものには同じ引用符号を付して説明する。
スライドフォーム移動装置21は、台車23と、該台車
23を固定するアウトリガー24と、前記台車23の前
部に傾動可能に設けられた揺動フレーム25と、該揺動
フレーム25を揺動させる揺動用駆動手段27と、前記
揺動フレーム25の上部に設けられた昇降装置29(移
動手段に相当)と、該昇降装置29により揺動フレーム
25に沿って移動される吊りフック30と、揺動フレー
ム25の下端に設けられたスライドフォーム剥離用ジャ
ッキ31等で構成されている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a side view of a slide form moving device according to an embodiment of the present invention, FIG. 2 is a front view of the same, and the same parts as those in FIG.
The slide form moving device 21 includes a carriage 23, an outrigger 24 that fixes the carriage 23, a swing frame 25 that is tiltably provided in a front portion of the carriage 23, and a swing that swings the swing frame 25. A driving means 27 for movement, an elevating device 29 (corresponding to a moving means) provided on the upper part of the swing frame 25, a hanging hook 30 moved along the swing frame 25 by the elevating device 29, and swinging. It is composed of a slide foam peeling jack 31 provided at the lower end of the frame 25.

【0010】前記台車23は、平面視矩形の基台33
と、該基台33の下部に配設され基台33を走行可能に
支持する4つの車輪35等を備える。前記4つの車輪3
5は操舵可能な操舵輪として構成されると共に、2つの
車輪35は駆動輪35Aとして構成されている。前記2
つの駆動輪35Aは、図3に示すように、前記基台33
の対角線上に位置する2つの隅部にそれぞれ配設され、
残りの2つの車輪35は、基台33の前記対角線とは別
の対角線上に位置する2つの隅部にそれぞれ配設されて
いる。
The carriage 23 has a base 33 which is rectangular in plan view.
And four wheels 35 and the like arranged below the base 33 to support the base 33 so that the base 33 can travel. The four wheels 3
5 is configured as a steerable wheel, and the two wheels 35 are configured as drive wheels 35A. 2 above
As shown in FIG. 3, the three drive wheels 35A are connected to the base 33.
Are arranged at two corners on the diagonal of
The remaining two wheels 35 are respectively arranged at two corners of the base 33 located on a diagonal line different from the diagonal line.

【0011】前記各駆動輪35Aは走行用駆動手段37
でそれぞれ走行駆動される。前記各走行用駆動手段37
は、走行用モータ3701と、該走行用モータ3701
に連結された減速機構3703等で構成され、減速機構
3703の出力軸は水平方向に延出して駆動輪35の支
軸3501となり、走行用モータ3701の動力により
駆動輪35Aは回転駆動され、走行用モータ3701
は、基台33側に旋回可能に連結されたブラケット33
01に固着されている。各駆動輪35Aは、同一の回転
方向、同一の速度で回転駆動され、これにより前記台車
23が走行される。
Each of the drive wheels 35A has a drive means 37 for traveling.
Each is driven to run. The driving means 37 for traveling
Is a traveling motor 3701 and the traveling motor 3701
The output shaft of the speed reduction mechanism 3703 extends in the horizontal direction to serve as a support shaft 3501 of the drive wheel 35, and the drive wheel 35A is rotationally driven by the power of the traveling motor 3701 to drive the vehicle. Motor 3701
Is a bracket 33 that is pivotally connected to the base 33 side.
It is fixed to 01. The drive wheels 35A are rotationally driven at the same rotation direction and the same speed, whereby the carriage 23 is run.

【0012】また、残りの2つの車輪35は、基台33
側に旋回可能に連結されたブラケット3303に回転可
能に支持されている。前記全ての車輪35は操舵用駆動
手段39でそれぞれ操舵される。前記各操舵用駆動手段
39は、前記ブラケット3301,3303の上部に固
着されたスプロケット3901と、前記基台33に支持
された操舵用モータ3903と、該操舵用モータ390
3の出力軸に取着されたスプロケット3905と、両ス
プロケット3901,3905に掛装されたチェーン3
907で構成され、各駆動操舵輪35Aは、同一の旋回
方向、同一の速度で旋回される。尚、図1に示すよう
に、前記基台33の後部には作業台43が設けられてい
る。作業台43には、揺動用駆動手段27、昇降装置2
9、並びにフォーム剥離用ジャッキ31の操作を行うた
めの操作盤(図示せず)が設けられている。
The remaining two wheels 35 are mounted on the base 33.
It is rotatably supported by a bracket 3303 rotatably connected to the side. All the wheels 35 are steered by steering drive means 39. Each of the steering driving means 39 includes a sprocket 3901 fixed to the upper portions of the brackets 3301 and 3303, a steering motor 3903 supported by the base 33, and the steering motor 390.
No. 3 sprocket 3905 attached to the output shaft, and chain 3 hung on both sprockets 3901, 3905.
907, each drive steering wheel 35A is turned at the same turning direction and at the same speed. As shown in FIG. 1, a work table 43 is provided at the rear of the base 33. On the work table 43, the swinging drive means 27, the lifting device 2
9 and an operation panel (not shown) for operating the foam peeling jack 31 are provided.

【0013】前記アウトリガー24は、前記基台33の
四隅にそれぞれ設けられ、各アウトリガー24は、シリ
ンダ本体2401とピストンロッド2403を備える油
圧シリンダで構成されている。前記各シリンダ本体24
01は、前記基台33の前部両端箇所と後部両端箇所で
それぞれ支持され、前記ピストンロッド2403はシリ
ンダ本体2401から下方に出没可能に構成され、各ア
ウトリガー24は、前記基台33に設けられた不図示の
油圧ポンプからの圧油の給排により伸縮作動する。
The outriggers 24 are provided at four corners of the base 33, and each outrigger 24 is composed of a hydraulic cylinder having a cylinder body 2401 and a piston rod 2403. Each cylinder body 24
01 is supported at both front end portions and rear end portions of the base 33, the piston rod 2403 is configured to be retractable downward from the cylinder body 2401, and each outrigger 24 is provided on the base 33. It expands and contracts by supplying and discharging pressure oil from a hydraulic pump (not shown).

【0014】前記揺動フレーム25は、上下方向に延出
する左右一対の縦メンバー2501と、水平方向に延出
し前記両縦メンバー2501の上部を連結する横メンバ
ー2503と、前記各縦メンバー2501の上部と横メ
ンバー2503からそれぞれ上方に突設された支持アー
ム2505,2506と、前記支持アーム2505,2
506で支持され縦メンバー2501の上方で水平方向
に延在する支持台2507等で構成されている。前記各
縦メンバー2501の下部は、図1に示すように、支軸
45を介して前記基台33の前端寄り箇所にそれぞれ枢
着されている。
The swing frame 25 includes a pair of left and right vertical members 2501 extending in the vertical direction, a horizontal member 2503 extending in the horizontal direction and connecting the upper portions of the vertical members 2501 with each other, and the vertical members 2501. Support arms 2505 and 2506 projecting upward from the upper and lateral members 2503, respectively, and the support arms 2505 and 2
It is composed of a support base 2507 and the like which is supported by 506 and extends in the horizontal direction above the vertical member 2501. As shown in FIG. 1, the lower portion of each vertical member 2501 is pivotally attached to a portion near the front end of the base 33 via a support shaft 45.

【0015】前記揺動用駆動機構27は、シリンダ本体
2701とピストンロッド2703を備える油圧シリン
ダで構成されている。前記各シリンダ本体2701の基
端は支軸47を介して前記基台33の後部両端箇所にそ
れぞれ枢着され、前記シリンダロッド2703の先端は
縦メンバー2501の上端に連結され、各揺動用駆動機
構27は、前記油圧ポンプからの圧油の給排により伸縮
作動し、これにより前記揺動フレーム25が支軸45を
中心として揺動される。
The swinging drive mechanism 27 is composed of a hydraulic cylinder having a cylinder body 2701 and a piston rod 2703. The base end of each cylinder body 2701 is pivotally attached to the rear end portions of the base 33 via the support shaft 47, and the tip end of the cylinder rod 2703 is connected to the upper end of the vertical member 2501 to drive each rocking mechanism. 27 is expanded and contracted by supplying and discharging pressure oil from the hydraulic pump, whereby the swing frame 25 is swung about the support shaft 45.

【0016】前記昇降装置29は、電動モータ(図示せ
ず)の動力によりウォームギア機構(図示せず)を介し
て昇降ロッド2901をその長手方向に昇降させる公知
のウォームギアジャッキ2903で構成されている。前
記ウォームギアジャッキ2903は、図2に示すよう
に、前記支持台2507の左右両側寄り箇所上にそれぞ
れ配設され、前記昇降ロッド2901は、図1に示すよ
うに、前記縦メンバー2501の長手方向と平行する向
きに延設されている。
The elevating device 29 is composed of a known worm gear jack 2903 which elevates and lowers the elevating rod 2901 in the longitudinal direction by the power of an electric motor (not shown) via a worm gear mechanism (not shown). As shown in FIG. 2, the worm gear jacks 2903 are respectively disposed on the left and right sides of the support base 2507, and the elevating rod 2901 is arranged in the longitudinal direction of the vertical member 2501 as shown in FIG. It is extended in parallel.

【0017】前記吊りフック30は、前記スライドフォ
ーム3の吊りフック301に対応して、前記各昇降ロッ
ド2901の下端にそれぞれ設けられている。
The hanging hooks 30 are provided at the lower ends of the respective lifting rods 2901 corresponding to the hanging hooks 301 of the slide form 3.

【0018】前記フォーム剥離用ジャッキ31は各縦メ
ンバー2501にそれぞれ設けられている。前記フォー
ム剥離用ジャッキ31は、シリンダ本体3101とピス
トンロッド(図示せず)を備える油圧シリンダで構成さ
れている。前記シリンダ本体3101は縦メンバー25
01の下端に支持板49を介して支持され、該縦メンバ
ー2501の長手方向と直交する方向に延設されてい
る。前記ピストンロッドの先端には、2つの車輪310
3が回転可能に支持されている。
The foam peeling jack 31 is provided on each vertical member 2501. The foam peeling jack 31 is composed of a hydraulic cylinder having a cylinder body 3101 and a piston rod (not shown). The cylinder body 3101 is a vertical member 25.
01 is supported by a lower end of 01 through a support plate 49 and extends in a direction orthogonal to the longitudinal direction of the vertical member 2501. Two wheels 310 are attached to the tip of the piston rod.
3 is rotatably supported.

【0019】尚、前記台車23の走行、操舵、並びに停
止と、揺動フレーム25の揺動と、昇降装置29及びフ
ォーム剥離用ジャッキ31の作動は、例えばワイヤレス
リモコン(図示せず)の操作により行うことができる。
また、本実施例において、前記スライドフォーム3に
は、各縦端太5の上端間に亘って、図1中想像線で示す
ように、連結フレーム51が水平に架設され、該連結フ
レーム51の上部で連結フレーム51の長手方向に間隔
を置いた2つの連結フレーム51箇所に前記吊りフック
301がそれぞれ形成されている。前記連結フレーム5
1の両端箇所には横端太7側に向けて支持片5101が
それぞれ突設され、各支持片5101の先端には当接板
5103がそれぞれ取着され、該当接板5103は、前
記メタルフレーム9の上方で該メタルフレーム9の略々
延長上に位置している。さらに、各縦端太5の下端には
車輪52が回転可能にそれぞれ支持されている。
The traveling, steering, and stopping of the carriage 23, the swing of the swing frame 25, and the operation of the elevating device 29 and the foam peeling jack 31 are performed, for example, by operating a wireless remote controller (not shown). It can be carried out.
Further, in the present embodiment, a connecting frame 51 is horizontally installed on the slide form 3 so as to extend between the upper ends of the vertical ends 5 as shown by phantom lines in FIG. The suspending hooks 301 are formed at two upper portions of the connecting frame 51 spaced apart in the longitudinal direction of the connecting frame 51. The connecting frame 5
Supporting pieces 5101 are respectively provided at both end portions of No. 1 so as to be directed toward the lateral end thick 7 side, and abutting plates 5103 are attached to the tips of the supporting pieces 5101, respectively. It is located above 9 and substantially above the extension of the metal frame 9. Further, the wheels 52 are rotatably supported at the lower ends of the respective thick vertical ends 5.

【0020】次に、前記スライドフォーム3とスライド
フォーム移動装置21を用いて堤体1を構築する場合に
ついて説明する。まず、スライドフォーム3を用いた堤
体1の構築方法について説明する。図4は、スライドフ
ォーム3の堤体1への取付け状態の説明図で、前記堤体
1は、複数の堤体部分103が上方に順次継ぎ足されて
構成され、各堤体部分103には埋め込みアンカー53
が埋設され、該埋め込みアンカー53の先端の雄ねじ
は、堤体部分103の側壁101に開口されたボルト挿
入孔105に露出している。前記スライドフォーム3
は、堤体1の上端の堤体部分103に配設される。
Next, a case where the bank 1 is constructed using the slide form 3 and the slide form moving device 21 will be described. First, a method of constructing the bank 1 using the slide form 3 will be described. FIG. 4 is an explanatory view of a state in which the slide form 3 is attached to the dam body 1. The dam body 1 is configured by sequentially adding a plurality of dam body portions 103 upward and embedded in each dam body portion 103. Anchor 53
The male screw at the tip of the embedded anchor 53 is exposed in the bolt insertion hole 105 opened in the side wall 101 of the bank portion 103. The slide form 3
Is arranged in the bank body portion 103 at the upper end of the bank body 1.

【0021】前記堤体部分103にスライドフォーム3
を配設するに当たっては、まず、各縦端太5の下端寄り
の上面501箇所に溶着されたナット57にジャッキボ
ルト55を螺着し、該縦端太5を貫設されたボルト挿通
孔505にジャッキボルト55を挿通し、該ジャッキボ
ルト55を回転しつつジャッキボルト55の先端を下面
503から堤体1側に突出させる。そして、ジャッキボ
ルト55の回転により下面503からのジャッキボルト
55の突出長さを調整する。
The slide form 3 is formed on the bank portion 103.
In arranging, the jack bolt 55 is screwed to the nut 57 welded to the upper surface 501 near the lower end of each vertical end thick 5, and the bolt insertion hole 505 penetrating the vertical end thick 5 is inserted. The jack bolt 55 is inserted through the screw bolt 55, and the tip of the jack bolt 55 is projected from the lower surface 503 to the bank 1 side while rotating the jack bolt 55. Then, the protrusion length of the jack bolt 55 from the lower surface 503 is adjusted by rotating the jack bolt 55.

【0022】次に、各縦端太5の略々中間部に貫設され
たボルト挿通孔507に上面501側からシーボルト5
9を挿通し、その先端をボルト挿入孔105に挿入し、
シーボルト59先端の雌ねじ(図示せず)を埋め込みア
ンカー53の雄ねじに螺着し、縦端太5の上面503か
ら突出するシーボルト59部分の雄ねじにナット60を
螺着し締め付ける。これにより、スライドフォーム3が
堤体部分103に取付けられ、メタルフォーム9が堤体
1の上方に配置される。
Next, the sea bolt 5 is inserted from the upper surface 501 side into a bolt insertion hole 507 which is provided at a substantially middle portion of each vertical end thick 5.
9 and insert the tip into the bolt insertion hole 105,
A female screw (not shown) at the tip of the seabolt 59 is screwed to the male screw of the embedded anchor 53, and a nut 60 is screwed to the male screw of the seabolt 59 portion protruding from the upper surface 503 of the vertical end 5 and tightened. As a result, the slide foam 3 is attached to the bank body 103, and the metal foam 9 is arranged above the bank 1.

【0023】そして、メタルフォーム9の内側に新たな
埋め込みアンカー53を配設する。埋め込みアンカー5
3の配設は、各縦端太5の上端寄り上面501箇所に取
着されたホルダ28から、該縦端太5箇所に貫設された
ボルト挿通孔509へとボルト61を挿通し、その先端
をメタルフォーム9の内側に延出させ、ボルト61先端
の雌ねじ(図示せず)に埋め込みアンカー53の雄ねじ
を螺着することで行う。また、この状態で、ホルダ28
の一方の側壁2801のピン挿通孔(図示せず)にピン
2803を挿通し、このピン2803を、ホルダ28か
ら突出するボルト61部分のピン挿通孔(図示せず)に
挿通し、さらに該ピン2803の先端を、ホルダ28の
他方の側壁2801のピン挿通孔(図示せず)に挿通す
ることで、ボルト挿通孔509からのボルト61の抜落
が防止される。以上により、堤体部分103へのスライ
ドフォーム3の配設作業が完了する。
Then, a new embedded anchor 53 is arranged inside the metal foam 9. Embedded anchor 5
In the arrangement of 3, the bolts 61 are inserted from the holder 28 attached to the upper surface 501 near the upper end of each vertical end thick 5 into the bolt insertion holes 509 penetrating the vertical end thick 5 and the The tip is extended to the inside of the metal foam 9, and the male screw of the embedded anchor 53 is screwed to the female screw (not shown) at the tip of the bolt 61. In this state, the holder 28
The pin 2803 is inserted into the pin insertion hole (not shown) of the one side wall 2801, and the pin 2803 is inserted into the pin insertion hole (not shown) of the bolt 61 projecting from the holder 28. By inserting the tip of 2803 into the pin insertion hole (not shown) of the other side wall 2801 of the holder 28, the bolt 61 is prevented from falling out from the bolt insertion hole 509. As described above, the work of disposing the slide form 3 on the bank portion 103 is completed.

【0024】堤体部分103にスライドフォーム3を配
設したならば、メタルフォーム9の内側にコンクリート
を打設して養生し、既に構築した堤体部分103上に新
たな堤体部分103を継ぎ足す。堤体1上に新たな堤体
1部分を継ぎ足したならば、スライドフォーム3を既に
構築された堤体101から取外し、スライドフォーム3
を上方に移動し、このようにして堤体1上に新たな堤体
1部分を順次継ぎ足して行く。
When the slide foam 3 is arranged on the bank body portion 103, concrete is placed inside the metal foam 9 for curing, and the new bank body portion 103 is spliced on the bank body portion 103 already constructed. Add When a new bank 1 portion is added to the bank 1, the slide form 3 is removed from the already built bank 101, and the slide form 3 is removed.
Is moved upward, and in this way, a new portion of the dam body 1 is successively added onto the dam body 1.

【0025】前記スライドフォーム移動装置21は、前
記工程におけるスライドフォーム3の取付け、取外し
時、上方への移動時に用いられる。まず、既に構築され
た堤体101からスライドフォーム3を取外す場合につ
いて説明する。前記2つの駆動輪35Aにより台車23
を走行させ、且つ、該駆動輪35A及び残りの2つの車
輪35により台車23を操舵して、スライドフォーム移
動装置21を継ぎ足した堤体部分103の端部に配置す
る。そして、揺動フレーム25の横メンバー2503を
堤体1の幅方向に延在させ、基台33の前端を堤体部分
103の側壁101側の縁部上方箇所に近付け、その位
置で、各アウトリガー24のピストンロッド2403を
シリンダ本体2401から突出させ、該堤体部分103
上に台車23を固定する。
The slide form moving device 21 is used for attaching and detaching the slide form 3 and for moving the slide form 3 in the above steps. First, a case where the slide form 3 is removed from the already constructed bank 101 will be described. The carriage 23 is driven by the two drive wheels 35A.
Is driven and the carriage 23 is steered by the drive wheel 35A and the remaining two wheels 35, and the slide form moving device 21 is arranged at the end of the bank portion 103. Then, the lateral member 2503 of the swing frame 25 is extended in the width direction of the dam body 1, and the front end of the base 33 is brought close to a position above the edge portion of the dam body portion 103 on the side wall 101 side. The piston rod 2403 of No. 24 is projected from the cylinder body 2401, and the bank portion 103
Fix the carriage 23 on top.

【0026】次に、前記揺動用駆動機構27を作動さ
せ、ピストンロッド2703の伸長長さを調整して、各
縦メンバー2501が側壁101の延長上に位置するよ
うに揺動フレーム25を揺動させる。そして、各昇降ロ
ッド2901の吊りフック30の孔とスライドフォーム
3の各吊りフック301の孔を合わせてそれら孔にピン
(図示せず)を挿通し、該ピンにより両昇降ロッド29
01とスライドフォーム3を図5に示すように連結す
る。このとき、各縦メンバー2501のフォーム剥離用
ジャッキ31は縮小状態で、前記車輪3103は前記各
当接板5103に臨んでいる。
Next, the swinging drive mechanism 27 is operated to adjust the extension length of the piston rod 2703 to swing the swinging frame 25 so that each vertical member 2501 is located on the extension of the side wall 101. Let Then, the holes of the hanging hooks 30 of the respective lifting rods 2901 and the holes of the respective hanging hooks 301 of the slide form 3 are aligned and a pin (not shown) is inserted into these holes, and both the lifting rods 29 are fitted by the pins.
01 and the slide form 3 are connected as shown in FIG. At this time, the foam peeling jacks 31 of the vertical members 2501 are in a contracted state, and the wheels 3103 face the contact plates 5103.

【0027】両昇降ロッド2901とスライドフォーム
3を連結したならば、前記各縦端太5のジャッキボルト
55を回転させ、該ジャッキボルト55の先端を前記側
壁101から離間させる。次に、前記ナット60を緩め
てシーボルト59を回転させ、該シーボルト59を埋め
込みアンカー53から外す。また、前記ピン2803を
ホルダ28から引き抜いてボルト61を回転させ、該ボ
ルト61を埋め込みアンカー53から外す。
When both the elevating rods 2901 and the slide form 3 are connected, the jack bolts 55 of each of the vertical ends 5 are rotated to separate the tip ends of the jack bolts 55 from the side wall 101. Next, the nut 60 is loosened and the sea bolt 59 is rotated to remove the sea bolt 59 from the embedded anchor 53. Further, the pin 2803 is pulled out from the holder 28, the bolt 61 is rotated, and the bolt 61 is removed from the embedded anchor 53.

【0028】次に、前記スライドフォーム剥離用ジャッ
キ31により車輪3103を縦メンバー2501から離
間する方向に移動させる。これにより、図6に示すよう
に、前記車輪3103で当接板5103が側壁101か
ら離れる方向に押され、連結フレーム51と側壁101
の間隔が縦端太5の上端側から次第に広がって行き、前
記メタルフォーム9が側壁101から剥離され、縦端太
5の車輪52が側壁101に当接する。
Next, the wheel 3103 is moved in the direction away from the vertical member 2501 by the slide foam peeling jack 31. As a result, as shown in FIG. 6, the contact plate 5103 is pushed by the wheel 3103 in a direction away from the side wall 101, and the connecting frame 51 and the side wall 101 are removed.
Is gradually widened from the upper end side of the vertical end thick 5, the metal foam 9 is separated from the side wall 101, and the wheel 52 of the vertical end thick 5 comes into contact with the side wall 101.

【0029】メタルフォーム9を剥離したならば、前記
ウォームギアジャッキ2903により昇降ロッド290
1を上昇させ、スライドフォーム3を側壁101に沿っ
て引上げる。このとき、各縦端太5の車輪52は側壁1
01上で転動し、各スライドフォーム剥離用ジャッキ3
1の車輪3103は、各当接板5103上からメタルフ
ォーム9上へと転動し、これら車輪52,3103の転
動によりスライドフォーム3が円滑に引上げられる。
After the metal foam 9 is peeled off, the worm gear jack 2903 is used to lift the rod 290.
1 is raised and the slide foam 3 is pulled up along the side wall 101. At this time, the wheel 52 of each vertical end 5 is attached to the side wall 1
01 rolling jack, each jack 3 for peeling slide form
The first wheel 3103 rolls on each contact plate 5103 and onto the metal foam 9, and the slide foam 3 is smoothly pulled up by the rolling of these wheels 52 and 3103.

【0030】そして、図7に示すように、継ぎ足した堤
体部分103の上方にメタルフォーム9が位置するまで
スライドフォーム3を引上げたところで、前記昇降ロッ
ド2901の上昇を停止させ、フォーム剥離用ジャッキ
31の車輪3103を縦メンバー2501に接近する方
向に移動させる。これにより、前記メタルフォーム9の
下端寄り箇所が、継ぎ足した堤体部分103でボルト挿
入孔105よりも上方の側壁101箇所に当接され、メ
タルフォーム9が側壁101の延長上に延在する。
Then, as shown in FIG. 7, when the slide foam 3 is pulled up until the metal foam 9 is located above the splint body portion 103, the lifting rod 2901 is stopped from rising and the foam peeling jack is stopped. The wheel 3103 of 31 is moved in the direction of approaching the vertical member 2501. As a result, the portion of the metal foam 9 near the lower end is brought into contact with the portion of the side wall 101 above the bolt insertion hole 105 in the additional bank portion 103, and the metal foam 9 extends on the extension of the side wall 101.

【0031】前記スライドフォーム3の引上げを終えた
ならば、各縦端太5毎に、ジャッキボルト55の下面5
03からの突出長さを調整し、継ぎ足した堤体部分10
3の埋め込みアンカー53にシーボルト59を締結する
と共に、ボルト61に新たな埋め込みアンカー53を締
結し、その埋め込みアンカー53をメタルフォーム9の
内側に配設する。これにより、図5と同じ状態となり、
スライドフォーム3が前記継ぎ足した堤体部分103に
配設される。
After pulling up the slide form 3, the lower surface 5 of the jack bolt 55 for each vertical end thickness 5
Adjusting the protruding length from 03, the levee body part 10 that has been added
The sea bolt 59 is fastened to the embedded anchor 53 of No. 3, the new embedded anchor 53 is fastened to the bolt 61, and the embedded anchor 53 is disposed inside the metal foam 9. As a result, it becomes the same state as in Fig. 5,
The slide foam 3 is arranged on the levee body portion 103 that has been added.

【0032】スライドフォーム3を継ぎ足した堤体部分
103に配設したならば、前記吊りフック301,30
どうしの連結を外し、前記アウトリガー24による台車
23の固定を解除し、継ぎ足した堤体部分103上から
該堤体部分103の外にスライドフォーム移動装置21
を移動する。その後、メタルフォーム9の内側にコンク
リートを打設し養生して新たな堤体部分103を継ぎ足
し、以後、上述と同じ手順で、スライドフォーム3を既
に構築された堤体部分103から外し、スライドフォー
ム移動装置21でスライドフォーム3を引上げ、引上げ
たスライドフォーム3を継ぎ足した堤体部分103に取
付けて行く。
If the slide form 3 is arranged on the levee body portion 103, the suspension hooks 301, 30
The slide form moving device 21 is connected to the outside of the bank body portion 103 from above the bank body portion 103 which is replenished by releasing the connection between them and releasing the fixing of the carriage 23 by the outrigger 24.
To move. After that, concrete is placed inside the metal foam 9 and cured to add a new dam body portion 103, and thereafter, the slide foam 3 is removed from the already constructed dam body portion 103 by the same procedure as described above. The slide form 3 is pulled up by the moving device 21, and the pulled up slide form 3 is attached to the bank body portion 103 to which the slide form 3 is added.

【0033】このように本実施例によれば、堤体1上で
アウトリガー24により台車23を固定して、堤体1の
側壁101の延長上に延在するように揺動フレーム25
を揺動させ、その状態で、昇降ロッド2901とスライ
ドフォーム3を連結し、メタルフォーム9をフォーム剥
離用ジャッキ31により側壁101から剥離させ、昇降
ロッド2901をウォームギアジャッキ2903により
上昇させてスライドフォーム3を引上げることで、スラ
イドフォーム3の移動を行うようにした。このため、ク
レーンによりスライドフォーム3を吊上げる従来の方式
に比べて、熟練したオペレータを要せず、効率よく短時
間でスライドフォーム3の移動作業を行うことができ
る。また、従来のように、作業員が堤体1から引上げ中
のスライドフォーム3を見下ろして、スライドフォーム
移動装置21のオペレータに身振りや声により合図を行
う必要がないので、高所で危険な堤体1の上縁に作業員
を配置せずに済み、スライドフォーム3の移動作業を安
全に行うことができる。
As described above, according to this embodiment, the bogie 23 is fixed on the bank 1 by the outriggers 24, and the swing frame 25 is extended so as to extend on the extension of the side wall 101 of the bank 1.
In this state, the elevating rod 2901 and the slide form 3 are connected, the metal foam 9 is separated from the side wall 101 by the foam separating jack 31, and the elevating rod 2901 is lifted by the worm gear jack 2903 to slide the slide form 3. The slide form 3 was moved by pulling up. Therefore, compared to the conventional method in which the slide form 3 is lifted by a crane, a skilled operator is not required, and the work of moving the slide form 3 can be efficiently performed in a short time. Further, unlike the conventional case, it is not necessary for an operator to look down on the slide form 3 being pulled up from the bank 1, and to give a motion or voice to the operator of the slide form moving device 21. It is not necessary to arrange a worker on the upper edge of the body 1, and the work of moving the slide form 3 can be performed safely.

【0034】尚、本実施例では、台車23の2つの駆動
輪35Aがそれぞれ個別の走行用駆動手段37により走
行駆動される構成としたが、2つの駆動輪35Aを単一
の走行用駆動手段37により走行駆動する構成としても
よい。この場合、駆動輪35A相互にチェーンを掛け渡
し、単一の駆動源により回転駆動してもよい。同様に、
本実施例では、2つの駆動輪35A及び残りの2つの車
輪35がそれぞれ個別の操舵用駆動手段39により操舵
される構成としたが、それら2つの駆動輪35A及び2
つの車輪35を単一の操舵用駆動手段39により操舵す
る構成としてもよい。この場合、駆動輪35Aや車輪3
5に相互にチェーンを掛け渡し、単一の駆動源により操
舵してもよい。また、本実施例では、基台33の対角線
上に位置する2つの隅部に駆動輪35Aをそれぞれ配置
し、前記対角線とは別の対角線上に位置する2つの隅部
に残りの車輪35をそれぞれ配置したが、基台33の後
側の隅部に駆動輪35Aをそれぞれ配設し、基台33の
前側の隅部に残りの車輪35をそれぞれ配設する等、車
輪35の配置は、実施例で示した配置に限らず任意であ
る。さらに、前記走行用駆動手段37を省略して全ての
車輪35を従動輪で構成したり、前記操舵用駆動手段3
9を省略して台車23の操舵を手動で行う構成とする
等、台車23を走行及び操舵させるための構成は、実施
例で示した構成に限らず任意である。また、本実施例で
は、台車23が4つの車輪35を備える構成としたが、
車輪35の数は3つであっても5つ以上であってもよ
い。
In this embodiment, the two drive wheels 35A of the carriage 23 are driven and driven by the individual traveling drive means 37, but the two drive wheels 35A are driven by a single traveling drive means. It may be configured such that the vehicle is driven by 37. In this case, the drive wheels 35A may be chained around each other and rotationally driven by a single drive source. Similarly,
In this embodiment, the two drive wheels 35A and the remaining two wheels 35 are steered by the individual steering drive means 39, but the two drive wheels 35A and 2A are used.
A configuration may be adopted in which one wheel 35 is steered by a single steering drive means 39. In this case, the drive wheels 35A and the wheels 3
It is also possible to chain the 5 to each other and steer with a single drive source. Further, in this embodiment, the drive wheels 35A are respectively arranged at the two corners located on the diagonal of the base 33, and the remaining wheels 35 are located at the two corners located on a diagonal different from the diagonal. The driving wheels 35A are arranged in the rear corners of the base 33, and the remaining wheels 35 are arranged in the front corners of the base 33. The arrangement is not limited to the arrangement shown in the embodiment, and is arbitrary. Further, the traveling drive means 37 may be omitted and all the wheels 35 may be driven wheels, or the steering drive means 3 may be used.
The configuration for traveling and steering the trolley 23 is not limited to the configuration shown in the embodiment, and the configuration in which the trolley 23 is manually steered without 9 is not limited to the configuration shown in the embodiment. Further, in the present embodiment, the carriage 23 is configured to include four wheels 35,
The number of wheels 35 may be three or five or more.

【0035】さらに、本実施例では、スライドフォーム
移動装置21に2つの昇降装置29を設ける場合につい
て説明したが、昇降装置29は単一であってもよく3つ
以上であってもよい。また、前記揺動用駆動機構27を
電動モータにより作動するように構成したり、昇降装置
29を油圧モータにより作動するように構成したり、揺
動用駆動機構27や昇降装置29をハンドル等の操作に
より手動で作動するように構成してもよく、昇降装置2
9のウォームギア機構は、例えばラックピニオン機構等
他の機構に代えてもよい。さらに、本実施例では、前記
アウトリガー24が油圧シリンダで構成されているもの
としたが、例えば前記昇降装置29と同様に、ウォーム
ギア機構やラックピニオン機構等によりロッドを昇降さ
せる公知のジャッキで構成してもよく、公知の手動式の
ジャッキで構成してもよい。また、係合部材は、本実施
例で示した孔の開いた吊りフック30に限らず、引っ掛
け式のフックや継手部材等任意である。
Further, in the present embodiment, the case where the slide form moving device 21 is provided with the two elevating devices 29 has been described, but the elevating devices 29 may be a single device or three or more devices. Further, the swing drive mechanism 27 is configured to be operated by an electric motor, the lifting device 29 is configured to be operated by a hydraulic motor, and the swing drive mechanism 27 and the lifting device 29 are operated by a handle or the like. The lifting device 2 may be configured to be manually operated.
The worm gear mechanism 9 may be replaced with another mechanism such as a rack and pinion mechanism. Further, in the present embodiment, the outrigger 24 is composed of a hydraulic cylinder, but, for example, like the lifting device 29, it is composed of a known jack for lifting and lowering the rod by a worm gear mechanism, a rack and pinion mechanism, or the like. Alternatively, a known manual jack may be used. Further, the engaging member is not limited to the hanging hook 30 having the hole shown in the present embodiment, but may be a hook, a joint member, or the like.

【0036】[0036]

【発明の効果】以上説明したように本発明によれば、堤
体の側壁に配設される堤体構築用のスライドフォームを
前記側壁に沿って上方に移動させるスライドフォーム移
動装置であって、走行可能な台車と、前記台車に設けら
れた台車固定用のアウトリガーと、前記台車の側部に傾
動可能に支持された揺動フレームと、前記揺動フレーム
と前記台車の間に介設され該揺動フレームを傾動させる
揺動用駆動手段と、前記揺動フレームに設けられた移動
手段と、前記スライドフォームに係脱可能で前記移動手
段により前記揺動フレームに沿って移動される係合部材
と、前記揺動フレームの下部に配設され、該揺動フレー
ムにおける前記台車とは反対側の面に出没する剥離用ジ
ャッキとを備える構成としたので、スライディングフォ
ーム工法によりコンクリートダムの堤体を構築するに当
たり、スライドフォームの移動作業を効率よく短時間で
安全に行うことができる。
As described above, according to the present invention, there is provided a slide form moving device for moving a slide form for constructing a dam body arranged on a sidewall of the dam body upward along the sidewall. A trolley capable of traveling, a trolley-fixing outrigger provided on the trolley, a swing frame tiltably supported on a side portion of the trolley, and an interposition provided between the swing frame and the trolley. A swinging drive means for tilting the swing frame, a moving means provided on the swing frame, and an engaging member that can be engaged with and disengaged from the slide form and that is moved along the swing frame by the moving means. Since it is provided with a peeling jack that is disposed below the rocking frame and that appears on the surface of the rocking frame on the opposite side of the bogie, a sliding form method is used. Upon building the embankment of the cleat dam can safely perform mobile work slide form efficiently in a short time.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係るスライドフォーム移動
装置の側面図である。
FIG. 1 is a side view of a slide form moving device according to an embodiment of the present invention.

【図2】図1に示すスライドフォーム移動装置の正面図
である。
FIG. 2 is a front view of the slide form moving device shown in FIG.

【図3】図1に示すスライドフォーム移動装置の底面図
である。
3 is a bottom view of the slide form moving device shown in FIG. 1. FIG.

【図4】スライディングフォーム工法によりダム堤体を
構築する際のスライドフォームの堤体への取付け状態を
示す説明図である。
FIG. 4 is an explanatory diagram showing a mounting state of a slide foam on a dam body when constructing a dam dam body by a sliding foam method.

【図5】図1に示すスライドフォーム移動装置によるス
ライドフォームの移動作業の説明図である。
FIG. 5 is an explanatory diagram of a slide form moving operation by the slide form moving device shown in FIG.

【図6】図1に示すスライドフォーム移動装置によるス
ライドフォームの移動作業の説明図である。
FIG. 6 is an explanatory diagram of a slide form moving operation by the slide form moving device shown in FIG. 1.

【図7】図1に示すスライドフォーム移動装置によるス
ライドフォームの移動作業の説明図である。
FIG. 7 is an explanatory diagram of a slide form moving operation by the slide form moving device shown in FIG.

【図8】従来のスライディングフォーム工法によるダム
堤体の構築作業の説明図である。
FIG. 8 is an explanatory diagram of a dam levee body construction work by a conventional sliding foam method.

【符号の説明】[Explanation of symbols]

1 堤体 101 側壁 3 スライドフォーム 21 スライドフォーム移動装置 23 台車 24 アウトリガー 25 揺動フレーム 27 揺動用駆動手段 29 昇降装置(移動手段) 30 吊りフック(係合部材) 31 剥離用ジャッキ 3103 剥離用ジャッキ車輪 DESCRIPTION OF SYMBOLS 1 Embankment 101 Side wall 3 Slide form 21 Sliding form moving device 23 Carriage 24 Outrigger 25 Swing frame 27 Swing driving means 29 Lifting device (moving means) 30 Hanging hook (engaging member) 31 Peeling jack 3103 Peeling jack wheel

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中鉢 和敏 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 (72)発明者 北 重夫 東京都葛飾区新宿3丁目31番22号 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kazutoshi Nakatoshi 4-6-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd. (72) Inventor Shigeo Kita, 3-31-22 Shinjuku, Katsushika-ku, Tokyo

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 堤体の側壁に配設される堤体構築用のス
ライドフォームを前記側壁に沿って上方に移動させるス
ライドフォーム移動装置であって、 走行可能な台車と、 前記台車に設けられた台車固定用のアウトリガーと、 前記台車の側部に傾動可能に支持された揺動フレーム
と、 前記揺動フレームと前記台車の間に介設され該揺動フレ
ームを傾動させる揺動用駆動手段と、 前記揺動フレームに設けられた移動手段と、 前記スライドフォームに係脱可能で前記移動手段により
前記揺動フレームに沿って移動される係合部材と、 前記揺動フレームの下部に配設され、該揺動フレームに
おける前記台車とは反対側の面に出没する剥離用ジャッ
キと、 を備えることを特徴とするスライドフォーム移動装置。
1. A slide form moving device for moving a slide form for constructing a dam body arranged on a side wall of the dam body upward along the side wall, the carriage being movable, and provided on the carriage. An outrigger for fixing the trolley, a swing frame tiltably supported on a side portion of the trolley, and a swinging drive unit interposed between the swing frame and the trolley for tilting the swing frame. A moving unit provided on the swing frame; an engaging member that can be engaged with and disengaged from the slide form and moved along the swing frame by the moving unit; A slide-form moving device, comprising: a peeling jack that appears on and off a surface of the swing frame opposite to the trolley.
【請求項2】 前記係合部材は前記揺動フレームの水平
方向に間隔を置いて2つ設けられ、前記移動手段は、前
記揺動フレームの上部で水平方向に間隔を置いて配設さ
れた2つの駆動機構を含んで構成され、前記各係合部材
は前記各駆動機構に連結されている請求項1記載のスラ
イドフォーム移動装置。
2. The two engaging members are provided at intervals in the horizontal direction of the rocking frame, and the moving means are arranged at intervals in the horizontal direction above the rocking frame. The slide form moving device according to claim 1, wherein the slide form moving device is configured to include two drive mechanisms, and each of the engagement members is connected to each of the drive mechanisms.
【請求項3】 前記剥離用ジャッキの先端には車輪が設
けられている請求項1又は2記載のスライドフォーム移
動装置。
3. The slide form moving device according to claim 1, wherein a wheel is provided at a tip of the peeling jack.
JP15278094A 1994-06-09 1994-06-09 Slide form moving device Pending JPH07331872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15278094A JPH07331872A (en) 1994-06-09 1994-06-09 Slide form moving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15278094A JPH07331872A (en) 1994-06-09 1994-06-09 Slide form moving device

Publications (1)

Publication Number Publication Date
JPH07331872A true JPH07331872A (en) 1995-12-19

Family

ID=15547992

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15278094A Pending JPH07331872A (en) 1994-06-09 1994-06-09 Slide form moving device

Country Status (1)

Country Link
JP (1) JPH07331872A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544966A (en) * 2016-01-29 2016-05-04 中国建筑第八工程局有限公司 Formwork reinforcing system and construction method for large-angle veneer fair-faced inclined wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544966A (en) * 2016-01-29 2016-05-04 中国建筑第八工程局有限公司 Formwork reinforcing system and construction method for large-angle veneer fair-faced inclined wall

Similar Documents

Publication Publication Date Title
JPH07259322A (en) Lifting-lowering scaffold
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
KR100445866B1 (en) An apparatus of a complex cart for a ship
JPH07331872A (en) Slide form moving device
CN212151383U (en) Novel concrete precast slab is with upset device
JP2003054876A (en) Device and method for attaching and detaching side frame
JP2838158B2 (en) Formwork setting device
JP3038292B2 (en) Formwork lifting attachment and formwork lifting vehicle
JPH02108760A (en) Moving form practice and device for said form
CN113152907A (en) Assembly type structure stabilizing device for building
JPH06156982A (en) Crane device
JPH09169495A (en) Weight lifting device
CN112520251B (en) Auxiliary transportation device for building modules
CN116791491B (en) Continuous rigid frame bridge box girder hanging basket suspension casting device and suspension casting process
CN110077952B (en) Building template cross-floor transportation equipment and transportation method
JP3517871B2 (en) Method and apparatus for transporting heavy box
JP3171288B2 (en) Formwork installation machine
CN117283702B (en) Demoulding and lifting mechanism for concrete member and production line
JP4286971B2 (en) Tower crane removal method
JP4664627B2 (en) Continuous casting equipment
JP2000226838A (en) Form installing machine
JPS6015774Y2 (en) Mobile concrete formwork equipment for embankments
CN115198655A (en) Equipment for assisting in assembling and mounting hydraulic creeping formwork
JPH0416584B2 (en)
JP2724662B2 (en) Method of placing concrete in concrete structure and formwork lifting device capable of traversing freely