JPH0728188Y2 JP9743689U JP9743689U JPH0728188Y2 JP H0728188 Y2 JPH0728188 Y2 JP H0728188Y2 JP 9743689 U JP9743689 U JP 9743689U JP 9743689 U JP9743689 U JP 9743689U JP H0728188 Y2 JPH0728188 Y2 JP H0728188Y2
Authority
JP
Japan
Prior art keywords
anchor
bolt
nut
screwed
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9743689U
Other languages
Japanese (ja)
Other versions
JPH0340339U (en
Inventor
和也 川田
陽一 山田
吉治 堀川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Matsuura Machinery Corp
Original Assignee
Matsuura Machinery Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsuura Machinery Corp filed Critical Matsuura Machinery Corp
Priority to JP9743689U priority Critical patent/JPH0728188Y2/en
Publication of JPH0340339U publication Critical patent/JPH0340339U/ja
Application granted granted Critical
Publication of JPH0728188Y2 publication Critical patent/JPH0728188Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は工作機械等各種機械用の基礎アンカーボルトに
関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a base anchor bolt for various machines such as machine tools.

〔従来技術〕[Prior art]

工作機械等の各種機械や装置を工場に据付ける場合に
は、通常、工場の床を新たに堀り、基礎工事を行なって
いる。従来の基礎工事では、基礎コンクリートの打設時
にアンカーボルトを埋め込むため、アンカーボルト間の
芯間寸法が正確にできないという問題があった。更に基
礎コンクリート打設後には養生期間が約1ケ月程度必要
であるため、基礎工事から機械等の据付までに時間がか
かるという問題があった。又基礎工事を新たに行う必要
があるため、工場内の機械、装置等のレイアウトを簡単
に自由に変更することが出来ないという問題があった。
When installing various machines and devices such as machine tools in a factory, usually the floor of the factory is newly dug and foundation work is performed. In the conventional foundation work, since the anchor bolts are embedded at the time of placing the concrete, there is a problem that the inter-center dimension between the anchor bolts cannot be accurate. Furthermore, since a curing period of about one month is required after the foundation concrete is placed, there is a problem that it takes time from foundation work to installation of machinery and the like. Further, since it is necessary to newly perform the foundation work, there is a problem that the layout of the machines and devices in the factory cannot be easily and freely changed.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

本考案は、上記の従来の問題点を解消し、機械、装置等
について工場内のレイアウトの変更を簡単且つ自由に実
施することを可能にする基礎アンカーボルトを提供する
ことを課題とする。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a foundation anchor bolt which solves the above-mentioned conventional problems and enables the layout of machines, devices, etc. to be changed easily and freely in a factory.

〔課題を解決するための手段〕 本考案は、上記の課題を、床に固定されるアンカーベー
スに移動可能に支持されるアンカーナットと、機械フレ
ームに高さ調整可能に螺着されるジャッキのボルトと、
該ジャッキボルトに挿入され、一端を前記アンカーナッ
トに螺着され、他端にナットが螺着されるボルトとを有
し、ボルトに螺着したナットを緊締することをにより、
ジャッキボルトがアンカーベースに固定される基礎アン
カーボルトにより解決した。
[Means for Solving the Problems] The present invention solves the above problems by using an anchor nut that is movably supported by an anchor base fixed to a floor and a jack that is height-adjustably screwed to a machine frame. Bolt and
By having a bolt inserted into the jack bolt, having one end screwed to the anchor nut and the other end screwed to the nut, by tightening the nut screwed to the bolt,
The problem was solved by the foundation anchor bolt where the jack bolt is fixed to the anchor base.

〔作用〕[Action]

本考案により、床にアンカーベースが固定され、高さ調
整されたジャッキボルトの中に固定用ボルトを挿入し、
アンカーベースに支持されるアンカーナットに一端を螺
着する。次いで固定用ボルトの他端に螺着したナットを
ジャッキボルトに向かって締めつけることにより、固定
用ボルトを介してアンカーベースはジャッキボルトとア
ンカーナットとの間に締付固定される。従ってジャッキ
ボルトを介して機械フレームはアンカーベースに固定さ
れる。
According to the present invention, the anchor base is fixed to the floor, and the fixing bolt is inserted into the height-adjusted jack bolt,
One end is screwed onto an anchor nut supported by the anchor base. Next, by tightening the nut screwed to the other end of the fixing bolt toward the jack bolt, the anchor base is tightened and fixed between the jack bolt and the anchor nut via the fixing bolt. Therefore, the machine frame is fixed to the anchor base via the jack bolt.

〔実施例〕〔Example〕

本考案の詳細を図に示す実施例に基づいて説明する。 The details of the present invention will be described based on an embodiment shown in the drawings.

第1図〜第3図において、工場建設時に、あらかじめ十
分な強度をもつように仕上げられた床1に、市販のナッ
トアンカー2を植設し、そのナットアンカー2にボルト
3をねじ込むことによりアンカーベース4を床1に固定
する。
1 to 3, at the time of construction of a factory, a commercially available nut anchor 2 is planted on a floor 1 that is finished to have sufficient strength in advance, and a bolt 3 is screwed into the nut anchor 2 to anchor the anchor. The base 4 is fixed to the floor 1.

床1の上に据付けようとする機械、装置等、例えば工作
機械のフレーム5に複数のジャッキボルト6が、例えば
第5図に示すように、ねじ込まれている。
A plurality of jack bolts 6 are screwed into a frame 5 of a machine, device, etc. to be installed on the floor 1, for example, a machine tool, as shown in FIG. 5, for example.

機械等の据付に際しては、アンカーベース4の上に敷板
7を載せ、その敷板7の上にジャッキボルト6が載るよ
うに機械を配置する。ジャッキボルト6のねじ込量を調
整することにより、機械フレーム5の床1に対する高さ
を調整することができる。ジャッキボルト6のねじ込量
の調整が終わると、ジャッキボルト6のねじ込んである
ロックナット8を締め込むことによりジャッキボルト6
の調整量をロックする。
When installing a machine or the like, the floor board 7 is placed on the anchor base 4, and the machine is arranged so that the jack bolts 6 are placed on the floor board 7. By adjusting the screwing amount of the jack bolt 6, the height of the machine frame 5 with respect to the floor 1 can be adjusted. When the adjustment of the screwing amount of the jack bolt 6 is completed, the lock nut 8 into which the jack bolt 6 is screwed is tightened so that the jack bolt 6 is
Lock the adjustment amount of.

ジャッキボルト6をアンカーベース4に固定するに先だ
って、第4図に示すように、ジャッキボルト6の中空穴
9と同径のピン10よりなる芯出し治具を中空穴9に上か
ら挿入する。ピン10は先端部がテーパー部11として形成
されており、該テーパー部11がアンカーベース1の下側
凹部12に挿入されたアンカーナット13のねじ穴14内に挿
入されることによりジャッキボルト6とアンカーナット
13との間の芯出しが簡単に行なわれる。アンカーナット
13は下側凹部12内で前後左右に移動可能であるので芯ず
れは簡単に調整できる。
Prior to fixing the jack bolt 6 to the anchor base 4, as shown in FIG. 4, a centering jig including a pin 10 having the same diameter as the hollow hole 9 of the jack bolt 6 is inserted into the hollow hole 9 from above. The tip of the pin 10 is formed as a taper portion 11, and the taper portion 11 is inserted into a screw hole 14 of an anchor nut 13 inserted into a lower recess 12 of the anchor base 1 so that the jack bolt 6 and Anchor nut
Centering with 13 is easily performed. Anchor nut
Since 13 can be moved back and forth and left and right within the lower recess 12, the misalignment can be easily adjusted.

芯出し後ピン10をジャッキボルト6から抜き取り、ジャ
ッキボルト6の中空穴9に固定用ボルト15を挿入し、ア
ンカーナット13内にねじ込む。その後ナット16を固定用
ボルト15にねじ込み、ジャッキボルト6に向かって締つ
けることにより敷板7及びアンカーベース4がジャッキ
ボルト6とアンカーナット13との間に緊締され、これに
よりフレーム5はアンカーベース4を介して床1に固定
されることができる。
After centering, the pin 10 is extracted from the jack bolt 6, the fixing bolt 15 is inserted into the hollow hole 9 of the jack bolt 6, and screwed into the anchor nut 13. After that, the nut 16 is screwed into the fixing bolt 15 and tightened toward the jack bolt 6, whereby the base plate 7 and the anchor base 4 are tightened between the jack bolt 6 and the anchor nut 13, and thereby the frame 5 is fixed to the anchor base 4. Can be fixed to the floor 1 via.

〔効果〕〔effect〕

本考案により機械等の据付に際して特別の基礎工事が不
必要になり、工場レイアウトが簡単かつ自由に変更可能
になった。又アンカーボルトの芯間寸法が正確に決めら
れることができ、機械の据付が簡単になり、更には基礎
工事の養生期間が不必要になり、作業性が著しく改善さ
れた。
The present invention eliminates the need for special foundation work when installing machines and the like, and allows the factory layout to be changed easily and freely. In addition, the inter-center dimension of the anchor bolt can be accurately determined, the installation of the machine is simplified, and the curing period of the foundation work is unnecessary, and the workability is remarkably improved.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案に係る基礎アンカーボルトの説明正面
図、第2図は平面図、第3図は底面図、第4図は芯出し
作業の説明図、第5図は機械の適用例を示す正面図であ
る。 1……床、4……アンカーベース 5……機械フレーム、6……ジャッキボルト 13……アンカーナット 15……固定用ボルト 16……ナット
1 is an explanatory front view of a foundation anchor bolt according to the present invention, FIG. 2 is a plan view, FIG. 3 is a bottom view, FIG. 4 is an explanatory view of centering work, and FIG. 5 is an application example of a machine. It is a front view shown. 1 …… Floor 4 …… Anchor base 5 …… Machine frame 6 …… Jack bolt 13 …… Anchor nut 15 …… Fixing bolt 16 …… Nut

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】床に固定されるアンカーベースにより床と
アンカーベースとの間に所定の範囲内で移動可能に支持
されるアンカーナットと、据付けるべき機械フレームに
高さ調整可能に螺着されるジャッキボルトと、該ジャッ
キボルトの中空穴に挿入され前記アンカーナットにねじ
込まれる固定用ボルトと、該ボルトにねじ込まれ、前記
ジャッキボルトに対し緊締されるナットとを有すること
を特徴とする基礎アンカーボルト。
1. An anchor nut, which is movably supported within a predetermined range between a floor and an anchor base by an anchor base fixed to the floor, and is height-adjustably screwed to a machine frame to be installed. Basic anchor comprising: a jack bolt, a fixing bolt inserted into a hollow hole of the jack bolt and screwed into the anchor nut, and a nut screwed into the bolt and tightened with respect to the jack bolt. bolt.
JP9743689U 1989-08-23 1989-08-23 Foundation anchor bolt Expired - Fee Related JPH0728188Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9743689U JPH0728188Y2 (en) 1989-08-23 1989-08-23 Foundation anchor bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9743689U JPH0728188Y2 (en) 1989-08-23 1989-08-23 Foundation anchor bolt

Publications (2)

Publication Number Publication Date
JPH0340339U JPH0340339U (en) 1991-04-18
JPH0728188Y2 true JPH0728188Y2 (en) 1995-06-28

Family

ID=31646577

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9743689U Expired - Fee Related JPH0728188Y2 (en) 1989-08-23 1989-08-23 Foundation anchor bolt

Country Status (1)

Country Link
JP (1) JPH0728188Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6395396B2 (en) * 2014-02-18 2018-09-26 三菱重工業株式会社 Device mounting device and device mounting method

Also Published As

Publication number Publication date
JPH0340339U (en) 1991-04-18

Similar Documents

Publication Publication Date Title
JPH0728188Y2 (en) Foundation anchor bolt
JP2870513B2 (en) A method of aligning the core of a steel column with the foundation concrete
JP5077856B1 (en) Construction method and construction jig
CN205999915U (en) A kind of adjustable standard component for reserving bolt suitable for each size
KR20080048748A (en) Moving jig
CN209837756U (en) Constructional column bar planting positioner
JP2003227167A (en) Height adjusting device of concrete member
CN220847676U (en) Column base bolt positioning device
CN111452932B (en) Auxiliary tool for mounting base
JP2001355791A (en) Anchor-integrated liner
JPH0694672B2 (en) Anchor bolt positioning tool
CN212656253U (en) Column base bolt mounting structure
JPH09221769A (en) Elevation adjuster and concrete secondary product with adjuster
JPS6039372Y2 (en) outer wall
JP3017247U (en) Height adjustment fittings and concrete members with height adjustment fittings
JPH0372117A (en) Fixing method for anchor bolt and its fixing metal fitting
JP2581775Y2 (en) Horizontal installation of concrete formwork
JPS5920489Y2 (en) Anchor bolt mounting structure
JP2571219Y2 (en) Punch Retainer
KR860000411Y1 (en) A regulative apparatus of level
JP2004036103A (en) Anchor frame and method for fixing the same
JP3733111B2 (en) Foundation level adjusting device and foundation level adjusting method on foundation slab having uneven top
JPS62225621A (en) Packer setter
JPH0728303Y2 (en) Level adjuster for concrete formwork
JPH0521326Y2 (en)

Legal Events

Date Code Title Description