JPH0724417Y2 - Concrete concrete block for sheet pile - Google Patents

Concrete concrete block for sheet pile

Info

Publication number
JPH0724417Y2
JPH0724417Y2 JP1990070923U JP7092390U JPH0724417Y2 JP H0724417 Y2 JPH0724417 Y2 JP H0724417Y2 JP 1990070923 U JP1990070923 U JP 1990070923U JP 7092390 U JP7092390 U JP 7092390U JP H0724417 Y2 JPH0724417 Y2 JP H0724417Y2
Authority
JP
Japan
Prior art keywords
sheet pile
concrete
block
back surface
makeup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1990070923U
Other languages
Japanese (ja)
Other versions
JPH0430127U (en
Inventor
里子 塚本
Original Assignee
里子 塚本
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 里子 塚本 filed Critical 里子 塚本
Priority to JP1990070923U priority Critical patent/JPH0724417Y2/en
Publication of JPH0430127U publication Critical patent/JPH0430127U/ja
Application granted granted Critical
Publication of JPH0724417Y2 publication Critical patent/JPH0724417Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は,護岸工事等に使用される矢板の前面を化粧
する化粧用コンクリートブロックに関するものである。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a decorative concrete block for applying makeup to the front surface of a sheet pile used for revetment work and the like.

〔従来の技術〕[Conventional technology]

護岸工事等の目的で地中に打ち込まれた矢板をそのまま
にしておくと土圧等で傾くこともあるから,その頭部を
笠コンクリートと呼ばれる補強体で補強するのが通常で
ある。しかし,矢板の前面(臨海(水)側)のうち,こ
の笠コンクリートより下方は普通はそのままであるか
ら,単調な表面が露出して非常に景観を害す。特に,鋼
製の矢板を使用した場合には赤錆が発生して著しく美観
を害す。さらに,長年の間には汚れやしみが発生してま
すます景観を損なうようなことにもなる。これを防ぐた
めには,矢板の前面に化粧を施すことが考えられるが,
一度打ち込んだ矢板に改めてこのような工作を施すのは
その施工が非常に煩わしい(この点では,笠コンクリー
トの場合も同様である)。
If a sheet pile that has been driven into the ground for the purpose of revetment work is left as it is, it may tilt due to earth pressure, etc., so the head is usually reinforced with a reinforcement body called shade concrete. However, the part of the front surface of the sheet pile (on the seaside (water) side) that is normally below the cap concrete is exposed, and the monotonous surface is exposed, which seriously damages the landscape. In particular, when steel sheet piles are used, red rust is generated and the appearance is significantly impaired. In addition, dirt and stains have been generated over the years, and this will further damage the landscape. To prevent this, it is possible to apply makeup to the front of the sheet pile.
It is very troublesome to perform such work again on the sheet pile that has been once driven (in this respect, the same applies to the cased concrete).

〔考案が解決しようとする課題〕[Problems to be solved by the device]

例えば,矢板を化粧する場合についていえば,まず,矢
板の前面の水を仮締切して水替えを行い,次いで,足場
を形成して化粧用コンクリート打ち込み用の型枠を組ん
でこれにコンクリートを打ち,その後に型枠,足場,仮
締切を解体するのである。また,笠コンクリートの形成
にしても,矢板の表裏面に支保工と呼ばれるステー材を
架設し,その上に型枠を組んでコンクリートを打った
後,これらを解体することになる。このため,実開昭62
−089324号公報に見られるように,矢板の前面を化粧板
で覆い隠すことも行われているが,その取付けは一々ボ
ルトで締め付けたりと非常に煩雑であった。
For example, in the case of applying makeup to a sheet pile, first, the water in front of the sheet pile is temporarily cut off to change the water, and then a scaffold is formed to assemble a formwork for placing concrete for makeup, and concrete is added to this. Hitting, then dismantling the formwork, scaffolding, and temporary deadline. In addition, even when forming shade concrete, stay materials called shorings are erected on the front and back surfaces of the sheet pile, a formwork is assembled on the stay material, and concrete is struck, and then these are dismantled. For this reason,
As can be seen in Japanese Patent Publication No. 089324, the front surface of the sheet pile is covered with a decorative plate, but its mounting was very complicated by tightening bolts one by one.

この考案は,このような課題を解決するものであって,
その目的とする処は,矢板の前面に吊り掛けると,矢板
を覆い隠す(化粧を施す)と同時に,笠コンクリート打
込み用の空間を確保できる矢板の化粧用コンクリートブ
ロックを具現するにある。
This invention is to solve such a problem,
The purpose is to embody a decorative concrete block for sheet pile that can be hung on the front of the sheet pile to cover up the sheet pile (apply makeup) and at the same time secure a space for driving the shade concrete.

〔課題を解決するための手段〕[Means for Solving the Problems]

以上の課題の下,この考案は,裏面にハンガーを取り付
け,ハンガーで矢板の前面に吊り掛ける矢板の化粧用コ
ンクリートブロックであって,この化粧用コンクリート
ブロックの裏面を,薄肉の上部裏面と,ほぼ水平な裏面
段部を経て厚肉の下部裏面とに形成し,上部裏面の頂面
と裏面段部との間に矢板の頂面が位置するようにハンガ
ーで矢板に吊り掛けるとともに,矢板の後方に矢板の頂
面よりも高い頂面を有する型枠を立て,上部裏面,裏面
段部及び型枠とで矢板の前面,上方及び背面に笠コンク
リート打込み用の空間を確保してなる矢板の化粧用コン
クリートブロックを提供するものである。
Under the above problems, the present invention is a decorative concrete block for a sheet pile that attaches a hanger to the back surface and hangs it on the front surface of the sheet pile with the hanger. It is formed on the thick lower backside through the horizontal backside step, and is hung on the sheet pile with a hanger so that the top surface of the upper backside is located between the top surface of the upper backside and the backside step portion, and at the rear of the sheet pile. The makeup of the sheet pile, which has a top surface higher than the top surface of the sheet pile, is erected, and the upper back surface, the back step and the frame provide space for driving concrete into the front, upper and back surfaces of the sheet pile. It provides concrete blocks for use.

〔作用〕[Action]

以上の手段をとることにより,まず,この化粧用コンク
リートブロックを矢板に吊り掛ければ,矢板の前面を覆
い隠してこれを化粧し,次いで,頂部付近に矢板を取り
囲むようにけいせいされた空間にコンクリートを打て
ば,そのまま笠コンクリートを造成することができる。
したがって,矢板に対して笠コンクリートと化粧ブロッ
クとを同時に施工することができる。もちろん,この
後,解体作業等は必要としない。
By taking the above means, first, if this decorative concrete block is hung on a sheet pile, the front face of the sheet pile is covered and the makeup is applied, and then the space near the top is surrounded by the sheet pile. By hitting concrete, it is possible to create shade concrete as it is.
Therefore, the cap concrete and the decorative block can be simultaneously applied to the sheet pile. Of course, after this, dismantling work is not required.

〔実施例〕〔Example〕

以下,この考案の実施例を図面に参照して説明する。 An embodiment of the present invention will be described below with reference to the drawings.

第1図はこの考案に係る化粧用コンクリートブロックの
斜視図,第2図はこの化粧用コンクリートブロックを用
いて矢板を化粧したときの断面図であるが,この化粧用
コンクリートブロック(以下,単にブロックという)1
は真直な表面1aに対して上部裏面1bと下部裏面1cとが裏
面段部1dによって階段状に張り出す形状をしているもの
である(上部裏面1b側が薄肉,下部裏面1c側が厚肉)。
そして,この表面1aにはできるだけ自然風の化粧が施さ
れる。化粧例として,ここでは,自然石を適当に張り付
けたように見える凹凸を付けたものを示した。なお,こ
の凹凸は自然石から型を取ったFRP型枠や自然石風ウレ
タン型枠を使用すれば,容易に形成できる。
FIG. 1 is a perspective view of a makeup concrete block according to the present invention, and FIG. 2 is a cross-sectional view when a sheet pile is applied using this makeup concrete block. 1)
Has a shape in which an upper back surface 1b and a lower back surface 1c project in a stepwise manner with respect to a straight surface 1a by a back surface step portion 1d (the upper back surface 1b side is thin, and the lower back surface 1c side is thick).
Then, the surface 1a is applied with natural makeup as much as possible. As a makeup example, here is shown an uneven surface that looks like a natural stone is properly attached. Note that this unevenness can be easily formed by using an FRP form made from natural stone or a natural stone-like urethane form.

次に,地中に打ち込まれた矢板2の頂部をコ字形に覆う
適当な幅の金属製のハンガー3を通常複数個用意し,こ
のハンガー3を裏面段部1dの上面にボルト4等で固定す
る。なお,ハンガー3の上面と背面には矢板2に対して
位置調整をするための調整ボルト5を螺合しておく。こ
の他,下部裏面1cの表面下部には幅一杯にスポンジ等の
当材6を貼着しておくとともに,上部裏面1bの両側面等
に隣り合うブロック1同士を結合するための連結金具7
を設けておく。
Next, usually prepare a plurality of metal hangers 3 of appropriate width to cover the top of the sheet pile 2 driven into the ground in a U shape, and fix the hangers 3 to the upper surface of the back step 1d with bolts 4 or the like. To do. An adjustment bolt 5 for adjusting the position of the sheet pile 2 is screwed on the upper surface and the back surface of the hanger 3. In addition to this, a sponge or similar material 6 is adhered to the lower surface of the lower back surface 1c to the full width, and a connecting metal fitting 7 for joining adjacent blocks 1 to both side surfaces of the upper back surface 1b.
Is provided.

以上のブロック1を施工する場合について説明すると,
このブロック1を地中に埋設された矢板2の上にクレー
ン等で吊って降ろす。すると,ハンガー3が矢板2の頂
部に覆い被さるから,このとき,調整ボルト5等を調整
して下部裏面1c等が矢板2に平行になるようにセットす
る。なお,このとき,上部裏面1bと裏面段部1dとの間に
矢板2の頂面が位置するようにハンガー2の高さ等を調
整しておく。また,ブロック1の高さや横の通りをでき
るだけ合わせる必要があるから,下部裏面1cと矢板2の
接合面に前記した当材6を介在させて厚み変化を吸収す
るとともに,間に適宜くさび8等を入れて調整する。も
ちろん,調整ボルト5の調整により,隣接するブロック
1同士の高さおよび出入りも調整できる。このようにし
てブロック1の位置がセットできたなら,連結金具7に
ボルト(図示省略)を通して固定し,これが適当な範囲
で完了したなら,上部裏面1bと矢板2の間にコンクリー
トを打ち込む(ただし,矢板2の後方適当位置に頂面が
矢板2の頂面よりも高い型枠9を立てておく)。コンク
リートはブロック1の上部裏面1b,裏面段部1dおよび型
枠9とで形成された空間10に流れ込み,これによって笠
コンクリート11が造成できるとともに,下部裏面1cと矢
板2前面の間にも流れ込み,ブロック1と矢板2とを一
体化する。したがって,ブロック1や矢板2等で形成さ
れる前記した空間10は笠コンクリート11打込み用の型空
間ともなるものである。なお,このとき,前記した当材
6の存在は笠コンクリート11となるコンクリートを打ち
込んだときにこのコンクリートが下に漏落するのを防ぐ
効果がある。したがって,この場合,当材6の上面を矢
板2で仕切る水面よりも高い位置に設定しておけば,コ
ンクリートが水に触れないで止まるから(いわゆる,水
中コンクリートとならない),固乾性に優れる。
Explaining the case of constructing the above block 1,
The block 1 is hung by a crane or the like on the sheet pile 2 buried in the ground and lowered. Then, the hanger 3 covers the top of the sheet pile 2. At this time, the adjustment bolts 5 and the like are adjusted so that the lower back surface 1c and the like are set parallel to the sheet pile 2. At this time, the height or the like of the hanger 2 is adjusted so that the top surface of the sheet pile 2 is located between the upper back surface 1b and the back surface step portion 1d. In addition, since it is necessary to match the height and the horizontal passage of the block 1 as much as possible, the above-mentioned material 6 is interposed at the joint surface between the lower back surface 1c and the sheet pile 2 to absorb the thickness change, and a wedge 8 or the like can be appropriately provided between them. And adjust. Of course, by adjusting the adjusting bolt 5, the height and the entrance / exit of the adjacent blocks 1 can be adjusted. If the position of the block 1 can be set in this way, fix it with bolts (not shown) to the connecting metal fitting 7, and if this is completed within an appropriate range, drive concrete between the upper back surface 1b and the sheet pile 2 (however, , A formwork 9 whose top surface is higher than the top surface of the sheet pile 2 is set up at an appropriate position behind the sheet pile 2). The concrete flows into the space 10 formed by the upper back surface 1b of the block 1, the back step 1d and the formwork 9, whereby the shade concrete 11 can be created, and also flows between the lower back surface 1c and the front of the sheet pile 2, The block 1 and the sheet pile 2 are integrated. Therefore, the space 10 formed by the block 1, the sheet pile 2 and the like also serves as a mold space for driving the shade concrete 11. At this time, the presence of the above-mentioned material 6 has an effect of preventing the concrete from leaking down when the concrete to be the shade concrete 11 is driven. Therefore, in this case, if the upper surface of the material 6 is set at a position higher than the water surface partitioned by the sheet pile 2, the concrete stops without touching the water (so-called underwater concrete does not exist), and the solid-dry property is excellent.

第3図はブロック1の他の実施例を示す側面図である
が,本例のものは表面1aの下方ほどその厚みを厚くした
ものであり,こうすることにより,どっしりとした安定
感を与える。第4図も他の実施例を示す平面図である
が,これは平面視噛合って凹凸状に埋設される鋼製(コ
ンクリート製もあるが)の矢板2に使用するものであ
り,下部裏面1cの表面を矢板2の凹凸形状に合わせたも
のである。
FIG. 3 is a side view showing another embodiment of the block 1. In this embodiment, the thickness is made thicker toward the lower part of the surface 1a, and by doing so, a solid and stable feeling is given. . FIG. 4 is also a plan view showing another embodiment, which is used for a steel sheet pile 2 (which may be made of concrete) which is meshed with each other in plan view and buried in an uneven shape. The surface of 1c is matched with the uneven shape of the sheet pile 2.

なお,以上は,矢板にこれから化粧や笠コンクリートを
施す場合についてのものであるが,このブロックは既設
の矢板(笠コンクリートも既に造成してある)に対して
も,その前面に添わせてアンカーボルト等で縫い付ける
ことができるから,特に,既設のものに自然石風の化粧
を施したい場合にはこの方法をとれば良い。
The above is the case of applying makeup or shade concrete to the sheet pile, but this block is also attached to the front of the existing sheet pile (the shade concrete has already been constructed) along with the anchor. Since it can be sewn with bolts, etc., this method should be used especially when it is desired to apply natural stone-like makeup to existing ones.

〔考案の効果〕[Effect of device]

以上,この考案は前記したものであるから,次のような
効果が期待できる。
As described above, since the present invention has been described above, the following effects can be expected.

i)種々に化粧したブロックで矢板の前面を覆い隠すも
のであるから,矢板の単調な表面を露出させず,これに
アクセントをつけて景観に優れる。特に,自然石風の化
粧を施したブロックを使用すれば,周りの環境とマッチ
する。
i) Since the front of the sheet pile is covered with variously decorated blocks, the monotonous surface of the sheet pile is not exposed and an accent is added to it to provide a great view. In particular, if you use a block with natural stone-like makeup, it matches the surrounding environment.

ii)このブロックを矢板に吊り掛ければ,矢板の化粧材
となるとともに,同時にブロックを矢板に固定するため
の笠コンクリート打込み用の空間を確保するための型枠
をも兼ねる。
ii) If this block is hung on a sheet pile, it becomes a decorative material for the sheet pile, and at the same time, it also serves as a formwork for securing a space for driving concrete into the sheet pile to fix the block to the sheet pile.

iii)このブロックの施工は,工場生産されたブロック
を現場に搬入して矢板に引っ掛けてコンクリートを打ち
込むだけでよいのであるから,従来の仮締切,型枠組
立,解体等に比べて造成コストが安く,工期も短い。ま
た,このとき,ブロックの装着と笠コンクリートの造成
が同時にできるから,この面からのコスト安も期待でき
る。
iii) The construction of this block requires only bringing the block produced in the factory to the site, hooking it on the sheet pile, and driving in concrete, so the construction cost is lower than the conventional temporary deadline, formwork assembly, dismantling, etc. It is cheap and the construction period is short. At this time, the block can be attached and the shade concrete can be created at the same time, which can be expected to reduce costs.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの考案に係る化粧用コンクリートブロックの
斜視図,第2図は使用状態を示す断面図,第3図は化粧
用コンクリートブロックの他の実施例の側面図,第4図
は同じく平面図である。 (符号) 1…化粧用コンクリートブロック 1b… 〃の上部裏面 1c… 〃の下部裏面 1d… 〃の裏面段部 2…矢板 3…ハンガー 9…型枠 10…空間 11…笠コンクリート
FIG. 1 is a perspective view of a makeup concrete block according to the present invention, FIG. 2 is a cross-sectional view showing a usage state, FIG. 3 is a side view of another embodiment of the makeup concrete block, and FIG. It is a figure. (Code) 1… Concrete block for makeup 1b… Upper back surface of 〃 1c… Lower back surface of 〃 1d… Back surface of 〃 Step 2… Sheet board 3… Hanger 9… Form 10… Space 11… Kasa concrete

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】裏面にハンガー(3)を取り付け,ハンガ
ー(3)で矢板(2)の前面に吊り掛ける矢板の化粧用
コンクリートブロック(1)であって,この化粧用コン
クリートブロック(1)の裏面を,薄肉の上部裏面(1
b)と、ほぼ水平な裏面段部(1d)を経て厚肉の下部裏
面(1c)とに形成し,上部裏面(1b)の頂面と裏面段部
(1d)との間に矢板(2)の頂面が位置するようにハン
ガー(3)で矢板(2)に吊り掛けるとともに,矢板
(2)の後方に矢板(2)の頂面よりも高い頂面を有す
る型枠(9)を立て,上部裏面(1b),裏面段部(1d)
及び型枠(9)とで矢板(2)の前面,上方及び背面に
笠コンクリート(11)打込み用の空間(10)を確保して
なる矢板の化粧用コンクリートブロック。
1. A decorative concrete block (1) for a sheet pile, wherein a hanger (3) is attached to the back surface and the hanger (3) hangs it on the front surface of the sheet pile (2). The back side is the thin top side (1
b) and a thick lower back surface (1c) through a substantially horizontal back surface step (1d), and a sheet pile (2) between the top surface of the upper back surface (1b) and the back surface step (1d). ) Is hung on the sheet pile (2) with the hanger (3) so that the top surface of the sheet pile is located, and a formwork (9) having a top surface higher than the top surface of the sheet pile (2) is placed behind the sheet pile (2). Stand, upper back (1b), back step (1d)
A decorative concrete block for a sheet pile, which secures a space (10) for driving a shade concrete (11) on the front, upper and back sides of the sheet pile (2) with a formwork (9).
JP1990070923U 1990-07-02 1990-07-02 Concrete concrete block for sheet pile Expired - Lifetime JPH0724417Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1990070923U JPH0724417Y2 (en) 1990-07-02 1990-07-02 Concrete concrete block for sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1990070923U JPH0724417Y2 (en) 1990-07-02 1990-07-02 Concrete concrete block for sheet pile

Publications (2)

Publication Number Publication Date
JPH0430127U JPH0430127U (en) 1992-03-11
JPH0724417Y2 true JPH0724417Y2 (en) 1995-06-05

Family

ID=31607508

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1990070923U Expired - Lifetime JPH0724417Y2 (en) 1990-07-02 1990-07-02 Concrete concrete block for sheet pile

Country Status (1)

Country Link
JP (1) JPH0724417Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5889102B2 (en) * 2012-05-21 2016-03-22 鹿島建設株式会社 Tide structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0342109Y2 (en) * 1985-11-27 1991-09-04
JPH06980B2 (en) * 1988-09-28 1994-01-05 錦工業株式会社 How to place steel sheet pile concrete

Also Published As

Publication number Publication date
JPH0430127U (en) 1992-03-11

Similar Documents

Publication Publication Date Title
US3216163A (en) Integrated building framing and floor therefor
US5234654A (en) Concrete forming system
US4548005A (en) Structural foam swimming pool wall and brace and method of erecting same
JPH0724417Y2 (en) Concrete concrete block for sheet pile
JP3682588B2 (en) Building member connection structure of H-shaped steel continuous foundation beam
CA1258777A (en) Foundation arrangement
KR20060106159A (en) The engineering-works structure using composite pile and steel sheet pile, and it's construction method
JPS609178B2 (en) How to install garden or boundary wall panels
JPH11159030A (en) Skeleton wall and retaining wall construction method and material
DE10348077A1 (en) Road or rail construction method, by driving sheet piles or infill supports into ground, placing support structure on top and excavating soil underneath
JPH08144293A (en) Continuous foundation
JP3054557B2 (en) Concrete blocks and retaining walls
CN109371984A (en) A kind of bracing of deep foundation pit and its construction technology that pin-connected panel is recyclable
JPH032422A (en) Construction of foundation sill
JP2004239036A (en) Fence building method by foamed synthetic resin plate
JP2802284B2 (en) Non-demoldable concrete foundation for buildings, etc.
JP2892972B2 (en) How to install a residential entrance
JP4629203B2 (en) Gate
JP2002047660A (en) Foundation execution method for house or the like and foundation form panel
JPH09507887A (en) Prefabricated masonry fence system
JP3002657B2 (en) Retaining wall fixing device
JPH05239835A (en) Independent foundation with form
JPH11107302A (en) Square block type for-cum-front decoration plate for earth-retaining wall integrally assembled with concrete body
JPH0754348Y2 (en) Combination basic block and combination basic
JP3079421B2 (en) Construction method of L-shaped retaining wall and prefabricated wall element used therefor