JPH0721617Y2 - Concrete block for foundation work - Google Patents
Concrete block for foundation workInfo
- Publication number
- JPH0721617Y2 JPH0721617Y2 JP6338990U JP6338990U JPH0721617Y2 JP H0721617 Y2 JPH0721617 Y2 JP H0721617Y2 JP 6338990 U JP6338990 U JP 6338990U JP 6338990 U JP6338990 U JP 6338990U JP H0721617 Y2 JPH0721617 Y2 JP H0721617Y2
- Authority
- JP
- Japan
- Prior art keywords
- concrete block
- side walls
- foundation work
- pair
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Revetment (AREA)
Description
【考案の詳細な説明】 (産業上の利用分野) 本考案は護岸工事に使用する基礎工用コンクリートブロ
ックに関し、詳細には外圧等に対する耐久性に優れ、か
つ上方より荷重がかかっても地面下に沈下し難い等の効
果を奏する基礎工用コンクリートブロックに関する。[Detailed Description of the Invention] (Industrial field of application) The present invention relates to a concrete block for foundation work used in revetment work, more specifically, it has excellent durability against external pressure, etc. The present invention relates to a concrete block for foundation work that has effects such as difficulty in sinking.
ここで、基礎工とは、河川等の堤の斜面上を保護するコ
ンクリート張等を、斜面下部にて支持する支持体のこと
をいう。Here, the foundation work means a support body that supports concrete upholstery for protecting the slope of a bank such as a river at the bottom of the slope.
(従来の技術) 従来より護岸工事に使用する基礎工は、施工現場におい
て木製の型枠を組立て、この型枠にセメントを流し込む
ことによって施工されていた。(Prior Art) Conventionally, a foundation work used for revetment work was constructed by assembling a wooden formwork at a construction site and pouring cement into the formwork.
ところが、この場合だと、現場においていちいち木製の
型枠を施工しなければならないので工期が長く成り、そ
の分人件費も高くつくということと、木製の型枠を使用
するので施工中に雨水等により冠水すると型枠が浮上
し、位置ずれ等が生じ易いという欠点があった。However, in this case, since it is necessary to construct wooden formwork one by one at the site, the construction period becomes long and the labor cost is high accordingly, and because wooden formwork is used, rainwater etc. Therefore, when submerged by water, the form frame floats up, and there is a drawback in that misalignment is likely to occur.
そこで上記欠点に鑑み、木製の型枠を使用せず、セメン
トを注入する注入口を有する断面が略U字状のコンクリ
ートブロックを使用したものが提案された。In view of the above drawbacks, it has been proposed to use a concrete block having a substantially U-shaped cross section having an injection port for injecting cement, without using a wooden form.
(考案が解決しようとする課題) しかしながら、上記のコンクリートブロックを使用した
従来のものは、木製の型枠を使用した場合に生じる欠点
は解消されるものの、以下の欠点があった。(Problems to be Solved by the Invention) However, the conventional one using the above concrete block has the following drawbacks although the drawbacks caused when a wooden form is used can be solved.
つまり、注入口よりセメントを注入するときに隣接され
た複数のコンクリートブロックの位置がずれたり、外圧
により側壁が折れたりし易く、さらには水圧やコンクリ
ート張等による上方からの荷重及びコンクリートブロッ
ク自身の自重により同コンクリートブロックが地面下に
沈下し易いという欠点があった。That is, when pouring cement from the pouring port, the positions of a plurality of adjacent concrete blocks are displaced or the side walls are easily broken due to external pressure, and the load from above due to water pressure or concrete tension and the concrete block itself. The concrete block had the drawback that it could easily sink below the ground due to its own weight.
そこで案出されたのが本考案であり、その目的とすると
ころは、外圧に対する耐久性に優れると共に、セメント
を注入するときに隣接された基礎工用コンクリートブロ
ック同志の位置がずれずに確実な施工ができ、また同コ
ンクリートブロックが地面下に沈下し難い同コンクリー
トブロックを提供することにある。The present invention was devised there, and its purpose is to have excellent durability against external pressure and to ensure that the positions of adjacent concrete blocks for foundation work do not shift when cement is injected. It is to provide a concrete block that can be constructed and that does not easily sink below the ground.
(課題を解決するための手段) 上記の目的を達成するために本考案の採った手段につい
て、実施例に対応する図面に用いた符号を付して以下に
説明する。(Means for Solving the Problems) Means adopted by the present invention for achieving the above object will be described below with reference numerals used in the drawings corresponding to the embodiments.
つまり、請求項1に係る基礎工用コンクリートブロック
の構成は、 「一対の側壁と、上壁とが略U字状に一体的に形成され
て成り、前記側壁の先端を地面上に当接させて護岸工事
に使用する基礎工用コンクリートブロックにおいて、 前記上壁面上に設けられたセメントを注入する注入口
(10)と、前記上壁の長手方向の両端面に設けられ、前
記注入口(10)に貫通すると共に締付具(21)が挿通さ
れる締付孔(20)と、前記一対の側壁の中央付近に設け
られた支持棒(31)が挿通される支持孔(30)と、前記
一対の側壁の長手方向の両端部に設けられた止具(41)
が挿通される連結孔(40)とを備えたことを特徴とする
基礎工用コンクリート(100)」 を内容とする。That is, the structure of the concrete block for foundation work according to claim 1 is that "a pair of side walls and an upper wall are integrally formed in a substantially U shape, and the tips of the side walls are brought into contact with the ground. In a concrete block for foundation work used for revetment construction, an injection port (10) is provided on the upper wall for injecting cement, and the injection port (10) is provided on both end faces in the longitudinal direction of the upper wall. ) And a tightening hole (20) through which the tightening tool (21) is inserted, and a support hole (30) through which a support rod (31) provided near the center of the pair of side walls is inserted, Stoppers (41) provided at both ends of the pair of side walls in the longitudinal direction.
The concrete for a foundation work (100) characterized by having a connecting hole (40) through which the
次に、請求項2に係る基礎工用コンクリートブロックの
構成は、 「一対の側壁と、上壁とが略U字状に一体的に形成され
て成り、前記側壁の先端を地面上に当接させて護岸工事
に使用する基礎工用コンクリートブロックにおいて、 前記上壁面上に設けられたセメントを注入する注入口
(10)と、前記上壁の長手方向の両端面に設けられ、前
記注入口(10)に貫通すると共に締付具(21)が挿通さ
れる締付孔(20)と、前記一対の側壁の中央付近に設け
られた支持棒(31)が挿通される支持孔(30)と、前記
一対の側壁の長手方向の両端部に設けられた止具(41)
が挿通される連結孔(40)とを備え、 前記一対の側壁の先端は、該側壁の外側に突出する突出
部(50)を有することを特徴とする基礎工用コンクリー
トブロック(100)」 を内容とする。Next, the structure of the concrete block for foundation work according to claim 2 is that "a pair of side walls and an upper wall are integrally formed in a substantially U shape, and the tips of the side walls are in contact with the ground. In the concrete block for foundation work to be used for revetment construction, an injection port (10) for injecting cement provided on the upper wall surface, and an injection port (10) provided on both end faces in the longitudinal direction of the upper wall. A tightening hole (20) which penetrates through (10) and through which a tightening tool (21) is inserted; and a support hole (30) through which a supporting rod (31) provided near the center of the pair of side walls is inserted. Stoppers (41) provided at both ends of the pair of side walls in the longitudinal direction.
And a connecting hole (40) through which the side walls are inserted, and the tip ends of the pair of side walls have a protrusion (50) protruding outside of the side walls. The content.
(考案の作用) そして、上記の手段により請求項1に係る基礎工用コン
クリートブロックについては、第2図及び第3図に示す
如く、現場において施工するときに、基礎工用コンクリ
ートブロック(100)同志を複数隣接させて設置し、同
コンクリートブロック(100)の上壁の締付孔(20)に
挿通した締付具(21)により同コンクリートブロック
(100)同志を隙間がないように締付けて連結する。(Advantage of the Invention) With regard to the concrete block for foundation work according to claim 1 by the above means, as shown in FIG. 2 and FIG. A plurality of comrades are installed adjacent to each other, and the concrete block (100) is clamped with a fastener (21) that is inserted into a tightening hole (20) in the upper wall of the concrete block (100) so that there is no gap. Link.
そして、一対の側壁の支持孔(30)に支持棒(31)を挿
通し、該側壁を支持することにより外圧に対する側壁の
耐久性を向上させる。Then, the support rod (31) is inserted through the support holes (30) of the pair of side walls to support the side walls, thereby improving the durability of the side walls against external pressure.
また側壁の長手方向の両端部の連結孔(40)に止具(4
1)を挿通して、前記コンクリートブロック(100)同志
を連結させて係止し、注入口(10)よりセメントを注入
したときの同コンクリートブロック(100)の位置ずれ
を防止する。Also, attach the stoppers (4) to the connecting holes (40)
(1) is inserted and the concrete blocks (100) are connected to each other and locked to prevent displacement of the concrete blocks (100) when cement is injected from the injection port (10).
さらには、第7図に示す如く、一対の側壁の間の地面上
に、頭部を地上に残すように杭が打設されていれば、上
壁の注入口(10)から注入したセメントと、この杭の頭
部とが一体的に固化し、前記コンクリートブロック(10
0)の自重や、水圧及び上方からの荷重による地面下へ
の沈下を抑制する。Furthermore, as shown in FIG. 7, if a pile is placed on the ground between the pair of side walls so as to leave the head on the ground, the cement injected from the injection port (10) on the upper wall , The head of this pile is solidified together and the concrete block (10
It suppresses subsidence due to its own weight, water pressure and load from above.
(実施例) 以下図面について、請求項1及び2に係る本考案の実施
例を詳細に説明するが、これは代表的なものを示したも
のであり、本実施例によって本考案が限定されるもので
はない。(Embodiment) An embodiment of the present invention according to claims 1 and 2 will be described in detail with reference to the drawings. However, this is a representative one, and the present invention is limited by this embodiment. Not a thing.
つまり、第1図〜第4図に示す如く、基礎工用コンクリ
ートブロック(100)は、長手方向の長さ1000mm、高さ1
000mm、幅1060mm、肉厚100mm、側壁の先端の突出部(5
0)の長さ30mmのコンクリートブロック(100)により構
成してある。That is, as shown in FIGS. 1 to 4, the concrete block for foundation work (100) has a longitudinal length of 1000 mm and a height of 1 mm.
000mm, width 1060mm, wall thickness 100mm, side wall protrusion (5
It is composed of a concrete block (100) with a length of 0) of 30 mm.
そして上壁の注入口(10)は、長手方向の長さ700mm、
幅350mmに形成してあり、この注入口(10)からセメン
トを注入するようにしてある。And the inlet (10) on the top wall is 700 mm long in the longitudinal direction,
It is formed with a width of 350 mm, and cement is injected from this injection port (10).
次に長手方向の両端面の締付孔(20)は、直径15mmに形
成してあり、この締付孔(20)に挿通して前記コンクリ
ートブロック(100)同志を締付ける締付具(21)に
は、ボルト及びこれに係合するナットを採用してある。Next, the tightening holes (20) on both end faces in the longitudinal direction are formed to have a diameter of 15 mm, and the tightening tool (21) is inserted through the tightening holes (20) to tighten the concrete block (100). A bolt and a nut that engages with the bolt are adopted for the.
次に一対の側壁の中央付近に設けた支持孔(30)は、直
径20mmに形成してあり、この支持孔(30)に挿通して側
壁を支持する支持棒(31)には、ターンバックルを採用
してある。Next, a supporting hole (30) provided near the center of the pair of side walls is formed with a diameter of 20 mm, and a turnbuckle is provided on the supporting rod (31) which is inserted through the supporting hole (30) to support the side wall. Has been adopted.
次に側壁の長手方向の両端部に設けた連結孔(40)は、
直径10mmに形成してあり、この連結孔(40)に挿通して
前記コンクリートブロック(100)同志を連結した状態
で係止する止具(41)には、ボルト及びこれに係合する
ナットと、平板(42)を採用してある。Next, the connecting holes (40) provided at both ends of the side wall in the longitudinal direction are
The stopper (41), which is formed to have a diameter of 10 mm, is inserted into the connecting hole (40) and is locked in a state where the concrete blocks (100) are connected to each other, includes a bolt and a nut engaging with the bolt. , A flat plate (42) is used.
なお、上記の実施例において、 基礎工用コンクリートブロック(100)は、長手方向100
0mm、高さ1000mm、幅1060mmの大きさにしてあるが、こ
れ以外の大きさであっても良く、例えば、施工現場が広
大な場合等は長手方向の長さ2000mmのものを採用する
と、同コンクリートブロック(100)の設置に要する時
間が短縮できるので都合が良い。In the above example, the concrete block for foundation work (100) has a longitudinal direction of 100.
The size is 0 mm, height 1000 mm, width 1060 mm, but other sizes are also possible, for example, if the construction site is vast, if a length of 2000 mm is adopted, This is convenient because the time required to install the concrete block (100) can be shortened.
次に側壁の先端の突出部(50)の長さを30mmにしてある
が、これ以外であっても良く、前記コンクリートブロッ
ク(100)の地面下への沈下を有効的に抑制できるよう
に地面の状態に応じて任意に選択すればよい。Next, the length of the protrusion (50) at the tip of the side wall is set to 30 mm, but it may be other than this, so that the subsidence of the concrete block (100) can be effectively suppressed. It may be arbitrarily selected according to the state of.
次に上壁の注入口(10)は、長手方向の長さ700mm、幅3
50mmの大きさにしてあるが、これ以外であっても良く、
前記コンクリートブロック(100)の大きさに応じて選
択しても良い。Next, the inlet (10) on the top wall has a length of 700 mm and a width of 3
The size is 50mm, but other sizes may be used.
It may be selected according to the size of the concrete block (100).
次に締付孔(20)の直径は15mmにしてあるが、これ以外
であっても良く、ここに挿通する締付具(21)の大きさ
に応じて選択しても良い。また締付孔(20)の形状も締
付具(21)が挿通し得る形状なら円形以外に何であって
も良い。Next, the diameter of the tightening hole (20) is set to 15 mm, but it may be other than this and may be selected according to the size of the tightening tool (21) to be inserted therethrough. Further, the shape of the tightening hole (20) may be any shape other than circular as long as the tightening tool (21) can be inserted therethrough.
次に締付具(21)にはボルト及びこれに係合するナット
を採用してあるが、締付孔(20)に挿通して前記コンク
リートブロック(100)同志を締付け得るものであれ
ば、それ以外であっても良い。Next, a bolt and a nut that engages with the bolt are used as the fastening tool (21), but if the concrete block (100) can be fastened by being inserted into the fastening hole (20), It may be other than that.
次に側壁の中央付近に設けた支持孔(30)の直径は20mm
にしてあるが、これ以外であっても良く、ここに挿通す
る支持棒(31)の大きさに応じて選択しても良い。また
支持孔(30)の形状も支持棒(31)が挿通し得る形状な
ら円形以外に何であっても良い。Next, the diameter of the support hole (30) near the center of the side wall is 20 mm.
However, other than this, it may be selected according to the size of the support rod (31) to be inserted there. Further, the support hole (30) may have any shape other than a circle as long as the support rod (31) can be inserted therethrough.
次に支持棒にはターンバックルを採用してあるが、一対
の側壁を支持し得るものならこれ以外であっても良い。Next, a turnbuckle is adopted as the support rod, but any other one can be used as long as it can support the pair of side walls.
次に側壁の長手方向の両端部に設けた連結孔(40)の直
径は、10mmにしてあるが、これ以外であっても良く、こ
こに挿通する止具(41)の大きさに応じて選択しても良
い。また連結孔(40)の形状も止具(41)が挿通し得る
形状なら円形以外に何であっても良い。Next, the diameter of the connecting holes (40) provided at both ends in the longitudinal direction of the side wall is set to 10 mm, but it may be other than this, depending on the size of the stopper (41) to be inserted there. You may choose. Further, the shape of the connecting hole (40) may be any shape other than circular as long as the stopper (41) can be inserted therethrough.
次に止具(41)にはボルト及びこれに係合するナット
と、平板(42)を採用してあるが、連結孔(40)に挿通
して前記コンクリートブロック(100)同志を連結させ
て係止し得るものであれば、これ以外であっても良く、
例えばボルトの替りにリベットを採用し、このリベット
をかしめて前記コンクリートブロック(100)同志を連
結させれば良い。Next, a bolt and a nut that engages with this, and a flat plate (42) are used for the stopper (41), but they are inserted into the connecting hole (40) to connect the concrete blocks (100) to each other. Other than this, as long as it can be locked,
For example, a rivet may be used instead of the bolt, and the rivet may be caulked to connect the concrete blocks (100) to each other.
また第5図及び第6図に示す如く、側壁の長手方向の両
端面に切欠き(43)を設けたものを採用し、前記コンク
リートブロック(100)同志を連結させたときに連結孔
(40)を形成するようにして、この連結孔(40)に止具
(42)を挿通しても良い。この場合だと連結孔(40)が
1個で済むので挿通させる止具(42)も1個で済み、従
ってその分コスト的に有利である。Further, as shown in FIGS. 5 and 6, the side wall is provided with notches (43) on both end faces in the longitudinal direction, and when the concrete blocks (100) are connected to each other, the connection holes (40 ) May be formed, the stopper (42) may be inserted into the connecting hole (40). In this case, since only one connecting hole (40) is required, only one stopper (42) can be inserted, which is advantageous in terms of cost.
このようにして得られた本実施例に係る基礎工用コンク
リートブロック(100)を、第7図に示す如く、河川の
護岸工事に採用したところ、木製の型枠を採用する従来
のものと較べて工期が半分以下で済み、迅速な施工がで
きたばかりでなく、施工費用も安くあげることができ
た。また前記コンクリートブロックの地面下への沈下は
殆どなかった。The concrete block for foundation work (100) according to this example obtained in this way was adopted for revetment work on a river as shown in FIG. 7, and compared with a conventional one using a wooden formwork. The construction period was less than half, and not only was the construction done quickly, but the construction cost was also reduced. Further, there was almost no subsidence of the concrete block below the ground.
(考案の効果) 以上説明した通り、請求項1又は2に係る本考案による
と、以下の効果を奏する。(Effects of the Invention) As described above, the present invention according to claim 1 or 2 has the following effects.
まず請求項に1に係る基礎工用コンクリートブロック
は、 上壁の長手方向の両端面に締付孔を有し、この締付
孔に挿通する締付具により隣接した同コンクリートブロ
ック同志を締付けることができるので隙間がなく、従っ
て注入口よりセメントを注入したときもこのセメントが
漏れたりせず、確実な施工ができる。First, the concrete block for foundation work according to claim 1 has tightening holes on both end surfaces of the upper wall in the longitudinal direction, and the adjacent concrete block blocks should be tightened by fasteners inserted into the tightening holes. Since there is no gap, therefore, even when cement is injected from the injection port, this cement does not leak and reliable construction is possible.
一対の側壁の中央付近に支持孔を有し、この支持孔
に挿通する支持棒により側壁を支持し、コンクリート張
の荷重、水圧その他外圧に対する耐久性が向上している
ので使用年数を長くすることができる。A pair of side walls has a support hole near the center, and the side walls are supported by a support rod that is inserted into the support holes.The durability against concrete load, water pressure and other external pressure is improved, so the service life should be extended. You can
側壁の長手方向の両端部に連結孔を有し、この連結
孔に挿通する止具により前記コンクリートブロック同志
を連結して係止させるので、同コンクリートブロック同
志の位置ずれが生じず、従って施工がし易いばかりでな
く確実な施工ができる。Since the concrete blocks have connecting holes at both end portions in the longitudinal direction of the side wall and the concrete blocks are connected and locked by the stoppers inserted through the connecting holes, the positional displacement of the concrete blocks does not occur. Not only is it easy to perform, but reliable construction is possible.
注入口によりセメントを注入し、地面上より打設し
た杭と一体的に固化し、同コンクリートブロックの地面
下への沈下を抑制する。Cement is injected through the inlet to solidify together with the piles placed from above the ground to prevent the concrete block from sinking below the ground.
施工現場において木製の型枠を組み立てる必要がな
いので迅速に施工ができ、工期が短くて済むと共に施工
費用が少なくて済む。Since it is not necessary to assemble a wooden formwork at the construction site, construction can be done quickly, and the construction period is short and construction costs are low.
次に請求項2に係る基礎工用コンクリートブロックは、 側壁の先端に同側壁の外部に突出部を有するので、請求
項1に係る基礎工用コンクリートブロックの効果に加
え、突出部により接地面積が大きく成り、従って同コン
クリートブロックの自重や、水圧、その他上方からの荷
重による地面下への沈下を抑制する。Next, since the concrete block for foundation work according to claim 2 has a projecting portion at the tip of the side wall outside the side wall, in addition to the effect of the concrete block for foundation work according to claim 1, the grounding area is increased by the projecting portion. Therefore, the concrete block is prevented from sinking below the ground due to its own weight, water pressure, and other loads from above.
第1図は本考案の実施例に係る基礎工用コンクリートブ
ロックの斜視図、第2図は同基礎工用コンクリートブロ
ックを複数隣接させて使用した状態を示す一部省略斜視
図、第3図は同平面図、第4図は同側面図、第5図は別
の実施例に係る基礎工用コンクリートブロックの一部省
略斜視図、第6図は同基礎工用コンクリートブロックを
隣接させた状態の一部省略正面図、第7図は本考案の実
施例に係る基礎工用コンクリートブロックを河川に使用
した状態を示す断面図である。 符号の説明 10…注入口、20…締付孔、30…支持孔、40…連結孔、50
…突出部、100…本考案の実施例に係る基礎工用コンク
リートブロック。FIG. 1 is a perspective view of a concrete block for foundation work according to an embodiment of the present invention, FIG. 2 is a partially omitted perspective view showing a state where a plurality of concrete blocks for foundation work are used adjacent to each other, and FIG. The same plan view, FIG. 4 is the same side view, FIG. 5 is a partially omitted perspective view of a concrete block for foundation work according to another embodiment, and FIG. 6 is a state in which the concrete blocks for foundation work are adjacent to each other. FIG. 7 is a partially omitted front view, and FIG. 7 is a cross-sectional view showing a state where a concrete block for foundation work according to an embodiment of the present invention is used in a river. Explanation of reference numerals 10 ... injection port, 20 ... tightening hole, 30 ... supporting hole, 40 ... connecting hole, 50
… Projection part, 100… Concrete block for foundation work according to the embodiment of the present invention.
Claims (2)
に形成されて成り、前記側壁の先端を地面上に当接させ
て護岸工事に使用する基礎工用コンクリートブロックに
おいて、 前記上壁面上に設けられたセメントを注入する注入口
と、前記上壁の長手方向の両端面に設けられ、前記注入
口に貫通すると共に締付具が挿通される締付孔と、前記
一対の側壁の中央付近に設けられた支持棒が挿通される
支持孔と、前記一対の側壁の長手方向の両端部に設けら
れた止具が挿通される連結孔とを備えたことを特徴とす
る基礎工用コンクリートブロック。1. A concrete block for foundation work, comprising a pair of side walls and an upper wall integrally formed in a substantially U shape, the tip of the side walls being in contact with the ground for use in revetment work. An injection port for injecting cement, which is provided on the upper wall surface, and a tightening hole which is provided on both end surfaces in the longitudinal direction of the upper wall and which penetrates the injection port and into which a fastener is inserted, A pair of side walls provided with a support hole through which a support rod is inserted, and a pair of side walls with connection holes through which stoppers are inserted, which are provided at both ends in the longitudinal direction. Concrete block for foundation work.
突出する突出部を有することを特徴とする請求項1記載
の基礎工用コンクリートブロック。2. The concrete block for foundation work according to claim 1, wherein the tip ends of the pair of side walls have a projecting portion projecting to the outside of the side walls.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6338990U JPH0721617Y2 (en) | 1990-06-14 | 1990-06-14 | Concrete block for foundation work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6338990U JPH0721617Y2 (en) | 1990-06-14 | 1990-06-14 | Concrete block for foundation work |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0422513U JPH0422513U (en) | 1992-02-25 |
JPH0721617Y2 true JPH0721617Y2 (en) | 1995-05-17 |
Family
ID=31593392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP6338990U Expired - Lifetime JPH0721617Y2 (en) | 1990-06-14 | 1990-06-14 | Concrete block for foundation work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0721617Y2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2538649Y2 (en) * | 1992-02-13 | 1997-06-18 | 建設省北陸地方建設局長 | Precast concrete block for anchoring |
CN107842028A (en) * | 2017-11-27 | 2018-03-27 | 佛山科学技术学院 | A kind of civil engineering slopes ruggedized construction |
-
1990
- 1990-06-14 JP JP6338990U patent/JPH0721617Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0422513U (en) | 1992-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100243401B1 (en) | A supporting structure for laying pipes under the ground | |
JPH0721617Y2 (en) | Concrete block for foundation work | |
KR100397768B1 (en) | Substructure construction device of green house | |
KR100609500B1 (en) | Apparatus for fixing temporary-mold, using iron-bar | |
JP2000199203A (en) | Expansion device of road bridge joint part and reinforcing structure of road bridge end | |
KR100656117B1 (en) | Support wood block for an incline plane | |
JP3061593B2 (en) | Concrete block connection method and connection metal fittings | |
KR200272166Y1 (en) | A connection equipment to expansion and contraction for bridge | |
JP4656460B2 (en) | Building reinforcement structure | |
JP2649218B2 (en) | Connection structure between building foundation and foundation and method of raising inclined building | |
KR100431835B1 (en) | Anchor for steel pier by using deformed bar | |
CN219886952U (en) | Be used for filling lid sealant device | |
CN214738246U (en) | Pile plate type anchor cable retaining wall | |
JPH0211476Y2 (en) | ||
JP2500752Y2 (en) | Box carbonate | |
JP3068789B2 (en) | PC foundation beam members | |
SU1133357A1 (en) | Unit for joining foundation with metal upright | |
JP3074326B2 (en) | Concrete member for corner of retaining wall | |
JPH0784745B2 (en) | Basic construction method for structures | |
WO2000012833A1 (en) | Hold down bolt anchor | |
JPH0223678Y2 (en) | ||
JPS6231445Y2 (en) | ||
JPH0514224U (en) | Steel plate concrete composite sheet pile | |
JPH11350451A (en) | Hybrid steel plate cell structure | |
CN118793162A (en) | Assembled concrete frame structure |