JP2649218B2 - Connection structure between building foundation and foundation and method of raising inclined building - Google Patents

Connection structure between building foundation and foundation and method of raising inclined building

Info

Publication number
JP2649218B2
JP2649218B2 JP7092395A JP7092395A JP2649218B2 JP 2649218 B2 JP2649218 B2 JP 2649218B2 JP 7092395 A JP7092395 A JP 7092395A JP 7092395 A JP7092395 A JP 7092395A JP 2649218 B2 JP2649218 B2 JP 2649218B2
Authority
JP
Japan
Prior art keywords
base
long
foundation
bolt
foundation concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7092395A
Other languages
Japanese (ja)
Other versions
JPH08239862A (en
Inventor
好健 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP7092395A priority Critical patent/JP2649218B2/en
Publication of JPH08239862A publication Critical patent/JPH08239862A/en
Application granted granted Critical
Publication of JP2649218B2 publication Critical patent/JP2649218B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建築物の基礎と土台と
の連結部構造及び傾斜した建築物の嵩上げ方法に関する
物である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for connecting a foundation and a foundation of a building and a method for raising a building which is inclined.

【0002】[0002]

【従来の技術】従来、木造建築物は、開放的な居住空間
を形成でき、移築、改造、解体が容易であり、施工がし
易く、また施工費も比較的に安価であるため、居住性に
優れた建物として多数設置されている。これらの木造建
築物は、基礎として地盤に基礎コンクリートを構築し、
この基礎コンクリートの上面に土台を設置し、この土台
に根太や柱等を連設しながら居住空間を形成している。
前記土台は、基礎に強固に緊結するために、図6に示す
様に、基礎コンクリート内に略3ないし4mの間隔でア
ンカーボルトを埋設し、基礎コンクリートの上面に突出
させたアンカーボルトを土台に設けた孔に貫通させて土
台の上面へ突出させ、アンカーボルトの上端部に座金を
嵌挿して螺合させた締着ナットを座金を介して土台上面
に締着させて土台を基礎コンクリートへ強固に固定して
いる。
2. Description of the Related Art Conventionally, wooden buildings can form an open living space, are easily relocated, remodeled, and dismantled, are easy to construct, and have relatively low construction costs. Many are installed as excellent buildings. These wooden buildings build foundation concrete on the ground as a foundation,
A base is installed on the upper surface of the foundation concrete, and a living space is formed by connecting joists and pillars to the base.
As shown in FIG. 6, the base is buried with anchor bolts at intervals of approximately 3 to 4 m in the base concrete, and anchor bolts protruding from the upper surface of the base concrete are used as bases, as shown in FIG. Penetrate the hole provided to protrude to the upper surface of the base, tighten the fastening nut that was screwed in by inserting a washer into the upper end of the anchor bolt, and fastened to the upper surface of the base via the washer to firmly attach the base to the foundation concrete It is fixed to.

【0003】前記木造建築物を構築した地域が軟弱地盤
である場合には、地盤の不当沈下で建築物が傾斜するも
ので、この建築物に傾斜が発生したら、建築物を土台と
共に嵩上げして水平に復元する必要がある。このため
に、作業者が床下空間に入り、図7、図8に示す様に、
土台上面に締着していた座金と締着ナットをアンカーボ
ルトの上端から取り外し、或は、締着ナットが外せない
ときには、アンカーボルトを中間位置で切断し、この状
態で土台を基礎コンクリートの上面から上方へ持ち上げ
て基礎コンクリート上面と土台下面とに図7に示す台
木、或は図8に示すコンクリート等の嵩上げ部材を挟装
して水平に転位させ、建築物を水平に保持しているもの
である。
If the area where the wooden building is constructed is on soft ground, the building is inclined due to improper subsidence of the ground. If the building is inclined, the building is raised together with the foundation. It needs to be restored horizontally. For this reason, the worker enters the underfloor space, and as shown in FIGS.
Remove the washer and the fastening nut fastened to the upper surface of the base from the upper end of the anchor bolt, or if the fastening nut cannot be removed, cut the anchor bolt at an intermediate position. From above, the raising material such as the stock shown in FIG. 7 or the concrete shown in FIG. 8 is sandwiched between the upper surface of the foundation concrete and the lower surface of the base, and is displaced horizontally to hold the building horizontally. Things.

【0004】[0004]

【発明が解決しようとする問題点】しかしながら、前記
土台を基礎コンクリートの上面から嵩上げしたときに
は、基礎コンクリート上面より突出しているアンカーボ
ルトの長さが短いために嵩上げした後の土台をアンカー
ボルトで緊結できず、振動や風圧等で土台が基礎コンク
リートに対して横ずれし易くなって、嵩上げした後の建
築物は耐震性や耐風性が弱体化する欠点がある。また、
嵩上げした後の土台をアンカーボルトに緊結できる様に
長いアンカーボルトを使用して基礎コンクリート内に埋
設し、基礎コンクリート上面からの突出長さを長くして
もよいが、基礎コンクリートの成型時に長く突出したア
ンカーボルトは倒れ易く、更に、基礎コンクリート上面
より長く突出したアンカーボルトのために基礎コンクリ
ート上面への土台の載着等の作業がやり難く、施工の上
からもアンカーボルトを長く伸ばせない等問題があっ
た。
However, when the base is raised from the upper surface of the foundation concrete, the length of the anchor bolt protruding from the upper surface of the foundation concrete is short, and the raised base is connected with the anchor bolt. It is not possible to do so, and the base is liable to be laterally shifted with respect to the foundation concrete due to vibration, wind pressure, etc., and the building after raising has a drawback that the earthquake resistance and wind resistance are weakened. Also,
The base after raising can be buried in the foundation concrete using long anchor bolts so that it can be tied to the anchor bolts, and the projection length from the top surface of the foundation concrete may be increased. Anchor bolts that are easy to fall down, and because the anchor bolts protrude longer than the top surface of the foundation concrete, it is difficult to work such as mounting the base on the top surface of the foundation concrete, and the anchor bolts cannot be extended long even from the construction. was there.

【0005】本発明は、上記従来の問題点に鑑みてなさ
れたものであり、その目的は、地盤の不等沈下で建築物
が傾斜した場合に、土台を簡易に嵩上げして再び基礎コ
ンクリートに強固に緊結して耐震性や耐風性の低下を防
止でき、基礎コンクリートの上面に対する土台の設置も
手数を要することなく強固に緊結でき、土台の施工経費
も安価である等を特徴とした建築物の基礎と土台との連
結部構造及び傾斜した建築物の嵩上げ方法を提供するこ
とにある。
The present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to easily raise the foundation and rebuild the foundation concrete when the building is inclined due to uneven settlement of the ground. A building that is tightly tied to prevent seismic resistance and wind resistance from being reduced, can be firmly tied without the need for installation of the base on the upper surface of the foundation concrete, and the construction cost of the base is inexpensive. And a method of raising a sloped building.

【0006】[0006]

【問題点を解決するための手段】上記目的を達成するた
めに、請求項1に係る発明は、建築物を構築するための
基礎コンクリート12と、該基礎コンクリート12内に
埋設され、上端側に継手部14を備えたアンカーボルト
16と、前記基礎コンクリート12の上面に載着された
土台18と、該土台18を縫刺し状に貫通し、上端を該
土台上面から突出させると共に下端を前記継手部14に
継手連結され前記アンカーボルト16と一体的に連結固
定される長ボルト20−と、該長ボルト20の上方突出
部分に螺合され、前記土台18上面に締着される締着ナ
ット22とを備えて成る建築物の基礎と土台との連結部
構造10から構成される。
Means for Solving the Problems In order to achieve the above object, the invention according to claim 1 comprises a foundation concrete 12 for constructing a building, and a base concrete 12 embedded in the foundation concrete 12 and having an upper end side. An anchor bolt 16 having a joint portion 14, a base 18 mounted on the upper surface of the foundation concrete 12, penetrating the base 18 in a sewn manner, projecting an upper end from the upper surface of the base, and connecting a lower end to the joint A long bolt 20-jointly connected to the portion 14 and integrally connected and fixed to the anchor bolt 16, and a fastening nut 22 screwed to an upwardly projecting portion of the long bolt 20 and fastened to the upper surface of the base 18. And a connection structure 10 for connecting the foundation and the base of the building.

【0007】また、請求項2に係る発明では、前記継手
部14の上端は、前記基礎コンクリート12の上面と面
一状に埋設されて成ることとしてもよい。
Further, in the invention according to claim 2, the upper end of the joint portion 14 may be buried flush with the upper surface of the foundation concrete 12.

【0008】また、請求項3に係る発明では、前記継手
部14は、螺進方向に長く形成された長ナット36を含
むボルト継手から成り、該長ナット36は、前記アンカ
ーボルト16の上端に、その上端面が基礎コンクリート
12の上面と面一状になる様に高さ調整自在に螺合され
て成ることとしてもよい。
Further, in the invention according to claim 3, the joint portion 14 comprises a bolt joint including a long nut 36 formed long in the screwing direction, and the long nut 36 is provided at the upper end of the anchor bolt 16. The height may be freely adjusted so that the upper end surface thereof is flush with the upper surface of the foundation concrete 12.

【0009】また、請求項4に係る発明は、上方に突出
させた上端に継手部14を取り付けたアンカーボルト1
6を基礎コンクリート12に埋設させ、この基礎コンク
リート12の上面に土台18を載着し、その後、長ボル
ト20上端を上方に突出させる様にして土台18に貫通
させて継手部14に連結させることにより前記アンカー
ボルト16と一体的に連結させ、前記土台18上面を長
ボルト20に螺合させた締着ナット22で締着させ、地
盤の不等沈下等により建築物32が傾斜した場合には、
前記土台18に締着した各長ボルト20の締着ナット2
2を緩めて該長ボルトに沿って上方へ移動させ、前記土
台18を各長ボルト20に沿って嵩上げして水平に転位
させ、前記基礎コンクリート12の上面と嵩上げした土
台18下面とに嵩上げ部材34を挟装して建築物32の
土台18を水平に保持し、前記締着ナット22を再び土
台18上面に締着させて成る傾斜した建築物の嵩上げ方
法から構成される、
Further, according to a fourth aspect of the present invention, there is provided an anchor bolt 1 having a joint 14 attached to an upper end protruding upward.
6 is buried in the foundation concrete 12, the base 18 is mounted on the upper surface of the foundation concrete 12, and then the upper end of the long bolt 20 is made to penetrate the base 18 so as to protrude upward and connected to the joint portion 14. When the building 32 is tilted due to uneven settlement of the ground or the like, the upper surface of the base 18 is fastened with the fastening nut 22 screwed to the long bolt 20. ,
Fastening nut 2 of each long bolt 20 fastened to the base 18
2 is lifted and moved upward along the long bolts, the base 18 is raised along each long bolt 20 and displaced horizontally, and a raising member is formed on the upper surface of the foundation concrete 12 and the lower surface of the raised base 18. 34, the base 18 of the building 32 is held horizontally, and the fastening nut 22 is tightened to the upper surface of the base 18 again.

【0010】また、請求項5に係る発明では、前記継手
部14は、螺進方向に長く形成した長ナット36であ
り、前記アンカーボルト16の上端に該長ナット36を
螺合させ、該長ナット36の螺子孔38に、上面から仮
止栓40を係止して該螺子孔38を閉鎖させ、この状態
で長ナット36を前記基礎コンクリート12に面一状に
埋設して成ることとしてもよい。
Further, in the invention according to claim 5, the joint portion 14 is a long nut 36 formed to be long in the screwing direction. A temporary stopper 40 may be engaged with the screw hole 38 of the nut 36 from the upper surface to close the screw hole 38, and in this state, the long nut 36 may be buried flush with the foundation concrete 12. Good.

【0011】また、請求項6に係る発明では、前記仮止
栓40は、弾性部材から成ることとしてもよい。
In the invention according to claim 6, the temporary stopper 40 may be formed of an elastic member.

【0012】[0012]

【作用】本発明に係る建築物の基礎と土台との連結部構
造においては、建築物を構築するための基礎コンクリー
トの成型時に、該基礎コンクリート内に上端側に継手部
を備えたアンカーボルトを所望の間隔をおいて埋設す
る。そして、この基礎コンクリートの上面に載着する土
台に、アンカーボルトの継手部と上下に連通する孔を開
孔し、この土台を基礎コンクリートの上面に載着して継
手部に連通した孔の上面から長ボルトを縫刺し状に貫通
し、該長ボルトの下端を基礎コンクリート内の継手部に
連結する。その後で該長ボルトに螺合された締着ナット
を土台上面に締着して該土台を基礎コンクリートに一体
的に緊結し、この土台に根だ、柱、間柱等を組立てなが
ら建築物を構築する。
In the joint structure between the foundation and the base of the building according to the present invention, when forming the foundation concrete for constructing the building, an anchor bolt having a joint on the upper end side is provided in the foundation concrete. It is buried at a desired interval. Then, a hole that communicates vertically with the joint part of the anchor bolt is opened in the base mounted on the upper surface of the base concrete, and the base is mounted on the upper surface of the base concrete and the upper surface of the hole that communicates with the joint part. , A long bolt is penetrated in a sewn shape, and the lower end of the long bolt is connected to a joint in the foundation concrete. After that, a fastening nut screwed to the long bolt is fastened to the upper surface of the base, and the base is integrally tied to the foundation concrete, and a building is constructed while assembling roots, columns, studs, etc. on this base. I do.

【0013】地盤に不等沈下が発生して建築物が傾斜し
た場合には、締着ナットを緩めた後で、土台を長ボルト
に沿って水平になる様に嵩上げして嵩上部材を土台と基
礎コンクリートとに挟装させて復元し、長ボルトと締着
ナットで土台を再び基礎コンクリートへ強固に緊結で
き、嵩上げした後の建築物の耐震性、耐風性等の低下を
防止できる。また、基礎コンクリートの上面に載着した
土台を、アンカーボルトに継手連結した長ボルト及び締
着ナットで強固に固定でき、しかも、土台の固定作業も
簡略で経費も安価に施工できる。
In the case where the building is inclined due to uneven settlement on the ground, after loosening the fastening nuts, the base is raised so as to be horizontal along the long bolts, and the raised member is mounted on the base. The foundation can be firmly tied to the foundation concrete again with the long bolts and the fastening nuts, and the building can be prevented from deteriorating in seismic resistance, wind resistance, etc. after being raised. Further, the base mounted on the upper surface of the foundation concrete can be firmly fixed by the long bolts and the fastening nuts connected to the anchor bolts, and the work for fixing the base can be simplified and the cost can be reduced.

【0014】また、前記継手部の上端は、前記基礎コン
クリートの上面と面一状に埋設されて成ることにより、
基礎コンクリートの上面に土台を載着するときに継手部
が邪魔になることがなく、また土台に継手部のための凹
部等を加工する必要がなく、基礎コンクリートの上面に
土台を敏速に載着できる。
The upper end of the joint portion is buried flush with the upper surface of the foundation concrete,
When mounting the base on the upper surface of the foundation concrete, the joint does not become an obstacle, and there is no need to process recesses etc. for the joint on the base, and the base is quickly mounted on the upper surface of the foundation concrete. it can.

【0015】また、前記継手部は、螺進方向に長く形成
された長ナットを含むボルト継手から成り、該長ナット
は、前記アンカーボルトの上端に、その上端面が基礎コ
ンクリートの上面と面一状になる様に高さ調整自在に螺
合されて成ることにより、アンカーボルトと長ボルトと
の一体的連結の実効を図ることができ、基礎コンクリー
トの構築のために組立てた型枠内にアンカーボルトを配
置したときに、アンカーボルトの上端に螺合した長ナッ
トを回転させながら、長ナットの上面を、打設する基礎
コンクリートの上面と略面一状になる様に手数を要する
ことなく高さ調整できる。
[0015] Further, the joint portion is formed of a bolt joint including a long nut formed long in the screwing direction. The long nut has an upper end surface flush with an upper surface of the foundation concrete at an upper end of the anchor bolt. The bolts are screwed together so that they can be adjusted in height so that the anchor bolts and the long bolts can be integrally connected, and the anchors are installed in the formwork assembled to construct the foundation concrete. When the bolt is placed, rotate the long nut screwed onto the upper end of the anchor bolt and raise the upper surface of the long nut so that it is almost flush with the upper surface of the foundation concrete to be cast without any trouble. Can be adjusted.

【0016】また、本発明に係る傾斜した建築物の嵩上
げ方法においては、上方に突出させた上端に継手部を取
り付けたアンカーボルトを基礎コンクリートに埋設さ
せ、この基礎コンクリートの上面に土台を載着し、その
後、長ボルト上端を上方に突出させる様にして土台に貫
通させて継手部に連結させることにより前記アンカーボ
ルトと一体的に連結させ、前記土台上面を長ボルトに螺
合させた締着ナットで締着させ、地盤の不等沈下等によ
り建築物が傾斜した場合には、前記土台に締着した各長
ボルトの締着ナットを緩めて該長ボルトに沿って上方へ
移動させ、前記土台を各長ボルトに沿って嵩上げして水
平に転位させ、前記基礎コンクリートの上面と、嵩上げ
した土台下面とに嵩上げ部材を挟装して建築物の土台を
水平に保持し、前記締着ナットを再び土台上面に締着さ
せて成ることにより、建築物とともに傾斜した土台を、
アンカーボルトに一体に連結された長ボルトに沿って安
定して水平に嵩上げでき、嵩上げ中に位置ずれ等が発生
することもなく、嵩上げ作業を簡易に、しかも作業経費
も安価に施工できる。また、嵩上げした後の建築物の土
台を基礎コンクリートに、長ボルト及び締着ナットを利
用して再び強固に緊結でき、嵩上げ後の建築物の耐震
性、耐風性等が低下することがない。
Further, in the method for raising a sloping building according to the present invention, an anchor bolt having a joint portion attached to an upper end protruding upward is embedded in a foundation concrete, and a base is mounted on an upper surface of the foundation concrete. Then, the upper end of the long bolt is penetrated through the base so as to protrude upward and connected to the joint portion to be integrally connected to the anchor bolt, and the upper surface of the base is screwed to the long bolt. When the building is tilted due to uneven settlement of the ground, etc., tighten the nut with the nut, loosen the fastening nut of each long bolt fastened to the base and move it upward along the long bolt, The foundation is raised along each long bolt and displaced horizontally, and the upper surface of the foundation concrete and the raised lower surface are sandwiched by raising members to hold the foundation of the building horizontally, By comprising a wearing nut is again fastened to the base upper surface, an inclined base with buildings,
It is possible to stably and horizontally raise along the long bolts integrally connected to the anchor bolts, no displacement occurs during the raising, and the raising operation can be performed easily and at low cost. Further, the foundation of the raised building can be firmly tied again to the foundation concrete by using the long bolts and the fastening nuts, so that the seismic resistance and wind resistance of the raised building do not decrease.

【0017】また、前記継手部は、螺進方向に長く形成
した長ナットであり、前記アンカーボルトの上端に該長
ナットを螺合させ、該長ナットの螺子孔に、上面から仮
止栓を係止して該螺子孔を閉鎖させ、この状態で長ナッ
トを前記基礎コンクリートに面一状に埋設して成ること
により、基礎型枠内へコンクリートを打設するときに、
長ナットの螺子孔内にコンクリートが付着して閉塞され
ることなく、仮止栓で螺子孔を保護しながら、コンクリ
ートが固化した後では、長ボルトを長ナットに確実に継
手連結できる。
The joint is a long nut formed long in the screwing direction. The long nut is screwed to the upper end of the anchor bolt, and a temporary stopper plug is inserted from above into a screw hole of the long nut. When the concrete is poured into the foundation formwork by locking and closing the screw hole, and in this state, the long nut is buried flush with the foundation concrete.
After the concrete is solidified while the screw hole is protected by the temporary stopper and the screw hole is protected without being blocked by the concrete adhering in the screw hole of the long nut, the long bolt can be securely connected to the long nut.

【0018】また、前記仮止栓は、弾性部材から成るこ
とにより、長ナットの螺子孔内に着脱取付けながら水密
性を保持でき、螺子孔内がコンクリートで閉塞されるの
を確実に防止できる。
Further, since the temporary stopper is made of an elastic member, it can maintain watertightness while being detachably attached to the screw hole of the long nut, and can reliably prevent the screw hole from being closed by concrete.

【0019】[0019]

【実施例】以下添付図面に基づき、本発明の好適な実施
例を説明する。図1、図2、図3には、本発明の第1実
施例に係る建築物の基礎と土台との連結構造(以下、基
礎土台連結構造と略する。)10が示されている。図よ
り明らかな様に、前記基礎土台連結構造10は、建築物
を構築するための基礎コンクリート12と、この基礎コ
ンクリート12内に埋設され、上端側に継手部14を備
えたアンカーボルト16と、前記コンクリート12の上
面に載着された土台18と、該土台18を縫刺し状に貫
通し、上端を該土台上面から上方に突出させると共に下
端を前記継手部14に継手連結されてアンカーボルト1
6と一体的に連結固定される長ボルト20と、該長ボル
ト20の上方突出部分に螺合され、前記土台18上面に
締着される締着ナット22とを備えている。
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings. 1, 2, and 3 show a connection structure (hereinafter, abbreviated as a base connection structure) 10 between a foundation and a foundation of a building according to a first embodiment of the present invention. As is clear from the figure, the foundation-base connection structure 10 includes a foundation concrete 12 for constructing a building, an anchor bolt 16 buried in the foundation concrete 12, and having a joint portion 14 on an upper end side. A base 18 mounted on the upper surface of the concrete 12, penetrating the base 18 in a sewn manner, projecting an upper end upward from the upper surface of the base, and a lower end jointly connected to the joint portion 14 to anchor bolt 1
A long bolt 20 integrally connected to and fixed to 6, and a fastening nut 22 screwed to an upwardly projecting portion of the long bolt 20 and fastened to the upper surface of the base 18.

【0020】図1、図2に示す様に、前記基礎コンクリ
ート12は、地盤上で建築物の荷重を支持するものであ
り、コンクリートや鉄筋コンクリートで断面略T形等に
成型されている。この基礎コンクリート12の上面に載
着する土台18は、耐久性のある角材を素材とし、建築
物の根だや柱等を連結して該建築物を基礎コンクリート
12と共に強固に支持するものである。このために、土
台18は、基礎コンクリート12内に埋設されたアンカ
ーボルト16と、このアンカーボルト16の継手部14
に一体的に継手連結される長ボルト20及び締着ナット
22とで基礎コンクリート12に強固に緊結されること
となる。
As shown in FIGS. 1 and 2, the foundation concrete 12 supports a load of a building on the ground and is formed of concrete or reinforced concrete into a substantially T-shaped cross section. The base 18 mounted on the upper surface of the basic concrete 12 is made of a durable square material, and connects the roots, columns, etc. of the building, and firmly supports the building together with the basic concrete 12. . For this purpose, the base 18 comprises an anchor bolt 16 embedded in the foundation concrete 12 and a joint 14 of the anchor bolt 16.
Is firmly connected to the foundation concrete 12 by the long bolt 20 and the fastening nut 22 which are integrally connected to the base concrete 12.

【0021】図3に示す様に、アンカーボルト16は、
黒ボルト等を素材とし、その上端部には、継手部14を
螺合連結するための螺子部24が設けられ、下端部に
は、引き抜けを防止するためのL形フック26が折曲さ
れている。該アンカーボルト16は、基礎コンクリート
12内に埋設される長さが長い程その支持耐力が増大す
る。
As shown in FIG. 3, the anchor bolt 16
A black bolt or the like is used as a material, and a screw portion 24 for screwing and connecting the joint portion 14 is provided at an upper end thereof, and an L-shaped hook 26 for preventing pull-out is bent at a lower end thereof. ing. As the length of the anchor bolts 16 buried in the foundation concrete 12 increases, the supporting strength increases.

【0022】図1、図2に示す様に、継手部14は、ア
ンカーボルト16の上端部の螺子部24に螺合連結さ
れ、かつ土台18の上面から下面へ向け開孔された縦孔
28に縫刺し状に貫通される長ボルト20の下端を継手
連結し得る様に基礎コンクリート12内に埋設されてい
る。この継手部14及びアンカーボルト16は、基礎コ
ンクリート12内に略3ないし4mの間隔をおいて埋設
され、1戸の建築物で略30ないし40本が使用され
る。
As shown in FIGS. 1 and 2, the joint portion 14 is connected to a screw portion 24 at the upper end of the anchor bolt 16 and is formed with a vertical hole 28 opened from the upper surface to the lower surface of the base 18. The lower bolt 20 is buried in the foundation concrete 12 so that the lower end of the long bolt 20 penetrated in a sewn shape can be connected with a joint. The joints 14 and the anchor bolts 16 are buried in the foundation concrete 12 at intervals of about 3 to 4 m, and about 30 to 40 bolts are used in one building.

【0023】長ボルト20は、土台18の上面からアン
カーボルト16上端の継手部14に連通する様に開孔し
た縦孔28を貫通して継手部14に継手連結される。こ
れにより、長ボルト20はアンカーボルト16に一体化
される。この長ボルト20は、土台18の上方に長く突
出する長さを有し、この突出部分に座金30を貫挿して
締着ナット22が螺合され、この座金30と締着ナット
22とを土台18の上面に締着させて土台18は基礎コ
ンクリート12に強固に緊結される。従って、基礎コン
クリート12内に埋設されたアンカーボルト16に至極
簡易に長ボルト20を継手連結できて土台18の固定作
業に手数を要することなく、経費も安価に施工できるこ
ととなる。
The long bolt 20 is connected to the joint 14 through a vertical hole 28 opened from the upper surface of the base 18 so as to communicate with the joint 14 at the upper end of the anchor bolt 16. Thereby, the long bolt 20 is integrated with the anchor bolt 16. The long bolt 20 has a length that protrudes long above the base 18, and a fastening nut 22 is screwed into the protruding portion through a washer 30, and the washer 30 and the fastening nut 22 are connected to the base. The base 18 is firmly fastened to the foundation concrete 12 by being fastened to the upper surface of the base 18. Therefore, the long bolt 20 can be jointly connected to the anchor bolt 16 buried in the foundation concrete 12 extremely easily, so that the operation for fixing the base 18 does not require any trouble and the cost can be reduced.

【0024】また、図4に示す様に、前記基礎土台連結
構造10を備えた建築物32が、地盤の不等沈下等で傾
斜した場合には、土台18の上面に締着している各締着
ナット22を緩めた後で、図4、図5に示す様に、土台
18を長ボルト20に沿って水平になる様に持ち上げて
台木、コンクリート等の嵩上部材34を土台18と基礎
コンクリート12上面とに介装させ、その後で、長ボル
ト20の締着ナット22を嵩上げした土台18に再び締
着させる。これにより、嵩上げした土台18を基礎コン
クリート12へ強固に緊結でき、嵩上げした後の建築物
の耐震性、耐風性等の低下を防止できる。
As shown in FIG. 4, when the building 32 provided with the foundation connection structure 10 is tilted due to uneven settlement of the ground or the like, the building 32 is fastened to the upper surface of the base 18. After the fastening nut 22 is loosened, as shown in FIGS. 4 and 5, the base 18 is lifted so as to be horizontal along the long bolt 20, and the raised member 34 such as a stock or concrete is connected to the base 18. After being interposed on the upper surface of the foundation concrete 12, the fastening nut 22 of the long bolt 20 is fastened to the raised base 18 again. As a result, the raised base 18 can be firmly tied to the foundation concrete 12, and it is possible to prevent deterioration in the earthquake resistance, wind resistance, and the like of the building after the raising.

【0025】図1、図2の実施例に示す様に、前記継手
部14は、その上端が基礎コンクリート12の上面と同
一面状になる様に埋設されている。これにより、基礎コ
ンクリート12の上面に土台18を載着するときに継手
部14が施工の邪魔になることがなく、また土台18の
下面に継手部14に嵌合するための凹部等を加工する必
要がなく、基礎コンクリート12の上面に土台18を敏
速に載着でき、建築物32の基礎部分の施工効率が極め
て良好となる。
As shown in the embodiment of FIGS. 1 and 2, the joint portion 14 is embedded so that the upper end thereof is flush with the upper surface of the foundation concrete 12. Thereby, when mounting the base 18 on the upper surface of the foundation concrete 12, the joint portion 14 does not hinder construction, and a concave portion or the like for fitting to the joint portion 14 is formed on the lower surface of the base 18. There is no necessity, and the base 18 can be quickly mounted on the upper surface of the foundation concrete 12, and the construction efficiency of the foundation portion of the building 32 becomes extremely good.

【0026】また、前記継手部14は、螺進方向に長く
形成された長ナット36を含むボルト継手から成り、該
長ナット36は、前記アンカーボルト16の上端に、そ
の上端面が基礎コンクリート12の上面と同一面状にな
る様に高さ調整自在に螺合されている。これにより、ア
ンカーボルト16と長ボルト20との一体的連結の実効
を図ることができ、基礎コンクリート12の構築のため
に組立てた型枠内にアンカーボルト16を配置したとき
に、アンカーボルト16の上端に螺合した長ナット20
を回転させながら、長ナット20の上面を打設する基礎
コンクリート12の上面と略同一面状になる様に手数を
要することなく高さ調整できる。
The joint portion 14 comprises a bolt joint including a long nut 36 formed long in the screwing direction. The long nut 36 is provided at the upper end of the anchor bolt 16 at the upper end surface of the foundation concrete 12. Are screwed together so that the height can be adjusted so as to be flush with the upper surface of. As a result, the integral connection between the anchor bolt 16 and the long bolt 20 can be achieved, and when the anchor bolt 16 is arranged in the formwork assembled for the construction of the foundation concrete 12, the anchor bolt 16 Long nut 20 screwed on top
While rotating the nut, the height can be adjusted without any trouble so that the upper surface of the long nut 20 is substantially flush with the upper surface of the foundation concrete 12 on which the long nut 20 is cast.

【0027】次に、前記第1実施例に係る建築物の基礎
と土台の連結部構造の作用を、本発明の第2実施例に係
る傾斜した建築物の嵩上げ方法と共に説明する。図1、
図2に示す様に、本発明の第1実施例に係る基礎土台連
結部構造10においては、上方に突出させた上端に継手
部14を取り付けたアンカーボルト16を基礎コンクリ
ート12内に埋設させる。
Next, the operation of the connection structure between the foundation and the base of the building according to the first embodiment will be described together with the method of raising the inclined building according to the second embodiment of the present invention. Figure 1,
As shown in FIG. 2, in the foundation connection structure 10 according to the first embodiment of the present invention, an anchor bolt 16 having a joint 14 attached to an upper end protruding upward is embedded in the foundation concrete 12.

【0028】この基礎コンクリート12の上面に土台1
8を載着し、その後、長ボルト20を、上端を上方に突
出させる様にして土台18に開孔した縦孔28に貫通さ
せて継手部14に連結させ、長ボルト20を前記アンカ
ーボルト16に一体的に継手連結させる。前記土台18
上面に、長ボルト20に装着した座金30を載着させた
後で締着ナット22を長ナット20に螺合させつつ強固
に締着させるものである。
The foundation 1 is placed on the upper surface of the foundation concrete 12.
8, the long bolt 20 is passed through the vertical hole 28 formed in the base 18 with the upper end protruding upward and connected to the joint portion 14, and the long bolt 20 is connected to the anchor bolt 16 To the joint. The base 18
After the washer 30 attached to the long bolt 20 is mounted on the upper surface, the fastening nut 22 is screwed into the long nut 20 and firmly fastened.

【0029】次に、前記基礎土台連結部構造10により
基礎コンクリート12に土台18を強固に緊結させた建
築物32が、地盤の不等沈下等により傾斜した場合に、
本発明の第2実施例に係る傾斜した建築物の嵩上げ方法
により、建築物32の傾斜を水平に補正するものであ
り、このために、作業者が建築物32の床下にはいり、
土台18に締着した各長ボルト20の締着ナット22及
び座金30を緩めて該長ボルト20に沿って締着ナット
22及び座金30を上方へ移動させる。
Next, when the building 32 in which the foundation 18 is firmly connected to the foundation concrete 12 by the foundation connection structure 10 is inclined due to uneven settlement of the ground or the like,
The inclination of the building 32 is corrected horizontally by the method of raising the inclined building according to the second embodiment of the present invention. For this reason, the worker enters under the floor of the building 32,
The fastening nut 22 and the washer 30 of each long bolt 20 fastened to the base 18 are loosened, and the fastening nut 22 and the washer 30 are moved upward along the long bolt 20.

【0030】そして、図4、図5に示す様に、前記土台
18を、ジャッキ等を使用して各長ボルト20に沿って
嵩上げして水平に転位させる。その後で、基礎コンクリ
ート12の上面と、嵩上げした土台18下面との間隙
に、台木やコンクリート等の嵩上げ部材34を挟装して
建築物32の土台18を水平に保持する。その後で、前
記締着ナット22及び座金30を再び土台18上面に締
着させて嵩上げ施工を終了する。
Then, as shown in FIGS. 4 and 5, the base 18 is raised along the long bolts 20 using jacks or the like and is displaced horizontally. After that, the base 18 of the building 32 is horizontally held by sandwiching a raising member 34 such as a stock or concrete in a gap between the upper surface of the foundation concrete 12 and the lower surface of the raised base 18. Thereafter, the fastening nut 22 and the washer 30 are again fastened to the upper surface of the base 18 to complete the raising operation.

【0031】従って、土台18をアンカーボルト16に
一体に連結された長ボルト20に沿って安定して嵩上げ
でき、位置ずれ等が発生することなく、嵩上げ作業を簡
易に、経費も安価に施工できる。また、嵩上げした後の
建築物32の土台18を基礎コンクリート12に、長ボ
ルト20及び締着ナット22を利用して再び強固に緊結
でき、嵩上げした後の建築物32の耐震性、耐風性等の
低下を防止できることとなる。
Accordingly, the base 18 can be stably raised along the long bolts 20 integrally connected to the anchor bolts 16, so that the raising work can be performed easily and at low cost without occurrence of displacement or the like. . Further, the base 18 of the raised building 32 can be firmly tied again to the foundation concrete 12 using the long bolts 20 and the fastening nuts 22, and the seismic resistance, wind resistance, etc. of the raised building 32 can be improved. Can be prevented from decreasing.

【0032】また、前記継手部14は、螺進方向に長く
形成した長ナット36から形成されている。従って、図
2、図3に示す様に、アンカーボルト16及び長ナット
36を基礎コンクリート12内に埋設するときには、ア
ンカーボルト16の上端に該長ナット36を螺合させ
て、長ナット36の螺子孔38に上面から仮止栓40を
係止して螺子孔38を閉鎖させる。この状態で基礎コン
クリート12を成型する基礎型枠内にアンカーボルト1
6を配置し、成型される基礎コンクリート12の上面と
長ナット36の上面が面一状に一致する様に調整してコ
ンクリートを打設して固化させる。
The joint portion 14 is formed by a long nut 36 formed long in the screwing direction. Therefore, as shown in FIGS. 2 and 3, when the anchor bolt 16 and the long nut 36 are embedded in the foundation concrete 12, the long nut 36 is screwed to the upper end of the anchor bolt 16, and the screw of the long nut 36 is screwed. The temporary stopper 40 is locked in the hole 38 from the upper surface to close the screw hole 38. In this state, the anchor bolt 1 is placed in the foundation form for molding the foundation concrete 12.
6 is arranged, and the concrete is poured and solidified by adjusting the upper surface of the base concrete 12 to be molded and the upper surface of the long nut 36 so as to be flush with each other.

【0033】これにより、基礎型枠内へ打設したコンク
リートが長ナット36の螺子孔38内に付着して固化閉
塞されることなく、仮止栓40で螺子孔38を保護で
き、また、長ナット36の上面を基礎コンクリート12
の上面と同一面に固化できる。そして、コンクリートが
固化した後で仮止栓40を取外すものであり、固化した
基礎コンクリート12上面から長ナット36が突出する
ことなく、均一面に成型された基礎コンクリート12の
上面に土台18を容易に載着でき、また、土台18に貫
通させた長ボルト20を長ナット36に確実に継手連結
して長ボルト20をアンカーボルト16と一体化できる
こととなる。
Thus, the screw hole 38 can be protected by the temporary stopper 40 without the concrete poured into the foundation form adhering into the screw hole 38 of the long nut 36 and being solidified and blocked. The upper surface of the nut 36 is attached to the foundation concrete 12
Can be solidified on the same plane as the upper surface. Then, the temporary stopper 40 is removed after the concrete is solidified, and the base 18 is easily placed on the upper surface of the foundation concrete 12 formed into a uniform surface without the long nut 36 protruding from the upper surface of the solidified foundation concrete 12. In addition, the long bolt 20 penetrating the base 18 can be securely connected to the long nut 36 by a joint so that the long bolt 20 can be integrated with the anchor bolt 16.

【0034】前記仮止栓40は、ゴム、発砲樹脂等の弾
性部材で形成することにより、長ナット36の螺子孔3
8内に着脱取付けしながら水密性を保持でき、螺子孔3
8内がコンクリート等で閉塞されるのを確実に防止でき
ることとなる。
The temporary stopper 40 is formed of an elastic member such as rubber, foamed resin or the like, so that the screw hole 3 of the long nut 36 is formed.
8 while maintaining watertightness while attaching and detaching the screw hole.
8 can be reliably prevented from being blocked by concrete or the like.

【0035】上記した様に、本発明の第2実施例に係る
傾斜した建築物の嵩上げ方法においては、不等沈下で傾
斜した建築物を、土台を簡易に嵩上げして再び基礎コン
クリートに強固に緊結できて耐震性や耐風性の低下を確
実に防止でき、建築物の耐久性を向上できることとな
る。
As described above, in the method for raising a sloping building according to the second embodiment of the present invention, a building which is sloping due to unequal settlement is easily raised on a foundation and again firmly attached to a foundation concrete. Tightening can reliably prevent seismic resistance and wind resistance from deteriorating, thereby improving the durability of the building.

【0036】[0036]

【発明の効果】以上説明したように、請求項1に係る建
築物の基礎と土台との連結構造によれば、建築物を構築
するための基礎コンクリートと、該基礎コンクリート内
に埋設され、上端側に継手部を備えたアンカーボルト
と、前記基礎コンクリートの上面に載着された土台と、
該土台を縫刺し状に貫通し、上端を該土台上面から突出
させると共に下端を前記継手部に継手連結され前記アン
カーボルトと一体的に連結固定される長ボルトと、該長
ボルトの上方突出部分に螺合され、前記土台上面に締着
される締着ナットとを備えて成ることにより、地盤の不
等沈下で建築物が傾斜した場合に、締着ナットを緩めた
後で土台を長ボルトに沿って水平になる様に嵩上げして
嵩上部材を土台と基礎コンクリートとに挟装させ、長ボ
ルトと締着ナットで土台を再び基礎コンクリートへ強固
に緊結でき、嵩上げした後の建築物の耐震性、耐風性等
の低下を防止できる。また、基礎コンクリートの上面に
載着した土台を、アンカーボルトに継手連結した長ボル
ト及び締着ナットで強固に固定でき、しかも、土台の固
定作業も簡略で経費も安価に施工できる。
As described above, according to the connecting structure between the foundation and the foundation of the building according to the first aspect, the foundation concrete for constructing the building and the upper end embedded in the foundation concrete and having the upper end Anchor bolts with joints on the side, a base mounted on the top surface of the foundation concrete,
A long bolt that penetrates the base in a sewn manner, has an upper end protruding from the upper surface of the base, and a lower end coupled to the joint portion and integrally fixed to the anchor bolt; And a fastening nut which is fastened to the upper surface of the base, when the building is inclined due to uneven settlement of the ground, the base is loosened after loosening the fastening nut. Raise so that it becomes horizontal along with the base material and sandwich the raising member between the base and the foundation concrete, and then use the long bolts and fastening nuts to firmly tie the foundation to the foundation concrete again, It is possible to prevent the seismic resistance and the wind resistance from being lowered. Further, the base mounted on the upper surface of the foundation concrete can be firmly fixed by the long bolts and the fastening nuts connected to the anchor bolts, and the work for fixing the base can be simplified and the cost can be reduced.

【0037】また、請求項2によれば、前記継手部の上
端は、前記基礎コンクリートの上面と面一状に埋設され
て成ることにより、基礎コンクリートの上面に土台を載
着するときに継手部が邪魔になることがなく、また土台
に継手部のための凹部等を加工する必要がなく、基礎コ
ンクリートの上面に土台を敏速に載着でき、建築物の基
礎部分の施工効率が極めて良好となる。
According to a second aspect of the present invention, the upper end of the joint portion is buried flush with the upper surface of the foundation concrete, so that the joint portion is mounted when the base is mounted on the upper surface of the foundation concrete. The foundation can be quickly mounted on the upper surface of the foundation concrete without the need for processing the recesses for the joints on the foundation, and the construction efficiency of the foundation of the building is extremely good. Become.

【0038】また、請求項3によれば、前記継手部は、
螺進方向に長く形成された長ナットを含むボルト継手か
ら成り、該長ナットは、前記アンカーボルトの上端に、
その上端面が基礎コンクリートの上面と面一状になる様
に高さ調整自在に螺合されて成ることにより、アンカー
ボルトと長ボルトとの一体的連結の実効を図ることがで
き、基礎コンクリートの構築のために組立てた型枠内に
アンカーボルトを配置したときに、アンカーボルトの上
端に螺合した長ナットを回転させながら、長ナットの上
面を、打設する基礎コンクリートの上面と略面一状にな
る様に手数を要することなく高さ調整できる。
According to the third aspect, the joint portion is
It consists of a bolt joint including a long nut formed long in the screwing direction, and the long nut is provided at the upper end of the anchor bolt,
By being screwed so that the upper end surface is flush with the upper surface of the foundation concrete, the joint of the anchor bolt and the long bolt can be effectively performed. When the anchor bolt is placed in the formwork assembled for construction, the upper surface of the long nut is flush with the upper surface of the foundation concrete to be cast while rotating the long nut screwed to the upper end of the anchor bolt. The height can be adjusted without the need for troublesome work.

【0039】次に、請求項4に係る傾斜した建築物の嵩
上げ方法によれば、上方に突出させた上端に継手部を取
り付けたアンカーボルトを基礎コンクリートに埋設さ
せ、この基礎コンクリートの上面に土台を載着し、その
後、長ボルト上端を上方に突出させる様にして土台に貫
通させて継手部に連結させることにより前記アンカーボ
ルトと一体的に連結させ、前記土台上面を長ボルトに螺
合させた締着ナットで締着させ、地盤の不等沈下等によ
り建築物が傾斜した場合には、前記土台に締着した各長
ボルトの締着ナットを緩めて該長ボルトに沿って上方へ
移動させ、前記土台を各長ボルトに沿って嵩上げして水
平に転位させ、前記基礎コンクリートの上面と、嵩上げ
した土台下面とに嵩上げ部材を挟装して建築物の土台を
水平に保持し、前記締着ナットを再び土台上面に締着さ
せて成ることにより、建築物とともに傾斜した土台を、
アンカーボルトに一体に連結された長ボルトに沿って安
定して水平に嵩上げでき、嵩上げ中に位置ずれ等が発生
することもなく、嵩上げ作業を簡易に、しかも作業経費
も安価に施工できる。また、嵩上げした後の建築物の土
台を基礎コンクリートに、長ボルト及び締着ナットを利
用して再び強固に緊結でき、嵩上げ後の建築物の耐震
性、耐風性等の低下を防止できる。
Next, according to the method for raising a sloping building according to claim 4, an anchor bolt having a joint portion attached to an upper end protruding upward is buried in a foundation concrete, and a base is provided on an upper surface of the foundation concrete. After that, the upper end of the long bolt is screwed into the long bolt by connecting the anchor bolt integrally with the anchor bolt by penetrating the base so as to project the upper end of the long bolt upward and connecting to the joint portion. When the building is tilted due to uneven settlement of the ground, etc., loosen the nuts of each long bolt fastened to the base and move upward along the long bolt. Then, the base is raised along each long bolt and displaced horizontally, and an upper surface of the foundation concrete and a raised lower surface are sandwiched by a raising member to hold the foundation of the building horizontally, By comprising a wearing nut is again fastened to the base upper surface, an inclined base with buildings,
It is possible to stably and horizontally raise along the long bolts integrally connected to the anchor bolts, no displacement occurs during the raising, and the raising operation can be performed easily and at low cost. Further, the foundation of the raised building can be firmly tied again to the foundation concrete by using the long bolts and the fastening nuts, so that the seismic resistance and wind resistance of the raised building can be prevented from lowering.

【0040】また、請求項5によれば、前記継手部は、
螺進方向に長く形成した長ナットであり、前記アンカー
ボルトの上端に該長ナットを螺合させ、該長ナットの螺
子孔に、上面から仮止栓を係止して該螺子孔を閉鎖さ
せ、この状態で長ナットを前記基礎コンクリートに面一
状に埋設して成ることにより、基礎型枠内へコンクリー
トを打設するときに、長ナットの螺子孔内にコンクリー
トが付着して閉塞されることなく、仮止栓で螺子孔を保
護しながら、コンクリートが固化した後では、長ボルト
を長ナットに確実に継手連結してアンカーボルトと一体
化できて土台を基礎コンクリートに緊結できる。
Further, according to claim 5, the joint portion is
A long nut formed long in the screwing direction, the long nut is screwed into the upper end of the anchor bolt, and a temporary stopper is locked from the upper surface into the screw hole of the long nut to close the screw hole. In this state, the long nut is buried flush with the foundation concrete, so that when the concrete is poured into the foundation formwork, the concrete adheres to the screw hole of the long nut and is closed. After the concrete has solidified while protecting the screw hole with the temporary stopper, the long bolt can be securely connected to the long nut by coupling and integrated with the anchor bolt, and the base can be tied to the foundation concrete.

【0041】また、請求項6によれば、前記仮止栓は、
弾性部材から成ることにより、長ナットの螺子孔内に着
脱取り付けしながら水密性を保持でき、螺子孔内がコン
クリートで閉塞されるのを確実に防止できる。
According to the sixth aspect, the temporary stopper is
With the elastic member, watertightness can be maintained while being attached to and detached from the screw hole of the long nut, and the screw hole can be reliably prevented from being closed by concrete.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例に係る建築物の基礎と土台との
連結部構造の一部拡大縦断面図である。
FIG. 1 is a partially enlarged longitudinal sectional view of a connection structure between a foundation and a base of a building according to an embodiment of the present invention.

【図2】図1の建築物の基礎と土台との連結部構造のア
ンカーボルト、長ナット、長ボルト、仮止栓等を示した
一部断面拡大斜視図である。
FIG. 2 is a partially enlarged perspective view showing an anchor bolt, a long nut, a long bolt, a temporary stopper, and the like of a connecting portion structure between a foundation and a foundation of the building of FIG. 1;

【図3】アンカーボルト、長ナット、長ボルト、締着ナ
ット、仮止栓等の拡大斜視図である。
FIG. 3 is an enlarged perspective view of an anchor bolt, a long nut, a long bolt, a fastening nut, a temporary stopper, and the like.

【図4】傾斜した建築物の嵩上げ方法を実施して水平に
復元させた建築物の正面説明図である。
FIG. 4 is an explanatory front view of a building that has been restored to a horizontal position by performing a method of raising a building that has been inclined;

【図5】基礎コンクリートと土台とに嵩上げ部材を挟装
させ、更にアンカーボルトに継手連結した長ボルトの締
着ナットで嵩上げした土台上面を締着した状態を示した
基礎と土台との連結部構造の一部拡大断面図である。
FIG. 5 shows a state in which a raising member is sandwiched between a foundation concrete and a base, and furthermore, a connection part between the base and the base showing a state in which the upper surface of the base raised by a fastening nut of a long bolt connected to an anchor bolt is fastened. It is a partially expanded sectional view of a structure.

【図6】従来の基礎と土台との連結部構造を示した一部
拡大断面図である。
FIG. 6 is a partially enlarged sectional view showing a conventional connection structure between a foundation and a base.

【図7】従来の基礎と土台との連結部構造において、土
台を台木から成る嵩上げ部材で嵩上げした状態を示した
一部拡大断面図である。
FIG. 7 is a partially enlarged cross-sectional view showing a state in which the base is raised by a raising member made of a stock in a conventional connection structure between a foundation and a base.

【図8】従来の基礎と土台との連結部構造において、土
台をコンクリートから成る嵩上げ部材で嵩上げした状態
を示した一部拡大断面図である。
FIG. 8 is a partially enlarged cross-sectional view showing a state in which the base is raised with a raising member made of concrete in the conventional connection structure between the foundation and the base.

【符号の説明】[Explanation of symbols]

10 建築物の基礎と土台との連結部構造 12 基礎コンクリート 14 継手部 16 アンカーボルト 18 土台 20 長ボルト 22 締着ナット 32 建築物 34 嵩上げ部材 36 長ナット 38 螺子孔 40 仮止栓 DESCRIPTION OF SYMBOLS 10 Connection part structure of foundation and foundation of building 12 Foundation concrete 14 Joint part 16 Anchor bolt 18 Base 20 Long bolt 22 Tightening nut 32 Building 34 Raising member 36 Long nut 38 Screw hole 40 Temporary stopper plug

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建築物を構築するための基礎コンクリー
トと、 該基礎コンクリート内に埋設され、上端側に継手部を備
えたアンカーボルトと、 前記基礎コンクリートの上面に載着された土台と、 該土台を縫刺し状に貫通し、上端を該土台上面から突出
させると共に下端を前記継手部に継手連結され前記アン
カーボルトと一体的に連結固定される長ボルトと、 該長ボルトの上方突出部分に螺合され、前記土台上面に
締着される締着ナットと、を備えて成る建築物の基礎と
土台との連結部構造。
1. A foundation concrete for constructing a building, an anchor bolt embedded in the foundation concrete and provided with a joint on an upper end side, a base mounted on an upper surface of the foundation concrete, A long bolt that penetrates the base in a sewn shape, an upper end protrudes from the upper surface of the base, and a lower end is jointly connected to the joint portion and is integrally connected and fixed to the anchor bolt. And a fastening nut which is screwed and fastened to the upper surface of the base.
【請求項2】 前記継手部の上端は、前記基礎コンクリ
ートの上面と面一状に埋設されて成る請求項1記載の建
築物の基礎と土台との連結部構造。
2. The structure according to claim 1, wherein an upper end of the joint is buried flush with an upper surface of the foundation concrete.
【請求項3】 前記継手部は、螺進方向に長く形成され
た長ナットを含むボルト継手から成り、 該長ナットは、前記アンカーボルトの上端に、その上端
面が基礎コンクリートの上面と面一状になる様に高さ調
整自在に螺合されて成る請求項1または2記載の建築物
の基礎と土台との連結部構造。
3. The joint part comprises a bolt joint including a long nut formed long in the screwing direction. The long nut has an upper end surface flush with an upper surface of the foundation concrete at an upper end of the anchor bolt. 3. The connecting part structure between a foundation and a base of a building according to claim 1 or 2, which is screwed so as to be adjustable in height so as to form a shape.
【請求項4】 上方に突出させた上端に継手部を取り付
けたアンカーボルトを基礎コンクリートに埋設させ、 この基礎コンクリートの上面に土台を載着し、 その後、長ボルト上端を上方に突出させる様にして土台
に貫通させて継手部に連結させることにより前記アンカ
ーボルトと一体的に連結させ、 前記土台上面を長ボルトに螺合させた締着ナットで締着
させ、 地盤の不等沈下等により建築物が傾斜した場合には、 前記土台に締着した各長ボルトの締着ナットを緩めて該
長ボルトに沿って上方へ移動させ、 前記土台を各長ボルトに沿って嵩上げして水平に転位さ
せ、 前記基礎コンクリートの上面と、嵩上げした土台下面と
に嵩上げ部材を挟装して建築物の土台を水平に保持し、 前記締着ナットを再び土台上面に締着させて成る傾斜し
た建築物の嵩上げ方法。
4. An anchor bolt having a joint attached to an upper end protruding upward is buried in the foundation concrete, a base is mounted on an upper surface of the foundation concrete, and then an upper end of the long bolt is protruded upward. And connected to the joint part by penetrating through the base to connect with the anchor bolt integrally.The upper surface of the base is fastened with a fastening nut screwed to a long bolt. If the object is inclined, loosen the fastening nut of each long bolt fastened to the base and move it upward along the long bolt, raise the base along each long bolt and displace horizontally. An inclined building formed by sandwiching a raising member between the upper surface of the foundation concrete and the raised lower surface of the foundation to horizontally hold the foundation of the building, and fastening the fastening nut to the upper surface of the foundation again. Raising way of things.
【請求項5】 前記継手部は、螺進方向に長く形成した
長ナットであり、 前記アンカーボルトの上端に該長ナットを螺合させ、該
長ナットの螺子孔に、上面から仮止栓を係止して該螺子
孔を閉鎖させ、 この状態で長ナットを前記基礎コンクリートに面一状に
埋設して成る請求項4記載の傾斜した建築物の嵩上げ方
法。
5. The joint portion is a long nut formed long in the screwing direction. The long nut is screwed to an upper end of the anchor bolt, and a temporary stopper plug is inserted into a screw hole of the long nut from an upper surface. 5. The method for raising a sloped building according to claim 4, wherein said screw hole is closed by locking, and a long nut is buried flush with said foundation concrete in this state.
【請求項6】 前記仮止栓は、弾性部材から成る請求項
5記載の傾斜した建築物の嵩上げ方法。
6. The method for raising a sloped building according to claim 5, wherein the temporary stopper is made of an elastic member.
JP7092395A 1995-03-03 1995-03-03 Connection structure between building foundation and foundation and method of raising inclined building Expired - Lifetime JP2649218B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7092395A JP2649218B2 (en) 1995-03-03 1995-03-03 Connection structure between building foundation and foundation and method of raising inclined building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7092395A JP2649218B2 (en) 1995-03-03 1995-03-03 Connection structure between building foundation and foundation and method of raising inclined building

Publications (2)

Publication Number Publication Date
JPH08239862A JPH08239862A (en) 1996-09-17
JP2649218B2 true JP2649218B2 (en) 1997-09-03

Family

ID=13445521

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7092395A Expired - Lifetime JP2649218B2 (en) 1995-03-03 1995-03-03 Connection structure between building foundation and foundation and method of raising inclined building

Country Status (1)

Country Link
JP (1) JP2649218B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4553978B1 (en) * 2010-03-15 2010-09-29 株式会社美和テック Support device for height adjustment
JP4726093B1 (en) * 2010-08-25 2011-07-20 株式会社美和テック Support device for height adjustment for structures
JP6300622B2 (en) * 2014-04-25 2018-03-28 三井ホーム株式会社 Anchor unit, anchor structure and horizontal restoration method

Also Published As

Publication number Publication date
JPH08239862A (en) 1996-09-17

Similar Documents

Publication Publication Date Title
US5384993A (en) Tie down for building structures
US7444787B2 (en) Concrete post anchor
KR100997128B1 (en) Screw jack for supporting member
JP3505213B2 (en) Construction method of diagonally cut beam
JP4693299B2 (en) Column base connection structure
US20030041550A1 (en) Wood fence post repair device
JP3479516B2 (en) Slope stabilization method and slope stabilization device
CA1322863C (en) Joining of a concrete element to a support
JP2649218B2 (en) Connection structure between building foundation and foundation and method of raising inclined building
US5406769A (en) Joining of a concrete element to a support
US20070056227A1 (en) Modular foundation method
JP3612600B2 (en) Unit anchor and structural steel foundation beam
JP2784952B2 (en) Anchor bolt fixing device
AU648871B2 (en) Joining of a concrete element to a support
KR19980010326U (en) Fixed installation structure of construction angle
JPH08269912A (en) Fastening method of steel bridge pier to footing
JP4296537B2 (en) Joining structure and joining method of ready-made pile and superstructure
CA1327711C (en) Joining of a concrete element to a support
JP3048453B2 (en) Exterior material mounting method
JP2002220997A (en) Construction method for stabilizing tunnel
JP2003321913A (en) Method for repairing handrail and attachment device for new handrail
JP2776620B2 (en) Basic structure of building
JP2620838B2 (en) Building floor foundation structure
JP2825150B2 (en) Fixing method of column base in steel frame building
JP2000087369A (en) Wall body unit, auxiliary bottom plate unit and execution of wall