JPH0720338U - Attachment assembly equipment for construction machinery - Google Patents

Attachment assembly equipment for construction machinery

Info

Publication number
JPH0720338U
JPH0720338U JP5443493U JP5443493U JPH0720338U JP H0720338 U JPH0720338 U JP H0720338U JP 5443493 U JP5443493 U JP 5443493U JP 5443493 U JP5443493 U JP 5443493U JP H0720338 U JPH0720338 U JP H0720338U
Authority
JP
Japan
Prior art keywords
bracket
set bolt
boom
assembling
attachment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5443493U
Other languages
Japanese (ja)
Inventor
浩 深谷
Original Assignee
浩 深谷
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 浩 深谷 filed Critical 浩 深谷
Priority to JP5443493U priority Critical patent/JPH0720338U/en
Publication of JPH0720338U publication Critical patent/JPH0720338U/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】 【目的】 車体上に起伏回動自在にブームを支架し、そ
れの先端側にアタッチメントを装脱自在に組付ける建設
機械において、ブームの先端側に対するアタッチメント
の脱着作業が簡単に行なえ、また、組付け装着したアタ
ッチメントの組付け姿勢の変換が簡略に行なえるように
する。 【構成】 車体a上に起伏回動自在に装架せるブームb
の先端側には、油圧シリンダ20により作動するトッグ
ルリンク機構2を介してベースブラケット4を回動自在
に組付けて、これの先端側に鍔状の組付鍔部4bを設け
ておき、作業機にはそれの基端側に、前記組付鍔部4b
と接合して重合する鍔状の組付ブラケット5を設けてお
いて、この組付鍔部4bと組付ブラケット5とのセット
ボルト44…による閉じ合わせで作業機を組付け、その
閉じ合わせの解放で作業機を取り外すようにする。
(57) [Summary] [Purpose] In a construction machine in which a boom is supported on the vehicle body so that it can be swung up and down, and an attachment is detachably attached to the tip side of the boom, it is easy to attach and detach the attachment to the tip side of the boom. In addition, the attachment posture of the attachment attached can be easily changed. [Structure] A boom b that is mounted on a vehicle body a so that it can be raised and lowered freely.
A base bracket 4 is rotatably assembled to the tip end side of the base via a toggle link mechanism 2 operated by a hydraulic cylinder 20, and a brim-shaped mounting collar portion 4b is provided on the tip end side of the base bracket 4. At the base end side of the machine, the assembling flange 4b is provided.
A brim-shaped assembly bracket 5 that is bonded to and overlaps with each other is provided, and the work machine is assembled by closing the assembly flange 4b and the assembly bracket 5 with the set bolts 44 ... Be sure to remove the work implement by releasing it.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、車体上に起伏回動自在に支架せるブームの先端側に、バケット等の 作業機を装着して構成するバックホウ等の建設機械において、車体上に装架せる ブームの先端側に組付けるショベル・油圧ブレーカー・リッパー等のアタッチメ ントの組付装置についての改良に関する。 The present invention relates to a construction machine such as a backhoe configured by mounting a working machine such as a bucket on the tip side of a boom that can be rotatably and rotatably supported on the vehicle body, and is assembled on the tip side of the boom that is mounted on the vehicle body. The present invention relates to improvements in attachment devices for attachments such as shovels, hydraulic breakers, and rippers.

【0002】[0002]

【従来の技術】[Prior art]

建設機械において、それの車体上に装架せるブームの先端側にアタッチメント を装着するための組付手段は、図1に示す如く、車体aの上面に起伏回動自在に 装架せるブームbの先端側に、作業機としてバケットcを組付ける手段について いえば、ブームbを構成しているアーム1の先端部に連結軸穴w1を設けるとと もに、油圧シリンダ20により作動するトッグルリンク機構2の先端に連結軸穴 y1を設けておいて、これら連結軸穴w1・y1に、バケットcの基端部に装設 せる取付ブラケット3に開放しておく連結軸穴w2・y2を重合させて、連結軸 を挿通し、締付ナットの締着でセットすることで、バケットcを装着するように している。 In the construction machine, assembling means for mounting the attachment on the tip side of the boom to be mounted on the body of the construction machine is as shown in FIG. Regarding a means for assembling the bucket c as a working machine on the tip end side, a connecting shaft hole w1 is provided in the tip end portion of the arm 1 forming the boom b, and a toggle link mechanism operated by the hydraulic cylinder 20 is provided. 2 are provided with connecting shaft holes y1 and the connecting shaft holes w1 and y1 are overlapped with the connecting shaft holes w2 and y2 which are opened to the mounting bracket 3 mounted at the base end of the bucket c. Then, the bucket c is mounted by inserting the connecting shaft and setting by tightening the tightening nut.

【0003】 そして、このバケットcを、例えば、油圧ブレーカーdと交換するときは、バ ケットcを組付けている連結軸を抜き取ってバケットcを下ろし、次いで、油圧 ブレーカーdを持ち上げて、それの基端側に装設してある取付ブラケット3に開 設しておく連結軸穴w2・y1を、前述のブームbの先端側の連結軸穴w1およ びトッグルリンク機構2先端の連結軸穴y1に重合させて、連結軸を挿通してセ ットすることで行なうようにしている。When replacing the bucket c with the hydraulic breaker d, for example, the connecting shaft to which the bucket c is assembled is pulled out, the bucket c is lowered, and then the hydraulic breaker d is lifted. The connecting shaft holes w2 and y1 to be opened in the mounting bracket 3 mounted on the base end side are the connecting shaft hole w1 on the tip side of the boom b and the connecting shaft hole on the tip end of the toggle link mechanism 2. It is performed by superimposing it on y1 and inserting the connecting shaft to set it.

【0004】[0004]

【考案が解決しようとする課題】[Problems to be solved by the device]

上述の建設機械におけるアタッチメントの組付手段は、バケットcの組付手段 についていえば、重量のあるバケットcを持ち上げて、それの取付ブラケット3 の連結軸穴w2・y2を、ブームbの先端側の連結軸穴w1・y2に対して軸芯 線が揃う状態に重合させ、その状態のところに連結軸を挿通してセットすること から、組付作業が大変な作業となる問題がある。 As for the attachment means of the attachment in the construction machine described above, as for the attachment means of the bucket c, a heavy bucket c is lifted and the connecting shaft holes w2 and y2 of the mounting bracket 3 of the bucket c are attached to the tip side of the boom b. There is a problem that the assembling work becomes a difficult work because the shafts are overlapped with the connecting shaft holes w1 and y2 so that the shaft cores are aligned and the connecting shaft is inserted and set in that state.

【0005】 また、作業機を交換するときは、装着してある作業機を支承した状態で、まず 、連結軸を抜き取り、これに続いて作業機を外し、交換して装着しようとする作 業機を持ち上げて、前述の組付作業を行なうことで、交換のための脱着作業が面 倒でむづかしい問題がある。Further, when exchanging the working machine, with the mounted working machine supported, first, the connecting shaft is pulled out, the work machine is subsequently removed, and the working machine is replaced and mounted. When the machine is lifted and the above-mentioned assembling work is performed, there is a problem that the detaching work for replacement is troublesome and difficult.

【0006】 また、作業機が前述のバケットcである場合に、作業の状態によっては、バケ ットcが、それの開放口を下方に向けた下向きの姿勢として組付けてあることが 作業に都合が良い場合と、開放口を上方に向けた上向きの姿勢として組付けてあ ることが作業に都合が良い場合がでてくる。このようなときには、バケットcの 取付姿勢を180度回転させるよう、バケットcの組付けをやりなおすことにな るが、この場合においても、面倒な脱着作業を行なわなければならない問題があ る。Further, when the working machine is the above-mentioned bucket c, depending on the working state, the bucket c may be assembled in a downward posture with its opening opening facing downward. There are cases where it is convenient and cases where it is convenient for the work to assemble it with the opening facing upwards. In such a case, the bucket c has to be reassembled so that the mounting posture of the bucket c is rotated by 180 degrees. However, even in this case, there is a problem that a troublesome detaching work must be performed.

【0007】[0007]

【目的】【Purpose】

本考案は、従来手段に生じている上述の問題を解消せしめるためになされたも のであって、車体上に起伏回動自在にブームを支架し、それの先端側にアタッチ メントを装脱自在に組付ける建設機械において、ブームの先端側に対するアタッ チメントの脱着作業が簡単に行なえ、また、組付け装着したアタッチメントの組 付け姿勢の変換が簡略に行なえるようにする新たな手段を提供することを目的と する。 The present invention has been made in order to solve the above-mentioned problems occurring in the conventional means.A boom is rotatably and rotatably supported on a vehicle body, and an attachment is detachably attached to the tip end side of the boom. To provide a new means to easily attach and detach the attachment to and from the tip side of the boom in the construction machine to be assembled, and to change the assembly posture of the attached attachment. The purpose.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

そして、本考案は、上述の目的を達成するための手段として、車体の上面に起 伏回動自在に支架せるブームの先端側に、油圧シリンダにより作動するトッグル リンク機構を介してベースブラケットを回動自在に組付け、それの先端側に左右 方向に横切る鍔状の組付鍔部を一体に装設し、その組付鍔部の中心部位に中心軸 45挿通用の回転中心穴を設けるとともに、周縁部位に回転中心穴に等分対向さ せてセットボルト挿通用のセットボルト穴を開設し、作業機には、それの基端側 に、前記鍔状の組付鍔部と接合して重合する鍔状の組付ブラケットを設け、それ の中心部位に回転中心穴を設けるとともに周縁部位に前記組付鍔部のセットボル ト穴と対応する位置に、回転中心穴に等分対向するセットボルト穴を設けてなる 建設機械におけるアタッチメントの組付装置を提起するものである。 As a means for achieving the above-mentioned object, the present invention provides a base bracket, which is mounted on a tip end side of a boom which is supported on the upper surface of a vehicle body so that it can be rotatably and rotatably supported, via a toggle link mechanism operated by a hydraulic cylinder. Assemble freely, and integrally install a brim-shaped assembling flange part that crosses in the left-right direction on the tip side of it, and provide a rotation center hole for inserting the central shaft 45 at the center part of the assembling flange part. Establish a set bolt hole for inserting the set bolt in the peripheral area equally facing the rotation center hole, and connect the work piece to the base end of the set bolt hole with the flange-shaped assembly flange part. A bracket-shaped mounting bracket that overlaps is provided, and a rotation center hole is provided in the center part of the bracket, and a set bolt that equally opposes the rotation center hole at a position corresponding to the set bolt hole of the assembly flange part at the peripheral part. For construction machines with holes It is intended to raise the assembling device of attachment.

【0009】[0009]

【実施例】【Example】

次に実施例を図面に従い詳述する。なお、図面符号は、従前手段のものと同効 の構成部材については同一の符号を用いるものとする。 Next, embodiments will be described in detail with reference to the drawings. The same reference numerals are used for the constituent members having the same effects as those of the conventional means.

【0010】 図3は、本考案を実施せる建設機械の要部の、ブーム先端にアタッチメントを 組付ける途上の側面図で、同図において、bは図においては大半を省略している が、図1の如く建設機械の車体aの上面に起伏回動自在に支架せるブーム、1は そのブームbの先端部を構成するようそのブームbの先端に屈曲回動自在に連結 してあるアーム、2はそのアーム1に組付けられて油圧シリンダ20により回動 するトッグルリンク機構、4は作業機組付用のベースブラケット、cは作業機た るバケット、5はそのバケットcの基端部に設けた組付ブラケットを示す。FIG. 3 is a side view of the main part of the construction machine embodying the present invention during the attachment of the attachment to the tip of the boom. In FIG. 3, most of b is omitted in the figure. 1, a boom that is rotatably supported on the upper surface of a vehicle body a of a construction machine, 1 is an arm that is flexibly connected to the tip of the boom b so as to form the tip of the boom b, 2 Is a toggle link mechanism assembled to the arm 1 and rotated by a hydraulic cylinder 20, 4 is a base bracket for assembling the working machine, c is a bucket as a working machine, and 5 is a base end portion of the bucket c. The assembled bracket is shown.

【0011】 ブームbは、図1にあるように、先端側に屈曲回動自在にアーム1が連結して ある通常のもので、そのアーム1の上面側には油圧シリンダ20が組付けられ、 それの出入りするピストン200の先端にトッグルリンク機構2のリンク杆2a ・2bの各基端が連結している。そして、それらリンク杆2a・2bのうちの一 方の先端部はアーム1に軸着連結し、他方のリンク杆2aの先端部には作業機連 結用の連結軸穴y1が開設してある。また、アーム1の先端には、前記連結軸穴 y1と対をなす連結軸穴w1が開設してある。As shown in FIG. 1, the boom b is a normal one in which the arm 1 is connected to the tip side so as to be bent and rotatable, and the hydraulic cylinder 20 is attached to the upper surface side of the arm 1. The base ends of the link rods 2a and 2b of the toggle link mechanism 2 are connected to the tip end of the piston 200 into and out of which the link rods 2a and 2b are connected. One of the link rods 2a and 2b is pivotally connected to the arm 1 and the other end of the link rod 2a is provided with a connecting shaft hole y1 for connecting a working machine. . Further, a connecting shaft hole w1 paired with the connecting shaft hole y1 is opened at the tip of the arm 1.

【0012】 ベースブラケット4は、前記アーム1の先端に連結する連結部4aと作業機を 組付ける鍔状の組付鍔部4bとからなる。その連結部4aには、前記連結軸穴w 1・y1と対応させる連結軸穴w2・y2が形設してあり、この連結軸穴w2・ y2を、前記アーム1の先端側の連結軸穴w1とトッグルリンク機構2に設けら れる連結軸穴y1とに重合して、連結軸40・41を挿通し、締付ナットにより 締着することで、図4に示している如く、従前のバケットc等の作業機に一体に 設けられる取付ブラケット3と同様にブームbの先端側に組付け装着される。The base bracket 4 is composed of a connecting portion 4 a that is connected to the tip of the arm 1 and a brim-shaped assembling flange portion 4 b for assembling the working machine. In the connecting portion 4a, connecting shaft holes w2 and y2 corresponding to the connecting shaft holes w1 and y1 are formed. The connecting shaft holes w2 and y2 are formed on the distal end side of the arm 1. By overlapping the w1 and the connecting shaft hole y1 provided in the toggle link mechanism 2, inserting the connecting shafts 40 and 41, and tightening with the tightening nut, as shown in FIG. Like the mounting bracket 3 integrally provided to the working machine such as c, it is assembled and attached to the tip side of the boom b.

【0013】 また、作業機を組付ける鍔状の組付鍔部4bは、図5に示しているように正面 視において、略長方形状をなすプレート状に形成してあって、前述の連結部4a の先端側を左右に横切る姿勢として、その連結部4aの先端側に形設された袋状 部の前面に鍔状に接合し、熔接により連結部4aと一体に結合している。そして 、この鍔状の組付鍔部4bには、中心部位に、中心軸を挿通する回転中心穴42 が形設され、また、周縁部位には、前記回転中心穴42を対称軸芯として上下お よび左右に対称するように配した位置に、セットボルト穴43…が形設してある 。Further, as shown in FIG. 5, the brim-shaped mounting collar portion 4b for assembling the working machine is formed in a plate shape having a substantially rectangular shape in a front view, and has the above-mentioned connecting portion. The front end side of the connecting portion 4a is laterally crossed, and is joined to the front surface of the bag-shaped portion formed on the front end side of the connecting portion 4a in a brim shape, and is integrally connected to the connecting portion 4a by welding. A rotation center hole 42 for inserting the central axis is formed in the center portion of the collar-shaped mounting collar portion 4b, and the rotation center hole 42 is vertically arranged with the rotation center hole 42 as the symmetrical axis center in the peripheral portion. And set bolt holes 43 are formed at positions symmetrically arranged to the left and right.

【0014】 しかして、ベースブラケット4は、バケットc等の作業機とは別体に形成して あり、それの前記連結部4aによるブームbの先端側との連結で、図4に示して いる状態となる。そして、この状態のベースブラケット4の先端側の組付鍔部4 bに、作業機を、それに設ける組付ブラケット5を介して装脱自在に組付けるよ うにしてある。Therefore, the base bracket 4 is formed separately from the working machine such as the bucket c, and is connected to the tip side of the boom b by the connecting portion 4a thereof, which is shown in FIG. It becomes a state. Then, the working machine is removably assembled to the assembled brim portion 4b on the front end side of the base bracket 4 in this state via the assembled bracket 5 provided therein.

【0015】 作業機に設ける前記組付ブラケット5は、前述のベースブラケット4の組付鍔 部4bと重合して接合するよう略同形の板状に形成され、組付鍔部4bに設ける 中心軸挿通用の回転中心穴42およびセットボルト挿通用のセットボルト穴43 …と対応する位置に、それぞれ回転中心穴50およびセットボルト穴51…が開 設される。The assembling bracket 5 provided on the working machine is formed in a plate shape having substantially the same shape so as to be overlapped with the assembling flange portion 4b of the above-mentioned base bracket 4, and is joined to the assembling flange portion 4b. A rotation center hole 50 and a set bolt hole 51 are opened at positions corresponding to the rotation center hole 42 for insertion and the set bolt hole 43 for insertion of the set bolt, respectively.

【0016】 そして、この鍔状の組付ブラケット5は、図7・図8・図9に示している如く 、バケットc、油圧ブレーカーd、リッパーe、リフトアームf等の各作業機の 基端側に鍔状に接合して一体に熔接することで取付けられ、この鍔状の組付ブラ ケット5を前述のベースブラケット4に設けた鍔状の組付鍔部4bに重合するよ う接合して、セットボルト44…により閉じ合わせることで連結し、その閉じ合 わせの解放により取り外すようにし、これによって、作業機の脱着が行なわれる ようにしてある。As shown in FIGS. 7, 8 and 9, the brim-shaped mounting bracket 5 is a base end of each working machine such as a bucket c, a hydraulic breaker d, a ripper e, and a lift arm f. It is attached by welding to the side in a brim shape and integrally welded, and this brim-shaped assembling bracket 5 is joined so as to overlap with the brim-like assembling brim portion 4b provided on the base bracket 4 described above. Then, the set bolts 44 are connected to each other by closing them, and the set bolts 44 are connected to each other to release the connection, whereby the work machine is attached and detached.

【0017】 次に、図10および図11は、ベースブラケット4に組付ブラケット5を介し て組付けた作業機たるバケットcを、ブームbの先端側から取り外すことなく、 開放口が上向きの姿勢と下向きの姿勢とに変換させる際の説明図である。Next, FIG. 10 and FIG. 11 show a posture in which the open mouth is upward without removing the bucket c, which is a working machine assembled to the base bracket 4 via the assembly bracket 5, from the tip side of the boom b. It is explanatory drawing at the time of converting into a downward attitude.

【0018】 即ち、バケットcが、図10に示している如く、下向きの姿勢で組付けられて いる状態において、ベースブラケット4の組付鍔部4bとバケットcの基端側の 組付ブラケット5とを閉じ合わせているセットボルト44…を抜き取り、組付鍔 部4bの回転中心穴42と組付ブラケット5の回転中心穴50とに嵌挿している 中心軸45を支点軸として、バケットcを180度回転させれば、バケットcは 上向きの姿勢となる。この状態において、ベースブラケット4の組付鍔部4bの セットボルト穴43…とバケットcの組付ブラケット5のセットボルト穴51… とを重合させて、そこにセットボルト44…を挿通して締着することで、バケッ トcを上向きの姿勢に組付けなおす作業が完了するようになる。That is, as shown in FIG. 10, when the bucket c is assembled in a downward posture, the assembly flange portion 4b of the base bracket 4 and the assembly bracket 5 on the base end side of the bucket c are assembled. The set bolts 44 that close the and are removed, and are inserted into the rotation center hole 42 of the assembly collar portion 4b and the rotation center hole 50 of the assembly bracket 5, and the bucket c is set with the center shaft 45 as a fulcrum shaft. When rotated by 180 degrees, the bucket c is in an upward posture. In this state, the set bolt holes 43 of the assembling flange portion 4b of the base bracket 4 and the set bolt holes 51 of the assembling bracket 5 of the bucket c are overlapped with each other, and the set bolts 44 are inserted and tightened. By wearing it, the work of reassembling the bucket c in the upward posture is completed.

【0019】 なお、回転中心穴42・50に嵌挿する中心軸45は、ベースブラケット4の 組付鍔部4bに固定状態に装設しておき、ここに、作業機側の組付ブラケット5 の回転中心穴50を嵌合させて、ナットにより締着するように構成する場合があ る。これにより作業機の脱着が一たん一本の中心軸45に支架された状態を経て 行なえることになり、一層、楽に作業できるようになる。The center shaft 45 fitted into the rotation center holes 42 and 50 is fixedly mounted on the assembling flange portion 4b of the base bracket 4, and here, the assembling bracket 5 on the working machine side is provided. The rotation center hole 50 may be fitted and tightened with a nut. As a result, the work machine can be attached and detached only once while being supported by the central shaft 45, and the work can be further facilitated.

【0020】[0020]

【考案の効果】[Effect of device]

以上説明したように、本考案における建設機械におけるアタッチメントの組付 装置は、車体a上に起伏回動自在に装架せるブームbの先端側には、油圧シリン ダ20により作動するトッグルリンク機構2を介してベースブラケット4を回動 自在に組付けて、これの先端側に鍔状の組付鍔部4bを設けておき、作業機には それの基端側に、前記組付鍔部4bと接合して重合する鍔状の組付ブラケット5 を設けておいて、この組付鍔部4bと組付ブラケット5とを中心軸45中心に自 在に回転するよう連結した状態からセットボルト44…による閉じ合わせで作業 機を組付けるようにし、その閉じ合わせの解放で作業機を取り外すようにしてい るのだから、作業機の脱着の際に、ブームbの先端側のトッグルリンク機構2と の連結軸40・41を抜き差しする面倒な作業を行なわずに、簡単な作業で作業 機を脱着し得るようになる。 As described above, in the attachment mounting apparatus for the construction machine according to the present invention, the toggle link mechanism 2 that is operated by the hydraulic cylinder 20 is provided on the tip side of the boom b that is mounted on the vehicle body a so as to be erected and rotatable. The base bracket 4 is rotatably assembled through the base bracket 4, and a brim-shaped mounting collar portion 4b is provided on the tip end side of the base bracket 4, and the mounting collar portion 4b is mounted on the base end side of the working machine. A brim-shaped mounting bracket 5 that is bonded to and overlaps with the mounting bracket 4 is provided, and the mounting bolt 4b and the mounting bracket 5 are connected so as to rotate independently around the central axis 45, and then the set bolt 44 The work machine is assembled by closing with ... and the work machine is removed when the work is released. Therefore, when attaching or detaching the work machine, the work machine is connected to the toggle link mechanism 2 on the tip side of the boom b. Connection shaft 40 / Without troublesome work of inserting and removing the 1, it will be capable of desorbing the working machine with a simple operation.

【図面の簡単な説明】[Brief description of drawings]

【図1】従前の建設機械の作業機を外した状態の全体の
概要図である。
FIG. 1 is an overall schematic diagram of a conventional construction machine with a working machine removed.

【図2】同上建設機械の作業機の一例としての油圧ブレ
ーカーの側面図である。
FIG. 2 is a side view of a hydraulic breaker as an example of a working machine of the same construction machine.

【図3】本考案を実施せる建設機械の要部の、ベースブ
ラケットおよび作業機としてバケットを組付けていく途
上の側面図である。
FIG. 3 is a side view of a main part of a construction machine embodying the present invention, on the way of assembling a base bracket and a bucket as a working machine.

【図4】同上要部の、ベースブラケットを組付けた状態
の側面図である。
FIG. 4 is a side view of the main part of the same with the base bracket assembled.

【図5】同上要部に組付けたベースブラケットの正面図
である。
FIG. 5 is a front view of the base bracket assembled to the main part of the same.

【図6】同上要部のベースブラケットに組付ける作業機
の組付ブラケットの後面図である。
FIG. 6 is a rear view of the assembly bracket of the working machine assembled on the base bracket of the main part of the above.

【図7】同上要部の作業機として油圧ブレーカーを組付
けた状態の側面図である。
FIG. 7 is a side view showing a state in which a hydraulic breaker is installed as a working machine for the essential parts of the same.

【図8】同上要部の作業機としてリッパーを組付けた状
態の側面図である。
FIG. 8 is a side view showing a state in which a ripper is assembled as a working machine of the same as above.

【図9】同上要部の作業機としてリフトアームを組付け
た状態の側面図である。
FIG. 9 is a side view showing a state in which a lift arm is assembled as a working machine for the essential parts of the same.

【図10】同上要部の作業機としてのバケットを組付け
た状態の一部破断した側面図である。
FIG. 10 is a partially cutaway side view showing a state in which a bucket as a working machine of a main part of the same is assembled.

【図11】同上要部の、組付けたバケットの姿勢を18
0度転回させた状態の一部破断した側面図である。
[Fig. 11] Fig. 11 shows the posture of the assembled bucket of the same as above.
It is a partially broken side view of a state of being rotated by 0 degree.

【符号の説明】[Explanation of symbols]

a…車体、b…ブーム、c…バケット、d…油圧ブレー
カー、e…リッパー、f…リフトアーム、w1・w2・
y1・y2…連結軸穴、1…アーム、2…トッグルリン
ク機構、2a・2b…リンク杆、20…油圧シリンダ、
200…ピストン、3…取付ブラケット、4…ベースブ
ラケット、4a…連結部、4b…組付鍔部、40・41
…連結軸、42…回転中心穴、43…セットボルト穴、
44…セットボルト、45…中心軸、5…組付ブラケッ
ト、50…回転中心穴、51…セットボルト穴。
a ... vehicle body, b ... boom, c ... bucket, d ... hydraulic breaker, e ... ripper, f ... lift arm, w1, w2 ...
y1 / y2 ... connecting shaft hole, 1 ... arm, 2 ... toggle link mechanism, 2a / 2b ... link rod, 20 ... hydraulic cylinder,
200 ... Piston, 3 ... Mounting bracket, 4 ... Base bracket, 4a ... Coupling portion, 4b ... Assembling flange portion, 40/41
... connecting shaft, 42 ... rotation center hole, 43 ... set bolt hole,
44 ... Set bolt, 45 ... Center shaft, 5 ... Assembly bracket, 50 ... Rotation center hole, 51 ... Set bolt hole.

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成5年10月20日[Submission date] October 20, 1993

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図5[Name of item to be corrected] Figure 5

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図5】 [Figure 5]

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図6[Name of item to be corrected] Figure 6

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図6】 [Figure 6]

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 車体aの上面に起伏回動自在に支架せる
ブームbの先端側に、油圧シリンダ20により作動する
トッグルリンク機構2を介してベースブラケット4を回
動自在に組付け、それの先端側に左右方向に横切る鍔状
の組付鍔部4bを一体に装設し、その組付鍔部4bの中
心部位に中心軸45挿通用の回転中心穴42を設けると
ともに、周縁部位に回転中心穴42に等分対向させてセ
ットボルト44挿通用のセットボルト穴43…を開設
し、作業機には、それの基端側に、前記鍔状の組付鍔部
4bと接合して重合する鍔状の組付ブラケット5を設
け、それの中心部位に回転中心穴50を設けるとともに
周縁部位に前記組付鍔部4bのセットボルト穴43…と
対応する位置に、回転中心穴50に等分対向するセット
ボルト穴51…を設けてなる建設機械におけるアタッチ
メントの組付装置。
1. A base bracket 4 is rotatably assembled to a tip end side of a boom b rotatably and rotatably supported on an upper surface of a vehicle body a via a toggle link mechanism 2 operated by a hydraulic cylinder 20. A brim-shaped assembling flange portion 4b that crosses in the left-right direction is integrally provided on the tip side, and a rotation center hole 42 for inserting the central shaft 45 is provided at the center portion of the assembling flange portion 4b, while rotating at the peripheral portion. A set bolt hole 43 for inserting the set bolt 44 is opened so as to face the center hole 42 equally, and the work machine is joined to the brim-shaped assembling flange portion 4b at the base end side thereof to be superposed. Is provided with a collar-shaped mounting bracket 5, and a rotation center hole 50 is provided at the central portion thereof, and a rotation center hole 50 is provided at a position corresponding to the set bolt hole 43 of the assembling collar portion 4b at the peripheral portion. By providing set bolt holes 51 ... Attachment assembly equipment for construction machinery
【請求項2】 ベースブラケット4の鍔状の組付鍔部4
bに開設するセットボルト穴43…を、その組付鍔部4
bの中心部位に装設する中心軸45または回転中心穴4
2を中心として上下および左右に対称するよう配設し、
作業機の鍔状の組付ブラケット5に前記セットボルト穴
43に対応させて開設するセットボルト穴51…を、そ
の組付ブラケット5の中心部位に開設する中心軸45挿
通用の回転中心穴50を中心として上下および左右に対
称させて配設したことを特徴とする請求項1記載の建設
機械におけるアタッチメントの組付装置。
2. A brim-shaped mounting collar portion 4 of the base bracket 4.
The set bolt hole 43, which is opened in b, is attached to the assembling flange 4
Central shaft 45 or rotation center hole 4 installed in the central portion of b
Arranged vertically and horizontally with 2 as the center,
A set bolt hole 51, which is opened corresponding to the set bolt hole 43 in the flange-shaped assembly bracket 5 of the working machine, is formed in the central portion of the assembly bracket 5, a central shaft 45, and a rotation center hole 50 for insertion. 2. The attachment assembling device for a construction machine according to claim 1, wherein the attachment device is arranged symmetrically with respect to the top and bottom and left and right.
JP5443493U 1993-09-13 1993-09-13 Attachment assembly equipment for construction machinery Pending JPH0720338U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5443493U JPH0720338U (en) 1993-09-13 1993-09-13 Attachment assembly equipment for construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5443493U JPH0720338U (en) 1993-09-13 1993-09-13 Attachment assembly equipment for construction machinery

Publications (1)

Publication Number Publication Date
JPH0720338U true JPH0720338U (en) 1995-04-11

Family

ID=12970613

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5443493U Pending JPH0720338U (en) 1993-09-13 1993-09-13 Attachment assembly equipment for construction machinery

Country Status (1)

Country Link
JP (1) JPH0720338U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012506509A (en) * 2008-10-21 2012-03-15 ラマン,ジョン,アール Modular system for connection attachment to construction machinery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012506509A (en) * 2008-10-21 2012-03-15 ラマン,ジョン,アール Modular system for connection attachment to construction machinery

Similar Documents

Publication Publication Date Title
JPH0720338U (en) Attachment assembly equipment for construction machinery
JP5072107B2 (en) Work vehicle
KR200493426Y1 (en) Tong attachment for excavator
JP4133050B2 (en) Tractor work equipment coupling device
JP4563366B2 (en) Tractor work equipment coupling device
JP3765921B2 (en) Construction machinery
JP2000192495A (en) Mounting structure of attachment for construction work
JPH10140853A (en) Disassembling fork
JP4589561B2 (en) Mounting structure of clamp type bucket to construction machine arm
JP3530375B2 (en) Front loader
JP3639166B2 (en) Tractor work equipment mounting device
JP2782394B2 (en) Hydraulic excavator attachment / detachment device
JPH0372121A (en) Device for attaching/detaching working tool of boom type working machine
JP4563367B2 (en) Tractor work equipment coupling device
JP2005087170A (en) Adapter device and implement-coupling device of transferable agricultural machine using the same
JP3620549B2 (en) Built-in breaker arm
JPS6231471Y2 (en)
JPS634125A (en) Device for fitting attachment of pressure oil shovel
JP4563064B2 (en) Tractor work equipment coupling device
JP2541879Y2 (en) Grab bucket device
JP2023161828A (en) work vehicle
JP2004308163A (en) Driving mechanism for attachment of construction machine
JPS594852Y2 (en) Agricultural tractor rear structure
JP3040338U (en) Attachment structure of the gripping dismantling device to the arm
JP2008238958A (en) Reinforcement frame structure for tractor