JPH07189491A - Working-stage pushing-up device used for constructing multistoried structure - Google Patents

Working-stage pushing-up device used for constructing multistoried structure

Info

Publication number
JPH07189491A
JPH07189491A JP33066593A JP33066593A JPH07189491A JP H07189491 A JPH07189491 A JP H07189491A JP 33066593 A JP33066593 A JP 33066593A JP 33066593 A JP33066593 A JP 33066593A JP H07189491 A JPH07189491 A JP H07189491A
Authority
JP
Japan
Prior art keywords
work stage
jack
lifting device
horizontal beam
central body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP33066593A
Other languages
Japanese (ja)
Inventor
Yoshiharu Tokuda
義治 徳田
Shigeru Sakamoto
成 坂本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP33066593A priority Critical patent/JPH07189491A/en
Publication of JPH07189491A publication Critical patent/JPH07189491A/en
Pending legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PURPOSE:To set the load point of a working stage at the time of pushing-up operation so as to be loaded on a body in an assembling process with excellent balance in a pushing-up device, in which the working stage, on which a lifting equipment such as materials is loaded, is mounted around a previously assembled body, the erection operation of the body and the pushing-up operation of the working stage are repeated alternately and a multistoried building, etc., are constructed, for the working stage. CONSTITUTION:A working stage 2 consists of working stage stoppers 3 mounted and borne onto the outer circumference of a central section body 1, a guide column 5 with engaging brackets 5a and jacks 6. The working stage stoppers 3 are installed and borne at both ends of the post members 1a of the central section body 1 by two stopper members, and the engaging brackets 5a are also set up and borne similarly at both sides of the same post members 1a of the central section body 1 by the two engaging brackets 5a, 5a.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、ジャッキアップ工法
(別称、リフトアップ工法あるいはT−UP工法)と呼
ばれている超高層構造物、例えば超高層ビルなどの建設
工事において用いる作業ステージのせり上げ装置に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction of a work stage used in a construction work of a super high-rise structure called a jack-up construction method (also called a lift-up construction method or a T-UP construction method), for example, a super high-rise building. It concerns a lifting device.

【0002】[0002]

【従来の技術】建築構造物の高層化に対応する建設技術
として、ジャッキアップ工法がある。このジャッキアッ
プ工法の特徴とする点は、図12(A)(B)(C)
(D)で示すような工程から構成されたものである。 図12(A) 建設すべき構造物、つまり躯体の中央部を構成する鉄骨
構造部100(以下、中央部躯体100と呼ぶ)を任意
の高さ先行して組み立てる。そして、この先行して組み
立てた中央部躯体100の外周に、躯体の外まわりに相
当する外周鉄骨構造部101(この外周鉄骨構造部10
1を組み立て作業の足場として利用するので、以下、作
業ステージ101と呼ぶ)を、複数基の作業ステージス
トッパー102を介して架支固定させる工程と、 図12(B) 前記中央部躯体100の外周と、前記作業ステージ10
1の内周との間に、上端部に係止ブラケット104aを
有するガイド柱104とジャッキ105とからなるせり
上げ装置103の複数基を配備する。つまり、各せり上
げ装置103のガイド柱104における上端部の係止ブ
ラケット104aを前記中央部躯体100側の水平梁部
材に架支させ、前記作業ステージ101上には、揚重設
備等を搭載装備(図示せず)し、この揚重設備を用い
て、前記中央部躯体100上に、支柱部材や梁部材など
の資材を吊り込み、所定高さ(構造物がビルの場合は、
1階相当分)の建て方作業を行う工程と、 図12(C) 前記1階相当分の建て方が終了したところで、前記せり
上げ装置103のガイド柱104をせり上げて、つまり
ガイド柱104をジャッキ105によってせり上げ、そ
の上端部の係止ブラケット104aを前記建て方の終わ
った中央部躯体100の天端水平梁部材100bに架支
させる工程と、 図12(D) 作業ステージストッパー102の中央部躯体100に対
する架支を解除し、作業ステージ101を中央部躯体1
00に沿って1階相当分せり上げ、せり上げた作業ステ
ージ101自体を作業ステージストッパー102を介し
て中央部躯体100側に再架支させる工程と、以下、前
記(A)(B)(C)(D)の各作業工程を繰り返し、
所望高さの鉄骨構造物を構築することを特徴とするもの
である。
2. Description of the Related Art A jack-up method is known as a construction technique that can cope with higher-rise building structures. The features of this jack-up method are shown in FIGS. 12 (A), (B) and (C).
It is composed of the steps shown in FIG. FIG. 12 (A) A structure to be constructed, that is, a steel frame structure portion 100 (hereinafter, referred to as a central body 100) that constitutes a central portion of the body is assembled at an arbitrary height in advance. Then, on the outer periphery of the central body 100 assembled in advance, the outer peripheral steel structure portion 101 corresponding to the outer periphery of the body (this outer peripheral steel structure portion 10
1 is used as a scaffold for assembling work, so that it will be referred to as a work stage 101 hereinafter) via a plurality of work stage stoppers 102. FIG. 12B shows the outer periphery of the central body 100. And the working stage 10
A plurality of raising devices 103 each including a guide column 104 having a locking bracket 104a at its upper end and a jack 105 are provided between the raising device 103 and the inner circumference of the first device. That is, the locking bracket 104a at the upper end of the guide column 104 of each lifting device 103 is supported by the horizontal beam member on the side of the central body 100, and the lifting equipment is mounted on the work stage 101. (Not shown), using this lifting equipment, suspend materials such as a pillar member and a beam member on the central body 100, and a predetermined height (when the structure is a building,
12C, when the building for the first floor is completed, the guide pillar 104 of the lifting device 103 is raised, that is, the guide pillar 104. Is raised by the jack 105, and the locking bracket 104a at the upper end thereof is supported on the top end horizontal beam member 100b of the central structure 100 after the above-mentioned construction, and the work stage stopper 102 of FIG. The supporting structure for the central structure 100 is released, and the work stage 101 is moved to the central structure 1.
00, the step of raising the work stage 101 itself by one floor, and re-supporting the raised work stage 101 itself to the side of the central body 100 via the work stage stopper 102, and the steps (A), (B), (C) below. ) Repeating each work process of (D),
It is characterized by constructing a steel structure having a desired height.

【0003】ところで、前記中央部躯体100側に、作
業ステージ101を架支固定させる作業ステージストッ
パー102は、前記図12(A)で示すように、作業ス
テージ101の上部水平梁部材101aの側から中央部
躯体100の水平梁部材100a上に張り出し、架支さ
せるように構成している。つまり、その複数基の作業ス
テージストッパー102を作業ステージ101の内側に
配備し、この各作業ステージストッパー102を中央部
躯体100の水平梁部材100a上に張り出させること
により作業ステージ101を中央部躯体101の外まわ
りに架支固定させるように構成している。
By the way, as shown in FIG. 12A, a work stage stopper 102 for supporting and fixing the work stage 101 on the side of the central body 100 is provided from the side of the upper horizontal beam member 101a of the work stage 101. The horizontal beam member 100a of the central frame 100 is extended and supported. That is, the plurality of work stage stoppers 102 are arranged inside the work stage 101, and each work stage stopper 102 is projected onto the horizontal beam member 100a of the center body 100 so that the work stage 101 can be moved to the center body. It is configured to be fixed to the outer periphery of 101 by a frame.

【0004】また、前記せり上げ装置103は、先に説
明したように、上端部に係止ブラケット104aを有す
るガイド柱104と、ジャッキ105との組み合せによ
って構成している。さらに、この点の構成と作動要領を
図13および図14に基づいて、具体
的に説明すると、まずガイド柱104は、コ字もしくは
C形断面形状の細長い角パイプ状の形鋼で構成し、上端
部に係止ブラケット104aを装備し、かつガイド柱1
04自体には、一定のピッチをもって多段的に係止孔1
04b,104b……を設けた構造としている。
Further, as described above, the lifting device 103 is constituted by a combination of the guide pillar 104 having the locking bracket 104a at the upper end and the jack 105. Further, the configuration and operating procedure of this point will be specifically described with reference to FIGS. 13 and 14. First, the guide column 104 is made of elongated rectangular pipe-shaped steel having a C-shaped or C-shaped cross-section, The upper end is equipped with a locking bracket 104a, and the guide pillar 1
04 itself has a multi-stage locking hole 1 with a constant pitch.
04b, 104b ... are provided.

【0005】一方、ジャッキ105は、上端部と下端
部、つまりシリンダ側とロッド側の端部に、それぞれ水
平方向に出入りするロックピン105aおよび105b
を装備したもので、前記ガイド柱104に設けた係止孔
104b,104b……に、そのロックピン105aお
よび105bをロックさせることができるように組み合
わせた構造としたものである。
On the other hand, the jack 105 has lock pins 105a and 105b that horizontally move in and out, respectively, at an upper end portion and a lower end portion, that is, at an end portion on a cylinder side and a rod side.
The guide pin 104 has locking holes 104b, 104b ... And a lock pin 105a and 105b that can be locked.

【0006】そして作業ステージ101をせり上げる場
合は、せり上げ装置103におけるガイド柱104をジ
ャッキ105を用いてまずせり上げるとともに、上端部
の係止ブラケット104aを中央部躯体100側の天端
水平梁部材100aに掛け替え架支させる。ついで同じ
ジャッキ105を用いて作業ステージ101を中央部躯
体100に沿ってせり上げるようにしている。つまり、
ジャッキ105によりガイド柱104のみをせり上げる
工程と、次にせり上げたガイド柱104に沿って作業ス
テージ101自体の押し上げる工程との二つの工程を交
互に繰り返すことにより作業ステージ101をせり上げ
るようにしたものである。
When the work stage 101 is to be raised, the guide column 104 of the raising device 103 is first raised using the jack 105, and the locking bracket 104a at the upper end is provided at the top horizontal beam on the side of the central body 100. The member 100a is replaced and supported. Next, the same jack 105 is used to raise the work stage 101 along the central body 100. That is,
The work stage 101 is lifted by alternately repeating two processes, a process of raising only the guide pillar 104 by the jack 105 and a process of pushing up the work stage 101 itself along the guide pillar 104 raised next. It was done.

【0007】この点のせり上げ作業の手順を、さらに図
面に基づいて具体的に説明すると、まず、前記せり上げ
装置103のガイド柱104のみをせり上げる場合は、
図13で示すように、ジャッキ105の頭部を、前記
作業ステージ101の水平梁101aの下端部に、連結
ピン(図示せず)をもって一体的に連結固着させてお
く。そして、ジャッキ105はストローク一杯伸ばし、
下端部側のロックピン105bを、図13で示すよう
に、ガイド柱104の係止孔104bにロックさせてお
く。
The procedure of the raising work in this respect will be specifically described with reference to the drawings. First, when raising only the guide column 104 of the raising device 103,
As shown in FIG. 13, the head of the jack 105 is integrally connected and fixed to the lower end of the horizontal beam 101a of the work stage 101 with a connecting pin (not shown). Then, the jack 105 extends the stroke as much as possible,
The lock pin 105b on the lower end side is locked in the locking hole 104b of the guide column 104 as shown in FIG.

【0008】この状態で、ジャッキ105をストローク
一杯縮める。するとジャッキ105の頭部は、作業ステ
ージ101側に固定されているため、ジャッキ105の
下端部が相対的に引き上げられることになる。その結
果、ガイド柱104が1ストローク分せり上げられるこ
とになる。図13は、その状態を示す。ガイド柱10
4の1ストローク分のせり上げが終ると、図13で示
すように、ジャッキ105の上端部側のロックピン10
5aをガイド柱104の係止孔104bにロックさせ
る。そして、下端部側のロックピン105bは、係止孔
104bから解放するとともに、こんどは、ジャッキ1
05を伸ばす。つまりロッドを押し下げる。図13
は、その状態を示す。この状態で、ジャッキ105の下
端部側のロックピン105bをガイド柱104側にロッ
クさせ、上端部側のロックピン105aは、ガイド柱1
04より解放する。するとジャッキ105は、前記図1
3の状態となる。
In this state, the jack 105 is fully compressed. Then, since the head of the jack 105 is fixed to the work stage 101 side, the lower end of the jack 105 is relatively pulled up. As a result, the guide pillar 104 is raised by one stroke. FIG. 13 shows the state. Guide pillar 10
When one stroke of 4 is finished, as shown in FIG. 13, the lock pin 10 on the upper end side of the jack 105 is
5a is locked in the locking hole 104b of the guide pillar 104. Then, the lock pin 105b on the lower end side is released from the locking hole 104b, and this time, the jack 1
Extend 05. That is, push down the rod. FIG.
Indicates the state. In this state, the lock pin 105b on the lower end side of the jack 105 is locked to the guide column 104 side, and the lock pin 105a on the upper end side is the guide column 1
Release from 04. Then, the jack 105 is the same as that shown in FIG.
It becomes the state of 3.

【0009】そこで、この図13の操作を繰り
返せば、ガイド柱104を所定高さ(h)までせり上げ
ることができる。つまり、尺取り虫の要領でガイド柱1
04をせり上げることができる。そこでガイド柱104
の頭部を前記図12(C)で示した中央部躯体100上
に建て増しした1階相当分の高さレベルまで押し上げた
ところで、ガイド柱104の上端部に設けてある係止ブ
ラケット104aを中央部躯体100側の天端水平梁部
材100aに掛け替え架支させる。ちなみに図13に示
すせり上げ装置103においては、ガイド柱104のみ
を1階相当分(約4m)せり上げるために、前記図13
のサイクルを5回繰り返すことにより、そのレ
ベルまでせり上げることができるように設計している。
Therefore, by repeating the operation of FIG. 13, the guide pillar 104 can be raised to a predetermined height (h). In other words, the guide pole 1
You can raise 04. Therefore, the guide pillar 104
12C is pushed up to a height level equivalent to the first floor which is built on the central structure 100 shown in FIG. 12C, and the locking bracket 104a provided at the upper end of the guide pillar 104 is moved to the center. The top end horizontal beam member 100a on the side of the building frame 100 is suspended and supported. By the way, in the raising device 103 shown in FIG. 13, in order to raise only the guide pillar 104 by the amount equivalent to the first floor (about 4 m),
It is designed so that it can be raised to that level by repeating the cycle of 5 times.

【0010】前記ガイド柱104のせり上げと、そのガ
イド柱104の上端部を中央部躯体100側に架支させ
る作業が終了すると、次に作業ステージ101のせり上
げ作業を行う。
When the work for raising the guide column 104 and the work for supporting the upper end of the guide column 104 on the side of the central frame 100 are completed, the work stage 101 is then raised.

【0011】図14が、そのせり上げ作業時に
おけるジャッキ105の作動図である。この場合は、ま
ず作業ステージ101自体の中央部躯体100側に対す
る架支固定を解除する。すなわち前記図12(C)で示
すように、作業ステージストッパー102を中央部躯体
100の水平梁100a側から解除する。すると、作業
ステージ101は、ガイド柱104に組み付けられたジ
ャッキ105の頭部で支持されるとともに、ガイド柱1
04の上端部における係止ブラケット104aを介して
中央部躯体100の外周に架支されることになる。
FIG. 14 is an operation diagram of the jack 105 during the raising work. In this case, first, the pedestal fixing of the work stage 101 itself to the central body 100 side is released. That is, as shown in FIG. 12C, the work stage stopper 102 is released from the side of the horizontal beam 100a of the central frame 100. Then, the work stage 101 is supported by the head of the jack 105 assembled to the guide pillar 104, and
It is supported on the outer periphery of the central body 100 through the locking bracket 104a at the upper end of 04.

【0012】そこで前記ガイド柱104のせり上げ作業
の場合と同様に、ジャッキ105を伸縮させ、かつジャ
ッキ105の上下ロックピン105aおよび105bを
交互にガイド柱104側の係止孔104bに切換えロッ
クさせれば、ジャッキ105自体がガイド柱104に沿
って上昇することになる。ジャッキ105自体がガイド
柱104に沿って上昇すれば、それに応じて作業ステー
ジ101も上昇することになる。何故ならジャッキ10
5の頭部に作業ステージ101が載荷されているため、
その上昇にともなって作業ステージ101は押し上げら
れることになる。
Therefore, as in the case of raising the guide pole 104, the jack 105 is expanded and contracted, and the upper and lower lock pins 105a and 105b of the jack 105 are alternately switched to the locking holes 104b on the guide pole 104 side and locked. Then, the jack 105 itself rises along the guide pillar 104. If the jack 105 itself rises along the guide pillar 104, the work stage 101 also rises accordingly. Because jack 10
Since the work stage 101 is loaded on the head of 5,
The work stage 101 is pushed up with the rise.

【0013】そこで、前記ガイド柱104のせり上げ作
業の場合と同様に、図14の操作を5回繰り返
せば、作業ステージ101自体の1階相当分のせり上げ
ができる。この作業ステージ101のせり上げ作業が終
了したところで、作業ステージ101を中央部躯体10
0側に、再度、作業ステージストッパー102を介して
架支させる。この状態図12(D)で、作業ステージ1
01上に装備させている揚重、運搬設備を利用して、中
央部躯体100上に次層の鉄骨部を組み立てる。以下、
中央部躯体100の建て増しと、作業ステージ101の
せり上げ作業とを交互に繰り返して行けば、所望高さの
高層構造物の組み立て建設が効率的に展開できるという
ものである。
Therefore, as in the case of raising the guide pillar 104, by repeating the operation of FIG. 14 five times, the work stage 101 itself can be raised by one floor. When the work of raising the work stage 101 is completed, the work stage 101 is moved to the center frame 10
The 0-side is supported again via the work stage stopper 102. In this state diagram 12 (D), the work stage 1
Using the hoisting and transporting equipment mounted on 01, the next-stage steel frame part is assembled on the central structure 100. Less than,
If the building of the central frame 100 and the raising work of the work stage 101 are alternately repeated, the assembling and construction of a high-rise structure having a desired height can be efficiently developed.

【0014】なお、図15は、図12(B)を上方から
みた平面図で、中央部躯体100まわりに対する作業ス
テージ101の架支点、つまり作業ステージストッパー
102の配備位置と、せり上げ装置103の配備位置を
示すものである。図示のように、中央部躯体100まわ
りに対する作業ステージ101の架支位置、すなわち作
業ステージストッパー102の設定位置と、せり上げ装
置103におけるガイド柱104の上端部の係止ブラケ
ット104aの中央部躯体100まわりに対する架支位
置とは、平面的にみて、それぞれずらした位置に設定し
た構成となっている。つまり、図15で示すように中央
部躯体100の外周における支柱部材100bの1本お
きに、作業ステージ101の架支位置と、せり上げ装置
103におけるガイド柱104の架支位置とを設定した
構造となっている。
FIG. 15 is a plan view of FIG. 12 (B) seen from above, showing a fulcrum of the work stage 101 around the central body 100, that is, a position where the work stage stopper 102 is arranged and a lifting device 103. It shows the deployment position. As shown in the figure, the supporting position of the work stage 101 with respect to the center frame 100, that is, the setting position of the work stage stopper 102, and the center frame 100 of the locking bracket 104a at the upper end of the guide column 104 in the lifting device 103. The frame positions with respect to the surroundings are configured so that they are shifted from each other in plan view. That is, as shown in FIG. 15, a structure in which the frame position of the work stage 101 and the frame position of the guide column 104 in the lifting device 103 are set for every other column member 100b on the outer periphery of the central body 100. Has become.

【0015】[0015]

【発明が解決しようとする課題】ところで、建設過程に
おける作業ステージ101の荷重は、搭載装備させた揚
重設備の重量を含む、全荷重を前記作業ステージストッ
パー102ないしガイド柱104の上端部の係止ブラケ
ット104aを介して組み立て過程中の中央部躯体10
0側に負荷されるものである。しかも、その負荷重は、
作業ステージ101を中央部躯体100側に架支させて
いる時と、作業ステージ101をせり上げるため、せり
上げ装置103のガイド柱104をせり上げ、それを中
央部躯体100側に架支させた時と、ついで作業ステー
ジ101自体をせりあげる時と、その架支位置が、先に
説明したように、それぞれずらした位置で架支されるよ
うになっているため、荷重点が多くなること、またその
負荷重が中央部躯体100に対し、移動荷重として負荷
作用することになる。
By the way, the load of the work stage 101 in the construction process is the total load including the weight of the lifting equipment mounted on the work stage stopper 102 or the upper end of the guide pillar 104. Central body 10 during the assembly process via the stop bracket 104a
It is loaded on the 0 side. Moreover, the load weight is
When the work stage 101 is supported on the central body 100 side, and when the work stage 101 is raised, the guide pillar 104 of the lifting device 103 is raised, and it is supported on the central body 100 side. As described above, when the work stage 101 itself is lifted up and when the work stage 101 itself is lifted, the load positions are increased because the load positions are increased. Further, the load weight acts on the central body 100 as a moving load.

【0016】その結果、組み立て中の中央部躯体100
を構成する鉄骨構造部に、荷重移動による応力変化や歪
量の変化をもたらし、中央部躯体100の組み立ての精
度に悪い影響を及ぼす恐れがあった。そこで従来は、す
べての荷重点について、荷重移動による影響を排除する
ため、中央部躯体100側を部材を用いて補強する必要
があった。この発明は、このような問題点を解消すると
ともに、前記補強材等を最小限にし、組み立て作業にお
ける効率性や経済性の向上を狙いとした作業ステージせ
り上げ装置を提供することを目的として開発を行ったも
のである。
As a result, the central body 100 being assembled
There is a possibility that a change in stress and a change in strain amount due to load movement may be brought to the steel structure portion constituting the above, and the assembly accuracy of the central body 100 may be adversely affected. Therefore, conventionally, at all load points, in order to eliminate the influence of the load movement, it was necessary to reinforce the central body 100 side with members. The present invention has been developed with the object of solving the above problems and providing a work stage lifting device aiming to improve the efficiency and economical efficiency in the assembly work by minimizing the reinforcing material and the like. Was done.

【0017】[0017]

【課題を解決するための手段】前記目的を達成する手段
として、この発明は、作業ステージを建設過程中にある
中央部躯体まわりに架支させる作業ステージストッパー
と、中央部躯体に沿って作業ステージをジャッキアップ
するせり上げ装置とを次のように構成し、作業ステージ
せり上げ装置としたことにある。
As a means for achieving the above object, the present invention relates to a work stage stopper for supporting a work stage around a central structure in a construction process, and a work stage along the central structure. The lifting device for jack-up is configured as follows, and is used as a working stage lifting device.

【0018】まず、作業ステージを中央部躯体まわりに
架支させる作業ステージストッパーは、作業ステージを
構成する部材具体的に言えば、上段ないし下段の水平梁
部材側から2本のストッパー部材を水平方向に、かつ中
央部躯体側に向けて張り出し自在に装備させた構成とし
た。すなわちこの2本のストッパー部材をもって、中央
部躯体を構成する支柱部材を挾むように、つまり支柱部
材の両側に架支させる構成とした。
First, the work stage stopper for supporting the work stage around the central frame is a member constituting the work stage. Specifically, two stopper members are horizontally arranged from the upper or lower horizontal beam member side. In addition, it is configured so that it can be overhanged toward the side of the central body. That is, the two stopper members are used so as to support the strut member that constitutes the central frame, that is, to support the strut member on both sides of the strut member.

【0019】せり上げ装置は、上端部に2本の係止ブラ
ケットを有するガイド柱と、2基のジャッキとを次のよ
うに組み合わせて構成した。まず、2本の係止ブラケッ
トを有するガイド柱は、その2本の係止ブラケットをガ
イド柱の上端部から支柱部材を挾む間隔をもって水平方
向に張り出し自在に装備した構造とした。すなわち支柱
部材の両側に架支させる構造とした。さらにガイド柱自
体には、一定のピッチをもって多段的に係止孔を設けた
構成とした。つまり前記作業ステージを架支した中央部
躯体の同一支柱部材を挾む要領で水平梁部材に架支させ
ることができる構造とした。
The lifting device was constructed by combining a guide column having two locking brackets at its upper end and two jacks in the following manner. First, the guide pillar having the two locking brackets has a structure in which the two locking brackets are provided so as to be able to horizontally project from the upper end portion of the guide pillar with a space between the pillar members. That is, the support member is supported on both sides. Further, the guide column itself has a multi-stage locking hole with a constant pitch. In other words, the structure is such that the same support member of the central frame supporting the work stage can be supported by the horizontal beam member in a manner of sandwiching it.

【0020】ついで、前記2基のジャッキは、それぞれ
上端部と下端部とに、前記ガイド柱の係止孔に係合離脱
自在なロックピンを装備した構造とした。そして前記ガ
イド柱の両側に平行に配置するとともに、各ジャッキの
頭部は、前記作業ステージを構成する水平梁部材の下面
に連結ピンを介して連結させることができる構造とし
た。
Next, each of the two jacks has a structure in which an upper end portion and a lower end portion are provided with lock pins which can be engaged with and disengaged from the engaging holes of the guide columns. The jacks are arranged in parallel on both sides of the guide pillar, and the heads of the jacks can be connected to the lower surface of the horizontal beam member forming the work stage via connecting pins.

【0021】[0021]

【作用】この発明による作業ステージのせり上げ装置
は、以上説明したように構成したので、組み立て過程に
ある中央部躯体に対する作業ステージの架支点、つま
り、作業ステージストッパーの中央部躯体側に対する架
支点と、せり上げ装置におけるガイド柱上端部の係止ブ
ラケットの架支点とを、中央部躯体を構成する同一支柱
部材の両側に設定することができるようになった。すな
わち作業ステージを利用して中央部躯体の組み立て作業
を行う時点と、作業ステージをせり上げる時点における
荷重負荷点が中央部躯体を構成する同一支柱部材の両側
に設定されるようになった結果、従来のように作業ステ
ージをせり上げる過程において、中央部躯体に対する荷
重点が平面的に分散されることなく、しかも荷重移動が
抑止され、中央部躯体の応力変化や歪量の変化が抑制さ
れた。
Since the lifting device for the working stage according to the present invention is constructed as described above, the fulcrum point of the working stage with respect to the central body in the assembly process, that is, the supporting point of the working stage stopper with respect to the central body side. It is now possible to set the frame of the locking bracket at the upper end of the guide column in the lifting device on both sides of the same column member that constitutes the central frame. That is, when the assembly work of the central structure is performed using the work stage, and the load load points at the time of raising the work stage are set on both sides of the same strut member that constitutes the central structure, In the process of raising the work stage as in the past, the load points on the central structure were not dispersed in a plane, and the load movement was suppressed, and the changes in stress and strain of the central structure were suppressed. .

【0022】[0022]

【実施例】さらに、この発明による作業ステージせり上
げ装置の構成・作用を図面に示す実施例に基づいて具体
的に説明する。なお、実施例においては、高層ビルの組
み立て建設に適用した場合を例にとって説明する。図1
(A)(B)(C)は、この発明装置を組み立て過程に
ある中央部躯体1と、作業ステージ2と間に装備させた
状態を示すもので、(A)は正面図、(B)は側面図、
(C)は平面図である。まず作業ステージ2を中央部躯
体1側に架支させるための作業ステージストッパー3
は、(B)に示すように作業ステージ2を構成する下弦
水平梁部材2b上あるいは、その近傍に操作シリンダ3
aを設置(上弦水平梁部材2a上あるいは、その近傍に
設置する場合もある。)し、この操作シリンダ3aをも
って2本のストッパー部材3(3)を中央部躯体1側に
押し出し、中央部躯体1を構成する支柱部材1aの左右
両側の水平梁部材1b(1b)に架支させる構成とし
た。つまり、前記支柱部材1aを2本のストッパー部材
3(3)をもって挟持する形で架支固定するように構成
した。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The construction and operation of the work stage raising device according to the present invention will be described in detail with reference to the embodiments shown in the drawings. It should be noted that the embodiment will be described by taking a case where it is applied to the assembly and construction of a high-rise building as an example. Figure 1
(A), (B) and (C) show a state in which the device of the present invention is mounted between the central body 1 and the work stage 2 in the process of assembling, and (A) is a front view and (B). Is a side view,
(C) is a plan view. First, a work stage stopper 3 for supporting the work stage 2 on the side of the central frame 1
Is located on or near the lower chord horizontal beam member 2b constituting the work stage 2 as shown in FIG.
a is installed (may be installed on the upper horizontal beam member 2a or in the vicinity thereof), and the two stopper members 3 (3) are pushed out toward the central body 1 side by the operation cylinder 3a, and the central body 1 is pushed. The horizontal beam members 1b (1b) on both the left and right sides of the support column member 1a constituting the frame 1 are supported. That is, the strut member 1a is configured to be supported and fixed by being sandwiched by the two stopper members 3 (3).

【0023】せり上げ装置4は、先に説明したように、
上端部に、2本の係止ブラケット5a(5a)を有する
ガイド柱5と、2基のジャッキ6および6をもって構成
した。そして、まずガイド柱5は、図1(A)および
(B)、(C)で示すように、その上端部に前記2本の
係止ブラケット5aおよび5aを装備し、これを中央部
躯体1側の1番上の水平梁部材1b、つまり上段の水平
梁部材1b上に架支固定させる構成とした。つまり、双
方の係止ブラケット5aおよび5aをもって、支持部材
の両側に架支させ、しかも前記作業ステージ2を架支し
た中央部躯体1の同一支柱部材1aの両側の水平梁部材
1b,1bに架支させる構成とした。ついでガイド柱5
自体には、前記図1(B)で示すように一定のピッチを
もって多段的に係止孔5b,5b,……を設けた構成と
した。なお、5cは、ガイド柱5の下端部に設けたガイ
ドローラで、ガイド柱5自体のせり上げ時に、中央部躯
体1の支柱部材1aに沿ってガイド柱5が円滑に上昇す
ることを確保するためのものである。
The lifting device 4 is, as explained above,
A guide column 5 having two locking brackets 5a (5a) and two jacks 6 and 6 are provided at the upper end. First, as shown in FIGS. 1 (A), 1 (B), and 1 (C), the guide column 5 is equipped with the two locking brackets 5a and 5a at the upper end thereof, which is attached to the central body 1 The upper horizontal beam member 1b on the side, that is, the upper horizontal beam member 1b is fixed to the frame. That is, the two retaining brackets 5a and 5a are used to support both sides of the support member, and the horizontal beam members 1b and 1b on both sides of the same support member 1a of the central body 1 on which the working stage 2 is supported. It was configured to support. Then guide pillar 5
As shown in FIG. 1B, the structure itself is provided with locking holes 5b, 5b, ... With a constant pitch. Reference numeral 5c is a guide roller provided at the lower end portion of the guide column 5 to ensure that the guide column 5 smoothly rises along the column member 1a of the central body 1 when the guide column 5 itself is raised. It is for.

【0024】次に2基のジャッキ6および6は、図1
(A)で示すように、それぞれ上端部と下端部、つまり
シリンダ側とロッド側の端部に、前記ガイド柱5に設け
た前記係止孔5b,5b,……に係合するロックピン7
および7を装備した構造とした。実施例においては、図
1(A)で示すように各ジャッキ6および6の上端部と
下端部とに、前記ロックピン7および7を内蔵させたロ
ックボックス8および8を設け、図面上には、その詳細
な構成は表示していないが、このロックボックス8およ
び8内にジャッキ6(6)を構成する操作シリンダを内
蔵させ、この操作シリンダを作動させることにより、ロ
ックピン7および7が前記ガイド柱5に設けた係止孔5
b,5b,……に適宜、係合離脱される構造として装備
させた。
Next, the two jacks 6 and 6 are shown in FIG.
As shown in (A), a lock pin 7 that engages with the locking holes 5b, 5b, ... Provided in the guide column 5 at the upper end and the lower end, that is, the end on the cylinder side and the end on the rod side, respectively.
The structure is equipped with 7 and 7. In the embodiment, as shown in FIG. 1 (A), lock boxes 8 and 8 incorporating the lock pins 7 and 7 are provided at the upper and lower ends of the jacks 6 and 6, respectively. Although the detailed structure is not shown, the lock pins 8 and 7 are operated by incorporating the operation cylinder that constitutes the jack 6 (6) into the lock box 8 and 8 and operating the operation cylinder. Locking hole 5 provided in the guide pillar 5
b, 5b, ... are equipped with a structure that can be engaged and disengaged as appropriate.

【0025】さらに、前記ジャッキ6および6の各頭部
は、図1(B)に示すように作業ステージ2の下弦水平
梁部材2bから作業ステージ載荷部材2cを中央部躯体
1側に突出させ、図1(B)では右側に突出させ、この
突出させた作業ステージ載荷部材2cの下面に、図面上
に表示してないが、連結ピンを用いて一体的に連結させ
る構造とした。
Further, as shown in FIG. 1 (B), the heads of the jacks 6 and 6 project the working stage loading member 2c from the lower chord horizontal beam member 2b of the working stage 2 toward the central body 1 side, In FIG. 1B, the structure is such that it is projected to the right side and is integrally connected to the lower surface of the projecting work stage loading member 2c, which is not shown in the drawing, using a connecting pin.

【0026】以上のように、この発明は、作業ステージ
2自体を中央部躯体1側に架支させる作業ステージスト
ッパー3と、作業ステージ2自体を中央部躯体1に沿っ
てせり上げるせり上げ装置4におけるガイド柱上端部の
係止ブラケット5a(5a)とを、中央部躯体1側の同
一支柱部材1aに架支させるように構成しているため、
作業ステージ2を中央部躯体1側に架支させて、それを
足場として中央部躯体1の上層階を組み立てている場合
も、ジャッキアップ装置4を利用して作業ステージ2を
せり上げる場合でも、その全荷重は、前記同一支柱部材
1aを介して中央部躯体1側に負荷される。つまり中央
部躯体1に対する荷重点の数が最小に抑制され、また、
負荷重移動が抑制されるようになった。
As described above, according to the present invention, the work stage stopper 3 for supporting the work stage 2 itself on the side of the central body 1 and the lifting device 4 for raising the work stage 2 itself along the central body 1 are provided. Since the locking bracket 5a (5a) at the upper end of the guide column in the above is configured to be supported by the same support member 1a on the side of the central body 1,
Even when the working stage 2 is supported on the side of the central structure 1 and the upper floor of the central structure 1 is assembled using it as a scaffold, or when the working stage 2 is raised using the jack-up device 4, The total load is applied to the side of the central body 1 via the same support member 1a. That is, the number of load points for the central body 1 is suppressed to a minimum, and
The heavy load movement is now suppressed.

【0027】ちなみに図2(A)(B)(C)(D)
は、中央部躯体1の外周に、架支させた作業ステージ2
をせり上げ装置4を用いてせり上げる作動要領を説明す
るものである。なお、この作動要領は、従来装置として
先に説明した図13および図14の場
合と同要領であるので簡略に説明する。
By the way, FIG. 2 (A) (B) (C) (D)
Is a work stage 2 that is supported around the outer periphery of the central structure 1.
This is a description of an operating procedure for lifting using the lifting device 4. Note that this operation procedure is the same as that in the case of FIGS. 13 and 14 described above as the conventional apparatus, and therefore will be briefly described.

【0028】まず、図2(A)は、作業ステージストッ
パー3を介して作業ステージ2自体を中央部躯体1側に
架支し、せり上げ装置4におけるガイド柱5はその上端
部の係止ブラケット5a(5a)を介して中央部躯体1
側の天端水平梁部材1bに架支させた状態を示す。図2
(B)は、作業ステージ2を利用して、前記中央部躯体
1上に斜線を入れて示す支柱部材や水平梁部材の建て方
を行い、建設すべき1階相当分を組み立てた状態を示
す。図2(C)は、せり上げ装置4におけるガイド柱5
をまずせり上げ、すなわちせり上げ装置4のジャッキ6
(6)を作動してガイド柱5をせり上げ、その上端部に
装備した係止ブラケット5a(5a)を中央部躯体1側
の天端水平梁部材1bのレベルまでせり上げるとともに
天端水平梁部材1bに係止させた状態を示す。図2
(D)は、さらに作業ステージ2を中央部躯体1側に架
支させた作業ステージストッパー3(3)を中央部躯体
1側から解除し、せり上げ装置4におけるジャッキ6
(6)をもって作業ステージ2を1階相当分せり上げた
状態を示すものである。
First, as shown in FIG. 2A, the work stage 2 itself is supported on the side of the central body 1 via the work stage stopper 3, and the guide column 5 of the lifting device 4 is provided with a locking bracket at the upper end thereof. Central body 1 through 5a (5a)
The state which was supported by the top end horizontal beam member 1b of the side is shown. Figure 2
(B) shows a state in which a pillar member or a horizontal beam member shown by hatching is formed on the central body 1 by using the work stage 2, and a portion corresponding to the first floor to be constructed is assembled. . FIG. 2C shows the guide pillar 5 in the lifting device 4.
First, that is, the jack 6 of the lifting device 4
(6) is actuated to raise the guide pillar 5, and the locking bracket 5a (5a) mounted on the upper end of the guide pillar 5 is raised to the level of the top end horizontal beam member 1b on the side of the central body 1 and the top end horizontal beam. The state locked by the member 1b is shown. Figure 2
(D) further releases the work stage stopper 3 (3) supporting the work stage 2 on the side of the central body 1 from the side of the central body 1, and the jack 6 in the lifting device 4
(6) shows a state in which the work stage 2 is raised by one floor.

【0029】なお図3(A)(B)(C)(D)は、前
記図2(A)(B)(C)(D)に示した要領で作業ス
テージ2をせり上げ、高層ビルを建設する場合の一連の
作業工程を説明するものである。まず図3(A)は、作
業ステージ2を中央部躯体1側に作業ステージストッパ
ー3を介して架支させた状態を示すもので、この時、せ
り上げ装置4におけるジャッキ6の頭部は、作業ステー
ジ2の上弦水平梁部材2aの下端部に連結つまり、作業
ステージ2のせり上げポイントを作業ステージ2の上弦
水平梁部材2aに設定していることを示している。図3
(B)は、作業ステージ2を利用して中央部躯体1上に
1階相当分の建て方作業を終わった状態を示し、図3
(C)は、せり上げ装置4のガイド柱5をせり上げ、そ
の上端部の係止ブラケット5a(5a)を中央部躯体1
側の天端水平梁部材1bに架支させた状態を示す。さら
に図3(D)は、作業ステージ2を前記せり上げ装置4
におけるジャッキ6(6)を作動して中央部躯体1の天
端水平梁部材1bのレベルまでせり上げた状態を示す。
3 (A) (B) (C) (D), the working stage 2 is raised in the same manner as shown in FIGS. 2 (A) (B) (C) (D) to raise a high-rise building. A series of work steps for construction will be described. First, FIG. 3A shows a state in which the work stage 2 is supported on the side of the central body 1 via the work stage stopper 3, and at this time, the head of the jack 6 in the lifting device 4 is It is shown that the work stage 2 is connected to the lower end of the upper chord horizontal beam member 2a, that is, the raising point of the work stage 2 is set to the upper chord horizontal beam member 2a of the work stage 2. Figure 3
FIG. 3B shows a state in which the work for constructing the first floor is completed on the central frame 1 using the work stage 2, and FIG.
(C) raises the guide pillar 5 of the raising device 4 and attaches the locking bracket 5a (5a) at the upper end thereof to the central body 1
The state which was supported by the top end horizontal beam member 1b of the side is shown. Further, FIG. 3D shows that the work stage 2 is lifted by the lifting device 4 described above.
2 shows a state in which the jack 6 (6) in FIG. 6 is actuated and raised to the level of the top horizontal beam member 1b of the central body 1.

【0030】図4は、図3(B)のa−a線横断平面図
で、せり上げ装置4の配置要領を示す平面図である。実
施例では、図示のように中央部躯体1まわりに8基のせ
り上げ装置4を配備している。しかも各せり上げ装置4
の各ガイド柱5上端部におけるそれぞれ2本の係止ブラ
ケット5a(5a)は前記図1(C)に示すように中央
部躯体1を構成する支柱部材1aの両側に架支されてい
る。すなわち、支柱部材1aを両側から挟む要領で、そ
の支柱部材1aの両側の上段の水平梁部材1b,1bに
架支されている。
FIG. 4 is a cross-sectional plan view taken along the line aa of FIG. 3B and is a plan view showing the arrangement of the raising device 4. In the embodiment, as shown in the drawing, eight lifting devices 4 are arranged around the central body 1. Moreover, each lifting device 4
The two locking brackets 5a (5a) at the upper end of each of the guide columns 5 are mounted on both sides of the column member 1a constituting the central body 1 as shown in FIG. 1 (C). That is, it is supported by the upper horizontal beam members 1b and 1b on both sides of the column member 1a in such a manner as to sandwich the column member 1a from both sides.

【0031】図5は、同じく図3(B)のb−b横断平
面図で、作業ステージ2を中央部躯体1まわりに架支さ
せる作業ステージストッパー3の配置要領を示すもので
ある。すでに図1(A)で説明したように、作業ステー
ジ2側から中央部躯体1側に2本のストッパー部材3
(3)を張り出し、中央部躯体1側の同一支柱部材1a
の両側における下段の水平梁部材1b,1bに架支固定
させている。つまり、中央部躯体1側に対する作業ステ
ージ1の架支点と作業ステージ2をせり上げ装置4を用
いてせり上げる際の、ガイド柱5上端部の架支点とが、
中央部躯体1を構成する同一支柱部材1aに集約されて
いることを示す。
FIG. 5 is a bb cross-sectional plan view of FIG. 3B, showing the arrangement of the work stage stopper 3 for supporting the work stage 2 around the central body 1. As already described with reference to FIG. 1A, the two stopper members 3 are provided from the work stage 2 side to the central body 1 side.
(3) overhang, and the same strut member 1a on the side of the central body 1
Are fixed to the lower horizontal beam members 1b, 1b on both sides of the frame. That is, the fulcrum point of the work stage 1 with respect to the side of the central body 1 and the fulcrum point of the upper end of the guide column 5 when the work stage 2 is lifted using the lifting device 4,
It is shown that they are integrated into the same support member 1a that constitutes the central body 1.

【0032】図6(A)(B)(C)(D)は、作業ス
テージ2を中央部躯体1側に架支させる作業ステージス
トッパー3を前記図5の場合と同様、作業ステージ2を
構成する下弦水平梁部材2bの近傍に設け、せり上げ装
置4におけるジャッキ6の頭部も、同じく作業ステージ
2における下弦水平梁部材2bの下面に連結し、作業ス
テージ2のせり上げポイントを作業ステージ2の下弦水
平部材2aに設定した場合を例示するものである。な
お、図7は、図6におけるa−a線横断平面図であり、
図8は同じくb−b線横断平面図で、前記図4および図
5で示したように、作業ステージストッパー3と、せり
上げ装置4を中央部躯体1を構成する同一支柱部材1a
に架支固定させるようにした配置要領を示すものであ
る。
6A, 6B, 6C and 6D, the work stage stopper 3 for supporting the work stage 2 on the side of the central body 1 is constructed as in the case of FIG. The lower chord horizontal beam member 2b is provided near the lower chord horizontal beam member 2b, and the head of the jack 6 of the lifting device 4 is also connected to the lower surface of the lower chord horizontal beam member 2b of the work stage 2 so that the work stage 2 is lifted up. The case where it is set to the lower chord horizontal member 2a is illustrated. 7 is a cross-sectional plan view taken along the line aa in FIG.
FIG. 8 is a plan view similar to the line bb in FIG. 8 and, as shown in FIGS. 4 and 5, the work stage stopper 3 and the raising device 4 are the same strut member 1a that constitutes the central body 1.
It shows the procedure for fixing the frame to the frame.

【0033】図9(A)(B)(C)(D)は、作業ス
テージストッパー3を前記図7の場合と異なり作業ステ
ージ2を構成する上弦水平梁部材2aの近傍に設定し、
せり上げ装置4におけるジャッキ6の頭部も、作業ステ
ージ2の上弦水平梁部材2aの下面に連結し、作業ステ
ージ2のせり上げ時のせり上げポイントも作業ステージ
2の上弦水平梁部材2aに集約させた場合の実施例を示
す。なお、図12は、図9(B)のa−a線横断平面図
であり、図11は同じくb−b線横断平面図であり、作
業ステージストッパー3とせり上げ装置4との配置要領
を示すものである。
9A, 9B, 9C and 9D, the work stage stopper 3 is set near the upper chord horizontal beam member 2a constituting the work stage 2 unlike the case of FIG.
The head of the jack 6 in the lifting device 4 is also connected to the lower surface of the upper chord horizontal beam member 2a of the work stage 2, and the lifting points when raising the working stage 2 are also integrated in the upper chord horizontal beam member 2a of the work stage 2. An example in the case of allowing it is shown. Note that FIG. 12 is a cross-sectional plan view taken along the line aa of FIG. 9 (B), and FIG. 11 is a cross-sectional plan view taken along the line bb of the same, showing how the work stage stopper 3 and the raising device 4 are arranged. It is shown.

【0034】[0034]

【発明の効果】この発明による作業ステージせり上げ装
置は、以上実施例をとおして説明したように構成したの
で、従来のせり上げ装置に比較し、次のような効果を発
揮することができる。 (1)せり上げ装置を介して作業ステージを組み立て過
程にある中央部躯体側に架支させた時も、作業ステージ
を中央部躯体に沿ってせり上げる時も、その荷重は中央
部躯体を構成する同一支柱部材に集約されて負荷される
ので、荷重点の数を最小にすることができ、また荷重変
動が最小限に抑制される。その結果、荷重点周辺の補強
用部材等を減ずることができるようになった。
Since the work stage lifting device according to the present invention is configured as described above with reference to the embodiments, the following effects can be exhibited as compared with the conventional lifting device. (1) Whether the work stage is supported on the side of the center frame in the process of assembling through the lifting device, or the work stage is raised along the center frame, the load constitutes the center frame. Since the same support members are collectively loaded, the number of load points can be minimized and the load fluctuation can be suppressed to the minimum. As a result, it has become possible to reduce the reinforcing members and the like around the load point.

【図面の簡単な説明】[Brief description of drawings]

【図1】(A)は、この発明による高層構造物建設に用
いる作業ステージせり上げ装置の正面図で、(B)は側
面図、(C)は平面図である。
FIG. 1A is a front view of a work stage lifting device used for constructing a high-rise structure according to the present invention, FIG. 1B is a side view, and FIG. 1C is a plan view.

【図2】(A)(B)(C)(D)は、この発明による
せり上げ装置によって作業ステージをせり上げる際の装
置の作動要領図である。
2 (A), (B), (C), and (D) are operation charts of the device when the work stage is lifted by the lift device according to the present invention.

【図3】(A)(B)(C)(D)は、この発明による
せり上げ装置を高層ビルの建設に適用した場合のせり上
げ作業工程図である。
3 (A), (B), (C), and (D) are elevation work process diagrams when the elevation device according to the present invention is applied to the construction of a high-rise building.

【図4】図3(B)のa−a線横断平面図である。FIG. 4 is a cross-sectional plan view taken along the line aa of FIG.

【図5】図3(B)のb−b線横断平面図である。5 is a cross-sectional plan view taken along the line bb of FIG. 3 (B).

【図6】(A)(B)(C)(D)は、せり上げ装置に
おける作業ステージストッパーを作業ステージの下弦水
平梁部材に設置するとともに、せり上げ装置のジッキ頭
部も作業ステージにおける下弦水平梁部材の下面に連結
して、作業ステージをせり上げる実施例を示す工程図で
ある。
6 (A), (B), (C), and (D) show that the work stage stopper of the lifting device is installed on the lower chord horizontal beam member of the working stage, and the head of the lifting device is also the lower chord of the working stage. FIG. 7 is a process diagram showing an example in which the work stage is raised by being connected to the lower surface of the horizontal beam member.

【図7】図6におけるa−a線横断平面図である。7 is a cross-sectional plan view taken along the line aa in FIG.

【図8】図6におけるb−b線横断平面図である。8 is a cross-sectional plan view taken along the line bb in FIG.

【図9】(A)(B)(C)(D)は、せり上げ装置に
おける作業ステージストッパーを作業ステージの上弦水
平梁部材の近傍に設置し、せり上げ装置におけるジャッ
キの頭部は、同じく上弦水平梁部材の下面に連結して作
業ステージをせり上げる実施例を示す工程図である。
9 (A), (B), (C), and (D) show that the work stage stopper in the lifting device is installed near the upper chord horizontal beam member of the work stage, and the head of the jack in the lifting device is the same. It is process drawing which shows the Example connected to the lower surface of an upper chord horizontal beam member, and raising a work stage.

【図10】図9(B)のa−a線横断平面図である。FIG. 10 is a cross-sectional plan view taken along the line aa of FIG. 9 (B).

【図11】図9(B)のb−b線横断平面図である。11 is a cross-sectional plan view taken along the line bb of FIG. 9 (B).

【図12】(A)(B)(C)(D)は、従来のジャッ
キアップ工法による高層構造物建設の工程図である。
12 (A), (B), (C), and (D) are process drawings for constructing a high-rise structure by a conventional jack-up method.

【図13】は、せり上げ装置のガイド柱をせり
上げる時のジャッキの作動要領図である。
FIG. 13 is an operation diagram of the jack when the guide column of the lifting device is lifted up.

【図14】は、作業ステージのせり上げ作業を
行う時のジャッキの作動要領図である。
FIG. 14 is an operation diagram of the jack when raising the work stage.

【図15】前記図12(B)の平面図である。FIG. 15 is a plan view of FIG. 12 (B).

【符号の説明】[Explanation of symbols]

1……中央部躯体(建設過程にある高層構造物) 1a……支柱部材 1b……水平梁部材 2……作業ステージ 2a……上弦水平梁部材 2b……下弦水平梁部材 2c……作業ステージ載荷部材 3……作業ステージストッパー 3a……操作シリンダ 4……せり上げ装置 5……ガイド柱 5a……係止ブラケット 5b……係止孔 5c……ガイドローラ 6……ジャッキ 7……ロックピン 8……ロックボックス 1 ... Central structure (high-rise structure in the process of construction) 1a ... Column member 1b ... Horizontal beam member 2 ... Working stage 2a ... Upper chord horizontal beam member 2b ... Lower chord horizontal beam member 2c ... Working stage Loading member 3 …… Work stage stopper 3a …… Operating cylinder 4 …… Raising device 5 …… Guide pillar 5a …… Locking bracket 5b …… Locking hole 5c …… Guide roller 6 …… Jack 7 …… Lock pin 8: Lock box

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 作業ステージを建設過程の躯体まわりに
架支させる作業ステージストッパーと、躯体に沿って作
業ステージをせり上げる装置とからなる高層構造物建設
に用いる作業ステージせり上げ装置であって、 前記作業ステージストッパーは、作業ステージを構成す
る上段ないし下段の水平梁部材側から2本のストッパー
部材を躯体側に向けて張り出し自在に装備し、この2本
のストッパー部材を躯体を構成する支柱部材の両側に架
支させる構造としたものであり、 前記せり上げ装置は、上端部に2本の係止ブラケットを
有するガイド柱と、ジャッキとの組み合せからなり、ガ
イド柱自体には、一定のピッチをもって多段的に係止孔
を設けたものであり、前記2本の係止ブラケットを躯体
の支柱部材の両側に架支させるものであり、 前記ジャッキは、上端部と下端部とに、前記ガイド柱の
係止孔に係合離脱自在なロックピンを有し、かつ各ジャ
ッキの頭部は、前記作業ステージの水平梁部材の下面に
連結させる構造としたことを特徴とする高層構造物建設
に用いる作業ステージせり上げ装置。
1. A work stage lifting device for use in construction of a high-rise structure, comprising: a work stage stopper for supporting the work stage around a skeleton in a construction process; and a device for lifting the work stage along the skeleton. The work stage stopper is equipped with two stopper members which can be freely projected from the upper or lower horizontal beam member side constituting the work stage toward the skeleton side, and these two stopper members are pillar members constituting the skeleton body. The lifting device comprises a combination of a guide pillar having two locking brackets at the upper end and a jack, and the guide pillar itself has a fixed pitch. Is provided with locking holes in multiple stages, and the two locking brackets are supported on both sides of the pillar member of the frame. The jack has lock pins at the upper end and the lower end that can be engaged with and disengaged from the locking holes of the guide columns, and the head of each jack is connected to the lower surface of the horizontal beam member of the work stage. A work stage lifting device used for the construction of high-rise structures, which is characterized by its structure.
【請求項2】 前記せり上げ装置のジャッキは、油圧作
動のジャッキであることを特徴とする請求項1記載の高
層構造物建設に用いる作業ステージせり上げ装置。
2. The work stage lifting device used in the construction of a high-rise structure according to claim 1, wherein the jack of the lifting device is a hydraulically operated jack.
JP33066593A 1993-12-27 1993-12-27 Working-stage pushing-up device used for constructing multistoried structure Pending JPH07189491A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33066593A JPH07189491A (en) 1993-12-27 1993-12-27 Working-stage pushing-up device used for constructing multistoried structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33066593A JPH07189491A (en) 1993-12-27 1993-12-27 Working-stage pushing-up device used for constructing multistoried structure

Publications (1)

Publication Number Publication Date
JPH07189491A true JPH07189491A (en) 1995-07-28

Family

ID=18235220

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33066593A Pending JPH07189491A (en) 1993-12-27 1993-12-27 Working-stage pushing-up device used for constructing multistoried structure

Country Status (1)

Country Link
JP (1) JPH07189491A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
JP2014185435A (en) * 2013-03-22 2014-10-02 Jfe Civil Engineering & Construction Corp Lift frame unit and operation method of lift frame unit
WO2017072654A1 (en) * 2015-10-27 2017-05-04 DESPE S.p.A. Climbing equipment and climbing method for the construction of buildings

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007154540A (en) * 2005-12-06 2007-06-21 Japan Steels International Inc Temporary scaffolding unit
JP2014185435A (en) * 2013-03-22 2014-10-02 Jfe Civil Engineering & Construction Corp Lift frame unit and operation method of lift frame unit
WO2017072654A1 (en) * 2015-10-27 2017-05-04 DESPE S.p.A. Climbing equipment and climbing method for the construction of buildings
US10036170B2 (en) 2015-10-27 2018-07-31 DESPE S.p.A. Climbing equipment and climbing method for the construction of a building
US10633874B2 (en) 2015-10-27 2020-04-28 DESPE S.p.A. Climbing equipment and climbing method for the construction of a building

Similar Documents

Publication Publication Date Title
MXPA03006286A (en) Product attribute data mining in connection with a web converting manufacturing process.
JP6348888B2 (en) Stair lifting device and method for lifting heavy objects
JP2016088709A (en) Lifting device and lifting method
JPH07189491A (en) Working-stage pushing-up device used for constructing multistoried structure
JPH04257602A (en) Installation method of hanging type boiler
JP2021116153A (en) Supporting platform for tower crane and climbing method using the same
JPH08100517A (en) Vertically movable scaffold
JPH0932120A (en) Method of construction of structure
JP3553370B2 (en) Work stage device for steel tower construction and steel tower construction method
JP7214545B2 (en) Elevating workbench and assembly method using the elevating workbench
JPH062434A (en) Method of building steel structure roof
JP3179814B2 (en) Column and beam construction method and apparatus
JPH06101348A (en) Method for constructing tower
JP2878571B2 (en) Building construction method using construction equipment
JP3119982B2 (en) Self-elevating construction equipment
JPH07150766A (en) Steel frame erecting method for multistory building
JPH0692569A (en) Balance weight temporary supporting device
JPH04146372A (en) Constructing method for frame
JP2876957B2 (en) Self-elevating construction equipment
JP2916592B2 (en) Beam lifting method and structure
JPH09242194A (en) Raise-superimposing facility of building structure
JP2934567B2 (en) Work gondola for multi-story parking lot construction
JPH0317356A (en) Construction of multi-story building
JPH04336167A (en) Construction of building and elevation device to be used for same construction
JPH0734668A (en) Lifter for structure