JPH07187511A - Spool turning/delivering device in spool carry/transfer device - Google Patents
Spool turning/delivering device in spool carry/transfer deviceInfo
- Publication number
- JPH07187511A JPH07187511A JP33600693A JP33600693A JPH07187511A JP H07187511 A JPH07187511 A JP H07187511A JP 33600693 A JP33600693 A JP 33600693A JP 33600693 A JP33600693 A JP 33600693A JP H07187511 A JPH07187511 A JP H07187511A
- Authority
- JP
- Japan
- Prior art keywords
- spool
- conveyor
- holding plate
- transfer
- swivel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Specific Conveyance Elements (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Intermediate Stations On Conveyors (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、スプール搬送移載装
置におけるスプールの旋回受渡し装置に係わり、更に詳
しくは前工程から搬送されて来るスプールを円滑に受取
り、受け取ったスプールを次工程に確実に受け渡すこと
を可能としたスプール搬送移載装置におけるスプールの
旋回受渡し装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a spool turning and delivering device in a spool carrying and transferring device, and more specifically, it smoothly receives a spool conveyed from a previous process and surely receives the spool to the next process. The present invention relates to a swivel transfer device for a spool in a spool transfer device capable of transferring.
【0002】[0002]
【従来の技術】従来、タイヤの補強コード等に使用する
スチールコードを巻付けた複数個のスプールを収容した
スプール箱を、投入工程からクリールスタンドまで搬送
する場合、フォークリフトにより搬送してきたスプール
箱を搬送コンベヤ上に投入し、搬送コンベヤ上にあるス
プール箱の位置を作業員が修正した後、所定位置まで搬
送するようにしている。2. Description of the Related Art Conventionally, when a spool box containing a plurality of spools around which steel cords are used for reinforcing cords of tires is transferred from a loading process to a creel stand, a spool box transferred by a forklift is used. After being put on the transport conveyor and the position of the spool box on the transport conveyor is corrected by the worker, it is transported to a predetermined position.
【0003】そして、順次搬送されてくる複数のスプー
ル箱をローディング台車上に積載してクリールスタンド
の近傍まで移送し、ここでエアリフター等によりスプー
ル箱から一個づつスプールを取出してクリールスタンド
のクリール軸に順次掛け渡していた。Then, a plurality of spool boxes that are sequentially conveyed are loaded on a loading carriage and transferred to the vicinity of the creel stand, where the spools are taken out one by one from the spool box by an air lifter or the like and the creel shaft of the creel stand. I was sequentially handing over to.
【0004】[0004]
【発明が解決しようとする問題点】ところで、スプール
の搬送工程中において、スプール箱内からスプールを取
出し次工程に移載する場合、一定の長さのスチールコー
ドを巻付けたスプール1個の重量はかなりの重量があ
り、このようなスプールを一度に複数個受け渡す場合に
は、スプール移載工程と受け取る工程との間に間隙が大
きいと、スプールが脱落して衝撃音が大きかったり、機
械を損傷する等の問題があった。When the spool is taken out from the spool box and transferred to the next step during the spool carrying process, the weight of one spool around which a steel cord of a certain length is wound. Is very heavy, and when delivering multiple spools at once, if there is a large gap between the spool transfer process and the receiving process, the spool may drop off and the impact noise may increase. There was a problem such as damage.
【0005】このため、従来ではスプールが脱落による
衝撃音を低減し、機械の損傷を防止するため、スプール
の受取り側にゴムシート等の緩衝シートを貼付けて対応
させている。またスチールコードカレンダーにおいて
は、スプールの旋回受渡し装置が全て行うことになるた
め、設備が複雑で大掛かりとなり、設備費用もかかると
言う問題があった。Therefore, conventionally, a cushioning sheet such as a rubber sheet is attached to the receiving side of the spool in order to reduce the impact noise caused by the dropping of the spool and prevent the damage of the machine. Further, in the steel cord calender, since all of the spool swiveling / delivering devices perform, there is a problem that the equipment is complicated and large-scaled, and the equipment cost is also high.
【0006】この発明は、かかる従来の課題に着目して
案出されたもので、スプールの搬送工程中において、ス
プールの受渡しを確実に行い、スプールを脱落させるこ
とによる衝撃音を低減させると共に機械の損傷も未然に
防止でき、更に現在の設備を改造することなく安価に対
応させることが出来るスプール搬送移載装置におけるス
プールの旋回受渡し装置を提供することを目的とするも
のである。The present invention has been made in view of the above-mentioned conventional problems, and during the spool conveying process, the spool is reliably delivered, and the impact noise caused by dropping the spool is reduced, and the mechanical noise is reduced. It is an object of the present invention to provide a swivel transfer device for a spool in a spool transfer device which can prevent damage to the spool before it can be dealt with at a low cost without modifying existing equipment.
【0007】[0007]
【課題を解決するための手段】この発明は上記目的を達
成するため、支持フレーム上に、旋回駆動装置を介して
旋回中心を支点として略90°旋回駆動可能な旋回保持
プレートを設け、この旋回保持プレートの表面側に、該
旋回保持プレートを垂直にした時、複数個のスプールの
下面側を支持する位置決めピンを所定の間隔を隔てて植
設し、前記旋回保持プレートの裏面側に、旋回保持プレ
ートが水平の時、前記スプール移載工程から搬送されて
来るスプールを迎えに行くために押さえブロックを水平
に上昇させる機構と、旋回保持プレートを垂直に旋回し
た時に、位置決めピンにより保持された夫々のスプール
を次工程に押し出す機構の上昇兼押出しシリンダを各々
設けたことを要旨とするものである。In order to achieve the above object, the present invention provides a swivel holding plate, which is swivelable about 90 ° about a swivel center via a swivel drive device, on a support frame. Positioning pins for supporting the lower surface side of a plurality of spools are planted on the front surface side of the holding plate at predetermined intervals when the swivel holding plate is made vertical, and swiveled on the back surface side of the swivel holding plate. When the holding plate is horizontal, a mechanism that raises the holding block horizontally to pick up the spool conveyed from the spool transfer process, and when the turning holding plate is vertically swung, it is held by the positioning pin. The gist of the present invention is to provide a lifting and extruding cylinder of a mechanism for pushing out each spool to the next process.
【0008】[0008]
【発明の作用】この発明は上記のように構成され、スプ
ール移載工程から搬送されて来るスプールに対して、旋
回保持プレートを水平に上昇させて迎えに行くようにす
ることで、受渡し間隙を少なくし、スプールの受渡しを
確実に行い、スプールが脱落することによる衝撃音を低
減させると共に機械の損傷も未然に防止できるようにし
たものである。The present invention is configured as described above, and the swivel holding plate is raised horizontally to the spool conveyed from the spool transfer process to pick up the delivery gap. By reducing the number of the spools, the spool can be delivered reliably, the impact noise caused by the drop of the spool can be reduced, and the damage to the machine can be prevented.
【0009】また、位置決めピンにより保持されたスプ
ールを保持する旋回保持プレートを垂直に旋回した時
に、夫々のスプールが脱落するのを防止するため、旋回
保持プレートの裏面側に、位置決めピンにより保持され
たスプールを旋回保持プレートの表面側に固定する旋回
可能な固定爪を設け、これによりスプールを次工程に容
易に移載させることが出来るものである。Further, in order to prevent each spool from falling off when the swivel holding plate holding the spool held by the positioning pin is swung vertically, the spool is held by the positioning pin on the back side of the swivel holding plate. Also, a rotatable fixed claw for fixing the spool to the surface side of the swivel holding plate is provided, whereby the spool can be easily transferred to the next step.
【0010】[0010]
【発明の実施例】以下、添付図面に基づき、この発明の
実施例を説明する。図1は、この発明を実施したスプー
ルの搬送移載装置の工程を示す概略平面図、図2は図1
の側面図を示し、前記搬送移載装置の搬送工程として
は、投入位置Xから搬送コンベヤ10上に投入された一
定の長さのスチールコードを巻付けた複数個(この実施
例では、1段で、縦3個,横4個,計12個)のスプー
ルWを収容したスプール箱Wxを、搬送コンベヤ10の
搬送方向と平行になるように位置修正を行う位置修正工
程20と、この位置修正を行ったスプール箱Wxの幅決
めを行う幅位置決め工程30と、この位置決めを行った
スプール箱Wxを移載位置Yまで搬送するスプール箱W
xの搬送工程50と、この移載位置Yで待機するスプー
ル箱WxからスプールWと中敷板Wzとを分離して取り
出すと共に、スプールWをスプール旋回装置210に移
載するスプール移載工程100と、スプールWを90度
旋回させた状態でローディング台車250に受渡すスプ
ール受渡し工程200と、ローディング台車250が移
載されたトラバース台車280をクリールスタンド30
0の近傍まで搬送して、ローディング台車250から夫
々のスプールWをクリールスタンド300のクリール軸
310に掛け渡す台車搬送工程350及び空クリールの
回収工程400とから構成されている。Embodiments of the present invention will be described below with reference to the accompanying drawings. FIG. 1 is a schematic plan view showing the steps of a spool transfer device according to the present invention, and FIG.
FIG. 4 is a side view of the above, and in the carrying step of the carrying / transferring apparatus, a plurality of steel cords of a certain length, which are put into the carrying conveyor 10 from the feeding position X, are wound (in this embodiment, one stage is used). Then, the position correction step 20 for correcting the position of the spool box Wx accommodating the spools W of 3 in the vertical direction, 4 in the horizontal direction, 12 in total) and parallel to the transfer direction of the transfer conveyor 10, and this position correction. The width positioning step 30 for determining the width of the spool box Wx that has been performed, and the spool box W that conveys the positioned spool box Wx to the transfer position Y
and a spool transfer process 100 for transferring the spool W to the spool revolving device 210 while separating and taking out the spool W and the insole plate Wz from the spool box Wx waiting at the transfer position Y. , A spool delivery process 200 for delivering the spool W to the loading carriage 250 in a state of being rotated by 90 degrees, and a traverse carriage 280 on which the loading carriage 250 is transferred, the creel stand 30.
It is constituted by a carriage transporting step 350 for transporting the spools W from the loading carriage 250 to the creel shaft 310 of the creel stand 300 and a collecting step 400 for empty creels.
【0011】前記搬送コンベヤ10,位置修正工程20
及び幅位置決め工程30の構成は、図3及び図4に示す
ように、略直線的に接続されている。前記投入位置Xか
らフォークリフト等により複数のスプールWが中敷板W
zを介して多段積みされた(この実施例では6段)スプ
ール箱Wxが投入される搬送コンベヤ10は、図3及び
図5,図6に示すように、機台11上のコンベヤフレー
ム12上の幅方向中央部に、フリーローラコンベヤ13
が水平に設置され、その両側には、チェーンコンベヤ1
4が平行に配設されている。The transfer conveyor 10 and the position correcting step 20
As shown in FIGS. 3 and 4, the width positioning step 30 and the width positioning step 30 are connected substantially linearly. A plurality of spools W are inserted from the loading position X by a forklift or the like to the insole plate W
As shown in FIGS. 3 and 5 and 6, the transport conveyor 10 into which the spool boxes Wx stacked in multiple stages (6 stages in this embodiment) via z are placed on the conveyor frame 12 on the machine base 11. The free roller conveyor 13
Are installed horizontally, and the chain conveyor 1
4 are arranged in parallel.
【0012】チェーンコンベヤ14の左右一対のチェー
ン14aは、コンベヤフレーム12上の前後に設置され
た駆動スプロケット15と従動スプロケット16に掛け
回され、その上面HーHは、前記フリーローラコンベヤ
13の上面と略同一面となるように配設されている。前
記駆動スプロケット15は、コンベヤフレーム12の側
面に設置された駆動モータ17を介して駆動され、搬送
コンベヤ10の先端側(図5の左側,スプール箱Wxの
搬送側)の両側には、スプール箱Wxをガイドするガイ
ドフレーム18が対称位置に配設されている。A pair of left and right chains 14a of the chain conveyor 14 is wound around a drive sprocket 15 and a driven sprocket 16 installed on the front and rear of the conveyor frame 12, and the upper surface H-H thereof is the upper surface of the free roller conveyor 13. Are arranged so as to be substantially flush with. The drive sprocket 15 is driven by a drive motor 17 installed on the side surface of the conveyor frame 12, and is provided on both sides of the leading end side of the transfer conveyor 10 (the left side in FIG. 5, the transfer side of the spool box Wx). Guide frames 18 for guiding Wx are arranged at symmetrical positions.
【0013】前記複数のスプールWが中敷板Wzを介し
て多段積みされたスプール箱Wxは、ベース台Lを介し
て前記フリーローラコンベヤ13及びチェーンコンベヤ
14上に載置されるものである。次に、スプール箱Wx
を搬送コンベヤ10の搬送方向と平行になるように位置
修正を行う位置修正工程20を構成する斜め修正コンベ
ヤ21は、図3及び図7〜図10に示すように、前記搬
送コンベヤ10と同様に、機台22上のコンベヤフレー
ム23上の幅方向中央部に、前記フリーローラコンベヤ
13と同一幅のフリーローラコンベヤ24が水平に設置
され、その両側には、前記チェーンコンベヤ14と同一
幅のチェーンコンベヤ25が平行に配設されている。A spool box Wx, in which a plurality of spools W are stacked in multiple layers via an insole plate Wz, is placed on the free roller conveyor 13 and the chain conveyor 14 via a base L. Next, spool box Wx
The diagonal correction conveyor 21 that constitutes the position correction step 20 for correcting the position so as to be parallel to the transfer direction of the transfer conveyor 10 is similar to the transfer conveyor 10 as shown in FIGS. 3 and 7 to 10. A free roller conveyor 24 having the same width as that of the free roller conveyor 13 is horizontally installed at a central portion in a width direction on a conveyor frame 23 on a machine base 22, and a chain having the same width as the chain conveyor 14 is provided on both sides thereof. Conveyors 25 are arranged in parallel.
【0014】前記チェーンコンベヤ25の左右一対のチ
ェーン25aは、コンベヤフレーム23上の前後に設置
された駆動スプロケット26aと従動スプロケット26
bに掛け回され、その上面は、前記フリーローラコンベ
ヤ24の上面と略同一面となるように配設されている。
前記駆動スプロケット26aは、コンベヤフレーム23
の側面に設置された駆動モータ27を介して駆動される
ものである。The pair of left and right chains 25a of the chain conveyor 25 are a drive sprocket 26a and a driven sprocket 26 installed on the front and rear of the conveyor frame 23.
It is wound around b and its upper surface is arranged to be substantially flush with the upper surface of the free roller conveyor 24.
The drive sprocket 26a is mounted on the conveyor frame 23.
It is driven via a drive motor 27 installed on the side surface of the.
【0015】前記フリーローラコンベヤ24とチェーン
コンベヤ25との間には、エアーシリンダ等の昇降シリ
ンダ28を介してフリーローラコンベヤ24とチェーン
コンベヤ25との搬送面に対して昇降する回転自在な中
空円盤状のターンテーブル28aが設置され、このター
ンテーブル28aの下面は、複数のガイドローラ28a
により回転自在に支持され、またまたコンベヤフレーム
23の幅方向の対称位置には、スプール箱Wxが搬送コ
ンベヤ10の搬送方向と平行になるように斜め修正を行
う斜め修正シリンダ29a,29bが設置されている。Between the free roller conveyor 24 and the chain conveyor 25, a rotatable hollow disk that moves up and down with respect to the conveying surfaces of the free roller conveyor 24 and the chain conveyor 25 via an elevating cylinder 28 such as an air cylinder. -Shaped turntable 28a is installed, and the lower surface of the turntable 28a has a plurality of guide rollers 28a.
Is rotatably supported by the conveyor frame 23, and diagonal correction cylinders 29a and 29b for performing diagonal correction so that the spool box Wx is parallel to the transport direction of the transport conveyor 10 are installed at symmetrical positions in the width direction of the conveyor frame 23. There is.
【0016】従って、搬送コンベヤ10上に投入された
複数のスプールWを中敷板Wzを介して多段積みされた
スプール箱Wxが、ベース台Lを介して搬送方向に対し
て斜めの状態で投入され、更にその状態で斜め修正コン
ベヤ21上に供給された場合、斜め修正コンベヤ21で
は、まず昇降シリンダ28が伸長作動してスプール箱W
xをターンテーブル28aによってフリーローラコンベ
ヤ24とチェーンコンベヤ25との搬送面から上方に持
ち上げ、この状態で幅方向から斜め修正シリンダ29
a,29bが伸長作動して、スプール箱Wxの相対向す
る側面を押圧することで斜め修正コンベヤ21の幅方向
中心にセンターリングされるものである。Therefore, a plurality of spools W loaded on the transport conveyor 10 are stacked in multiple stages via the insole plate Wz, and the spool boxes Wx are loaded via the base L in a state oblique to the transport direction. Further, when it is further supplied to the diagonal correction conveyor 21 in that state, in the diagonal correction conveyor 21, the elevating cylinder 28 is first extended to operate the spool box W.
x is lifted upward from the conveying surface of the free roller conveyor 24 and the chain conveyor 25 by the turntable 28a, and in this state, the diagonal correction cylinder 29 is tilted from the width direction.
The a and 29b are extended to press the opposite side surfaces of the spool box Wx to center the diagonal correction conveyor 21 in the width direction.
【0017】そしてセンターリング終了後は、左右対称
の斜め修正シリンダ29a,29bが後退し、更に昇降
シリンダ28が収縮作動して、センターリングされたス
プール箱Wxをターンテーブル28aを介して下降させ
てフリーローラコンベヤ24とチェーンコンベヤ25と
の搬送面に載置させる。次に、斜め修正等の位置修正を
行ったスプール箱Wxの幅決めを行う幅位置決め工程3
0を構成する幅決めコンベヤ31は、図3及び図11,
図12に示すように、ベースプレート32上に、スプー
ル箱Wxの搬送方向と直交する向きに移動可能な台車3
3が設置され、この台車33上に設置されたコンベヤフ
レーム34上の幅方向中央部には、前記フリーローラコ
ンベヤ13,24と同一幅のフリーローラコンベヤ35
が水平に設置され、その両側には、前記チェーンコンベ
ヤ14,25と同一幅のチェーンコンベヤ36が平行に
配設されている。After the centering is completed, the symmetrical correction cylinders 29a and 29b are retracted, and the lifting cylinder 28 is contracted to lower the centered spool box Wx via the turntable 28a. It is placed on the transport surfaces of the free roller conveyor 24 and the chain conveyor 25. Next, a width positioning step 3 for determining the width of the spool box Wx that has undergone position correction such as diagonal correction
The width-determining conveyor 31 forming 0 is shown in FIGS.
As shown in FIG. 12, a carriage 3 movable on the base plate 32 in a direction orthogonal to the transport direction of the spool box Wx.
3 is installed, and a free roller conveyor 35 having the same width as the free roller conveyors 13 and 24 is provided in the widthwise central portion on the conveyor frame 34 installed on the carriage 33.
Is horizontally installed, and on both sides thereof, a chain conveyor 36 having the same width as the chain conveyors 14 and 25 is arranged in parallel.
【0018】前記チェーンコンベヤ36の左右一対のチ
ェーン36aは、コンベヤフレーム34上の前後に設置
された駆動スプロケット37aと従動スプロケット37
bに掛け回され、その上面は、前記フリーローラコンベ
ヤ24の上面と略同一に配設されている。前記駆動スプ
ロケット37aは、コンベヤフレーム34の側面に設置
された駆動モータ38を介して駆動されるものである。The pair of left and right chains 36a of the chain conveyor 36 includes a drive sprocket 37a and a driven sprocket 37 installed on the front and rear of the conveyor frame 34.
It is wound around b and its upper surface is arranged substantially the same as the upper surface of the free roller conveyor 24. The drive sprocket 37 a is driven by a drive motor 38 installed on the side surface of the conveyor frame 34.
【0019】なお、前記斜め修正コンベヤ21と幅決め
コンベヤ31とを一つにして、夫々の機能を持たせるこ
とも可能である。前記台車33の一側部のベースプレー
ト32上には、シリンダフレーム39が設置され、この
シリンダフレーム39の上部には、前記フリーローラコ
ンベヤ35及びチェーンコンベヤ36上に多段積み上げ
されたスプール箱Wxを、ベースプレート32の他側部
に立設された位置決め用のローラ40に当接させて位置
決めを行う位置決めシリンダ41が水平に設置されてい
る。It should be noted that the slant correction conveyor 21 and the width determining conveyor 31 may be integrated into one to have respective functions. A cylinder frame 39 is installed on the base plate 32 on one side of the carriage 33, and spool boxes Wx stacked in multiple stages on the free roller conveyor 35 and the chain conveyor 36 are installed on the cylinder frame 39. A positioning cylinder 41, which is positioned on the other side of the base plate 32 and abuts against a positioning roller 40, is horizontally installed.
【0020】また、シリンダフレーム39の下部には、
前記台車33を一定位置でロックするロックシリンダ4
2が水平に設置され、このロックシリンダ42のロッド
43は台車33の側部に連結されている。従って、移載
されたスプール箱Wxの幅決めを行う場合には、スプー
ル箱Wxが積載された台車33を位置決めシリンダ41
を介して位置決め用のローラ40に当接するまでスプー
ル箱Wxの搬送方向と直交する方向に移動させ、この
時、台車33の移動と共にロックシリンダ42のロッド
43も伸長作動する。Further, at the bottom of the cylinder frame 39,
Lock cylinder 4 for locking the carriage 33 at a fixed position
2 is installed horizontally, and the rod 43 of this lock cylinder 42 is connected to the side portion of the carriage 33. Therefore, when the width of the transferred spool box Wx is determined, the carriage 33 on which the spool box Wx is loaded is moved to the positioning cylinder 41.
The spool box Wx is moved in the direction orthogonal to the transport direction until it comes into contact with the positioning roller 40 via, and at this time, the rod 43 of the lock cylinder 42 also extends as the carriage 33 moves.
【0021】前記スプール箱Wxが位置決め用のローラ
40に当接した時点でスプール箱Wxの位置決めが終了
し、位置決めシリンダ41が元の位置に収縮作動する前
には、ロックシリンダ42はロック状態になるため、台
車33は位置決めされた位置に停止保持された状態とな
り、スプール箱Wxの幅決め作動が終了する。前記幅位
置決め工程30の幅決めコンベヤ31には、この位置決
めを行ったスプール箱Wxを移載位置Yまで搬送するス
プール箱Wxの搬送工程50が直列に接続されている。The positioning of the spool box Wx is completed when the spool box Wx comes into contact with the positioning roller 40, and the locking cylinder 42 is locked before the positioning cylinder 41 contracts to its original position. Therefore, the carriage 33 is stopped and held in the positioned position, and the width determining operation of the spool box Wx ends. To the width determining conveyor 31 of the width positioning step 30, a spool box Wx transfer step 50 for transferring the positioned spool box Wx to the transfer position Y is connected in series.
【0022】このスプール箱Wxの搬送工程50は、図
3及び図13〜図15に示すように、移送コンベヤを構
成する第1移載コンベヤ51と、中間接続コンベヤ71
と、第2移載コンベヤ91とで構成されており、以下の
説明で、第1移載コンベヤ51と第2移載コンベヤ91
とは、同一構成要素であるので、第1移載コンベヤ51
の構成,作用を説明して第2移載コンベヤ91の説明は
省略する。In the transfer process 50 of the spool box Wx, as shown in FIGS. 3 and 13 to 15, the first transfer conveyor 51 and the intermediate connection conveyor 71 which constitute the transfer conveyor.
And the second transfer conveyor 91, and in the following description, the first transfer conveyor 51 and the second transfer conveyor 91.
Are the same constituent elements, the first transfer conveyor 51
Of the second transfer conveyor 91 will be omitted.
【0023】前記スプール箱Wxの搬送工程50を構成
する第1移載コンベヤ51は、図3及び図13,図14
に示すように、ベース基盤52上にリンクアーム53と
シリンダ54とから成る公知の昇降装置55を介して昇
降可能なベースプレート56が設置され、このベースプ
レート56上に前後方向に摺動するプレート57と、左
右方向に摺動するプレート58とがガイドレール59及
び60を介してそれぞれ載置され、プレート58上に
は、コンベヤフレーム61が設置されている。The first transfer conveyor 51 constituting the transfer step 50 of the spool box Wx is shown in FIGS.
As shown in FIG. 3, a base plate 56 that can be moved up and down is installed on a base substrate 52 via a known lifting device 55 composed of a link arm 53 and a cylinder 54, and a plate 57 that slides in the front-rear direction on the base plate 56. , A plate 58 that slides in the left-right direction are respectively placed via guide rails 59 and 60, and a conveyor frame 61 is installed on the plate 58.
【0024】前記コンベヤフレーム61上には、複数本
のローラ62を並列に配設した駆動ローラコンベヤ63
が設置され、この駆動ローラコンベヤ63の各ローラ6
2は、ローラ軸64に設けたスプロケット65にチェー
ン66を介して連結され、端末部に設けたローラ62の
ローラ軸64には、コンベヤフレーム61に設置された
駆動モータ67と駆動伝達機構68(チェーン,スプロ
ケット等)を介して連結されている。A drive roller conveyor 63 having a plurality of rollers 62 arranged in parallel on the conveyor frame 61.
Is installed, and each roller 6 of this drive roller conveyor 63 is installed.
2 is connected to a sprocket 65 provided on a roller shaft 64 via a chain 66, and a roller shaft 64 of a roller 62 provided at a terminal portion has a drive motor 67 installed on a conveyor frame 61 and a drive transmission mechanism 68 ( Chain, sprocket, etc.).
【0025】従って、駆動モータ67の回転駆動によ
り、駆動伝達機構68を介して各ローラ62が回転駆動
し、ローラ62上に多段積みされたスプール箱Wxを一
定の方向へ移送するものである。前記ベースプレート5
6の側部には、コンベヤフレーム61をガイドレール6
0及びプレート58を介して、図13及び図14の左右
方向へ摺動させる摺動シリンダ69aと、コンベヤフレ
ーム61をガイドレール59及びプレート57を介し
て、図13及び図14の前後方向へ摺動させる摺動シリ
ンダ69bとが設置されている。Therefore, each roller 62 is rotationally driven by the drive transmission mechanism 68 by the rotational drive of the drive motor 67, and the spool boxes Wx stacked on the roller 62 in multiple stages are transferred in a fixed direction. The base plate 5
A conveyor frame 61 is provided on the side of 6 with a guide rail 6
13 and 14, the sliding cylinder 69a that slides in the left-right direction in FIGS. 13 and 14, and the conveyor frame 61 in the front-back direction in FIGS. 13 and 14 through the guide rail 59 and the plate 57. A sliding cylinder 69b for moving is installed.
【0026】また、第1移載コンベヤ51に直列に接続
される中間接続コンベヤ71は、図15に示すように、
この支持台72上に設置されたコンベヤフレーム73上
の幅方向中央部に、フリーローラコンベヤ74が水平に
設置され、その両側には、前記チェーンコンベヤ75が
平行に配設されている。前記チェーンコンベヤ75の左
右一対のチェーン76は、コンベヤフレーム73上の前
後に設置された駆動スプロケット77aと従動スプロケ
ット77bに掛け回され、その上面は、前記フリーロー
ラコンベヤ74の上面と略同一に配設されている。前記
駆動スプロケット77aは、コンベヤフレーム73の側
面に設置された駆動モータ78を介して駆動されるもの
である。The intermediate connecting conveyor 71 connected in series to the first transfer conveyor 51 is, as shown in FIG.
A free roller conveyor 74 is horizontally installed at a central portion in a width direction on a conveyor frame 73 installed on the support base 72, and the chain conveyors 75 are arranged in parallel on both sides of the free roller conveyor 74. The pair of left and right chains 76 of the chain conveyor 75 are wound around a drive sprocket 77a and a driven sprocket 77b installed on the front and rear of the conveyor frame 73, and their upper surfaces are arranged substantially the same as the upper surface of the free roller conveyor 74. It is set up. The drive sprocket 77a is driven by a drive motor 78 installed on the side surface of the conveyor frame 73.
【0027】そして、第1移載コンベヤ51により移送
されて来たスプールWを多段積みしたスプール箱Wx
を、中間接続コンベヤ71を介して第2移載コンベヤ9
1上に移載し、第1移載コンベヤ51及び第2移載コン
ベヤ91上に載置されたスプール箱Wxを次工程に供給
するように待機するものである。前記スプール箱Wxの
搬送工程50上には、図1,図3及び図16〜図24に
示すように、スプールWの搬送方向と直交する向きにス
プール移載工程100の架台101が設置され、このス
プール移載工程100では、前記位置決めを行ったスプ
ール箱WxからスプールWと中敷板Wzとを分離して取
り出すと共に、中敷板Wzは、搬送工程50の側部の中
敷板置き場Zに積載され、またスプール箱Wxから取り
出したスプールWは、次工程のスプール受渡し工程20
0に移送される。A spool box Wx in which the spools W transferred by the first transfer conveyor 51 are stacked in multiple stages
To the second transfer conveyor 9 via the intermediate connection conveyor 71.
1 is placed on the first transfer conveyor 51 and the second transfer conveyor 91, and the spool box Wx placed on the first transfer conveyor 51 and the second transfer conveyor 91 is on standby so as to be supplied to the next step. As shown in FIGS. 1, 3 and 16 to 24, the pedestal 101 of the spool transfer step 100 is installed on the transfer step 50 of the spool box Wx in a direction orthogonal to the transfer direction of the spool W, In the spool transfer step 100, the spool W and the insole board Wz are separated and taken out from the spool box Wx subjected to the positioning, and the insole board Wz is loaded on the side insole board storage area Z of the carrying step 50. Further, the spool W taken out from the spool box Wx is used in the spool delivery step 20 in the next step.
Transferred to 0.
【0028】前記第1移載コンベヤ51,中間接続コン
ベヤ71,第2移載コンベヤ91を跨ぐように架設され
た架台101上のフレーム102には、複数本のガイド
レール103aと103bとが平行に敷設され、このガ
イドレール103a上には、複数本のシリンダ104及
び車輪105を介して中敷板置き場Z,搬送工程50及
びスプール受渡し工程200を往復移動する走行フレー
ム106,107が移動可能に載置されている。なお、
移動させる手段としては、歯車等の伝動機構を用いるこ
とも可能である。A plurality of guide rails 103a and 103b are arranged in parallel on a frame 102 on a pedestal 101 which is installed so as to straddle the first transfer conveyor 51, the intermediate connection conveyor 71, and the second transfer conveyor 91. On the guide rail 103a, traveling frames 106 and 107 are movably mounted on the guide rail 103a for reciprocating the insole board storage space Z, the transfer process 50 and the spool delivery process 200 via a plurality of cylinders 104 and wheels 105. Has been done. In addition,
It is also possible to use a transmission mechanism such as a gear as the moving means.
【0029】前記一方の走行フレーム106は、スプー
ルWを保持して次工程に搬送するために移動するもの
で、また他方の走行フレーム107は、第1移載コンベ
ヤ51及び第2移載コンベヤ91上に積載された多段積
みされたスプールWの間に介在された中敷板Wzを移送
するために移動するものである。前記走行フレーム10
6には、図19に示すようにブラケット108を介して
パワーシリンダ109が垂直に立設され、このパワーシ
リンダ109のロッド110の下端部には、複数本のガ
イドロッド111を介して保持プレート112が水平に
取付けられている。The one traveling frame 106 moves to hold the spool W and convey it to the next process, and the other traveling frame 107 includes the first transfer conveyor 51 and the second transfer conveyor 91. It moves to transfer the insole plate Wz interposed between the multi-tiered spools W stacked on top. The traveling frame 10
As shown in FIG. 19, a power cylinder 109 is vertically installed upright on the shaft 6, and a holding plate 112 is provided at the lower end of a rod 110 of the power cylinder 109 via a plurality of guide rods 111. Are installed horizontally.
【0030】前記保持プレート112には、スプール箱
Wx内に配列された複数個(この実施例では12個)の
スプールWの中心穴にそれぞれ挿入され、かつスプール
Wをチャッキングする複数本(この実施例では12本)
のチャッキングロッド113が吊設されている。このチ
ャッキングロッド113は、図23,図24に示すよう
に、中空筒状のロッド114内にシリンダ115を介し
て伸縮するシリンダーロッド116が内装され、前記ロ
ッド114の先端には、前記シリンダーロッド114に
より圧縮された際、径方向に膨出してスプールWの内壁
面Waを圧着させる環状ゴム等の圧着部材114aが取
付けられている。The holding plate 112 is inserted into the center holes of a plurality (12 in this embodiment) of spools W arranged in the spool box Wx, and a plurality of spools chucking the spools W (this one). (12 in the example)
The chucking rod 113 is suspended. As shown in FIGS. 23 and 24, the chucking rod 113 has a hollow cylindrical rod 114 in which a cylinder rod 116 that expands and contracts via a cylinder 115 is installed. The tip of the rod 114 has the cylinder rod 116. When compressed by 114, a crimping member 114a such as an annular rubber that bulges in the radial direction and crimps the inner wall surface Wa of the spool W is attached.
【0031】なお、このスプールWのチャッキング機構
としては、本願出願人が既に出願した特願昭61−16
6581号(円筒状物品のチャッキング装置)と同様な
構成のものを使用しているが、フック等で引っ掛ける機
械的な手段を用いることも可能である。また、各チャッ
キングロッド113には、図21〜図23に示すよう
に、スプール箱Wxから取出したスプールWの間隔を同
一ピッチに調整するためのピッチ調整手段116がそれ
ぞれ12個取付けられ、このピッチ調整手段116は、
前記保持プレート112上にベースプレート112aを
介してガイドレール117が敷設され、このガイドレー
ル117上にガイドベース118を介して前記チャッキ
ングロッド113のシリンダ115が取付けられ、ガイ
ドベース118及びチャッキングロッド113は、ピッ
チ調整シリンダ119を介して移動出来るように構成さ
れている。As the chucking mechanism for the spool W, Japanese Patent Application No. 61-16 filed by the applicant of the present application has already been filed.
Although the same structure as No. 6581 (chucking device for cylindrical articles) is used, it is also possible to use mechanical means for hooking with a hook or the like. Further, as shown in FIGS. 21 to 23, each of the chucking rods 113 is provided with 12 pitch adjusting means 116 for adjusting the intervals of the spools W taken out from the spool box Wx to the same pitch. The pitch adjusting means 116
A guide rail 117 is laid on the holding plate 112 via a base plate 112a, and a cylinder 115 of the chucking rod 113 is mounted on the guide rail 117 via a guide base 118, so that the guide base 118 and the chucking rod 113 are attached. Are configured to be movable via a pitch adjusting cylinder 119.
【0032】以上のように、走行フレーム106に吊設
された各チャッキングロッド113は、スプール箱Wx
内に収容されている複数個のスプールWを同時にチャッ
キングしてパワーシリンダ109によりピンの挿入量を
検出するリミットスイッチ等の検出手段120に当接す
る位置まで持ち上げ、更に所定のピッチ間隔に調整する
ものである。As described above, each chucking rod 113 suspended from the traveling frame 106 is attached to the spool box Wx.
A plurality of spools W accommodated therein are chucked at the same time, and the power cylinder 109 raises the spool to a position where it abuts on a detection means 120 such as a limit switch for detecting the pin insertion amount, and further adjusts to a predetermined pitch interval. It is a thing.
【0033】そして、チャッキングロッド113に保持
されたスプールWは、走行フレーム106を介してスプ
ール受渡し工程200側に移送するものである。次に、
スプールWの間に介在された中敷板Wzを移送するため
に移動する走行フレーム107は、図18及び図20に
示すように、昇降シリンダ121が走行フレーム106
の中心に立設され、この昇降シリンダ121のロッド1
22の先端には、ガイドロッド123を介して保持プレ
ート124が水平に取付けられている。The spool W held by the chucking rod 113 is transferred to the spool delivery process 200 side via the traveling frame 106. next,
As shown in FIGS. 18 and 20, in the traveling frame 107 that moves to transfer the insole plate Wz interposed between the spools W, the lifting cylinder 121 has the traveling frame 106.
The rod 1 of this lifting cylinder 121 is erected at the center of
A holding plate 124 is horizontally attached to the tip of 22 via a guide rod 123.
【0034】この保持プレート124には、前記チャッ
キングロッド113により取外されたスプールWの間に
介在された中敷板Wzを吸着保持する複数本(この実施
例では8本)のバキュームパット125がガイドプレー
ト126を介して配設され、前記チャッキングロッド1
13でスプールWを取り去った後の中敷板Wzを吸着保
持して走行フレーム107により中敷板置き場Zに移送
するものである。The holding plate 124 is provided with a plurality of vacuum pads 125 (eight in this embodiment) for sucking and holding the insole plate Wz interposed between the spools W removed by the chucking rod 113. The chucking rod 1 is disposed via the guide plate 126.
The insole plate Wz after removing the spool W at 13 is suction-held and transferred to the insole plate storage space Z by the traveling frame 107.
【0035】前記走行フレーム106,107間には、
各走行フレーム106,107をガイドレール103a
に沿って移動させる複数本のシリンダ128,129が
各々設けられている。なお、歯車機構等の伝動手段を用
いて移動させることも可能である。以上のように、この
スプール移載工程100では、前記位置決めを行った多
段積みのスプール箱WxからスプールWと中敷板Wzと
をそれぞれ分離して取り出すと共に、中敷板Wzは、走
行フレーム107に取付けられたバキュームパッド12
5を介して搬送工程50の側部の中敷板置き場Zまで移
送して積載させ、またスプール箱Wxから取り出したス
プールWは、走行フレーム106に取付けたチャッキン
グロッド113を介して次工程のスプール受渡し工程2
00に移送するものである。Between the traveling frames 106 and 107,
The traveling frames 106 and 107 are connected to the guide rail 103a.
A plurality of cylinders 128 and 129 for moving along the respective cylinders are provided. It should be noted that it is also possible to move by using a transmission means such as a gear mechanism. As described above, in the spool transfer process 100, the spool W and the insole plate Wz are separated and taken out from the positioned multi-tiered spool boxes Wx, and the insole plate Wz is attached to the traveling frame 107. Vacuum pad 12
The spool W transferred to the insole board storage space Z on the side of the transfer process 50 via the loader 5 and loaded, and the spool W taken out from the spool box Wx is transferred to the spool of the next process via the chucking rod 113 attached to the traveling frame 106. Delivery process 2
It is to be transferred to 00.
【0036】次に、前記スプール移載工程100から搬
送されて来たスプールWを保持し、スプールWを90度
旋回させた状態でローディング台車250に受渡すスプ
ール受渡し工程200は、図25〜図27に示すよう
に、前記チャッキングロッド113により水平に保持さ
れて移送されて来たスプールWを水平状態で受けるスプ
ール旋回装置210を備えている。Next, the spool delivery step 200 of holding the spool W conveyed from the spool transfer step 100 and delivering it to the loading carriage 250 in a state in which the spool W is rotated 90 degrees will be described with reference to FIGS. As shown in 27, a spool turning device 210 is provided which receives the spool W horizontally held and transferred by the chucking rod 113 in a horizontal state.
【0037】このスプール旋回装置210は、ベースプ
レート211上に設置された支持フレーム212上に、
旋回中心となる軸受部材213及びシャフト214を介
して旋回保持プレート215の背面中心部が旋回可能に
支持され、前記シャフト214の一端には、プーリ21
6,ベルト217及び駆動プーリ218を介して旋回駆
動モータ219に連結されている。The spool revolving device 210 has a support frame 212 installed on a base plate 211,
The center of the rear surface of the swivel holding plate 215 is rotatably supported via a bearing member 213 serving as a swivel center and a shaft 214, and the pulley 21 is attached to one end of the shaft 214.
6, the belt 217 and the drive pulley 218 are connected to the turning drive motor 219.
【0038】前記旋回保持プレート215は、図26の
状態から約90度時計方向に旋回して垂直状態になるも
ので、旋回保持プレート215の表面には、前記チャッ
キングロッド113で一定のピッチに調整した複数個の
スプールWを保持位置決めする二本一対の位置決めピン
220が複数本(この実施例では24個のスプールWを
保持するための位置決めピン220が計48本)植設さ
れている。The swivel holding plate 215 is swung about 90 degrees clockwise from the state shown in FIG. 26 to a vertical state. The swivel holding plate 215 has a constant pitch on the surface thereof by the chucking rods 113. A plurality of pairs of two positioning pins 220 for holding and positioning the adjusted plurality of spools W (a total of 48 positioning pins 220 for holding 24 spools W in this embodiment) are implanted.
【0039】また、旋回保持プレート215の裏面側に
は、前記位置決めピン220により保持されたスプール
Wを、ローディング台車250の挿入ピン251に押し
出す押出しシリンダ221が立設されている。従って、
前記スプール移載工程100のチャッキングロッド11
3により水平状態で移送されて来た複数個のスプールW
が、水平位置で待機する旋回保持プレート215の表面
に移載されると、図示しない検出手段がこれを検出し
て、旋回駆動モータ219を回転駆動させ、位置決めピ
ン220により保持されたスプールWを、水平状態から
時計方向に90度旋回して停止する。この状態でローデ
ィング台車250が移載位置まで進入して来て、スプー
ルWの移載作業が行われるものである。Further, on the back surface side of the swivel holding plate 215, an extruding cylinder 221 for pushing the spool W held by the positioning pin 220 to the insertion pin 251 of the loading carriage 250 is provided upright. Therefore,
The chucking rod 11 in the spool transfer step 100
A plurality of spools W transferred in a horizontal state by
However, when it is transferred to the surface of the swivel holding plate 215 that stands by in the horizontal position, the detection means (not shown) detects this and drives the swivel drive motor 219 to rotate, and the spool W held by the positioning pin 220 is moved. , Turn 90 degrees clockwise from the horizontal state and stop. In this state, the loading carriage 250 comes to the transfer position and the spool W is transferred.
【0040】前記スプール受渡し工程200のスプール
旋回装置210の側部に進入して来るローディング台車
250は、前記スプール旋回装置210の側部のベース
252に敷設されたガイドレール253上に車輪254
a,254bを介して移動可能に載置され、一方の車輪
254aは、図28〜図31に示すように駆動モータ2
55及びプーリ及びベルト等の伝達機構256及びクラ
ッチ機構257を介して駆動力を伝達したり、非駆動状
態となるように構成され、また他方の車輪254bに
は、所定位置で停止した後にローディング台車250を
固定するためのディスクブレーキ258が取付けられて
いる。The loading carriage 250 coming into the side of the spool revolving device 210 in the spool delivery step 200 has wheels 254 on guide rails 253 laid on the base 252 of the side of the spool revolving device 210.
a and 254b are movably mounted, and one wheel 254a is driven by the drive motor 2 as shown in FIGS.
55, a transmission mechanism 256 such as a pulley and a belt, and a clutch mechanism 257 so as to transmit a driving force or to a non-driving state. Further, the other wheel 254b is stopped at a predetermined position and then the loading carriage is stopped. A disc brake 258 for fixing 250 is attached.
【0041】前記ローディング台車250のベース台2
59上には、前記スプール旋回装置210からスプール
Wが移載される支持フレーム260が垂直に立設され、
この支持フレーム260の表面には、前記挿入ピン25
1が所定の間隔を隔てて複数本(この実施例では24
本)揺動可能に取付けられている。なお、挿入ピン25
1の代わりに2本のバーにより下方からスプールWを支
えるようにしても良く、この場合には挿入ピン251の
ように位置決めや、挿入に際する問題を解消出来るもの
である。Base stand 2 of the loading carriage 250
A support frame 260 on which the spool W is transferred from the spool revolving device 210 is vertically installed on the 59.
The insertion pin 25 is provided on the surface of the support frame 260.
1 is a plurality of pieces at a predetermined interval (24 in this embodiment).
This is attached so that it can swing. In addition, the insertion pin 25
Instead of 1, the spool W may be supported from below by two bars. In this case, it is possible to solve the problem of positioning and inserting like the inserting pin 251.
【0042】前記複数本の挿入ピン251の基端部は、
軸受部材261に回転自在に支持されたシャフト262
を介して固定され、このシャフト262はアーム263
を介して前記支持フレーム260の背部に取付けられた
角度調整シリンダ264に連結され、また、挿入ピン2
51の一部は、ガイドレスシリンダ265に連結されて
いる。The base ends of the plurality of insertion pins 251 are
Shaft 262 rotatably supported by bearing member 261
The shaft 262 is fixed via the arm 263.
Is connected to an angle adjustment cylinder 264 mounted on the back of the support frame 260 via the insertion pin 2
A part of 51 is connected to the guideless cylinder 265.
【0043】また、前記支持フレーム260の表面側に
は、図28,図29及び図32に示すように、前記挿入
ピン251に挿入された複数のスプールWのフランジ部
を支持フレーム260に対して固定するスプール固定手
段266が取付けられている。このスプール固定手段2
66は、ローディング台車250の移動時にスプールW
が挿入ピン251から脱落しないように固定するもの
で、支持フレーム260の背面側に垂直下向きに取付け
られたピンシリンダ267のロッド268の先端に、ピ
ン269を支点として旋回する固定爪270の基端部が
連結されている。Further, on the front surface side of the support frame 260, as shown in FIGS. 28, 29 and 32, the flange portions of the plurality of spools W inserted into the insertion pins 251 are provided with respect to the support frame 260. A spool fixing means 266 for fixing is attached. This spool fixing means 2
66 is a spool W when the loading carriage 250 moves
Is fixed so as not to drop from the insertion pin 251, and the base end of the fixed claw 270 that pivots about the pin 269 as a fulcrum at the tip of the rod 268 of the pin cylinder 267 mounted vertically downward on the back side of the support frame 260. The parts are connected.
【0044】固定爪270の先端はL字状に形成され
て、前記スプールWのフランジ部と係止するようになっ
ており、前記ピンシリンダ267の伸縮作動によりピン
269を支点として旋回し、スプールWを係止したり、
解除するようになっている。また、支持フレーム260
の背面側中央下部には、図33及び図34に示すように
ローディング台車250の位置決めピン装置271が取
付けられ、この位置決めピン装置271は、支持フレー
ム260の背面側中央下部に垂直下向きに位置決めシリ
ンダ272が取付けられ、この位置決めシリンダ272
のロッド273の先端に、ガイドレール253の側面に
設置された係合部274と係合可能な突起275が取付
けられている。The tip of the fixed claw 270 is formed in an L shape so as to engage with the flange portion of the spool W, and the pin cylinder 267 expands and contracts to swivel about the pin 269 as a fulcrum, thereby spooling the spool. Lock W,
It is supposed to be released. In addition, the support frame 260
As shown in FIGS. 33 and 34, a positioning pin device 271 of the loading carriage 250 is attached to the lower central part on the rear side of the positioning cylinder. The positioning pin device 271 is positioned vertically downward on the lower central part of the rear side of the support frame 260. 272 is attached to the positioning cylinder 272.
A projection 275 engageable with an engaging portion 274 installed on the side surface of the guide rail 253 is attached to the tip of the rod 273 of the.
【0045】従って、ローディング台車250がガイド
レール253に沿ってスプール旋回装置210の側部に
所定位置まで進入して来た時に、図示しない検出手段が
検出して前記位置決めシリンダ272を作動させ、ロッ
ド273の先端に設けた突起275をガイドレール25
3の側面に設置された係合部274に係合させることに
より所定位置に位置決めを行うものである。Therefore, when the loading carriage 250 enters the side portion of the spool revolving device 210 along the guide rail 253 to a predetermined position, a detecting means (not shown) detects and activates the positioning cylinder 272 to move the rod. The projection 275 provided at the tip of the 273 is attached to the guide rail 25.
By engaging with the engaging portion 274 installed on the side surface of No. 3, the positioning is performed at a predetermined position.
【0046】次に、ローディング台車250を移載させ
た状態で搬送するトラバース台車280を、図1及び図
35〜図38を参照しながら説明する。トラバース台車
280は、ローディング台車250が走行するガイドレ
ール253と直交する向きに敷設されたガイドレール2
81a上を走行するもので、ベース台282上には、前
記ローディング台車250が走行するガイドレール25
3と同一幅のガイドレール281bが敷設され、またベ
ース台282の下部には、前記ガイドレール281a上
を走行する左右一対の駆動車輪283と従動車輪284
とがそれぞれシャフト285を介して相対向して設置さ
れている。Next, a traverse carriage 280 which conveys the loading carriage 250 in a transferred state will be described with reference to FIGS. 1 and 35 to 38. The traverse trolley 280 is a guide rail 2 laid in a direction orthogonal to the guide rail 253 on which the loading trolley 250 travels.
81a, and the guide rail 25 on which the loading carriage 250 travels is mounted on the base 282.
A guide rail 281b having the same width as that of No. 3 is laid, and a pair of left and right drive wheels 283 and driven wheels 284 running on the guide rail 281a are provided below the base 282.
Are installed opposite to each other via a shaft 285.
【0047】前記駆動車輪283は、ベース台282上
に設置された駆動モータ286に伝達機構287を介し
て接続され、この伝達機構287は、駆動モータ286
の駆動軸288と、前記駆動車輪283のシャフト28
5とに設けたプーリ289及びベルト290を介して連
結され、駆動モータ286の駆動によってトラバース台
車280は自走するようになっている。The drive wheels 283 are connected to a drive motor 286 installed on the base 282 via a transmission mechanism 287, and the transmission mechanism 287 is connected to the drive motor 286.
Drive shaft 288 and the shaft 28 of the drive wheel 283.
5 is connected via a pulley 289 and a belt 290 provided to the traverse carriage 280, and the traverse trolley 280 is self-propelled by the drive motor 286.
【0048】前記トラバース台車280のベース台28
2上の一側部には、トラバース台車280の走行位置決
めを制御する制御盤291が設置され、この制御盤29
1の上端には、L字状のフレーム292を介して前記ロ
ーディング台車250の電源を供給する横行用トロリー
ダクト293が取付けられている。前記トラバース台車
280のベース台282の下部には、トラバース台車2
80の停止センサー294及びオーバーラン用センサー
295が取付けられ、この各センサー294及び295
は、前記ガイドレール281aの近傍の所定位置に設置
したドグ296a,296bを検出して、トラバース台
車280を停止させたり、オーバランしたことを検出す
るものである。The base 28 of the traverse trolley 280
A control panel 291 for controlling the traveling positioning of the traverse carriage 280 is installed on one side of the control panel 29.
A traverse trolley duct 293 for supplying electric power to the loading carriage 250 via an L-shaped frame 292 is attached to the upper end of 1. The traverse carriage 2 is provided below the base 282 of the traverse carriage 280.
Eighty stop sensors 294 and overrun sensors 295 are attached to each of the sensors 294 and 295.
Detects the dogs 296a and 296b installed at a predetermined position near the guide rail 281a to stop the traverse trolley 280 or detect overrun.
【0049】前記トラバース台車280が走行するよう
に敷設されたガイドレール281aの一側部(図1,図
37,図38において右側)には、搬送されて来るロー
ディング台車250から夫々のスプールWをクリールス
タンド300のクリール軸310に掛け渡す台車搬送工
程350が設置され、またトラバース台車280が走行
するように敷設されたガイドレール281aの他側部
(図1,図37及び図38において左側)には、空クリ
ールの回収工程400が設置されている。At one side portion (right side in FIGS. 1, 37 and 38) of the guide rail 281a laid so that the traverse trolley 280 can travel, the spools W from the loading trolley 250 being conveyed are loaded. On the other side portion (left side in FIGS. 1, 37, and 38) of the guide rail 281a, which is provided with the carriage conveying process 350 to be passed around the creel shaft 310 of the creel stand 300, and is laid so that the traverse carriage 280 travels. Has a collection process 400 for empty creel.
【0050】前記ローディング台車250を載置したト
ラバース台車280は、前記停止センサー294及びオ
ーバーラン用センサー295がガイドレール281aの
近傍の所定位置に設置したドグ296a,296bを検
出して所定位置停止すると、次に、台車搬送工程350
に敷設された複数列のガイドレール351上に、前記ス
プールWを搭載したローディング台車250を順次移載
させ、クリールスタンド300のスプール移載位置まで
順次搬送させる。スプールWを搭載した複数のローディ
ング台車250は、台車搬送工程350に敷設されたガ
イドレール351上で順次待機し、クリールスタンド3
00に移載位置にスプールWが進むように構成されてい
る。When the stop sensor 294 and the overrun sensor 295 detect the dogs 296a and 296b installed at a predetermined position near the guide rail 281a, the traverse carriage 280 on which the loading carriage 250 is mounted stops at a predetermined position. Next, the trolley transportation step 350
The loading carriages 250 having the spools W mounted thereon are sequentially mounted on the plurality of rows of guide rails 351 laid on the rails 351 and sequentially transported to the spool transfer position of the creel stand 300. The plurality of loading carriages 250 equipped with the spools W sequentially wait on the guide rails 351 laid in the carriage conveying process 350, and the creel stand 3
The spool W is advanced to the transfer position at 00.
【0051】前記クリールスタンド300は、図39,
図40に示すように、ベースプレート312上に、スタ
ンド311が垂直に立設され、このスタンド311の前
後面には、前記ローディング台車250に搭載されてい
る複数個のスプールWを掛け渡す複数本のクリール軸3
10が所定の角度で上向きで取付けられ、このクリール
軸310には、ブラケット313を介してワイヤーガイ
ドローラ314がそれぞれ取付けられている。The creel stand 300 is shown in FIG.
As shown in FIG. 40, a stand 311 is vertically installed on a base plate 312, and a plurality of spools W mounted on the loading carriage 250 are provided on the front and rear surfaces of the stand 311. Creel shaft 3
10 is attached upward at a predetermined angle, and wire guide rollers 314 are attached to the creel shaft 310 via brackets 313.
【0052】前記クリールスタンド300の前方には、
図1及び図2に示すようにワイヤーガイド装置316が
設置され、このワイヤーガイド装置316を通過した複
数本のワイヤーQは、ベルト等を成形する図示しないカ
レンダー装置に供給されるものである。次に、各スプー
ルWからワイヤーQを巻き出して空となった空クリール
の回収装置について説明する。In front of the creel stand 300,
A wire guide device 316 is installed as shown in FIGS. 1 and 2, and the plurality of wires Q that have passed through the wire guide device 316 are supplied to a calendar device (not shown) that forms a belt or the like. Next, a device for collecting empty creel that is emptied by unwinding the wire Q from each spool W will be described.
【0053】前記クリールスタンド300にスプールW
を掛け渡して空になったローディング台車250は、前
記台車搬送工程350に敷設されたガイドレール351
に沿ってトラバース台車280上に移載させ、更にトラ
バース台車280上から図1及び図41,図42に示す
ように、空クリールの回収工程400側に接続する4本
の渡りレール320上を往復移動する空クリール回収台
車321上に移載される。The spool W is mounted on the creel stand 300.
The loading carriage 250 emptied by passing over the guide rail 351 laid in the carriage conveying step 350.
1 and is transferred onto the traverse trolley 280 along the traverse trolley 280, and as shown in FIG. 1, FIG. 41, and FIG. 42, reciprocates on four crossing rails 320 connected to the collecting process 400 side of the empty creel. It is transferred onto the moving empty creel recovery cart 321.
【0054】前記空クリール回収台車321上には、前
記搬送工程50で空になったスプール箱Wxがガイドロ
ーラ330を介して移動可能に載置されており、空クリ
ール回収台車321をクリールスタンド300に移動
し、作業車で空クリールを取外してスプール箱Wx内に
収容する。前記空クリール回収台車321の底部には、
図42に示すように前記4本の渡りレール320a,3
20b上に載置されて移動する前後8個の車輪322
a,322b,323a,323bが取付けられ、内側
の車輪323a,323bは、渡りレール320bを通
過する時のみ使用され、外側の車輪は323a,323
bは、渡りレール320aが切れるため、クリールスタ
ンド300側のレール351にかかるまで中空にある。A spool box Wx emptied in the carrying step 50 is movably mounted on the empty creel recovery carriage 321 via guide rollers 330, and the empty creel recovery carriage 321 is moved to the creel stand 300. Then, the work vehicle removes the empty creel and stores it in the spool box Wx. At the bottom of the empty creel recovery cart 321,
As shown in FIG. 42, the four transition rails 320a, 320a
Eight front and rear wheels 322 mounted on 20b and moving
a, 322b, 323a, 323b are mounted, the inner wheels 323a, 323b are used only when passing the transition rail 320b, and the outer wheels 323a, 323.
Since the crossover rail 320a is cut, b is hollow until it reaches the rail 351 on the creel stand 300 side.
【0055】また、前記渡りレール320bの下側には
駆動装置が設置され、この駆動装置は、駆動モータ32
5の駆動軸326に駆動ギャ327が固定され、この駆
動ギャ327が渡りレール320bの底面に固定された
ラック328と噛合している。渡りレール320bは、
トラバース台車280がレール位置にない時に動かさ
れ、トラバース台車280及び人の移動用の橋として使
用される。A drive device is installed below the crossover rail 320b, and the drive device includes a drive motor 32.
The drive gear 327 is fixed to the drive shaft 326 of No. 5, and the drive gear 327 is meshed with the rack 328 fixed to the bottom surface of the crossover rail 320b. The crossing rail 320b is
When the traverse carriage 280 is not in the rail position, it is moved and used as a bridge for the movement of the traverse carriage 280 and people.
【0056】前記渡りレール320bは、凹部330に
敷設されたベース部329上に敷設された渡りレール3
20a上に載置され、凹部330のベース部329の深
さは、渡りレール320上に載置された空クリール回収
台車321上に載置される前記空クリールを収容したス
プール箱Wxの底面と面ーとなるように構成されてい
る。The transition rail 320b is the transition rail 3 laid on the base portion 329 laid in the recess 330.
20a and the depth of the base portion 329 of the recess 330 is equal to the bottom surface of the spool box Wx accommodating the empty creel mounted on the empty creel recovery carriage 321 mounted on the transition rail 320. It is configured to be a surface.
【0057】次に、空クリールの回収工程400は、図
1及び図43に示すように、前記位置修正工程20,幅
位置決め工程30,スプール箱Wxの搬送工程50と並
列に二列の搬出用チェーンコンベヤ410a,410b
が敷設され、この搬出用チェーンコンベヤ410a,4
10bの前後における渡りレール320の近傍には、搬
出用チェーンコンベヤ410a,410bを接続する出
没可能なフリーローラコンベヤ420a,420bと、
その両側に接続用チェーンコンベヤ430a,430b
が配設されている。Next, as shown in FIGS. 1 and 43, the empty creel recovery step 400 is carried out in two rows in parallel with the position correction step 20, the width positioning step 30, and the spool box Wx transfer step 50. Chain conveyors 410a, 410b
Is laid down, and the carry-out chain conveyors 410a, 410a, 4
In the vicinity of the transition rail 320 before and after 10b, retractable free roller conveyors 420a and 420b for connecting the carry-out chain conveyors 410a and 410b,
Chain conveyors 430a and 430b for connection on both sides thereof
Is provided.
【0058】前記空クリール回収台車321は、凹部3
30に敷設されたベース部329上に敷設された渡りレ
ール320上に載置され、凹部330のベース部329
の深さは、渡りレール320上に載置された空クリール
回収台車321上に載置される前記空クリール搬送面と
スプール箱Wxの上部開口面とが略面ーとなるように構
成されている。The empty creel recovery cart 321 has a recess 3
The base portion 329 of the recess 330 is placed on the crossover rail 320 laid on the base portion 329 laid on the base plate 30.
Is configured such that the empty creel carrying surface mounted on the empty creel recovery carriage 321 mounted on the crossover rail 320 and the upper opening surface of the spool box Wx are substantially flat. There is.
【0059】次に、空クリールの回収工程400は、図
1及び図67に示すように、前記位置修正工程20,幅
位置決め工程30,スプール箱Wxの搬送工程50と並
列に二列の搬出用チェーンコンベヤ410a,410b
が敷設され、この搬出用チェーンコンベヤ410a,4
10bの前後における渡りレール320の近傍には、搬
出用チェーンコンベヤ410a,410bを接続する出
没可能なフリーローラコンベヤ420a,420bと、
その両側に接続用チェーンコンベヤ430a,430b
が配設されている。Next, as shown in FIGS. 1 and 67, the empty creel recovery step 400 is carried out in two rows in parallel with the position correction step 20, the width positioning step 30, and the spool box Wx transfer step 50. Chain conveyors 410a, 410b
Is laid down, and the carry-out chain conveyors 410a, 410a, 4
In the vicinity of the transition rail 320 before and after 10b, retractable free roller conveyors 420a and 420b for connecting the carry-out chain conveyors 410a and 410b,
Chain conveyors 430a and 430b for connection on both sides thereof
Is provided.
【0060】前記搬送工程50で空になったスプール箱
Wxは、図1及び図43の矢印Xa,Xbに示すよう
に、搬送工程50と接続する駆動ローラコンベヤ410
a→接続用チェーンコンベヤ430a→搬出用駆動ロー
ラコンベヤ410b→駆動チェーンコンベヤ420b→
接続用チェーンコンベヤ430b及び搬出用駆動ローラ
コンベヤ410aにより、空クリール回収台車321か
らの空クリール移載位置Pまで順次移送され、この空ク
リール移載位置Pで待機するスプール箱Wx内に複数の
空クリールが回収されて移載されると、再び搬出用駆動
ローラコンベヤ410a→駆動チェーンコンベヤ420
a→搬出用駆動ローラコンベヤ410bを介してスプー
ル箱Wxの投入位置X側に順次搬出されるものである。The spool box Wx emptied in the carrying step 50 is connected to the driving roller conveyor 410 connected to the carrying step 50 as shown by arrows Xa and Xb in FIGS. 1 and 43.
a → connection chain conveyor 430a → unloading drive roller conveyor 410b → drive chain conveyor 420b →
By the connection chain conveyor 430b and the unloading drive roller conveyor 410a, the empty creel recovery carriage 321 sequentially transfers the empty creel transfer position P to the empty creel transfer position P. When the creel is collected and transferred, the carry-out drive roller conveyor 410a → drive chain conveyor 420 again.
a → Sequentially carried out to the loading position X side of the spool box Wx via the carry-out driving roller conveyor 410b.
【0061】この発明は、上記のように搬送コンベヤ1
0上に投入された複数個のスプールWを収容したスプー
ル箱Wxを、搬送コンベヤ10の搬送方向と平行になる
ようにスプール箱Wxの位置修正を位置修正工程20で
行い、そして、この位置修正を行ったスプール箱Wxの
幅決めを幅位置決め工程30で行った後、スプール箱W
xを搬送工程50により移載位置Yまで搬送する。The present invention, as described above, uses the transport conveyor 1
In the position correcting step 20, the position of the spool box Wx accommodating the plurality of spools W loaded on the 0 is corrected so that the spool box Wx is parallel to the transfer direction of the transfer conveyor 10, and this position correction is performed. After determining the width of the spool box Wx that has been subjected to the width positioning step 30, the spool box Wx
x is transported to the transfer position Y by the transport process 50.
【0062】そして、スプール移載工程100では、前
記移載位置Yで待機するスプール箱WxからスプールW
と中敷板Wzとを分離すると共に、スプール旋回装置2
10に移載させ、スプール旋回受渡し装置200でスプ
ールWを90度旋回させた状態でローディング台車25
0に受渡し、ローディング台車250を移載したトラバ
ース台車280を台車搬送工程350でクリールスタン
ド300の近傍まで搬送して、ローディング台車250
から夫々のスプールをクリールスタンド300のクリー
ル軸310に掛け渡すものである。Then, in the spool transfer step 100, the spool W from the spool box Wx waiting at the transfer position Y to the spool W is transferred.
And the insole plate Wz are separated, and the spool turning device 2
10 and the spool W transfer device 200 rotates the spool W by 90 degrees.
0, and the traverse trolley 280 on which the loading trolley 250 is transferred is transported to the vicinity of the creel stand 300 in the trolley transporting step 350 to load the loading trolley 250.
The respective spools are wound around the creel shaft 310 of the creel stand 300.
【0063】また、クリールスタンド300で空になっ
たクリールは、空クリールの回収工程400を介して回
収し再び使用する。以上のように、この発明ではスプー
ルWの供給と、スプールWをクリールスタンド300に
掛け渡すまでの工程において、それぞれの作業を停止さ
せることなく連続して継続させることで、スプールWの
搬送,移載,掛け渡し作業の作業能率の効率化を図り、
時間の短縮,作業能率を向上させることが出来る。ま
た、空のなったクリールを回収するシステムも対応出来
ることで、次の作業にも結び付けることができ、作業能
率の効率化を図ったものである。The creel emptied at the creel stand 300 is recovered through the empty creel recovery process 400 and is reused. As described above, according to the present invention, in the process of supplying the spool W and the process of hanging the spool W on the creel stand 300, the respective works are continuously continued without being stopped, whereby the spool W is conveyed and transferred. To improve the efficiency of loading and handing work,
Time can be shortened and work efficiency can be improved. In addition, the system that collects the emptied creel can also be supported so that it can be linked to the next work and the work efficiency is improved.
【0064】[0064]
【発明の効果】この発明は、上記のように支持フレーム
上に、旋回駆動装置を介して旋回中心を支点として略9
0°旋回駆動可能な旋回保持プレートを設け、この旋回
保持プレートの表面側に、該旋回保持プレートを垂直に
した時、複数個のスプールの下面側を支持する位置決め
ピンを所定の間隔を隔てて植設し、前記旋回保持プレー
トの裏面側に、旋回保持プレートが水平の時、前記スプ
ール移載工程から搬送されて来るスプールを迎えに行く
ために押さえブロックを水平に上昇させる機構と、旋回
保持プレートを垂直に旋回した時に、位置決めピンによ
り保持された夫々のスプールを次工程に押し出す機構の
上昇兼押出しシリンダを各々設けたので、スプールの搬
送工程中においてスプールの受渡しを確実に行い、スプ
ールを脱落させることによる衝撃音を低減させると共に
機械の損傷も未然に防止でき、更に現在の設備を改造す
ることなく安価に対応させることが出来る効果がある。As described above, according to the present invention, the rotation center is set as a fulcrum on the support frame via the rotation drive device, and the rotation center is set as a fulcrum.
A swivel holding plate capable of swiveling 0 ° is provided, and positioning pins for supporting the lower surface side of a plurality of spools are provided at predetermined intervals on the surface side of the swivel holding plate when the swivel holding plate is vertical. When the swivel holding plate is horizontally installed on the back side of the swivel holding plate, a mechanism for raising the holding block horizontally to pick up the spool conveyed from the spool transfer step, and a swivel holding When the plate is swung vertically, each lifting and pushing cylinder is equipped with a mechanism that pushes out each spool held by the positioning pin to the next process.Therefore, the spool is reliably delivered during the spool transfer process, and the spool is The impact noise caused by falling off can be reduced, the damage to the machine can be prevented, and the cost can be reduced without modifying the existing equipment. There is an effect that can be made to respond.
【0065】また、位置決めピンにより保持されたスプ
ールを保持する旋回保持プレートを垂直に旋回した時
に、位置決めピンにより保持されたスプールを旋回可能
な固定爪により旋回保持プレートの表面側に固定するの
で、これによりスプールを次工程に容易に移載させるこ
とが出来る効果がある。Further, when the swivel holding plate holding the spool held by the positioning pin is swung vertically, the spool held by the positioning pin is fixed to the surface side of the swivel holding plate by the swivelable fixing claw. This has the effect that the spool can be easily transferred to the next step.
【図1】この発明を実施したスプールの搬送移載装置の
工程を示す概略平面図である。FIG. 1 is a schematic plan view showing a process of a spool transfer device according to the present invention.
【図2】図1の側面図である。FIG. 2 is a side view of FIG.
【図3】搬送コンベヤ,位置修正工程及び幅位置決め工
程の構成を示す平面図である。FIG. 3 is a plan view showing a configuration of a transport conveyor, a position correcting process, and a width positioning process.
【図4】図3の正面図である。FIG. 4 is a front view of FIG.
【図5】搬送コンベヤの拡大平面図である。FIG. 5 is an enlarged plan view of a transfer conveyor.
【図6】図5の正面図である。FIG. 6 is a front view of FIG.
【図7】位置修正コンベヤの平面図である。FIG. 7 is a plan view of a position correction conveyor.
【図8】図7の正面図である。8 is a front view of FIG. 7. FIG.
【図9】位置修正コンベヤの昇降装置を示す一部平面図
である。FIG. 9 is a partial plan view showing a lifting device for a position correction conveyor.
【図10】図8の側面図である。FIG. 10 is a side view of FIG.
【図11】幅位置決めコンベヤの正面図である。FIG. 11 is a front view of a width positioning conveyor.
【図12】幅位置決めコンベヤにおける位置決めシリン
ダ及びロックシリンダの拡大正面図である。FIG. 12 is an enlarged front view of a positioning cylinder and a lock cylinder in the width positioning conveyor.
【図13】スプール箱の搬送工程の第1移載コンベヤの
平面図である。FIG. 13 is a plan view of the first transfer conveyor in the spool box transfer process.
【図14】図13の正面図である。FIG. 14 is a front view of FIG.
【図15】中間接続コンベヤの平面図である。FIG. 15 is a plan view of the intermediate connection conveyor.
【図16】スプール移載工程の概略平面図である。FIG. 16 is a schematic plan view of a spool transfer process.
【図17】図16のAーA矢視側面図である。FIG. 17 is a side view taken along the line AA of FIG.
【図18】図16のBーB矢視側面図である。FIG. 18 is a side view taken along the line BB of FIG.
【図19】スプールを搬送する走行フレームの拡大正面
図である。FIG. 19 is an enlarged front view of a traveling frame that conveys a spool.
【図20】スプール及び中敷板Wを移送する走行フレー
ムの一部拡大正面図である。FIG. 20 is a partially enlarged front view of the traveling frame that transfers the spool and the insole plate W.
【図21】スプールを保持するチャッキングロッドの配
置を示す平面図である。FIG. 21 is a plan view showing the arrangement of a chucking rod that holds a spool.
【図22】チャッキングロッドのピッチ調整手段を示す
平面図である。FIG. 22 is a plan view showing a pitch adjusting means of a chucking rod.
【図23】図22の正面図である。FIG. 23 is a front view of FIG. 22.
【図24】チャッキングロッドの構成を示す拡大正面図
である。FIG. 24 is an enlarged front view showing the structure of the chucking rod.
【図25】スプール受渡し工程のスプール旋回装置の平
面図である。FIG. 25 is a plan view of the spool turning device in the spool delivery process.
【図26】スプール受渡し工程のスプール旋回装置の正
面図である。FIG. 26 is a front view of the spool turning device in the spool delivery process.
【図27】スプール旋回装置とローディング台車との関
係を示す正面図である。FIG. 27 is a front view showing the relationship between the spool turning device and the loading carriage.
【図28】ローディング台車の平面図である。FIG. 28 is a plan view of the loading carriage.
【図29】ローディング台車の正面図である。FIG. 29 is a front view of the loading cart.
【図30】ローディング台車の側面図である。FIG. 30 is a side view of the loading cart.
【図31】ローディング台車の駆動部の拡大正面図であ
る。FIG. 31 is an enlarged front view of the drive unit of the loading cart.
【図32】ローディング台車のスプール固定爪の拡大正
面図である。FIG. 32 is an enlarged front view of the spool fixing claw of the loading cart.
【図33】ローディング台車の位置決めピン装置の正面
図である。FIG. 33 is a front view of the positioning pin device of the loading cart.
【図34】ローディング台車の位置決めピン装置の側面
図である。FIG. 34 is a side view of the positioning pin device of the loading cart.
【図35】トラバース台車の正面図である。FIG. 35 is a front view of the traverse carriage.
【図36】トラバース台車の左側面図である。FIG. 36 is a left side view of the traverse carriage.
【図37】トラバース台車及びローディング台車の台車
搬送工程の平面図である。FIG. 37 is a plan view of a carriage transporting process of the traverse carriage and the loading carriage.
【図38】図60の正面図である。38 is a front view of FIG. 60. FIG.
【図39】クリールスタンドの側面図である。FIG. 39 is a side view of the creel stand.
【図40】クリールスタンドの正面図である。FIG. 40 is a front view of the creel stand.
【図41】空クリール回収工程の渡りレールの正面図で
ある。FIG. 41 is a front view of the crossover rail in the empty creel collecting step.
【図42】空クリール回収台車の一部拡大正面図であ
る。FIG. 42 is a partially enlarged front view of the empty creel recovery cart.
【図43】空クリール回収工程の平面図である。FIG. 43 is a plan view of an empty creel collecting step.
10 搬送コンベヤ 20 位置修正
工程 21 斜め修正コンベヤ 30 幅位置決
め工程 31 幅位置決めコンベヤ 50 搬送工程 100 スプール移載工程 200 スプー
ル受渡し工程 210 スプール旋回装置 215 旋回保
持プレート 220 位置決めピン 221 上昇兼
押出しシリンダ 250 ローディング台車 280 トラバース台車 300 クリー
ルスタンド 310 クリール軸 321 クリー
ル回収台車 350 台車搬送工程 400 空クリ
ールの回収工程 W スプール Wx スプール箱 Wz 中敷板 X スプール箱の投入位置 Y 移載位置 Z 中敷板置き場10 Conveyor Conveyor 20 Position Correcting Step 21 Oblique Correcting Conveyor 30 Width Positioning Step 31 Width Positioning Conveyor 50 Conveying Step 100 Spool Transfer Step 200 Spool Handing Step 210 Spool Revolving Device 215 Revolving Holding Plate 220 Positioning Pin 221 Lifting / Extruding Cylinder 250 Loading Cart 280 Traverse bogie 300 Creel stand 310 Creel shaft 321 Creel collecting cart 350 Carrying process 400 Carrying process of empty creel W Spool Wx Spool box Wz Insole board X Spool box loading position Y Transfer position Z Insole board storage space
───────────────────────────────────────────────────── フロントページの続き (72)発明者 町島 健二 東京都中央区日本橋室町2−3−14 古河 ビル 東京製綱株式会社内 (72)発明者 堤 久夫 東京都中央区日本橋室町2−3−14 古河 ビル 東京製綱株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Kenji Machishima 2-3-14 Nihonbashi Muromachi, Chuo-ku, Tokyo Furukawa Building, Tokyo Steel Co., Ltd. (72) Hisao Tsutsumi 2-3-3 Nihombashi Muromachi, Chuo-ku, Tokyo −14 Inside Furukawa Building Tokyo Steel Co., Ltd.
Claims (1)
て旋回中心を支点として略90°旋回駆動可能な旋回保
持プレートを設け、この旋回保持プレートの表面側に、
該旋回保持プレートを垂直にした時、複数個のスプール
の下面側を支持する位置決めピンを所定の間隔を隔てて
植設し、前記旋回保持プレートの裏面側に、旋回保持プ
レートが水平の時、前記スプール移載工程から搬送され
て来るスプールを迎えに行くために押さえブロックを水
平に上昇させる機構と、旋回保持プレートを垂直に旋回
した時に、位置決めピンにより保持された夫々のスプー
ルを次工程に押し出す機構の上昇兼押出しシリンダを各
々設けたことを特徴とするスプール搬送移載装置におけ
るスプールの旋回受渡し装置。1. A swivel holding plate capable of swiveling about 90 ° about a swivel center as a fulcrum via a swivel driving device is provided on a support frame, and a front surface side of the swivel holding plate is provided.
When the swivel holding plate is vertical, positioning pins for supporting the lower surface side of the plurality of spools are planted at predetermined intervals, and when the swivel holding plate is horizontal on the back surface side of the swivel holding plate, A mechanism for horizontally raising the pressing block to pick up the spool conveyed from the spool transfer step, and each spool held by the positioning pin when the swivel holding plate is vertically swung to the next step. A spool swiveling and delivering device in a spool transporting and transferring device, characterized in that a lifting and extruding cylinder of a pushing mechanism is provided respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33600693A JP3401069B2 (en) | 1993-12-28 | 1993-12-28 | Spool swivel transfer device in spool transfer / transfer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP33600693A JP3401069B2 (en) | 1993-12-28 | 1993-12-28 | Spool swivel transfer device in spool transfer / transfer device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07187511A true JPH07187511A (en) | 1995-07-25 |
JP3401069B2 JP3401069B2 (en) | 2003-04-28 |
Family
ID=18294724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP33600693A Expired - Lifetime JP3401069B2 (en) | 1993-12-28 | 1993-12-28 | Spool swivel transfer device in spool transfer / transfer device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3401069B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013136434A (en) * | 2011-12-28 | 2013-07-11 | Jfe Steel Corp | Transfer device and transfer method |
CN105905683A (en) * | 2016-06-24 | 2016-08-31 | 浙江斐尔德智能设备有限公司 | Truck loading equipment for spinning cakes |
CN107364703A (en) * | 2017-07-28 | 2017-11-21 | 广东恒鑫智能装备股份有限公司 | A kind of transfer tipping arrangement |
CN108190647A (en) * | 2018-02-09 | 2018-06-22 | 云南昆船电子设备有限公司 | A kind of automatic discharging yarn machine of high efficient and reliable |
-
1993
- 1993-12-28 JP JP33600693A patent/JP3401069B2/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013136434A (en) * | 2011-12-28 | 2013-07-11 | Jfe Steel Corp | Transfer device and transfer method |
CN105905683A (en) * | 2016-06-24 | 2016-08-31 | 浙江斐尔德智能设备有限公司 | Truck loading equipment for spinning cakes |
CN107364703A (en) * | 2017-07-28 | 2017-11-21 | 广东恒鑫智能装备股份有限公司 | A kind of transfer tipping arrangement |
CN108190647A (en) * | 2018-02-09 | 2018-06-22 | 云南昆船电子设备有限公司 | A kind of automatic discharging yarn machine of high efficient and reliable |
CN108190647B (en) * | 2018-02-09 | 2023-06-02 | 云南昆船电子设备有限公司 | Efficient and reliable automatic yarn unloading machine |
Also Published As
Publication number | Publication date |
---|---|
JP3401069B2 (en) | 2003-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20100239403A1 (en) | Methods and apparatuses for loading and unloading by pallet truck | |
US8474223B2 (en) | Apparatus for loading and unloading by pallet truck a wrapping surface | |
JP2844300B2 (en) | Spool transport / transfer method and apparatus | |
CN212355692U (en) | Vertical glass carrying mechanism and glass carrying device | |
JPH07187511A (en) | Spool turning/delivering device in spool carry/transfer device | |
JPH1045257A (en) | Cargo handling device | |
JP3531959B2 (en) | Method and apparatus for sorting and transferring spools and insoles | |
JP3401071B2 (en) | Empty creel recovery method and apparatus | |
JPH07187360A (en) | Spool positioning method in carrier conveyor and device therefor | |
JP2000302248A (en) | Long object loading device and method | |
CN212173796U (en) | Glass clamping device and glass carrying device | |
JPH07187399A (en) | Spool box supply method in spool carrying process and device thereof | |
US5306111A (en) | Apparatus for withdrawing reels from a packing case | |
JP3285652B2 (en) | Method and apparatus for supplying rim to tire uniformity machine | |
JP4322036B2 (en) | Tire inspection method and apparatus | |
JP4241990B2 (en) | Workpiece loading / unloading device in plate material processing machine | |
CN110775633A (en) | Glass clamping device | |
JPH10310202A (en) | Conveyor for circular member | |
JP3807147B2 (en) | Transport equipment | |
JP4352438B2 (en) | Flat plate stock equipment | |
JP2889818B2 (en) | Bead automatic loading device | |
JP3391641B2 (en) | Seedling box collection machine | |
JPH08108976A (en) | Spool transferring method of loading carriage and device therefor | |
JP3285756B2 (en) | Seedling box collection machine | |
JP4400963B2 (en) | Storage and supply method and storage and supply equipment for unvulcanized tires |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 5 Free format text: PAYMENT UNTIL: 20080221 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090221 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090221 Year of fee payment: 6 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 6 Free format text: PAYMENT UNTIL: 20090221 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 7 Free format text: PAYMENT UNTIL: 20100221 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100221 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 8 Free format text: PAYMENT UNTIL: 20110221 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20120221 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120221 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 10 Free format text: PAYMENT UNTIL: 20130221 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20140221 |
|
EXPY | Cancellation because of completion of term |